Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 1

1

Section 347Section 347

SECTION 347PORTLAND CEMENT

CONCRETECLASS 1

(NON-STRUCTURAL)

SECTION 347SECTION 347PORTLAND CEMENT PORTLAND CEMENT

CONCRETECONCRETECLASS 1CLASS 1

(NON(NON--STRUCTURAL)STRUCTURAL)

Page 2: SECTION 347 PORTLAND CEMENT CONCRETE CLASS … Lab Technician Spec Cours… · SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)(NON-STRUCTURAL) ... The C-22 electronic

Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 2

2

Structural –vs- Nonstructural ?

Class 1 Non-StructuralClass 1 Non-Structural

Photographs of concrete structures and a sidewalk.

Page 3: SECTION 347 PORTLAND CEMENT CONCRETE CLASS … Lab Technician Spec Cours… · SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)(NON-STRUCTURAL) ... The C-22 electronic

Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 3

3

• Applicable to concrete designated as Class I (Nonstructural)

• Composed of portland cement, aggregates, and water, with or without chemical admixtures, slag, or pozzolanic materials

• Deliver concrete to placement site in a freshly mixed, unhardened state.

Description- Section 347-1Description- Section 347-1

347-1 Description.The requirements of this Section are applicable to concrete designated as Class I (Nonstructural), hereinafter referred to as concrete. Use concrete composed of a mixture of portland cement, aggregates, and water, with or without chemical admixtures, slag, or pozzolanic materials. Deliver concrete to placement site in a freshly mixed, unhardened state. Ensure the concrete is placed and cured in a manner to ensure that the strength and durability of the concrete is maintained.

Page 4: SECTION 347 PORTLAND CEMENT CONCRETE CLASS … Lab Technician Spec Cours… · SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)(NON-STRUCTURAL) ... The C-22 electronic

Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 4

4

• Must be from Approved sources

(a) Portland Cement............................... Section 921*(b) Fine Aggregate.............. ...................Section 902(c) Coarse Aggregate..............................Section 901(d) Water .................................................Section 923(e) Chemical Admixtures.........................Section 924(f) Pozzolans and Slag............................ Section 929

*The heat of hydration requirements of Section 921 is not applicable to nonstructural concrete.

• Chemical admixtures may be used

Materials- Section 347-2Materials- Section 347-2

347-2 Materials.347-2.1 General: Certify that all materials used in concrete are from Department approved sources, and free from frozen or other detrimental matter.

Meet the following requirements:(a) Portland Cement.................................. Section 921*(b) Fine Aggregate.................................... Section 902(c) Coarse Aggregate.............................. Section 901(d) Water ................................................. Section 923(e) Chemical Admixtures........................... Section 924(f) Pozzolans and Slag.............................. Section 929

•The heat of hydration requirements of Section 921 is not applicable to nonstructural concrete. Portland cements meeting the requirements of AASHTO M-85 or ASTM C 150 are allowed for nonstructural concrete.

347-2.2 Admixture Requirements: Chemical admixtures may be added at the dosage rates recommended by the manufacturer.

Page 5: SECTION 347 PORTLAND CEMENT CONCRETE CLASS … Lab Technician Spec Cours… · SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)(NON-STRUCTURAL) ... The C-22 electronic

Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 5

5

• Chemical Admixtures OK

• Approved material sources may be substituted for similar materials indicated on the originally approved mix design.

347-2.2 Admixture Requirements347-2.3 Substitution of Materials

Materials- Section 347-2Materials- Section 347-2

347-2.2 Admixture Requirements: Chemical admixtures may be added at the dosage rates recommended by the manufacturer.347-2.3 Substitution of Materials: Approved material sources may be substituted for similar materials indicated on the originally approved mix design. Use originally approved mix components and proportions, when unsatisfactory test results are obtained from the use of the substituted material(s).

Page 6: SECTION 347 PORTLAND CEMENT CONCRETE CLASS … Lab Technician Spec Cours… · SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)(NON-STRUCTURAL) ... The C-22 electronic

Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 6

6

347-2.4.2 Aggregate Storage:

• Provide suitable storage for different aggregates.

• Identify Department approved pit number and aggregate type/gradation.

• Minimize segregation.

• Sprinkle coarse aggregate with water, 24 hours prior to introduction into concrete mix.

• Store aggregate in well-drained conditions to minimize free water content.

• Provide Access for the Engineer to sample aggregate.

