Section 5

Building Techniques

Sec

tio

n 5

: B

uil

din

g T

ech

niq

ues

Page 2: Section 5 Building Techniques - TF System - Installation...Building Techniques. Slightly bent rebar ends ... 28. Slide poly panel up ... rip this splice panel to the same width

Slightly bent rebar endsslide over ties easier

Slide rebar into postion from the open end of wall

Vertical reinforcement may be installed at any time before

interior top c-channel is installed.

Slide up panels to gain access and tie rebar

into place

Date: 2/19/2013

Horizontal Rebar Installation TF Forming Systems, Inc800-360-4634

www.TFSystem.com

ThermoFormX28

Page 3: Section 5 Building Techniques - TF System - Installation...Building Techniques. Slightly bent rebar ends ... 28. Slide poly panel up ... rip this splice panel to the same width

Slide poly panel up to installand tie vertical rebar into place

Install vertical rebar by inserting the top of the rebarinto the wall opening and rotate bottom into place

Vertical rebar shown in place

Date: 2/19/2013

Vertical Rebar Installation TF Forming Systems, Inc800-360-4634

www.TFSystem.com

ThermoFormX29

Page 4: Section 5 Building Techniques - TF System - Installation...Building Techniques. Slightly bent rebar ends ... 28. Slide poly panel up ... rip this splice panel to the same width

16" Overlap

After mounting upper c-channel withproper overlap, straighten wall with string line

Once wall is straightened, screw c-channelstogether with steel stud screws or sheet metal screws

As you build the wall, install theupper exterior c-channel to help stiffenthe wall and hold everything together

Exterior c-channel

Interior of wall

Installing upper interior c-channelis the last step. This will allow

for the panels to be slid upfor access to the cavity.

After all the rebar is tied, the wall isinspected, and the bottom of the

cavity is cleaned out, thenthe interior c-channel

may be installed.

Date: 2/19/2013

TF Forming Systems, Inc800-360-4634

www.TFSystem.com

ThermoFormX

Upper C-Channel Installation

30

Page 5: Section 5 Building Techniques - TF System - Installation...Building Techniques. Slightly bent rebar ends ... 28. Slide poly panel up ... rip this splice panel to the same width

Brace and plumb back surface beforeattaching the stud of the intersecting wall

(See next page)

Use 1" sheet metal screwsspaced 12" vertically

Plumb T-intersection in all directions before screwing together

When using 8" or less wall system,rip this splice panel to the same width

as the intersecting wall cavity

Plastic stud with cut flanges

If you need a T-Intersection

When using 10" thick or larger wall system,use two equally sized splice panels with

a stud rail joining them

Contact a TF Forming Systemsrepresentitive for additional bracing information

1-1/2"Construction screw

Plastic stud

Plastic stud rail

Date: 2/19/2013

T-Intersection Top View TF Forming Systems, Inc.800-360-4634

www.TFSystem.com

ThermoFormX31

Page 6: Section 5 Building Techniques - TF System - Installation...Building Techniques. Slightly bent rebar ends ... 28. Slide poly panel up ... rip this splice panel to the same width

Do not flow concretein this direction

(if possible)

Always try to flow concreteaway from the T-Intersection

Kickers as needed to stopbracing from moving

(3 kickers are suggested for an 8ft wall)

2" X 6" T-brace screwedto horizontal 2" X 4"

Horizontal 2" X 4" every16" o.c. from bottom to top

ConcreteFlow

T- Intersection Bracing

Contractor assumes allresponsibility for design

and implementationof bracing

Date: 2/19/2013

T-Intersection Bracing TF Forming Systems, Inc.800-360-4634

www.TFSystem.com

ThermoFormX32

Page 7: Section 5 Building Techniques - TF System - Installation...Building Techniques. Slightly bent rebar ends ... 28. Slide poly panel up ... rip this splice panel to the same width

Stagger screws on each stud

Metal strapping every 4ft

2" X 12"

Perforated metal strapping

Screw lumber bracinginto plastic studs every 16" o.c.

