SECTION 8 - RACKING (BRACING) AND SHEAR FORCES WEEK 13. 8.1 GENERAL. Permanent bracing shall be provided to enable the roof, wall and floor framework to resist horizontal forces applied to the building (racking forces). - PowerPoint PPT Presentation
Citation preview
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
1
SECTION 8 -
RACKING (BRACING)AND SHEAR FORCES
WEEK 13
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
2
8.1 GENERAL
Permanent bracing shall be provided to enable the roof, wall and floor framework to resist horizontal forces applied to the building (racking forces).
Appropriate connection shall also be provided to transfer these forces through the framework and subfloor structure to the building’s foundation.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
3
8.1 GENERAL
Where required, bracing within the building, which normally occurs in vertical planes, shall be constructed into walls or subfloor supports and distributed evenly throughout.
Where buildings are more than one storey in height, wall bracing shall be designed for each storey.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
4
G a b l e e n d b r a c i n g
C r o s s o r s h e e tb r a c i n g
C r o s s o r s h e e tb r a c i n g
W i n d
S u b f l o o r c r o s s - b r a c i n g ,c a n t i l e v e r e d s t u m p s o rb r a c i n g w a l l
FIGURE 8.1 VARIOUS BRACING SYSTEMS
CONNECTING HORIZONTAL DIAPHRAGMS
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
5
NOTES to Figure 8.1
1. The wind force on unclad frames may be equal to or greater than those on a completed clad or veneered house.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
6
NOTES to Figure 8.12.Horizontal wind (racking)
forces are applied to external surfaces that are supported by horizontal or near horizontal diaphragms. Diaphragms include roofs, ceilings and floor surfaces including their associated framing.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
7
NOTES to Figure 8.13.Each horizontal diaphragm
transfers racking forces to lower level diaphragms by connections and bracing. This continues down to the subfloor supports or concrete slab on the ground, where the forces are then resisted by the foundations.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
8
Wind produces horizontal loads on buildings that must be transmitted through the structure to the foundation.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
9
• In a conventionally constructed house these loads are transmitted to the ground by a complex interaction between the walls, ceiling/roof structure and floor structure.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
10
• The ceiling and floor form large horizontal diaphragms and normally play an important part in this action as most walls rely on support from this ceiling or floor diaphragm to prevent them blowing over.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
11
The wind forces are transmitted to the ceiling diaphragm from the walls and also the roof. They are then transferred through the ceiling diaphragm to the bracing walls that transmit them to the floor structure, foundations and then into the ground.
Without ceiling diaphragm
With ceiling diaphragm
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
12
Wind forces on the roof are carried to the ceiling sheeting (ceiling diaphragm) via the roof & ceiling framing
Wind forces on the are carried to the ceiling
sheeting (ceiling diaphragm) via the wall & ceiling framing
top half of th is wall
Ceiling diaphragm
Wind forces transfered to the ' are carried down to the slab and the ground via bracing walls.
ceiling diaphragm'BraceWind forces on the bottom half of
th is wall are carried direct to the ground slab & footings.
via the wall fram ing,
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
13
Wind forces on the roof are carried to the ceiling sheeting (ceiling diaphragm) via the roof & ceiling fram ing
Wind forces on the bottom half of th is wall are carried to the flooring (floor diaphragm) via the wall & floor framing
Wind forces on the top half of th is wall are carried to the flooring (floor diaphragm) via the wall & floor fram ing
Wind forces on the bottom half of th is wall are carried direct to the ground slab & footings.
via the wall fram ing,
Wind forces on the are carried to the ceiling
sheeting (ceiling diaphragm) via the wall & ceiling framing
top half of th is wall
Ceiling diaphragm
Floor diaphragm
Wind forces transfered to the ' are carried down to the ';f
via bracing
ceiling diaphragm'loor
diaphragm '
Wind forces transfered to the 'floor are carried down to
via bracing walls.
diaphragm '
the slab/footings & ground
Brace
Brace
Brace
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
14
8.2 TEMPORARY BRACING
Temporary bracing shall be equivalent to at least 60% of permanent bracing required. Temporary bracing may form part of the installed permanent bracing.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
15
8.3.1 General Bracing shall be designed and provided for each storey of the house and for the subfloor, where required, in accordance with the following procedure:
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
16
• Determine the wind classification
• Determine the wind pressure
• Determine area of elevation
• Calculate racking force
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
17
NOTE: To calculate the number of braces required for wall bracing, the required racking force (kN) is divided by the capacity of each brace.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
18
The total capacity of each brace is equal to the length of the brace multiplied by its unit capacity (kN/m) as given in Table 8.18 (pg 141).
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
19
For example:
a diagonal brace Type (c)
(as per Table 8.18) has a total capacity of 1.5 kN/m
Multiplied x length of bracing wall
= 1.5kN/m x 2.4m = 3.6 kN
for a 2.4 m long section of braced wall.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
20
8.3.1 General
(f) Check even distribution and spacing
(g) Check connection of bracing to roof/ceilings and floors
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
21
8.3.2 Wind pressure on the building
Wind pressures on the surfaces of the building depend on the wind classification, width of building and roof pitch. Tables 8.1 to 8.5 give pressures depending on these variables.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
22
When wind flows over a building it applies different pressures (forces) on a flat vertical wall to that on the sloping roof surface.
* These values are indicative only and will vary with roof pitch, building height to depth ratio etc.
Pressure on roof- 0.77 kPa*
Pressure on wall- 1.10 kPa*
The tables need to know the ratio between how much roof area the wind ‘sees’ as opposed to how much wall area the wind ‘sees’. The building width and roof pitch will establish this ratio.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
23
8.3.2 Wind pressure on the building
Pressures are given for single storey and upper storey of two storeys for both long wind at 90O to the ridge and short wind parallel to the ridge sides of the building, and lower storey of two storeys or subfloor for both long wind at 90O to the ridge and short wind parallel to the ridge sides of the building.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
24
8.3.3 Area of elevation
The wind direction used shall be that resulting in the greatest load for the length and width of the building, respectively.
As wind can blow from any direction, the elevation used shall be that for the worst direction.
For example ...........
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
25
8.3.3 Area of elevation In the case of a single-storey house having a gable at one end and a hip at the other, the gable end facing the wind will result in a greater amount of load at right angles to the width of the house than the hip end facing the wind.
vertical wall
Sloping roof surface All vertical
surface this is the worst wind direction
+
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
26
For example, the relatively simple building shape shown in Figure 8.2(A) must be broken into two parts (shapes) in Wind Direction 2 because gable ends are calculated using a different table. After calculating the separate bracing requirements for each part the bracing elements used must also be distributed accordingly.
