127
January PR y 31, 2013 ROJE ECT D SEC EVEL CTION LOPM Pro N 2 MENT oject Develo PROC opment Pro CESS ocess S

SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

PR

y 31, 2013

ROJEECT D

SEC

EVEL

CTION

LOPM

Proj

N 2

MENT

oject Develo

PROC

opment Pro

CESS

ocess

S

Page 2: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

Developmeent Processs Jaanuary 31, 22013

Page 3: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.01

The Despreliminwith the project pbudgetinmeetingcreated

The procstandardproject.

2.01.01

Form 10documetrack fin

2.01.02

The DSRChargesletter shitems on

1. L

2. P

3. T

4. A

5. E

6. D

7. R

8. E

y 31, 2013

DESIG

sign Scopinary design.planning a

pool (payrong. Some p. It is accepand budge

cess establds, funding All projects

Form 10

048, Projectnt the desigal clearanc

Design

R meeting ss can be maall include t

n the follow

ocation ma

Plan and pro

Traffic data.

Accident his

Existing road

Design spee

Related inte

Environmen

GN SCOP

ng Review ( This enabnd design cll charges)

projects will ptable to hated and an

lishes the osources, as, regardles

048, Projec

t Scoping/Cgn scoping

ces prior to

Scoping R

shall be schade to the Rthe CDOT ing list, and

ap of the pro

ofile of exis

story and ha

dway cond

ed and exis

r-modal inf

tal conside

PING RE

(DSR) is anbles develocharacterisof Design Sbe created

ave two scoother after

objectives oand the requss of size, s

ct Scoping

Clearance Rprocess, toadvertisem

Review (DS

heduled as Region ScoForm 1048d as many o

oject with p

ting facility

azard rating

ition and pa

sting signed

formation.

rations.

2-1

EVIEW

n early, on-spment of a tics. See SScoping Red and budgeoping meetithe project

of a project,uired resoushall use th

/Clearance

Record como monitor st

ment of a pro

SR) Meeting

soon as pooping Pool s8 completedof the rema

proposed pr

, if available

g.

avement ra

d speed.

Proj

site review scope of wection 1.02

eview prior eted beforengs. One bis created

, the identifrces neces

he scoping

e Record

mprises a retatus towaroject.

g

ossible whesection 1.0

d through Paining items

roject limits

e.

ting.

oject Develo

of a projecwork that wi2.04 for timito project c

e the scopinbefore the pand budge

ication of dssary to comprocess.

eview list usrd PS&E ap

en a projec2.04. The D

Phase I, the s on the list

s identified.

opment Pro

ct prior to ill be consising and scocreation andng review project is eted.

esign mplete a

sed to pproval, and

t is identifieDSR invitatfirst three as possible

ocess

stent oping d

d to

ed. tion

e:

Page 4: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D 2.01.03

The follo

Fr

Pr

Re

Tra

Ut

Pla

Ma

Ma

RO

Su

Hy

Civ

2.01.04

The Respreparedcurrentlyreviewed

Developme

DSR Inv

owing shall

rom CDOT

ogram Engin

esident Engi

affic and Saf

ilities Engine

anning/Envir

aintenance S

aterials Engi

OW Supervis

urvey Coordi

ydraulics Eng

vil Rights Ma

Conduc

sident Engind to ensurey in force wd include, b

ent Process

vitees

be invited

Region:

neer

neer

fety Enginee

eer

ronmental M

Superintenda

ineer

sor

inator

gineer

anager

ct of the DS

neer will coe all critical will be consibut are not

s

to the DSR

er

Manager

ant

SR Meeting

onduct the Dissues are dered whenlimited to, t

2-2

R, or receive

Other

CDOT HydrauTranspEnviro

Other S

Local Gcounty

FHWAfedera

Specifischoolsponso

Railroa

g

Design Scoaddressedn preparingthe followin

e notice of t

rs:

Staff represulics, Safetyportation Devnmental, Ge

State Agenc

Governmenty, etc.

A Represental agencies)

ic organizatis, special diors, etc.

ads, Transit

oping Revie. All CDOT

g the agendg:

Ja

the DSR, a

sentatives: (y and Traffic,velopment,

eotechnical,

cies

t Agencies (

atives (and o

ions: emergeistricts, enha

Operators, A

ew. An agenT policies anda. The item

anuary 31, 2

s appropria

Bridge, , ROW, etc.)

city,

other

ency, ancement

Airports

nda will be nd directivems to be

2013

ate:

es

Page 5: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

1. Ddpsc

2. C

3. E

4. A

5. M

6. R

7. S

8. M

9. T

10. T

11. U

12. C

13. G

14. C

2.01.05

The Resunresolvschedule

2.01.06

1. 23 C

y 31, 2013

Design Requetour, drainedestrian/bafety, trafficlearances,

Construction

Environmen

Any NEPA (

Maintenance

Right of Way

Survey requ

Multi-modal

Travel dema

Traffic and s

Utility requir

Contract req

Geotechnica

Coordination

DSR Me

sident Enginved concernes.

Addition

CFR Part 62

uirements –nage, approbicycle featuc control, aerosion co

n requireme

tal issues,

National En

e concerns

y requireme

uirements.

issues and

and and trip

safety issue

ements.

quirements.

al considera

n of all disc

eeting Reco

neer will prns and issu

nal Referen

25, Design S

– Typical seoach to projures, landsccess contntrol, and p

ents.

including a

nvironment

.

ents.

d accommo

p reduction.

es.

.

ations.

ciplines.

ords

oduce the mues, prepare

nces:

Standards f

2-3

ections, horject, cut-offcaping, lighrol, source

pavement a

ir quality.

tal Policy Ac

dations.

.

minutes of e cost estim

for Highway

Proj

rizontal andf points, aehting, majorof material

and resurfac

ct) commitm

the DSR mmates, and

ys

oject Develo

d vertical alsthetic featr structuresls, roadwaycing options

ments

meeting, resprepare pr

opment Pro

lignment, tures, s, railroad, y and roadss.

search roposed pro

ocess

side

oject

Page 6: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

2.02

Stage codoes nonear urbexcess oimprovecapacityapproprisidewalkare antic

The Resshould bbe discuengineebe identshown o

Traffic vproject dstage codevelop

Developme

STAG(FUTU

onstruction t provide th

ban areas. of the desigments shou

y facility in fiate clear zk, auxiliary cipated.

sident Enginbe accommussed in thering stage.

tified on theon typical se

volumes anddevelopmenonstruction,ments and

ent Process

E CONSURE CAP

accommodhe ultimate When a pr

gn capacity uld provide future yearsone, and planes, or b

neer is respmodated in te Design ScFuture ele

e constructioections.

d commercnt phase fo the constrrequiremen

s

STRUCTPACITY

dates futuredesign nee

roject is antwithin 10 yfor and pro

s. The acqrovision forikeways sh

ponsible forhe current coping Revments to beon plans; th

cial growth sor potential sruction plannts.

2-4

ION CONSID

e improvemeded to hanicipated to

years after otect the intuisition of ar items suchould be con

r identifyingdesign. Fu

view and bue accommohese eleme

should be dstage conss and the f

DERATIO

ments whenndle the prohave a desconstructiotegrity of deadditional rih as extra lansidered w

g elements uture designudgeted at todated in thents can be

documentedstruction. If five-year pla

Ja

ONS)

n the initial cojected traffsign hourly on, the initiaeveloping aight of way anes, curb

when future

of future con considerathe preliminhe current de identified b

d and analyf a project isan shall ind

anuary 31, 2

constructionfic, particulavolume in

al a higher and and gutter,improveme

onstruction ations shounary design shouby notes or

yzed durings to includedicate these

2013

n arly

, ents

that ld

uld r

g the e e

Page 7: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.03

Most prois to be Roadwatypical ro

The exisconstrucroadwaycurb andconformstandard

The Restypical sGuide crTransposuch as Access System at the fo

The exisScoping

Addition1. CDO

(DSR2. FHW3. CDO4. For f

http:/

y 31, 2013

EXIST

oject plans overlaid or

ay Design Goadway sec

sting typicaction or roay lane widthd gutter, me

m to old typicds.

sident Enginsection baseriteria and m

ortation Devfunctional - Transport(OTIS) ava

ollowing link

sting typicag/Clearance

nal RefereOT ProceduR)

WA FlexibilitOT Roadwayforms, see C//www.colo

TING TYP

show an exreconstruc

Guide shoulction.

l section is dway impro

hs, shouldeedians, or bcal section

neer will coed on the fumake the pvelopment dclassificatiotation Data ailable for mk: (OTIS) (h

l section she Record, a

nces: ral Directiv

ty in Highway Design GCDOT on-liradodot.info

PICAL S

xisting roadcted, currenld be review

the roadwaovements. r widths, z-

barriers. Mstandards

ompare the unctional cl

proposed tydeveloped aon, traffic daSet and D

more informhttp://dtdapp

hall be docund Form 46

e 512.1, Pr

ay Design, Guide, Chapine forms lio/library/for

2-5

SECTION

dway typicat standard

wed for reas

ay cross-seThe typica

-slope distaany existingand do not

existing roaassificationpical sectioa website tata, and hig

DTD also haation and pps.colorado

umented on63, Design

roject Scop

Publicationpter 4 brary rms

Proj

N

al section. Wtypical sectsonable ap

ection that el section us

ance, and sg roadwaysmeet curre

adway sectn of the roaon recommehat containghway dataas Online Tphotos of exodot.info/oti

n the Form Data.

ing and the

n No. FHWA

oject Develo

When an extions in Cha

pplication to

exists prior sually conside slopes.s were consent roadway

tion to the ldway and Cendation. T

ns road invea. The webransportatixisting highis ).

1048, Proje

e Design Sc

WA-PD-97-06

opment Pro

xisting roadapter 4 of t

o the existin

to new ists of the It may incstructed to y design

latest standCDOT DesThe Divisioentory data bsite is at Don Informa

hway condit

ect

coping Rev

62 (1997)

ocess

dway he

ng

clude

dard ign n of

Data tion tions

view

Page 8: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

2.04

The propCDOT RRegion MCDOT P

The ResfunctionData, shAny excdocumeDesign Vconditiondeterminshould amay con

The proproadwayconstrucotherwissection o

Travel laroads, sdependiprovide in the AA

CDOT tyor edge Design Gdepend thicknesmay also

For projeDesign g

Developme

PROP

posed geomRoadway DMaterials E

Pavement D

sident Enginal, safety a

hall be usedception to thnted in the Variance. Bns, new insnation is to always consnsult the FH

posed typicy improvemction plans se noted in on a projec

ane width vuch as collng on the radequate cASHTO Ro

ypical sectiof the road

Guide. Thion the type

ss of layerso be contai

ects within guidebook.

ent Process

OSED T

metric typicesign Guid

Engineer in Design Man

neer shouldnd capacity

d to documehe maximum

project file Because of stallation of be docume

sider accideHWA Flexib

cal section ments. The

and shall mSection 2.0

ct if needed

varies from ectors and roadway funclear zone roadside Des

ons usuallydway referres slope is pe of facility. . Typical sened in the

scenic or h

s

TYPICAL

cal section sde. The pav

accordancenual.

d provide ay requiremeent these rem or minimand may nbudget, funa full-stand

ented on Foent history

bility in High

is the roadwproposed t

meet curren05 of this mto cover th

10 feet on arterials. S

nctional typrecovery (asign Guide.

y incorporated to as thepart of the c

The typicaections for plans.

historic area

2-6

L SECTIO

should be dvement strue with the R

proposed tents of the equirementum standar

need to be dnding type, dard typicalorm 464, Deof the exist

hway Desig

way cross-stypical roadnt CDOT or manual. Thehe full lengt

low volumeShoulder wpe. Roadwaa relatively f.

te a slight se z-slope, dclear zone dal section uroad appro

as, refer to

ON

designed inucture shall Roadway D

typical secthighway. Tts. (See nerd identifieddocumenteterrain, dev

l section maesign Variating facility

gn guideboo

section usedway sectio

AASHTO sere may beh of the pro

e roads to 1width varies

ay side slopflat, unobst

sloping areadetailed in tdesign. Meusually detaoaches, bike

the FHWA

Ja

n accordanc be designe

Design Guid

tion that meThe Form 4ext Section d on the Foed with a Fovelopment,ay not be p

ance. The das well. Th

ok for these

ed on new con should bestandards, e more thanoject.

12 feet on hfrom 4 to 1pes should ructed area

a borderinghe CDOT R

edian and tuails pavemee paths, an

Flexibility i

anuary 31, 2

ce with the ed by the de and the

eets the 463, Designon Form 46rm 463 sha

orm 464, , or scenic practical; thdesigner he designere situations.

constructione in all unless

n one typica

higher volum2 feet, be designe

a) as explai

g the shouldRoadway urn lane wident type andnd sidewalk

in Highway

2013

n 63) all be

is

r .

n or

al

me

ed to ned

der

dths d s

Page 9: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January The Ressection. functionmodes, later thaReview change designsaltered ban addit

Prior to typical sEnvironmare to be

Addition1. AAS2. 23 C3. CDO

(DSR4. CDO5. For f

http:/6. CDO

http:/

y 31, 2013

sident Engin Current anal class andsuch as bic

an two weekplans and osignificantly, right of waby changestional Field

the Field Insection to thmental perse informed

nal RefereHTO Policy

CFR Part 62OT ProceduR)

OT M&S Staforms, see C//www.colo

OT Online T//internal/Ap

neer is respnd future trad use of thecycles. Theks after the on the final y after the Fay acquisitios to the typiInspection

nspection Rhe participasonnel, wheof all chang

nces: y on Geome25, Design Sral Directiv

andard PlanCDOT on-liradodot.info

Transportatipp_DTD_D

ponsible foraffic countse highway f

e proposed Field InspeForm 463.

Field Inspeon, and envcal sectionReview me

Review, the ting Bridgeen appropriges to the t

etric DesignStandards fe 512.1, Pr

ns ine forms lio/library/foron Informa

DataAccess

2-7

r establishins, current afacility shalroadway tyection Revi In generaction Revievironmenta. If the typieeting may

Resident Ee, Hydrauliciate for the typical sect

n of Highwafor Highwayroject Scop

brary rms

ation System/index.cfm

Proj

ng the apprnd future lal be consid

ypical sectioew, based

al, the typicaew is condual impact caical sectionbe required

Engineer wics, Materials

project typion.

ays and Strys ing and the

m (OTIS):

oject Develo

ropriate roaand use, anered, includon should bon the Fiel

al section sucted, sincean all be sign is substand.

ill provide ths, Traffic, ae. Appropr

reets

e Design Sc

opment Pro

adway typicnd the ding alterna

be finalized d Inspectio

should not e bridge gnificantly ntially chang

he proposeand riate person

coping Rev

ocess

cal

ate no

on

ged,

ed

nnel

view

Page 10: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

2.05

Form 46all CDOinformat(http://vu

Much ofManageoutlined The sele

2.05.01

An impoand feasseverity project lCDOT dCDOT MAASHTOForm 46standardSection

2.05.02

The Resdesign sNationalin the CD

Form 46with the importanForm 46referencclassific

Developme

DESIG

63, Design T projects ttion during upweb.dot.s

f the informer Tab. If th

in the Stewection for th

Safety E

ortant goal osible level oof accidentimits is req

design standM&S StandaO Policy on63 compareds acceptab2.07 applie

Preparin

sident Enginscoping revl Highway SDOT Road

63 prompts minimum s

nt that the a63 and Formce will depeation of the

ent Process

GN DATA

Data, whichto documenproject devstate.co.us/

ation in Forhe project hwardship Aghis is made

Evaluation

of FHWA inof safety onts on highwuired to ensdards are dard Plans.

n Geometrices the existible for that es.

ng Form 46

neer shouldview meetinSystem shaway Design

the preparestandards aappropriatem 464, and end on the te roadway,

s

A (FORM

h is complent importanvelopment./gm/folder-

rm 463 is pas FHWA ogreement bwhen the p

n conjunction the transpways. A safsure hazarddetailed in tThe CDOT

c Design of ing and proparticular t

63 in SAP

d begin Forg is comple

all comply wn Guide.

er to compaacceptable e reference

that both fotype of fedethe design

2-8

M 463)

eted in SAPt design infLink to the 1.11.30033

populated froversight, tbetween FHproject is cr

on with CDOportation sysfety evaluatdous featurhe CDOT R

T Roadway f Highways oposed desype of road

rm 463 sooeted. Fedewith geomet

are the exisfor that parsource for orms cite theral fundingelements c

P under tranformation awork instru

3?mode=EU

rom informahen the ove

HWA Colorareated in CJ

OT is to prostem and totion of highres are not Roadway DDesign Guand Streetign criteria dway. If it is

on after the eral aid projtric and stru

sting and prticular typethe standa

he same reg program, tconsidered,

Ja

nsaction ZJand provide uctions ZJ1U).

ation from Cersight respado DivisionJ20N – PM

ovide the hio reduce th

hway sectiooverlooked

Design Guiduide is basets (the “Grewith the mi

s a 3R proje

project is cects and pructural stan

roposed dee of roadward be identiferences. the function, or a comb

anuary 31, 2

14, is useduniform 4 Form 463

CJ20N Projponsibilitiesn and CDO

M tab.

ghest practhe number aons within thd. The currede and the ed on the een Book”).inimum ect, then

created androjects on tndards outl

esign criteriay. It is ified on In general, nal bination the

2013

on

3

ect s are

OT.

tical and he ent

d the ined

a

the

reof.

Page 11: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January In additicurrent lgood de

Design d

The Resand com“standartype of fBook. ThproposeincreaseThe TypB, C, anshoulderoadwaymedian Form 46

When a preliminthe scoplimits or changedResidenRegion B

To modiPMGR. regionalOnce thchanged

y 31, 2013

on to the Clisting of AA

esign are in

data on For

1. Traffic2. Geom3. Projec4. Right o5. Railroa6. Agenc7. Entitie

sident Enginmplete all aprd” typical sfacility. Thishe “ultimate

ed for the cued capacitypical Sectionnd D found ir widths lefy separatedexists. Item

63 by an as

project reaary Form 4pe of work othe scope

d under thent Engineer Business o

ify the projeThis status Business Oe project std in by tran

CDOT RoadASHTO pub23 CFR Pa

rm 463 incl

c volumes etric standa

ct characterof Way issuad crossingcy coordinaes involved

neer shouldpplicable desection shous is outlinede” typical seurrent proje, a NEPA dn Type refein the CDOft and right d by a doubms that do n

terisk and m

aches the F63 should bor extend thof work, the SAP transwill have toffice to cha

ect limits in s is typicallyOffice or thtatus is set nsaction CJ

dway Designblications thart 625.

udes, but is

ardsristicsues gs tion

d determineesign data ould be base

d in the CDOection referect. If the udocument mers to Geom

OT Design Grefer to left

ble yellow wnot meet themay require

ield Inspecbe complethe project lien Form 46

saction CJ2o have the ange the pro

SAP, the py set to LOCe OFMB Prto the PMG

J20N Projec

2-9

n Guide anhat provide

s not limited

8. Struc9. Majo10. Hig11. Util12. Env13. Con

e accurate on Form 46ed on the cOT Design rs to a futurltimate typi

must exist thmetric DesigGuide and t

as the medwould have e design stae a variance

ction Reviewe and the Rimits. If it is63 must be 0N and is aProject Maoject limits

project will nCK. To get rojects and

GR User Stact Manager

Proj

nd the AASHvaluable in

d to:

ctural road or structuresghway classities vironmentanstruction i

project limi63 to the fuhosen desiGuide and

re design becal sectionhat recognign Type whthe AASHTdian. For exan existingandards are (see Sec

w stage, theResident Ens necessaryrevised. T

auto populaanager tab u

in CJ20N.

need to havthis status Grants groatus, the Mr tab and se

oject Develo

HTO Greennformation f

parameterss sification

l category nformation

ts, project dllest extentign speed, the AASHTeyond the t provides fozes this fut

hich includeO Green Bxample, a t

g 0 ft. left shre to be idenction 2.06 of

e informationgineer shoy to revise

The Project ated into Founlocked th

ve the Userchanged, a

oup to set itMile Point fieelecting

opment Pro

n Book, a for obtainin

s

descriptiont possible. traffic levelTO Green typical sector future ture expanses Types AAook. The two-way houlder as nntified on f this manu

on on the ould not chathe project Limits are

orm 463. Thhrough their

r Status setask your t to PMGR.elds can be

ocess

ng

, The and

ion

sion. A, A,

no

al).

ange

he r

t to

e

Page 12: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

the the projechangesgroup asmade anexplaininrequired

Form 46Form 46near the

These ficlearing used suexampleproject soriginal used fortracking

The Resto the Rshould b

Developme

ect in OTISs are complsking them nd why. An ng the chand for the Cle

63 is create63 that neede top of the

elds are intof the consch (like a R

e would be specifically.project). Adr this projecof related p

sident Enginegion Prog

be made wh

ent Process

where the leted, a reqto set the semail shou

nges so he earance of t

d for the cods to get filform as sh

tended to listruction pr

Resurfacingif a ROW a (the intent

dditionally, ct, it should project cos

neer will chram Enginehile it is still

s

Project GISquest needsstatus backuld also be can make the project.

onstruction led out corrown below

st any otheroject. Gene Design po

acquisition pt is not to lisif an envirobe listed ints in SAP, m

heck the foreer for apprl in prelimin

2-10

S informatios to be sentk to LOCK asent to thean informed.

project PS rectly is the:

er projects terally speak

ool or a projproject wasst Projects wonmental EAn these fieldmainly for F

rm for accuroval. If po

nary status.

buton is storedt to the OFMand explaine Environmed decision

and E pace PE Projec

that were usking, if a seect design

s used to acwhere ROWA or EIS wads as well. TFHWA infor

racy and coossible, all c

Ja

tton. This gd and trackMB Project

ning what chental Prograon whether

ckage. A kect Codes fi

sed for the eparate descorridor). A

cquire ROWW was acquas completeThese fieldrmational n

ompletion bchanges to

anuary 31, 2

grants accesed. Once thts and Granhanges weam Manager a change

y portion ofelds locate

preparatiosign projectAnother W for this uired for theed and is b

ds are usedeeds.

before submForm 463

2013

ss to he nts re er is

f ed

n or t was

e being for

mittal

Page 13: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January 2.05.03

If the nethe formthey havmade. Oneed to

2.05.04

The Fina

FHWA sThese re

1. D

pstoto

y 31, 2013

Revising

eed arises tom will need tve set the sOnce the chcheck the L

Final Fo

al form is re

stresses twoequirement

Description roject files.afety featuro these criteo FHWA for

g Form 463

o modify thto be set to status to Rehanges havLock after R

orm

equired for

o requiremets, which ar

of the proje These critres. Any coeria should r reference

3 in SAP

e data afteRevised by

evised, the fve been maRevision bu

OFMB auth

ents concere mandato

ect and its cteria conceorrective acbe docume

.

2-11

r Form 463y the Regioform will be

ade and apputton as sho

horization p

rning desigory unless e

controlling cern the presction or proented. Suc

Proj

3 has been onal Businee editable sproved, theown below

prior to the

gn standardexceptions a

criteria mussent conditioposed imprch documen

oject Develo

set to Finaess office grso the chane Resident and save th

project bein

ds on federaare specific

st be identifon of the rorovements ntation mus

opment Pro

l status in Sroup. Onceges can beEngineer whe changes

ng advertis

al aid projeccally noted,

fied in the oadway andneeded rel

st be availa

ocess

SAP, e e will s.

ed.

cts. are:

d ative

able

Page 14: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

2. Fredsfe

2.05.05

The follo

1. Cm

2. Inw

3. Pd

4. Csh

In additithe CJ20Form 12

2.05.06

1. Post http:/bulle

2. AAS3. CDO

(DSR4. CDO

http:/5. For f

http:/6. CDO

http:/agre

7. FHW

Developme

FHWA concequest sentoes not proafety and deatures. Th

Summa

owing steps

Conduct themanual). Disnitiate Crea

will have stePrepare the

istribution tComplete thignature onalf of the fo

on, Block 50N and the28.

Addition

Award Pro//www.colo

etins/currenHTO Policy

OT ProceduR)

OT Transpo//internal/Apforms, see C//www.colo

OT and FHW//www.coloement.pdf/v

WA core cur

ent Process

cerns must t to FHWA ovide enougdesign imprhe Form 46

ry

s describe t

e Design Scstribute me

ate Project iep 1 after th

preliminaryto users an

he final Formn the hard corm 128 wil

5 (Environm Environme

nal Referen

oject Financradodot.infot/cb-2009-5y on Geomeural Directiv

rtation Datapp_DTD_DCDOT on-liradodot.info

WA stewardradodot.infoview rriculum http

s

be reasonafor its apprgh informatovements p

64 meets th

the activitie

coping Revieting minutn SAP (see

his step. y Form 463d for actionm 463 and copy. This cl be signed

mental sectioental custom

nces:

cial Statemefo/business/5-form-65.detric Design

ve 512.1, Pr

a Set DataAccessine forms lio/library/for

dship agreeo/business/

p://www.fhw

2-12

ably addresroval. FHWtion and detprovided, aese require

es involved

iew (see Setes with acte Section 1

3 after the Dn on any exobtain the Rcan be done.

on) of Formm tab along

ent: Form 6/designsupp

doc/view n of Highwaroject Scop

/index.cfmbrary rms

ement /permits/ac

wa.dot.gov/

ssed in any WA may not

tail to satisfnd the opp

ements.

in the comp

ections 1.02tion items. .04 of this m

Design Scoxception to dRegion Proe after the

m 463 is pog with inform

65 pport/bulletin

ays and Strping and the

ccesspermit

/programad

Ja

variance juapprove a fy its conceortunity to p

pletion of a

2 and 2.01

manual). S

ping Reviewdesign stan

ogram EngiFIR meetin

pulated frommation ente

ns_manual

reets e Design Sc

ts/reference

dmin/contra

anuary 31, 2

ustification request tha

erns about tprovide suc

a Form 463:

of this

ome projec

w for ndards. neer's

ng when the

m input on ered via ZJ

ls/construct

coping Rev

es/stewards

acts/

2013

at the ch

:

cts

e top

both 17,

tion-

view

ship-

Page 15: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.06

Form 46exceptioinformatDesign D

The ResSubstanForm 46the desifeature mshould b

2.06.01

The Forcriteria wimportanForm 46referencclassific

2.06.02

In additicurrent lgood de

If the proprocedu

2.06.03

The Descompletand whefollowingstandard

y 31, 2013

DESIG

64, Design on (variancetion requireData, canno

sident Enginndard featur64, along wgn standardmust be exbe compare

Agreem

m 463 promwith the minnt that the a63 and Formce will depeation of the

Addition

on to the Clisting of AA

esign is in 2

oject is a 3Rures.

Discove

sign Scopinion, prior to

ether any exg controllingd values are

GN EXCE

Exception Ve). This ford when minot be met.

neer shall ires that willith the ratiod, accident plained. Th

ed to the es

ment betwee

mpts the prenimum stanappropriatem 464, and end on the te roadway,

nal Resour

CDOT RoadASHTO pub3 CFR Par

R Project, f

ering Non-c

ng Review po or concurrxception to g design cre not met.

EPTION

Variance Rrm documenimum des

dentify subl not be coronale for the

history dathe estimatestimated cos

en Forms 4

eparer to condards accee reference

that both fotype of fedethe design

rces

dway Designblications tht 625.

follow Secti

conformiti

provides a drent with Fothe minimu

iteria requir

2-13

(VARIA

equest, is unts importaign standar

bstandard drrected on te exceptionta, and costed cost for tst for const

463 and 46

ompare theeptable for tsource for orms cite theral fundingelements c

n Guide anhat provide

on 2.07 for

es

design dataorm 463, wum criteria re variance

Proj

ANCE) (F

used to docant decisionrds, as iden

esign featuthe project wns. Mitigatiot analysis fothe project tructing the

64

e existing athat particuthe standa

he same reg program, tconsidered,

nd the AASHvaluable in

r the applica

a scoping pill identify threquires fu

e document

oject Develo

FORM 46

cument a prns, mitigationtified on Fo

ures based will be descon measureor each subwith the de project to f

nd proposeular type of rd be identiferences. the function, or a comb

HTO Greennformation f

able design

process; anhe existing rther action

tation when

opment Pro

64)

roject desigon, and safeorm 463,

on Form 46cribed on aes for reducbstandard esign excepfull standar

ed design roadway. ified on In general, nal bination the

n Book, a for obtainin

n exception

d upon criteria sta

n. The never the

ocess

gn ety

63. a cing

ption rds.

It is

the

reof.

ng

atus

Page 16: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project Development Process Rev: June 29, 2020

2-14

1. Design speed 8. Grade2. Lane width 9. Cross-slope3. Shoulder width 10. Superelevation4. Structural capacity 11. Horizontal clearance (except clear zone)5. Horizontal alignment 12. Vertical clearance6. Vertical alignment 13. Bridge width7. Stopping sight distance

Guardrail and bridge rail are to be designed according to the latest CDOT M&S Standard Plans, Standard Specifications for Road and Bridge Construction and AASHTO Roadside Design Guide on all new construction and reconstruction projects. For 3R and surfacing type projects, guardrail is to be handled in accordance with Section 2.07.

FHWA may approve design exceptions on federal aid projects for experimental features or where conditions warrant an exception.

Determination to approve a project design that does not conform to the minimum criteria is to be made only after due consideration is given to project conditions and safety benefits for the dollar invested, compatibility with adjacent sections of roadway, and the probable time before the roadway section will be reconstructed due to increased traffic demands or changed conditions.

On local agency projects the involved entities and consultants should discuss the variance request with the Resident Engineer to determine the feasibility of approval and the possibility of project delays. Local agency projects may not have historical accident data and roadway safety inventories. However, accident records may be available from the Safety and Traffic Engineering Branch.

FHWA should be invited to the Field Inspection Review meeting on National Highway System projects and federal-oversight projects when there is a potential variance.

All variances should be identified by the Field Inspection Review and approved prior to the Final Office Review. Early submittal of variance requests will allow time to incorporate comments and concerns, and to collect any additional supporting data and analysis. Untimely submittal for approval of design variances can result in costly delays to the project.

