Summit Anchor Co. January 15, 2019 Suspended maintenance and fall restraint equipment 11014-1 SECTION 11014 SUSPENDED ACCESS SUPPORT EQUIPMENT AND FALL RESTRAINT EQUIPMENT PART 1: GENERAL 1.1 SUMMARY SECTION INCLUDES A. Suspended access support equipment including 1. System design 2. Tieback anchors 3. Suspension line anchors 4. Fall arrest anchors 5. Rigging sleeves 6. Davits B. Horizontal fall restraint cable system including 1. System design 2. Cable 3. Intermediate anchors 4. Terminating anchors 5. Energy absorber 1.2 RELATED SECTIONS A. Section 03300 Cast-In-Place Concrete B. Section 05120 Structural Steel C. Section 05500 Metal Fabrications D. Section 07500 Membrane Roofing E. Section 07620 Sheet Metal Flashing and Trim F. Section 07920 Joint Sealants 1.3 REFERENCES A. Publications listed herein are part of this specification to extent referenced. 1. Occupational Safety and Health Standard a. IWCA I-14.1-2001 Window Cleaning Safety Standard b. 1910 Subpart D (Walking and Working Surfaces) c. 1910.66 Appendix C (Personal Fall Arrest) d. 1910.66 Subpart F (Powered Platforms) 2. American Institute of Steel Construction (AISC) a. AISC Publication Load and Resistance Factor Design for Structural Steel Buildings b. AISC Specifications for the Design of Cold-Formed Steel Structural Members 3. American Society for Testing and Materials (ASTM) a. ASTM A36 Specification for Structural Steel b. ASTM A123 Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Hardware c. ASTM A500 Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes d. ASTM A780 Practice for Repair of Damaged and Uncoated Areas of Hot- Dip Galvanized Coatings e. ASTM B209-04 Specification for Aluminum and Aluminum-Alloy Sheet and Plate

SECTION 11014 SUSPENDED ACCESS SUPPORT EQUIPMENT …...Jan 15, 2019  · ASTM A123 Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Hardware c. ASTM A500 Specification

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SECTION 11014 SUSPENDED ACCESS SUPPORT EQUIPMENT …...Jan 15, 2019  · ASTM A123 Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Hardware c. ASTM A500 Specification

Summit Anchor Co. January 15, 2019

Suspended maintenance and fall restraint equipment 11014-1

SECTION 11014

SUSPENDED ACCESS SUPPORT EQUIPMENT AND FALL RESTRAINT EQUIPMENT PART 1: GENERAL

1.1 SUMMARY SECTION INCLUDES

A. Suspended access support equipment including 1. System design 2. Tieback anchors 3. Suspension line anchors 4. Fall arrest anchors 5. Rigging sleeves 6. Davits

B. Horizontal fall restraint cable system including 1. System design 2. Cable 3. Intermediate anchors 4. Terminating anchors 5. Energy absorber

1.2 RELATED SECTIONS A. Section 03300 Cast-In-Place Concrete B. Section 05120 Structural Steel C. Section 05500 Metal Fabrications D. Section 07500 Membrane Roofing E. Section 07620 Sheet Metal Flashing and Trim F. Section 07920 Joint Sealants

1.3 REFERENCES

A. Publications listed herein are part of this specification to extent referenced.

1. Occupational Safety and Health Standard a. IWCA I-14.1-2001 Window Cleaning Safety Standard b. 1910 Subpart D (Walking and Working Surfaces) c. 1910.66 Appendix C (Personal Fall Arrest) d. 1910.66 Subpart F (Powered Platforms)

2. American Institute of Steel Construction (AISC)

a. AISC Publication Load and Resistance Factor Design for Structural Steel Buildings

b. AISC Specifications for the Design of Cold-Formed Steel Structural Members

3. American Society for Testing and Materials (ASTM)

a. ASTM A36 Specification for Structural Steel b. ASTM A123 Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron

and Steel Hardware c. ASTM A500 Specification for Cold-Formed Welded and Seamless Carbon

Steel Structural Tubing in Rounds and Shapes d. ASTM A780 Practice for Repair of Damaged and Uncoated Areas of Hot-

Dip Galvanized Coatings e. ASTM B209-04 Specification for Aluminum and Aluminum-Alloy Sheet

and Plate

Page 2: SECTION 11014 SUSPENDED ACCESS SUPPORT EQUIPMENT …...Jan 15, 2019  · ASTM A123 Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Hardware c. ASTM A500 Specification

Summit Anchor Co. January 15, 2019

Suspended maintenance and fall restraint equipment 11014-2

f. ASTM B221-02 Specification for Aluminum and Aluminum-Alloy Extruded Bars, Wire, Shapes, and Tubes

g. ASTM B308/B308M-02 Standard Specification for Aluminum-Alloy 6061-T6 Standard Structural Profiles

h. ASTM A193 Specification for Alloy-Steel and Stainless-Steel Bolting Materials.