Materials- Section 347-2Materials- Section 347-2

347-2.4.2 Aggregate Storage: Provide suitable bins, stockpiles or silos to store and identify aggregates without mixing, segregating or contaminating different grades or types of materials. Identify Department approved pit number and aggregate type/gradation. Handle the aggregates in a manner to minimize segregation and meet the specification requirements when recovered from storage. Continuously and uniformly sprinkle coarse aggregate with water, for 24 hours preceding introduction into the concrete mix. Maintain stored aggregates in a well drained condition to minimize free water content. Provide access for the Engineer to sample the aggregates from the recovery side of the storage facility.

Page 7: SECTION 347 PORTLAND CEMENT CONCRETE CLASS … Lab Technician Spec Cours… · SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)(NON-STRUCTURAL) ... The C-22 electronic

Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 7

7

• Concrete production equipment must be in good operating condition and operated in a manner to ensure a consistent product.

• Facility must determine free moisture for the aggregate within two hours prior to each day’s batching.

• An additional moisture test must be performed for placements exceeding three hours.

Produce, Mix, Deliver -Section 347-3Produce, Mix, Deliver -Section 347-3

347-3 Production, Mixing and Delivery.

347-3.1 Concrete Production Requirements: ….Produce concrete utilizing equipment that is in good operating condition and operated in a manner to ensure a consistent product. Within two hours prior to each day’s batching, ensure that the concrete production facility determines the free moisture for the coarse and fine aggregates. On concrete placements expected to exceed three hours, perform an additional moisture test approximately half way through the batching operations and adjust batch proportions accordingly….

Aggregate free moisture may be determined by one or more of the following methods:

-By using moisture probe readings, speedy moisture tester or chapmanflask for fine aggregate moisture. The accuracy of the moisture probe shall be verified at least weekly by the manufacturer’s recommended method. The Chapman flask and speedy moisture tester will be verified at least weekly by method (b) below.

b. By calculating both coarse and fine aggregate free moisture based upon dry sample weights and adjusting for absorption.

c. By towel drying coarse aggregate to calculate free moisture on saturated surface dry aggregate. The accuracy of towel drying shall be verified weekly by method (b) above.

Page 8: SECTION 347 PORTLAND CEMENT CONCRETE CLASS … Lab Technician Spec Cours… · SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)(NON-STRUCTURAL) ... The C-22 electronic

Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 8

8

Quarterly have a qualified rep of a scale company registered with the Bureau of Weight and Measures of the Florida Dept. of Agriculture check all scales, meters and other weighting or measuring devices for accuracy.

Produce, Mix, Deliver -Section 347-3Produce, Mix, Deliver -Section 347-3

347-3 Production, Mixing and Delivery.

347-3.1 Concrete Production Requirements: ….Ensure that the calibration of the measuring devices of the concrete production facilities meets the requirements of Chapter 531 of the Florida Statutes. At least quarterly, ensure that all scales, meters and other weighing or measuring devices are checked for accuracy by a qualified representative of a scale company registered with the Bureau of Weights and Measures of the Florida Department of Agriculture. Have the accuracy of admixture measuring dispensers certified annually by the admixture supplier.

When Volumetric Mixers are used, deliver concrete in accordance with the requirements of Volumetric Mixer Manufactures Bureau (VMMB) and ensure that the vehicle has a VMMB registered rating plate.

Page 9: SECTION 347 PORTLAND CEMENT CONCRETE CLASS … Lab Technician Spec Cours… · SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)(NON-STRUCTURAL) ... The C-22 electronic

Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 9

9

347-3.2 Mixers

• Ensure mixers are in good working order

• Operate mixers according to manufacturer’s recommendations

Produce, Mix, Deliver -Section 347-3Produce, Mix, Deliver -Section 347-3

347-3.2 Mixers: Ensure that mixers are capable of combining the components of concrete into a thoroughly mixed and uniform mass, free from balls or lumps of cementitious materials, and capable of discharging the concrete uniformly. Operate concrete mixers at speeds per the manufacturer’s design. Do not exceed the manufacturer’s rated capacity for the volume of mixed concrete in the mixer, mixing drum, or container.

Page 10: SECTION 347 PORTLAND CEMENT CONCRETE CLASS … Lab Technician Spec Cours… · SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)(NON-STRUCTURAL) ... The C-22 electronic

Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 10

10

• Maximum allowable maximum mixing and agitation time of concrete is 120 minutes

• May make job site water adjustments if before discharging concrete

347-3.3 Delivery

Produce, Mix, Deliver -Section 347-3Produce, Mix, Deliver -Section 347-3

347-3.3 Delivery: The maximum allowable mixing and agitation time of concrete is 120 minutes.

