LEGEND:
WALL
(N) FOUNDATION
(E) FOUNDATION
WALL ABOVE
BEAMS AND
HEADERS
BEAM # IN
CALCS.
JOIST # IN
CALCS.
POST BELOW
POST ABOVE
INDEX:
C1.1 GENERAL NOTES /
DETAILS
S1.1 FOUNDATION PLAN /
2ND FLOOR FRAMING PLAN
S1.2 3RD FLOOR FRAMING PLAN /
ROOF DECK FRAMING PLAN
S1.3 ROOF FRAMING PLAN /
DETAILS
1
Design Criteria1. Building code:
1.1 Model building code: 2009 IBC, 2009IRC1.2 2011 Denver Amendment
2. Dead loads:2.1 Roof total 15psf2.2 Floor 12psf2.3 Walls 10psf
3. Live loads3.1 Residential 40psf3.2 Roof 20psf
4. Snow loads4.1 Roof snow load 25psf
5. Handrail5.1 200# point load
6. Wind Design Data6.1 Exposure Category C6.2 Basic Wind Speed V = 90mph6.3 Occupancy Cat. Iw = 2
General notes:1. Construction documents are valid for a single use at the project location and shall not be reused, copied, or reproduced without written
approval of the registered design professional in reasonable charge.2. General notes and typical details are provided as a supplement to the construction documents and apply where specific notes and details
are not available. Specific notes and structural details shall take precedence over general notes and typical details. Structuralrequirements shown in the framing plans and in the structural shall take precedence over structural notes indicated in architecturalsections.
3. Printed dimensions shall take precedence over scales shown on construction documents. The registered design professional in reasonablecharge does not warrant the accuracy of scaled dimensions.
4. Approval by the inspector does not imply approval by the registered design professional in reasonable charge. Structural specificationsthat are unclear or ambiguous shall be referred to the registered design professional in reasonable charge for interpretation or clarification.
5. The contractor is responsible for the methods, means and sequence of all structural erection except when specifically noted otherwise inthe construction documents. The contractor shall provide temporary shoring and bracing, providing adequate vertical and lateral supportduring erection. Shoring and bracing shall remain in place until all permanent members are placed and all final connections are completed.
6. The contractor is responsible for standard connections unless notes otherwise. The contractor shall obtain additional assistance from theregistered design professional in reasonable charge for all non-standard connections.
7. The contractor agrees that, in accordance with generally accepted construction practices, the contractor will be required to assume soleand complete responsibility for job site conditions during the course of construction of the project, including safety of all persons andproperty. This requirement shall be made to apply continuously and not be limited to normal working hours. The contractor further agreesto defend, indemnify and hold owner and engineer harmless from any and all liability, real or alleged, in connection with the performanceof work on this project, exempting liability arising from the sole negligence of engineer.
Concrete1. Concrete materials, quality control and construction shall comply with 2009 IBC Chapter 1704.4,19 and ACI 318-08. Special inspections
shall be evaluated in accordance with ACI 318-08 R5.6, 5.8 and tested in accordance with ASTM C172, C31. Compressive strength (minimum specified at 28 days)1.1 Footing 4000 psi1.2 Slab 4000 psi1.3 Walls 4000 psi2. Materials
2.1 Cements (ASTM C 150) Concrete exposed to freezing and thawing or deicing chemicals shall conform to the maximumwater-cementitious material ratio and minimum compressive strength requirements of ACI 318-08 table 4.3.1.
2.2 Aggregates (ASTM C 33) nominal maximum size of course aggregates shall conform to (ACI 318-08 3.3.2)2.3 Water used in mixing concrete shall be potable and clean. ACI 318-08-3.1.1-2)
3. Steel3.1 Deformed Bars: fy =60 ksi (ASTM A615)3.2 At the time concrete is placed, reinforcement shall be free from mud, oil, and other nonmetallic coatings that
decrease bond (ACI 318-11 7.4.1)4. Minimum Concrete cover (ACI 318-11-7.7.1)
4.1 Concrete cast against earth: 3 inches4.2 Concrete exposed to earth or weather:
5.2.1 No. 6 or larger 2 inches5.2.2 No. 5 bars, W31 Wire, or smaller: 1.5 inches
5. Formwork shall conform to ACI 318-08 and ACI 347. Forms shall be removed in a manner as not to impair safety and serviceability of thestructure. Concrete exposed by form removal shall have sufficient strength not to be damaged by removal operation.