I. ASTM 436 Specification for Hardened Steel Washers

4. American Welding Society (AWS) a. AWS D1.1 Structural Welding Code – Steel b. AWS D1.2 Structural Welding Code – Aluminum

1.4 SYSTEM DESCRIPTION

A. Anchorage Design Requirements 1. Safety anchor system design shall comply with current OSHA, ANSI, and local

regulations pertaining to window cleaning and fall protection in accordance with sections 1.1, 1.2, and 1.3.

2. Anchor system shall provide independent fall arrest anchorages in addition to suspension line anchorages for each descent location as required by OSHA and ANSI requirements. See diagram at end of this document.

3. System shall be designed to be compatible with current window cleaning industry standard equipment (examples: rope descent systems, boatswain chairs, swing stages, transportable suspension devises).

4. Structural design requirements of anchorages and tie-back a. Anchorage shall be capable of sustaining a minimum ultimate load of

5,000 lbs., in any direction the load may be applied, without fracture or failure.

b. Anchorage shall be capable of sustaining a minimum proof load of 2,500 lbs., in any direction the load may be applied, without permanent deformation or damage to anchorage.

c. Anchorages shall be designed with a minimum 1,250 lb. working load, in any direction the load may be applied.

e. Parapet or guardrails subject to direct loading by workers’ ropes, possibly cables, shall be designed to withstand such loading (typically 1,800 lbs) without damage to either the structure of the rigging component in contact with it.

5. Locate primary support and fall arrest anchors in conjunction with areas on façade of building needing to be serviced. Consideration shall be given to the type of suspension equipment that will be used at the building and conditions such as: workers’ reach, rigging methods, and roof edge conditions. Anchorages shall be unobstructed and located behind and in line with equipment or portion of building they are intended to service. Anchors shall not be located within 6 feet of the roof edge unless fall protection is provided to access those areas safely. (See illustrations on page 12: “Anchor Spacing Diagram” and “Outside Corner Layout Reference Diagram”).

Note: This specification does not address powered platform design or permanently installed roof mounted powered equipment. The IWCA I-14.1-2001 Window Cleaning Safety Standard states: “Rope descents shall not exceed 300 feet (91m) above grade unless the windows cannot be safely and practicably accessed by other means” (Section 5.7.12). Additionally, The ASME A120 Safety Requirements for Powered Platforms for Building Maintenance Standard should be consulted when designing such equipment.

B. Davit Design Requirements and Rigging Sleeve 1. Locate rigging sleeves and davits to accommodate suspended maintenance

during swing stage operations. Typical spacing of davits shall be column lines or

Page 3: SECTION 11014 SUSPENDED ACCESS SUPPORT EQUIPMENT …...Jan 15, 2019  · ASTM A123 Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Hardware c. ASTM A500 Specification

Summit Anchor Co. January 15, 2019

Suspended maintenance and fall restraint equipment 11014-3

every 20 feet, on center, where possible. Typical spacing of rigging sleeves is 6 feet 8 inches, on center. Placement of supports should allow cables suspending powered equipment to hang either parallel and in plane or slightly angulated with the building façade as required by users. (See illustrations on page 11: “Suggested Rigging Sleeve Layout” and “Suggested Davit Layout”). Consideration should be given to operating other equipment that may be required for access.

2. Locate independent anchorages for personal fall protection when using rigging sleeves or davits in accordance with section 1.4(A) Anchorage Design Requirements (See illustrations on page 11: “Suggested Rigging Sleeve Layout” and “Suggested Davit Layout”).

3. Davits shall be capable of supporting an ultimate load of not less than 4 times the rated load. The rated load of the davit shall be based on the swing stage hoist and powered platform load capacity, which is frequently 1,000 lbs or more.

4. Manufacture shall provide engineer’s calculations and test report to verify that davit will support load requirements.

