IPTC New Training Facility Fluid-Applied Flooring IFB 19-07-324 Section 096700 - Page 1 of 7 ETICA GROUP Etica Project # 180024.05 SECTION 096700 - FLUID-APPLIED FLOORING PART 1 GENERAL 1.1 SECTION INCLUDES A. Furnish necessary material, labor, and equipment required to prepare designated areas and install a Decorative Mosaic Coating System. 1.2 RELATED REQUIREMENTS A. Section 016116 - Volatile Organic Compound (VOC) Content Restrictions. B. Section 079200 - Joint Sealants: Sealing joints between fluid-applied flooring and adjacent construction and fixtures. 1.3 REFERENCE STANDARDS A. ANSI/ESD STM7.1 - Standard Test Method for the Protection of Electrostatic Discharge Susceptible Items - Floor Materials - Resistive Characterization of Materials 2013. B. ASTM F710 - Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring 2019. C. ASTM F1869 - Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride 2016a. D. ASTM F2170 - Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes 2018. E. ICRI 310.2R - Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, Polymer Overlays, and Concrete Repair 2013. 1.4 SUBMITTALS A. See Section 013000 - Administrative Requirements, for submittal procedures. B. Product Data: Provide data on specified products, describing physical and performance characteristics; sizes, patterns and colors available. C. Samples: Submit two samples, 6 by 6 inch in size illustrating color and pattern for each floor material for each color specified. D. Concrete Subfloor Test Report: Submit a copy of the moisture and alkalinity (pH) test reports. E. Manufacturer's Installation Instructions: Indicate special procedures. F. Manufacturer's Qualification Statement. G. Applicator's Qualification Statement. H. Maintenance Data: Include maintenance procedures, recommended maintenance materials, procedures for stain removal, repairing surface, and suggested schedule for cleaning.

SECTION 096700 - FLUID-APPLIED FLOORING PART 1 GENERAL

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

IPTC New Training Facility Fluid-Applied Flooring IFB 19-07-324 Section 096700 - Page 1 of 7 

ETICA GROUP Etica Project # 180024.05

SECTION 096700 - FLUID-APPLIED FLOORING

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Furnish necessary material, labor, and equipment required to prepare designatedareas and install a Decorative Mosaic Coating System.

1.2 RELATED REQUIREMENTS

A. Section 016116 - Volatile Organic Compound (VOC) Content Restrictions.

B. Section 079200 - Joint Sealants: Sealing joints between fluid-applied flooring andadjacent construction and fixtures.

1.3 REFERENCE STANDARDS

A. ANSI/ESD STM7.1 - Standard Test Method for the Protection of ElectrostaticDischarge Susceptible Items - Floor Materials - Resistive Characterization ofMaterials 2013.

B. ASTM F710 - Standard Practice for Preparing Concrete Floors to Receive ResilientFlooring 2019.

C. ASTM F1869 - Standard Test Method for Measuring Moisture Vapor Emission Rateof Concrete Subfloor Using Anhydrous Calcium Chloride 2016a.

D. ASTM F2170 - Standard Test Method for Determining Relative Humidity in ConcreteFloor Slabs Using in situ Probes 2018.

E. ICRI 310.2R - Selecting and Specifying Concrete Surface Preparation for Sealers,Coatings, Polymer Overlays, and Concrete Repair 2013.

1.4 SUBMITTALS

A. See Section 013000 - Administrative Requirements, for submittal procedures.

B. Product Data: Provide data on specified products, describing physical andperformance characteristics; sizes, patterns and colors available .

C. Samples: Submit two samples, 6 by 6 inch in size illustrating color and pattern foreach floor material for each color specified.

D. Concrete Subfloor Test Report: Submit a copy of the moisture and alkalinity (pH) testreports.

E. Manufacturer's Installation Instructions: Indicate special procedures.

F. Manufacturer's Qualification Statement.

G. Applicator's Qualification Statement.

H. Maintenance Data: Include maintenance procedures, recommended maintenancematerials, procedures for stain removal, repairing surface, and suggested schedulefor cleaning.

IPTC New Training Facility Fluid-Applied Flooring IFB 19-07-324 Section 096700 - Page 2 of 7 

ETICA GROUP Etica Project # 180024.05

I. Maintenance Materials: Furnish the following for Indianapolis Public TransportationCorporation's use in maintenance of project.