W IND DIRECTION 2
h
Area of e levation
W IND DIRECTION 2
h
Area of e levationArea of elevationGable End
W IND DIRECTION 2
GableEnd
Hip End
W IND DIRECTION 1
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
27
As indicated by Figures 8.2 (A) and Note 1, the area of an elevation includes only the top half of the wall.Note: 1 - h = half the height of the wall (half of the floor to ceiling height).
Ceiling diaphragm
Floor Slab
This is the area used to calculate single or upper storey bracing
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
28
This is the area used to calculate lower storey bracing
Ceiling diaphragm
Floor diaphragm
As indicated by Figures 8.2 (B) and Note 1, the area of an elevation For lower storey of two storey section h = half the height of the lower storey (i.e. lower storey floor to lower storey ceiling)
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
29
Note 3 of Figures 8.2 (A, B & C) pg 113 statesThe area of elevation of the triangular portion of eaves overhang up to 1000 mm wide may be ignored in the determination of area of elevation.
Area of Elevation
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
30
Include the area of enclosed verandah in the total area. Also include any roof area over an open verandah
Building with open and enclosed verandahs, with main roof pitched from verandah beams.
Width Width
Width
Building with open and enclosed verandahs, with main roof pitched separately from verandahs.
Calculate area of enclosed verandah separately using its width and pitch and distribute bracing accordingly.
Do not include areas of open verandahs
Open Verandah
Open Verandah
Enclosed Verandah
Enclosed Verandah
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
31
8.3.4 Racking force (pg 116)
The total racking force, in kN, shall be calculated as follows:
Projected area of elevation (m2)
Lateral wind pressure (kPa)
Total racking force
x
=
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
32
TABLE 8.1 (pg 116)
•Gable ends and flat, vertical surfaces only
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
33
T A B L E 8 . 1
P R E S S U R E ( k P a ) O N P R O J E C T E D A R E A — S I N G L E S T O R E Y , U P P E R O F T W OS T O R E Y , L O W E R S T O R E Y O R S U B F L O O R O F S I N G L E O R T W O S T O R E Y —
A L L V E R T I C A L S U R F A C E E L E V A T I O N S ( G A B L E E N D S , S K I L L I O N E N D S A N DF L A T W A L L S U R F A C E S )
W in d d i re c t io n W ind d ire c t ion
W ind d ire c t ion W ind d ire c t ion
W ind d ire c t ion
W ind d ire c t ion
W i n d c l a s s i f i c a t i o n P r e s s u r e ( k P a )
N 1 0 . 6 7
N 2 0 . 9 2
N 3 1 . 4
N 4 2 . 1
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
34
Table 8.2 is used for determining the pressure on single or upper storey elevations where the wind direction is at 90O to the ridge and for wind speeds N1, N2, N3 & N4.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
35
N2
continued
N2
0 5 10 15 20 25 30 35
4.0 0.84 0.74 0.67 0.61 0.61 0.72 0.77 0.76
5.0 0.84 0.71 0.64 0.57 0.58 0.69 0.75 0.74
6.0 0.84 0.69 0.61 0.55 0.59 0.70 0.74 0.74
7.0 0.84 0.67 0.58 0.53 0.59 0.70 0.73 0.74
8.0 0.84 0.65 0.56 0.51 0.60 0.71 0.72 0.75
9.0 0.84 0.64 0.54 0.49 0.61 0.71 0.71 0.75
10.0 0.84 0.62 0.52 0.48 0.61 0.72 0.70 0.75
11.0 0.84 0.60 0.50 0.48 0.62 0.72 0.71 0.75
12.0 0.84 0.59 0.47 0.49 0.63 0.72 0.71 0.76
13.0 0.84 0.57 0.45 0.49 0.63 0.73 0.71 0.77
14.0 0.84 0.56 0.43 0.50 0.64 0.73 0.72 0.77
15.0 0.84 0.55 0.42 0.50 0.65 0.73 0.72 0.77
16.0 0.84 0.53 0.40 0.51 0.65 0.73 0.72 0.78
T A B L E 8 . 2
P R E S S U R E ( k P a ) O N P R O J E C T E D A R E A — S I N G L E S T O R E Y O R U P P E R O FT W O S T O R E Y — L O N G L E N G T H O F B U I L D I N G — H I P O R G A B L E E N D S
N O T E : S ee F ig u re 1 .1 fo r gu idan ce on d e te rm in ing .W
W
WW ind d ire c t ion
W ind d ire c t ion
WIND 90O TO RIDGE
A3
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
36
Table 8.3 is used for determining the pressure on lower storey elevations where the wind direction is at 90O to a ridge and for wind speeds N1, N2, N3 & N4.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
37
N2
continued
N2
0 5 10 15 20 25 30 35
4.0 0.84 0.74 0.67 0.61 0.61 0.72 0.77 0.76
5.0 0.84 0.71 0.64 0.57 0.58 0.69 0.75 0.74
6.0 0.84 0.69 0.61 0.55 0.59 0.70 0.74 0.74
7.0 0.84 0.67 0.58 0.53 0.59 0.70 0.73 0.74
8.0 0.84 0.65 0.56 0.51 0.60 0.71 0.72 0.75
9.0 0.84 0.64 0.54 0.49 0.61 0.71 0.71 0.75
10.0 0.84 0.62 0.52 0.48 0.61 0.72 0.70 0.75
11.0 0.84 0.60 0.50 0.48 0.62 0.72 0.71 0.75
12.0 0.84 0.59 0.47 0.49 0.63 0.72 0.71 0.76
13.0 0.84 0.57 0.45 0.49 0.63 0.73 0.71 0.77
14.0 0.84 0.56 0.43 0.50 0.64 0.73 0.72 0.77
15.0 0.84 0.55 0.42 0.50 0.65 0.73 0.72 0.77
16.0 0.84 0.53 0.40 0.51 0.65 0.73 0.72 0.78
N O T E : S ee F igu re 1 .1 fo r g u id an ce on de te rm in ing .W
W ind d ire c t ionW ind d ire c t ion
W W
TABLE 8.3PRESSURE (kPa) ON PROJECTED AREA—LOWER STOREY OR SUBFLOOR OF SINGLE OR
TWO STOREY—LONG LENGTH OF BUILDING—HIP OR GABLE ENDS WIND 90O TO RIDGE
A3
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
38
Table 8.4 is used for determining the pressure on single or upper storey elevations where the wind direction is parallel to a ridge and for wind speeds N1, N2, N3 & N4.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
39
N2N2
0 5 10 15 20 25 30 35
4.0 0.92 0.86 0.81 0.77 0.76 0.79 0.82 0.81
5.0 0.92 0.84 0.79 0.74 0.73 0.77 0.81 0.79
6.0 0.92 0.83 0.77 0.72 0.73 0.77 0.79 0.79
7.0 0.92 0.82 0.75 0.70 0.73 0.77 0.78 0.79
8.0 0.92 0.80 0.73 0.68 0.72 0.77 0.77 0.79
9.0 0.92 0.79 0.71 0.66 0.72 0.77 0.76 0.79