5. Outreach of portable davit boom shall not exceed 8 foot 6 six inches. 6. Rigging sleeves shall meet the loading requirements in Section 1.4(A) Anchorage

Design Requirements.

C. Horizontal fall restraint cable system 1. The Horizontal fall restraint cable system (HFRCS) shall allow up to two users to

traverse the length of the cable span, each using a single lanyard for traveling along the cable spans. Turns in the HFRCS will require a double lanyard. The HFRCS shall be designed for two users using an energy absorbing lanyard, which limits the force applied to the HFRCS to 900 lb. or less.

2. HFRCS shall spans shall not exceed 180 feet in length. 3. The horizontal line shall be constructed of 3/8” x 7 x 19 stainless steel, construction

grade, with breaking strength of not less than 12,000 lbs. 4. Horizontal lines shall be permanently attached to anchors with 2 non-corrosive

permanently swaged fittings swaged to manufacturer's specifications at each termination. Swages shall be verified not to loosen under load. Capacity of one swage shall exceed strength of wire rope.

5. Horizontal lines must be attached to anchorages designed to be capable of supporting a minimum 5,000 lb. However, the HFRCS cable and anchorages shall be independent of anchorages used for suspension in accordance with Section 1.4(A) Anchorage Design Requirements.

1.5 SUBMITTALS

A. Product Data: Manufacturer's data sheets on each product proposed 1. Test report certified by a professional engineer 2. General product data 3. Detailed drawings of equipment proposed 4. Installation instructions

B. Shop Drawings

1. Submit scaled shop drawings showing location plan of all support equipment and sections detailing all parts and accessories.

2. Clearly specify equipment dimensions, materials, fabrication details, hardware, and installation instructions.

3. Include notes with guidelines of proper use of system. 4. Equipment location plan to include identification number next to each piece of

equipment, i.e. (anchors, davits, and rigging sleeves.) that are permanently affixed to a structure.

5. Field welds shall be indicated on equipment details using AWS symbols and showing length and size. Auxiliary views shall be shown to clarify welding as required.

Page 4: SECTION 11014 SUSPENDED ACCESS SUPPORT EQUIPMENT …...Jan 15, 2019  · ASTM A123 Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Hardware c. ASTM A500 Specification

Summit Anchor Co. January 15, 2019

Suspended maintenance and fall restraint equipment 11014-4

6. Shop drawings shall be prepared under supervision of a registered professional engineer and shall bear engineer’s seal and signature. Professional engineer shall be licensed in jurisdiction where project is located. Include P.E. certified report of tested equipment.

C. Quality Assurance Submittal Certificates

1. Provide documentation verifying company’s amount of experience and successful performance in design, fabrication, and installation of permanent window washing equipment.

2. Submit listing of company’s installations representing similar scope and complexity to project requirements for previous 10 years. List shall include information as follows: a. Project name and address b. Name of owner c. Name of contractor d. Name of architect (if applicable) e. Date of completion

3. Provide documentation verifying that installers have been trained by the manufacturer and are competent.

D. Contract Close-out Submittals 1. Operation and Maintenance

a. Provide a safety inspection logbook for yearly inspections. Log book shall include a certification of compliance letter. The certification of compliance shall state that access system follows current OSHA regulations and IWCA I-14.1-2001 Window Cleaning Safety Standard.

2. Project Record Document Data a. Record anchor locations and details. b. Submit 2 copies of a reduced, plastic laminated Project Record Drawing

showing as-installed anchor locations, details, and instructional text in English (and Spanish upon request). Post one copy on interior of each roof door or adjacent to exit on roof; owner shall establish exact location.

c. Submit a letter of certification by a registered professional engineer licensed in jurisdiction where project is located verifying that installed anchors and system are in compliance with OSHA and ANSI requirements as specified. Each piece of access equipment dedicated to the building shall be tested on site under the supervision of a P.E. in accordance with IWCA I-14.1-2001 Window Cleaning Safety and Summit Anchor Co. test procedures. See Summit Anchor Co. test procedure document.

1.6 QUALITY ASSURANCE

A. Qualifications 1. Provide products from a company specializing in design, fabrication, and

installation of permanent suspended access equipment with a minimum of 5 years documented experience. Companies like miscellaneous metal fabricators not normally engaged in design and fabrications of suspended access equipment are not acceptable.

2. Manufacturer and installer shall have specific liability insurance (products and completed operations) in an amount not less than $5,000,000.

3. Installer(s) shall be trained or qualified by manufacturer in installation techniques and procedures of permanent suspended access equipment.