Wood1. Wood materials, quality and construction shall conform to 2009 IBC chapter 23 and Table 2304.9.1.2. Structural lumber: (2009 IBC 2303.1.1-8, 2005 NDS)
2.1 Bearing walls:Hem-Fir (HF) Stud (SATM D 1990, DOC PS 20)2.2 Post: Hem-fir (HF) #2 or better (ASTM D 1990, DOC PS 20)2.3 Beam and Headers Hem-fir (HF) #2 or better (ASTM D 1990, DOC PS 20)2.4 Sill Plates Preservative-treated wood
3. Structural composite lumber and engineered wood (2005 NDS 8.1.1)3.1 Laminated strand lumber 3.1.2 Ex = 1.55E3.2 Prefabricated wood I-Joist (IBC 2009 2303.1.2, 2005 NDS 9.1.3)3.3 Microllam LVL Ex = 2.0
4. Wood Structural panels4.1 Roof floor and sheathing: Oriented Strand Board (OSB) (DOC PS 1,2)4.2 Sheathing shall be manufactured with exterior glue and not less than 4x8 feet, except at boundaries and at
changes in framing.4.3 Wall Sheathing
4.3.1 Oriented Strand Board (OSB) (DOC PS 1,2)4.3.2 All panel joints in wall shall occur over studs or blocking using 8D nails spaced a minimum of 6 inches at
panel edges and 12 inches at intermediate framing. Stager sheathing joints.5. Joist hanger, column caps, column bases, framing hardware:
5.1 Acceptable manufacturer Simpson Strong Tie 5956 W. Las Positas Blvd., Pleasanton, CA 94588 (800) 925-5099 http://www.strongtie.com
5.2 Substitutions: not permitted.6. Adhesive:
6.1 Liquid nails heavy duty construction adhesive (ln-903/lnp-903)6.2 Specification ASTM c-5576.3 Substitutions: permitted.
Structural Steel:1. Structural Steel shall be detailed, fabricated and erected in accordance with 2010 AISC Specification
for Structural Steel Buildings, and “Code of Standard Practices” 2005.2. Structural Steel shall be confirmed to the following grades:
2.1 W- & WT- Shapes: ASTM A992 2.2 Plates & Angles: A36 2.3 HSS: ASTM A500 gr B 2.4 Steel Pipe: ASTM A53 gr B
3. All bolts shall conform to the ASTM A325 except anchor bolts which shall conform to ASTM A307.Bolt Size shall be ¾”, unless noted otherwise on the drawings.
4. All welding shall be by a certified welder in accordance with ACIS and AWS specifications andrecommendation.
5. Special inspections shall be performed per IBC 1704.3 in accordance with AISC 360 and AWS D1.1-1.4.
Structural Observation1. The owner shall employ a registered design professional to perform structural observations as defined in 2009 IBC 1702 for those
structures where one or more of the conditions stated in 2009 IBC 1710.2 through 1710.3 exist. Prior to the commencement ofobservations, the structural observer shall submit to the building official a written statement identifying the frequency and extent of thestructural observations. At the conclusion of the work, the structural observer shall submit to the building official a written statement thatthe site visits have been made and identify any reported deficiencies which have not been resolved (2009 IBC 1710.0)
BOTH
FLANGES TYP.
7/16
2/16
2/16
W12x26
W12x22
(8)
7
8
" Ø BOLTS
SECTION 9
1" = 1'-0"
1
2
" x 16
1
2
" x 5
1
2
"
TOP PLATE
1
1
2
"
2
1
2
"
1
1
2
"
1"
2
7
16
"
9
5 8
"
2
7
16
"
1"
5
1
2
"
1'-4
1 2
"
1" TYP
6" M
IN
1
2
" AB PER PLAN
2x6 @ 16" o.c.
2x6 PT SILL
7/16" OSB.
OR SHEATHING PER
SHEAR WALL SCHEDULE
8d @ 6" o.c.
OR NAILING PER
SHEAR WALL SCHEDULE
8"
3' M
IN
SECTION 2
1" = 1'-0"
MESH PER PLAN
CONCRETE SLAB
PER PLAN
EXPANSION JOINT
#4 @ 18" o.c.
3" CLR. TYP
SECTION 3
1" = 1'-0"
#4 VERTICAL @ 24" o.c.
3" CLR. TYP.
2'
8"
10
1
2
"
1/2" Ø AB PER PLAN
2x4 PT SILL
2x4 STUD @ 16" o.c.
SOUND PROOFING &
FIRE RATING SEE
SEE ARCH. PLANS
3' M
IN
(3) #4
3" CLR. TYP.
LAP 24" TYP.
#4 @ 24" o.c.
5/8" TYPE X
GYPSUM
6" M
IN
1
2
" AB PER PLAN
2x6 @ 16" o.c.
2x6 PT SILL
7/16" OSB.
OR SHEATHING PER
SHEAR WALL SCHEDULE
8d @ 6" o.c.
OR NAILING PER
SHEAR WALL SCHEDULE
(4) #4 (2) TOP,
(2) BOTTOM
8"
3' M
IN
SECTION 1
1" = 1'-0"
MESH PER PLAN
CONCRETE SLAB
PER PLAN
EXPANSION JOINT
#4 @ 18" o.c.
3" CLR. TYP
1
2
" GYPSUM
3' M
IN
8"
MESH PER PLAN
CONCRETE SLAB
PER PLAN
EXPANSION JOINT
CONCRETE DRIVE
SECTION 6
1" = 1'-0"
(4) #4 (2) TOP,
(2) BOTTOM
3" CLR. TYP.