10.0 0.92 0.78 0.69 0.65 0.72 0.77 0.75 0.78
11.0 0.92 0.77 0.68 0.64 0.72 0.77 0.75 0.79
12.0 0.92 0.76 0.66 0.64 0.72 0.77 0.75 0.79
13.0 0.92 0.75 0.64 0.64 0.73 0.77 0.75 0.79
14.0 0.92 0.73 0.62 0.64 0.73 0.77 0.76 0.79
15.0 0.92 0.72 0.60 0.64 0.73 0.77 0.76 0.80
16.0 0.92 0.71 0.59 0.64 0.73 0.77 0.76 0.80
T A B L E 8 .4
P R E S S U R E ( k P a ) O N P R O J E C T E D A R E A — S I N G L E S T O R E Y O R U P P E R O FT W O - S T O R E Y — S H O R T E N D O F B U I L D I N G — H I P E N D S
W in d d i re c t io n W in d d ire c t io n
N O T E : S ee F ig u re 1 .1 fo r g u idan ce on de te rm in ing .W
WIND PARALLEL TO RIDGE
A3
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
40
Table 8.5 is used for determining the pressure on lower storey elevations where the wind direction is parallel to a ridge and for wind speeds N1, N2, N3 & N4.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
41
N2 N2
0 5 10 15 20 25 30 35
4.0 0.92 0.90 0.89 0.87 0.86 0.87 0.88 0.87
5.0 0.92 0.90 0.88 0.85 0.85 0.86 0.87 0.87
6.0 0.92 0.89 0.87 0.84 0.85 0.86 0.87 0.86
7.0 0.92 0.89 0.86 0.84 0.84 0.86 0.86 0.86
8.0 0.92 0.88 0.85 0.83 0.84 0.85 0.85 0.86
9.0 0.92 0.88 0.84 0.82 0.84 0.85 0.84 0.85
10.0 0.92 0.87 0.84 0.81 0.83 0.85 0.84 0.85
11.0 0.92 0.87 0.83 0.80 0.83 0.85 0.84 0.85
12.0 0.92 0.86 0.82 0.80 0.83 0.85 0.83 0.85
13.0 0.92 0.86 0.81 0.80 0.83 0.84 0.83 0.85
14.0 0.92 0.85 0.80 0.80 0.83 0.84 0.83 0.85
15.0 0.92 0.85 0.79 0.79 0.83 0.84 0.83 0.85
16.0 0.92 085 0.78 0.79 0.83 0.84 0.83 0.85
TABLE 8.5
PRESSURE (kPa) O N PROJECTED AREA— LOW ER STOREY OR SUBFLOOR OFSINGLE OR TW O STO REY— SHORT END OF BUILDING— H IP ENDS
W in d d i re c t io n
N O T E : S ee F ig u re 1 .1 fo r g u id an c e o n d e te rm in in g .W
WIND PARALLEL TO RIDGE
A3
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
42
8.3.6.2 Nominal wall bracing (pg 140)
Nominal wall bracing is wall framing lined with sheet materials such as plywood, plasterboard, fibre cement or hardboard, or the like, with the wall frames nominally fixed to the floor and the roof or ceiling frame. (table 9.4 pg 167)
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
43
The most common nominal bracing material used in houses is plasterboard wall linings.
Plasterboard, fixed to the wall frame appropriately (to manufacturers specification) is given ‘structural bracing’ status with a reasonable strength rating.
Fixed to the wall frame with nominal fixings, however, its bracing strength is much lower.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
44
The maximum amount that can be resisted by nominal wall bracing is 50% of the total racking forces determined from Clause 8.3.4 . Nominal wall bracing shall be evenly distributed throughout the building. If this is not the case, the contribution of nominal bracing shall be ignored.
The minimum length of nominal bracing walls shall be 450 mm.
8.3.6.2 Nominal wall bracing
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
45
The minimum length of nominal bracing walls shall be 450 mm.
The bracing capacity of nominal bracing is scheduled in Table 8.17.
8.3.6.2 Nominal wall bracing
TABLE 8.17
NOMINAL SHEET BRACING WALLS
Method Bracing capacity (kN/m)
Sheeted one side only 0.45 kN/m
Sheeted two sides 0.75 kN/m
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
46
Where sheet wall lining is placed over the top of a structural brace, the value of the sheet wall lining can not be given its nominal value for the section that overlaps the structural brace.
Th is section o f w all shee ting is counted as nom inal b racing .M in im um length 450m m .
S tructural brace
The section of w all shee ting that overlapsthe S tructu ra l b race m ust not be coun tedas nom ina l b racing .
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
47
See TABLE 8.18 pg 141
For sheet-braced walls, the sheeting shall be continuous from the top plate to the bottom plate
Unless otherwise specified, sheet-
bracing walls shall be a minimum of 900 mm wide to satisfy the requirements of their nominated ratings.
8.3.6.3 Structural wall bracing
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
48
A2
A4
T A B L E 8 .1 8
S T R U C T U R A L W A L L B R A C I N G( M A X I M U M W A L L H E I G H T = 2 .7 m )
T y p e o f b r a c in g
B r a c in g
c a p a c i ty
( k N / m )
( a ) T w o d ia g o n a l l y o p p o s e d t i m b e r o r m e ta l a n g l e b r a c e s
4 5 x 1 9 m m o r 7 0 x 1 9 m m h a rd w o o dt im b e r b r a c e f i x e d to e a c h s tu d a n d p l a te w i th 1 /5 0 x 2 .8 m m g a lv. f la t h e a d n a i l
1 8 0 0 m m m in . t o2 7 0 0 m m m a x .
F i x b o t t o m p la t e t o f lo o r f r a m e o r
s la b w i t h n o m in a l f i x in g o n ly
( s e e Ta b le 9 .4 )
3 0 t o
6 0
G a l v. m e t a l a n g le (1 8 x 1 6 x 1 .2 m m )b r a c e f i x e d t o s t u d s w i th o n e 3 0 x 2 .8 m m n a i l a n d t o p la t e s w i t h 2 / 3 0 x 2 . 8 m m g a lv. f la t h e a d n a i l s
N O T E : A l l f la t h e a d n a i ls s h a l l b e g a lv a n iz e d o r e q u iv a l e n t .
0 .8
A 3
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
49
TABLE 8.18 (continued)
A3
A4
) Metal straps — Tensioned
Te n s io n e d g a lv a n iz e d m e t a l s t r a p w i th m i n . t h ic k n e s s o f 0 .8 m m a n d m i n . n e t s e c t io n a l a r e a o f 1 5 . 2 m m , f i x e d to s tu d s w i th o n e 3 0 x 2 .8 m m g a lv a n i z e d f la t h e a d n a i l
a n d t o p l a te s w i th 3 /3 0 x 2 .8 m m g a lv a n i z e d f la t h e a d n a i l s
2
( o r e q u iv a le n t )
( o r e q u iv a le n t )
1 8 0 0 m m m in . t o2 7 0 0 m m m a x .