B. Regulatory Requirements

1. Comply with Occupational Health and Safety Standards: a. IWCA I-14.1-2001 Window Cleaning Safety Standard b. 1910 Subpart D (Walking and Working Surfaces)

Page 5: SECTION 11014 SUSPENDED ACCESS SUPPORT EQUIPMENT …...Jan 15, 2019  · ASTM A123 Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Hardware c. ASTM A500 Specification

Summit Anchor Co. January 15, 2019

Suspended maintenance and fall restraint equipment 11014-5

c. 1910.66 Appendix C (Personal Fall Arrest) d. 1910.66 Subpart F (Powered Platforms)

2. Welding shall comply with AWS D1.1 and shall be performed by welders qualified

to work in jurisdiction where project is located. 3. Comply with AISC publications:

a. Load and Resistance Factor Design for Structural Steel Buildings b. Specifications for the Design of Cold-Formed Steel Structural Members

1.7 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials in original unopened packaging.

B. Storage and Protection 1. Store materials in a protected area away from construction activities. 2. Clean bolts that have become dirty before installing. 3. Do not install damaged materials, removing them from site.

1.8 SEQUENCING AND COORDINATION

A. General contractor is responsible for coordinating the schedule so as not to conflict with other trades.

B. Manufacturer to provide detailed installation instructions and directions for installation of embedded items, welded items, and through-bolted items, etc.

C. Manufacturer to provide installation assistance during installation of the equipment. However, the responsibility of the installation rest with the general contractor unless equipment is installed and certified by the manufacturer.

PART 2: PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS & INSTALLERS

A. Suspended Access and Fall Restraint System 1. Summit Anchor Company, Inc.

Tel: 800-372-1098 Fax: 301-620-9819 Web Site: www.summitanchor.com

B. Equivalent or superior materials and/or system substitutions shall be submitted to architect

and or owner of record for review in compliance with substitution procedures in Section 01630 of this Project Manual.

2.2 STRUCTURAL COMPONENTS’ MATERIALS

A. Exposed Structural Components Finish: Galvanized Mild Steel or Stainless Steel 1. Steel: ASTM A572 GR 50 2. Steel: ASTM A A36 3. Galvanizing: ASTM A123 4. Stainless Steel; 304 ASTM A 193 Grade B8, Class 2 5. Aluminum; 6061-T6 Alloy B. Yield Strength

1. Base Plates and Bottom Plates, High Strength Steel: 50 ksi minimum 2. Other Sections: 36 ksi minimum

Page 6: SECTION 11014 SUSPENDED ACCESS SUPPORT EQUIPMENT …...Jan 15, 2019  · ASTM A123 Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Hardware c. ASTM A500 Specification

Summit Anchor Co. January 15, 2019

Suspended maintenance and fall restraint equipment 11014-6

C. Non-Structural Components 1. Aluminum; 6061-T6 Alloy 2. Alloys shall conform to requirements published in AA Aluminum Standards. 3. Sheet and Plate: ASTM B209 4. Extruded Bars, Rods, Shapes, and Tubes: ASTM B221

D. Cold-Rolled Sections

1. ASTM A500 2. Yield Strength: 46 ksi minimum 3. Tensile Strength: 62 ksi minimum

E. Nuts, Bolts, Davit Pins, and Washers 1. Stainless Steel; 304 ASTM A 193 Grade B8 or F593C 2. Galvanized Flat Washers ASTM F-436 or 18 -8 Stainless Steel F. Anchor Bolts (for securing base plate)

1. Metal: Stainless Steel, 304 Stainless Steel; ASTM A 193 Grade 8, B8 2. Size: 5/8 in. diameter minimum

2.3 MANUFACTURED UNITS

A. Anchor 1. Capable of withstanding 5000 lbs. (2268kg) in any direction without permanent

deformation. 2. Anchor eye size: Forge Eye with 2 ¼ in (60 mm) minimum eye opening. 3. Anchor eye metals:

1. Forged, 1035 quenched and tempered per ASTM 576-90-b, with 72ksi minimum yield strength and 240-280 BHN.

4. Anchor tube height: not less than 4 in. above the finished roof.

B. Davits 1. Pedestal to mate with davit socket secured with pins with steel safety ring snap-

pins. 2. Davit socket; with two stainless steel hinge pins and self-locking ring snap-pins. 3. Pier Height: generally, not less than 8 in. above finished roof surface to allow

proper fit up with adaptor. 4. Davit arm assembly shall weigh less than 300 lb. total weight, easily broken down

into components weighing less than 80 lb. for ease of transport to each davit pedestal.