When the design criteria are properly discussed on Form 464, the minimum FHWA requirements for preparing the variance request are satisfied. Additional comments can be added to clarify items. No separate variance transmittal letter is necessary when Form 464 is used.

Page 17: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January Form 46projects is explaiAdminis

2.06.04

The follodecision

1. Rmo

2. CHa

2.06.05

The docfollows:

1. IdDER

2. P3. P

cstRrebm

4. Tstthpab

y 31, 2013

64 is approvand all inte

ined in the tration, Col

No Varia

owing itemsn. See Sect

Reduction inminimum in

r appropriaChanges to However, ch

variance, a

Design

cumentation

dentify the eDesign ScopEngineer shReview. Prepare a prPrepare a Fosts, and ptatement sh

Resident Enesearched e noted wit

made to obtThe followintandards buhe CDOT Rrepared: . 3R proje. Corridor

Design Gand Streon the N

ved by the erstate projStewardshlorado Divis

ance Requ

s do not reqion 2.20.

n existing roThe AASH

ate CDOT sthe CDOT

hanges to Fas stated in

Exception

n and proce

exception toping Reviewould discus

reliminary Form 464 (o

proposed mhould be in

ngineer shoor obtainedth applicablain the infog type of prut must me

Roadway De

cts: See theprojects, as

Guide and Tets for thosational High

Region Proects regardip Agreemesion, and th

uired

quire a varia

oadway eleHTO Policy ostandard (do

M&S StandFHWA policn the policy

Request

edures for p

o the desigw but prior tss the statu

Form 463 aor letter) wit

itigation. Wcluded stat

ould included. If criteria le reasonin

ormation. rojects may

eet the miniesign Guide

e CDOT Ros defined bThe AASHTse sections hway Syste

2-15

ogram Engidless of oveent betweenhe Colorado

ance, but s

ements wheon Geometoes not appdard Planscy, such as .

preparing a

n standardto the Field

us of varianc

and indicateh a descrip

When suppoting that suc

e as much incannot be g. The rem

y not be reqmum stande. Otherwis

oadway Deby a NEPA dTO Policy othat apply

em.

Proj

neer and, oersight, by Fn the Federo Departme

should be do

ere the roadtric Design ply to rehabare handlecrash-teste

design exc

s within at d Inspectionce approva

e all exceptption of all eorting informch data is nnformation addressed

marks shou

quired to mdards in these a varianc

esign Guidedocument:

on Geometrto the class

oject Develo

on federal-oFHWA. Fedral Highwayent of Trans

ocumented

dway still mof Highway

bilitation proed on a projed bridge ra

ception req

least 30 dan Review. Tal at the Fie

ions to desexceptions, mation is nonot collectaas can be , “Not Availld describe

eet full AASe appropriatce request

e. See the CD

ric Design osification of

opment Pro

oversight deral oversy sportation.

d as a desig

meets the ys and Streojects). ject basis. ail, may req

uest are as

ays after theThe Reside

eld Inspectio

sign standarjustificationot availableble. The reasonablylable” shou

e the effort

SHTO te sections will be

DOT Roadwof Highwaysf roadways

ocess

ight

gn

eets

quire

s

e ent on

rds. ns, e, a

y ld

of

way s not

Page 18: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

c

5. Pa

6. Fv

All affecapprovaCDOT b

Any desbe docuSection

2.06.06

1. Desi2. Desi3. CDO

(DSR4. FHW

Critehttp:/

5. Tran6. For f

http:/

Developme

. Safety typrojects, minimumconsider more appstandardguardrailstandardfederal arecomme

Projects withpproval.

For projects ariance req

cted organizal of any varbranches.

sign decisiomented in a2.20.)

Addition

gn Data (Sgn Scoping

OT ProceduR)

WA Technicaeria and Pro//www.fhwasportation forms, see C//www.colo

ent Process

ype projectsthe 3R pro

m roadway csafety and

propriate. Fds and apprl at the app

ds. Althougaid and Statendation to h federal ai

by outsidequest to det

zations musriance. The

ns that do a design de

nal Referen

ee Section g Review (Sural Directiv

al Advisoryocesses for a.dot.gov////Research BCDOT on-liradodot.info

s

s. When evaoject standacriteria haved hazard poFor examplropriate rail proach roadh the scopite projects, prepare a

d oversight

agencies otermine whe

st be informese organiz

not require ecision lette

nces:

2.05 of thisSee Sectionve 512.1, Pr

y No. T 5040r Non-Freew///legsregs/Board, TRBine forms lio/library/for

2-16

aluating exards may bee been met

otential in dele, new bridcrash-testiways shalling processthe approvsafety lettet and Inters

or consultaether the in

med of the pzations inclu

a varianceer and place

s manual.)n 2.06 of thiroject Scop

0.28, 10/17way RRR Pdirectives/t

B Special Rebrary rms

xisting conde used to dt. The Reseciding whedge rail anding requirembe evaluat

s may not bval of a varier may be astate projec

nts, the Rentent of the

progress maude local a

e or design ed in the pr

is manual.)ping and the

7/88, DeveloProjects at: techadvs.hteport 214

Ja

ditions on sadetermine wsident Enginether a highd guardrail sments. Theted against be extensiveiance and t

applicable. cts require F

egion will reForm 464

ade towardgencies, co

exception rroject file. (

) e Design Sc

oping Geom

tm

anuary 31, 2

afety type whether neer shouldher standarshall meet f

e existing the 3R

e on non-he

FHWA

view the is satisfied.

d obtaining onsultants,

request sho(See

coping Rev

metric Desi

2013

d rd is full

.

and

ould

view

gn

Page 19: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.07

2.07.01

The purpand enhsafety bcost of umaximizand to bimproveaccidentdesign leopportun

The Resprojects

2.07.02

A 3R prorestorati

Resurfaexisting Restora

1. Raa

2. W

3. Ala

4. CS

y 31, 2013

PROCREQUAND R

Purpose

pose of thehance highwy strategicaupgrading toze accident be consistenments at lots. The folloeading to enities to imp

sident Enginwill be mad

3R (Res

oject is anyion, or reha

acing: Placroadway to

ation and R

Restoration dequate strdditional st

Widening of

Addition of aanes, etc. T

Correction oSection 2.07

EDURESIREMEN

REHABIL

e of 3R Pro

e 3R prograway safety. ally upgradio current Areduction o

nt with the iocations whowing proceenhanced saprove safet

neer will ende when ju

surfacing, R

y project thaabilitation.

cement of ao improve s

Rehabilitat

of the existructural suptage of cons

f the lanes,

auxiliary lanThis does no

of minor stru7.4.6).

S FOR ANTS ON LITATIO

ogram

am is to pres 3R project

ing existingAASHTO deon 3R projeintent of the

here they doedures are afety statewty.

nsure that instified and

Restoratio

at consists o

additional sserviceabilit

ion:

ting pavempport or to astruction.

shoulders,

nes such asot include a

ucture safe

2-17

ADDRESRESUR

ON PROJ

serve and ets enable h

g highway aesign standaects within te 3R policy o the most gintended to

wide by tak

nvestment economica

n, and Reh

of one or m

urfacing maty, to provid

ent (includia condition

or both of a

s acceleratiaddition of t

ty defects o

Proj

SSING SRFACINGJECTS

extend the highway ageand roadsidards. It is Cthe limitatioby makinggood and po develop aking advanta

in safety imally feasible

habilitation

more of the

aterial (1.5 de additiona

ing shouldeadequate f

an existing

on, decelerthrough lan

or deficienc

oject Develo

SAFETY G, REST

service lifeencies to ime features CDOT’s objons of availag roadway sprevent the a more safeage of cost

mprovemente.

n):

following: r

to 6 inchesal strength,

ers) to a cofor placeme

facility.

ration, turnnes.

cies (See

opment Pro

ORATIO

of highwaymprove highwithout thejective to able budgesafety

most ety consciout effective

ts within 3R

resurfacing,

s thick) oveor both.

ndition of ent of an

, short clim

ocess

ON,

ys hway e

ets

us

R

,

er the

bing

Page 20: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D 4R (Resrequiringprocedurequired Maintenor equalare less Safety Pproject a

2.07.03

2.07.03

The Desproject pknowledrelation with CDfurther Dand doc

When a project (initial idereferring“LocatiointersectHighwayand canthe ProjespecificaListings website

http://intocations

Developme

surfacing, g reconstruures becausd when the

nance Projl to 1.5 inchthan 1.5 in

Project: Saaddresses a

3R Desi

.01 Desig

sign Scopinprior to preldge of what to cost. ThOT’s 3R po

Design Scocument pote

project fall(Designer, Rea of the leg to a map pns with Pottions (Yelloy) on the St possibly bect Team sally identifie(in PDF forat:

ternal.dot.sts.html

ent Process

Restoratioction or res

se AASHTOdesign doe

ect: Mainthes will follonches do no

afety projeca specific s

gn Proced

gn Scoping

ng Review (iminary desimproveme

his enables olicy. See Sping Reviewential safety

s under 3RResident Evel of possprovided bytential for Aow Dots) antate Highwae addresse

should then es each locrmat) are lo

tate.co.us/s

s

on, Rehabilsurfacing grO design staes not meet

enance typow these 3Rot fall under

cts do not fasafety defici

dures

g Review fo

(DSR) creasign. The pents to the the develo

Section 2.0w requiremy improvem

R procedurengineer, Prible safety y the HQ SaAccident Rend highway ay System ed. If an ac

refer to theation by Hig

ocated on th

stafftraffic/s

2-18

litation andreater than andards ap relevant st

pe projects wR procedurer 3R proced

all under 3Rency.

or 3R Proje

tes an earlyproject teamproject yiel

opment of a01 (DSR) anments. This ments.

es, the Regiroject Enginwork needeafety and T

eduction”. Tsegments where spec

ccident pattee accompanghway andhe HQ Safe

safety_engi

d Reconstrsix inches

pply and detandards.

with a resues. Maintedures.

R procedur

ects 

y office studm should evld the great

a scope of wnd Procedureview sho

ion Project neer, or Traed as relate

Traffic EnginThese “Loc(Colored Lcific accideern exists wnying “Listi Mile Point

ety and Tra

neering_gr

Ja

ruction): Pshould not sign varian

urfacing depenance type

res because

dy and on-svaluate safetest safety gwork that wiural Directivould be use

Team in chaffic Engineed to accideneering Bra

cation Mapsines Parallent patterns within the png”. This li. Both the

affic Engine

roup/accide

anuary 31, 2

Projects follow the

nces are

pth greater e projects th

e this type o

site review ety with thegains in ill be consis

ve 512.1 fored to identif

harge of theeer) can getent history anch identifs” identify el to the are observ

project limitsisting Maps and ering Branc

ent_reductio

2013

3R

than hat

of

of a e

stent r fy

e t an by fying

ved s,

ch’s

on_l

Page 21: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January 2.07.03

A Safetybe doneor Safetand Trafthrough level of aA TOA icomprehand will Evaluatiif recomincorpor If a SafeThe projcomplet

2.07.03

FIR andin Sectio

At the Fminimumvariance

2.07.03

The des13 geomBoxes 3geometrInterstatproceduinformatthe CDOhttp://wwthe 3R s

y 31, 2013

.02 Safet

y Evaluatione for all 3R py Assessmffic Engineethe HQ Saanalysis reqs an accidehensive anainclude speon processmendations

rate those r

ety Evaluatiject team me design ex

.03 FieldProje

FOR meetons 2.17 an

ield Inspecm design ste is required

.04 Safet

signer will ametric desig3 and 4 of Cric design cte 3R projec

ures, Freewtion see AAOT Transpoww.dot.statestandards a

ty Evaluati

n performedprojects anent Report ering Brancfety and Trquired and ent history ralysis of theecific recoms at the earls are maderecommend

on (TOA ormust evaluaxception va

 Inspectioects 

tings shall bnd 2.28.

tion Reviewtandards fod, including

ty Issues R

dhere to thgn criteria if CDOT Formcriteria, see cts, full AAS

ways are artASHTO’s A ortation Date.co.us/App

are intended

ion for 3R 

d by the HQd will result(SAR). Th

ch to requesraffic Enginewill provide

report with e accident h

mmendationliest possib

e in the Safedations into

r SAR) is noate all 13 geariance requ

n Review/

be conducte

w, the Residr 3R projec

g a safety le

Related to G

e followingf a safety ev

m 463 and Cthe CDOT

SHTO stanerial highwPolicy on Ga Set p_DTD_Dad to provide

2-19

Projects 

Q Safety ant in either ahe Residentst a Safety eering Webe the Resida brief recohistory, canns. The Proble stages oety Evaluatthe project

ot obtainedeometric deuests in acc

/Final Offic

ed in accor

dent Enginects, and recetter.

Geometric

procedurevaluation is

CDOT FormRoadway Ddards applyays with fu

Geometric D

ataAccess/ine reduced li

Proj

nd Traffic Ea Traffic Opt Engineer wEvaluation

bsite. This dent Engineommendation take up tooject Team

of the projection, there wt plans.

d, these 3R esign criteriacordance w

ce Review 

rdance with

eer shall idecord those o

c Design Cr

es for designs not done. m 1327). Fo

Design Guiy. For the ll control ofDesign of H

ndex.cfm ).imits in des

oject Develo

Engineering erational Awill contact

n. This can Branch wil

eer either a on section. o 6 months

m should stact (DSR or will be enou

procedurea for the en

with Section

(FIR/FOR)

h the proced

entify any eon the Form

riteria  

ning and do(Design St

or definitionide. For Frpurposes of access (foHighways a

. For all othsign. Howe

opment Pro

Branch shAnalysis (TOt the HQ Sabe requestl determineTOA or a S A SAR is to complete

art the Safeearlier), so ugh time to

s do not apntire projectn 2.06.

) for 3R 

dures outlin

exceptions m 463a whe

ocumentingandards,

ns of the 13reeway andof these or further nd Streets

her 3R projever, these

ocess

ould OA) afety ted

e the SAR. a e, ty that

pply. t and

ned

to en a

g the

3 d

and

ects,

Page 22: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project Development Process Rev: June 29. 2020

2-20

lesser standards should not be used automatically, but only if higher values are not possible, practical, or cost effective (See Section on 3R standards in the CDOT Roadway Design Guide for these standards).

The project team should address all documented safety issues identified through the Safety Evaluation, DSR, FIR, and FOR processes. Existing roadway design features may be retained where they are performing in a satisfactory manner with regard to accident history. The proposed design should not worsen an existing condition (guardrail height, edge drop-off, drainage, etc.). Safety issues identified as being related to any of the 13 geometric design criteria will be addressed in the design process. Only those geometric design criteria directly related to the identified safety issue need to be addressed. Refer to the “Process for Addressing Safety Requirements on 3R Projects” flowchart (Figure 2-1) for guidance.

If a geometric design criterion is identified as being related to accident causality, then the designer will either bring this design element up to the relevant standard, or will complete a design variance according to the procedures described in Section 2.05 Design Exception (Variance) (Form 464) and the process flowchart (Figure 2-1). Design variances for Interstate projects require FHWA approval.

All existing guardrail, bridge rail,transitions and end and median terminals not meeting NCHRP 350 shall be upgraded to meet MASH 2016 requirements. All roadside safety devices meeting NCHRP 350 in good condition, determined to function as designed and meeting minimum height requirements may remain in place. See the AASHTO Roadside Design Guide and Sections 2.09 and 5.12 of the this manual for additional information. For assistance contact the Standards and Specifications Unit and Staff Bridge.

The Resident Engineer may implement safety improvements not specifically identified in the Safety Evaluation, DSR, FIR, and FOR if funding and special circumstances exist and written approval is obtained from the Program Engineer.

2.07.03.05 Safety Issues Not Related to One of the 13 Geometric Design Criteria

Safety mitigation recommendations identified through the Safety Evaluation, DSR, FIR, and FOR processes that are not related to one of the 13 geometric design criteria should be incorporated into the plans. If the decision is made not to implement recommendations for improvement, this decision should be documented in the meeting minutes or explained in a design decision letter.

Page 23: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January 2.07.03

The Resrecommwithin th

2.07.03

Residen

2.07.03

The ColSurface the stateeligible fup worknecessaguidancAnalysis

Enhanceand guabut fund

2.07.03

Safety ethrough these reenhanceprioritizethe maxEngineeenhanceof all reqto not fuThe Res“ProcessFigure 2

y 31, 2013

.06 Struc

sident Enginmendations che project li

.07 Comp

nt Engineers

.08 Resu

orado TranTreatment

e highway sfor this fund, guardrail a

ary to compe on allowa

s of Essenti

ements thaardrail, permding other th

.09 Safet

enhancemethe Region

equests to tement, and e these requximum reduer, the Regiements will quested safund the safesident Engins for Addre

2-1) for guid

ctural Reco

neer will coconcerningmits.

pletion of 

s must com

rfacing Pro

nsportation Program w

system. CDding. Minoradjustment

plete the suable items, ial Items.

t are deemmanent storhan resurfa

ty Enhance

nts not allon - Safety Ehe Programestimated

uests and action of accon Traffic Ebe funded

fety enhancety enhanceneer will thessing Safet

dance.

ommendat

ontact the a Structural

the Prelim

mplete a Fo

ogram Fun

Commissiowith the goaDOT’s surfar safety wots, and Amerface treatmthe Reside

ed desirabrmwater quaacing would

ement Fun

owed underEnhancemem Engineer

costs listedallocate funcidents withEngineer, oin the Reg

cements, thement and en completty Requirem

2-21

tions for O

appropriate Capacity a

minary Des

rm 463 in a

nding Limit

on determinal of maintaace treatmerk (signing,ericans withment, are aent Enginee

le or that arality featurehave to be

nding  

r the resurfants Pool. Tdetailing p

d by appropnds based ohin budgetar both workion. If budg

he Programwill submit

te the approments on 3R

Proj

Overlay Wo

Regional Sand Bridge W

sign Data (

accordance

tations 

nes the leveaining the coent program, striping, deh Disabilitiellowed und

er should re

re mandatees, etc.) cae provided t

acing progrThe Resideroposed wopriate work on the systeary allocatioking togethegetary limita

m Engineer wa copy to t

opriate docR Projects”

oject Develo

ork 

Staff BridgeWidth for a

Form 463)

e with Sectio

el of fundingondition an

m restricts thelineation e

es Act requier this prog

efer to Polic

ed (upgraden also be imto supplem

ram can be ent Engineeork, reasonitems. The

em-wide goons. The Rer will decidations prohwill documethe Residen

cumentation” flowchart (

opment Pro

Unit for ll structures

on 2.05.

g for the d drivabilityhe type of wetc.), shouldirements gram. For cy Memo No

ed bridge ramplementedent the bud

funded er will submns for the sae Region woal of achie

Region Progde which sahibit the funent the decnt Engineern. Refer to (See

ocess

s

y of work der-

o. 7

ail d, dget.

it afety ill ving

gram afety ding

cision r. the

Page 24: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

Developmeent Process

s

2-22

Jaanuary 31, 22013

Page 25: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

y 31, 2013

Figgure 2-1 3

2-23

3R Projects

Proj

Flowchart

oject Develoopment Proocess

Page 26: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

FollowinProject

Developme

ng the flowc

ent Process

chart is an e

s

example of

2-24

a sample FForm 464, c

Ja

completed f

anuary 31, 2

for a 3R

2013

Page 27: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

COLORA

DESIG

Project nam SH 99 NeptuType (check

New co Recons

Part 1 – CoA. Short pResurface SSafety Evalu B. DescripIn accordancREHABILITA(Recommenconsidered. C. RationaSee attacheTable) for ea D. MitigatiSee attacheTable) for ea

E. Descrip Other:

F. Accide Most recent functional cl a) Latest accid a) H. Other Part 2 – ApA. Submitted

Resident E

Required forApproved by

B. Not ap Approv

Distribution:

DO DEPART

GN EXCEP

e

une to Venus k all that are appl

onstruction Restruction Saomplete A throug

project descriptioSH 99 from Neptuuation to include

ption of standardce with the PROATION (3R) PRO

ndations Section)

al need for excepd Safety Assessach specific safe

ion measures prod Safety Assessach specific safe

ption of adjoining

nt data Sourc

statewide accideass / facility: (pe2.31 b) ent rate for this h1.41 b) (as needed)

ppropriate signatd by (Project Ma

Engineer Approva

r Federal-oversigy (FHWA Divisio

pproved ved with conditio

Project ManaProgram EngResident EngHQ Records FHWA, if app

TMENT OF TR

PTION VA

licable)

estoration Reafety Enhgh H for all projen ( see CDOTune Road to Venguardrail, minor

(s) reduced CEDURES FOR

OJECTS, not all s) and CDOT Form

ption(s) sment Report (Reety issue location

oposed (include sment Report (Reety issue location

g sections: ( se

ce: Safety Assess

ent rate (calendar million vehicle-

highway (usually

tures required. nager)

al

ght projects only n Administrator)

ons Condition

Previoager gineer gineer Center

plicable

RANSPORTA

ARIANCE

surfacing hancement cts.

T Form 463 for mnus Avenue. Saf

widening, and s

R ADDRESSING standards have bm # 1327 (13 Ge

ecommendations.

safety discussioecommendations.

ee CDOT Form 4

sment Report

ar year) for this miles of travel)

y 3 years): 5 year

Date

s/comments

ous editions are

ATION

E REQUES

Rehabilitation

more detailed desfety Work per reclope flattening.

SAFETY REQUbeen addressedeometric Design

s Section) and C

n) s Section) and C

463)

rs

G. Cost Estimated itEstimated it + di

Program Engi

e obsolete and m

ST

FHOv

Da 10

Re 11

scription) commendations

IREMENTS ON . See attached SCriteria Table) fo

DOT Form # 132

DOT Form # 132

tem cost if built totem cost with excifference in cost:

ineer Approval

may not be used

HWA versight Yes No

P 1

ate

0/10/2004

P N

evised

/11/2004

R 1

in AASHT 3R stan Other:

RESURFACINGSafety Assessmeor specific improv

27 (13 Geometric

27 (13 Geometric

same as exis

same as pro

o full standard ception:

Date

Date

Date

d.

CD

Project Code

14122

Project Number

NH 099-121 Region

1

TO standards appndards apply

G, RESTORATIOent Report vement locations

c Design Criteria

c Design Criteria

sting project

posed project

$ 400$ 200$ 200

DOT Form #0464

ply

ON,

s

a

a

0000 0000 0000

4 08/04

Page 28: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

2.07.04

1. 23 C2. AAS3. CDO4. FHW

Prochttp:/

5. Tran6. For f

http:/7. Polic

http

Developme

Addition

CFR Part 62HTO Road

OT RoadwayWA Technicacesses for N//www.fhwasportation forms, see C//www.colo

cy Memo No://www.colo

ent Process

nal Referen

25, Design Sdside Design

y Design Gal Advisory

Nonfreewaya.dot.gov////Research BCDOT on-liradodot.infoo. 7 Analysoradodot.inf

s

nces:

Standards fn Guide

Guide y 5040.28, Dy RRR Proje///legsregs/Board, TRBine forms lio/library/for

sis of Essenfo/business

2-26

for Highway

Developing ects directives/t

B Special Rbrary rms ntial Itemss/designsup

ys

Geometric

techadvs.hteport 214,

pport/policy

Ja

c Design Cr

tm Designing

y-memos .

anuary 31, 2

riteria and

Safer Road

2013

ds

Page 29: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.08

The desand conwith the

Highwaycan be d

1. R

2. R

3. Td

AASHTOexisting

1. E

2. R

3. U

4. Sto

5. D

The Resobjectivecan equdesign fconsiderEnginee

The ResAny bengeometrdetails.

AASHTOprojects (federal,approve

y 31, 2013

SAFETDECIS

sign of safetinues throuAASHTO R

y safety impdivided into

Roadway sa

Roadside ha

Traffic enginirections

O’s recommhighways i

Elimination o

Relocation o

Use of break

Selection of o reduce ac

Delineation

sident Engine. In manyal or excee

funds by prer a safety a

ering Branch

sident Enginnefit/cost anry, and acci

O design anon the Nat

, state, locaed design ex

TY REVISIONS)

r public streugh advertiRoadside D

provements three area

afety improv

azard elimin

neering and

mended ords as follows

of the haza

of the hazar

k-away dev

a cost-effeccident seve

of the Haza

neer is respy instances,ed additionaeparing a b

analysis of th detailing f

neer shouldnalysis shouident costs

nd safety sttional Highwal, or privatexceptions.

IEW (INC

eets and higisement. C

Design Guid

s to decreasas of concer

vements --

nation -- rem

d operations

der of prefes:

rd.

rd to a poin

vices to red

ective trafficerity.

ard

ponsible for benefits ga

al cost. Thebenefit/cost the project feasible alt

d review anuld include . See the A

tandards apway Systeme). DeviatioThe FHWA

2-27

CLUDIN

ghways begClear zonesde.

se vehicularn:

visibility an

moving roa

s -- improvi

rence for tr

nt where it is

uce the haz

c barrier (lon

r providing ained from e Resident analysis. Tperformed ernatives a

nd documenthe followin

AASHTO R

pply to any m (includingons from stA has estab

Proj

G CLEA

gins at the s should be

ar accidents

nd operation

adside obsta

ng traffic re

reatment of

s less likely

zard.

ngitudinal b

a design wa specific sEngineer cThe Resideby the Safe

and recomm

nt the safetng: encroac

Roadside De

proposed g Interstate)tandards mblished 13 c

oject Develo

AR ZONE

Design Scodesigned i

s and fatalit

n character

acles

egulations,

f roadside o

y to be struc

barrier or cr

with safety asafety desigcan best utient Engineeety and Tramendations

ty issues anchments, roesign Guide

improveme) regardlessust be justicontrolling c

opment Pro

E

oping Revien accordan

ty reduction

ristics

warnings, a

obstacles o

ck.

rash cushio

as a primarygn or treatmlize limited

er shall affic .

nd decisionoadside e for more

ent on all s of fundingfied by criteria

ocess

ew nce

n

and

n

on)

y ment

s.

g

Page 30: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D requiringDesign S(Varianc

For CleaDesign M

Addition1. AAS2. AAS3. CDO4. Tran5. CDO

Developme

g formal apStandards fces).

ar Zone reqManual.

nal ReferencHTO HighwHTO Policy

OT Roadwaysportation

OT Procedu

ent Process

proval, withfor Highway

quirements

ces: way Safety y on Geomey Design GResearch Bral Directiv

s

h the excepys). Refer

of hydraulic

Design andetric Design

Guide Board, TRBe 1602.1 B

2-28

ption of the to Section

c structures

d Operationn of Highwa

B Special ReBike and Pe

clear zone 2.05 for De

s, refer to th

ns Guide ays and Str

eport 214, edestrians

Ja

(23 CFR Pesign Excep

he CDOT D

reets

Designing

anuary 31, 2

Part 625, ptions

Drainage

Safer Road

2013

ds

Page 31: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project Development Process Rev: June 29, 2020

2-29

2.09 ROADSIDE BARRIER DESIGN AND REVIEW

Roadside barrier is installed to reduce the severity of run-off-the-road accidents. The primary purpose of roadside barrier is to prevent a vehicle from leaving the road and striking a fixed object or terrain feature that is more hazardous than the roadside barrier.

A roadside barrier is a longitudinal barrier used to shield motorists from natural or manmade hazards located along either side of a roadway, and may occasionally be used to protect bystanders, pedestrians, and cyclists from vehicular traffic. A barrier is installed when an obstacle cannot be removed or relocated or when the steepness of the roadside terrain prevents establishing an adequate clear zone. CDOT installs barrier only when it is not economically feasible to eliminate a hazard or make the feature traversable or when terrain conditions are such that an adequate roadside recovery area cannot be provided for the given design speed.

CDOT uses several types of barriers, primarily Guardrail Type 3 W-beam, Guardrail Type 7 F-shape and Type 9 Single Slope Concrete Barrier, and Tensioned Wire Cable Barrier. Thrie Beam Guardrail is also used.

In many cases, slope flattening and extending hazardous features such as culverts can be viable alternatives to barrier. Guardrail Type 3 (semi-rigid) and concrete (rigid) barriers can redirect errant vehicles when impacted. Semi-rigid barriers can deflect up to 5 feet upon impact. Rigid concrete barrier that is anchored has no deflection upon impact. In some cases, the available space between the barrier and the object may not be adequate. In such cases, the barrier should be stiffened as suggested in the AASHTO Roadside Design Guide in advance of and alongside the fixed object. Also, important is the need for a thrie beam transition between semi-rigid and rigid barriers or between a semi-rigid barrier and bridge rail to eliminate pocketing, snagging, or penetration of the vehicle at the point of connection.

Because guardrail is a hazard in itself, it should be installed only in accordance with the guidelines of the AASHTO Roadside Design Guide. See CDOT Roadway Design Guide Section 20.3.2.4 for guidance on offset distance for the guardrail. Placement of barrier is based on accident potential and severity. Since both barriers are hazards, they should be installed only where they result in a reduction in the accident severity compared to impacting the hazard being shielded.

Substandard bridge rail should be examined for upgrading on resurfacing projects.

The Resident Engineer is responsible for evaluating factors concerning safety, traffic control, hazards, and other constraints in the use of guardrail. Justifications and

Page 32: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January 31, 2013 Rev:June 29, 2020 Project Development Process

2-30

warrants for guardrail design are best done after the scoping review. The Resident Engineer should use an analysis to warrant the use of guardrail based on the AASHTO Roadside Design Guide. Bridge rail designs and decisions should be coordinated with the Bridge Design and Management Branch.

The Resident Engineer should consider factors such as design speed and traffic volume in relation to barrier need as identified in the AASHTO Roadside Design Guide. The cost of slope flattening and hazard elimination compared with barrier cost should be considered.

The design sequence for the placement of barrier is as follows:

1. Provide the clear zone as determined from the AASHTO Roadside DesignGuide.

2. Provide for slope flattening for traversable grades (4:1 slope) within the clearzone.

3. Remove the obstacle or redesign it so it can be traversed safely.4. Relocate the obstacle or flatten the steep terrain. Relocate obstacles to a location

where an errant vehicle is less likely to impact it. Location should be as far fromthe edge of travel way as practical.

5. Reduce impact severity by using appropriate breakaway roadway fixtures.6. Shield the obstacle, terrain feature, or water hazard with longitudinal barrier,

crash cushion, or a combination thereof when it cannot be eliminated, relocated,or redesigned.