1. See Section 016000 - Product Requirements, for additional provisions.

2. Extra Top Coat Materials: 2 gallons.

1.5 QUALITY ASSURANCE

A. Manufacturer Qualifications: Obtain Decorative Mosaic Coating System materialsfrom a single manufacturer with a minimum of ten (10) years verifiable experienceproviding materials of the type specified in this section.

B. Applicator Qualifications: Company specializing in performing the work of thissection.

1. Minimum 5 years of documented experience .

2. Approved by manufacturer.

1.6 MOCK-UP

A. Construct mock-up(s) of fluid applied flooring to serve as basis for evaluation oftexture and workmanship.

1. Number of Mock-Ups to be Prepared: One.

2. Use same materials and methods for use in the work.

3. Locate where directed.

4. Minimum Size: 48 inches by 48 inches .

B. See Section 014000 - Quality Requirements for additional requirements.

C. Obtain approval of mock-up by Architect / Engineer before proceeding with work.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Primary system materials shall be delivered in the manufacturer's undamaged,unopened containers. Each container shall be clearly marked with the following:

1. Product name(s) and/or Number(s)

2. Manufacturer's name

3. Component designation (A, B, etc.)

4. Product Mix Ratio

5. Health and Safety Information

6. CHEMTREC Emergency Response Information

B. Provide equipment and personnel to handle the materials by methods which preventdamage.

C. The contractor shall promptly inspect direct jobsite material deliveries to assure thatquantities are correct, comply with requirements and are not damaged.

IPTC New Training Facility Fluid-Applied Flooring IFB 19-07-324 Section 096700 - Page 3 of 7 

ETICA GROUP Etica Project # 180024.05

D. The contractor shall be responsible for materials furnished by him, and he shallreplace, at his own expense, such materials that are found to be defective inmanufacture or that have become damaged in transit, handling or storage.

E. Store materials for three days prior to installation in area of installation to achievetemperature stability.

F. Store material(s) in accordance with manufacturer's instructions, with seals andlabels intact and legible. Maintain temperatures within the required range. Do not usematerials which exceed the manufacturer's maximum recommended shelf life.

1.8 FIELD CONDITIONS

A. The contractor shall visit the jobsite prior to the installation of the Decorative MosaicEpoxy Coating System to evaluate substrate condition, including substrate moisturetransmission, quantity and severity of cracking, and the extent of repairs needed.Substrate imperfections should be repaired only after mechanical preparation of thesubstrate. Surface preparation reveals most imperfections requiring repair. Concretesubstrates shall be tested to verify that the moisture vapor transmission of thesubstrate does not exceed the Decorative Mosaic Epoxy Coating Systemmanufacturers' recommendations.  Cost associated with repair, leveling andremediation of the substrate are the responsibility of the provider of the substrate.

B. The contractor should exercise care during surface preparation and systeminstallation to protect surrounding substrates and surfaces, as well as in-placeequipment. The contractor shall prepare the substrate to remove laitance and openthe surface. This shall be achieved by light brush grit blasting. Surface profileachieved shall be similar to medium grit sandpaper and free from bond-inhibitingcontaminants. Costs incurred that are associated with damage from negligence orinadequate protection shall be the sole responsibility of the contractor.

C. Sub floor tolerances are specified in Section 033000 (in accordance with ACI 302).Toleraces shall not exceed 1/8-inch in 10-feet. Each drain in the installation areamust be working and raised or lowered to the actual finished elevation of theDecorative Mosaic Epoxy Coating System.

D. The minimum slab temperature must be conditioned to 60 degrees F beforecommencing installation, during installation, and for at least 72 hours after installationis complete.  The substrate temperature must be at least 5 degrees F above the dewpoint during installation.

E. Maintain lighting at a minimum uniform level of 50 or more foot candles in areaswhere the Decorative Mosaic Epoxy Coating System is being installed. It is therecommendation of the manufacturer that the permanent lighting be in place andworking during the installation.

F. Store materials in area of installation for minimum period of 24 hours prior toinstallation.

IPTC New Training Facility Fluid-Applied Flooring IFB 19-07-324 Section 096700 - Page 4 of 7 

ETICA GROUP Etica Project # 180024.05

G. Maintain ambient temperature required by manufacturer 72 hours prior to, during,and 24 hours after installation of materials.

1.9 WARRANTY

A. The contractor and the manufacturer shall furnish a standard guarantee of theDecorative Mosaic Coating System for a period of one year after installation. Thelabor and material guarantee shall include loss of bond and wear-through to theconcrete substrate from normal use.