6" M
IN
3
4
" Ø AB
MIN 8" EMBEDMENT
#4 @ 8" o.c.
EACH WAY
3" CLR. TYP.
1'
3' M
IN
SECTION 7
1" = 1'-0"
MESH PER PLAN
CONCRETE SLAB
PER PLAN
5/8" TYPE X
GYPSUM
1/4
1/4
W12x22
1
4
" x 12
3
8
" x 4
1
2
"
BASE PLATE
4
1
2
"
1"
(4) #4 (2) TOP,
(2) BOTTOM
3" CLR. TYP.
(2) #4
3" CLR. TYP.
1'-0
3 8
"
4
1
2
"
W12x26
SECTION 11
1" = 1'-0"
(2)
1
2
" BOLT
TJI PER PLAN
23
32
" OSB T&G
NAILED & GLUED
2x10 NAILER w/
POWDER ACTUATED
FASTENER @ 16" o.c.
W10x100 OR BEAM PER PLAN
W10x19
L
1
4
"x4"x4" DOUBLE ANGLE
w/ (6)
1
2
" BOLTS
23
32
" OSB T&G
NAILED & GLUED
1
3
4
" THICK NAILER w/
POWDER ACTUATED
FASTENER @ 16" o.c.
W10x54 OR BEAM PER PLAN
2x6 SOLE PLATE
2x6 STUDS @ 16" o.c.
1
3 4
" N
AILE
R
1
2
" WEB STIFFENER
EACH SIDE
SECTION 12
1" = 1'-0"
1
4
"x4"x7
1
2
"
PLATE
2" 2"
1
1 4
"5"
1
1 4
"
3/16
(2)
5
8
" ALL THREAD
PER POST
SECTION 8
1" = 1'-0"
#4 VERTICAL @ 24" o.c.
3" CLR. TYP.
2'
8"
10
1
2
"
3' M
IN
(3) #4
3" CLR. TYP.
LAP 24" TYP.
#4 @ 24" o.c.
HSS3.000x0.125
1'-4"1'-4"
1
4
" WEB STIFFENER
EACH SIDE
HSS3.000x0.125
SECTION 10
1" = 1'-0"
3/16
(2) L
1
4
"x4"x4"
w/ (6)
1
2
" BOLTS
W10x54 OR BEAM PER PLAN
W10x30
WEB STIFFENER
AT CONNECTION
23
32
" OSB T&G
NAILED AND GLUED
2x6 NAILER
w/ POWDER ACTUATED
FASTENER @ 12" o.c.
6" M
IN
8"
3' M
IN
SECTION 5
1" = 1'-0"
MESH PER PLAN
CONCRETE SLAB
PER PLAN
EXPANSION JOINT
1'-4"
FOOTING PER PLAN
(2)
1
2
" AB PER POST
1'-4"
8"
6" M
IN
8"
3' M
IN
SECTION 4
1" = 1'-0"
MESH PER PLAN
CONCRETE SLAB
PER PLAN
EXPANSION JOINT
#4 @ 18" o.c.
3" CLR. TYP
1
2
" GYPSUM
1'-4"
8"
1
4
"x4"x7
1
2
"
PLATE
2" 2"
1
1 4
"5
"1
1 4
"
(2)
1
2
" AB PER POST
3/16
3/16
GROUT
GROUT
GROUT
WEB STIFFENER
AT CONNECTION
TJI PER PLAN
GROUT
8"
3" 5"
(2) #4
3" CLR. TYP.
(4) #4 (2) TOP,
(2) BOTTOM
(2) #4
3" CLR. TYP.
(4) #4 (2) TOP,
(2) BOTTOM
(2) #4
3" CLR. TYP.
(4) #4 (2) TOP,
(2) BOTTOM
3" CLR. TYP.
(2) #4
3" CLR. TYP.
1
2
" AB PER PLAN
2x6 @ 16" o.c.
2x6 PT SILL
(4) #4 (2) TOP,
(2) BOTTOM
#4 @ 18" o.c.
3" CLR. TYP
8"
#4 @ 18" o.c.
3" CLR. TYP
#4 @ 18" o.c.
3" CLR. TYP
LSTHD8
1
2
" GYPSUM
4'-6"
(4) #4 (2) TOP,
(2) BOTTOM
8d @ 6" o.c.
3-16d @ 16" o.c.
---
---
---
---
SHEET
DATE
OF
JOB NO.
BY
REVISIONS
1
DATE
2
3
DL
E
NG
IN
EE
RIN
G IN
C.
27
50
S
. W
AD
SW
OR
TH
B
LV
D.