7. Delineate the obstacle or hazard when the above alternatives are not appropriatedue to type of project, low design speed, low volume, classification of theroadway as scenic, or classification of the obstacle as a historical feature.

8. If barrier is impeding the free passage of drainage flow or is causing ponding,consult the Region Hydraulics Engineer to address the drainage problem.

When the Resident Engineer recommends barrier, criteria in the CDOT Roadway Design Guide, CDOT M Standard Plans, and the AASHTO Roadside Design Guide should be followed. For resurfacing, rather than just replace in kind, the existing Type 3 guardrail should first be checked to ensure that the installation configuration meets the length of need criteria in the AASHTO Roadside Design Guide or current CDOT M Standard Plans. If Type 3 guardrail condition is such that it will function and safely perform as designed and the height is at least 26.5 inches following 3R work, the guardrail may remain in place. If guardrail would be less than 26.5 inches in height after the 3R work is complete, adjusting and resetting to a specified height of 29 +/- 1 inches may be an option under specific conditions. It is necessary to check to ensure that existing guardrail is in good condition before adjusting and resetting. If the height of guardrail will be less than 26.5 inches following 3R work, the following options are available:

Page 33: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project Development Process Rev: June 29, 2020

2-31

1. Guardrail with a height less than 25 inches must be removed and replaced with31 inch MGS guardrail per CDOT M-Standards.

2. Guardrail with steel posts at a height 25 inches to less than 26.5 inches may bemodified by using additional predrilled bolt holes to raise block and guardrailassembly and reset to height to 29 +-/ 1 inches. If pre-drilled holes are present inW-beam rail, the rail shall be adjusted horizontally along guardrail run, so railsplice location is midspan between posts. Field drilling of steel posts or W-beamrail is not permitted, and only holes pre-drilled by the manufacturer shall be used.

3. Guardrail with timber posts at height less than 26.5 inches must be removed andreplaced with 31 inch MGS guardrail per CDOT M-Standards. Field modificationof timber posts in any kind is not permitted.

Raising, resetting and/or reuse of removed guardrail posts (steel or timber) in an attempt to attain acceptable guardrail height, in any manner, is not permitted. Consideration must be given to condition of assembly hardware (bolts, nuts) and guardrail components (blockouts, metal W-beam sections) when choosing to leave in place or modify. Replacement of hardware or individual blockouts and/or W-beam guardrail sections may be necessary to ensure overall integrity of guardrail system.

When completing the CDOT Form 463 Design Data in SAP, the designer should provide a detailed description of the barrier elements that do not meet current standards. The description should appear either in the comments section of Section 8, Safety Considerations or in Section 13, Remarks where additional text can be added.

Barrier installations should use the standard configurations as shown in the CDOT M Standard Plans. For situations not addressed in the CDOT M Standard Plans, barrier installations will need to be designed in accordance with the AASHTO Roadside Design Guide. Designers are to include the barrier design calculations as part of the project file. For those barrier designs that are project specific and different from the M Standard Plans, designers need to send the proposed design into the Standards and Specifications Unit for review and comment. Allow 2-3 weeks within the project schedule for this review.

Substandard existing guardrail end sections on all Interstate highway projects and on all National Highway System projects with a design speed of at least 45 miles per hour and an average daily traffic of 6,000 or more are to be replaced.

Page 34: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January 31, 2013 Project Development Process

2-31a

1. CDOT Cable Barrier Guide2. AASHTO Roadside Design Guide3. CDOT Roadway Design Guide, Chapter 204. AASHTO Manual for Assessing Safety Hardware (MASH) 2009

Replace them with end treatments passing the National Cooperative Highway Research Program Report No. 350 criteria or AASHTO Manual for Assessing Safety Hardware (MASH) 2009. When possible replace substandard end treatments on other roadway systems.

Additional References

Rev: June 29, 2020

Page 35: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

2.10

Bicycle arecreatiodesign pproper pnew or r

CDOT Pneeds otranspor

Coloradany roadother roathat in spedestriexclusivtranspordesignatpractica

Consideschools

The Resfacilitiesreview oDesign G902.0 Shand attelocationsto be adrequiredMUTCD

Bicycle aAmericacrosswa(ramps)

Developme

BICYC

and pedestonal purposphase, bothplacement areconstruct

Policy Direcf bicyclists rtation facili

o statutes rdway unlesad users. ome mannean travel, o

ve use of bicrtation is anted bike lanl.

eration for pand parks.

sident Engin on new co

of CDOT PrGuide - Chahoulder Po

ention must s. For 3R t

ddressed acd to addressD, Section 6

and pedestans With Disalks, overpa, and acces

ent Process

CLE AND

trian facilitieses. When h safety andand design ion projects

ctive 1602.0and pedesities as a m

recognize bs specificalBicycle ander is specifor both, regcycles, pedn important nes and sho

pedestrian a

neer shall eonstruction arocedural Dapter 14 Bilicy. Thesebe paid to

type projectccording to s accommoC.01.

trian facilitiesabilities Acasses and uss ramps fo

s

D PEDES

es are of grthese facil

d efficiency of these fa

s.

0 Bikes andtrians in the

matter of rou

bicycles as lly prohibited pedestriaically desigardless of w

destrians, oconsideratoulders, are

and bicycle

evaluate theand recons

Directive 16icycle and Pe facilities atheir presets, the desiPD 1602.1

odations for

es should cct requiremunderpasseor persons w

2-32

STRIAN

rowing impoities are noof the shar

acilities is an

d Pedestriane planning, utine.

vehicles. Aed and havean facilities a

nated as bewhether sur both. Shaion. On-roae viable opt

design is e

e options fostruction pro02.1 Bike aPedestrian are an integence in ruragn of pedes. Construc

r bicycles a

comply withments, includes, traffic cowith disabil

FACILIT

ortance natot incorporared roadwan important

ns requiresdesign, an

As such, bice all the rigare portioneing open tch facilitiesared bicyclead bicycle ftions when

especially im

or providingojects. Theand PedestrFacilities, a

gral part of tal areas as wstrian and b

ction projecand pedestr

the latest dding requireontrol featuities. Curb

Ja

TIES

tionally for cated or consay can be imt element o

s CDOT to ind operation

cyclists arehts and ress of a road to bicycle trs are designe use with ofacilities, suseparate fa

mportant in

g bicycle ane evaluationtrian, CDOTand CDOT the roadwawell as urbabicycle faci

ct Traffic Corians as ca

design stanements for res, curb cu cuts (ramp

anuary 31, 2

commuting sidered in tmpaired. Tof design on

nclude the n of

e allowed tosponsibilitieor pathway

ravel, ned for the other modeuch as acilities are

n areas clos

nd pedestrian will includT Roadway Policy Dire

ay environmanized lities will ne

ontrol Planslled for in th

ndards and sidewalks, uts, lightingps) and othe

2013

and he he

n all

o use es of y

es of

e not

se to

an de

ective ment,

eed s are he

g er

Page 36: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January provisionsidewalkregardin

Accordinpedestriand conpersonsshould b

Where cwith mot

Where revaluateTraffic EM-614-1

Replacebicyclist

The scofacilitiesor reconvariancebicycle fDesign G

GuidelinFacilitiesof the RHighwayfunded pprojects

For Hydrefer to

Addition1. 23 C

y 31, 2013

ns for persoks. See pang complian

ng to Title 2ans and bicstruction of with disab

be given to

current or ator vehicle

rumble striped accordinEngineering1 for rumble

ed and rehas and pede

ping docum, and the F

nstruction pes for bicycfacilities shoGuide.

nes are in ths, the AASHoadway Deys and Streprojects, an.

raulic DesigCDOT Drai

nal RefereCFR Part 65

ons with disragraph 4 i

nce and con

23 of the Cocyclists shof federal aidilities shall state-funde

nticipated ptraffic, ever

ps are propong to the CDg. If the dece strips sha

abilitated brestrians whe

ment shouldorm 463, Drojects, thele and pedeould be doc

he AASHTOHTO Guideesign Guideeets. Thesend it is reco

gn of drainainage Desig

nces: 52, Pedestr

sabilities arn Section 8nsulting the

ode of Fedeould be gived highway pbe consideed projects.

pedestrian ry effort sha

osed on proDOT Roadwision is madll be followe

ridge decksere they are

d discuss aDesign Datae Resident Eestrian facicumented i

O Guide fore for the Dee, and the Ae design gummended t

age structugn Manual.

ian and Bic

2-33

re required 8.01 for infoe CDOT AD

eral Regulaen full consprojects. Tered on all p.

or bicycle tall be made

ojects, the eway Designde to instaled.

should be e permitted

pplicability a, should doEngineer shlities. The n accordan

r the Develovelopment

AASHTO Pouidelines withat local a

res under B

cycle Accom

Proj

on all projeormation onDA Coordina

ations the sideration dhe special projects. T

traffic presee to minimiz

effects to bn Guide, Chl rumble str

reconstrucd.

of providingocument thhall documeinability to

nce with Ch

opment of Bof Pedestriolicy on Gell be used ogencies us

Bicycle and

mmodations

oject Develo

ects involvinn making deator..

afe accommuring the deneeds of thhe same co

ents a potenze the confl

bicyclists shhapter 20 – rips, CDOT

cted to acco

g bicycle anese decisioent design provide ped

hapter 14 of

Bicycle andrian Facilitieeometric Deon all state se them for

d Pedestrian

s and Proje

opment Pro

ng curbs orecisions

modation oevelopmenhe elderly aonsideratio

ntial confliclicts.

hould be Safety and

T Standard

ommodate

nd pedestrions. For nedecisions adestrian anf the Roadw

d Pedestrianes, Chapteresign of or federallylocally fund

n Facilities,

ects

ocess

r

of t

and n

ct

d Plan

ian ew and nd way

n r 14

y ded

,

Page 37: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D 2. Tran

http:/3. CDO

Unde4. CDO

Disa5. Ame6. FHW7. CDO8. CDO9. Flexi10. The 11. Manu12. Pede13. Ame14. Pede

http:/15. CDO16. Peds

http:/17. ITE B

http:/18. Acco

DOTInfrahttp:/desig

Developme

sportation //pubsindex

OT Proceduerpasses an

OT Policy Dbilities ricans With

WA Region 8OT M StandOT Roadwayibility in HigNational Biual on Unifoestrian and ricans with

estrian and //www.bicyc

OT Bridge Dsafe: Pede//www.walkBicycle and//www.ite.o

ommodatingT Policy Stastructure //www.fhwagn.cfm

ent Process

Research Bx.trb.org/vie

ural Directivnd Overpasirective 605

h Disabilitie8 Commen

dard Plans y Design G

ghway Desiicycling andform Traffic

Bicyclist InDisabilitiesBicycle Inf

clinginfo.orDesign Man

strian Safekinginfo.orgd Pedestrianrg/councilsg Bicycle antement Inte

a.dot.gov/en

s

Board, TRBew.aspx?id=ve 507.1, Stsses 5.0 Compre

s Act Handtary and Te

Guide, Chapign – FHWAd Walking SControl De

ntersection s Act Accesformation Cg/engineerual, Sectio

ety Guide an/pedsafe/ n studies 19/pedbike/pund Pedestregrating Bic

nvironment

2-34

B 959 - Ped=216854 tandards fo

ehensive Ac

dbook ext, Section

pter 14 BicyA-PD-97-06Study – FHWevices for SSafety Indic

ssibility GuiCenter ing/ n 2.2.7 Bicynd Counter

996 - 2005ublications.ian Travel: cycling and

t/bicycle_pe

estrian and

or Rest Area

ccessibility

n 14, ADA A

ycle and Pe62 WA-PD-94-

Streets and ces, 2006 delines (AD

ycle Railingrmeasure S

.asp A RecommWalking in

edestrian/g

Ja

d Bicycle Fa

as, Pedestr

for Person

Accessibility

edestrian Fa

-023 Highways

DAAG)

g Selection Sy

mended Appnto Transpo

uidance/de

anuary 31, 2

acilities

rian

ns with

y Guideline

acilities

(MUTCD)

ystem

proach A Uortation

esign_guida

2013

es

US

ance/

Page 38: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.11

The purprunoff, thof desigapplicab

The desthe magthe drainsedimen

Design othe CDOCDOT E

The Hydlocationworking identify fsignificaprotectiodrainagedrainage

Routine completreviewed

HydrauliCDOT Dhas beecompletPlanninglitigation

Proceduthe Drai

y 31, 2013

HYDRASTOR

pose of hydhe best locaned drainag

ble to all CD

sign of highwgnitude and nage facilitint control, w

of drainageOT DrainagErosion Con

draulics Eng, and size, with the Enfloodplain n

ant encroacon, storm rue structurese features s

designs, sued by a Red by the Re

ic reports aDrainage Den made. If e written asg/Environmn occurs, an

ures for the inage Desig

AULIC DMWATE

draulic desiation and age systems

DOT project

way drainafrequency es. Hydrau

water quality

e features oe Design Mntrol and St

gineer is reas determinnvironmentneeds, and hments. Tunoff, and as. Undergroshould be id

uch as culvsident Eng

egion Hydra

and documeesign Manuf environmessessment

mental Manand in case d

design of pgn Manual.

DESIGNER)

gn is to detadequate sizs. Erosion cts.

ge structureof storm ru

ulic design y, and storm

on transportManual, the tormwater Q

esponsible fned by calcal Programto accommhe structureany other faound utilitiedentified an

verts or smaineer familiaulics Engin

entation shoual as evideental factorsshould be

ager. Repodesign mod

pipe culvert Erosion co

2-35

(EROSI

termine theze of drainacontrol and

es requiresunoff and a includes mmwater ma

tation projeCDOT Pip

Quality Con

for determinculations an

ms staff to asmodate floode design wiactors involves in the vicnd located b

all concretear with minneer.

ould be comence that a s are affecteprepared a

orts and docdifications b

ts, CBCs, aontrol proce

Proj

ION CON

e magnitudeage facilitie

d stormwate

s a hydrologhydraulic a

methods andanagement

cts will be de Type Sel

ntrol Guide.

ning major nd field inspssess envirdplain requill consider ved in the dcinity of exisby the Regi

e box culvernor structure

mpleted in acompetented by the h

and submittecumentatiobecome nec

and bridge hedures are

oject Develo

NTROL

e and freques, and hyder managem

gic analysisanalysis to ld practices on projects

done in acclection Guid.

drainage stpections. Tronmental n

uirements, ielevations

design of hysting and pion.

rts (CBCs),e hydraulic

accordancet and respohydraulic deed to the Rn are essencessary.

hydraulics aaddressed

opment Pro

AND

uency of storaulic efficiement is

s to determlocate and for erosion

s.

cordance wde, and the

tructure typThis involveneeds, to ncluding an, scour, eroydraulic

proposed

, can be s, and will b

e with the onsible desiesign, a

Region ntial in case

are outlined in the Eros

ocess

orm ency

ine size and

with

pe, es

ny osion

be

ign

e

d in sion

Page 39: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D Control during th

When thwith the is capabsuch as than 48

The Resnecessacompletresponsrequiremcompletwill scheadvertisthe hydrinto the

Addition1. 23 C2. CDO

Developme

and Stormwhe project s

he hydrologRegion Hy

ble of desigirrigation, sinches in d

sident Enginary data to ted prior to ible for ens

ments of theed, the PM

edule the soement dateraulic desigplans.

nal RefereCFR Part 65OT Drainage

ent Process

water Qualiscoping pro

gy predictionydraulics Enning. The storm drain

diameter.

neer will prthe Region the Field In

suring that pe CDOT Pip will use enoil and watee. Upon finan informatio

nces: 50, Bridges,e Design M

s

ity Guide. Hocess.

ns are comngineer, wilHydraulics s, MS4 pon

ovide surveHydraulics

nspection Rpipe type sepe Type Sengineering jer testing toal design coon will be s

, StructuresManual

2-36

Hydraulic d

pleted, the l decide whEngineer w

nds, and all

ey, structurs Engineer. Review. Theelection is c

election Guiudgment to

o ensure coompletion, asent to the R

s and Hydra

design need

Resident Ehich structuwill design tl standard d

re cross-sec Preliminar

e Project Maconducted ide. After tho determineompliance wand prior toResident E

aulics

Ja

ds will be de

Engineer, inures the Resthe special drainage st

ctions, and ry designs anager (PMpursuant to

he preliminae sampling with the proo the Final Ongineer for

anuary 31, 2

etermined

n conjunctiosident Engistructures,

tructures la

other should be

M) is o the ary designslocations a

oject Office Revier incorporat

2013

on ineer rger

s are and

ew, ion

Page 40: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.12

Designeon enginmaterialrequire tcompetitanalysisLocal Ag

CDOT hacceptafactors. and poliMemoraupdatedtheir prowebpagDocumedocs/cdo

Residenon a speengineeand corrand hydchoose tin applicConstruAny pipeaccordaaccepta

All desigletter pla

y 31, 2013

CONSMATECROS

ers will consneering ands for considthat State Dtion for pric

s for considegency proje

has developbility of alteThe Pipe Mcies regard

andum, Febd as changeojects. The e on the De

ents” at: httpot_pipe_se

nt Engineersecific projecring requirerosion), soilraulic charathe final pip

cable sectioction and Se that meetnce with thble for all p

gn decisionaced in the

IDERATRIALS FS DRAIN

sider all avad economicderation incDOT’s allowcing when pering alternects receivin

ped a Pipe ernative pipMaterial Selding the selebruary 1984es occur an

CDOT Pipesign and Cp://www.colection_gui

s will selectct after balaements sucl conditionsacteristics ope material ons of the CStandard Spts the corroe Contract

projects as d

s regardingproject file

TION OFFOR CUNS (UND

ailable pipec analysis aclude concrw the use ofperformancenative pipe ng federal a

Material Sepe materials

ection Policection of pi

4. The CDOd designerse Material S

Constructioloradodot.inde/view .

t the allowaancing the ach as durabs, fill heightsof pipe matfrom the o

CDOT Standpecial Provsion and abis expected

described a

g pipe mate. Copies of

2-37

F ALTERLVERTSDERDRA

e product ms part of th

rete, metal, f alternativee is deemematerials isaid funds.

election Pols based on cy replacespe materia

OT Pipe Mats should staSelection Pn Support pnfo/busines

able pipe malternative u

bility, enviros, need for erial insideptions provdard Specifisions as mbrasion crited to have aabove.

erial type sef all selectio

Proj

RNATIVES, STORAINS AN

aterials thae project deand plastic

e pipe mateed to be equs required f

licy that is tapplication

s all previoul including tterial Selecay current o

Policy can bpage underss/designsu

material optiouse of pipe

onmental cowater tight surfaces.

vided in the fications fo

modified for eria in this

a 50-year se

election muon letters a

oject Develo

E PIPE RM SEWEND SIDE

at are judgeesign. Avac pipe. Federials to prouivalent. Thfor all CDOT

to be used tn, locale, anus procedurthe Chief E

ction Policy on the lates

be found onr “Miscellanupport/desig

ons for eace materials bonsiderationt joints, slopThe ContraContract a

r Road andthe particupolicy and ervice life a

st be documare to be se

opment Pro

ERS, ANDRAINS

ed acceptabailable pipe eral regulat

omote he engineerT projects a

to evaluatend regional res, guideli

Engineer's will be

st revisionsn the CDOTneous Desiggn-

ch installatiobased on ns (abrasiopes of inveractor will

and as specd Bridge lar project. is installed

and is thus

mented andent to the Ar

ocess

ND S)

ble

tions

ring and

e

nes,

s for T gn

on

n rts,

cified

in

d a rea

Page 41: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D Engineebeing m

All excemust be

Addition1. CDO2. CDO3. FHW

Developme

er for guidanade.

ptions to th approved

nal RefereOT DrainageOT Pipe MaWA website:

ent Process

nce and ve

he Pipe Matby the Reg

nces: e Design Mterial Selec http://www

s

rification of

terial Selecion Program

Manual ction Policy w.fhwa.dot.g

2-38

f consistenc

tion Policy m Engineer

gov/constru

cy prior to f

require a Jr and the F

uction/cqit/c

Ja

final design

JustificationHWA.

culvert.cfm

anuary 31, 2

decisions

letter and

2013

Page 42: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.13

The StatmaintenMaintenThe Mai

http://dtde.pdf

The Mairegardin

For projelocated wwith C.Rincluded

The Resor DepuReview,

Maintenabout hiareas whit. Mainhazardoalso havpersonn

MaintenMaintenguardraithe apprcontrol p

Maintenminutes

y 31, 2013

CDOT

te of Coloraance oversance Supeintenance S

dapps.color

intenance Sng the appro

ects on couwithin cities

R.S 43-2-13d in the proj

sident Enginty Superint the Field In

ance persogh-water leith surfacinntenance peous materiave valuable nel can help

ance requirance persoil, delineatoropriate typplan, snow

ance persoand incorp

MAINTE

ado is dividsight of statrintendent w

Section bou

radodot.info

Superintendopriate pers

unty roads os, maintena35. The city ject develop

neer shouldtendent, or nspection R

onnel have evel at draing and sub-ersonnel mls, undergroknowledge

p determine

rements foronnel duringors, fence, ae of materiremoval sh

onnel commporated into

ENANCE

ed into eighe highwayswho reports

undaries of

o/staticdata

dent for thesonnel to b

or city streeance is the

or county mpment proc

d contact thboth, for ap

Review and

valuable innage structbase probleay be familound tankse about cure stockpile l

r new desigg the desigand temporal specified

hould be dis

ments and co project pla

2-39

E INPUT

ht CDOT Ms. The Mains directly tojurisdiction

a/Download

e applicablee involved

ets includingresponsibilmaintenanccess.

he CDOT Mppropriate rd the Final O

put for projures, areasems, and loliar with site

s, rare vegerent and paocations an

gn elementsn. Particularary and ped for these iscussed wit

concerns shans as appl

Proj

T

Maintenancentenance Seo a Region n are indicat

ds/Statewid

e Section shin the proje

g some staity of the loce or Public

MaintenancerepresentatOffice Revie

ject designs with erosioocations whes along a

etation, andast landownnd material

s should bear elementsermanent eritems. Wheth the Main

hould be doicable.

oject Develo

e Sections fections havTransportated in a ma

eMaps/Mai

hould be coect develop

ate highwayocal entity inc Works se

e Section Stion at the Dew meeting

as they haon problemhere guardrproject that animal habners. Maint pit sites.

e discusseds of interestrosion BMPen designinntenance Su

ocumented

opment Pro

for ve a ation Directoap found at:

intSections

ontacted pment proce

ys that are n accordanction shoul

SuperintendDesign Scogs.

ave knowledms, roadwayrail has beet could contbitat. They tenance

d with t may includPs, along wg the trafficuperintende

in the revie

ocess

or. :

sBas

ess.

ce d be

dent oping

dge y en tain may

de with c ent.

ew

Page 43: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D The Resproject rrepresenwriting to

Addition1. CDO2. CDO3. CDO

(DSR4. Field5. Final

Developme

sident Enginreviews durntative shouo the Resid

nal RefereOT Plant MaOT Manual oOT ProceduR) d Inspectionl Office Rev

ent Process

neer will noring the prould review t

dent Engine

nces: aintenance of Maintenaral Directiv

n Review (sview (see S

s

otify the appoject develothe project eer.

Field Manuance Procee 512.1, Pr

see SectionSection 2.28

2-40

propriate Mopment proc

plans and

ual edures roject Scop

2.17 of this8 of this ma

Maintenancecess. The Mprovide com

ping and De

s manual)anual)

Ja

e Section peMaintenancmments at

esign Scopi

anuary 31, 2

ersonnel ofce the review

ing Review

2013

f all

or in

Page 44: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.14

A field spropose

A field sresurfacreconstrrequiremrequiredadequatland acq

The full the startinitially pprojects

At the prused as Survey Rnotice ppropertydone on

The ResScopingEngineeThe Surfrom the

The Regsurvey o

1. Rs

2. Cth

3. Gth

4. E

y 31, 2013

FIELD

urvey is used limits.

urvey is uscing. A fieldruction, newments, or std when an ote field survquisition on

extent of tht of the fieldperformed w, project sc

roject scopa tool to en

Request shrior to the s

y. A presurvn the prelim

sident Enging Review to er should finrvey Requee Resident E

gion Surveyon highway

Research anurveys, ma

Conduct thehrough all s

Gain accesshe use of F

Establish gro

SURVE

ed to map

ually requird survey is w alignmenttructures to overlay projvey is essen

a project.

he project lid survey to within the acoping may

ing meetingnsure that ahould be a pstart of a suvey confereinary surve

neer is respdiscuss iss

nalize a surst is a prodEngineer a

y Unit or suprojects in

nd gather inaps, as-conse pre-surveysurvey activs to private orm 730, Pound contro

EY (FOR

the topogra

red whenevappropriatets, municipabe constru

ject includential to a pr

mits must beliminate m

anticipated pbe an exte

g, the Formall issues aproduct of turvey is reqence shouldey.

ponsible forsues relevarvey requesduct of the Dnd all the a

rvey consucluding the

nformation structed play conferencvities. property fo

Permission tols and XYZ

2-41

M 1217)

aphy of a pr

ver a projece when theral separate

ucted or extes slope flatroperly cons

be determinmultiple survproject area

ensive study

m 1217, Prere addressehe Design uired to obtd be condu

r including tant to any sst within 30 Design Sco

affected disc

ultant firm we following:

for a pre-suans, and infce to establ

or the purpoto Enter ProZ coordinat

Proj

)

roject within

ct consists ore is significe storm sewtended. A fttening or gstructed pro

ned by the veys and da. For newy of the are

eliminary Sued at the mScoping Retain permis

ucted prior t

the Surveysurvey requ

days of theoping Revieciplines.

will conduct

urvey confeformation frlish ground

ose of surveoperty. tes, install m

oject Develo

n the exten

of more thacant earthw

wer system field survey

guardrail insoject and is

Resident Euplicate eff

w or reconstea.

urvey Requmeeting, andeview. Suf

ssion to entto any fieldw

y Coordinatoirements. Te Design Scew, and incl

and docum

erence inclurom other e rules to be

eying, if req

monuments

opment Pro

nt of its

an minor work,

(MS4) y may be stallation. As required fo

Engineer prifort. Scopintruction

est, shouldd a draft fficient advaer any work being

or in the DeThe Residecoping Revludes input

ment the fie

uding existientities. e followed

quired, thro

s for use in

ocess

An or

or to ng is

d be

ance

esign ent view.

ld

ng

ugh

Page 45: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

ri5. C

c6. S7. P8. F

aP

9. S

Addition1. CDO2. CDO

(DSR3. Mem

Profe4. For f

http:/

Developme

ght of way Compile XYontours on

Schedule anPrepare survFile the cont

nd file monProfessionaSign, seal, a

nal RefereOT Survey MOT ProceduR)

morandum oessional Enforms, see C//www.colo

ent Process

purchasesZ data on ta topograp

nd obtain a vey report, trol diagram

nument recol Engineers

and file the

nces: Manual ral Directiv

of Understangineers anCDOT on-liradodot.info

s

, and stakehe T-MOSS

phic map. review by aother requ

m in the surords with ths and Proferight of way

e 512.1, Pr

anding with nd Professioine forms lio/library/for

2-42

e parcels, anS computer

a professioired submitrvey plat dehe Coloradoessional Lany plans with

roject Scop

the Coloradonal Land Sbrary rms

nd easemer program f

onal land suttals, or botepository wio Board of Rnd Surveyoh the appro

ing and De

do State BoSurveyors (

Ja

ents. format and

urveyor. th if neededith the apprRegistration

ors. opriate coun

esign Scopi

oard of Reg(attached)

anuary 31, 2

produce

d. ropriate coun for

nty.

ng Review

gistration fo

2013

unty,

or

Page 46: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.15

Value Edisciplinfor that fand prov

Value Efollowing

1. As

2. Ap

3. Cps

A Value million. project, under $4complexthat havdifficult trequirem

2.15.01

Life-

Majo

y 31, 2013

VALUE

ngineering ed team whfunction or vides the ne

ngineering g three bas

An organizepecialists k

A function oroduct, or s

Creative thinerforming fervice, or p

EngineerinA VE analyand lower i40 million, ixities, or eleve major strtechnical is

ments, com

Definitio

-cycle cost

or project

E ENGIN

is the systehich identifiservice; geeeded func

may be deic precepts

d review toknowing varriented appservice bein

nking whichfunctions atproduct.

ng (VE) anaysis often leimpacts to tit is a good ements thatuctures, cosues, exterpeting com

ons

t The toincludprojecway, pmaintetaxes,

A projof the millionTrans

NEERING

ematic appies the func

enerates altctions, reliab

efined in oths:

o improve various aspecproach to idng studied a

h uses recot a lower ov

alysis is reqeads to mothe travelinpractice to

t may beneomplex desirnal influenc

mmunity and

otal cost of es all of the

ct or item, inplanning, deenance, mo disposal, a

ect receivinfollowing c

n or more, oportation as

2-43

G (DURI

lication of rction of a prernatives thbly, at the lo

her ways, as

alue by usicts of the prdentify the eand the cos

ognized techverall cost o

quired for feney and timg public. A

o perform a efit from a Vign or consces and und stakehold

a project oe relevant cncluding iniesign, and odification, and salvage

ng Federal criteria: (1) Ior (2) it hass being “Ma

Proj

ING DES

recognized roduct or sehrough the owest over

s long at th

ng a multi-droblem beinessential fusts associa

hniques to or to otherw

ederally funme savings,Although no

VE on projVE analysisstruction, chnique or comer objective

r item over costs that otial acquisitconstructioreplacemee value as

financial asIt has an es

s been idenajor.”

oject Develo

SIGN PH

techniqueservice; estause of crea

rall cost.

he definition

disciplined ng studied. nctions of tted with tho

explore altewise improv

nded projec, a more coot required fjects that ha. Examples

hallenging cmplicated fues, etc.

its useful lioccur througtion costs (

on), operationt, demolitiapplicable.

ssistance thstimated cotified by the

opment Pro

HASE)

s by a multiablishes a wative thinkin

n contains t

team of

the system,ose function

ernate wayve the desig

ts over $40onstructible for projectsave s are projecconstraints,unctional

ife. This ghout life of(such as rigon, ion, financin

hat meets oost of $500 e Secretary

ocess

-worth ng;

he

, ns.

s of gn,

0

s

cts

f a ght of

ng,

one

y of

Page 47: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

Proje

Prod

Valu

Valu

After produring a

1. G

2. A

3. Sre

4. E

5. D

Developme

ect

duct or ser

ue Enginee

ue Enginee

oject selecta VE analys

Gather infor

Analyze func

Speculate uequired fun

Evaluate the

Develop alte

ent Process

A portto conprelimA projsevera

rvice Any eoperaachievperfor

ring analyprojecmultidteam functiocost; (reduci

ring Job Pconduthe reanalyssolvinand go Involvearly iexperi

ion, the Jobsis:

mation;

ctions, wort

sing creativctions;

e best and l

ernatives in

s

tion of a hignstruct, reco

minary desigect may coal years.

lement of ation. In all ived at the lormance, ma

sis A systect, during thdiscipline teprovides reons safely, (2) improvining the time

Plan A systeucting a VE commendasis shall follg procedurovernmenta

ve FHWA anin the VE pience in the

b Plan cons

th, cost, pe

ve techniqu

lowest life-c

to fully sup

2-44

ghway that onstruct, orgn report oronsist of sev

a project fronstances, towest life-c

aintainability

ematic proche concept aam of perso

ecommendareliably, eff

ng the valuee to comple

ematic and analysis an

ations. The low widely res that areal agencies

nd CDOT Process. FHe requireme

sists of the

erformance,

ues to ident

cycle cost a

pported reco

a State or pr improve asr applicableveral contra

om concept the requiredcycle cost by, safety, a

cess of reviand designons not invations for: (ficiently, ane and qualiete the proje

organized nd assuringmethodolorecognizedused throu

s.