B. Not included in the warranty are damage due to structural design deficienciesincluding but not limited to slab cracking from lateral, vertical or rotational movement,and gouging or other damage due to fork lifts, other equipment, or other elementsbeyond the scope of protection of this system nor causes not related to the systemmaterials.

C. In case of a warranty claim, the owner will notify the manufacturer and contractor inwriting within 30 days of the first appearance of problems covered under thiswarranty. The owner will provide free and unencumbered access to the area duringnormal working hours for warranty rework. Property protection is also the owner'sresponsibility. Remedy is limited to direct repair of the Decorative Mosaic CoatingSystem.

PART 2 PRODUCTS

2.1 MATERIALS (BASIS-OF-DESIGN SYSTEM)

A. System Overview: The General Polymers Decorative Mosaic Epoxy Coating Systemwith Resuprime and GP 4850 as manufactured by Sherwin-Williams consists of  GP3830 Resuprime Moisture Mitigation Primer, GP 3746 Self-Leveling Epoxy as basecoat with 6750/6755 Decorative Vinyl Chip Aggregate and GP4850 Polyaspartic SS.

B. Physical Properties:

1. Color: Custom blend to match colors on Room Finish Legend.

2. Abrasion Resistance: 100 mgs lost (ASTM D 4060, CS-17 wheel, 1000 cycles.

3. Flexural Strength: 10,000 psi, ASTM C 580.

4. Adhesion: 300 psi, ACI 503R.

5. Flammability: Self-extinguishing over concrete.

6. Impact Resistance: MIL-D-3134J, direct, inch pound greater that 160, passesreverse, inch pound greater that 80, passes.

7. Resistance Elevated Temperatures: MIL-D-3134J, No slip or flow at requiredtemperature of 158 degrees F.

C. Subject to compliance with requirements provide an equivalent product by one of thefollowing:

1. PPG Paints.

IPTC New Training Facility Fluid-Applied Flooring IFB 19-07-324 Section 096700 - Page 5 of 7 

ETICA GROUP Etica Project # 180024.05

2. SPARTACOTE™, a division of LATICRETE International, Inc.

3. Sika Corporation.

4. Substitutions: See Section 016000 - Product Requirements.

2.2 FLUID-APPLIED FLOORING SYSTEMS

A. Fluid-Applied Flooring: Epoxy base coat(s), with broadcast aggregate.

1. Aggregate: Quartz granules.

2. Texture: Slip resistant .

3. Sheen: Semi-Gloss .

4. Color: As selected by Architect / Engineer.

2.3 ACCESSORIES

A. Base Caps: Zinc with projecting base of 1/8 inch ; mill finish color .

B. Subfloor Filler: Type recommended by fluid-applied flooring manufacturer.

C. Primer: Type recommended by fluid-applied flooring manufacturer.

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify that subfloor surfaces are smooth and flat within the tolerances specified forthat type of work and are ready to receive flooring.

B. Verify that wall surfaces are smooth and flat within the tolerances specified for thattype of work, are dust-free, and are ready to receive flooring.

C. Verify that subfloor surfaces are dust-free and free of substances that could impairbonding of materials to subfloor surfaces.

D. Cementitious Subfloor Surfaces: Verify that substrates are ready for fluid-appliedflooring installation by testing for moisture and alkalinity (pH).

1. Test as Follows:

a. Alkalinity (pH): ASTM F710.

b. Internal Relative Humidity: ASTM F2170.

c. Moisture Vapor Emission: ASTM F1869.

2. Obtain instructions if test results are not within limits recommended by fluid-applied flooring manufacturer.

E. Verify that required floor-mounted utilities are in correct location.

3.2 PREPARATION

A. Moisture Testing: For thorough instructions regarding moisture testing of concretesubstrates "Instruction for Concrete Surface Preparation" (Form G-1).https://www.generalpolymers.com/drop/conc_surf_prep.pdf or other manufacturers

IPTC New Training Facility Fluid-Applied Flooring IFB 19-07-324 Section 096700 - Page 6 of 7 

ETICA GROUP Etica Project # 180024.05

equivilent.

B. Remove subfloor ridges and bumps. Fill low spots, cracks, joints, holes, and otherdefects with subfloor filler.

C. Prepare concrete surfaces according to ICRI 310.2R , and manufacturers instructionsand recommendations .

D. Apply, trowel, and float filler to achieve smooth, flat, hard surface. Grind irregularitiesabove the surface level. Prohibit traffic until filler is cured.

