Section 5
Building Techniques
Sec
tio
n 5
: B
uil
din
g T
ech
niq
ues
Slightly bent rebar endsslide over ties easier
Slide rebar into postion from the open end of wall
Vertical reinforcement may be installed at any time before
interior top c-channel is installed.
Slide up panels to gain access and tie rebar
into place
Date: 2/19/2013
Horizontal Rebar Installation TF Forming Systems, Inc800-360-4634
www.TFSystem.com
ThermoFormX28
Slide poly panel up to installand tie vertical rebar into place
Install vertical rebar by inserting the top of the rebarinto the wall opening and rotate bottom into place
Vertical rebar shown in place
Date: 2/19/2013
Vertical Rebar Installation TF Forming Systems, Inc800-360-4634
www.TFSystem.com
ThermoFormX29
16" Overlap
After mounting upper c-channel withproper overlap, straighten wall with string line
Once wall is straightened, screw c-channelstogether with steel stud screws or sheet metal screws
As you build the wall, install theupper exterior c-channel to help stiffenthe wall and hold everything together
Exterior c-channel
Interior of wall
Installing upper interior c-channelis the last step. This will allow
for the panels to be slid upfor access to the cavity.
After all the rebar is tied, the wall isinspected, and the bottom of the
cavity is cleaned out, thenthe interior c-channel
may be installed.
Date: 2/19/2013
TF Forming Systems, Inc800-360-4634
www.TFSystem.com
ThermoFormX
Upper C-Channel Installation
30
Brace and plumb back surface beforeattaching the stud of the intersecting wall
(See next page)
Use 1" sheet metal screwsspaced 12" vertically
Plumb T-intersection in all directions before screwing together
When using 8" or less wall system,rip this splice panel to the same width
as the intersecting wall cavity
Plastic stud with cut flanges
If you need a T-Intersection
When using 10" thick or larger wall system,use two equally sized splice panels with
a stud rail joining them
Contact a TF Forming Systemsrepresentitive for additional bracing information
1-1/2"Construction screw
Plastic stud
Plastic stud rail
Date: 2/19/2013
T-Intersection Top View TF Forming Systems, Inc.800-360-4634
www.TFSystem.com
ThermoFormX31
Do not flow concretein this direction
(if possible)
Always try to flow concreteaway from the T-Intersection
Kickers as needed to stopbracing from moving
(3 kickers are suggested for an 8ft wall)
2" X 6" T-brace screwedto horizontal 2" X 4"
Horizontal 2" X 4" every16" o.c. from bottom to top
ConcreteFlow
T- Intersection Bracing
Contractor assumes allresponsibility for design
and implementationof bracing
Date: 2/19/2013
T-Intersection Bracing TF Forming Systems, Inc.800-360-4634
www.TFSystem.com
ThermoFormX32
Stagger screws on each stud
Metal strapping every 4ft
2" X 12"
Perforated metal strapping
Screw lumber bracinginto plastic studs every 16" o.c.
Secure metal strapping to lumber and to plastic rails with coarse
thread construction screws
2" X 4"
2" X 4"
H
Space needed forconcrete brick ledge
4"
Date: 2/14/2014
TF Forming Systems, Inc800-360-4634
www.TFSystem.com
ThermoFormX
Installing a Brickledge
33
When using 2"X12" lumber,a furring strip may be neededto fill out the window cavity on wall thickness greater than 6"
The sides of the window buck must be pressure
treated lumber
Use pressure treated2"X4" lumber for base
A
A
Horizontal 2"X4" bracing
Vertical 2"X4" bracing
Assemble woodenwindow buck frameand add a furring
strip if needed
Install a 2"X4" verticallyto brace the top andbase of the wooden
buck frame
Install ahorizontal 2"X4"
to reinforcebase boards
Install horizontal 2"X4" 'sto brace the sides of
the window buck
Add header bracingto keep window square
SECTION A-A
Base boards
Furring strip
Rough openingheight
Rough openingwidth
Rough opening width +3"
Rough openingheight +3"
Topof buck
Window bucks should be assembled ahead of time for increased speed and efficiency at the job site
1 2
3 4
Headerbracing
2"X4" bracing must bein place before pouring wall!