UN
IT
D
-1
15
DE
NV
ER
, C
O 8
02
27
72
0-4
40
-9
45
0
WW
W.D
LE
NG
IN
EE
R.C
OM
TO
WN
H
OU
SE
S A
T
27
20
F
ED
ER
AL
B
LV
D
DE
NV
ER
, C
O 8
02
11
OW
NE
R: ---
3/1
4/1
6
2016-1013
AS
C1-1
4
GJ
T
8/5/16
CHECK
BY
GE
NE
RA
L N
OT
ES
DE
TIA
LS
---
---
0" 1'
1
1
A B C
1
3
4
D E F G
2
FOUNDATION NOTES:
1. FOLLOW ALL RECOMMENDATIONS OF SOIL AND FOUNDATION INVESTIGATION REPORT BY COMPLETE ENGINEERING SERVICES, INC.
DATED FEBRUARY 17, 2016 REPORT NO. 16-10264. OPEN HOLE OBSERVATION TO BE PERFORMED AFTER EXCAVATION.
2. CONCRETE SLAB SHALL BE 4" THICK REINFORCED WITH 6x6 W1.4xW1.4
3. ANCHOR BOLTS SHALL BE
1
2
" DIAMETER x 10" LONG w/ 3"x3"x0.229" STEEL PLATE WASHER AT 4' ON CENTER MAXIMUM AND 1' FROM ENDS
TYPICAL UNLESS OTHERWISE NOTED
4. ANCHOR BOLTS SHALL BE LOCATED AS FOLLOWS"
4.1. WITHIN 12" OF A SPLICE ON EXTERIOR WALLS
4.2. WITHIN 12" OF THE END OF A SHEAR PANEL INTERIOR & EXTERIOR
4.3. MINIMUM OF TWO BOLTS PER SPLICE
5. DO NOT POUR SLAB UNTIL UNDER FLOOR UTILITIES HAVE BEEN VERIFIED
6. COORDINATE LOCATIONS OF ANCHOR BOLTS HOLD DOWNS AND POST BASES ETC... WITH FRAMING CONTRACTOR PRIOR TO POURING
FOOTING AND SLAB.
7. ALL HOLD DOWNS TO BE SIMPSON STRONG-TIE OR EQUIVALENT.
SECOND FLOOR FRAMING PLAN
3/16" = 1'-0"
FOUNDATION PLAN
3/16" = 1'-0"
W10x19
1
W10x100
2
W10x54
3
4
11
7
8
" T
JI 110 @
16"o.c. T
YP
1
11
L
S
T
H
D
8
L
S
T
H
D
8
L
S
T
H
D
8
L
S
T
H
D
8
5
W
1
2
x
2
2
W
1
2
x
2
2
W12x26
6
L
S
T
H
D
8
L
S
T
H
D
8
L
S
T
H
D
8
L
S
T
H
D
8
L
S
T
H
D
8
L
S
T
H
D
8
L
S
T
H
D
8
L
S
T
H
D
8
3 4
"
Ø
A
B
3 4
"
Ø
A
B
28.00' F.F.28.25' F.F.28.90' F.F.30.15' F.F.30.60' F.F.30.60' F.F.
STEP T.O.W.
DOWN 3"
STEP T.O.W.
DOWN 8"
STEP T.O.W.
DOWN 15"
STEP T.O.W.
DOWN 5"
SLOPE
1
8
" PER FOOT
SLOPE
1
8
" PER FOOT
SLOPE
1
8
" PER FOOT
SLOPE
1
8
" PER FOOT
SLOPE
1
8
" PER FOOT
SLOPE
1
8
" PER FOOT
5'-5
3
4
"
5'-11"
3'-7
1
2
"
1'-4
1 2
"
10'-10
1
2
"
3'-2
1
4
"
6'-2"
5'-3"
1'-4"
8'-2
3
4
"
1'-4"
3'-6
1
2
"
3'-2
1
4
"
6'-2"
5'-3"
1'-4"
8'-2
3
4
"
1'-4"
3'-6
1
2
"
3'-2
1
4
"
6'-2"
5'-3"
1'-4"
8'-2
3
4
"
1'-4"
3'-6
1
2
"
3'-2
1
4
"
6'-2"
5'-3"
1'-4"
8'-2
3
4
"
1'-4"
3'-6
1
2
"
2'-10
3
4
"
6'-2"
6'-1
1
2
"
1'-4"
7'-6"
1'-4"
3'-4
1
2
"
4' 15'-9" 8' 11'-8
3
4
" 8' 11'-6
3
8
" 4' 3'-1
1
4
" 4' 11'-6
3
8
" 8' 11'-8
3
4
" 8' 15'-9" 4'
4'
10
'-1
1 2
"
8"
10'-5
1 2
"
2'-2
1 2
"
5"
5'-5
1 2
"
H
S
S
3
.
0
0
0
x
0
.
1
2
5
W10x191
W10x100
2
5W10x15
W10x100
2
I
T
S
1
.
8
1
/
1
1
.
8
8
T
Y
P
11
7
8
" T
JI 110 @
16"o.c. T
YP
55
W
1
2
x
2
2
W
1
2
x
2
2
W12x26
6
H
S
S
3
.
0
0
0
x
0
.
1
2
5
H
S
S
3
.
0
0
0
x
0
.