Project DevHWA and Pents of Valu

following p

, and quality

ify alternati

alternatives

ommendati

Ja

public auths described

e environmeacts or pha

t through md function sbased on rend esthetic

iew and ann phases, byvolved in the1) providing

nd at the lowity of the prect.

plan of actg the implemgy utilized f

d systematicughout priva

velopment BPDB have sue Enginee

phases that

y;

ives that ca

s;

ons; and

anuary 31, 2

ority proposd in the ental documses over

aintenanceshould be equirementscs.

alysis of a y a e project. Tg the needewest overalroject; and (

tion for mentation ofor any VE c problem-ate industry

Branch (PDignificant ring.

are conduc

an provide t

2013

ses

ment.

e and

s for

The ed ll (3)

of

y

DB)

cted

the

Page 48: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

6. Pim

Post-anaoutcomeconduct

2.15.02

FHWA r

1. Epo

2. A

3. Pp

4. A

Any useregardlerequire C

A VE anthe preliabove. Adevelopdesign ocontractsmaller conduct

2.15.03

In additiCDOT aprojects VE analy

y 31, 2013

Present VE mplementat

alysis Job Pes of the aped in accor

Value E

requires a V

Each projecroject dever more that

Any other fe

Per MAP-21rojects..

A Value Eng

e of FAHP fuess of the aCDOT to pe

nalysis is reminary desAfter complment proce

or is prograts, an additiprojects or a VE analy

Value E

on to all proand other pu

where therysis, or the

recommention.

Plan activitipproved recrdance with

ngineering

VE analysis

t on the fedelopment, dt uses FAH

ederal aid p

, Value En

gineering an

unding on amount of FAerform mor

quired if thesign report oeting the re

ess, if the pmmed to beional VE anmultiple co

ysis is not a

ngineering

ojects descublic authorre is a high potential e

dations for

ies include commendath the policie

g Analysis

s on:

deral aid syesign, rightP funding;

rojects FHW

gineering a

nalysis is n

a Major ProAHP fundine than one

e establisheor environmequired VE roject is sue complete

nalysis is noonstruction allowed.

g Analysis

cribed in Serities (Locapotential fo

exists to imp

2-45

review, ap

the implemtions. Thesees stated by

Required

stem with at of way, anand

WA determ

analyses are

ot required

oject requireng that mayVE analys

ed scope amental docu

analysis atbsequently

ed by the letot required.contracts to

Recomme

ection 2.15.al Agencies)or cost saviprove the p

Proj

proval, repo

mentation ane post-anay FHWA.

an estimatend construc

ines to be a

e not requi

for design-

es that a VEy be used ois for a Maj

and estimateument meett this stage

y split into stting of mul. However, o avoid the

ended

02, FHWA ) to conducings in com

projects’ per

oject Develo

orting, and

nd evaluatilysis phase

ed cost (whction costs)

appropriate

red on desi

-build proje

E analysis on the projejor Project.

e of the prots the criterin the proje

smaller projltiple constrsplitting a p requireme

strongly enct the VE anmparison to rformance o

opment Pro

on of the es are

ich includesof $40 mill

e.

ign-build

ects.

be conductect. FHWA m

oject costs ria noted inect ects in finaruction project intonts of havin

ncourages nalysis on othe cost ofor quality.

ocess

s ion

ted, may

in

l

ng to

other f the

Page 49: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D Projectsrequiremfor impro

FHWA mencountdoes no

1. If3sreec

2. IfSfo

abc

When thproceedsatisfied

1. Acs

2. A2dp

2.15.04

For maxplanning(30–35 pproject daccepte

Developme

s involving cments, and oved value

may requireters instanct immediate

f a project th-year, or loubstantial cequired re-encourage oompleted V

f a project’sSection 2.15ollowing ap

. The proje

. A substa

. The chanabove thevaluatio

he design od to construd, or not nec

A project meonducted, aubstantial c

A project’s e.15.02, but ue to inflatirojects des

When s

ximum beneg or design percent) dedevelopmend and incor

ent Process

complex teccompeting by conduc

e a VE analces when thely proceed

hat met thenger, delaychange to tevaluation oor require aVE analysis

s estimated 5.02, FHWAply:

ect advanceantial changnge is detere criteria id

on of the en

f a project ction, the recessary, if:

et the criterand advancchanges in

estimated cwhen adva

ion, standasign or cont

hould a VE

efit, VE anaphase of a

esign. The Vnt activitiesrporated int

s

chnical issucommunityting VE ana

ysis to be che design od to constru

e criteria idey prior to adhe project’sof the envir

a new VE ans to be cond

cost initiallA will requir

es to a lettige occurs tormined to b

dentified in Snvironmenta

has been cequirement

ia identifiedces to a lettits scope o

ost initially ancing to lerd escalatioract.

E analysis

alysis shoula project, prVE analysiss. This will eto the proje

2-46

ues, challeny and stakealyses.

conducted if a project h

uction. In ac

entified in Sdvancing tos scope or dronmental dnalysis or aducted; or

y fell belowre a VE ana

ng for conso the projecbe the basisSection 2.1al documen

completed bt to conduct

d in Sectionting for con

or its design

fell below tetting for coon of costs,

be conduc

d be condureferably bes should beenable propect design w

nging projeceholder obje

if CDOT or has been cccordance w

Section 2.15o a letting fodesign is iddocument isan update to

w the criteriaalysis to be

struction. ct’s scope os for an incr15.02 whennt is perform

but the projet a VE anal

n 2.15.02, hstruction w

n; or

the criteria onstruction, , or minor m

cted?

ucted as eaefore the coe closely coposed VE rewithout conf

Ja

ct constrainectives offe

the public completed bwith Sectio

5.02 encouor constructdentified whs performedo the previo

a identified conducted

or design. rease in the

n the requiremed,

ect does nolysis is con

had a VE anwithout need

identified infalls above

modification

arly as practompletion oordinated wecommendflicting with

anuary 31, 2

nts, unique er opportuni

authority but the projen 2.15.02:

ntered a tion, and a hen the d, FHWA mously

in d when all th

e project coed re-

ot immediatsidered to b

nalysis ding any

n Section e the criterians to the

ticable in thof preliminarwith other ations to be or adverse

2013

ties

ect

may

he

ost

tely be

a

he ry

e ely

Page 50: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January impactinconstruc

2.15.05

To satisfand 23 Ccharacte

The usedesign oVE tech

The systof this m

The prod

1.

2.

3.

4.

5.

6.

7.

8.

For bridg

1. Inc

2. B

y 31, 2013

ng previousction sched

What chprocess

fy the requiCFR 627], teristics:

e of a multi-of the projecniques and

tematic appmanual.

duction of a

Project info

Identificatio

Backgrounother analyoperations

Documentadocumenta

Summariza

Documentathe time th

Documentainformationreporting;

The formalcompletion

ge projects

nclude bridgonstruction

Be evaluate

agency or ule.

haracterists?

irement to cthe analysis

disciplinaryct, with at le

d able to se

plication of

a formal wr

ormation;

on of the VE

nd and suppyses condu, constructa

ation of theation of the

ation of the

ation of thee report is f

ation of then to support

l written repn of the proj

, the VE An

ge substrucn material;

d based on

project com

ics need to

conduct a Vs process w

y team of ineast one inrve as the t

the VE Job

itten report

E analysis t

porting docucted on theability);

stages of tlife-cycle c

analysis co

proposed finalized;

proposed t the CDOT

port shall beject (as spe

nalyses mu

cture and s

n:

2-47

mmitments,

o be incorp

VE analysiswill incorpor

dividuals ndividual whteam’s facil

b Plan desc

outlining a

team;

umentatione project (e.

the VE Jobcosts that w

onducted;

recommend

and approvT and FHWA

e retained fecified in 49

st:

uperstructu

Proj

, the projec

porated in

s [as specifrate each o

ot directly iho is trainedlitator and c

cribed in Se

t a minimum

n, such as in.g., environ

Plan whichwere analyze

dations and

ved recommA’s VE prog

for at least 9 CFR 18.4

ure requirem

oject Develo

ct’s develop

the VE an

ied in 23 Uof the follow

involved in d and knowcoordinator

ection 2.15.

m:

nformation nmental, saf

h would inced;

d approvals

mendationsgram monit

3 years afte42); and

ments base

opment Pro

pment, or th

alysis

.S.C. 106(ewing

the planninwledgeable r;

01 Definitio

obtained frfety, traffic

clude

s received a

s, and relatetoring and

er the

ed on

ocess

he

e)

ng or in

ons

rom

at

ed

Page 51: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

a

b

2.15.06

CDOT mshould nthey havqualifiedsufficienInternati

2.15.07

As direcGeneral

1. Eaa

2. Pd

3. Tim

4. Ma

CDOT’sprojects multi-ye

VE exam

The CDOstatus ofshall preeffectiveManageFHWA’s

Developme

. Engineerdesigns f

. Analysis

How ma

may employnot conductve an intered VE practitnt VE traininional as me

What ar

cted in 23 Cly, an acce

Ensures all analysis, incuthorities (i

Provides forocumentat

Tracks all Vmplemented

Monitors, annd VE prog

VE prograthat will be

ar Statewid

mples are a

OT Project f CDOT’s V

epare the Aeness of effer will subms VE websit

ent Process

ring and ecfor bridges;of life-cycle

ay consulta

y qualified Vt a VE analyest in the prtioners, expng, educatioeeting the re

re CDOT’s

CFR 627.5, ptable VE p

applicable cluding anai.e. Local A

r the timely ion of the V

E analysesd; and

nalyzes, andgram perfor

m, policies e subject to de Transpor

available fro

DevelopmeVE programAnnual VE Aforts to encoit the Annute.

s

conomic bas; e costs and

ants be us

VE consultaysis on projroject. It is sperienced inon, and expequirement

responsib

CDOT musprogram is

projects nolyses for ap

Agencies);

review, finaVE analysis

s that are co

d disseminarmance.

and proceda VE analy

rtation Impr

om the Area

ent Branch m and submAccomplishourage VE al Accomp

2-48

ses, taking

d duration o

ed to cond

ants to condjects (as spstrongly recn performinperience to ts for certific

bilities?

st establish one that:

oted in Sectpplicable pr

al dispositio recommen

onducted an

ates the res

dures will pysis early inrovement P

a Engineers

Manager wit it to FHWment Repoon federallishment Re

into consid

of project co

duct VE an

duct VE anpecified in Scommendedg and leadbe recognication.

and sustai

tion 2.15.02rojects bein

on, implemendations;

nd VE reco

sults of all V

provide for tn the proceProgram.

s in Project

will completWA. FHWAort including

aid projecteport to CD

Ja

deration acc

onstruction

nalyses?

alyses. ConSection 2.1d that consing VE studized by SAV

in a VE pro

2 will receivng administ

entation, an

ommendatio

VE analyse

the identificss to devel

t Developm

te an annuaVE Progra

g an assessts. FHWA VDOT and po

anuary 31, 2

ceptable

.

nsulting firm5.02) wher

sultants be dies, and haVE

ogram.

ve a VE ered by Pu

nd

ons that are

es conducte

cation of op the Stat

ment.

al report onam Managesment of theVE Programost results o

2013

ms re

ave

blic

e

ed

te’s

n the er e

m on

Page 52: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.15.08

1. http:/2. Pre-C

y 31, 2013

Addition

//www.fhwaConstructio

nal Referen

a.dot.gov/veon Team (H

nces:

e HIPA-20)

2-49

Projoject Develoopment Proocess

Page 53: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

2.16

Upon obassessemake ceheld to v

2.16.01

2.16.01

The Resproject. the manaffect SpAd date

2.16.01

The Resinvolvedthe prefethe overwritten dmade.

2.16.01

The Resnecessaetc.) in oupdatedthat the assessm

Developme

DESIGPLAN

bligation of ed against tertain respoverify that th

Design

.01 Targe

sident EnginAs the Proj

nagement opecialties U.

.02 Main

sident Engind on the proerred methorall project sdocumentat

.03 Revie

sident Enginary, at all morder to assd cost estim

Cost Estimment.

ent Process

GN PROJSTATUS

the project heir approp

onsibilities ahese respo

Phase Res

et the Curr

neer will beject Managf unexpecte

Units and th

ntain Good

neer will maoject. Persood for discuschedule. Ction, as rec

ew Project

neer will coajor projectsess unfore

mates, as remates Unit is

s

JECT MAS REVIE

funds, projpriate projecare met andonsibilities a

sponsibilit

rent Plann

e responsiber, the Resed changes

he overall p

d Commun

aintain gooon to personussing projeConversatioord of the d

t Cost Estim

oordinate ret milestone

eseen budgquested. Ins provided c

2-50

ANAGEEW

ject activitiect phase. Dd that perioare met. the

ies

ned Ad Dat

ble for meetsident Engins to the schroject delive

nications 

od communn communicect issues, ons must bediscussion a

mates 

evisions to ts (Field Insetary need

n addition, tcurrent proj

MENT A

es may comDuring this podic Region e following t

te 

ting the Curneer will behedule, incluery by the a

ications witcation (teleespecially

e followed uand any de

the project spection Res. Specialty

the Residenoject cost es

Ja

AND REG

mmence anphase, it is Plan Statutasks will b

rrent Planne responsibuding thoseapproved C

th the Specephone or fathose whicup with emaecisions or c

cost estimaeview, Finaly Units will nt Engineerstimates for

anuary 31, 2

GION

d charges important t

us Meetingse complete

ed Ad datele for e that couldCurrent Plan

cialty Units ace to faceh could affeail or other commitmen

ate, as l Office Revprovide

r will ensurer review an

2013

to s are ed:

e of a

d nned

) is ect

nts

view,

e d

Page 54: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.16.01

The ResRegion is determthe chanincludingrequire areflect th

2.16.01

The ResCurrent BusinesindividuacontribuCurrent Specialt

2.16.01

The Regor rejectand the will provThe issutheir pro

2.16.01

The ResprogresscommonUnit withupdate sMeeting

y 31, 2013

.04 Conv

sident EnginProgram Emined, the nge(s). Chag the time ra new budghese impac

.05 Discu

sident EnginPlanned Ads Manager als needs toting issuesPlanned Ad

ty Units ass

.06 Comm

gion Businetion to a chaContracts a

vide a documues will be rogress may

.07 Upda

sident Engins in the projn milestonehout prior dshould refles, as detail

vey Scope o

neer will sungineer for Resident Eanges that required forget request cts in the pr

uss Any Po

neer will bed date with and the Re

o occur as . The Residd date chansociated wit

municate A

ess Manageange in theand Agreemment summreflected thbe monitor

ate Workin

neer will upject activitie

es or the Cuiscussion w

ect all informed below:

or Budget 

ubmit any capproval. Wngineer muaffect the b

r budget acor STIP/TI

roject’s wor

otential Im

e responsibthe approp

egion Transsoon as the

dent Enginenge and coth the proje

Any Decisi

er will comme Current Plments unit fmarizing therough chanred.

ng Schedul

pdate the wes. Changeurrent Plannwith and apmation curre

2-51

Changes

hanges in tWhen a chaust inform abudget or Stions or STP amendmking sched

pact on Ad

ble for discupriate Regiosportation De Resident eer will docmmunicate

ect.

ions on Ad

municate thlanned Ad dfor trackinge issues whnges to the

le 

working schees to the woned Ad dateproval by thent at the ti

Proj

the project ange in proall membersSTIP/TIP muTIP/TIP amements, the R

ule.

d Date 

ussing any pon ProgramDirector. CoEngineer is

cument the e these deta

d Date 

he final decdate, to the purposes.

hich supporproject wo

edule montorking schee will not behe Residenime of any

oject Develo

scope or buoject scope s of the proust be consendments.

Resident En

potential chm Engineer,ommunicatis aware of reasons forails to all af

ision, regare Chief Eng

The Residrt the schedrking sched

thly to reflecedule whiche made by nt EngineerRegion Pla

opment Pro

udget to theand/or bud

oject team osidered, If the chang

ngineer will

hanges to th, the Regionion with thethe r the requeffected staff

rding approgineer, OFMent Engine

dule changedule so that

ct accurateh affect any Specia. This mont

an Status

ocess

e dget of

ges

he n ese

sted f and

oval MB, eer e. t

e

alty thly

Page 55: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D 2.16.02

Each ReinformatThese mfrequentindividuatechnica

The RegEngineethese mindividua

1. A

2. R

3. E

4. R

5. U

6. B

7. H

8. T

9. B

10. M

11. M

All Progbetter unon the n

Region Residendetermin

In order recommRegion thorough

1. C

Developme

Region

egion will hotion exchan

meetings mutly at the disal Project Sal detail and

gion Plan Sers and will eeting shouals are reco

All Program

Resident En

Environmen

Right of Way

Utilities

Bridge

Hydraulics

Traffic

Business Of

Materials

Maintenance

ram Enginenderstand t

needs of the

Plan Statusnt Engineer ned approp

to provide mended to b

Plan Statush review of

Current Proj

ent Process

Plan Statu

old a Regionge and to aust be heldscretion of

Status meetd assessme

Status Meetreview the uld be moreommended

Engineers

ngineer

tal

y / Survey

ffice

e

eers shouldthe Region’e full region

s Meetings or with all

priate by the

meaningfue complete

s Meeting. Weach proje

ject Budget

s

us Meeting

on Plan Staassess the at a minimeach regiotings that aent.

ing should progress o

e on criticalto attend t

d attend the’s activities

n.

can be conResident Ee Program E

l informatioed by each With the fol

ect manage

t

2-52

atus Meetingstatus of bo

mum of evern. These mre often he

be facilitateof projects inl project dehe Region

e entire Regand to mak

nducted witngineers frEngineers.

on at these Resident Ellowing infod within the

g which wiloth design ry two mont

meetings dold more fre

ed by the Rn each Protails. At a mPlan Status

gion Plan Ske better re

h schedulerom a respe

meetings, aEngineer anormation, the residencie

Ja

l serve to faand constrths, but can

o not take thquently and

Region’s Program area.

minimum, ths Meetings

Status Meetesource dec

ed time slotsective Prog

a Project Snd made avhis report wies:

anuary 31, 2

acilitate ruction projen be held mhe place of d involve m

ogram . The focushe following:

ing in ordercisions bas

s for each ram Area, a

tatus Repovailable for till allow for

2013

ects. more

more

of g

r to sed

as

ort is the a

Page 56: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2. D

3. D

4. In

Discussproject sallocatio

Prior to status ofshould cUpdatedproject.

Specialtupdatedin PhaseprovisionestimateSpecialtdecision

The RegResidenrequiredto the pr

Involvemto be adEngineeresource

y 31, 2013

Dates of Sch

Dates of Act

nitial Planne

ions at the schedule, hon of resour

these meetf their proje

come to thed working s

ty unit sched as necesse I will be bns for chanes, the estimty Unit manns that may

gion Plan Snt Engineersd. All changroject team

ment of the djusted to mers and affees to ensur

heduled Pro

tual Project

ed, Current

Region Plahave fiscal irces.

tings, the Rects with theese meetingchedules a

dules, worksary by specased on the

nge, and idemates will bagers will kaffect thes

Status Meets an opportes will be uand Progra

Program Emeet projectected Specie that key r

oject Milest

t Milestones

t Planned a

an Status Mmpacts, inv

Resident Eneir staff. Thgs preparednd work-ho

k-hour estimcialty unit me best inforentification be reviewedkeep the Rese estimates

ing discusstunity to upupdated in tam Enginee

Engineer wit milestonesalty Unit maregion prior

2-53

tones

s

and Schedu

Meetings shvolve issues

ngineer andhe Residentd to discussour estimate

mates, and managers. Trmation avaof assumptd for modificesident Engs for the sp

sions with thdate milestthe workinger, as they

ll be necesss. In some anagers wirities are pr

Proj

uled Ad Dat

ould centers of risk or

d Specialty t Engineer as the latest es should b

project cosThe prelimiailable at thtions, shoucation as thgineer inforpecialty port

he specialtytone dates,g schedule are made.

sary if speccases, all oll need to m

roperly add

oject Develo

tes

r on issues require a c

Units shouland Speciaproject info

be available

st estimatesinary estima

he time. Althld be a parthe project prmed of anytion of the p

y units shou activity duand will be

cialty unit reof the Regiomeet and diressed.

opment Pro

that affect change in th

ld discuss talty Units ormation. e for each

s will be ates providhough t of the origprogresses.y activities oproject wor

uld allow thrations, etccommunic

esources neon Programiscuss

ocess

the he

the

ed

ginal . The or rk

he c. as cated

eed m

Page 57: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

2.17

The Fielconstrucis held inInspectiorequiredconcludespecific

The follothe FieldPlans, Steam.

2.17.01

The Fiel

2.17.02

The follo

2.17.02

1. PS

2. P

3. JjuJsfe

2.17.02

1. Fo

2. E

Developme

FIELD

ld Inspectioction plans n an office on Review

d items and e all unresocriteria and

owing instrud InspectionSpecification

Authorit

ld Inspectio

Require

owing items

.01 Scop

Preliminary Section 2.05

Preliminary

ustification ustified prioustificationsafety effecteatures con

.02 Envir

Form 128, Cther approp

Every projec

ent Process

INSPEC

on Review (that signifiemeeting enplans are pdetails of a

olved issued direction t

uctions estan Review mns, and Est

ty

on Review w

ed Items

s are requir

ing, Budge

Form 463 -5 Design Da

alignment d

for variancr to being is for variants on the hignsidered. Se

ronmental

Categorical priate clear

ct requires a

s

CTION R

(FIR) is intees the end onvironment preliminary all salient fes identifiedthat are to b

ablish the pmeeting. Thtimate (PS&

will be initia

red prior to

eting, and 

- Design Daata.

data.

ces: Varianncluded in

nces are to ghway facilee Section

 Clearance

Exclusion Dance docum

an environm

2-54

REVIEW

ended to beof the prelimwith an optin nature, b

eatures. Thduring pre

be used in t

procedures hese instruc&E) are dev

ated and sc

the Field In

Planning

ata with saf

nces to desithe Field Inbe based ulity, alternat2.05

e Documen

Determinatment. See S

mental clea

e the on-siteminary destional field tbut still mushe Field Ins

eliminary dethe final de

preparatoryctions applyveloped by

heduled by

nspection R

fety require

ign standarnspection Rupon analystives consid

nt 

tion showinSection 3.0

arance of so

Ja

e review of ign phase. trip to visit tst contain aspection Reesign and toesign.

y to and fory to all projethe Reside

y the Reside

Review:

ments, if av

rds must beReview plansis of operadered, and

g clearance02.

ome type.

anuary 31, 2

preliminaryOften, the the site. Fi

applicable eview is helo establish

r the conduects on wh

ent Enginee

ent Enginee

vailable. Se

e identified ns. ational and

mitigation

e activities

2013

y FIR eld

d to the

uct of ich

er's

er.

ee

and

or

Page 58: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

3. Ps

4. RC

2.17.02

1. Ids

2. Cs

2.17.02

1. S

2. F

2.17.02

1. TaW

2. Tcos

2.17.02

Existing available

2.17.02

A prelimReview.

2.17.02

1. IdP

y 31, 2013

Projects not ign-off.

Resident EnCJ20N in SA

.03 Traff

dentificationhould be de

Complete trahould be av

.04 Mate

Soil survey s

Final stabiliz

.05 Right

The assessovailable rig

Way Manag

The consultaompleted ewnership mhould be pr

.06 Utilit

utility infore. The Reg

.07 Hydr

minary hydra

.08 Wetl

dentificationPlanning/En

eligible for

ngineer canAP under C

fic 

n of detourseveloped p

affic data, available, if r

erials 

should be c

zation plan

t of way 

or’s parcel ht of way iner. All nec

ant selectioearly to allowmap. Accurrovided prio

ties 

mation, incion Utility E

raulics 

aulic report

ands 

n and schednvironmenta

r Programm

see if enviCustom Fiel

s and the prior to the F

accident darequired.

completed.

should be p

maps, ownnformation essary tem

on process w the consrate locationor to the Fie

cluding irrigaEngineer sh

or design s

duling of weal Manager

2-55

matic Catego

ronmental ds, then En

roposed preField Inspec

ata, safety re

provided.

ership list, should be p

mporary eas

for right of ultant time n of all exiseld Inspecti

ation ditchehould resea

should be p

etland map(see Sectio

Proj

orical Exclu

clearance invironmenta

reliminary cction Revie

report, and

old right of prepared fo

sements mu

way work sto complete

sting right oion Review

es and watearch utilities

provided pr

pping by theon 3).This i

oject Develo

usions requ

is completeal tab.

constructionew.

turning mov

way plans,or review byust be ident

should be ine the prelim

of way and pw.

er rights, shs.

ior to the F

e Region item is not

opment Pro

uire FHWA

e through

n-phasing p

vements

, and other y the Right tified.

nitiated or minary property lin

hould be

ield Inspec

required pr

ocess

plan

of

es

tion

rior

Page 59: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

toin

a

b

2. Atheda

2.17.02

1. Asth

2. Ifmo

2.17.02

1. Tb

2. Fs

3. Tc

2.17.03

Three caInspectio

2.17.03

1. SAto

Developme

o the Field nformation a

. Before thDevelopmcheck wiManager

. The Regthe Envir

Avoidance ohe U.S. Armffective Febesign procevoidance.

.09 Surve

A complete hould be cohe design to

f right of wamarkers mu

wnership m

.10 Prelim

The Field Inelow in sec

FIR plans shalient featu

The Engineeurrent pricin

Included

ategories oon Review

.01 Requ

Scoping, buA title sheetopography

ent Process

Inspection available as

he Environmment can sth the Resir for projection Planninronmental P

of wetlands my Corps ofbruary 7, 19ess where w

ey 

survey, incompleted ao begin.

ay is involvest also be t

map to begi

minary Co

spection Rection III, ma

hall containures.

ering Estimng.

d Categori

f items (reqplans:

uired on al

dgeting and, typical secand utilities

s

Review, hos possible.

mental Progtart field madent Engint scope, terng/ EnvironPrograms o

is stressedf Engineers990. Desigwetland are

luding topond tied to C

ed, aliquot stied to CDOn.

st Estimat

eview plansay not apply

all the app

ates and M

es

quired, desi

l plans 

d planning:ctions, genes, proposed

2-56

owever, it is

grams officeapping, theeer or the R

rmini, detoumental Man

office.

d by the Envs in their Migners must eas are so t

ography, utiCDOT’s sur

section cornOT’s survey

te 

s are prelimy to speciali

plicable item

Market Analy

ired and op

eral notes,

d alignment

s desirable

e in the Dive EnvironmeRegion Pla

urs, and thenager will s

vironmentaitigation Meknow earlythe sites ca

lities, and ervey contro

ners, propey control net

minary in naized projec

ms and prel

ysis Unit is

ptional) are

plan and pts, slope ca

Ja

to have as

vision of Traental Progrnning/Envir

e project plasubmit the i

al Protectionemorandumy in the scopan be analy

existing mol network to

erty pins, antwork to all

ature. The ct plans.

liminary det

available t

included on

profile sheetatch points,

anuary 31, 2

much of th

ansportatioams office ronmental an sheets.nformation

n Agency am of Agreemping and

yzed for

onumentatioo allow wor

nd right of wow work on

items inclu

tails of the

to assist in

n Field

ts with exisprofile grad

2013

e

n will

to

and ment

on, rk on

way n the

ded

sting des,

Page 60: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

gd

2. E

a

bcd

3. T

ab

4. S

ab

5. M

a

6. R

a

7. U

ab

8. O

abcd

2.17.03

The Fielfor the s

1. P

2. P

2.17.03

The Fielavailable

y 31, 2013

round line, rainage pla

Environmen

. Mappingstaff. ThInspectio

. Prelimina

. Location

. Initial siteidentified

Traffic

. Conceptu

. Traffic vo

Structure

. Bridge ge

. Major str

Materials

. Soil profi

Right of way

. Existing

Utilities

. Identifica

. Names o

Other

. Prelimina

. Prelimina

. Special d

. Driveway

.02 Desir

ld Inspectioscheduled F

Preliminary

Preliminary

.03 Optio

ld Inspectioe at the tim

cross sectan, access

tal

of any exishis will allowon Review mary mitigatios of environe assessmed.

ual construolume data

eneral layoructure cros

ile and stab

y

and propos

ation of impof utility com

ary layouts ary estimatedetails and ys and field

red items 

on Review pField Inspec

survey tabu

survey con

onal items

on Review pe of the sch

ions, existinplan, and d

sting wetlanw discussionmeeting. on plan. nmental coent complet

ction phasi.

uts and apss-sections

bilization req

sed right of

pacts to utilimpanies an

of interchae. unusual sp

d approache

plans shoulction Review

ulation shee

trol sheet.

plans shoulheduled Fie

2-57

ng right of wdetour plan.

nds identifien of avoida

nstraints (oted and pot

ng plan.

plicable pla.

quirements

way shown

ties shownd contact p

anges and in

pecificationses.

d contain thw:

et.

d contain aeld Inspecti

Proj

way and ro.

ed by the Ence alterna

other than wtential haza

an sheets.

s.

n on the de

. people.

ntersection

s.

he following

all appropriaion Review

oject Develo

ugh structu

Environmenatives durin

wetlands). ardous mat

esign plan.

ns.

g items if a

ate optionaw. These ite

opment Pro

ure notes,

tal Programg the Field

erials sites

vailable in t

l items thatems may

ocess

ms

time

t are

Page 61: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

identify dalso conencountthose thInspectiodetails.