C. Rigging Sleeves

1. Assembled complete with cap tethered to cross bar. 2. Length of bottom of rigging sleeve as required to clear under side of façade by a

minimum two inches. 3. Not less than 6” above the finished roof.

D. Cable system 1. Install complete with inline shock absorber to limit load to 2,250 lbs. or less at

terminating anchors. 2 Intermediate pass through cable restraint anchors to allow up to two workers to

traverse straight cable runs with single lanyard without detachment off lanyard. E. Flashing with one E.P.D.M. gasket seal top and base

1. Seamless Spun Aluminum Flashing: ASTM B221; Type 6061-T6 alloy 2. Stainless Steel: 304

Page 7: SECTION 11014 SUSPENDED ACCESS SUPPORT EQUIPMENT …...Jan 15, 2019  · ASTM A123 Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Hardware c. ASTM A500 Specification

Summit Anchor Co. January 15, 2019

Suspended maintenance and fall restraint equipment 11014-7

F. Cast in place equipment

1. A minimum of two cast-in-place steel studs are required for concrete embedded anchors.

G. *Hilti HDA Undercut Anchoring System

1. HAD-T Undercut Anchor (Through-Set Type) 2. Anchor size and embedment depth: As needed to suit loads imposed by Summit

Anchor equipment. Consult project engineer to determine proper anchoring system based on concrete condition, psi, and thickness before ordering Summit equipment.

3. Installed per Hilti installation instructions.

H. *Hilti HIT-RE 500-SD V3 Epoxy Adhesive Anchor System 1. Anchor size and embedment depth: As needed, but not less than 5/8” diameter

threaded rods, to suit loads imposed by Summit Anchor equipment. Consult project engineer to determine proper anchoring system based on concrete condition, psi, edge distance, and thickness before ordering Summit equipment.

2. Installed per Hilti installation instructions. 3. Installed by ACI accredited installers only. 4. Each installed anchor assembly shall be load tested to 50 percent of its rated

capacity. Test results shall be certified a P.E. with experience in suspended access equipment.

Note: Fasteners that are equivalent, superior, or other suitable fasteners may be considered for substitutions. Proposed substitutions shall be submitted to architect and or owner of record for review in compliance with substitution procedures in Section 01630 of this Project Manual.

2.4 FABRICATION

A. Fabricate work true to dimension, square, plumb, level, and free from distortion or defects detrimental to appearance and performance.

B. Grind off surplus welding material to ensure exposed surfaces are smooth so as not to

abrade workers’ ropes.

C. Welding shall be in accordance with the AWS Structural Welding Code D1.1/D1.

PART 3: EXECUTION

3.1 EXAMINATION

A. Site Verification of Conditions 1. Examine areas and conditions under which permanent window washing

equipment shall be installed. 2. Report to general contractor any conditions that deviate from shop drawings or any

defects in workmanship that would cause an unsafe installation. This report shall be verified in writing to the general contractor and any other responsible party.

3. Correct conditions detrimental to timely and proper execution of work. 4. Do not proceed until unsatisfactory conditions have been corrected. 5. Commencement of installation constitutes acceptance of conditions and

responsibility for satisfactory performance by installer. 6. Faults occurring in work of this section due to acceptance of unsatisfactory

conditions shall be corrected at no additional cost to owner.

3.2 INSTALLATION

A. General Requirements

Page 8: SECTION 11014 SUSPENDED ACCESS SUPPORT EQUIPMENT …...Jan 15, 2019  · ASTM A123 Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Hardware c. ASTM A500 Specification

Summit Anchor Co. January 15, 2019

Suspended maintenance and fall restraint equipment 11014-8

1. Install window washing system in compliance with manufacturer’s instructions. Install equipment level, tightly fitted, and flush to adjacent surfaces as needed for proper installation.

2. Coordinate anchor installation with roofing installation to ensure a watertight and warrantable condition of the roofing. Anchors shall be directly flashed into roofing in a manner compatible with roofing system and anchors.

3. When components come into contact with dissimilar metals, surfaces shall be kept from direct contact to prevent corrosion.

4. No wall anchors shall be installed through membrane roofing system without specification detailing such from the architect or water proofing company warranting the roof.