1
2
5
(
2
)
2
x
4
W10x191
W10x100
2
5W10x15
W10x100
2
I
T
S
1
.
8
1
/
1
1
.
8
8
T
Y
P
11
7
8
" T
JI 110 @
16"o.c. T
YP
55
W
1
2
x
2
2
W
1
2
x
2
2
W12x26
6
H
S
S
3
.
0
0
0
x
0
.
1
2
5
H
S
S
3
.
0
0
0
x
0
.
1
2
5
(
2
)
2
x
4
111
W10x191
W10x100
2
5 W10x15
W10x100
2
I
T
S
1
.
8
1
/
1
1
.
8
8
T
Y
P
11
7
8
" T
JI 110 @
16"o.c. T
YP
5 5
W
1
2
x
2
2
W
1
2
x
2
2
W12x26
6
H
S
S
3
.
0
0
0
x
0
.
1
2
5
H
S
S
3
.
0
0
0
x
0
.
1
2
5
W10x191
W10x100
2
5 W10x15
W10x100
2
I
T
S
1
.
8
1
/
1
1
.
8
8
T
Y
P
11
7
8
" T
JI 110 @
16"o.c. T
YP
5 5
W
1
2
x
2
2
W
1
2
x
2
2
W12x26
6
H
S
S
3
.
0
0
0
x
0
.
1
2
5
H
S
S
3
.
0
0
0
x
0
.
1
2
5
W10x19
1
W10x100
2
W10x54
3
4 W10x15
I
T
S
1
.
8
1
/
1
1
.
8
8
T
Y
P
11
7
8
" T
JI 110 @
16"o.c. T
YP
1
1
5
W
1
2
x
2
2
W
1
2
x
2
2
W12x26
6
H
S
S
3
.
0
0
0
x
0
.
1
2
5
I
T
S
1
.
8
1
/
1
1
.
8
8
T
Y
P
W10x15
8
1
4
"4
3
4
" 3'-1
3
8
" 8
1
4
" 3'-1
3
8
"8
1
4
"8
1
4
"4
3
4
"3'-1
3
8
"8
1
4
"3'-1
3
8
" 8
1
4
"
10'-8
1 2
"
7'-7
3
4
" 12'-6" 7'-10
7
8
" 12'-5
3
4
" 7'-10
7
8
"12'-5
3
4
" 7'-7
3
4
"12'-6"7'-10
7
8
"12'-5
3
4
"7'-10
7
8
" 12'-5
3
4
"
8" 19'-11
3
4
"
10
1
2
"
20'-2
1
2
"
10
1
2
"
20'-2
1
2
"
10
1
2
"
20'-2
1
2
"
10
1
2
"
20'-2
1
2
"
10
1
2
"
19'-11
3
4
" 8"
8"
12'-2
1 2
"
1
C1.1
2
C1.1
3
C1.1
4
C1.1
5
C1.1
6
C1.17
C1.1
8
C1.1
9
C1.1
C1.1
11
C1.1
12
C1.1
(
2
)
2
x
4
(
2
)
2
x
4
(
2
)
2
x
4
(
2
)
2
x
4
SHEAR WALL KEY:
1
KEY PLYWOOD FIELD EDGED
7
16
OSB
8d @ 6" o.c.8d @12"o.c.
2
7
16
OSB
8d @ 12"o.c. 8d @ 4"o.c.
5
5
8
" GYPSUM 1
3
4
" TYPE W OR S @ 7"o.c. 1
3
4
" TYPE W OR S @ 7"o.c.
4
3
7
16
OSB
8d @ 3"o.c. 8d @ 3"o.c.
1
2
" GYPSUM 1
1
2
" TYPE W OR S @ 7"o.c. 1
1
2
" TYPE W OR S @ 7"o.c.
H
S
S
3
.
0
0
0
x
0
.
1
2
5
1
5"
1'-11
1 2
"
H
S
S
3
.
0
0
0
x
0
.
1
2
5
(3) 1
3
4
" x 7
1
4
" 2.0E LVL
H
U
C
6
8
H
U
C
6
8
L
U
S
2
6
THA213
1
H
U
C
6
8
L
U
S
2
6
THA213
H
U
C
6
8
10
H
S
S
3
.
0
0
0
x
0
.
1
2
5
SISTER 2x8 @ 16" o.c.
SISTER 2x8 @ 16" o.c.
1
3
4
" x 7
1
4
" 2.0E
LV
L
1
3
4
" x 7
1
4
" 2.0E
LV
L
(3) 1
3
4
" x 7
1
4
" 2.0E LVL
7
7
3 4
"
Ø
A
B
3 4
"
Ø
A
B
3 4
"
Ø
A
B
3 4
"
Ø
A
B
3 4
"
Ø
A
B
3 4
"
Ø
A
B
3 4
"
Ø
A
B
3 4
"
Ø
A
B
3 4
"
Ø
A
B
3 4
"
Ø
A
B
1'-4
"1
'-4
"
---
---
---
---
SHEET
DATE
OF
JOB NO.