2.17.04

The Resseven, bField Insneeds to

1. F

2. R

3. P

4. G

5. R

6. R

7. R

8. R

9. R

10. R

11. R

12. R

13. R

14. R

15. L

16. C

17. O

18. C

19. O

20. D

2.17.05

The Reswho will

Developme

design probntain prelimtered duringat the Resion Review.

Distribu

sident Enginbut preferabspection Reo determine

FHWA-Attn.

Region Tran

Project Struc

Geotechnica

Region Plan

Region Prog

Region Mate

Region Righ

Region Utilit

Region Hydr

Region Prof

Region Main

Region Resi

Region Traff

andscape A

Colorado St

Other Local,

Consultant

Others as de

DTD Data C

Particip

sident Enginhave signif

ent Process

blems that cinary desigg the Field dent Engin They do n

ution of pla

neer will disbly 14 dayseview planse when it is

: Operation

nsportation

ctural Engin

al Engineer

nning and E

gram Engin

erials Engin

ht of Way M

ty Engineer

raulics Eng

fessional La

ntenance S

ident Engin

fic Enginee

Architect

ate Patrol

, State, or F

etermined b

Collection U

pation

neer shouldficant input

s

can best begn data thatInspection eer determ

not include

ans

stribute prins, in advancs will be tran

appropriate

ns Engineer

Director

neer

r

Environmen

eer

neer

Manager

r

gineer

and Survey

uperintend

neer

er

Federal Age

by the Resi

nit

d limit partict. Those re

2-58

e resolved wt would assReview. O

mines will imitems such

nts of the Fce of the Fiensmitted ase to distribu

r

tal Manage

Coordinato

ent

encies

dent Engin

cipation at teceiving pla

with an on-ist in resolv

Optional itemmprove the eh as tabulat

ield Inspeceld Inspectis follows (thute the mem

er

or

neer

the Field Inns who hav

Ja

-site inspecving problemms should iefficiency otions, summ

ction Reviewion Reviewhe Residenmo without

nspection Rve only min

anuary 31, 2

ction and mams nclude only

of the Field maries, and

w plans at lw. Prints of

t Engineer the plans):

Review to thnor concern

2013

ay

y

final

east the

hose ns

Page 62: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

should cReview

Staff Bri

On certaseparateconduct should dconstrucEngineereview wcommen

2.17.06

The Respreparedpreparedrecognizinclude,

2.17.06

1. T

2. T

3. Pin

4. P

5. ST

6. Bit

2.17.06

1. P(s

2. P

3. S

y 31, 2013

communicaand not att

dge Branch

ain projectse field reviethese revie

document inction plans.er will notifywith sufficients (if they s

Conduc

sident Engind checklist d and followze which pabut are not

6.01 Scop

Typical sect

The horizon

Plan details nsufficient t

Preliminary

Schedule. UThe schedul

Budget the ems.

6.02 Envir

Plan details such as noi

Preliminary f

Stormwater

te those to end the me

h may cond

s, outside puew prior to tews separan writing pe When a re

y the appropnt advanceso desire) f

ct of the rev

neer will cobe complet

wed, especarts of the mt limited to,

ing, Budge

ions, stabili

tal and vert

for approaco construct

cost estima

Update the ble should b

ROW and/

ronmental

for measurise, air, wat

field mappi

manageme

the Resideeeting.

duct a sepa

ublic agencthe Field Insately from thertinent infoequest for apriate agene time to allofor consider

view

onduct the rted for all m

cially for commeeting the

the followi

eting and P

ization, and

tical alignm

ches to prot the propos

ate.

baseline sce discussed

or Utility ph

 

res to mitigater, parks (4

ng of existi

ent plans.

2-59

ent Enginee

arate Field I

cies involvespection Rehe schedule

ormation ana separate cies' represow the ageration prior

review. It ismeetings. Amplex projeey should atng:

Planning 

d general no

ments.

oject and posed length o

chedule to rd at the FIR

hases as ne

ate or avoid4(f)), and st

ng wetland

Proj

er prior to th

nspection R

ed in the proeview. Theed Field Insd requiremreview is dsentatives a

encies to preto the Field

s strongly reAlso, an ageects, so thattend. The

otes.

ossible cutoof the proje

reflect impaR meeting.

ecessary kn

d adverse etream encr

d areas.

oject Develo

he Field Ins

Review.

oject may re Resident spection Re

ments incorpesirable, thand shall scepare their d Inspection

ecommendenda (schedt participanitems to be

off points if ect.

act to projecSee Sectio

nowing the

environmenroachments

opment Pro

spection

request a Engineer m

eview and porated intohe Residentchedule ther own written Review.

ded that a dule) shoulnts can e reviewed

funds are

ct milestoneon 1.02.

scope of th

ntal impactss).

ocess

may

o t e n

d be

may

es.

hese

s

Page 63: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

4. P

2.17.06

1. Pp

2. T

3. T

2.17.06

1. S

2. S

2.17.06

1.2.3.4.

2.17.06

1. R

2. Im

3. N

4. P

5. E

6. P

7. P

8. P

9. S

2.17.06

1. U

2. P

3. N

4. Ir

Developme

Permit requi

6.03 Traff

Plan details hasing, and

Traffic contr

Traffic signa

6.04 Struc

Structure Se

Structure de

6.05 Mate

6.06 Right

Right of way

mpacts to b

Number of o

Purchase of

Existing Agr

Plan details

Purchase of

Purchase of

Section 4(f)

6.07 Utilit

Utility reloca

Power sourc

New or futur

rrigation ditc

ent Process

irements.

fic 

for any prod barrier.

ol plan.

al plan (if ap

ctures 

election Re

emolition me

erials 

Stabilization Report and Life Cycle Cost Analysis (if available)Materials Recommendation ReportQuality incentivesCertifications or FIPIs for proprietary items, if any (See Section 2.24 for theapproval process)

t of way 

y requireme

buildings, ot

owners affe

f mitigation

reements th

for fencing

f utility ease

f temporary

process re

ties 

ation require

ces.

re utility acc

ches.

s

ovisions for

pplicable).

port.

ethod.

ents and ac

ther improv

cted and w

areas.

hat have co

requireme

ements.

y constructio

quirements

ements.

commodatio

2-60

traffic durin

ccess contro

vements, an

what the imp

onditions aff

ents.

on easeme

s.

ons.

ng construc

ol plan.

nd agricultu

pacts are.

fecting plan

nts.

Ja

ction, includ

ural operatio

ns.

anuary 31, 2

ding detours

ons.

2013

s,

Page 64: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.17.06

1. R

2. R

3. Cc

2.17.06

1. P

2. A

2.17.06

1. Ir

2. M

2.17.06

1. S

2. M

3. S

4. S

5. F

6. Ad

2.17.07

As soon

2.17.07

Send a loriginallycopy of Enginee

y 31, 2013

6.08 Agre

Railroad req

Requiremen

Coordinationonditions, o

6.09 Surve

Preliminary

Additional su

6.10 Hydr

rrigation an

Major structu

6.11 Othe

Safety issue

Maintenance

Special inter

Specialty rep

Fencing.

Additional Curing const

Field Ins

n as possibl

.01 Distr

letter repory sent Fieldthe marked

er deems it

ements, ju

quirements

nts for any I

n of all desior justificati

ey 

survey tabu

urvey need

raulics 

d drainage

ure sizing

ers 

es.

e concerns

rest groups

ports (safet

CDOT assettruction bec

spection R

e after the

ibute FIR M

ting the mind Inspectiond-up plans anecessary.

ustification

and other a

ntergovern

ign elemenons within C

ulation shee

s.

requireme

.

s.

ty, geotech

ts. For exacause their

Review foll

Field Inspe

Minutes 

nutes of then Review noand additio.

2-61

ns, and app

agreement

mental Agr

ts requiringCDOT or b

et.

nts.

nical).

ample, DTDexistence i

ow-up

ection Revie

e Field Inspotification. nal copies w

Proj

provals sta

conditions.

reements.

g mitigationetween CD

D count statis often unk

ew, the Res

pection RevThe Resid

will be sent

oject Develo

atus 

.

s, action iteDOT and oth

ions are oftknown by th

sident Engi

view to all went Enginet to others i

opment Pro

ems, her entities

ten damagehe Region.

neer will:

who were eer will keepif the Resid

ocess

s.

ed

p a dent

Page 65: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

2.17.07

Obtain dReview

2.17.07

Update tscopingdefined.

2.17.07

Revise t

2.17.07

1. ME

2. R

3. C

4. T

5. TU

6. R

7. TC

2.17.07

If the proensure tProgramforwardefinding isto forwafinding isof wetlan

Developme

.02 Addr

decisions anmeeting.

.03 Upda

the project . This may

.04 Upda

the Form 46

.05 Revis

Monitor the Environmen

Request traf

Complete st

Transmit pla

Transmit plaUtilities Eng

Request or c

Transmit theCoordinator

.06 Follo

oject impacthat a wetla

ms office or ed to the Ens approvedrd a copy tos a legally bnd impacts

ent Process

ress Unans

nd respons

ate Project

schedule obe the case

ate Form 4

63, Design

se project 

progress oftal Manage

ffic plans.

tabilization

ans showing

ans showingineer.

complete th

e preliminar.

ow up on W

cts wetlandsands finding

a private cnvironment

d, copies areo the Residbinding comand mitiga

s

swered Qu

ses for all q

t Schedule

or completee for more c

463 

Data, as ne

plans: 

f the wetlaner submits t

and specia

g proposed

g replacem

he final hyd

ry survey ta

Wetland re

s, the Regiog is prepareonsultant. tal Programe returned

dent Enginemmitment bation require

2-62

uestions 

uestions lef

e the baselincomplex pr

ecessary.

nds finding to FHWA.

al justificatio

d features to

ent or new

raulic repo

abulation sh

equiremen

on Planninged, whetherFollowing c

ms office forto the Regi

eer. This labetween CDements.

ft unanswe

ne schedulrojects whe

that the Re

on letters.

o the Regio

utility locat

rt.

heet to the

nts: 

g and Envirr by the Regcompletionr review andion. It is theast step is imDOT and FH

Ja

ered at the F

e if it was nere the scop

egion Plann

on Right of

tions to the

Region Fie

ronmental Mgion, the E, the findingd approval.e Region's mportant beHWA regar

anuary 31, 2

Field Inspec

not done at ping is bette

ning and

Way Mana

Region

eld Survey

Manager mnvironmentg must be Once the responsibi

ecause therding the ex

2013

ction

the er

ger.

must tal

lity

xtent

Page 66: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.17.07

Details sfield appwetland Region’s

2.17.07

Follow u

2.17.08

For smaReview are adeqbe reflec

2.17.09

1. 23 C2. For f

http:/

y 31, 2013

.07 Prepa

such as edgproaches, aareas, repl

s Right of W

.08 Follo

up on Utility

Combin

all projects, with the Fiequate. In socted in the

Addition

CFR Part 62forms, see C//www.colo

are inform

ge of pavemalignment, dlacement u

Way Unit.

ow‐up on U

y issues. H

nation Field

such as wreld Inspectiome instancbaseline sc

nal Referen

25, Design SCDOT on-liradodot.info

mation for 

ment, curb drainage dittilities, ease

Utility Issue

ave the Uti

d Inspectio

rite-ups, it mion Reviewces, formalchedule.

nces:

Standards fine forms lio/library/for

2-63

Right of w

and gutter,tches and pements, an

es 

lity Enginee

on Review-

may be ben, if the Plan meetings m

for Highwaybrary rms

Proj

way require

toe of sloppipes, irrigand detours s

er initiate u

-Final Offic

neficial to cons, Special may not be

ys

oject Develo

ements 

pe, drivewayation designshould be s

tility agreem

ce Review

ombine theProvisions

e necessary

opment Pro

ys, structurn, replacemsent to the

ments.

e Final Offic, and Estim

y. This shou

ocess

res, ment

ce mate uld

Page 67: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

2.18

2.18.01

A Consttechnoloadvantaindustry special eprocess be enhaconstruc

Projectshave extprojects techniquat projecfuture pr

Accordina CR shtimeframmight beconstrucprojects Manage

The Colwhen coadvanta

2.18.02

A PSCRin the scto reviewonly, butfiles.

Developme

CONS

Introduc

tructability Rogy, and exge of the w(both inter

expertise, rmay be ite

anced plansction, with f

s that may btraordinary that have i

ues and/or ct closeout rojects.

ng to sectiohortly after tme for a Sigenefit from ction). It sheligible for

er should m

orado Depaontractors age to the co

Project

R should becope. Additw the decist document

ent Process

TRUCTA

ction

Review (CRxperience inwealth of knnal and extrelevant to terative, and s and speciffewer chang

benefit fromenvironme

innovative finnovative /are extrem

on 1.07, Sigthe FIR or agnature Projadditional C

hould be nor CRs. Thisake on a ca

artment of Tare includedontractors w

Scoping C

held shorttionally, it isions of the ted on the a

s

ABILITY

R) is the intento the engiowledge anternal i.e. cothe project,is expecte

fications leages.

m constructaental circumfeatures su/ alternate b

mely valuabl

gnature Proa 30 percenoject to haveCRs (e.g. p

oted, howevs is a determase by case

Transportatd in reviewiwho particip

CR - PSCR

ly after the s recommescoping meattached CR

2-64

Y REVIEW

egrating of ineering annd experienontractors) be included to be muading to inc

ability reviemstances. T

ch as expebidding cone in assisti

ojects requirnt Project Ce a CR, it w

project scopver, that Sigmination thae basis.

tion (CDOTng plans it pate in the

project sconded that reeting. ThiR documen

WS

constructiond design ofnce that exi

it is recomed when waltidisciplinacreased eas

ws are comThis processerimental mntracting. Inng the proje

re a CR. SCR. While twould be exping, 90 pergnature Projat the Resi

T) is requiredoes so wireview.

oping, in ordregional envis meeting ntation form

Ja

on knowledf a project. ists in the c

mmended tharranted in tary. The ense and effic

mplex, time s is also rec

materials, prn addition, ect team in

Section 1.12this is the expected tharcent, and pojects are ndent Engin

ed to have athout giving

der to identvironmentais intended

m, and kept

anuary 31, 2

ge, resourcTo take

constructionat persons the CR. Th

nd result shociency of

critical andcommendeocesses, CRs condu

n improving

2 recommenstablished t the projecpost ot the only eer and Pro

a process tg a compet

tify “fatal flaal staff is inv to be interin the proje

2013

ces,

n with is ould

d/or ed for

ucted

nds

ct

oject

hat itive

aws” vited rnal ect

Page 68: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January 2.18.03

A 30 perestablishteam wil

2.18.04

A 90 peeopportunspecific specific staging

It may btypicallyconstrucconstrucprocedu

2.18.05

A Post Cimproveconstrucconstrucmeets wand Arethe meeon. Thethe meeteams, a

2.18.06

CDOT hlarge to network

y 31, 2013

30 Perce

rcent PCR hed (i.e. at ll not force

90 Perce

ercent PCRnity to interconstructiostructure tydetails (e.g

e a temptay conductedctability focuctability issuural issues t

Post Co

Constructioments for tction contraction issueswith the cona Engineer

eting shoulde Resident Eeting, finalizand Project

Procedu

has an FTP email. Acceand from a

ent Projec

should be hthe FIR staa specific d

ent Projec

R should beact with the

on techniquypes, modifg. crane pick

tion to includ (i.e. Scopius may be ues that arethat are com

onstruction

n CR at prohe design p

actor, contras. In the Postruction pr

r), to assessd focus on pEngineer w

ze a report, t Developm

ures

server thatess to CDOany internet

t CR – 30 P

held shortlyage). The pdesign witho

t CR – 90 P

e held after e contractines. This wfy/add specking diagra

ude a CR, aing, FIR, FOblurred. The specific tommon at th

n CR

oject closeoproject manact change ost Construroject engins the overapositive asp

will scheduleand distribent Branch

t can be usOT's FTP set location.

2-65

Percent PC

y after the fpurpose of tout conside

Percent PC

the FOR. Tng communill be an op

cifications, aams).

at any stageOR). This ihe CR meeo that projeese meetin

out incorpornagement teorders, dection CR, t

neering teaall quality ofpects of thee the Post Cute the repo

h.

sed to uploaerver can b

Proj

CR

final profile this meetineration of o

CR

This will givity and othe

pportunity toand conside

e, in conjunis not recom

eting shouldct and not g

ngs.

rates discueam. It malay claims, he design pm (includinf the designe project as Constructioort to the d

ad and dowbe obtained

oject Develo

and alignmng is so thatther option

ve the projeers knowledo fine tune ter detour a

nction with tmmended, d be held toget bogged

ssions regaay include aand other s

project manng Residentn product. T

well as topon CR meetesign and c

wnload files from both

opment Pro

ment are t the projecs.

ect team andgeable in the design nd construc

the meetingas the

o only discud down on t

arding futura survey of staging or nagement tt Engineer(sThe format pics to imprting, facilitaconstructio

that are toowithin CDO

ocess

ct

n

on ction

g

uss the

re the

eam s) of

rove ate n

o OT's

Page 69: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D Files upautomatdurationuploadeplan to s

If data istheir cusdata, plesecure s

The FTPconveniestability

Files shomoved tthe FTPand is n

When ththat conbe taken

1. Cto

2. Tftaw

3. C

4. U

5. TAinac

6. TwCpin

Developme

loaded to thtically be de

n files can red to the sershare docum

s sensitive, stomers, anease contacsolution.

P site is outence and isor usability

ould not beto the user’s server, youot designed

he Project Mtractors are

n:

Contact youo inform him

Type the folltp://yogi.dotnd enter th

when promp

Create a fold

Upload relev

The project All documennclude a stare “not for conclusion o

The Residenwith some eContractors

articipate, hnterested co

ent Process

he FTP sereleted from eside on thrver and is ments with

please do nd is open tct the Help

tside the CDs not considy.

e opened dis computeru may be pd to be use

Manager, Re to be inclu

r Area Engm of an upc

lowing FTPt.state.co.ue usernam

pted.

der with the

vant plans a

team shoulnts to be poamp statingconstructioof the meet

nt Engineerxpertise wiAssociatio

however, inontractor ca

s

rver will havthe server

e server. Tnot reset uof this limit

NOT use thto the internDesk and t

DOT firewadered busin

rectly from r and openeprompted fod to view o

Resident Enuded in Con

ineer for thcoming Con

P address ins e and pass

e project na

and specific

ld also haveosted on theg that they an”. There iing.

r or Project th similar pn (CCA) ma

n order to man participa

2-66

ve a 10 day. No excepthe 10 day “pon use. Btation.

his FTP sitenet. If you hthe IT staff

all and is opness critical

the FTP seed from theor credentiar edit docum

gineer, andnstructabilit

e latest FTnstructability

nto Window

sword you r

ame and su

cations to t

e review doe FTP site aare for a “cos no need t

Manager wprojects to pay be able

maintain fairate in these

y life. After 1tions will be“clock” begBe sure to a

e, as it is ophave a needwill work w

pen to the Inl. There are

erver; they ere. If you aals. The FTPments.

d/or the Proty Review,

TP site usery Review.

ws Explorer

received fro

ubaccount n

he newly c

ocuments aand provideonstructabito collect do

will contact participate ito assist in r and compe reviews, w

Ja

10 days, the made to i

gins the momadvise othe

pen for all Cd to transfe

with you to p

nternet. It ise no guaran

should be cattempt to oP server is

ogram Engithe followin

r name and

, (not Intern

om your Are

number.

reated folde

available at ed at the mlity review” ocuments a

at least twon the CR. locating co

petitive biddwhether a m

anuary 31, 2

e file(s) wilncrease thement the fil

ers who you

CDOT staffer sensitive provide a m

s offered asntees of its

copied or open a file fr

not a file sh

neer determng steps are

password,

net Explore

ea Enginee

er.

the meetineeting musand that th

at the

o contractoThe Colora

ontractors tding, any member of C

2013

l e e is

u

f,

more

s a

rom hare

mine e to

and

er):

er,

g. st hey

ors ado o

CCA

Page 70: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

oth

7. Inah TC

abcd

e

8. ACCp

9. Aime

10. Twp

11. Cabp

When thinvitationstamped

y 31, 2013

r not. Conthe project.

n order to ndvertise a Cttp://www.c

The Project Contracts U

. for a Con

. name/pro

. Brief des

. The namreach to

. RemovalCR anno

All attendeeCR meetingContractor c

urposes of

All suggestiomplementedconomicall

The project will formally

articipation

Contact youssistance we contactedrojects that

he CR will cn procedured as mentio

tractors wh

not overlookCR at the focoloradodot

Engineer wnit at CDOT

nstructabilitoject numbscription of

me and phonparticipate l date that t

ouncement

s to the CR, but rather

contact infofollow-up o

ons will be d or modifiey feasible f

team shoulthank all pa

n.

r Area Engwith procesd. The Projt use const

consist solees will be fooned in Num

o participat

k any intereollowing loct.info/busine

will provide T HQ, deta

ty Review er the project ne number in the CR

tells the Cofrom the bi

R will be advr on the ultimrmation shoor clarificati

reviewed bed then impfor impleme

ld explain ifarticipants

ineer prior s uniformity

oject Develoructability r

ely of CDOTollowed. Enmber 5 abov

2-67

te in a CR w

ested contracation: ess/bidding

a Word dociling that th

and reasonof the poin

onstruction Cdding webs

vised to notmate constould be gaton.

by the projecplemented. entation will

f / why any and expres

to holding ay, and for copment Brareviews

T or consultnsure that ave.

Proj

will not be p

actors, the

g

cument to this is

n for the CRt-of-contac

Contracts Usite

t rely on whtruction planthered by th

ct team. SuThose whic

l be elimina

suggestionss CDOT’s

a constructconcurrenceanch will ma

tant design all docume

oject Develo

precluded f

Project Ma

the Constru

R ct that contr

Unit when t

hat was disns and spehe project t

uggestions ch are not s

ated.

ns are not uappreciatio

tability reviee on which aintain a sta

personnel,nts used in

opment Pro

from bidding

nager will a

uction

ractors can

o remove t

scussed in tcifications. eam for the

may be dirsuitable or

used. CDOon for their

ew for contractorsatewide list

, typical the CR are

ocess

g on

also

he

the

e

rectly

OT

s will of

e

Page 71: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

DaProje

SLocat

The folloreviewed Sheet

Developme

ate:ect:SA:ion

owing is a cd during a C

ent Process

Con

checklist of Constructa

Is

s

nstructabil

project itembility Review

ssue

2-68

ity Review

Re

ms (if applicw (at the R

w ChecklistPM:RE:

eviewers:

cable to theRE/PE’s disc

Clear

Ja

t

e project) thcretion):

r PE

anuary 31, 2

hat need to

RE

2013

be

Page 72: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

PROJECSUB-ACPROJECPROJECPROJEC Intendedspecificacontactsforward informa MeetingThe Cra1:00 - 4:Golden, PurposeThe purpremovalConstrurecomm(limited underneefforts a Project DThis prothat carrconstrucits placeimprove How to AThe plan2010 at (NOTESPotentiashall ONContracthis provolunta

y 31, 2013

NOTI

CT NO: CCOUNT: CT NAME: CT LOCATCT SCHED

d Audienceally looking s that you fethis invite t

ation about

Informatioane Constru:00 p.m. in CO 80401

e: pose of this and replacctability Re

mended conROW, Sou

eath, overheare needed

Descriptionoject includeries I-25 ovcting a newe, as well asments.

Access Prons will be av9:00 a.m.

S: The planal bidders NLY bid thctors whichoject. Partiry.)

CE OF CD

BR 16 I-2

TION: DeDULE: An

: This meefor input fr

eel would bto them. (*Bt this meet

n: uctability Rethe Fox Ho.

s review is tcement of theview was hducting a cth Platte Riead transmwith crane

n: es the remoer the Sout

w 3 span, prs constructi

oject Plans vailable forTo access ns availabshould noe project bh participaicipation in

DOT CRANE

R R600-297212

25 / Bronco enver, CO nticipated A

eting is operom bridge abe interesteBridge Conting with th

eview Meetollow Confe

to determinhe bridge aheld on Aprcrane constiver, two locission linesplacement

oval of a 3 sth Platte Rivre-cast concing retainin

Prior to Mer review on the FTP sitle on the F

ot base thebased on tate in the ren the review

2-69

E CONSTR

7

Arch Bridg

Advertiseme

n to all conand crane cd in attendintractors aheir crane

ting is scheerence Room

ne the craneand bridge dril 27, 2010.ructability rcal streets, s, etc.) to w and select

span, steel ver (a.k.a. Bcrete tub gig walls, dra

eeting: CDOT’s FTte please fo

FTP site areir bids on he “Adverteview are Nw will NOT

Proj

RUCTABILI

ge Replacem

ent Date – J

ntractors. Hcontractorsing this meare stronglcontractor

duled for Om, located

e constructdeck panels. The particreview, as ttwo bike p

work with antion.

arch bridgeBronco Arcrder bridge

ainage impr

TP site on Tollow the ine “For Infothis prelimtisement” NOT preclT be compe

oject Develo

ITY REVIEW

ment

January 27

However, Cs. Also, if yeting, pleasly encourar/supplier c

October 21, at 425B Co

tability durins. A traditiocipants of tthere are maths, and a

nd extensive

e (384’ longch Bridge) ae (373’ longrovements

Tuesday, Ostructions b

ormation Ominary set

set of planuded fromensated as

opment Pro

W

, 2011

DOT is ou have se feel free

aged to shacontacts.*)

2010 from orporate Ci

ng the phasonal hat meeting

many constraa trolley linee coordinat

g x 158’ widand x 196’ widand roadw

October 12, below.

Only”. of plans, ans.

m bidding os it is stric

ocess

e to are )

rcle,

sed

g aints

e tion

de)

e) in ay

and

on tly

Page 73: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D 1. Open

2. In the

3. A se

4. Pres

5. The

You are conditionsite, plea

Developme

n Windows

e address f

curity windo

User

Passw

s the LOGI

plans are lo

also encouns. If you hase contac

ent Process

Explorer w

field, type: f

ow will ope

Name: yo

word: 4re

IN button.

ocated in th

uraged to vhave any qut the Projec

s

window (not

ftp://yogi.do

n requiring

gib

esieg!

he folder na

isit the projuestions abct Manager

2-70

t Internet Ex

ot.state.co.u

the user to

amed: 1621

ect site to gbout this mer, Jana Spik

xplorer).

us and pres

o enter a us

2 I-25 Bron

get familiareeting or troker, at (720

Ja

ss <ENTER

ser name a

nco Arch Br

r with existinouble acces) 497-6959

anuary 31, 2

R>.

nd passwo

ridge

ng site ssing the F

9.

2013

rd.

FTP

Page 74: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.19

Design Oconsultaissues ounits anreviews Office Rproblem

The Resdocumemeetingissues c

y 31, 2013

DESIG

Office Reviant-prepareor problemsd external agenerally a

Review stagms, such as

sident Enginnting these. The meet

considered

GN OFFI

ews usuallyd projects w

s. For largeagencies, mare conductes. Minuteutilities, ma

neer is respe reviews. Pting should at Design O

CE REV

y are conduwhen an inf

er projects tmonthly stated betweees are prepaajor structu

ponsible forPlans for spbe attende

Office Revie

2-71

VIEW (ST

ucted on theformal meethat requiretus meetingn the Field ared of revires, right of

r initiating, specific area

ed by all resew.

Proj

TATUS M

e more cometing is dese coordinatiogs may be Inspection iews held fof way, or hy

schedulingas of concesponsible pe

oject Develo

MEETIN

mplicated pirable to dison with muconducted. Review anor examininydraulics.

, conductinrn may be ersonnel in

opment Pro

G)

projects or scuss desigltiple specia. These nd the Finalng specific

ng, and required fo

nvolved with

ocess

gn alty

l

r the h the

Page 75: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

2.20

A designdiscretiospecial cless desthe deciletters” omore inf

Design d

1. D2. A3. A4. R5. R

Addition1. 23 C2. For f

http:/

Developme

DESIG

n decision lonary desigcircumstancsirable. Thesion that wor “design eformation o

decision let

Discussed wAddressed tAddressed tReferred to Referred to

nal RefereCFR Part 62forms, see C//www.colo

ent Process

GN DECI

etter can bn decisionsces exist th

e letter shouas made. Dexceptions”n design ex

tters should

with the Proto the projeto the Residon a Form in the Field

nces: 25, Design SCDOT on-liradodot.info

s

ISION LE

e used by ts. The lettehat would muld clearly eDesign deci” (variance xceptions.

d be:

ogram Enginct file if writdent Engine463, Desig

d Inspection

Standards fine forms lio/library/for

2-72

ETTER

the Residener is used to

make conforexplain the sion lettersfrom design

neer. tten by the eer if writtenn Data, und

n Review or

for Highwaybrary rms

nt Engineero documenrming to acoptions tha

s should non standards

Resident En by outsidder remarkr Final Offic

ys

Ja

r to supportt a major d

ccepted desat were cont be used ins). See Se

Engineer. e agencies

ks. ce Review m

anuary 31, 2

t and documecision whe

sign guidelinnsidered ann lieu of “sa

ection 2.06 f

s or consulta

minutes.

2013

ment en nes d afety for

ants.