3 0t o6 0
F ix b o t t o m p la t e t o f lo o r f r a m e o r s la b w i t h n o m in a l f i x in g o n ly ( s e e Ta b l e 9 . 4 )
1.5
Type of bracing
Bracing
capacity
(kN/m)
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
50
Type of bracing
Bracing
capacity
(kN/m)
) Timber and metal angle braces The maximum depth of a notch or saw-cut shall not exceed 20 mm.Saw-cuts studs shall be designed as notched.
3 0 x 0 .8 m m g a lv . s t r a p 3 / 3 0 x 2 . 8 m m g a lv . f l a th e a dn a i l s ( o r e q u iv a l e n t )t o e a c h e n d to s tu d
3 0 x 0 .8 m m g a lv . s t r a p 3 / 3 0 x 2 . 8 m m g a lv . f l a th e a dn a i l s ( o r e q u iv a l e n t )t o e a c h e n d to s tu d
3 0 x 0 .8 m m g a lv. s t ra p 3 / 3 0 x 2 . 8 m m
n a i l s t o e a c h e n d to s tu d g a lv . f l a th e a d
( o r e q u iv a le n t )
F i x b o t t o m p la t e t o f lo o r f r a m e o r s la b w i t h n o m in a l f i x i n g o n ly ( s e e Ta b le 9 .4 )
1.5A3
A4
TABLE 8.18 (continued)
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
51
(d) Double diagonal tension or m etal strap bra ces
3 0 x 0 .8 m m ( o r e q u iv a le n t ) t e n s i o n e d g a l v. m e t a l s t r a p s n a i l e d t o p l a te s w i t h 4 / 3 0 x 2 . 8 m m g a lv. f la t h e a d n a i l st o e a c h e n d
( o r e q u i v a le n t )
3 0 x 0 .8 m m g a lv. m e ta l s t ra p lo o p e d o v e r p la t e a n d f i x e d t o s tu d w i th 4 /3 0 x 2 .8 m m g a lv . f l a th e a d n a i l s ( o r e q u iv a l e n t ) t o e a c h e n d .A l te r n a t i v e ly, p r o v id e s in g les t r a p s t o b o t h s i d e s , w i t h 4 n a i l s p e r s t r a p e n d , o r e q u iv a l e n t a n c h o rs o r o t h e r fa s t e n e rs
3 0 to6 0
1 8 0 0 m m m in . t o2 7 0 0 m m m a x .
F o r f i x in g o f b o t t o m p la t e t o f lo o r f r a m e o r s la b , r e f e r to C la u s e 8 .3 . 6 .1 0
3 .0
TAB LE 8.18 (con tinued )
TABLE 8.18 (continued)
Type of bracing
Bracing
capacity
(kN/m)
A3
A4
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
52
( e ) D i a g o n a l t i m b e r w a l l l i n i n g o r c l a d d i n g M i n i m u m t h i c k n e s s o f b o a r d — 1 2 m m f ix e d w i t h2 / 2 0 5 0 m m l o n g T - h e a d n a i l s .I n t e r m e d i a t e c r o s s i n g s o f b o a r d s a n d s t u d s s h a l l b e f ix e d w i t h o n e n a i l .
2 1 0 0 m m m in .
F o r f i x in g o f b o t t o m p la t e t o f lo o r f r a m e o r s la b , r e f e r to C l a u s e 8 . 3 .6 . 1 0
P e r im e te r n a i l s p a c i n g
3 0 x 0 .8 m m G . I . s t r a p t o e a c h c o r n e r o f b ra c in g p a n e l t y i n g s t u d s t o p la t e s 4 / 2 .8 m m d ia . n a i ls e a c h e n d
27
00
mm
ma
x.
4 0 to 5 0
s
N O T E : N o g g i n g s h a v e b e e n o m i t t e d f o r c l a r i t y . S ( m m )6 04 0
2 .13 .0
T A B L E 8 .1 8 ( c o n t i n u e d )
TABLE 8.18 (continued)
Type of bracing
Bracing
capacity
(kN/m)
A4
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
53
Type of bracing
Bracing
capacity
(kN/m)
TABLE 8.18 (continued)
A4
A3
Minimum plywoodthickness (mm)
Studspacing
mmStressgrade
450 600
No nogging(except horizontal
butt joints)
F8F11F14F27
74.543
976
4.5
One row ofnogging
F8F11F14F27
74.543
74.543
(g) Plywood Plywood shall be nailed to frame using 30 mm2.8 mm galvanized flathead nails or equivalent.
W h e re re q u i r e d , o n e ro w o f n o g g in g s ta g g e r e d o r s i n g le l i n e a t h a l f w a l l h e i g h t
NOTES: 1 For plywood fixed to both sides of the wall, see Clauses Error! Reference
source not found. and Error! Reference source not found. . No other rods or straps are required between top or bottom plate. Fix bottom plate to floor frame or slab with nominal fixing only (see Table 9.4).
3.4
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
54
M inim um p lywoodthickness (m m )
S tud sp acing(m m )S tress
grade450 600
F 8F 11F 14F 27
7644
976
4 .5F astener sp acing, s
(m m )T op andb ottom p late: M ethod A M ethod B
15050
V ert ica l edges 150Interm edia testuds
300
F ix ing of b ottomp late to f loor fram e
or s lab
(h) Plywood P lywood sha ll b e na iled to fram e us ing 30 2.8 galvanizedflathead na ils or eq uiva lent.
F or M ethod A, M 12 rods sha ll b e used at each end of sheathed sect ion topp late to b ottom p late/f loor fram e. M ethod B has no rods b ut sheath ing sha llb e na iled to top and b ottom p lates and any horizonta l jo ints at 50 m mcentres .
N O T E: F or p lywood f ix ed to b oth s ides of the wall, s ee C lauses 8.3 .6 .5 and8 .3 .6 .10 .
M ethod A : M 12 rodsas shown p lus a13 kN capacityconnect ion a t m ax .1200 m m centres
M ethod B : A 13 kNcapacity connect ionat each end andinterm ediately a tm ax . 1200 m mcentres
M ethod A6 .4
M ethod B6 .0
TAB LE 8.18 (con tinued )
A3
A4
Type of bracing
Bracing
capacity
(kN/m)
TABLE 8.18 (continued)
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
55
M inimum hardboardthickness (mm)
Stud spacing(mm)
T ype
450600
RD 5.5 5 .5
G P 6.4 6 .4
Fastener spacing(mm)
T op andbottom p lates
100
Verticaledges
100
(j) Hardboard Hardboard shall comply with AS/NZS 1859.4 .