BY
REVISIONS
1
DATE
2
3
DL
E
NG
IN
EE
RIN
G IN
C.
27
50
S
. W
AD
SW
OR
TH
B
LV
D.
UN
IT
D
-1
15
DE
NV
ER
, C
O 8
02
27
72
0-4
40
-9
45
0
WW
W.D
LE
NG
IN
EE
R.C
OM
TO
WN
H
OU
SE
S A
T
27
20
F
ED
ER
AL
B
LV
D
DE
NV
ER
, C
O 8
02
11
OW
NE
R: ---
3/1
4/1
6
2016-1013
AS
S1-1
4
GJ
T
8/5/16
CHECK
BY
FO
UN
DA
TIO
N P
LA
N
SE
CO
ND
F
LO
OR
F
RA
MIN
G P
LA
N
---
---
0" 4'
1
A B C
1
3
4
2
D E F G
A B C
1
3
4
2
D E F G
THIRD FLOOR FRAMING PLAN
3/16" = 1'-0"
ROOF DECK FRAMING PLAN
3/16" = 1'-0"
(4) 1
3
4
" x 11
7
8
" 2.0E LVL2
(2) 1
3
4
" x 11
7
8
" 2.0E
LV
L
1
3
11
7
8
" TJI 360 @ 16"o.c.
11
7
8
" TJI 110 @ 16"o.c.
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
(2) 1
3
4
" x 11
7
8
" 2.0E LVL
(2) 1
3
4
" x 11
7
8
" 2
.0E
LV
L
1
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
11
7
8
" TJI 360 @ 16"o.c.
1
3
4
" x 11
7
8
" 2.0E LVL
11
7
8
" TJI 110 @ 16"o.c.
2
3
5
4
(3)2x6
TY
P
(
2
)
2
x
6
T
Y
P
(
3
)
2
x
6
SHEAR WALL KEY:
1
KEY PLYWOOD FIELD EDGED
7
16
OSB
8d @ 6" o.c.8d @12"o.c.
2
7
16
OSB
8d @ 12"o.c. 8d @ 4"o.c.
5
5
8
" GYPSUM 1
3
4
" TYPE W OR S @ 7"o.c. 1
3
4
" TYPE W OR S @ 7"o.c.
4
3
7
16
OSB
8d @ 3"o.c. 8d @ 3"o.c.
1
2
" GYPSUM 1
1
2
" TYPE W OR S @ 7"o.c. 1
1
2
" TYPE W OR S @ 7"o.c.
1
1
1
1
11
1
M
S
T
A
4
9
M
S
T
A
4
9
M
S
T
A
4
9
1
1
11
1
1
1
1
4
4
1
1
S1.3
2
S1.3
3
S1.3
4
S1.3
11
7
8
" TJI 360 @ 16"o.c.
11
7
8
" TJI 110 @ 16"o.c.
(2) 1
3
4
" x 11
7
8
" 2.0E LVL
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
(2) 1
3
4
" x 11
7
8
" 2.0E LVL
(2) 1
3
4
" x 11
7
8
" 2
.0E
LV
L
1
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
1
3
4
" x 11
7
8
" 2.0E LVL
2
3
M
S
T
A
4
9
M
S
T
A
4
9
M
S
T
A
4
9
1
1
1
4
4
1
1
M
S
T
A
4
9
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
(2) 1
3
4
" x 11
7
8
" 2.0E LVL
(2) 1
3
4
" x 11
7
8
" 2
.0E
LV
L
1
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
11
7
8
" TJI 360 @ 16"o.c.
1
3
4
" x 11
7
8
" 2.0E LVL
11
7
8
" TJI 110 @ 16"o.c.
2
3
M
S
T
A
4
9
M
S
T
A
4
9
M
S
T
A
4
9
1
1
1 1
1
1
1
4
1
11
7
8
" TJI 360 @ 16"o.c.
11
7
8
" TJI 110 @ 16"o.c.
(2) 1
3
4
" x 11
7
8
" 2.0E LVL
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
(2) 1
3
4
" x 11
7
8
" 2.0E LVL
(2) 1
3
4
" x 11
7
8
" 2
.0E
LV
L
1
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
1
3
4
" x 11
7
8
" 2.0E LVL
2
3
M
S
T
A
4
9
M
S
T
A
4
9
M
S
T
A
4
9
1
1
1
4
4
1
1
M
S
T
A
4
9
(4) 1
3
4
" x 11
7
8
" 2.0E LVL2
(2) 1
3
4
" x 11
7
8
" 2.0E
LV
L
1
3
11
7
8
" TJI 360 @ 16"o.c.
11
7
8
" TJI 110 @ 16"o.c.
(2) 1
3
4
" x 11
7
8
" 2.0E LVL
1
11
11
4
4
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
(4) 1
3
4
" x 11
7
8
" 2.0E LVL2
(2) 1
3
4
" x 11
7
8
" 2.0E
LV
L
1
3
11
7
8
" TJI 360 @ 16"o.c.