Page 76: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.21 The purptraining to the jodisadvan

CDOT h(OJT) reCDOT wTrainingprogramapprentiapplicab

The OJTStandarestablishProvisioproject, Standarhttp://wwSpecs/susing anOffice, thadvertis

When a goals, thproject. goals analthoughthe train

For fedefor On-thdefined Civil Rigon the grequired

y 31, 2013

ON-THpose of thethat will advurney workntaged indi

has establiselative to thwill accept tg Programs ms approvediceship ageble to contra

T Program d Special Phing goals fn defines thas shown id Special Pww.coloradotandard-sp

ny of the tabhe OJT proed contract

project esthe Region CThe Reside

nd related sh the On-thning program

eral aid projhe-Job Traiby the Reg

ghts Office wgoal set. Fod.

HE-JOB e On-the-Jovance unsk

ker level. Eviduals and

shed procede Equal Emraining progwhich have

d by the U.Sency. The Cactors parti

is implemeProvision. Tfor each prohe number n Table 2-1

Provision toodot.info/buecial-provisbles mentio

oject speciat specificati

timate is suCivil Rights ent Engineespecificatione-Job Trainm requirem

jects, a projining. The

gion Civil Riwill use theor non-fede

TRAINEob Trainingkilled worke

Emphasis shd persons f

dures for idmployment Ograms frome been pre-S. DOL – OCDOT OJTcipating thr

nted on all The Regionoject. The of training

1 below. (Po verify the cusiness/dessions/mics/oned aboveal provision ons for the

bmitted to tOffice will

er ensures ns are incluning Standa

ments apply

ject force aforce accoghts Office table to de

eral-aid proj

2-73

EE APPR(OJT) Prog

ers toward mhould be plarom minorit

entifying anOpportunity

m two categ-approved b

Office of Ap Specificatirough these

projects thn Civil RightOn-the-Jobhours a colease visit tcurrent tablsignsupportOJT.docx/v

e. When a gwith the goproject.

the Regiondetermine that the pro

uded in the ard Special only to fed

account itemunt amount

e, also showetermine theects, no pro

Proj

ROVALgram is to pmore highlyaced on adty groups.

nd approviny program. ories. CDOby CDOT/Fprenticeshiion (Standae programs

rough the its Office is b Training Sntractor is rthe most rele t/constructiview.) Thegoal is set

oal must be

Civil Rightthe appropoject specifContract. Provision ieral aid pro

m and budgt for the pro

wn in Tablee appropriaoject force

oject Develo

provide cony skilled wodvancemen

ng On-the-J For federa

OT will acceFHWA, as wip or recognard Special s.

nclusion of responsible

Standard Srequired to

ecent revisio

ion-specifice project goby the Reg

e included in

ts Office forpriate OJT gfic On-the-JIt should beis included ojects.

get must beoject OJT tr2-1 below.

ate budget aaccount ite

opment Pro

struction ork, preferat of women

Job Trainingal aid projecept Standawell as nized state Provision)

f the OJT e for pecial train on the

on of the O

cations/201oal may be ion Civil Rin the

r establishingoal for the Job Traininge noted thain all projec

e establisheraining goa. The Regioamount bas

em or budge

ocess

bly n,

g cts, rd

is

e OJT

1-met ghts

ng

g at cts,

ed, l is on sed et is

Page 77: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

Addition1. 23 C2. CDO3. Curre4. For f

http:/

Developme

Cont

U

>

>

>

For e$5 mill

nal RefereCFR Parts 2OT Construcent OJT Staforms, see C//www.colo

ent Process

tract Dollar

Up to 1 Mill

>1 – 2 Milli

>2 – 4 Milli

>4 – 6 Milli

>6 – 8 Milli

>8 – 12 Mill

12 – 16 Mil

16 – 20 Mil

each incremion, over $2

nces: 230A, Equaction Manuaandard SpeCDOT on-liradodot.info

s

r Value

ion

on

on

on

on

lion

llion

llion

ment of 20 million

TOJT T

l Employmeal ecification ine forms lio/library/for

2-74

Minimto be

Table 2-1 Training Go

ent Opportu

brary rms

mum Total TProvided o

32

64

128

160

192

224

256

+128

oal

unity

Ja

Training Hon the Pro

0

20

40

80

00

20

40

60

80

anuary 31, 2

ours oject

2013

Page 78: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Januaryy 31, 2013

DISAD

Introduc

advantagedg objectivests:

Ensure nondDepartment’

Create a levompete fair

Ensure that ailored in ac

Ensure that Program eligBusiness En

Help removen contracts;

Assist the deutside the D

Provide appDisadvantag

Certifica

onsidered aantaged Busantaged Busation Progra

and Countmally recoged on the Cs.

advantagedDOT Execu

ss Enterpris

DVANTA

ction

d Business s on highwa

discriminati’s highway,

vel playing frly for contr

CDOT’s Diccordance w

only firms tgibility stannterprises;

e barriers to

evelopmenDisadvanta

ropriate flexged Busines

ation

a Disadvantsiness Entesiness Enteam (UCP). y of Denve

gnized UCPDOT extern

d Business utive Directse.

AGED BU

Enterpriseay construc

on in the aw, transit, an

field on whiracts;

isadvantagewith applica

that fully medards are p

o the partic

t of firms thaged Busine

xibility in esss Enterpris

taged Businerprise goaerprise CertCurrently, r’s Division

P certifying enal website

Enterprisetor and CDO

2-75

USINESS

(DBE) progction and hi

ward and ad airport fin

ch Disadva

ed Businesable law;

eet the Disapermitted to

ipation of D

hat can comess Enterpr

stablishing ses.

ness Enterpl on a projetification thrthe CDOT of Small Bentities. Th

e along with

Program wOT Policy D

Proj

S ENTE

gram was cghway des

administrationancial ass

antaged Bu

ss Enterpris

advantagedo participate

Disadvantag

mpete succerise program

and provid

prise and bect, the firmrough the CCenter for

Business Ophe current Uh other DBE

was establisDirective 61

oject Develo

RPRISE

created to asign and en

on of contraistance pro

usiness Ente

se program

d Businesse as Disadv

ged Busine

essfully in tm; and

ing opportu

be credited m must haveColorado UEqual Opppportunity (UCP DBE dE Program r

shed under11.0, Disad

opment Pro

E GOALS

achieve thegineering

acts in the ograms;

erprises ca

is narrowly

Enterprisevantaged

ess Enterpri

the marketp

unities for

toward the e received nified ortunity and(DSBO) aredirectory is related

r the authordvantaged

ocess

S

e

an

y

e

ises

place

d e the

rity

Page 79: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D To be ce

1. AB

2. AaNa

3. In

4. M

5. A

2.22.03

It is the to set a Rights Oestimateanticipaton the pconsidercommunwith the

A CDOTCivil Rigthe RegBusinessubmitteproject.

2.22.04

Conductcomponcontractoutreach

Developme

ertified as a

A small busiBusiness Ac

At least 51 pre included

Native Amernd socially

ndependen

Managed an

Able to mee

Project

responsibilDBE goal f

Office whene and bid iteted constru

project will bred by the Rnicated bacgoal must

T Form 863ghts Office aion Civil Rigs Enterpris

ed by contra Due to con

Outreac

ting outreacent for the t specificatioh. Please b

ent Process

a Disadvant

iness concect.

percent ownd are peoplerican, womedisadvanta

t from any o

nd controlle

t other requ

Goals

ity of the Rfor each pron establishinems, locatiouction issuebe reasonabRegion Civ

ck to the probe included

3, DBE Conand sent toghts Officeres are listeactors, Formnfidentiality

ch

ch to small DBE prograons may bebe sure to c

s

taged Busin

ern as defin

ned by onee who are Hen, or memaged under

other firm.

ed on a day

uirements c

egion Civil oject. Seveng the DBEon of the prs by projecble and achil Rights Ofoject staff. d in the adv

tract Goal Ro the HQ Cer believes c

ed on the fom 863 is us

y issues, Fo

and disadvam. Projece needed if consult with

2-76

ness Enterp

ned pursua

or more mHispanic, A

mbers of othr Section 8(

-to-day bas

contained in

Rights Offieral items wE goal includroject, availct staff, the hievable baffice. The gThe DBE p

vertised con

Recommenenter for Eqcan be subcorm. At bid tsed by HQ sorm 863 is n

vantaged buct staff shoua mandato

h the Regio

prise, a firm

nt to Sectio

minorities or Asian Ameriher groups f(a) of the Sm

sis by the d

n the 49 CF

ce, at the rwill be consding type olability of DCDOT bidd

ased on theoal set on e

project specntract spec

ndation, is fqual Opportcontracted time and wstaff to verinot provided

usinesses iuld keep in ory requiremn Civil Righ

Ja

m must be:

on 3 of the

women; thcan, Africafound to bemall Busine

disadvantag

FR Part 26.

request of thidered by thf funding, fBEs for bid

ders list, etce informatioeach projeccial provisioifications.

filled out bytunity. Poteto Disadvahen evaluaify the goal d to project

is an impormind that a

ment is addhts Office a

anuary 31, 2

Federal Sm

he groups thn American

e economicess Act.

ged owners

he project she Region Cinal engine

d items, c. The goal n availablect will be on (workshe

y the Regionential items ntaged

ating bids set on the

t staff.

rtant additional

ded for as needed.

2013

mall

hat n, ally

.

staff, Civil er’s

set and

eet)

n that

Page 80: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January 2.22.05

Projectsstate fundevelopparticulaavailableproject.

Federallfunded sDBE reqproject i

1. Pmb

2. Pare

For addi

2.22.06

It is the its geogestablishconductspecificaDisadvaits overaincludesprojects track acprogram

The CDOEnterpriCommis

y 31, 2013

Funding

s administernds, local ament phase

ar project. Te or for the

ly funded psolely withoquirements s advertise

Projects funmust remain

e added af

Projects fundvertisemeemove all fe

itional guida

Adminis

Region’s Craphical reghing projecing disputeations are pantaged Busall annual Ds monitoring

regardlesshievements

m implemen

OT Center se Participa

ssion with m

g

red by CDOgency funde, it may beThis may bpurpose of

rojects are out federal fand how cod, adjustme

ded solely wn funded softer advertis

ded wholly ent must remederal aid f

ance pleas

stration

Civil Rights Ogion. Condt goals, pro resolution

part of admsiness Ente

DBE goal byg DBE partis of those ps, issues, atation.

for Equal Oation, and f

monthly rep

OT may be ds, or a come advantagebe due to nef funding ad

subject to funds. Exaontract DBEent of fundi

with non-feolely with nosement.

or in part wmain at leasfunds after

e contact y

Office respoducting outroviding techfor project inistering therprise goay the end oficipation on

projects’ DBnd discrepa

Opportunityfurnish the orts that lis

2-77

funded frommbination theous to adjew or additidditional pro

requiremenamples of thE goals areng sources

ederal aid fuon-federal a

with federalst partly funadvertisem

your area en

onsibility toreach to smhnical assisissues, and

hat programl and particf each fede

n both federBE percentaancies to m

will monitoRegion and

st Disadvan

Proj

m various shereof. Durust the fundional fundinojects or ex

nts that mayhese requiree establishes is limited a

unds at the aid funds. F

aid funds anded with fe

ment.

ngineer.

o administemall and disstance, estad enforcingm. The CROcipation to heral fiscal yerally fundedage goal ammonitor, ver

or Disadvand the Colorataged Busi

oject Develo

sources: fedring the proding source

ng sources xtending the

y not apply ements ma

ed. Therefoas follows:

time of advFederal fun

at the time ederal aid f

r the DBE padvantaged

ablishing prg compliancO will monihelp ensureear. This cd and state mounts. It iify, and ens

ntaged Busado Transpness Enter

opment Pro

deral fundsoject es for a becoming e scope of

to projectsay include thore, once a

vertisemennds are not

of funds. Do n

program wid businesseoject goals

ce with contitor each e CDOT mecommitment

funded s importantsure overal

iness portation rprise

ocess

,

the

s he

t to

not

thin es, , tract

eets t

t to l

Page 81: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D participastate.

2.22.07

1. 13 C2. 23 C3. 23 C

Regu4. 49 C

Depa5. Lates

Prov6. For f

http:/

Developme

ation on fed

Addition

CFR Part 12CFR Part 63CFR Subchaulations

CFR Part 26artment of Tst “DBE De

visions forms, see C//www.colo

ent Process

derally and

nal Referen

21, Small Bu35.107, Smaapter A, Pa

6, ParticipatTransportatefinitions an

CDOT on-liradodot.info

s

state funde

nces:

usiness Sizall and Disart 1, Sectio

tion by Disation Financnd Requirem

ine forms lio/library/for

2-78

ed projects

ze Regulatioadvantagedn 1.36, Com

advantagedial Assistanments” in th

brary rms

for each Re

ons d Business mpliance W

d Business nce Programhe CDOT S

Ja

egion and f

ParticipatioWith Federa

Enterprisesms

Standard Sp

anuary 31, 2

for the entir

on al Laws and

s in

pecial

2013

re

d

Page 82: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.23

Special specificaSpecial

1. PS

2. SSin

The ResprovisionchangedSpecificAll SectiEngineeMaterialspecial pprovisionaccordathe time

2.23.01

The StaStandarDevelopspecificafederallyspecifica

2.23.02

The Stabook to Special revised

y 31, 2013

SPECI

Provisions ations coveprovisions

Project SpecSupplement

Standard SpSupplementntended for

sident Enginns and the d special pration Enginion 100 – “Ger’s concurr Engineer’sprovisions ans are inclunce with th of advertis

Standar

ndard Specrd Specificapment Branations usedy funded locations relate

Standar

ndard Specimplement Provisions requiremen

IAL PRO

are additioering conditfall within o

cial Provisiotal Specifica

pecial Provital Specificatemporary

neer is respproject spe

rovisions arneer for revGeneral Prorence, and as concurrenare compleuded in the e latest list

sing the pro

rd Specific

cifications fations) is revch, Standa

d to control cal agency ed to road a

rd Special

cial Provisiocurrent CDhave an iss

nts related t

OVISION

ns and revions specifi

one of the tw

ons: Additioations, spec

ision: Additations, specuse.

ponsible forecial provisire to be subiew at leastovisions” spall material

nce. The Rted accuratPlans, Speprovided fr

oject.

cations

for Road anvised and rrds and Spthe work onadministerand bridge

Provisions

ons revise, DOT construsue date anto procedur

2-79

NS

isions to theic to an indwo followin

ons and revcific to a pro

ions and recific to a se

r preparing ions prior tobmitted to tht 2 weeks ppecifications specificat

Resident Entely, and alecifications rom the Sta

nd Bridge Creissued pepecificationsn CDOT trared projectsconstructio

s

clarify or suction and nd apply to res, current

Proj

e standard ividual projg categorie

visions to throject.

evisions to telected grou

referencedo the Final he Project prior to thein changes stion changegineer will l necessaryand Estima

andards an

Constructioneriodically bs Unit, and ansportations. This is thon.

upersede tmaterials rea group of

t wages, co

oject Develo

and suppleect or grou

es:

he Standard

the Standaup of projec

d standard Office ReviDevelopmer inclusion

should havees should hverify that ay standard ate packagd Specifica

n (referred tby the Projecontains thn, maintenahe primary r

he Standarequirementf projects. Tonstruction

opment Pro

emental p of project

d and

rd and cts or which

special iew. All newent Branch'in the PS&e the Residhave the Reall the projespecial e in

ations Unit a

to as the ect he standardance, and reference fo

rd Specificats. StandarThey contamaterials a

ocess

ts.

h are

w or s E. ent

egion ect

at

d

or

ation rd

ain and

Page 83: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D technoloprojects

The StaProvisioChapterapplicablist of St http://ww

2.23.03

Project Sor modifand bid superseEngineeparticulaSpecial

Project Saddressprovide ensure pthe Stan

Special intendedResidenProvisio

Review frequentprovision

1. SU

2. Ep

Developme

ogy, and proin accorda

ndards andns and the

r 16 of the Cble special ptandard Spe

ww.colorado

Project

Special Profy a particulpackage spde the Stan

er specific inar project. Provisions

Special Proed in the Sproject speproper comndard Spec

provisions d to be comnt Engineer n.

Proceduraltly, and keens.

Submit everUnit (SSU) f

Expect SSUrovisions it

ent Process

oject manaance with th

d Specificatinstruction

CDOT Roadprovisions tecial Provis

odot.info/bu

Special Pr

ovisions arelar aspect, pecific to a ndard Specnformation Project Spethat apply

ovisions areStandard Specific mater

mpletion of aifications.

are essentmplementary

is respons

l Directive 5ep the follow

ry new projefor review a

U to delay adetermines

s

agement. She instructio

tion unit wrifor use in a

dway Desigto each prosions with in

usiness/des

rovisions

e revisions titem or conparticular p

cial Provisioand require

ecial Provisto the proje

e used whepecificationsials and co

a project. T

ial parts of y and bindiible for the

513.1 and Cwing guidel

ect special at least two

pproval ands to be con

2-80

Standard Spons issued b

tes and updaccordancegn Guide. Toject. Eachnstruction fo

signsupport

to the Stanndition contproject. Theons and proements relasions includect

n specific rs or in the Snstruction r

The provisio

the Contracng instructicontent an

Chapter 16 ines in min

provision toweeks befo

d initiate a mtroversial o

pecial Proviby the Proje

dates the Se with ProceThe Reside Region ha

for the use o

t/constructi

dard Specitained in thee Project S

ovide the Coated to specde an index

requiremenStandard Srequiremenons appear

ct, and conons to com

nd accuracy

of the 2005d when pre

o the Standore it is nee

more formaor have a br

Ja

isions are inect Develop

Standard Spedural Dire

ent Engineeas access toof each pro

ion-specific

ifications the plans, sp

Special Provontractor acific aspectof the requ

ts are not apecial Prov

nts to the Coas change

ntain requiremplete a proy of each Pr

5 Roadwayeparing proj

dards and Seded.

al review ofroad impac

anuary 31, 2

ncluded in pment Bran

pecial ective 513.1er adds the o the up-to-ovision:

cations .

hat supplemecificationsvisions nd Project ts of a uired Stand

adequately visions. Theontractor to

es to section

ements thaoject. The roject Spec

y Design Guject specia

Specificatio

f project spect. The mor

2013

nch.

and

-date

ment s,

ard

ey o ns of

t are

cial

uide l

ns

ecial re

Page 84: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

foin

3. Swp

4. Spasath

5. Ppaaafop

6. Caasp

7. Dreo

Followintranspor

1. InS

2. Nlis

3. Cretos

4. C

5. Fin

6. Tth

y 31, 2013

ormal reviewndustry repr

Submit a coweeks befor

roject.

Submit a proroject to SS new projecubmit it to S more thorohat determi

Prepare a neay item or tppear in thnd the Engpprove a nor that pay roblems wi

Check the Spproved prddress. If tpecial provroject, mod

Do not subveviewed adr other plan

ng are examrtation cons

ndex PagesSpecial Prov

Notice to Bidsts CDOT c

Commencemequiremento be shownchedule.

Contract Go

Force Accouncluded in t

Traffic Contrhe propose

w may invoresentative

mmonly usre it is need

oject speciaSU for reviect special pSSU. New ough reviewnation.

ew project the materiae Standard

gineering Esew pay itemitem are adth its use.

Specificationroject specithere is an

vision. If thedify it and su

vert the spedditions or cn notes.

mples of Prostruction pla

s – List the visions.

dders - Estaconstruction

ment and Cts and Contn when a ba

oals - Estab

unt Items - the Contrac

rol Plan, Ged method o

olve approps.

sed project sded if it has

al provisionew before itprovision on

project spew that may

special proals and consd Specificatstimates & m without cdequately c

ns page onal provisionapproved s

e existing submit it to S

cial provisiochanges to

oject Speciaans:

applicable

ablishes then represent

Completion tract time. Oar chart sch

lishes Disa

Identifies Cct.

eneral Contof handling

2-81

priate CDOT

special probeen signi

that was at is used onn more thanecial provisinclude add

ovision for astruction reions. SubmMarket Anaonsulting Sovered and

the CDOTn that coverspecial provspecial provSSU for rev

on developthe specific

al Provision

Project Spe

e required atatives assi

of Work - EOn small simhedule is all

advantaged

CDOT's esti

tains key etraffic.

Proj

T staff or te

vision to SSficantly mo

approved fon other projen one projecions that wditional stak

a proposed equirementsmit that spealysis Unit (

SSU to ensud that there

T web site tors the issuevision, use vision is notview.

ment procecation requ

ns that are

ecial Provis

amount of tigned to the

Establishes mple projeclowed. Mos

Business E

imate for fo

lements of

oject Develo

echnical com

SU for revieodified for a

or use on a ects. If youct, indicate

will be widelykeholders;

new pay ites for that pa

ecial provisi(EEMA). Eure that the are no tec

o see if there you are trit instead o

t adequate

ess by incoirements in

usually inc

sions and S

the proposae project.

beginning cts it lists sast projects

Enterprises

orce accoun

the traffic c

opment Pro

mmittees an

ew at least particular

particular u intend to that when

y used requSSU will m

em when thay item do on to both S

EEMA will ne requiremehnical or po

re is alreadrying to of writing a for your

rporating un general no

luded in the

Standard

al guaranty

work alient featurequire a C

s goals.

nt work

control plan

ocess

nd

two

use you uire

make

hat not SSU ot

ents olicy

dy an

new

n-otes

e

y and

res CPM

n and

Page 85: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

7. Ulim

8. R

9. Pth

The follo

1. TFOfos

2. TsSS

3. USSS

2.23.04

1. CDO2. Proc

Developme

Utilities - Lismits.

Right of Way

Project Speche project.

owing outlin

The ResidenFinal Office Office Revieor the approhould be ob

To request nhould follow

SpecificationSpecial Prov

Upon requesSpecificationSpecificationSSU at leas

Addition

OT Roadwaycedural Dire

ent Process

sts utility co

y Restrictio

cific Specia

nes the proc

nt EngineerReview pla

ew prior to fopriate discbtained.

new or revisw CDOT Prns. The Revisions for c

st by the Rens Unit (SSns and Estit 2 weeks b

nal Referen

y Design Gective 513.1

s

mpanies an

ons – Lists r

al Provision

cedures for

r will preparans and incfinal plan recipline, for e

sed Standarocedural Desident Engchanges an

esident EngSU) will revie

mate packabefore they

nces:

Guide, Chap1

2-82

nd types of

restrictions

s - Contain

r preparatio

re Project Slude specif

eview. Conexample, co

ard Special Directive 51gineer will rend additions

gineer, the ew the speage. The spneed to be

pter 16

f utility reloc

that will aff

n specificati

on of specia

Special Profication chancurrence oonstruction

Provisions3.1, Constreview the cs prior to ad

Project Decifications pecificatione complete.

Ja

cations with

fect the pro

on changes

al provision

ovisions for nges made

of the perso, materials,

, the Residruction Projcurrent list odvertisemen

evelopment portion of th

ns should be

anuary 31, 2

hin the proje

oject.

s appropria

s:

inclusion ine at the Finaon responsib, or bridge,

ent Engineject of Standardnt.

Standardshe Plans, e submitted

2013

ect

ate to

n the al ble

eer

d

and

d to

Page 86: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.24

2.24.01

The usematerialprojectsspecificacompetitwhere a

If only pwith all, reasonainclude tPublic Innot requ

When thfewer thshow tha

One or mInterest

1. Csy

2. C3. S

c

When reprocess(See Se

y 31, 2013

PROP

Constru

e of trade ors, specifica, NHS and ations shoution among particular

atented or or at least

able numbethe term “onterest list iuired.

he use of a an three suat no equal

more of theto justify th

CDOT certifynchroniza

CDOT certifSuch patentonstruction

esearch is ued through

ection 8.10

RIETAR

uction Con

r brand namations, or prnon-NHS,

uld be deveg equivalentproprietary

proprietary a reasonabr would be r approved t will be no

patented ouitable prodlly suitable

e following che use of pr

fies that suction with ex

fies that no ted or proprn on relative

used as thethe Resea

Experiment

RY ITEMS

tracts

mes or the drocesses shregardless loped that wt materials product mu

products able number to specify tequal”. If a

ted in the s

or proprietarducts can bealternative

criteria musroprietary ite

ch patentedxisting transequally suirietary itemely short se

e justificatiorch Branchtal Items in

2-83

S

direct referehould be avof funding will obtain tor productsust be spec

are acceptaof accepta

three or moa product isspecification

ry (trade nae found, a Fexists.

st be documems:

d or propriesportation ftable alternis used for

ctions of ro

on for using h of the Divi this manua

Proj

ence to patvoided in cosource. Gethe desireds. There arecified for us

able, they shable materiaore equally s on the appn and the te

ame) item isFinding in t

mented in th

tary item isfacilities; ornative existsr research ooad for expe

a proprietaision of Traal).

oject Develo

tented or prontracts. Theneric cons results as e instancesse on a proj

hall be bid als or produsuitable pro

proved Finderm “or app

s essential the Public I

he Finding i

s essential fr s; or or for a disterimental p

ary item it mansportation

opment Pro

roprietary his applies struction

well as asss, however,ject.

as alternatiucts listed. oducts andding in the proved equa

for a projecnterest sha

in the Publi

for

tinctive typepurposes.

must be n Developm

ocess

to all

sure

ives A

d

al” is

ct or all

ic

e of

ment

A Finding in the Public Interest may be written for use of a proprietary item on a specific project, for use on a region-wide basis, or for use on state-wide basis. A project-specific Finding in the Public Interest applies only to that one project and cannot be used to justify use of the proprietary item on other projects.

[Revised May 2020]11,. 3 P.nt Pror.

2-83

Page 87: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

Approveoccurs:

1. T2. N

F3. R

re

If any ofspecifiedsubmitte

Once a specificabasis.

Developme

Finding in the Public Interest will require the approval by the Resident Engineer (for project specific), Program Engineer (for regionwide use), or Branch Manager (for statewide use). Copies of approved project specific, regionwide and statewide Findings in the Public Interest shall be distributed to the Standards & Specifications Unit. The Standards & Specifications Unit will maintain a list of the approved products.

ed Findings

Three yearsNew producFinding in thResearch haecommend

f the above d for use oned for appro

proprietary ation can be

ent Process

in the Pub

have elapscts are founhe Public Inas been coation for us

criteria occn a project, oval.

item is acce written, th

s

blic Interest

sed from dad or createterest. mpleted onse of the pro

curs and thethen anoth

cepted as mhe material

2-84

are valid u

ate of approd that are e

n the patentoduct has b

e particularher Finding

meeting staor product

ntil any of t

oval. equal to the

ted or proprbeen made

r proprietaryin the Pub

ndards andshould be

Ja

the followin

e products i

rietary item.

y product mlic Interest

d a non-proselected on

anuary 31, 2

g criteria

in the origin

m and a

must still bemust be

oprietary n a compet

2013

nal

e

titive

[Revised May 2020]PmiP.r.t 0 nt Pm :s

2-84

Page 88: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Januaryy 31, 2013

2-85

Projoject Develoopment Proocess

2.24.02 Procurement Contracts

A justification letter approved by the Manager of Procurement and Contract Services to the files certifies that no equally suitable or patented item exists for use on the project and that such patented or proprietary item is essential for the construction of the project. Generally, products identified by their brand or trade name are not to be specified without an "or equal" or equivalent phrase.

A Sole Source Certification Form

https://www.codot.gov/business/procurement-and-contract-services(shall be completed only for sole sources of goods or services.) This certification does not apply to situations classified as "Emergency Procurement" covered by CRS 24-103-206.

[Revised May 2020]11,. 3 P.nt Pror.

2-85

Page 89: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project DDevelopmeent Processs

2-86

Jaanuary 31, 22013

[This page intentionally left blank.]

[Revised May 2020]PmiP.r.t 0 nt Pm :s

2-86

Page 90: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.25

Most proneeded guidancdetermin

The stepCDOT's servicesthe FOR

The follo

1. Dw

2. P

a

b

c

d

e

3. BEinIT

4. Onre

5. Opfu

y 31, 2013

PROJE

ojects will hfor field offe on determne what IT

ps should bIT personn

s are availaR stage and

owing steps

During the Fwho this is, c

Please prov

. Project npossible

. Number and the d

. Identity oduring thprocess

. Identity obringing will be ne

. Duration

Before the FEngineer witncluded whT equipmen

Only CDOT etwork andequires Inte

Once the prorovided by uture projec

ECT INF

have some fices, field lamining whaservices m

be taken dunel determinble at the p

d ready for C

s should be

FIR processcontact the

ide your reg

name, numblocations foof project fadate those of the CDOThe project –

of the CDOTtheir CDOTeeded by thof the proje

FOR procesth the CDOen the proje

nt they need

authorizedd primary Inernet acces

oject has cothe region

cts.

FORMAT

need for infabs, or anot those IT nay be need

ring the FIRne what IT

project site. CDOT proje

e taken to id

s, contact y CDOT He

gion IT sup

ber, start daor the facilitacilities reqfacilities areT staff (if it this inform

T staff on loT issued wohe FOR staect

ss, the regioOT IT requir

ect is sent od to provide

equipmentnternet connss it must pr

ome to a clIT support

2-87

TION TE

formation teother projecneeds are; ided.