Secure metal strapping to lumber and to plastic rails with coarse

thread construction screws

2" X 4"

2" X 4"

H

Space needed forconcrete brick ledge

4"

Date: 2/14/2014

TF Forming Systems, Inc800-360-4634

www.TFSystem.com

ThermoFormX

Installing a Brickledge

33

Page 8: Section 5 Building Techniques - TF System - Installation...Building Techniques. Slightly bent rebar ends ... 28. Slide poly panel up ... rip this splice panel to the same width

When using 2"X12" lumber,a furring strip may be neededto fill out the window cavity on wall thickness greater than 6"

The sides of the window buck must be pressure

treated lumber

Use pressure treated2"X4" lumber for base

A

A

Horizontal 2"X4" bracing

Vertical 2"X4" bracing

Assemble woodenwindow buck frameand add a furring

strip if needed

Install a 2"X4" verticallyto brace the top andbase of the wooden

buck frame

Install ahorizontal 2"X4"

to reinforcebase boards

Install horizontal 2"X4" 'sto brace the sides of

the window buck

Add header bracingto keep window square

SECTION A-A

Base boards

Furring strip

Rough openingheight

Rough openingwidth

Rough opening width +3"

Rough openingheight +3"

Topof buck

Window bucks should be assembled ahead of time for increased speed and efficiency at the job site

1 2

3 4

Headerbracing

2"X4" bracing must bein place before pouring wall!

Date: 3/7/2013

Window Bucks TF Forming Systems, Inc.800-360-4634

www.TFSystem.com

ThermoFormX34

Page 9: Section 5 Building Techniques - TF System - Installation...Building Techniques. Slightly bent rebar ends ... 28. Slide poly panel up ... rip this splice panel to the same width

3/7/2013

www.TFSystem.com

ThermoFormXDate:

TF Forming Systems, Inc.800-360-4634Window Bucks

to face of window buck frame for bracing poly panels next to openings

Top View

After the wood frame is assembled, 2 X 4's must be screw attached

Begin by positioning a screwat the top, then placing ascrew down every 12"

12"

35

Page 10: Section 5 Building Techniques - TF System - Installation...Building Techniques. Slightly bent rebar ends ... 28. Slide poly panel up ... rip this splice panel to the same width

Interiorc-channel

(flush with sides)

1-1/2" excess felton exterior wall

2"

Allow exterior c-channel to extend 2" beyond each

side of window buck

Allow felt-paper to extend out 1-1/2" from exterior

face of buck C-channel

Side View

Felt paper

Staple down felt-paperto cover entire top surface

of wood buck frame

Install c-channel to top ofwindow buck with screws

Date: 3/7/2013

TF Forming Systems, Inc.800-360-4634

www.TFSystem.com

ThermoFormX

Window Bucks

36

Page 11: Section 5 Building Techniques - TF System - Installation...Building Techniques. Slightly bent rebar ends ... 28. Slide poly panel up ... rip this splice panel to the same width

Cut poly splice pieces to desiredwidth to achieve accurate length

for window buck installation

Poly splices pieces(Cut same height as buck)

Poly splices pieces (Cut same height as buck)

C-channel is samewidth as window buck

Position preassembled window buck into place on top ofc-channels. Screw down through the bottom of the buck

and into the c-channels with 3" construction screws

Build below the window to desiredheight and make perfectly level

Window layout marks

Window

Date: 3/7/2013

TF Forming Systems, Inc.800-360-4634

www.TFSystem.com

ThermoFormX

Window Bucks

37

Page 12: Section 5 Building Techniques - TF System - Installation...Building Techniques. Slightly bent rebar ends ... 28. Slide poly panel up ... rip this splice panel to the same width

Make sure formsbelow window are level

Plastic stud rails cut todesired height on job site

Window layout mark

Build below the windowto desired height

Position preassembledwindow buck into place

Felt-paper extendingout 1-1/2" from wall

Slide poly spliceunderneath c-channel

Date: 3/7/2013

TF Forming Systems, Inc.800-360-4634

www.TFSystem.com

ThermoFormX

Window Bucks

38

Page 13: Section 5 Building Techniques - TF System - Installation...Building Techniques. Slightly bent rebar ends ... 28. Slide poly panel up ... rip this splice panel to the same width

Slide down shortened poly panels in between stud rails

Adjust the cut of theplastic studs to provideat least two cross-ties

at the same height

Cut so that cross-ties line up horizontally with the

cross-ties on the full rails on either side of opening

Remember to install headerreinforcement according to code

Insert lateral-ties to lockplastic studs together

Use aviation snips tocreate a custom slot for

different size window bucks

Place plastic stud railsonto c-channel

Insert lateral-ties to lockplastic studs together Slide down shortened poly

panels in between stud rails

Use aviation snips tocreate a custom slot for

different size window bucks

Date: 3/7/2013

TF Forming Systems, Inc.800-360-4634

www.TFSystem.com

ThermoFormX

Window Bucks

39

Page 14: Section 5 Building Techniques - TF System - Installation...Building Techniques. Slightly bent rebar ends ... 28. Slide poly panel up ... rip this splice panel to the same width

Sides of door buck must be pressure treated lumber

2"X4" bracing must be inplace before pouring wall!