Hardboard shall be nailed to frame us ing minimum 25 2.8 mm galvanized nails or equivalent.
Nails shall be located a minimum of 10 mm from the vert ical edges and20 mm from the top and bottom edges .
Panel edges shall be supported by studs .
Intermediatestuds
300
3 .4
NO T ES:
1 Noggings have been omitted for clarity.
2 For fix ing of bottom p late to floor frame or s lab, see C lause 8 .3 .6.10 .
F ix bottom p late to floor frame or s lab with nominal fix ing only (see T ab le 9.4) Refer G UIDE NOT E No.9
TABLE 8.18 (continued )
A2
A4
Type of bracing
Bracing
capacity
(kN/m)
TABLE 8.18 (continued)
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
56
Minimum hardboardthickness (mm)
Stud spacing(mm)
Type
450 600
GP 6.4 6.4
Fastener spacing(mm)
Top andbottom plates
50
Vertical edges 100
(j) Hardboard Hardboard shall comply with AS/NZS 1859.4.
Hardboard shall be nailed to frame using minimum 30 2.8 mm galvanized nails or equivalent.
Nails shall be located a minimum of 10 mm from the vertical edges and15 mm from the top and bottom edges.
Panel edges shall be supported by studs.
Intermediatestuds
300
6.0
NOTES:
1 Noggings have been omitted for clarity.
2 For fixing of bottom plate to floor frame or slab, see Clause 8.3.6.10.
Type of bracing
Bracing
capacity
(kN/m)
TABLE 8.18 (continued)
A2
A4
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
57
EXAMPLE: Required Racking force = 22kN less provision for 50% nominal bracing = 11kN.
The proposed method of bracing is 2100mm long cut-in timber or metal angle braces. Type c
Each brace is rated at 3.15kN (2.1 m long x 1.5kN/m).
11kN / 3.15 = 3.5 therefore 4 x 2.1m (12.6kN total) long braces are required plus 9.4kN of nominal bracing.
(Check that 9.4kN of nominal bracing is achievable and also that the cut-in braces are not spaced more than required by 8.3.6.7)
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
58
EXAMPLE: cont’d
Of course there are other combinations for the above situation –
4 x 0.9 long ply braces rated at 3.4kN/m = 12.24kN plus 9.76kN of nominal bracing (type g)
or
2 x 0.9 long hardboard braces rated at 3.4kN/m = 6.12kN plus 2 x 2.1 long metal angle = 6.3kN plus 9.58kN of nominal bracing. (type l)
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
59
The capacity of bracing walls given in Table 8.18 is appropriate to wall heights up to and including 2700 mm. For wall heights greater than 2700 mm the capacity shall be multiplied by the values given in Table 8.19.
8.3.6.4 Wall capacity and height modification pg 147
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
60
Where the same structural plywood bracing system is fixed to both sides of the wall, the capacity of the wall will equal the combined capacity of the bracing system on each side.
8.3.6.5 Length and capacity for plywood bracing walls
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
61
Bracing shall be approximately evenly distributed and shall be provided in both directions (see Figure 8.5).
8.3.6.6 Location and distribution of bracing
Bracing shall initially be placed in
external walls and where
possible at the corners of the building.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
62
W in dd ire c t io n W in d
d ire c t io n
AA
B
B
C
C
D
D
E
T o t a l b r a c i n g s t r e n g t h = A + B + C + D , e t c .
N O T E : A , B , C a n d D a r e t h e d e s i g n s t r e n g t h s o f i n d i v i d u a l b r a c i n g w a l l s .
( a ) R i g h t a n g l e s t o l o n g s i d e ( b ) R i g h t a n g l e s t o s h o r t s i d e
FIGURE 8.5 LOCATION OF BRACING
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
63
For single or upper-storey construction, the maximum distance between braced walls at right angles to the building length or width shall not exceed 9000 mm for wind classifications up to N2 (see Figure 8.6).
8.3.6.7 Spacing of bracing walls in single storey or upper storey of two storey constructionA3
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
64
For wind classifications greater than N2, spacing shall be in accordance with Table 8.20 (pg 150) (N3) and Table 8.21 (N4) for the relevant wind classification, ceiling depth and roof pitch.
NOTE: Ceiling depth is measured parallel to the wind direction being considered.
8.3.6.7 Spacing of bracing walls in single storey or upper storey of two storey constructionA3
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
65
TABLE 8.20
MAXIMUM SPACING OF BRACING WALLS — N3 WIND CLASSIFICATION
Maximum bracing wall spacing (m)
Roof pitch (degrees)Ceiling
depth (m)0 5 10 15 17.5 20 25 30 35
4 5.9 6.6 7.4 7.5 7 6.4 5.1 4.4 4.2
5 7.4 8.3 9 9 8.6 7.9 6 5 4.7
6 8.9 9 9 9 9 8.8 6.7 5.6 5.1
7 9 9 9 9 9 9 7.1 6.1 5.5
8 9 9 9 9 9 9 7.6 6.7 5.7
9 9 9 9 9 9 9 7.9 7.2 5.9
10 9 9 9 9 9 9 8.4 7.9 6.2
11 9 9 9 9 9 9 8.7 7.9 6.4
12 9 9 9 9 9 9 9 7.9 6.6
13 9 9 9 9 9 9 9 8.1 6.6
14 9 9 9 9 9 9 9 8.3 6.7
15 9 9 9 9 9 9 9 8.4 6.8
16 9 9 9 9 9 9 9 8.6 6.9
NOTE: A ceiling depth of 16 m is to be used for all ceiling depths greater than 16 m.
N3
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
66
Where bracing cannot be placed in external walls because of openings or the like, a structural diaphragm ceiling can be used to transfer racking forces to bracing walls that can support the loads. Alternatively, wall frames may be designed for portal action. (This requires engineering advice)
8.3.6.7 Spacing of bracing walls in single storey or upper storey of twoA3
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
67
Wind d i r ec t io n A
Win d d i re
c t ion B
S p a c in g be tw e e n b ra c in gw a l ls fo r w in d d ir e c t io n B
S p a c in g be tw e e n b rac in g w a l ls fo r w in d d ir e c t io n A
FIGURE 8.6 SPACING OF BRACING
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
68
The ceiling and floor diaphragms play important roles in the transfer of wind loads from the walls and roof to the braces.
The ability of a ceiling or floor diaphragm to effectively transfer the wind load depends on the depth of the diaphragm.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
69
• Narrow or long diaphragms will not transfer the wind loads as effectively as a deeper diaphragm. The smaller the length to depth ratio the more effective the diaphragm.
• For this reason the spacing of bracing walls in limited as per Clause 8.3.6.7.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
70
DiaphragmDepth
D iaphragm
Length
The above diaphragm, has a large length to depth ratio, (the length being the distance between braces) will not transfer the wind loads effectively.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
71
By adding an intermediate brace, the diaphragm is broken into two. Individually they have a smaller length to depth ratio and will transfer the wind loads effectively
DiaphragmDepth
D ia p h ra g m
L e n g th
Diaphragm
Length
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
72
The same diaphragm, with the wind from the other direction, will transfer loads very effectively because its length to depth ratio is small.