E. Vacuum clean substrate.

F. Apply primer to surface in compliance with manufacturers instructions.

3.3 INSTALLATION - ACCESSORIES

A. Install terminating cap strip at top of base; attach securely to wall substrate.

3.4 INSTALLATION - FLOORING

A. Apply each component of the Decorative Mosaic Epoxy Coating System incompliance with manufacturer's written installation instructions and strictly adhere tomixing and installation methods, recoat windows, cure times and environmentalrestrictions. The Decorative Mosaic Epoxy Coating System is to be installed directlyover non-moving control joints and cracks which have been treated withmanufacturers flexible epoxy treatment, and the Decorative Mosaic Epoxy CoatingSystem will terminate at the edge of isolation and expansion joints as designated bythe Architect, Engineer or Design Professional. Integral cove base shall be installedwhere specified in the drawings.

B. Cracks: After preparation, evaluation of quantity and severity of cracks in concretewill determine the needed repairs. Original bid assumes repair and treatment ofcracks and control joints. For information pertaining to the treatment of cracks inconcrete substrates, consult manufacturer’s publications for crack treatment.

C. Control Joints: Original bid assumes repair and treatment of cracks and control jointsFor information pertaining to the treatment of control joints in concrete substrates,consult manufacturer’s publications for control joint treatment.

D. Isolation Joints / Expansion Joints: All expansion joints must be honored through theflooring system.

E. System Primer (Basis-of-Design): GP 3830 Resuprime Moisture Mitigation Primer.Provide primer approved by manufacturer for application indicated.

F. Base Coat (Basis-of-Design): GP 3746 Self-leveling epoxy.

G. Chip Broadcast (Basis-of-Design): 6750/6755 Decorative Vinyl Chip Aggregate.

H. Grout Coat (Basis-of-Design): GP4850 Polyaspartic Slow Set.

I. Apply each coat to minimum thickness required by manufacturer.

J. Finish to smooth level surface.

IPTC New Training Facility Fluid-Applied Flooring IFB 19-07-324 Section 096700 - Page 7 of 7 

ETICA GROUP Etica Project # 180024.05

K. Cove at vertical surfaces.

3.5 FIELD QUALITY CONTROL

A. See Section 014000 - Quality Requirements, for additional requirements.

B. Test installed floor surface in accordance with ANSI/ESD STM7.1 .

3.6 CURING, CLEANING AND PROTECTION

A. Cure the Decorative Mosaic Coating System materials in compliance withmanufacturer's directions, taking care to prevent contamination during stages of theinstallation and prior to completion of the curing process.

B. Protect the Decorative Mosaic Coating System from damage and wear during otherphases of the construction operation, using temporary coverings as recommendedby the manufacturer. Remove temporary covering just prior to final inspection.

C. Clean the Decorative Mosaic Coating System just prior to final inspection, usingmaterials and procedures suitable to the system manufacturer.

D. Some cleaners will affect the color, gloss or texture of your polymer floor surfaces.To determine how your cleaner will perform, first test each cleaner, in a small area,utilizing your cleaning technique. This precaution will demonstrate the effect of yourcleaner and technique. If no deleterious effects are observed, continue with theprocedure. If deleterious effects do occur, modify the cleaning material and/orprocedure. For recommendations regarding types of cleaners, contact the DecorativeMosaic Coating System manufacturer.

E. Prohibit traffic on floor finish for 48 hours after installation.

END OF SECTION

SITE DETAILS

C701

NO SCALE

S-3

PARKING BOLLARD

1" CONCRETE WASH

8" DIA. PIPE FILLED W/ CONC.

(PAINT SAFETY YELLOW) FURNISHED

BY STEEL CONTRACTOR INSTALLED

BY CONCRETE CONTRACTOR

CONCRETE WASH

T/PAVING

1'-6" DIA. CONC. FOOTING

#6 X 1'-2" LONG

REINFORCED BAR E.W.