R process trequiremenThis will en

ect staff to

dentify IT ne

our region lp Desk at 3

pport team w

ate, and locties that are

quiring highe expectedhas been d

mation will b

ocation whoorkstations age of the p

on IT supporements for out to bid se to the pro

t and usersnection at throvide a se

ose, the onteam must

Proj

ECHNOL

echnologyct facility. Tit includes s

to help the nts the projnsure that ause when t

eeds for the

IT support 303-757-93

with the foll

cation; this e within rea speed Inte

d to arrive odeterminede needed b

o (if it has bto the proje

process

ort team withe project

so contractooject.

s shall havehe project sparate serv

n-site netwot be returne

oject Develo

LOGY NE

(IT) serviceThis subsecsteps to be

project engect has as all IT needsthe project

e project:

team. If yo317.

lowing infor

will help ITach of high-ernet that won site. ) who will bby the FOR

been determect site – th

ll provide tht. These caors will be a

e access to site. If the Cvice for its o

ork equipmed so it can

opment Pro

EEDS

es. IT may ction providee taken to

gineer and well as wh

s are definesite is setu

u are unsu

rmation:

T identify -speed Inte

will be on-sit

be on-site R stage of th

mined) will his informat

he Residenan then be aware of wh

the CDOT Contractor own use.

ent that wabe used on

ocess

be es

at ed by p.

re

ernet. te

he

be ion

t

hat

as n

Page 91: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

2.26

The Forcontrollinshortly t

The comcontractMethod “controllsimple psoftwareAn MS Pchart maspecificafor a parpreferreDesign pdevelopdecision

NOTE: Acompletis an itembut may

All specthat mayEnginee

In additiwhen co

1. U

2. E

3. N

4. Ir

5. S

6. P

Developme

PROJE

m 859, Prong or salienhereafter p

mpleted Fort time, affec(CPM) sching items o

projects, CDe, and moreProject CPMay be used ations requrticular projd schedulinphase. Subment proce

ns with accu

A “controllinion time of m of work t

y not affect t

ific project fy impact coer is respon

on to the iteompleting th

Urgency of p

Effect of con

Need for coo

rrigation req

Special even

Production r

ent Process

ECT CO

oject Contront features rior to adve

rm 859 concted pay iteedule or a

of work” andDOT has che complex pM scheduleon very simire the Conect. Attach

ng method. bsequent mess will helpurate sched

ng item of wthe project

that may bethe overall

features, coontract time sible for ini

ems on thehe Form 85

proposed im

nstruction o

ordination w

quirements

nts, schedu

rates used.

s

ONTROL

ol Data, is ufor a constr

ertisement f

tains informm quantitiebar chart s

d “salient fehosen MS Pprojects wae should be mple projecntractor’s sching the MS A draft scodification

p the projecdule informa

work” is an iif the durat

e of special completion

onstruction should alstiation and

e form the fo59:

mprovemen

on local bus

with other p

.

ules, and ho

2-88

DATA (

used to estaruction projfor bids.

mation that es, and a Mhowing esta

eatures.” AProject as itarrant the us

prepared fcts. Note thchedule to bS Project CPhedule shoand update

ct team makation.

item of wortion of this interest in

n of the proj

requiremeo be includcompletion

ollowing key

nt.

sinesses an

projects.

oliday impa

(FORM 8

ablish the cject at the F

is relevant Microsoft (M

ablished timlthough a bts preferredse of this pfor all but thhat current be a CPM sPM Schedu

ould be prepes throughoke importan

rk that will eitem is incrcoordinatinject.

nts, and otded in the Fn of this form

y issues sh

nd property

acts.

Ja

859)

contract timeFinal Office

to the deteMS) Project C

me allotted bar chart mad CPM schereferred sche simplest CDOT consschedule, uule output tpared earlyout the projnt and infor

extend the oreased. A “ng the proje

her specialForm 859. Tm.

hould also b

access.

anuary 31, 2

e, and e Review or

ermination oCritical Patfor the ay be usededuling heduling toprojects. A

struction unless modo the 859 is

y in the projeect

rmed projec

overall “salient featect schedule

requiremeThe Reside

be documen

2013

r

of h

for

ool. A bar

ified s a ect

ct

ture” e,

ents ent

nted

Page 92: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January The proc

1. Ch

2. D

3. Id

4. LP

5. Ca

6. D

Addition1. CDO2. For f

http:/3. CDO

y 31, 2013

cedures for

Complete thave been r

Determine c

dentify the c

ist items ofProject CPM

Complete thnd receive

Distribute Fo

nal RefereOT Construcforms, see C//www.colo

OT, Fundam

r preparing

he final Formesolved.

contract tim

controlling

f work in chM.

he Form 859Program E

orm 859 an

nces: ction ManuaCDOT on-liradodot.info

mentals of C

the Form 8

m 859 after

e for the pr

items of wo

ronological

9 four weekEngineer ap

nd attachme

al ine forms lio/library/for

CPM Sched

2-89

859 are:

r the Final O

roject.

ork, salient

l order on th

ks prior to tpproval sign

ents.

brary rms

duling Using

Proj

Office Revie

features, a

he Bar Cha

he schedulnature.

g Microsoft

oject Develo

ew and all k

nd related w

art of Form

led advertis

Project,

opment Pro

key issues

working da

859 or the

sement date

ocess

ays.

MS

e

Page 93: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

2.27

The finaapparen

All bid itunit quain the Co

EEMA a

1. P

2. R

3. P

4. C

5. R

Copies oapplicabthey are

The Reswith the

1. Tfr

2. T

3. TE

4. Ta

2.27.01

To proviadhered

Developme

ESTIMAND M

al engineer'snt low bidde

ems listed ntities and ontracts an

activities inc

Preliminary

Review of F

Preparation

Creation of b

Retention of

of estimateble. Estimae no longer

sident EnginEEMA. Th

The Residenrom the EE

The EEMA p

The EEMA rEngineer.

The EEMA ddvertiseme

Estimat

ide for the cd to:

ent Process

MATE REMARKET

s estimate wer's bid on t

in the consgiven to the

nd Market A

clude:

unit pricing

inal Office

of the final

bid tabulatio

f historical

s prior to bates will be confidentia

neer shouldhe following

nt EngineerMA.

provides un

reviews any

determines ent.

e Security

confidential

s

EVIEW BT ANALY

will be usedhe project.

struction plae Engineer

Analysis Bra

prior to the

Review eng

engineer’s

ons based

cost data.

id will be seconfidentia

al.

d coordinatg activities d

r tabulates

nit prices fo

y subseque

the unit pr

lity of the es

2-90

BY ENGIYSIS UN

d as a basis

ans are taburing Estimatanch for ass

e Final Offic

gineer’s est

s estimate p

on contract

ent to CDOal prior to th

e each stagdescribe the

the plan qu

r the Prelim

ent estimate

ices for the

stimate, the

INEERINNIT

s for either

ulated by thtes and Masignment o

ce Review

timate.

prior to adve

tor bids.

T Regions e bid open

ge of the pre cost estim

uantities an

minary Engi

es as reque

e final estim

e following

Ja

NG ESTI

award or re

he Residenarket Analysof unit prices

stage.

ertisement.

and FHWAing, after th

roject estimmate review

d requests

ineer's Esti

ested by the

mate prior to

restriction s

anuary 31, 2

MATES

ejection of

t Engineer sis Unit (EEs.

.

A when he bid open

mating procew:

unit prices

mate.

e Resident

o

shall be

2013

the

with EMA)

ning

ess

Page 94: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

1. Esy

2. C3. T

b

2.27.02

1. 23 C2. CDO3. CDO

Deta4. Estim

y 31, 2013

Engineers pystem.

Consultants The Enginee

y CDOT po

Addition

CFR Part 63OT ProceduOT Proceduailed Estimamated Total

repare thei

prepare “qer’s Estimaolicy.

nal Referen

30B, Plans, ural Directivural Directivate l Project Co

r cost estim

quantity onlyte is protec

nces:

Specificative 303.01, Ae 511.1, Se

ost (see Se

2-91

mates using

y” estimatected by the

ons and EsAward of Coecurity and

ection 1.02 o

Proj

g the CDOT

es. computer s

stimates ontract – JuConfidentia

of this man

oject Develo

T computeri

system and

ustification iality of the

nual)

opment Pro

ized estima

d is confiden

of Bid Engineer’s

ocess

ating

ntial

Page 95: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

2.28

The Finaand costto be a fwhich thconsultaall varian

Design Buse of n

The Resindividuaresponsschedule

1. F

a

b.

2. P

a

b

Developme

FINAL

al Office Ret estimatesfully complehe Plans, Spants. Prior nces have

Bulletin 200ew or revis

sident Enginals from vaibility of thee, budget, s

Final Office

. Plans an

i. Comrequ

ii. All sthe

Cost EstimAn updateaccount woway, utilitie

Procedure

. Initiation The FinaResidentconvenieEngineer

. DistributiCopies oEngineerOffice RecontrolleDirectiveEstimate

ent Process

L OFFICE

eview (FOR for comple

eted plan sepecificationto the Finalbeen appro

09-5 Projecsed project

neer leads rious CDOTe Resident scoping, de

Review doc

nd specifica

mplete projeuired for cospecial provFinal Office

mate (not tod cost estimork and othes, construc

of the Finaal Office Ret Engineer. ent to the mr. ion of the Pof the plans r at least seeview. Thed and will b

e 511.1, Sece.

s

E REVIE

R) is a final eteness andet. A Final

ns and Estiml Office Revoved (See S

ct Special Pspecial pro

the projectT work unitEngineer is

esign, and q

cuments sh

tions

ect plans coonstruction.visions nece Review.

be distribumate of all fher items chction engin

al Office Review will be The Final

majority of th

Plans, Specand specia

even days, e distributiobe distributecurity and C

2-92

EW

review of cd accuracy.Office Rev

mate (PS&Eview, the RSection 2.0

Provisions sovisions on

design teas, consultas to ensure quality are s

hall consist

ontaining a

cessary for

uted except finalized plahargeable teering, and

eview e initiated, sOffice Rev

he attendee

cifications, aal provisionbut preferan of any preed only in aConfidentia

construction. The Final

view is condE) are final

Resident En5).

summarizesCDOT con

am. A designts and entthat the imsuccessfull

of the follo

all necessar

the project

as describan quantitieto the projed indirect co

scheduled aview will be es, as deter

and Estimans will be disably 14 dayseliminary co

accordanceality of the E

Ja

n plans, spel Office Revducted for aized by CDgineer shou

s CDOT postruction pr

gn team cotities. The

mportant objly accompli

owing plan p

ry tabulation

, current as

bed below) es, includingct such as osts.

and conducheld in the

rmined by t

te packagestributed bys, in advanost estimat with CDOT

Engineer’s D

anuary 31, 2

ecificationsview plans all projects

DOT or its uld ensure

licies regarrojects.

onsists of principal jectives (e.gshed.

package:

ns and deta

s of the date

g planned fdesign, righ

cted by the office mosthe Residen

e. y the Residce of the F

te is rigidly T ProcedurDetailed

2013

, are on

that

rding

g.,

ails

e of

force ht of

st nt

dent inal

ral

Page 96: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

c

d

e

y 31, 2013

Plans anEngineermemo w

i. FHWAii. Regiii. Projiv. Geov. Regvi. Regvii. Regviii. Regix. Regx. Regxi. Regxii. Regxiii. Regxiv. Regxv. Lanxvi. Coloxvii. Othxviii. Conxix. Oth

. Those reand accuto presenSpecialtiIf their inResident

. Conduct The Resso the paattend. Fensure thfor the finmade at

. DocumenThe Rescorrectiowill sendwho wereEngineerbe sent t On consuReview m

nd special pr will determithout the p

A-Attn.: Opgion Transpject Structuotechnical Egion Planningion Progragion Materiagion Right ogion Utility Egion Hydraugion Profesgion Maintegion Residegion Traffic ndscape Arcorado Stateer Local, S

nsultants ers as dete

eceiving plauracy of connt their recoes with signvolvement t Engineer of the Finaident Enginarticipants cFollowing thhat all correnalization oor prior to tntation ident Enginns and rev the minutee originally r will keep ato others, a

ultant-desigmeeting and

provisions wmine when plans):

perations Enportation Diural EngineEngineer ng and Env

am Engineeals Engineeof Way ManEngineer ulics Enginesional Land

enance Supent EngineeEngineer

chitect

e Patrol State or Fed

ermined by

ans and spenstruction dommendationificant invois limited, tprior to the

al Office Reneer shouldcan recognhe Final Offections are of the plansthe Final O

neer will maisions that

es reportingsent Final

a copy of ths the Resid

gned projecd prepare a

2-93

will be transand to who

ngineer rector er

vironmentaler er nager

eer d Survey Cperintendener

deral Agenc

the Reside

ecifications details and ons for reviolvement shthey can coFOR meet

eview d prepare anize which pfice Reviewmade for a, special prffice Review

aintain one result from

g the resultsOffice Rev

he marked-dent Engine

cts, the conand distribu

Proj

smitted to thom it is app

l Manager

oordinatornt

cies

ent Enginee

will review plan quantisions and chould atten

ommunicateting and no

n agenda foparts of the w meeting, tadvertising. rovisions, aw.

set of printthe review

s of the Finiew notificaup plans an

eer deems

nsultant will ute the minu

oject Develo

he followingropriate to

er

them for coities, and wcorrections

nd the Finale their conct attend.

or the Finalmeeting ththe Reside All decisiond cost est

ts on which w. The Resi

al Office Reation. The Rnd additionnecessary.

conduct thutes. The c

opment Pro

g (the Residdistribute th

ompleteneswill be prepas at the FOR Office Rev

cerns to the

l Office Revhey should nt Engineeons necesstimate will b

to record tident Engineview to allResident al copies w

he Final Offconsultant w

ocess

dent he

ss ared R. view. e

view

r will ary

be

he neer l

will

ice will

Page 97: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

Developme

incorporasubmit toreproduccorrectio

ent Process

ate all modo the Residcibles, CADns, if applic

s

ifications agent Engine

D files, and tcable.

2-94

greed to inter the minuthe Final O

to the plansutes of the mffice Review

Ja

s and specimeeting, thw documen

anuary 31, 2

ifications anhe revised nts with

2013

nd

Page 98: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.29

Plans anthe consthe anticreceived

The Resto help fReprodu

Whoeve1299 Plabefore there: ht

A compl

1. Ss

2. Pch

3. P

The EngAnalysisrequired

The ResEstimatesectionsand repr

1. C

2. Ra

3. OPre

4. Rfe

y 31, 2013

BID PA

nd specificastruction itecipated cosd.

sident Enginfinalize the uction.

er checks thans, Specifthe project ttp://www.c

lete PS&E s

Standard Spupplemente

Plans in the ross-sectioydraulics, s

Project costs

gineering Es Branch wid to perform

sident Engine package. s, special prroduction w

Compiling th

Running thend Market A

Obtaining CProject Scopeceived in w

Reviewing thederal and

ACKAGE

ations of a pems in sufficts in detail

neer shouldplans befor

he Plans, Sfications anis advanceoloradodot

set of plans

pecificationsed or modif

form of detns. These

structures, s

s of bid item

stimates anill review or

m the work (

neer is respThe packa

rovisions, ework order. A

he final plan

e final EnginAnalysis Un

DOT clearaping/Clearawriting. Em

he final Plastate requir

E REVIE

project descient detail to permit a

d use portiore advancin

pecificationnd Estimated to Advert.info/library

s shall inclu

s for Road fied by spec

tailed drawplans contasoil, pavem

ms, force ac

nd Market Ar establish p(see Sectio

ponsible forage includesestimate, scAssembly i

n sheets.

neer's Estimnit in the Co

ance approance Recordmails are an

ns, Specificrements.

2-95

EW (FOR

cribe the loto facilitaten effective

ons of the Fng the proje

ns and Estim Checklist ttisement any/forms/cdot

ude:

and Bridgecial provisio

ings, layouain informat

ments, and o

ccount item

Analysis Unprices for mn 2.27 of th

r assemblins, but is notchedule, adnvolves:

mate, as revontracts an

vals and sigrd. Clearancn acceptable

cations, and

Proj

RM 1299

ocation and e constructioreview and

Form 1299 ect to Adve

mate (PS&to ensure thnd Reprodut1299.docx

e Constructions to suit t

ts, profiles,tion pertainother featur

ms, right of w

nit in the Comaterials, lahis manual)

ng the final t limited to,

dvertisemen

viewed by tnd Market A

gn-offs as rces from Spe form of cl

d Estimate

oject Develo

9)

design feaon. The es

d compariso

not coveredrtisement a

E) should uhe plans aruction. Formx/view

tion. This bothe specific

, and any aning to geomres of the p

way, and ut

ontracts andabor, and eq).

Plans, Spe plan sheet

nt notice, bi

the EngineeAnalysis Bra

required onpecialty Unlearance.

for complia

opment Pro

atures with astimate refleons of bids

d in Form 1and

use the Forre completem 1299 is fo

ook will be c contract.

appropriatemetrics, project.

tility costs.

d Market quipment

ecifications,ts, cross-d documen

ering Estimanch.

n Form 104its should b

ance with

ocess

all ects

1048

rm e ound

, and

nts

mates

8, be

Page 99: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

5. Sre

The ForEngineeadvertis

Immediafinish theEngineeControl

Addition1. 23 C2. Proc

Proje3. For f

http:/

Developme

Submitting teproduction

m 1048, Prer. All clearaement of a

ately prior toe final chec

er shall alsoData, Form

nal RefereCFR Part 63cedural Direects forms, see C//www.colo

ent Process

he Plans, Sn center.

roject Scopances outlinproject.

o requestinck of the bido confirm alm 1048, and

nces: 35B, Force Aective 520.1

CDOT on-liradodot.info

s

Specificatio

ing/Clearanned on the

ng that a prod package fl clearance

d check she

Account Co1, Documen

ine forms lio/library/for

2-96

ns, and Est

nce RecordForm 1048

oject is advfollowing R

es and requeets) have b

onstructionnts for Bidd

brary rms

timate pack

d, is to be co8 will be obt

vertised the Region proce

irements (sbeen met.

ding and Co

Ja

kage for pri

ompleted btained prior

Resident Eedures. Thsee Form 8

ontracting o

anuary 31, 2

inting to the

by the Residr to

Engineer we Resident

859, Project

on Construc

2013

e

dent

ill t

ction

Page 100: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.30

After thefederal a(StandaSAP in oproject. and FormExclusioEnvironm

Obligatio SAP Ste

1. Z

2. Z

3. U

4. Z

5. Z

6. M

Constru10 perce

1. Ifthd

2. Ifto

Authoriz

1. F

2. Fa

3. Afr

These foadvertis

y 31, 2013

PLANSAPPRO

e final Plansand state rerds Certificorder to obl The Residm 859 have

on projects,mental Man

on:

eps:

ZJ14 - Form

ZJ17 – Form

Update Trns

ZJ23 – Initia

ZJ30 – Trac

ME51N – Cr

ction Estiment of the C

f the estimahe project bepending if

f the estimao ensure th

zation is req

Final Form 4

Form 1180 wnd Estimat

An approvedrom the reg

orms shouldement date

S, SPECOVAL (F

s, Specificaegulations hation and Pligate the co

dent Enginee been app the Form 1

nager,

m 463 – Fina

m 128 – Env

s*port fundi

ate Form 11

ck Form 118

reate a Pur

mate in TrnsConstruction

ate is 10% obefore it canf a STIP am

ate is 10% le budget is

quested fro

463 (Design

workflow(Ste Approval

d Form 128gion.

d be submie to allow ad

CIFICATIFORM 1

ations and Ehave been Project Planonstruction

eer cannot iproved by th128 has be

alize

vironmenta

ng to match

180

80 progress

rchase Req

*port reviewn funds bud

over the bun be advertmendment i

ess than ths not more t

m FHWA o

n Data)

tandards C)

8 (Environm

tted to OFMdequate tim

2-97

IONS AN180)

Estimate armet the Re

ns, Specific phase andnitiate the F

he Programen finalized

al Manager

h SAP fund

s

uisition for

wed by CDOdgeted.

dget, then atised. Be aws required.

he budget, tthan 10% o

once OFMB

Certification

mental Cate

MB at least me for OFM

Proj

ND ESTI

re reviewedesident Engcations and d obtain appForm 1180

m Engineer ad and appro

ding

Constructio

OT Cost Es

additional fware this m

then funds over the est

B receives:

and Projec

egorical Exc

7-10 days MB/FHWA to

oject Develo

IMATE

d and all reqgineer initiat

Estimates proval to aduntil the finand, for Caoved by the

on

stimating h

funds must may take up

need to be timate.

ct Plans, Sp

clusion Dete

prior to theo process t

opment Pro

quirementstes Form 1Approval) idvertise thenal Form 46ategorical e Region

as to be wi

be added tto 2-3 mon

de-budget

pecifications

ermination)

e scheduledhe

ocess

of 180 in e 63

thin

to nths

ed

s

)

d

Page 101: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D authorizadequatrequire t

The Regsafety stpackage

The Regto adverbudget dplannedpercent,notificatiadvertis

The ForManage463, cur

When Othey willforward

A federaphase oa projecconstitut

Once thbe found

After FHOFMB. O

To deter(CJ20N)appear i

NOTE: (particip

Developme

zation requetely before two weeks

gion Progratandards hae by approv

gion Businertise the prodeficits up t action vers the clearaion of the Cement of th

m 1180 wilement and Brrent cost e

OFMB receiv approve ththe packag

al aid constbligation/au

ct does not tes authoriz

e Construcd in SAP us

HWA has obOFMB will,

rmine whet). If the proin the “FHW

23 CFR Paating) for c

ent Process

est. Therefthe plannedto approve

am Engineeave been mving the For

ess Manageoject. With tto 10 percesus Enginence indicat

Chief Enginehe project b

l then be foBudget). Thstimate and

ves the comhe budget foge to FHWA

ruction projuthorizationinclude anyzation to pr

ction phase sing transac

bligated andin turn, aut

her a projeoject has reWA Agreem

art 630.106 osts incurre

s

fore the stad advertisethe PS&E

er will certifymet, and aprm 1180 in

er will certifthe Region’

ent (based oeer's Estimaes approvaeer. Deficit

because of

orwarded inhe Residentd Form 128

mpleted Foor advertise

A for obligat

ject will notn has been y federal funroceed with

is authorizection ZJ40

d authorizethorize the

ct has receceived FHW

ment Date” f

specifies thed prior to t

2-98

rt of the forment date.package fo

y on Form 1prove the PSAP.

fy on Form ’s approvalon Transpoate). For pral by the Rets greater trequired Tr

SAP to OFt Engineer

8 (if applica

rm 1180 anement (if ontion and au

t be advertisreceived frnding final aadvertisem

ed by FHWor CJ20N.

ed the Fedebudget for

eived FHWAWA authorizfield in the C

hat federal the dates o

rm 1180 woWhen FHW

or authorizin

1180 that aPlans, Spec

1180 in SA, projects m

ortation Comrojects withegion Transhan 15 perransportatio

FMB (Officeis responsible) to OFM

nd all of thenly state funuthorization

sed for bidsrom FHWA approval of

ment.

WA, the FHW

eral Funds, advertisem

A authorizazation, the CJ20N Use

funds shalof obligation

Ja

orkflow shouWA has oveng funds fo

appropriate cifications,

AP that fundmay be advmmission bu deficits gre

sportation Drcent may don Commis

e of Financible for forwMB.

e associatednds are use of Federal

s until the cIn those in

f the budge

WA authoriz

they will rement.

ation, you cadate it was

er fields.

l not be usen and autho

anuary 31, 2

uld be timeersight, theor construct

design andand Estima

ds are availvertised withudget plus eater than 1Director anddelay the ssion action

ial warding the

d documened), or will Funds.

constructionstances wh

et action

zation date

spond to

an log into s approved

ed orization.

2013

ed y

tion.

d ate

able h

10 d

.

ts,

n here

can

SAP will

Page 102: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January Federal projectscharges

Addition1. 23 C

Spec2. 23 U3. CDO

(DSR4. 23 C5. For f

http:/

y 31, 2013

Highway A. See Secti can be ma

nal RefereCFR Part 62cifications a

USC 106, PrOT ProceduR) CFR Part 63forms, see C//www.colo

Administratioon 1.03 an

ade against

nces: 25, Design Sand Estimatroject Appro

ural Directiv

30A, FederCDOT on-liradodot.info

on authorizd Section 1t a project.

Standards ftes oval and O

ve, 512.1, P

ral-Aid Projeine forms lio/library/for

2-99

zation is not1.04 of this

for Highway

versight Project Scop

ect Authorizbrary rms

Proj

t required fomanual for

ys, and Pa

ping and De

zation

oject Develo

or non-feder an explana

rt 630B, Pla

esign Scop

opment Pro

eral-aid ation of wh

ans,

ping Review

ocess

en

w

Page 103: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

2.31

After thecreate athe fundensure t

The Res

For a stainstructio

Link to

ME51N - FeFunded Con

http://vu

PRs for different

After youFirst youBusinesrelease will also Contract

For fede“FHWA Purchasobligatiostates thobligatio

Developme

PURCCONT

e project is a Purchase ds and advethe project

sident Engin

andard CDOon on how

ME51N – C

ederally nstruction

pweb.dot.s

Bridge Enttly and instr

u have savu will need ts Office anmust be cobe requirets Unit on t

erally fundeAgreement

se Requisition are comphat federal fon and agre

ent Process

HASE RRACT

authorized Requisition

ertise the prhas adequa

neer will cre

OT project,to fill out a

Create a Co

state.co.us/g

erprise or Truction for t

ed the PR, to send thed request t

ompleted prd on the rehe *HQ-CU

d projects, t Date” has on on a fedplete. Thesfunds shall eement. Se

s

REQUISI

by OFMB fn (PR) in SAroject. It alsate funds fo

eate the PR

, please usePR for a st

onstructio

gm/folder-1

Tolling Entethose PRs a

you’ll neede PR numbehat they aprior to the pquest adve

U/Construct

the Purchabeen rece

derally fundse requirem

not be usee Figure 2-

2-100

TION FO

for advertisAP. The PRso will serveor advertise

R using tran

e the attachtandard CD

n Project P

1.11.30001

erprise projeare attache

d to record ter to both thpprove (akaproject gettinertise letter tion Contrac

ase Requisiived. SAP w

ded project ents are ba

ed for costs -3.

OR CON

sement, theR is generae as a preliement in the

nsaction co

hed ResourDOT funded

PR Resour

ects will need as a refe

the PR numhe Programa release) thng advertisthat will bects Unit dis

ition shouldwill not allowunless the ased on 23Cincurred p

Ja

NSTRUC

e Resident Eally a requeminary bude construct

ode ME51N

rce guide wd project.

rce guide

eed to be crerence belo

mber for futm Engineer he PR in SA

sed. The PR sent to the

stribution lis

d not be staw the compfederal appCFR 630.1rior to the d

anuary 31, 2

TION

Engineer west to encumdget check ttion phase.

N.

with the pro

reated ow.

ture referenand the AP. This R informatioe Constructst.

arted until thpletion of thproval and 06 which

date of

2013

will mber to

per

nce.

on ion

he he

Page 104: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.31.01

1. In(p(pCF

2. Wast“F

3. BGnp

4. TDre

y 31, 2013

Key SAP

n the “Accoprojects thaprojects tha

Category” fieFHWA agree

When a P isutomaticalltate only fuFHWA Agre

Based on thGeneral Led

ot alter or eroject befor

The Region Date.” The Regarding Pu

Ch

P Purchas

unt Assignat require feat do not neeld of the Pement date

s entered foy check for

unds, there eement Dat

e “Accountdger Numbeedit the G/Lre going to

Business ORegion Busurchase Re

Fhecking FHW

e Requisit

ment Categederal authoeed federal Purchase Ree is in place

or the “Accor the “FHWAis no validate.”

t Assignmeer (G/L NumL Number o

Advertisem

Office shousiness Officequisitions o

2-101

igure 2-3 WA Agreem

tion Points

gory,” enterorization) oauthorizatioequisition is

e and federa

ount AssignA Agreemeation check

nt Categorymber) in theon a Purchament.

ld also crose should beor the “FHW

Proj

ment Date

s

r either a P or a Z for a on). The “As a critical fal participat

nment Categent Date”. Ifk on whethe

y,” SAP core Purchasease Requisi

ss check foe contactedWA Agreem

oject Develo

for a particnon-particip

Account Assfield for enstion is appr

gory” field, f a Z is enteer or not the

rrectly popue Requisitioition for a c

or the “FHWd for any qu

ment Date.”

opment Pro

cipating propating projesignment suring that roved.

SAP will ered indicatere is an

ulates the n. Please donstruction

WA Agreemeuestions

ocess

oject ect

ting

do n

ent

Page 105: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

5. IfC

6. UU

2.31.02

1. Link http:/

Developme

f the PurchaCDOT is in j

Upon awardUnit.

Addition

to BE CDO//vupweb.d

ent Process

ase Requisjeopardy of

d of the proj

nal Referen

OT combineot.state.co.

s

sition is creaf losing the

ect, the PR

nces:

ed PR creat.us/gm/folde

2-102

ated incorrefederal fun

R will be con

tion resourcer-1.11.300

ectly prior tonds for the p

nverted into

ce guide 001

Ja

o the federaproject.

o a PO by t

anuary 31, 2

al obligatio

the Agreem

2013

n,

ments

Page 106: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.32

The Resspecial papplicab(VCC). Fthe docu

1. CSCdad

2. CTd

3. AEwin

4. TUo1reCs Aatha

2.32.01

The PrinProject Dconstrucfrom For

y 31, 2013

PLANS

sident Enginprovisions, ble, and sevFour groupsuments at d

CDOT ProjeSupporting tContractor’s

eferrals. Ths possible, iscussion o

CDOT ConsThe CDOT C

ocuments.

Agencies: External agewho may nenternal revie

The ContracUpon award

f plans and02 Project eceive with

Contractor’special prov

After Award t the Visuahe Award pnd are ship

Form 28

nting and VDistributionction documrms 644 an

S AND R

neer develobid schedu

veral forms s of peopledifferent sta

ect Staff: the advertiss questions his group nejust in case

of Form 644

struction StaConstructio

encies sucheed the Ad aew and pro

ctor: d of the Cond specificatiPlans and out cost an

s Award setvisions, plus

distributionl Communilan sets wit

pped to the

87 Project

isual Commn (See Figurment sets thnd 155) are

REPROD

ops an Advules, cross s

for the Prin receive the

ages. The g

sement (Adand submieeds the Ade there are4.)

aff: on Staff can

h as FHWAand revisio

ocesses (se

ntract, the Cons. The pOther Data

nd how the Cts include As all revision

n, the Contrcation Centhin one weResident E

Distributio

municationsre 2-4.) as hat will be pcombined

2-103

DUCTION

vertisement sections ornting and Vese documroups are:

) process, tts-revisionsd documen immediate

n wait for no

A, other fedens-under-a

ee discussio

Contractor wroject spec

a, specifies Contractor

Ad plans, stans-under-ad

ractor’s Awter in Denv

eek, these sEngineer.

on

s Center bua workshee

printed. All sto get a tot

Proj

N PROC

package wr other suppVisual Comm

ents. Each

the CDOT s-under-ad nts and revie Contracto

ormal groun

eral agencied documen

on of Form

will be sent cial provisiohow many will receiveandard sped.

ward sets wiver. If the Csets are lab

usiness procet for determsections of tal print run

oject Develo

CESSES

which includplemental inmunications of these gr

Project Staand requessions-under questions

nd delivery

es, and Locnts as soon644.)

t Contractoron, Revision

sets the Coe the documecial provisi

ill be availaontractor d

beled “Cont

cess uses mining the the form (i. The const

opment Pro

des plans, nformations Center roups need

aff answerssts for bid

er-ad as soos. (See

of all

cal Agencie as possibl

r’s Award sn of Sectionontractor w

ments. The ions, projec

ble for pickoesn’t pick tractor’s Se

Form 287 total numbencluding totruction

ocess

if

ds

on

es e for

sets n will

ct

k-up k up ets”

er of tals

Page 107: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D documeprinting.