Dia
phra
gmD
epth
DiaphragmLength
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
73
All internal bracing walls shall be fixed to the floor for lower storey bracing walls, the ceiling or roof frame, and/or the external wall frame, with structural connections of equivalent shear capacity to the bracing capacity of that particular bracing wall.
8.3.6.9 Fixing of top of bracing walls
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
74
Nominal and other bracing walls with bracing capacity up to 1.5 kN/m require nominal fixing only, i.e. no additional fixing requirements.
For typical details and shear capacities, see Table 8.22. pg 152
8.3.6.9 Fixing of top of bracing walls
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
75
Fixing of top of bracing walls
Wind loads, transferred from the roof and walls to ceiling and floor diaphragms are then transferred through braces to the ground.
These braces, however, can only transfer these loads if the brace is connected to the ceiling or floor above and the floor below.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
76
Internal brace not connected to floor diaphragm
Internal brace not connected to ceiling diaphragm
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
77
The strength of these connections must be at least equal to the load the brace can transfer
e.g. a cut-in timber or metal brace 2.4 m long can transfer a total of 3.6kN (2.4 x 1.5kN/m) – a 3.6kN connection to the diaphragm is required.
or alternatively the strength of the brace can be reduced to equal the strength of the connection(s) .e.g. if a 2.8kN connection is used for the above brace, its bracing capacity will be reduced to 2.8kN.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
78
Metal angle brace as per Table 8.18(c)
Total brace capacity =1.5kN x 2.7m =
2.7 m long
4.05kN
In te rn a l b rac ingw all
Top p la te
E xte rna l w a ll
1 /30 x 0 .8 m m G .I strap w ith 6 /2 .8 na ils each end o fs trap in as perTab le 8.22 (k) =
JD 4 tim ber 4.9kN
Connection used equals the total brace capacity.
Refer to table 8.22 pg 155
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
79
Metal angle brace as per Table 8.18(c)
Total brace capacity =1.5kN x 2.7m =
2.7 m long
4.05kN
Rafter/Truss
Bracing wall
Provide clearancewhere roof istrussed.
Ceiling battens fixedwith 1/3.05 m m O naileither side of wall
in = JD 4 tim ber
3 ba tten to top p la te connec tionsw ith 2/3 .05 m m O na ils pe r battenas pe r Tab le 8.22 (d)
5.4kN
Connections used equals the total brace capacity.
Refer to table 8.22 pg153
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
80
AS 1684USER G UIDE 5
G U I D E T O T H E U S E O F A S 1684
Fixing of Top of Bracing Walls
Connect braced wall to external wall using 2 straps as perTable 8.22 (k). For JD 4 pine, 4/2.8 d ia nails required each end of each strap to achieve 6.6 kN.
Example 1 - Strapping to external walls
Brace6.12kNcapacity(1.8m x 3 .4kN /m )
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
81
AS 1684USER G UIDE 5
G U I D E T O T H E U S E O F A S 1684
Fixing of Top of Bracing Walls
B race5 .76kNcapac ity(0 .9m x 6 .4kN /m )
Connect braced w all to 6 ceiling jo ists using 2/3.05 dia skew nails per jo ist as per Table 8.22 (i). For JD 4 pine, capacity = 6 x 1.1 = 6.6 kN
Example 2 - Nailing floor or ceiling joists to walls
NOTE: The top plate in the wall m ust provide a continuous tie from the braced section of wall to where the top p la te is connected to the floor, ceiling or roof diaphragm.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
82
AS 1684USER G UIDE 5
G U I D E T O T H E U S E O F A S 1684
Fixing of Top of Bracing Walls
Connect braced wall to ceiling jo ists or truss bottom chords w ith b locking as per Table 8.22 (j) 4/3.05 dia nails to each block + one strap to the external wall w ith 4/2.8 d ia nails each end of strap.
Example 3 - Combinations
B race6 .75kNcapac ity(0 .9m x 7 .5kN /m )
NOTE: The top plate in the wall m ust provide a continuous tie from the braced section of wall to where the top p la te is connected to the floor, ceiling or roof diaphragm.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
83
Nails
3.05 3.0 2.1 1.5 2.1 1.8 1.3
3.33 3.3 2.4 1.7 2.4 2.0 1.5
Screws
No.14Type 17
12 8.3 5.9 8.3 5.9 4.3
(a)
P r o v id e c le a r a n c ew h e r e r o o f i s t r u s s e d
B r a c in g w a l l
9 0 x 3 5 m m
t r i m m e r o n f l a t
F 8 o r9 0 x 4 5 m m F 5
4 / 7 5 m m n a i l s a s p e r t a b le o r 3 / N o . 1 4
t y p e 1 7 s c re w s
2 / 7 5 m m n a i l s e a c h e n d a s p e r t a b l e o r 2 / 7 5 m m N o . 1 4 t y p e 1 7 s c r e w s
NOTE: For trussed roofs, nails or screwsthrough the top plate shall be placed inholes that permit free vertical movementof the trusses.
TABLE 8.22
FIXING OF TOP OF BRACING WALLS
Shear capacity (kN)
Unseasoned
timber
Seasoned
timber
Rafters, joists or trusses
to bracing wall
J2 J3 J4 JD4 JD5 JD6
A3
A4
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
84
Screws
1/No.14Type 17
4.8 3.5 2.5 3.5 2.5 1.8
2/No.14Type 17
9.7 6.9 4.9 6.9 4.9 3.6
3/No.14Type 17
13 9.3 6.6 9.8 7.4 5.4
Bolts
M10 6.4 4.1 2.6 4.3 3.0 2.0
M12 7.6 4.9 3.1 5.1 3.6 2.5
2/M10 12 8.0 5.1 8.4 5.9 4.0
(a)
P r o v id e c le a r a n c ew h e r e r o o f i s t r u s s e d
B r a c in g w a l lS c r e w s o r b o l t sa s p e r t a b le
T r i m m e r :o n e b o l t : 9 0 x 3 5 m m
t w o b o l t s : 1 2 0 x 3 5 m m
F 8 o r : 9 0 x 4 5 m m F 5
F 8o r : 1 2 0 x 4 5 m m F 5
F r a m in g a n c h o rs( le g s n o t b e n t )6 / 2 .8 m m n a i l se a c h f a c e
NOTE: For trussed roofs, screws or bolts through the topplate shall be placed in holes that permit free verticalmovement of the trusses.