2"

4'-0"

5'-0"

NO SCALE

S-5

CONCRETE PAVEMENT SECTION

4500 PSI - 6% AIR ENTRAINED CONC.

APPLY CONCRETE CURING

COMPOUND

CONTROL JOINT

1

4

" X

1

4

" DEEP. SPACED

MAXIMUM 15' EACH WAY

6 X 6 W2.9 X W2.9

WELDED WIRE MESH PLACED

AT 1/3 CONCRETE THICKNESS

8" #53 STONE

COMPACT SUBGRADE TO 95% ASTM D-1557

"D"=8"

NO SCALE

S-1

CHAIRBACK CURB AND GUTTER

2'-0"

7

3 4

"

1'-5"

6"

6" 1"

1'-0"

R

=

2

"

R

=

1

"

NO SCALE

S-6

HEAVY DUTY ASPHALT PAVEMENT

1-

1

2

" HMA 9.5mm SURFACE

3" HMA 19.5mm INTERMEDIATE

8" HMA BASE

4" #53 STONE

COMPACT SUBGRADE

TO 95% ASTM D-1557

NO SCALE

S-11

CONCRETE SIDEWALK

4" CONCRETE

4" COMPACTED SIZE 53 AGGREGATE

SUBGRADE COMPACTED TO

95% ASTM D-1557

VARIES

NO SCALE

S-7

LIGHT ASPHALT SECTION

1-

1

2

" HMA 9.5mm SURFACE

3" HMA 19.5mm INTERMEDIATE

3" #53 STONE

COMPACT SUBGRADE

TO 90% ASTM D-1557

6"

18"

2"

NO SCALE

S-2

CONCRETE STRAIGHT CURB

ASPHALT PVMT

(SEE SPECS.)

"A"

"B"

NO SCALE

S-12

WATER SEWER SEPARATION

NOTE:

SEPARATION DISTANCES FROM WATER SUPPLIES AND PIPE CLASSIFICATIONS SHALL CONFORM

TO INDIANA STATE BOARD OF HEALTH'S "ON-SITE WATER SUPPLY AND WASTEWATER

DISPOSAL FOR PUBLIC AND COMMERCIAL ESTABLISHMENTS - BULLETIN S.E. 13"

PVC (EITHER ASTM D 2241 (SDR 21), ANSI/AWWA C900 (DR 18),

ANSI/AWWA C905 (DR 21), OR DUCTILE IRON (CLASS 51 MIN.)

10' EITHER SIDE OF CROSSING

LESS THAN 10'LESS THAN 18"

18" OR MORE 10' OR MORE

IF "B" ISIF "A" IS THEN SANITARY SEWER PIPE SEGMENT SHALL BE

NO SPECIAL PIPE MATERIAL OR GRADE REQUIREMENTS

FLOW

NOTE:

WATER MAINS SHALL NOT BE LOCATED

IN THE SAME TRENCH AS SANITARY

SEWERS.

WATER MAIN

FINISHED GRADE

SANITARY SEWER

WATER MAIN

SANITARY SEWER

JOINT

JOINT

10' MINIMUM 10' MINIMUM

"A"

6" B BORROW (PRECAST BOTTOMS ONLY)

#4 AT 0.5' C. TO C. BOTH WAYS

PRECAST MANHOLE SECTION

CAST IRON MANHOLE STEPS

CEMENT MORTAR

6' x 6' CLASS A CONCRETE BASE

ECCENTRIC CONE,

CONCENTRIC CONE,

OR PRECAST COVER

VARIES

PIPE THICKNESS

+ 1/2D + 2"

4.00'

0.33'

0.50' MIN

1.00'

1.00'

0.42'

0.83'

VARIABLE 1' TO 6'

1.33'

2.00'

1.00'

VARIABLE 2.50'

MIN

VARIABLE

NO SCALE

S-15

TYPE C MANHOLE

1

8

"

3"

3"

1

1

"

4

"

18"

NO SCALE

S-8

ACCESSIBLE PARKING SYMBOL

0.5'

1' DIA.

1.5'

18" X 18" & 18" X 12"

COMBINATION SIGN

BLUE BACKGROUND- WHITE

SYMBOL

WHITE BORDER 18" X 18" LOGO

SIGN

WHITE BACKGROUND- BLACK

LETTERS

BLACK BORDER 18" X 12" LEGEND

SIGN

2 SIGN COMBINATION PLAIN

BAKED ENAMEL

2 SIGN COMBINATION

REFLECTIVE SHEETING

1.2'

GRADE

5'-0"

2'-6"

1.5'

ONLY

PERMIT

DISABLED

PARKING BY

NO SCALE

S-13

ACCESSIBLE PARKING SIGN

0.5'

1' DIA.

12"

GRADE

5'-0"

2'-6"

18"

RESERVED

PARKING

VAN

ACCESSIBLE

NO SCALE

S-14

VAN ACCESSIBLE SIGN

NOTE:

SIGN SHALL BE COMPLIANT

WITH ADA STANDARDS

96" MIN.

VAN ACCESS

60" MIN.