Developme

nt sets nee The goal o

ent Process

eded for theof VCC is to

s

e entire Ad to print only

FExam

2-104

through awonce.

igure 2-4 ple Form 2

ward proces

87

Ja

ss are printe

anuary 31, 2

ed in one in

Standard Distribution se

Ad sets

Award sets

2013

nitial

ets

Page 108: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

The illusrun. For sets tharevisionsThe AwaRevisionthe projenumber in the spsets, the

y 31, 2013

stration in Feach regio

t will be prins-under-ad ard sets aren of Sectionect’s speciaof Award s

pecial provie Designer

Figure 2-5 ison, the numnted and seare printed

e the Contrn 102-Projeal provision sets on the sion. If the will need to

s the top pamber design

ent by groud, each is sractor’s setsect Plans an

for the numForm 287 mspecial pro

o order them

2-105

art of Formated here wnd deliveryent separats, as specifnd Other Damber of setsmust be eqovisions stam (see disc

Proj

287, the stwill be the ny to the regitely to the rfied in the pata. The Des the Contrual to or lar

ate that thecussion on

oject Develo

tandard disnumber of aion for distrregion for dproject specesigner neeractor is to rger than wContractor Form 155.)

opment Pro

tribution pradvertisemeribution. Asdistribution. cial provisioeds to checreceive. Th

what is specr will get mo)

ocess

int ent

on, ck he cified ore

Page 109: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

INSTR ♥ 6 10 15

After Visualof planof fullpickedbe senmay breprodbidderreprod

Developme

RUCTIONS T Insert the apsets for write-

0 sets for norm5 sets for majo

the proposals hl Communicatins and special l-size major strd up the plans ant to the Residebe purchased onduction prices. r or they may pduction prices.

ent Process

TO DESIGNEppropriate numup projects.

mal projects witor projects (mo

PRhave been openions Center, 42provisions; an

ructure plan shand other availent Engineer inn a cash sale ba Subcontractor

purchase copie

s

FTop Pa

ERS (delete insmber of plan se

th plan sheets.re than 100 she

REVISIONROJECT PLANned, the low re201 East Arkand if available feets, and one slable data by 4n charge of the asis from CDOrs and suppliers on a cash sal

2-106

igure 2-5 art of Form

structions and sets:

eets).

N OF SECTIONNS AND OTHsponsible bidd

nsas Avenue, Dfor the project, set of computer:00 p.m. on theproject. Addit

OT's Visual Comrs may obtain pe basis from th

287

symbols from

N 102 HER DATA der may obtain Denver, Colora

one set of fullr output data. e second Fridaytional sets of pmmunication Cplans and otherhe Visual Comm

Ja

final draft):

from CDOT's ado 80222, at nl-size cross secIf the low bidd

ay after bid opeplans and otherCenter at currer data from the

mmunication Ce

anuary 31, 2

Printing and no cost: ♥ sets tions, one set

der has not ening, they willr available dataent e successful enter at current

2013

l a

t

Page 110: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.32.02

This formRecord

y 31, 2013

Form 64

m has threesets for the

44 Plan Dis

e functions.e residency

Form 644:

stribution R

. The first fuand Consu

FResident E

2-107

Request

unction is foultants. (Se

igure 2-6 Engineer Or

Proj

or the Residee Figure 2-

rders Reco

oject Develo

dent Engine-6.)

ord Sets

opment Pro

eer to orde

ocess

r

Page 111: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D The secstandardquestion

The Visurequeste

Developme

cond functiod mail. Thens. (See Fig

ual Commued and at th

ent Process

on is for these are the dgure 2-7.)

unications Che requesto

Form 64

s

e Resident Edocuments

Center doesor’s expens

F44: Residen

2-108

Engineer tos needed im

s not ship ose.

igure 2-7 nt Engineer

o order the 2mmediately

overnight m

r Orders 2 S

Ja

2 sets that to answer C

mail unless s

Sets

anuary 31, 2

will be shipContractor

specifically

2013

pped

Page 112: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January The thirdagencieManageAgencieThese athe Printimmediathe Formeach is r

y 31, 2013

d function iss such as t

ement, and es such as care ordered ting and Visate Ad copiem 155 but wreceived.

s to order che Federal National Pacities, counin the box

sual Commes, the Res

will have to

Form

copies that Highway A

ark Serviceties, and spbelow (See

munications sident Enginremember

F644: Copie

2-109

will be needAdministratie. Also, deppecial improe Figure 2-8Center. No

neer can orto mail the

igure 2-8 es for Exter

Proj

ded immedion, Forest

pending on ovement di8.) and are ote: if theserder construAd sets an

rnal Agencie

oject Develo

diately for eService, Buthe projectistricts maysent to the

e agencies duction docund revisions

es

opment Pro

external ureau of La, Local

y want copiee individualsdon’t need ument sets s-under-ad,

ocess

and

es. s by

on , as

Page 113: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D 2.32.03

This formdocume

The secwant you

Developme

Form 15

m has threents. (See F

cond functiour order pri

ent Process

55 Reprodu

e functions.Figure 2-9.)

Form 155

on is to tell tnted. (See

s

uction Wor

. The first f

F5: Authorize

the PrintingFigure 2-10

2-110

rk Order

function is t

igure 2-9 e Printing o

g and Visua0.)

to authorize

of Ad Docum

al Commun

Ja

e the printin

ments

ications Ce

anuary 31, 2

ng of the Ad

enter how y

2013

d

you

Page 114: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

The thirdflexibility

1. Tb

7. T

8. Ta

9. Tsafo “ISs

In aSp

y 31, 2013

d function oy to order m

There aren’tox,

The project

The Residengencies, an

The Revisioets for the Csk for additollowing wo

n addition tSpecial Provhould be on

addition to the stapecial Provisions, P

F

of this form more sets of

t enough se

is large and

nt Engineernd

n of SectioContractor.tional sets oording:

to the standvisions, Pronly the add

andard printing, plProject Special Pr

FigForm 155: P

(See Figurf document

ets identifie

d construct

r wants to s

n 102 requ. In the “Adof specific s

dard printinoject Speciaitional docu

lease print X sets Provisions, and cro

2-111

gure 2-10Printing Inst

re 2-11.) givts for the fo

d on Form

ion staff wil

send plan s

ires the Redditional Infsets. For e

g, please pal Provisionuments that

of plans, Standaoss sections.

Proj

tructions

ves the Resollowing situ

287 in the

ll need add

sets and rev

sident Engformation” bexample, Re

print X sets ns, and crost will be nee

ard

oject Develo

sident Engiuations:

Standard D

itional copi

visions und

ineer to ordbox, you neepro sugge

of plans, Sss sectionseded.)

opment Pro

neer the

Distribution

es,

er ad to ou

der additioneed to clearests the

Standard s.” (This list

ocess

Sets

tside

nal rly

Page 115: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

Using thspecs, cit’s imposubmitte

To reducare nowResidento the prresiding electronneed, wwill deveappropriThis list and 155

Final plain a newwebsite.number

Developme

he Form 287cross sectioortant that thed.

ce the amow distributingnt Engineer roject Conson the FTPic copies qhich typicalelop a prelimiate, bid scshould be

5.

ans, speciaw folder und. NOTE: Wr and ad da

ent Process

For

7, the Printons, etc. thahe Residen

ount of papeg FIR and Fmay send

struction PlaP server areuickly. Indivlly is not theminary disthedules anincluded in

l provisionsder \\public\hen choosate, not a s

s

Figrm 155: Ord

ing and Visat are neednt Engineer

er being useFOR plans out a “Notic

ans and Spe removed viduals attee full set of ribution list d at what sthe FOR n

s, bid schedreprojobs\p

sing a namsubaccoun

2-112

gure 2-11dering Addi

sual Commed for the eorder enou

ed during pelectronicace of FOR”

pecial Provisafter 10 da

ending the Fdocumentsof who nee

stage they anotes and u

dule, and Foplansandsp

me for the nnt.

itional Sets

unications entire projeugh sets wh

project deveally. In the c meeting visions on th

ays, project FOR may ps. At the FOeds plans, sare neededsed in filling

orms 155 apecs which new folder

Ja

Center princt at one timhen Form 2

elopment, scase of the ia email ane FTP site.reviewers

print the docOR, the Resspecificatio

d – either Adg out the fo

and 644 shois the Repruse the ac

anuary 31, 2

nts all the pme. Therefo287 is

some RegioFOR, the d provide a. Since filesmust get thcuments thsident Engi

ons, and, whd or Awardorms 287, 6

ould be plaro folder onctual proje

2013

lans, ore,

ons

a link s

heir ey ineer hen .

644,

ced the ct

Page 116: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January ReproduThe Ad are heldperiod is

As Revisaccordin

y 31, 2013

uction combsets are iss

d in the Prins over and A

sions-Undengly.

bines all forsued as insnting and ViAward is m

er-Ad are co

rms and pristructed on sual Comm

made.

ompleted, V

2-113

nts both AdForms 287

munications

VCC will pri

Proj

d and Awar, 155 and 6

s Center un

int them an

oject Develo

rd documen644. The retil the adve

nd distribute

opment Pro

nts at this tiemaining seertisement

e them

ocess

me. ets

Page 117: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

2.33

CDOT tylonger oEngineeManage

Two weeweeks is635.112steward

An adve(Contracthe projeInnovativperiod.

The acti

1. P

2. C

3. C

4. C

5. Aa

6. P

The Resthe Formdiscrepa

The ResVisual Cshould b

1. F

2. F

3. P

4. O

Developme

ADVE

ypically advor shorter ader is to requer.

eks is the ms the minim2(b) unless ship agreem

ertisement pctors) may ect has a unve Contrac

vities that l

Process des

Check estim

Check final d

Compile the

Approve thedvertiseme

Prepare the

sident Enginm 1048, Proancies have

sident EnginCommunicabe included

Form 644, P

Form 155, R

Project sche

Original proj

ent Process

RTISEM

vertises a pdvertiseme

uest concur

minimum admum adverti

approved bment).

period of 5 whave a diffinique elem

cting method

ead up to p

sign require

mate and bu

design, spe

Plans, Spe

e Plans, Speent for bid.

Plans, Spe

neer will enoject Scopine been reso

neer is resptions Cente:

Plan Distribu

Reproductio

edule of item

ject plan sh

s

MENT

project for thnt period mrence from

dvertisemensement pe

by the Regio

weeks or mcult time acent or difficd, bidders m

project adve

ements and

udget

ecifications,

ecifications

ecifications

ecifications,

nsure that ang/Clearanolved.

ponsible forer (See Sec

ution Reque

on Work Ord

ms

heets

2-114

hree weeksmay be appr

the Contra

nt period reriod requireon Transpo

more can beccurately ascult phasingmay benefit

ertisement

clearances

, and bid ite

, and Estim

s, and Estim

, and Estim

all applicablce Record,

r deliveringction 2.28 B

est

der

s. There areropriate. In acts and Ma

equired by Sed by FHWAortation Dire

e used whessessing thg, is a signat from the lo

are:

s.

ems.

mate deliver

mate packag

mate deliver

le clearance, and that a

the documBid Package

Ja

e situationseither case

arket Analy

State statutA accordingector (see C

en the potenhe risks of tature projeconger Adve

rable packa

ge, includin

ry schedule

es have beall mitigating

ments to thee Review).

anuary 31, 2

in which a e, the Progrsis Branch

te. Three g to 23CFRCDOT/ FHW

ntial biddershe project. ct, or uses aertisement

age.

ng

.

een obtaineg issues an

e Printing anThe follow

2013

ram

R WA

s If an

d on d

nd ing

Page 118: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

5. O

6. O

7. E

8. A

9. O

To ensuCenter rshould b

1. TD

2. LD

3. VD

The Adv

In

In

y 31, 2013

Original proj

Original proj

Earthwork c

Advertiseme

Other supple

ure a timely requires thebe given du

Typical PS&Deliver to th

arge PS&EDeliver to th

Very Large PDeliver to th

vertisement

n upper left

n upper righ

ject specific

ject cross-s

alculations

ent letter fro

emental inf

advertiseme following suring holiday

&E packagee Center 8

E packages e Center 15

PS&E packe Center 22

t Notice in T

corner: · L· C· R

ht corner: C· P· D· P· W· R· A____________

cations and

sections, if a

, if applicab

om Residen

formation, if

ment of the submittal scys):

es (200 plancalendar d

(between 5 calendar

kages (over2 calendar

Trns*Port m

Letting DateCounties Region

Contract IDProject No.DBE Goals/Plan PriceWork or CaResident EA check ma

_ More than_ Between $_ Between $_ Between $_ Between $_ Less than

2-115

d special pro

applicable

ble

nt Engineer

f applicable

project the chedule to

n sheets or days prior to

200 and 40days prior

r 400 plan sdays prior

must contain

e

D

/Guaranty

alendar Dayngineer ark by the c $20,000,0

$10,000,000$5,000,000 $1,500,000 $600,000 a$600,000

Proj

ovisions

r (e-mail)

e

Printing anbe followed

less): o advertisem

00 plan sheto advertise

sheets): to advertise

n the follow

ys

correct one 00 0 and $20,0and $10,00and $5,000nd $1,500,0

oject Develo

nd Visual Cd (additiona

ment.

eets): ement.

ement

wing informa

of the follo

000,000 00,000 0,000 000

opment Pro

Communicatal considera

ation:

wing:

ocess

tions ation

Page 119: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

U

A

The quaconferenit is man

2.33.01

Authorizdistributthan 9:0holiday,

A samplthe CDO

http://ww

(You ma

The sam

2.33.02

The Resshould p

Developme

Use the folloNumber of O

MT

23

Add $10 for ev

antities shounce is schendatory.

Authoriz

zation letterion list in O

00 a.m. on tthey must

le advertiseOT website

ww.colorado

ay need to s

mple format

Bid Ope

sident Enginprovide the

ent Process

owing to deOriginal Plan

TCE Projects 1 – 150

151 – 250 251 – 350 351 – 450

very additiona

uld read “Mduled, inclu

zation Lett

rs must be sOutlook. All the Mondaybe received

ement authoat:

odot.info/bu

scroll down

t is to be us

ening Defe

neer shouldnew bid op

s

termine then Sheets

l 100 plan she

MAJOR ITEMude the loca

ters

sent to the advertisemy morning bd by 9:00 a

orization let

usiness/bid

n to find the

sed on all le

rral

d notify the pening date

2-116

e Plan Price

eets, or portio

MS” as oppation, time,

“*HQ-CU/Cment authoribefore the aa.m. the pre

tter and pro

ding

“Advertise

etters autho

Award Offie and indica

e: Plan Price $10.00 $20.00 $30.00 $40.00 $50.00

on thereof, ove

posed to “B and date,

Constructionizations muadvertisemeevious Frida

ocedural ins

ment Lette

orizing proje

icer of a deate if there i

Ja

er 450.

BID ITEMS.”and clearly

n Contractsust be receient date. Ifay.

structions a

r Instruction

ect advertis

eferral via eis a revision

anuary 31, 2

” If a pre-biy state whet

s Unit” ved no latef Monday is

are located

ns” link.)

sements.

mail. The en to follow.

2013

d ther

er s a

on

email

Page 120: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.34

The folloAdvertis

All revisiCenter (submittewill incluthe revisThese st

AddressThe Revreceipt othe botto

FInlisDMRRSC

PR

The “SuNo.____distributiinformat

y 31, 2013

PS&E

owing proceement.

ion packageVCC) at lea

ed later will ude the revission letter mteps must b

s the actual vision No. sof the revisioom of the le

FHWA, Colondividuals list

Duran/StillerM. Pyle, Bid R. LiljenbergR. Ott, ConsS. Yu, Cost Central Files

Project ManaResident En

bject” for th

__" All the sion list calletion only.

AlBiJaB.TrRi

RegioProgr

REVISIO

edure and fo

es are to beast 10 daysresult in a dsion letter a

must be madbe followed

revision lethould be lison in their s

etter for hard

o. F/A Divissted in the

r, Printing CPlans

g, Business str. ContractEstimating s

ager gineer

he e-mail costandard noed "HQ-CU/

lvaro Duranid Plans ack Stiller . Rasmusseracie Bentoichard Ott

on Transp. Dram Engine

ONS UN

ormat are to

e submitted prior to thedeferred bidand all revisde concurreto ensure t

ter to “All Hsted under “submitted bd copy distr

ion Operatimost curren

Center

Programsts

over letter shon-regional /Constructio

n

en n

= *H

Dir. er

2-117

NDER AD

o be followe

to the Prine scheduledd opening. Tsed sheets. ently with orthat key pro

Holders of P“Subject.” (Aid proposalribution:

ions Engr. (nt *CU_HQ

hould note recipients h

on". The cu

HQ-CU/Con

Proj

DVERTIS

ed for all pla

ting and Visd bid openinThe packagAdditionally

r prior to theocesses are

Plans for ProAll bidders ls.) Include

(if FHWA hQ/constructio

"Revision Nhave been current name

nstruction

oject Develo

SEMENT

an Revision

sual Commng date. Rege to the Pry, an e-maie submittal e initiated.

oject No. __are to acknthe followin

as project oon Contract

No. _____ Pconsolidatees in this list

opment Pro

T

ns Under

munications evisions inting Centel distributioto the VCC

__________nowledge ng recipient

oversight) ts distributio

Project ed in a t are shown

ocess

er n of

C.

__.”

ts at

on

n for

Page 121: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

All non-rdistributias the R The latehttp://ww The revi

1. RLefo

abcdef.gh

2. BIntha

3. PLp

4. SL

5. PLreth

6. DEmpte

7. FIfre

Developme

regional disions are ba

Region direc

est version oww.colorado

sion letter s

Reasons forist the reasnhance newor each rev

. Plan or s

. commen

. biddable

. addition

. addition new Dav. funding a. other (ex

Bid Proposandicate whehere are, stmendment

Project Specist page nurovision.

Standard Spist titles, da

Plan Sheetsist sheet nuevised whehat the Titl

Date Explicitly stamake vague

roject has bext).

FHWA Apprf the projectevision.

ent Process

stribution inssed on a co

cts.

of the revisodot.info/bu

shall include

r Revision. sons for thewly requireision. There

specificationcement or quantity chor deletion or deletion

vis Bacon wavailability, xplain)

al ether there tate that themust be us

cial Provisioumbers with

pecial Proviates, numbe

s umbers withen any plale Sheet ha

ate the datee statementbeen deferr

roval t has FHWA

s

structions monsensus ta

ion letter causiness/bidd

e the follow

e need to red reportinge are eight

n correctioncompletionhange, of specs, of plan she

wage rates,

are any che revised scsed (see ex

ons h titles and

isions er of pages

h description revision as been rev

e of the bid ts, such as,red, call att

A oversight

2-118

must be folloaken from a

an be foundding.

wing in the o

evise the proneeds. Chpotential ca

n, of work tim

eets,

anges to thchedule (foxample).

brief descri

s, and brief

on of revisiooccurs. Th

vised.

opening an “At the timention to th

t, identify F

owed exactall the region

d on CDOT

order specifi

oject plans heck as manategories fr

me change,

he bid propor those not

iptions for e

description

on. The Tithe Residen

nd whether me previoushe revised E

HWA engin

Ja

ly. The intrans and may

T’s website

ied:

and specsny reasonsrom which t

osal (or schusing EBS

each revise

n of change

le Sheet mnt Enginee

it has chanly advertiseEBS file (se

neer who ap

anuary 31, 2

a-regional y be modifie

at:

s in order tos as may apto choose:

hedule). If S) or EBS

ed special

e.

must alwayser must ve

nged. Do noed.” If the ee example

pproved the

2013

ed

o pply

s be rify

ot

e

e

Page 122: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

8. AInas

IMPORTa revisiowith the creates

NOTE: Ithe Bid PConditiothese fo

The Resspecificaprocess(303) 75

Date: From: (Dept: Tel No: TO: Subject Please f Distribu

Which mshould bTO:

y 31, 2013

Authorizationdicate whouthorized bignature is

TANT: If sion. In the pa

intent to dedistortions

If a revisionPlans Room

ons Assuranrms to all n

sident Enginations caref, please co

57-9006.

(Automatica

See Below

t: Revision

find attache

ution:

may includebe used oveBid Plans @

n o is authorizby someonenot require

ignificant plast, there heal with thein the bidd

n adds Disam must be ince, “Note onew sets tha

neer shouldfully prior tontact Richa

EXAMPL

ally filled in

w

No. 1 HB

ed the follow

*

e the followier the list be@DHQ

zing the reve at or aboved.

lan quantityhave been se errors “in ting process

advantagedinstructed ton DBE %”at are sold.

d attempt too advertisemard Ott in C

LE OF REV

by Email)

9999-999

wing revisio

HQ-CU/Co

ng individuelow.

2-119

vision and tve the Profe

y errors becsome incidethe field.” Ts that canno

Business Eo include th” with the pa

o minimize ment. If the

Contracts an

VISION REQ

on letter for

nstruction c|

als but the

Proj

the Region.essional En

come knowents when tThis is not pot be admin

Enterprise he Form 71ackage sen

revisions bere are any nd Market A

QUEST E-M

r Project ___

contracts

distribution

oject Develo

. All revisiongineer II le

wn, it is manthe Region permissible nistered fai

participatio14, Underutnt to plan ho

by reviewingquestions

Analysis at

MAIL:

________.

n list is kept

opment Pro

ns must beevel. A

ndatory to iswent forwabecause it rly.

on to a projetilized DBE olders and

g all plans aon this

t up to date

ocess

e

ssue ard

ect, Bid add

and

e and

Page 123: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

TO: TO: TO: TO: TO: CC: CC:

The late http://ww

Developme

Duran, AlvStiller, JacOtt, RicharRasmusseBenton, Tr

RTD Program E

est version o

ww.colorado

ent Process

varo @DHQk @DHQ rd @DHQ en, Bernie @racie @DHQ

Engineer

of the revis

odot.info/bu

s

Q

@DHQ Q

ion letter ca

usiness/bid

2-120

an be found

ding .

d on CDOT

Ja

T’s website

anuary 31, 2

at:

2013

Page 124: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.35

Occasiobidders prescrib

CDOT cre-adverTranspolow bid gdoes noby the Tproject.

If a projeEngineeEngineeBranch t

The Engexcessiv

Bids on

1. Ltha

2. LO

3. FE

4. A

If all bidssteps to Exampleconditionappropri

y 31, 2013

RE-AD

onally projecall of whomed by statu

can reject brtise the pro

ortation Comgreater that limit the D

Transportati

ect’s low bider’s Estimatering Estimato determin

gineering Eve variation

a project m

ess than thhe engineerccordance

ack of fundOffice for res

Failure of bidEnterprise re

A negative f

s are rejectremedy the

es of such rns, modifyiniate.

DVERTIS

cts need to m exceededute, or there

ids for any oject at a lammission. An 15 percen

Departmenton Commis

d is greaterte,” it will beates and Mne the reaso

stimates anns from the

may be rejec

hree bids rer’s estimatewith CRS 4

ding to awarsolution of f

dders to saequirement

finding on th

ted, the Rege causes foremedies ang the scop

SEMENT

be re-adved the enginee were no a

reasonableater date or A cost justifnt over or 2’s authorityssion, the C

r than 115 pe discussedarket Analyon for the d

nd Market Aengineer’s

cted for any

eceived withe (greater th43-1-113(16

rd the projefunding sho

atisfactorily ts.

he cost just

gion may reor not receivre changingpe of the wo

2-121

T

ertised becaeers estimaacceptable b

e cause. Threquest ad

fication is re20 percent uy to reject bChief Engin

percent or ld with the aysis Unit in difference.

Analysis Unestimates.

y of severa

h the low bihan 125 pe6).

ect at the amortfall.

respond to

tification rev

e-advertiseving acceptg completioork, and rev

Proj

ause there ate by morebids.

he Residentdditional funequired to aunder the eids. If additeer can au

less than 80apparent low

the Contra

nit will docu

l reasons in

d being greercent on pr

mount bid.

o the Disadv

view or low

the projecttable bids pon time spevising the e

oject Develo

were less te than that w

t Engineer nds from thaward any pestimate. Thtional fundsthorize awa

0 percent ow bidder ancts and Ma

ument the re

ncluding bu

eater than 1rojects unde

Contact Re

vantaged B

w bid analys

t. The Regiprior to re-aecifications engineer's e

opment Pro

than three which is

can requese project withhis requirems are approvard of the

of the “Detand the arket Analys

easons for

ut not limited

110 percener $1 millio

egion Busin

Business

sis.

ion should tadvertisemeor working

estimate wh

ocess

st to

h a ment ved

ailed

sis

the

d to:

t of n) in

ness

take ent.

hen

Page 125: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D

Addition1. 23 P2. CDO

Developme

nal Refereart CFR 63

OT Procedu

ent Process

nces: 35A, Contraral Directiv

s

act Processe 303.01, A

2-122

s Award of Coontract – Ju

Ja

ustification

anuary 31, 2

of Bids

2013

Page 126: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

January

2.36

When a Preliminfor a bud

If the ReDirector process

2.36.01

Step one“intent” tsubmitte

Prior to the EngiMarket Abecomebidder, sbidder. would resecond region wseparateThis anaquantitieestimateEEMA dis reaso

2.36.02

Step twofunds to

Both subshould c

y 31, 2013

RETAI

bid results nary Financdget action

egion wantsshall requefor the reg

Step On

e is to sendto request ted to the Ch

the submisineering EsAnalysis Brs availablesecond lowIf EEMA de

esult in highor third low

will also anae contract, alysis will aes, estimateed unit pricedoes not conable, EEM

Step Tw

o is to subm the Chief E

bmissions scontain the

INING B

in surplus ial Stateme.

s to retain aest retentioion has two

ne

d an e-mail to retain all hief Engine

sion of the stimates anranch analy. The spre

w bidder, anetermines ther costs to

w bidder, thealyze costs including also be submed unit pricees to compncur that th

MA will notif

wo

mit a formalEngineer’s

should be sfunds reten

BID SURP

funds on thent and will

all or part ofn of surpluso steps.

to the Chieor part of ter by noon

email to thd Market A

yzing the pradsheet wid third low hat includin

o CDOT thae additionalto performdditional mmitted to EEes, and prolete the wohe anticipatfy the regio

letter requoffice by th

sent via emntion reque

2-123

PLUS FU

he project, tsubmit a re

f the bid sus funds afte

ef Engineerhe bid surpthe day fol

e CE the reAnalysis Uniroposed cosll list all itembidder; and

ng the additan if it were l work will nthe additioobilization,

EMA in a spoduct extensrk under a ed cost savn.

esting to rehe Monday

ail to the Cst letter and

Proj

UNDS

the Bids anequest to th

rplus, the Rer bid open

r (CE) with plus funds. llowing bid

egion will suit (EEMA) osts of the wms of work;d the produtional work included in

not be addeonal work as

traffic contpreadsheetsions. Theseparate covings to add

etain all or pfollowing b

Chief Engined a copy of

oject Develo

nd Awards Uhe Region B

Region Traning day. Th

notification This emailopening.

ubmit a sprof the Contrwork to be a; the unit pr

uct extensioin the low

n the bids fred to the Cos though it wtrol, indirect format cone EEMA maontract as nd the work

part of the bid opening.

eer. The sef the first em

opment Pro

Unit will issBusiness O

nsportationhe request

of the regiol must be

readsheet tracts and added if funrices of the

ons for eachbidder's bidrom either tontract. Thwere a

ct costs, etcntaining ay adjust thenecessary. to the Cont

bid surplus .

econd emamail with ini

ocess

ue a Office

on's

o

nding low

h d the he

c.

e If

tract

il itial

Page 127: SECTION 2 PROJECT DEVELOPMENT PROCESS · 2.01 The Des prelimin with the project p budgetin meeting created The proc standard project. 2.01.01 Form 10 docume track fin 2.01.02 The

Project D approvaemail: OEric EhrAward aAnalysis

The form

1. Ts

2. A

3. Tp

4. J

5. E

After recAccountcategorybe the namount Indirect

The Projsubmit it

Developme

al and amouOffice of Finrbar, and Daand Accouns (Richard O

mal letter sh

Time involveeparate con

Anticipated c

Time remaineriod.

ustification

Environmen

ceipt of the ting Unit wily 0200 and net amount

is calculatenumber).

ject Awardst to the Agr

ent Process

unt of surplunancial Manarrell Johns

nting Unit (AOtt), and th

hould conta

ed in prepantract.

competition

ning and the

of work tha

tal clearanc

signed lettell add a CMitem numbof funds re

ed by dividi

s and Accoreements U

s

us. The folnagement &son), OfficeAbeba Yehde Region B

ain the follow

ring, letting

n for the wo

e critical wo

at was omit

ces for the

er from theMO line in thber 700-700tained afterng the amo

ounting UnitUnit for proje

2-124

lowing Unit& Budget, Pe of Financidego, Tram

Business Of

wing justific

g, awarding

ork.

ork that mu

tted becaus

extra work,

Chief Engihe Trns*por002. The ar allowance

ount retaine

t will generaect award.

ts are to beProject Budal Manage

m Ngo), Conffice Manag

cation at a

and issuin

st be done

se of fundin

, if any.

ineer, the Prt worksheemount to in

e for CE anded by 1.239

ate a final f

Ja

e copied ondget Unit (Pment & Budntracts and ger.

minimum:

g a notice t

before win

ng constrain

Project Awaet bid projecnput in the Cd Indirect C

95 (or the cu

financial sta

anuary 31, 2

the secondPam Thomsdget - ProjeMarket

to proceed

nter shut-do

nts.

ards and ct under CMO line wCosts. The urrent CE &

atement and

2013

d son, ect

for a

own

will net

&

d