11
7
8
" TJI 110 @ 16"o.c.
5
4
(3)2x6
TY
P
(
2
)
2
x
6
T
Y
P
(
3
)
2
x
6
1
1
1
1
1 1
1
4
11
7
8
" TJI 360 @ 16"o.c.
11
7
8
" TJI 110 @ 16"o.c.
(2) 1
3
4
" x 11
7
8
" 2.0E LVL
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
(2) 1
3
4
" x 11
7
8
" 2.0E LVL
1
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
1
3
4
" x 11
7
8
" 2.0E LVL
2
3
M
S
T
A
4
9
M
S
T
A
4
9
M
S
T
A
4
9
1
1
1
4
4
1
1
M
S
T
A
4
9
11
7
8
" TJI 360 @ 16"o.c.
11
7
8
" TJI 110 @ 16"o.c.
(2) 1
3
4
" x 11
7
8
" 2.0E LVL
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
(2) 1
3
4
" x 11
7
8
" 2.0E LVL
(2) 1
3
4
" x 11
7
8
" 2
.0E
LV
L
1
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
1
3
4
" x 11
7
8
" 2.0E LVL
2
3
M
S
T
A
4
9
M
S
T
A
4
9
M
S
T
A
4
9
1
1
1
4
4
1
1
M
S
T
A
4
9
SISTER 2x8 @ 16" o.c. SISTER 2x8 @ 16" o.c.
(2
) 1
3
4
" x 7
1
4
" 2.0
E LV
L
4
(2
) 1
3
4
" x 7
1
4
" 2.0
E LV
L
4
(3
)2x6
TY
P
(
3
)
2
x
6
5
(
3
)
2
x
6
NOTE: ALL STRAPS AND HOLD
DOWNS SHOWN ARE TO BE
INSTALLED FROM THE 2ND
FLOOR WALL TO THE 2ND FLOOR
SYSTEM OR THE FIRST FLOOR
WALL.
(2) 1
3
4
" x 11
7
8
" 2.0E LVL
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
(2) 1
3
4
" x 11
7
8
" 2.0E LVL
(4) 1
3
4
" x 11
7
8
" 2.0E LVL2
(2) 1
3
4
" x 11
7
8
" 2.0E
LV
L
1
3
11
7
8
" TJI 360 @ 16"o.c.
11
7
8
" TJI 110 @ 16"o.c.
(2) 1
3
4
" x 11
7
8
" 2.0E LVL
1
11
11
4
4
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
(4) 1
3
4
" x 11
7
8
" 2.0E LVL2
(2) 1
3
4
" x 11
7
8
" 2.0E
LV
L
1
3
11
7
8
" TJI 360 @ 16"o.c.
11
7
8
" TJI 110 @ 16"o.c.
(2) 1
3
4
" x 11
7
8
" 2.0E LVL
1
1 1
1 1
4
4
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
(4) 1
3
4
" x 11
7
8
" 2.0E LVL2
(2) 1
3
4
" x 11
7
8
" 2.0E
LV
L
1
3
11
7
8
" TJI 360 @ 16"o.c.
11
7
8
" TJI 110 @ 16"o.c.
(2) 1
3
4
" x 11
7
8
" 2.0E LVL
1
1 1
1 1
4
4
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
M
G
U
3
.
6
3
(
H
1
=
9
.
2
5
)
I
U
S
1
.
8
1
/
1
1
.
8
8
T
Y
P
I
U
S
2
.
3
7
/
1
1
.
8
8
I
U
S
2
.
3
7
/
1
1
.
8
8
I
U
S
2
.
3
7
/
1
1
.
8
8
I
U
S
2
.
3
7
/
1
1
.
8
8
I
U
S
2
.
3
7
/
1
1
.
8
8
I
U
S
2
.
3
7
/
1
1
.
8
8
6
S1.3
6
S1.3
(
2
)
2
x
6
T
Y
P
7
S1.3
(2) 1
3
4
" x 11
7
8
" 2
.0E
LV
L
8
S1.3
---
---
---
---
SHEET
DATE
OF
JOB NO.
BY
REVISIONS
1
DATE
2
3
DL
E
NG
IN
EE
RIN
G IN
C.
27
50
S
. W
AD
SW
OR
TH
B
LV
D.
UN
IT
D
-1
15
DE
NV
ER
, C
O 8
02
27
72
0-4
40
-9
45
0
WW
W.D
LE
NG
IN
EE
R.C
OM
TO
WN
H
OU
SE
S A
T
27
20
F
ED
ER
AL
B
LV
D
DE
NV
ER
, C
O 8
02
11
OW
NE
R: ---
3/1
4/1
6
2016-1013
AS
S1-2
4
GJ
T
8/5/16
CHECK
BY
TH
IR
D F
LO
OR
F
RA
MIN
G P
LA
N
RO
OF
D
EC
K F
RA
MIN
G P
LA
N
---
---
0" 4'
1
A
4
B C
1
3
2
D E F G
THIRD FLOOR FRAMING PLAN
3/16" = 1'-0"
9
1
2
" T
JI 110
@
2
4" o.c.