Page 11: SECTION 347 PORTLAND CEMENT CONCRETE CLASS … Lab Technician Spec Cours… · SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)(NON-STRUCTURAL) ... The C-22 electronic

Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 11

11

• Submit proposed mix design on a form supplied by the Department

• Use mix designs with the following requirements and having prior approval of the Engineer

• 28-day minimum strength of 2,500 psi (17 MPa)

Control of Quality -Section 347-4Control of Quality -Section 347-4

347-4 Control of Quality.347-4.1 Concrete Mix Design: Before producing any concrete, submit the proposed mix design to the Engineer on a form provided by the Department. Use only concrete mix designs having prior approval of the Engineer.

Materials may be adjusted provided that the theoretical yield requirement of the approved mix design is met. Show all required original approved design mix data and batch adjustments and substituted material on the Department concrete delivery ticket. The Engineer may disqualify any concrete production facility for non-compliance with Specification requirements.

347-4.2 Sampling and Testing: The Engineer may sample and test the concrete at their discretion to verify its quality. The minimum 28-day compressive strength requirement for this concrete is 2,500 psi [17 MPa].

Page 12: SECTION 347 PORTLAND CEMENT CONCRETE CLASS … Lab Technician Spec Cours… · SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)(NON-STRUCTURAL) ... The C-22 electronic

Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 12

12

• Materials may be adjusted provided that the theoretical yield requirement of the approved mix design is met.

• The Engineer may disqualify any concrete production facility for non-compliance with Specification requirements.

Control of Quality -Section 347-4Control of Quality -Section 347-4

347-4.1 Concrete Mix Design: Before producing any concrete, submit the proposed mix design to the Engineer on a form provided by the Department. Use only concrete mix designs having prior approval of the Engineer.

Materials may be adjusted provided that the theoretical yield requirement of the approved mix design is met. Show all required original approved design mix data and batch adjustments and substituted material on the Department concrete delivery ticket. The Engineer may disqualify any concrete production facility for non-compliance with Specification requirements.

Page 13: SECTION 347 PORTLAND CEMENT CONCRETE CLASS … Lab Technician Spec Cours… · SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)(NON-STRUCTURAL) ... The C-22 electronic

Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 13

13

The Engineer may sample and test the concrete at his discretion to verify its quality.

Control of Quality -Section 347-4Control of Quality -Section 347-4

Page 14: SECTION 347 PORTLAND CEMENT CONCRETE CLASS … Lab Technician Spec Cours… · SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)(NON-STRUCTURAL) ... The C-22 electronic

Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 14

14

SECTION 347PORTLAND

CEMENTCONCRETE-

CLASS INONSTRUCTURAL

Any QuestionsAny Questions

Page 15: SECTION 347 PORTLAND CEMENT CONCRETE CLASS … Lab Technician Spec Cours… · SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)(NON-STRUCTURAL) ... The C-22 electronic

Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 15

15

FormsForms

CONCRETEFORMS

CONCRETECONCRETEFORMSFORMS

Page 16: SECTION 347 PORTLAND CEMENT CONCRETE CLASS … Lab Technician Spec Cours… · SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)(NON-STRUCTURAL) ... The C-22 electronic

Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 16

16

Mix DesignMix Design

Same as pages 64 & 65

Page 17: SECTION 347 PORTLAND CEMENT CONCRETE CLASS … Lab Technician Spec Cours… · SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)(NON-STRUCTURAL) ... The C-22 electronic

Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 17

17

1 23 4811109 6 57

20

121413

15 1619

1817222123

2427

2526 28 29

30 313233

3534

Sample Transmittal -Form # 675-060-04

36 37 38 3940

41

42 4344

The C-22 Card, still available from the Department’s website, can be used for recording sample information prior to entering the data in LIMS.

The C-22 electronic Card is printed out by the LIMS system following the initial Single Sample Login of a set of cylinders.Same as pages 64 & 65

Page 18: SECTION 347 PORTLAND CEMENT CONCRETE CLASS … Lab Technician Spec Cours… · SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)(NON-STRUCTURAL) ... The C-22 electronic

Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 18

18

Disposition of Defective MaterialDisposition of Defective MaterialDisposition of

Defective Material

This is the form used by the Department in cases of Defective Material, such as Asphalt or Concrete not meeting specifications or project requirements, which the Contractor desires to leave in place. Typically, the QC Manager is responsible for coordinating any Engineering Analysis Report (EAR) submittal to the Project Administrator in the case of defective material being left in-place and accepted.A full size of this form follows.

Page 19: SECTION 347 PORTLAND CEMENT CONCRETE CLASS … Lab Technician Spec Cours… · SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)(NON-STRUCTURAL) ... The C-22 electronic

Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 19

Page 20: SECTION 347 PORTLAND CEMENT CONCRETE CLASS … Lab Technician Spec Cours… · SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)(NON-STRUCTURAL) ... The C-22 electronic

Student Manual Concrete Laboratory Technician

Version 1.0-7/20/06 20

20

FORMS