Furring strip may be needed to fill out the door cavity

Rough Opening Width +3"

Rough OpeningHeight

Rough Opening

Width

Rough openingheight +1-1/2"

Topof buck

Assemble woodendoor frame and add

a furring strip if needed Cut vertical

2"X4" to roughopening height

Install some 2"X4"ledges under the horizontal 2"X4"

bracing

Add some horizontal2"X4" 's forincreasedsupport

B

B

Vertical2"X4" bracing

Horizontal2"X4" bracing

SECTION B-B

Door bucks should be assembled ahead of time for increased speed and efficiency at the job site

1 2

3 4

Date: 3/7/2013

Building Door Frame TF Forming Systems, Inc.800-360-4634

www.TFSystem.com

ThermoFormX40

Page 15: Section 5 Building Techniques - TF System - Installation...Building Techniques. Slightly bent rebar ends ... 28. Slide poly panel up ... rip this splice panel to the same width

12"

Poly Panel Support Boards

Date: 3/7/2013

www.TFSystem.com

TF Forming Systems, Inc.800-360-4634

ThermoFormX

to face of door buck frame for supporting poly panels next to openingsAfter the wood frame is assembled, 2 X 4's must be screw attached

Top View

Begin by positioning a screw at the top, then placing a screw down every 12"

41

Page 16: Section 5 Building Techniques - TF System - Installation...Building Techniques. Slightly bent rebar ends ... 28. Slide poly panel up ... rip this splice panel to the same width

Drill holes for the anchor boltsinto the wooden side bucks

Anchor Bolt

Wood side bucks

Anchor bolts

Wood top buck

2 x 4" bracingfor poly panels

2 x 4" bracing

Anchor bolt

www.TFSystem.com

Date: 3/7/2013ThermoFormX

TF Forming Systems, Inc.800-360-4634Installing Anchor Bolts

Embed anchor bolts, according to coderequirements, on both sides of door buck

42

Page 17: Section 5 Building Techniques - TF System - Installation...Building Techniques. Slightly bent rebar ends ... 28. Slide poly panel up ... rip this splice panel to the same width

2"

Cut exterior c-channel to extend 2" beyond each

side of door buck

Exterior c-channel

Interior c-channel

Staple felt paper to coverentire top of wooden buck

1-1/2" wider thanwood buck, let excess

material extend to the exterior

www.TFSystem.com

Date: 3/7/2013ThermoFormX

TF Forming Systems, Inc.800-360-4634Installing Felt & C-Channel

entire top surface of wood buck frameStaple down felt-paper to cover

door buck with screwsInstall c-channel to top of

1-1/2" excess felton exterior wall

Side View

C-channel

2 x 4"Poly panel bracing

43

Page 18: Section 5 Building Techniques - TF System - Installation...Building Techniques. Slightly bent rebar ends ... 28. Slide poly panel up ... rip this splice panel to the same width

Continue buildingTF Wall System

See door header instructions on next page

www.TFSystem.com

Date: 3/7/2013ThermoFormX

TF Forming Systems, Inc.800-360-4634Installing Door Buck

Cut a 2x1/16" c-channelslot into the exterior poly

before installing it

Position preassembleddoor buck into place

Build up to the dooropening, install a splice panel

as needed and install door buck

Cut a 2x1/16" slot into exterior poly wall to allow exterior c-channel to enter

44

Page 19: Section 5 Building Techniques - TF System - Installation...Building Techniques. Slightly bent rebar ends ... 28. Slide poly panel up ... rip this splice panel to the same width

Cut plastic studs to height on job site, place plastic stud

rails onto c-channel

Slide down correct height panels in between stud rails

Insert lateral-ties tolock stud rails together

Installing Door Header

Date: 3/7/2013

www.TFSystem.com

TF Forming Systems, Inc.800-360-4634

ThermoFormX

reinforcement according to codeRemeber to install header

Adjust the cut of the plastic studs to provide at least

two cross-ties atsame height

Use aviation snips to create a custom slot for different size door bucks

45