CAR ACCESS

18' M

IN

. D

EPTH

9' MIN.

ACCESSIBLE PARKING SIGN

NO SCALE

S-9

ACCESSIBLE PARKING STRIPING

MINIMUM 1.5*O.D. + 6"

6" BEDDING BELOW PIPE

MIN 12" ABOVE PIPEO.D.

WITHIN EXISTING PAVEMENT: MATCH

ADJACENT EXISTING SECTIONS ON #53 AGG

COMPACTED TO 95% MAXIMUM DENSITY,

PER SECTION 401.06. MAX 8" LIFTS

OUTSIDE OF PAVEMENT: CLEAN BACKFILL,

PER SECTION 401.06 MAX 12" LIFTS

WITHIN PROPOSED PAVEMENT: #53 AGG

COMPACTED TO 95% MAXIMUM DENSITY,

PER SECTION 401.06. MAX 8" LIFTS TO TOP

OF SUBGRADE, THEN AS SHOWN IN

PAVEMENT SECTIONS S-5 THROUGH S-7

CLASS II MATERIALS

PER 31 23 00

NO SCALE

S-4

STORM PIPE TRENCH BACKFILL

30"

STOP

min.

SLOPED

CONCRETE

12"

4"4"

42"

* POST TO BE

(2#/Ft.) 9'-10" LONG

* CHANNEL POST

PRE-PAINTED GALVANIZED STEEL

FACE MATERIAL

WHITE REFLECTIVE

6' - 0"

WHITE REFLECTIVE

FACE MATERIAL

SURFACE

RED

30"

NO SCALE

S-10

STOP SIGN DETAIL

CHECKED BY:DRAWN BY:

PROJECT NUMBER:

DRAWING TITLE:

SHEET NUMBER:

IFB 19-12-337

Indi

anap

olis

Pub

lic T

rans

porta

tion

Cor

pora

tion

PROFESSIONAL SEAL:

DISCLAIMER:This construction document is the property of The EticaGroup, Inc. It is intended solely for use by The EticaGroup, Inc., its heirs, and assigns. Modification or reuseof this document without permission from The EticaGroup, Inc. is prohibited. Use of this document for anypurpose other than that intended by The Etica Group, Inc.constitutes an impermissible misuse. The Etica Group,Inc. is not responsible for any damage or injury resultingfrom misuse of this document. The Etica Group, Inc.disclaims all warranties, express or implied, relating to theuse of this document for any purpose other than thatintended by The Etica Group, Inc.

DATE ISSUED:

1100

Wes

t 21s

t Stre

etIn

dian

apol

is, I

N 4

6202

1/13/20

180024.05

NEW

TR

AIN

ING

FAC

ILIT

Y

SPM JAD

No.

PE11100287

STATE OF

N

P

R

N

E

H

P

E

T

SK.

E

I

L

A

T

A

N

T

E

I

G

S E

R

D

E

AN

ADI

I

R

O

F

E

S

O

S

I

NA L

E

E

E

N

N

I

R

G

DESCRIPTION: DRAWN

BY:

DATE

ISSUED:

#

1

1

PRE-BID ADDENDUMSPM2/10/20

2

2

PRE-BID ADDENDUMSPM2/21/20

AutoCAD SHX Text
%%UBELOW SURFACE MOUNT%%U
AutoCAD SHX Text
REGULATORY SIGN - R1-1
AutoCAD SHX Text
30"X30"
AutoCAD SHX Text
File Path: P:\2018\180024 MASTER IndyGo Renovation Projects\180024.05 Bus Training Facility Task 5\Eng Design\Plans\Sheets\180024.05_Details.dwg Save Date: 2/19/2020 12:16 PM Plot Date: 2/20/2020 4:38 PM

SITE DETAILS

C706

CHECKED BY:DRAWN BY:

PROJECT NUMBER:

DRAWING TITLE:

SHEET NUMBER:

IFB 19-12-337

Indi

anap

olis

Pub

lic T

rans

porta

tion

Cor

pora

tion

PROFESSIONAL SEAL:

DISCLAIMER:This construction document is the property of The EticaGroup, Inc. It is intended solely for use by The EticaGroup, Inc., its heirs, and assigns. Modification or reuseof this document without permission from The EticaGroup, Inc. is prohibited. Use of this document for anypurpose other than that intended by The Etica Group, Inc.constitutes an impermissible misuse. The Etica Group,Inc. is not responsible for any damage or injury resultingfrom misuse of this document. The Etica Group, Inc.disclaims all warranties, express or implied, relating to theuse of this document for any purpose other than thatintended by The Etica Group, Inc.