Date: 3/7/2013
Window Bucks TF Forming Systems, Inc.800-360-4634
www.TFSystem.com
ThermoFormX34
3/7/2013
www.TFSystem.com
ThermoFormXDate:
TF Forming Systems, Inc.800-360-4634Window Bucks
to face of window buck frame for bracing poly panels next to openings
Top View
After the wood frame is assembled, 2 X 4's must be screw attached
Begin by positioning a screwat the top, then placing ascrew down every 12"
12"
35
Interiorc-channel
(flush with sides)
1-1/2" excess felton exterior wall
2"
Allow exterior c-channel to extend 2" beyond each
side of window buck
Allow felt-paper to extend out 1-1/2" from exterior
face of buck C-channel
Side View
Felt paper
Staple down felt-paperto cover entire top surface
of wood buck frame
Install c-channel to top ofwindow buck with screws
Date: 3/7/2013
TF Forming Systems, Inc.800-360-4634
www.TFSystem.com
ThermoFormX
Window Bucks
36
Cut poly splice pieces to desiredwidth to achieve accurate length
for window buck installation
Poly splices pieces(Cut same height as buck)
Poly splices pieces (Cut same height as buck)
C-channel is samewidth as window buck
Position preassembled window buck into place on top ofc-channels. Screw down through the bottom of the buck
and into the c-channels with 3" construction screws
Build below the window to desiredheight and make perfectly level
Window layout marks
Window
Date: 3/7/2013
TF Forming Systems, Inc.800-360-4634
www.TFSystem.com
ThermoFormX
Window Bucks
37
Make sure formsbelow window are level
Plastic stud rails cut todesired height on job site
Window layout mark
Build below the windowto desired height
Position preassembledwindow buck into place
Felt-paper extendingout 1-1/2" from wall
Slide poly spliceunderneath c-channel
Date: 3/7/2013
TF Forming Systems, Inc.800-360-4634
www.TFSystem.com
ThermoFormX
Window Bucks
38
Slide down shortened poly panels in between stud rails
Adjust the cut of theplastic studs to provideat least two cross-ties
at the same height
Cut so that cross-ties line up horizontally with the
cross-ties on the full rails on either side of opening
Remember to install headerreinforcement according to code
Insert lateral-ties to lockplastic studs together
Use aviation snips tocreate a custom slot for
different size window bucks
Place plastic stud railsonto c-channel
Insert lateral-ties to lockplastic studs together Slide down shortened poly
panels in between stud rails
Use aviation snips tocreate a custom slot for
different size window bucks
Date: 3/7/2013
TF Forming Systems, Inc.800-360-4634
www.TFSystem.com
ThermoFormX
Window Bucks
39
Sides of door buck must be pressure treated lumber
2"X4" bracing must be inplace before pouring wall!
Furring strip may be needed to fill out the door cavity
Rough Opening Width +3"
Rough OpeningHeight
Rough Opening
Width
Rough openingheight +1-1/2"
Topof buck
Assemble woodendoor frame and add
a furring strip if needed Cut vertical
2"X4" to roughopening height
Install some 2"X4"ledges under the horizontal 2"X4"
bracing
Add some horizontal2"X4" 's forincreasedsupport
B
B
Vertical2"X4" bracing
Horizontal2"X4" bracing
SECTION B-B
Door bucks should be assembled ahead of time for increased speed and efficiency at the job site
1 2
3 4
Date: 3/7/2013
Building Door Frame TF Forming Systems, Inc.800-360-4634
www.TFSystem.com
ThermoFormX40
12"
Poly Panel Support Boards
Date: 3/7/2013
www.TFSystem.com
TF Forming Systems, Inc.800-360-4634
ThermoFormX
to face of door buck frame for supporting poly panels next to openingsAfter the wood frame is assembled, 2 X 4's must be screw attached
Top View
Begin by positioning a screw at the top, then placing a screw down every 12"
41
Drill holes for the anchor boltsinto the wooden side bucks
Anchor Bolt
Wood side bucks
Anchor bolts
Wood top buck
2 x 4" bracingfor poly panels
2 x 4" bracing
Anchor bolt
www.TFSystem.com
Date: 3/7/2013ThermoFormX
TF Forming Systems, Inc.800-360-4634Installing Anchor Bolts
Embed anchor bolts, according to coderequirements, on both sides of door buck
42
2"
Cut exterior c-channel to extend 2" beyond each
side of door buck
Exterior c-channel
Interior c-channel
Staple felt paper to coverentire top of wooden buck
1-1/2" wider thanwood buck, let excess
material extend to the exterior
www.TFSystem.com
Date: 3/7/2013ThermoFormX
TF Forming Systems, Inc.800-360-4634Installing Felt & C-Channel
entire top surface of wood buck frameStaple down felt-paper to cover
door buck with screwsInstall c-channel to top of
1-1/2" excess felton exterior wall
Side View
C-channel
2 x 4"Poly panel bracing
43
Continue buildingTF Wall System
See door header instructions on next page
www.TFSystem.com
Date: 3/7/2013ThermoFormX
TF Forming Systems, Inc.800-360-4634Installing Door Buck
Cut a 2x1/16" c-channelslot into the exterior poly
before installing it
Position preassembleddoor buck into place
Build up to the dooropening, install a splice panel
as needed and install door buck
Cut a 2x1/16" slot into exterior poly wall to allow exterior c-channel to enter
44
Cut plastic studs to height on job site, place plastic stud
rails onto c-channel
Slide down correct height panels in between stud rails
Insert lateral-ties tolock stud rails together
Installing Door Header
Date: 3/7/2013
www.TFSystem.com
TF Forming Systems, Inc.800-360-4634
ThermoFormX
reinforcement according to codeRemeber to install header
Adjust the cut of the plastic studs to provide at least
two cross-ties atsame height
Use aviation snips to create a custom slot for different size door bucks
45