2/M12 13 9.3 6.1 9.8 7.0 4.9
TABLE 8.22
FIXING OF TOP OF BRACING WALLS
Shear capacity (kN)
Unseasoned
timber
Seasoned
timber
Rafters, joists or trusses
to bracing wall
J2 J3 J4 JD4 JD5 JD6
(b)
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
85
TABLE 8.22
FIXING OF TOP OF BRACING WALLS
Shear capacity (kN)
Unseasoned
timber
Seasoned
timber
Rafters, joists or trusses
to bracing wall
J2 J3 J4 JD4 JD5 JD6
Nails
3.05 6.6 4.7 3.4 5.0 4.2 3.1
(c)
9 0 x 3 5 m m b r id g i n g p ie c e
F 8
B r a c in g w a l l
Tw o lo o p e d s t r a p s ( 3 0 x 0 . 8 m m G . I . )4 / 2 .8 m m n a i l s e a c h e n d a n dt o b r id g i n g
3 / 7 5 m m n a i l sa s p e r t a b le
3 0 (m a x )
G a p b e tw e e nt o p p la t e a n d t ru s s
3.33 7.4 5.3 3.7 5.5 4.6 3.5
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
86
(d)
R a f te r o r t r u s s
B ra c in g w a l l
P ro v id e c le a ra n cew h e re ro o f is t r u s se d
2 /3 .0 5 m m n a i ls p e r b a tte n , 3 .5 m m h o le s s h a l l b e d r i l le d in b a t te n to a l lo w fo r t r u s s d e f le c t io n
C e i l in g b a tte n s f ix e d w i th 1 /3 .0 5 m m n a i le ith e r s id e o f w a l l
2.5 1.8 1.3 1.8 1.5 1.1
TABLE 8.22
FIXING OF TOP OF BRACING WALLS
Shear capacity (kN)
Unseasoned
timber
Seasoned
timber
Rafters, joists or trusses
to bracing wall
J2 J3 J4 JD4 JD5 JD6
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
87
Nails
4/3.05 5.0 3.6 2.5 3.6 3.0 2.2
6/3.05 6.6 4.7 3.4 5.0 4.2 3.1
4/3.33 5.6 4.0 2.8 4.0 3.3 2.5
6/3.33 7.4 5.3 3.7 5.5 4.6 3.5
Bolts
M10 6.4 4.1 2.6 4.3 3.0 2.0
M12 7.6 4.9 3.1 5.1 3.6 2.5
2/M10 13 8.0 5.1 8.4 5.9 4.0
Screws
2/No.14Type 17
9.7 6.9 4.9 6.9 4.9 3.6
(e)
B r a c i n g w a l l
G a p t o t r u s s
9 0 x 3 5 m m F 8 o r 9 0 x 4 5 m m F 5 t r im m e r
S h e a r b lo c k sn a i l e d , b o l t e d ,o r s c r e w e da s p e r t a b l e
N a i l in g p la te s o r f r a m in g a n c h o r ( le g s n o t b e n t ) t o e i t h e r e n d o f n o g g i n g 6 / 2 .8 m m n a i l s e a c h fa c e o r 2 /N o . 1 4 T y p e 1 7 b a t t e n s c r e w s e i t h e r e n d
3/No.14Type 17
13 9.2 6.6 9.8 7.4 5.4
TABLE 8.22 (continued)
TABLE 8.22
FIXING OF TOP OF BRACING WALLS
Shear capacity (kN)
Unseasoned
timber
Seasoned
timber
Rafters, joists or trusses
to bracing wall
J2 J3 J4 JD4 JD5 JD6
A3
A4
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
88
TABLE 8.22
FIXING OF TOP OF BRACING WALLS
Shear capacity (kN)
Unseasoned
timber
Seasoned
timber
Rafters, joists or trusses
to bracing wall
J2 J3 J4 JD4 JD5 JD6
A4
NOTE: For truss roof, nails through thetop plate shall be placed in holes thatpermit free vertical movement of thetrusses.
Nails
2/3.05 1.4 1.1 0.77 1.1 0.90 0.66
(i)
B r a c i n g w a l l
R a f t e r , c e i l i n g jo is t , o r b o t t o m c h o r d
2 s k e w n a i l s p e r c r o s s in g s iz e a s p e r t a b l e
2/3.33 1.7 1.2 0.85 1.2 1.0 0.75
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
89
Nails
4/3.05 5.0 3.6 2.5 3.6 3.0 2.2
6/3.05 6.6 4.7 3.4 5.0 4.2 3.1
4/3.33 5.6 4.0 2.8 4.0 3.3 2.5
6/3.33 7.4 5.3 3.7 5.5 4.6 3.5
Bolts
M10 6.4 4.1 2.6 4.3 3.0 2.0
M12 7.6 4.9 3.1 5.1 3.6 2.5
2/M10 13 8.0 5.1 8.4 5.9 4.0
Screws
2/No.14Type17
9.7 6.9 4.9 6.9 4.9 3.6
(j)
B ra c in g w a ll
B loc k ing p ie c e sla rg e e n o u g h toa v o id s p l i t t in g
G a p be tw e e n top p la te a n d t ru s s
N a ils , sc re w s o r b o lt s a s p e rtab le b lo c k s to b e b o th s id e so f ra f te r o r b o t to m c h o rd
3/No.14Type17
15 10 7.4 10 7.4 5.4
TABLE 8.22
FIXING OF TOP OF BRACING WALLS
Shear capacity (kN)
Unseasoned
timber
Seasoned
timber
Rafters, joists or trusses
to bracing wall
J2 J3 J4 JD4 JD5 JD6
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
90
Straps Nails
4/2.8 4.3 3.1 2.2 3.3 3.0 2.1
1
6/2.8 6.5 4.6 3.3 4.9 4.0 3.1
4/2.8 8.7 6.2 4.4 6.6 5.4 4.1
(k)
I n t e r n a l b r a c i n g w a l l
To p p la t e
E x te r n a l w a l l
2 /3 0 x 0 .8 m m G . I s t r a p s w i t h n u m b e r o f n a i l s e a c h e n d o f s t r a p s a s p e r t a b le
2
6/2.8 13 9.3 6.6 9.8 8.1 6.1
TABLE 8.22
FIXING OF TOP OF BRACING WALLS
Shear capacity (kN)
Unseasoned
timber
Seasoned
timber
Rafters, joists or trusses
to bracing wall
J2 J3 J4 JD4 JD5 JD6
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
91
The bottom plate of timber-framed bracing walls shall be fixed at the ends of the bracing panel and, if required, intermediately to the floor frame or concrete slab with connections determined from Table 8.18. pg 141
8.3.6.10 Fixing of bottom of bracing walls pg 155
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
92
Where bottom plate fixing information is not given in Table 8.18, the bottom plates shall be fixed at the ends of each bracing panel using tie-down fixings determined from Table 8.23 and Table 8.24.