DATE ISSUED:

1100

Wes

t 21s

t Stre

etIn

dian

apol

is, I

N 4

6202

1/13/20

180024.05

NEW

TR

AIN

ING

FAC

ILIT

Y

SPM JAD

No.

PE11100287

STATE OF

N

P

R

N

E

H

P

E

T

SK.

E

I

L

A

T

A

N

T

E

I

G

S E

R

D

E

AN

ADI

I

R

O

F

E

S

O

S

I

NA L

E

E

E

N

N

I

R

G

DESCRIPTION: DRAWN

BY:

DATE

ISSUED:

#

T

DETAIL 1

NON-EXTRUDING

PREMOLDED COMPRESSIBLE

MATERIAL

3/4" ± 1/8"

Te

Te = 1.25 T TO NEAREST 1" (3cm.)

TO NEAREST JOINT BUT

NOT LESS THAN 10'

2"

W.W.M. PER

DETAIL S-5

ROD BACKUP

MATERIAL

NON-EXTRUDING

PREMOLDED

COMPRESSIBLE

MATERIAL ASTM D-1751

OR 1752

3/4" ± 1/8"

DEPTH PER MANUFACTURER'S

RECOMMENDATION

DETAIL 1

JOINT

SEALANT

FIELD POURED SEALANT

MATERIAL 1/4" - 3/8"

BELOW SURFACE

NEW

PAVEMENT

DETAIL 2

EXISTING

PAVEMENT

T/2

±d/2

T

W.W.M. PER

DETAIL S-5

2"

DOWEL

1/4" ± 1/16"

7/8"

MIN

.

1-1/4"

MIN

.

BACK-UP

MATERIAL

DETAIL 2

FIELD POURED SEALANT

MATERIAL 1/4" - 3/8"

BELOW SURFACE

NO SCALE

S-16

THICKENED EDGE EXPANSION JOINT

NO SCALE

S-17

DOWELED CONSTRUCTION JOINT

NOTES

1. USE A DOWELED CONSTRUCTION JOINT AT SIDE AND END TERMINATIONS OF PAVING OPERATIONS

UNLESS PAVING ENDS AT AN ISOLATION OR EXPANSION JOINT

2. LOCATE EXPANSION JOINTS AT MAXIMUM INTERVALS OF 80 FEET

3. FORM AN ISOLATION JOINT OF PREFORMED JOINT-FILLER STRIPS WHERE CONCRETE ABUTS CURBS,

INLETS, MANHOLES, STRUCTURES, OR OTHER FIXED OBJECTS

4. DOWELS ARE TO BE EPOXY COATED 1.25" DIAMETER BARS EMBEDDED MINIMUM 9" EACH SIDE, SPACED

1' C/C, AND KEPT MINIMUM 6" FROM OUTSIDE EDGES OF PANELS

1

PRE-BID ADDENDUMSPM2/10/20

1

NO SCALE

S-18

TYPE 7 CASTING

2

NOTES

1. CASTING SHOWN IS A NEENAH TYPE R-3339-A

2. EQUIVALENTS CAN BE SUBSTITUTED WITH ENGINEER'S APPROVAL

AutoCAD SHX Text
File Path: P:\2018\180024 MASTER IndyGo Renovation Projects\180024.05 Bus Training Facility Task 5\Eng Design\Plans\Sheets\180024.05_Details.dwg Save Date: 2/19/2020 12:16 PM Plot Date: 2/20/2020 4:38 PM

A200

A200

A200

1

4

3

8A200

5A200

SECURITYOFFICE

101

VESTIBULE100

SHARED OFFICE102

TRAINING ROOM103

TRAINING ROOM107

OFFICE104

SIM ROOM106

CUSTODIAL125

DISPATCH / IT108

MEN'S111

BREAK RM.110

WOMEN'S113

RR114

MECHANICAL115

ELECTRICAL116

CORRIDOR117

WATER118

LACTATION112

STORAGE105

1

2

17

4

101A

102A

104A

107A

103B

125A

103A

109A

108A

114A

116A

118A

115A

113A 111A

6

6

BUS TRAININGBAY121

16' - 5" 12' - 4" 12' - 6" 10' - 8" 33' - 11 7/8"

11

9 8

5

6A200

A4001

A40014

2' -

9"2'

- 0" 4' -

0"2' -

5 1/

2"6'

- 5"

6' -

0"5'

