8
Section 6: Pond Routing Transforming an inflow hydrograph into an outflow hydrograph 35 Minutes Copyright 2004 HydroCAD Software Solutions LLC All Rights Reserved - Duplication Prohibited Press Space, PageDown, or Click to advance. Press PageUp to reverse. Esc to exit. Right-Click for other options. 6-010 Routing Introduction What is a pond routing? P What role does a pond play in the model? P How is the inflow hydrograph altered by the pond routing? 6-015 Pond Routing Effects #1 How is the inflow hydrograph altered by the routing? T i m e Peak occurs later (time lag) Peak flow is reduced (attenuation) 6-020 Pond Routing Effects #2 How much water is stored in the pond? T i m e P Maximum storage occurs at peak outflow < Volume is equal to area between curves P Pond is at equilibrium < Q OUT = Q IN 6-030

Section 6: Pond Routing Routing.pdfRouting Introduction What is a pond routing? PWhat role does a pond play in the model? PHow is the inflow hydrograph altered by the pond routing?

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Section 6: Pond Routing Routing.pdfRouting Introduction What is a pond routing? PWhat role does a pond play in the model? PHow is the inflow hydrograph altered by the pond routing?

Section 6:Pond Routing

Transforming an inflow hydrographinto an outflow hydrograph

35 Minutes

Copyright 2004 HydroCAD Software Solutions LLCAll Rights Reserved - Duplication Prohibited

Press Space, PageDown, or Click to advance.Press PageUp to reverse. Esc to exit.

Right-Click for other options.

6-010

Routing IntroductionWhat is a pond routing?

PWhat role does a pond play in the model?PHow is the inflow hydrograph altered by the

pond routing?

6-015

Pond Routing Effects #1How is the inflow hydrographaltered by the routing?

T i m e

Peak occurs later (time lag)

Peak flow is reduced (attenuation)

6-020

Pond Routing Effects #2How much water is stored in the pond?

T i m e

PMaximum storageoccurs at peak outflow< Volume is equal to area

between curvesPPond is at equilibrium< QOUT = QIN

6-030

Page 2: Section 6: Pond Routing Routing.pdfRouting Introduction What is a pond routing? PWhat role does a pond play in the model? PHow is the inflow hydrograph altered by the pond routing?

Estimated Pond SizingHow much storage do I need to attenuatethe peak to the target level?

PAfter you perform a pond routing, you knowthe actual peak outflow and storage used.< But how do you estimate the required storage in

advance?PThe pond sizing report will tell you the

approximate storage required to attenuateyour actual inflow to any desired level< First, create a pond with the actual inflow

– Pond data is optional< Then open the sizing report...

6-040

Using the PondSizing ReportHow much storage do I need?

Required Storage (AF)

PFind your target outflow onthe left axis

PMove right to the curve anddown to the bottom axis

PThis is the approximaterequired storage!

6-050

Pond Sizing NotesHow much storage do I need?

PThe pond sizing report provides an initialestimate only< Use this to design a trial pond and then refine

the designPThe sizing report is based on the actual

inflow and an assumed discharge curve< Your sizing may vary depending on your exact

outlet configuration

6-060

Other Detention Effects #1What happens to the larger watershed?

7 Existing Site

7 AdjacentWatershed

T i m e

7 Existing Combined Flow

PExisting peaks may occur at different timesPThis avoids direct peak addition and

minimizes downstream flooding

6-070

Page 3: Section 6: Pond Routing Routing.pdfRouting Introduction What is a pond routing? PWhat role does a pond play in the model? PHow is the inflow hydrograph altered by the pond routing?

Secondary Detention Effects #2What happens to the larger watershed?

Developed Site 7 (same peak)

T i m e

Developed Combined Flow7 (peak has increased)

PDeveloped discharge may have same peakPBut “peak widening” increases total flows

and contributes to downstream flooding

6-080

Trends in StormwaterManagementSometimes smaller is better

PManage stormwater near the source< Distribute mitigation measures throughout the site< Minimize use of large-scale ponds< Utilize all detention opportunites< Maximize inflitration

P Integrate site design and stormwatermanagement

6-085

Starting ElevationAllows for a pre-storm waterlevel in a pond

PBy default, all ponds start emptyPStarting Elevation sets pre-storm water level< If above outlet, will cause immediate outflow< Can be used without inflow hydrograph to observe

draw-down of pre-charged pond

6-090

Base Flow CalculationsBase flow can be used to modelconstant pre-runoff flows

PBase flow is added to inflow hydrograph< Base-flow is included in all downstream flows

PAutomatic base flow option calculates flowrequired to maintain starting elevation< Keeps the pond at equilibrium< Prevents draw-down from starting elevation< Useful for ponds with pre-storm flows

6-100

Page 4: Section 6: Pond Routing Routing.pdfRouting Introduction What is a pond routing? PWhat role does a pond play in the model? PHow is the inflow hydrograph altered by the pond routing?

Detention TimeHow long is the water stored in the pond?