8.3.6.10 Fixing of bottom of bracing walls
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
93
For bracing wall systems of capacity 6 kN/m or greater given in Table 8.18, which do not specify intermediate bottom plate fixings, additional intermediate bottom plate fixings of a minimum of 1/M10 bolt, or 2/No. 14 Type 17 screws, at max.1200 mm centres shall be used.
8.3.6.10 Fixing of bottom of bracing walls
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
94
TABLE 8.23 P153- AS1684.2 TABLE 8.24 P149- AS1684.3
UPLIFT FORCE AT ENDS OF BRACING WALLS
Uplift force at ends of bracing walls (kN)
For bracing walls rated at (kN/m) capacity
Wall
height
(mm) 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 8 10
2400 2700 3000
2.4 2.7 3.0
3.6 4.1 4.5
4.8 5.4 6.0
6.0 6.8 7.5
7.2 8.1 9.0
8.4 9.5 11
10 11 12
11 12 14
12 14 15
13 15 17
14 16 18
19 22 24
24 27 30
NOTES:1 Some bracing wall systems require fixings to be full-length anchor
rods, that is from the top plate to the floor frame or concrete slab.2 The maximum tension load of 8.5 kN given in the Notes to Span
Tables for studs in the Supplements is not applicable when considering the uplift force at the ends of bracing walls.
3 Where provided, the bottom plate tie-down details given in Table 8.18 may be used in lieu of the details determined from Table 8.23 and 8.24.
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
95
M10 cup-head
16 14 10 10 7 5
(a)
M 1 0 cu p h e a d b o l ts o r N o . 1 4 Typ e 1 7 b a tte n s c re w s a s p e r ta b le , w i th m in . 3 8 m m p e n e tra t ion in to f lo o r in g a n d /o r jo is t
2/No.14 Type17 screws
11 8.4 4.8 9.0 7.2 5.4
TABLE 8.24
FIXING OF BOTTOM OF BRACING WALLS
Uplift capacity (kN)
Unseasoned
timber
Seasoned
timberFixing details
J2 J3 J4 JD4 JD5 JD6
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
96
Bolts
M10 18 18 18 15 12 9
(b)
B o l t s a s p e r t a b le
D o u b le jo is t o r 4 5 0 m m l o n g f u l l d e p t h c le a tn a i l e d t o jo i s t w i t h 6 /7 5 x 3 .1 5 m m n a i l s
M12 27 27 26 20 16 12
TABLE 8.24
FIXING OF BOTTOM OF BRACING WALLS
Uplift capacity (kN)
Unseasoned
timber
Seasoned
timberFixing details
J2 J3 J4 JD4 JD5 JD6
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
97
M10 bolt
18 18 18 15 12 9.0
(c)
B e a re r o r u n d e rb a t te n
S o lidn o g g in g
B o lt a s p e r ta b le
M12 bolt
27 27 26 20 16 12
TABLE 8.24
FIXING OF BOTTOM OF BRACING WALLS
Uplift capacity (kN)
Unseasoned
timber
Seasoned
timberFixing details
J2 J3 J4 JD4 JD5 JD6
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
98
A4
2/No. 14Type 17screws
12 8.3 5.9 8.3 5.9 4.3
3/No. 14Type 17screws
17 13 9.0 13 9.0 7.0
(d)
1 2 0 x 70 m m b r id g in g p ie c e o n f la t
M 1 0 b o ltS c rew s o rc o a c h (1 25 m m lo n g )
s c re w s
e a c h e n d o fb r id g in g p ie c ea s p e r ta b le
2/M12coachscrews
18 18 13 15 12 9.0
TABLE 8.24
FIXING OF BOTTOM OF BRACING WALLS
Uplift capacity (kN)
Unseasoned
timber
Seasoned
timberFixing details
J2 J3 J4 JD4 JD5 JD6
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
99
M10 bolt
18 16 11 15 12 9
(e)
1 0 0 x 5 0 m m b r id g in g p ie c e o n e d g e
B o lt a s p e r ta b le
2 n a i l in g p la te s e a c h e n d o f b r id g in g , le g s n o t b e n t, w i th 6 /2 .8 m m n a i l s to e a c h fac e
M12 bolt
22 16 11 18 15 11
TABLE 8.24
FIXING OF BOTTOM OF BRACING WALLS
Uplift capacity (kN)
Unseasoned
timber
Seasoned
timberFixing details
J2 J3 J4 JD4 JD5 JD6
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
100
M10 bolt
18 18 18 15 12 9
(f)
M12 bolt
27 27 26 20 16 12
H o o k e d o r b e n ta n c h o r b o l t a s p e r t a b le
1 8 0 m m m i n .
TABLE 8.24
FIXING OF BOTTOM OF BRACING WALLS
Uplift capacity (kN)
Unseasoned
timber
Seasoned
timberFixing details
J2 J3 J4 JD4 JD5 JD6
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
101
(g)
F i r e d ,s c r e w e d ,c h e m ic a l o r e x p a n d i n gm a s o n r y a n c h o r
Refer to manufacturer’s specifications
TABLE 8.24 (continued) P154- AS1684.2 TABLE 8.24 P150- AS1684.3
TABLE 8.24
FIXING OF BOTTOM OF BRACING WALLS
Uplift capacity (kN)
Unseasoned
timber
Seasoned
timberFixing details
J2 J3 J4 JD4 JD5 JD6
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
102
The following shall apply to the bracing of pitched roofs:
(a) Hip roofs Hip roofs shall not require any specific bracing as they are restrained against longitudinal movement by hips, valleys and the like.
8.3.7 Roof Bracing pg 158
8.3.7.1 Pitched roofs (coupled and non-coupled roofs)
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
103
(b) Gable roofs (including cathedral roofs) For wind classifications up to N2 gable roof buildings with a roof pitch greater than 10° but less than 25°, shall be provided with roof bracing in accordance with Clause . Alternatively, for wind classifications up to N4 and roof pitches to 35° bracing shall be in accordance with Table 8.25, Table 8.26, and the following:
(i) Ridge to internal wall — minimum of two timber braces in opposing directions at approximately 45° (see Table 8.25 and 8.26).
(ii) Diagonal metal bracing — single or double diagonal bracing shall be designed and installed in accordance with engineering principles.
8.3.7.1 Pitched roofs (coupled and non-coupled roofs)
AS 1684 SECTION 8 - RACKING AND SHEAR FORCES
104
R i d g e b o a rd
R a f te r
G a b l e e n dM i n . 1 9 x 9 0 m m o r 2 5 x 7 5 m m b r a c e a t a p p ro x i m a t e ly 4 5 to r a f t e r s o n b o t h s id e s o f r i d g e
A l te r n a t i v e b r a c in g : o p p o s in g b ra c e s f r o m r id g e b o a r d t o in t e r n a l w a l l s a t a p p r o x i m a t e ly 4 5
FIGURE 8.9 GABLE ROOF BRACING