9
1
2
" T
JI 110
@
2
4" o.c.
9
1
2
" T
JI 110
@
2
4" o.c.
9
1
2
" T
JI 110
@
2
4" o.c.
9
1
2
" T
JI 110
@
2
4" o.c.
9
1
2
" T
JI 110
@
2
4" o.c.
(2)2x6 T
YP
(
2
)
2
x
6
T
Y
P
5
S1.3
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
SHEAR WALL KEY:
1
KEY PLYWOOD FIELD EDGED
7
16
OSB
8d @ 6" o.c.8d @12"o.c.
2
7
16
OSB
8d @ 12"o.c. 8d @ 4"o.c.
5
5
8
" GYPSUM 1
3
4
" TYPE W OR S @ 7"o.c. 1
3
4
" TYPE W OR S @ 7"o.c.
4
3
7
16
OSB
8d @ 3"o.c. 8d @ 3"o.c.
1
2
" GYPSUM 1
1
2
" TYPE W OR S @ 7"o.c. 1
1
2
" TYPE W OR S @ 7"o.c.
SECTION 2
1" = 1'-0"
TJI PER PLAN
2x6 STUDS @16" o.c.
2x6 STUDS @ 16" o.c.
SIDING NOT
SHOWN FOR
CLARITY
OSB JOINT AT
RIM BOARD
1
1
8
" TJI RIM
11
7
8
" TJI 360
@ 16" o.c.
2x4 STUD @ 16" o.c.
2x4 SOLE PLATE
SOUND PROOFING &
FIRE RATING SEE
SEE ARCH. PLANS
1 1/8" TJ RIM BOARD
2x4 STUD @ 16" o.c.
SECTION 3
1" = 1'-0"
SECTION 1
1" = 1'-0"
TJI PER PLAN
2x6
2x6
SIDING NOT
SHOWN FOR
CLARITY
MSTA49
w/ (13) 10d
EACH END
1
1
8
" RIM
SECTION 5
1" = 1'-0"
TJI PER PLAN
2x6 @ 16" o.c.
1
1
8
" TJI RIM
H2.5T
TJI BLOCKING
(2)1
3
4
" x 11
7
8
" 2.0E LVL
SECTION 7
1" = 1'-0"
11
7
8
" TJI PER PLAN
1
1
8
" TJI RIM
2x6 @ 16" o.c.
SECTION 6
1" = 1'-0"
TJI PER PLAN
w/ FILLED WEB
2x6 STUDS @16" o.c.
2x6 STUDS @ 16" o.c.
SIDING NOT
SHOWN FOR
CLARITY
1
1
8
" TJI BLOCKING
2x8 RIM
BOARD
METAL RAILING
BY OTHERS
SISTERED 2x8 @ 16" o.c.
w/ 6'6" BACK SPAN
3" 8d NAILS @ 4" o.c.
STAGGER TOP AND BOTTOM
HANDRAIL BY OTHERS
23/32" OSB T&G
GLUE AND NAIL
23/32" OSB T&G
GLUE AND NAIL
LU24
SECTION 4
1" = 1'-0"
TJI PER PLAN
2x6 @ 16" o.c.
SIDING NOT
SHOWN FOR
CLARITY
SLOPED ROOF
MEMBRANE2x6 BLOCKING
7
16
" OSB
NOTE:
SEE ARCH DRAWING
FOR SCUPPER
LOCATIONS
(3) 4" LEDGERLOK @
16" o.c.
1
3
4
" x 11
7
8
" 2.0E LVL LEDGER
HANGER PER PLAN
2x4 STUD @ 16" o.c.
2x4 SOLE PLATE
SOUND PROOFING &
FIRE RATING SEE
SEE ARCH. PLANS
2x4 STUD @ 16" o.c.
SECTION 8
1" = 1'-0"
FULL LENGTH
CANTILEVERED
1
3
4
" x 11
7
8
" 2.0E LVL RIM
INFILL
INFILL
SEE ARCH FOR
TAPERED INSULATION
& ROOF MEMBRANE
---
---
---
---
SHEET
DATE
OF
JOB NO.
BY
REVISIONS
1
DATE
2
3
DL
E
NG
IN
EE
RIN
G IN
C.
27
50
S
. W
AD
SW
OR
TH
B
LV
D.
UN
IT
D
-1
15
DE
NV
ER
, C
O 8
02
27
72
0-4
40
-9
45
0
WW
W.D
LE
NG
IN
EE
R.C
OM
TO
WN
H
OU
SE
S A
T
27
20
F
ED
ER
AL
B
LV
D
DE
NV
ER
, C
O 8
02
11
OW
NE
R: ---
3/1
4/1
6
2016-1013
AS
S1-3
4
GJ
T
8/5/16
CHECK
BY
RO
OF
F
RA
MIN
G P
LA
N
DE
TA
IL
S
---
---
0" 4'
1
1