PDetention time is the average length of timethat a molecule of water stays in the pond< This is not a routing procedure - It is an analysis

that is performed after the routing is completePThere are several ways to calculate TDET

PHydroCAD provides two procedures:< Center-of-Mass method< Plug-Flow method

PLets see how these are calculated...6-110

Center-of-Mass Detention Time #1A basic procedure for calculating detention time

T i m e

PFirst, calculate thecenter-of-mass time forthe inflow hydrograph

6-120

Center-of-Mass Detention Time #2A basic procedure for calculating detention time

T i m e

PThen calculate thecenter-of-mass time forthe outflow hydrograph

6-130

Center-of-Mass Detention Time #3A basic procedure for calculating detention time

T i m e

PThe detention time isthe difference betweenthe inflow and outflowcenter-of-mass times

6-140

Page 5: Section 6: Pond Routing Routing.pdfRouting Introduction What is a pond routing? PWhat role does a pond play in the model? PHow is the inflow hydrograph altered by the pond routing?

Center-of-Mass Detention Time #4

PAdvantages:< Simple, graphical solution< Fairly easy to verify results by hand

PLimitations:< Reduces each hydrograph to a single time value

– Doesn’t consider overall hydrograph shape< Can be “fooled” by certain hydrographs< Not a physical evaluation of the flow

PA better alternative:< The Plug-Flow method...

6-150

Plug-Flow Detention Time #1A better detention time procedure

PFirst, divide theoutflow into plugs ofequal volume

T i m e6-160

Plug-Flow Detention Time #2

PNext, identify when the firstplug enters the pond< Inflow and outflow plugs have

equal volume, but differentduration.

T i m e6-170

Plug-Flow Detention Time #3

PNow calculate the timebetween the plugs< This is the detention time for

a single plug

T i m e6-180

Page 6: Section 6: Pond Routing Routing.pdfRouting Introduction What is a pond routing? PWhat role does a pond play in the model? PHow is the inflow hydrograph altered by the pond routing?

Plug-Flow Detention Time #4

PRepeat the process for all theplugs, calculating the averageof all the detention times< The average gives the overall

detention time for the entire event

T i m e6-190

Plug-Flow CommentsPAdvantages:< Calculation is based by physical situation< Sensitive to exact hydrograph shape< Works with complex situations such as wet ponds

PThings to understand:< Produces a “best case” (maximum detention time)

based on a first-in first-out scenario.< Any pre-storm water is displaced before any of the

new runoff leaves the pond.– Wet ponds have a greater plug-flow detention time!

– Center-of-mass method ignores any pre-filled storage

PHydroCAD provides BOTH techniques6-200

Other Water QualityRequirementsUsing HydroCAD to meet yourlocal regulations

P “Detain the first inch for 24-hours”< Exactly what does this mean?< Read your regulations very carefully!

PTo verify compliance you can use:< Tabular inflow-outflow hydrograph

– Shows the pond volume at each time step

6-210

Software ExercisesExploring these topics in HydroCAD

PBefore we begin the software demonstration,are there any other questions about pondrouting calculations?

P If you wish, you may perform the followingexercises yourself, or just watch the demo.

6-220

Page 7: Section 6: Pond Routing Routing.pdfRouting Introduction What is a pond routing? PWhat role does a pond play in the model? PHow is the inflow hydrograph altered by the pond routing?

Lets examine a pond routingTo save time, we’ll work with an existing project

PGetting ready< Start HydroCAD< Open the “Mountain View Housing Complex”

PExamine the routing< Double-click pond “3P”< Examine the summary report

– Note the detention time calculations– In this case PF and CM results are very close

– Click any line for details (HydroCAD 7.1)< Examine the hydrograph

– Note the storage volume

6-230

Using the pondsizing reportEstimating the required storage

PExamine the sizing report< Make sure the report is open for pond 3P< Click the “Sizing” tab

– Try the 2D view– Select Table format– To see more values, remove the “Shrink” option– Click Help for detailed instructions

6-240

Modeling a “wet pond”How do we handle the initial waterlevel in the pond?

PUse the options on the “Advanced” tab:< Set the Starting Elevation:

– Set a Starting Elevation of 20.5' and click OK– Note immediate outflow at start of hydrograph

– But the outflow (and elevation) are dropping!

< Continue to next slide...

6-250

Pre-Storm FlowsWhat if the pond is dischargingbefore the storm begins?

PUse the options on the “Advanced” tab:< Add a base flow:

– Set a Base Flow of 1 CFS and click OK– Note initial decline is reduced but not eliminated

< Try Automatic Base Flow:– Select Automatic Base Flow and click OK– Pond is now at equilibrium!– Exact base flow is shown on Summary

6-260

Page 8: Section 6: Pond Routing Routing.pdfRouting Introduction What is a pond routing? PWhat role does a pond play in the model? PHow is the inflow hydrograph altered by the pond routing?

*** End of Section ***

PAre there any other questions about pondrouting calculations?

PFor specific routing equations, please see theHydroCAD Owner’s manual.

P If you performed the exercises, you mayclose HydroCAD at this time.< You do NOT need to save your changes.

P ** Take a 10-minute break **< Please complete your evaluations!

6-270