5. Threaded fasteners shall be secured to prevent accidental removal or vandalism by one of the following: a. Deformation of threads with 2/32" stainless steel punch b. Stainless Steel Lock nuts. c. Stainless Steel Tack weld.

B. Instructions for welding access equipment to structure

1. All welders must be certified to American Welding Society (AWS) in accordance with AWS standards.

2. Welding rods used to weld the anchor system to be E70 xx electrodes. 3. Prior to welding anchors to structure, abrasively remove, within one inch of all

welded surfaces, galvanizing, mill, scale, and rust. 4. Immediately after welding, chip away slag to prepare for welding inspector to

inspect welds. 5. An AWS certified welding inspector must inspect and confirm size of all field welds.

Following the inspection, a written report must be supplied to the building owner and/or general contractor. Welded joints shall not be painted until after welding has been completed and the weld accepted.

6. Immediately after an acceptable inspection, paint welded areas with cold-galvanizing compound to protect from corrosion.

7. Structural steel to receive roof or wall anchors shall have a surface wide enough so that base plate can be welded all the way around. For example, anchors equipped with 4½ in. (112.5 mm) base plates would require a minimum 5 in. (137.5 mm) surface to weld to.

C. Adhesive and Undercut Anchor Fasteners

1. Installation of Summit Anchor Co. equipment mounted with epoxy type anchor fasteners shall be performed by ACI accredited installers only.

2. Installation of Summit Anchor Co. equipment mounted with undercut type anchor fasteners shall be performed by Hilti trained installers only.

D. Aluminum Flashing 1. Deck flange shall be flashed in compliance with National Roofing Contractor

Association recommendations.

3.3 REPAIR/RESTORATION

A. Galvanizing Touch-Up 1. Immediately after erection clean field welds and abraded areas. Repair damaged

areas in compliance with ASTM A780.

3.4 FIELD QUALITY CONTROL

A. Inspection and site visits

Page 9: SECTION 11014 SUSPENDED ACCESS SUPPORT EQUIPMENT …...Jan 15, 2019  · ASTM A123 Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Hardware c. ASTM A500 Specification

Summit Anchor Co. January 15, 2019

Suspended maintenance and fall restraint equipment 11014-9

1. Inspections and site visits shall be performed while installation of equipment is in progress under the supervision qualified professional engineer registered in the jurisdiction where the project is located.

2. On site inspection of equipment welded to structure shall be performed by an AWS Certified Welding Inspector verifying, in writing, size and quality of welds. Such an inspection shall be performed on each piece of equipment before roofing material is installed.

3. On site inspection shall be performed on all cast in place items while being tied in with the rebar with sufficient time before concrete is poured to allow to adjustments to embedded items as recommended by inspector.

4. G.C. shall be responsible to schedule above site visits and inspections with sufficient advanced notice given to the inspection company.

B. Site Tests

1. All equipment shall be tested on site in accordance with manufacturer’s recommendations, under the supervision of a professional engineer, and IWCA I-14.1-2001 Window Cleaning Safety Standards, before being placed in service.

2. Equipment shall be tested under the supervision of a professional engineer with experience with suspended maintenance equipment and manufacturers guidelines.

C. Manufacturer shall assist and/or supervise installation of window washing equipment

installed by others when such is included in contracted.

3.5 ADJUSTING

A. Verify that completed work has been installed correctly and products function properly. Make adjustments where needed to ensure satisfactory operation.

B. Complete inspection logbook to certify system for use noting any deviations, changes, or

corrections from original shop drawings. Provide as-built anchor layout plan on 11 in. x 17 in. paper or larger together with annual inspection log book.

Page 10: SECTION 11014 SUSPENDED ACCESS SUPPORT EQUIPMENT …...Jan 15, 2019  · ASTM A123 Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Hardware c. ASTM A500 Specification

Summit Anchor Co. January 15, 2019

Suspended maintenance and fall restraint equipment 11014-10

Page 11: SECTION 11014 SUSPENDED ACCESS SUPPORT EQUIPMENT …...Jan 15, 2019  · ASTM A123 Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Hardware c. ASTM A500 Specification

Summit Anchor Co. January 15, 2019

Suspended maintenance and fall restraint equipment 11014-11

NOTE: LAYOUT OF DAVITS AND RIGGING SLEEVES WILL VARY DEPENDING ON BUILDNG CONFIGURATION AND GEOMMETRY.

END OF SECTION