- 3

3/8"

11' -

0 1

/2"

17' - 4" 14' - 0" 6' - 8" 43' - 11 1/2" 4' - 11" 8' - 0" 9' - 4" 8' - 0" 9' - 4" 8' - 0" 9' - 4" 8' - 0" 4' - 11" 12' - 1 1/2"

5' - 6" 4' - 5"

1' - 6 3/8"

4' - 5"

6' - 4 1/4" 17' - 11 3/8" 9' - 11"

1' - 6 3/8"

15' - 7" 7' - 10 1/8" 5' - 3 7/8" 6' - 10" 5' - 9" 5' - 4" 5' - 9" 9' - 6 1/8" 7' - 8" 8' - 5"

4' -

2 3/

4"

7' -

10"

7' - 6 1/4" 9' - 2" 9' - 2"

9' - 6 1/8" 9' - 4 3/4"

1A301

A4002

10A200

A6009

100A

STORAGE120

TRAINING ROOM109

1' - 4"

6' - 0" 4' - 8" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 9' - 7" 25' - 5" 6' - 0" 6' - 0" 8' - 0" 4' - 0"

2' - 0"

4' - 0"

2' - 0"

4' - 0" 8' - 0" 4' - 0"

2' - 0"

4' - 0"

2' - 0"

4' - 0" 8' - 0" 4' - 0"

2' - 0"

4' - 0"

2' - 0"

4' - 0" 6' - 0" 3' - 8" 7' - 1"

120A

121C

1515 15 15 15 15 15 15

15 151515

13

3

STORAGE123

105A

123A

121A

106A

5A302

163' - 9"

5' - 9"

9 5/

8" 14' -

11

3/4"

8' -

3"4'

- 10

5/8

"32

' - 4

"9

5/8"

CBADDE

Ea

D2

B B B B

F6

F7

A

ABABA1' -

4"6'

- 0"

4' -

8"4'

- 0

1/8"

4' -

0"42

' - 7

7/8

"

15

1' -

6 5/

8"

119A

110A

32' -

4"

5' - 2"

15' - 10 5/8" 17' - 11"

CORRIDOR119

112A

44444

4 4 4

13

10

2211

164

4

9A200

7A200

12' -

2 5

/8"

5' -

4"19

' - 0

3/4

"10

' - 8

"9"

9"

22' -

11

1/4"

1414 14

SLOP

E 1/

8" P

ER F

T

SLOPE 1/8" PER FT

SLOP

E 1/

8" P

ER F

T

SLOPE 1/8" PER FT

5' - 9 1/2"

12

6

J

W3W3W3

W3

W3

W3

W2W2

W3

W3

101A

W3

7' -

7 3/

4"

36" M

IN.

A40310

A40110

100B

1' -

6"

G

F

E

D

C

B

A

1

2345611" 81' - 0 1/2" 17' - 1 1/4" 17' - 11" 19' - 3 1/4" 19' - 6" 7' - 3" 11"

11"

22' -

11

1/4"

9' -

9"4'

- 6

3/8"

13' -

3 5

/8"

10' -

6 3

/8"

11"

5"

9

18 18

17

17

717 17

W2W2

W2 W2 19

19

V.I.F.

14' - 0"

V.I.F

.

5' -

0"

W1 W2 W3

8A200

A.F.F.GWB on Mtl. Stud11' - 0"

A.F.F.2' x 2' ACT System

8' - 0"

A.F.F.GWB on Mtl. Stud

9' - 8"

A.F.F.2' x 2' ACT System

9' - 0" A.F.F.2' x 2' ACT System

9' - 0"A.F.F.2' x 2' ACT System

9' - 0"A.F.F.2' x 2' ACT System

9' - 0"A.F.F.2' x 2' ACT System

9' - 0"

A.F.F.2' x 2' ACT System

9' - 0"

A.F.F.GWB on Mtl. Stud

9' - 0"

A.F.F.GWB on Mtl. Stud

9' - 0"

A.F.F.2' x 2' ACT System

10' - 0"

A.F.F.GWB on Mtl. Stud

9' - 0"

5

1

3A101

6A200

A.F.F.2' x 2' ACT System

9' - 0"

1A301

10A200

A.F.F.GWB on Mtl. Stud11' - 0"

3

A.F.F.2' x 2' ACT System

8' - 0"

A.F.F.2' x 2' ACT System

12' - 0" A.F.F.2' x 2' ACT System

12' - 0" A.F.F.2' x 2' ACT System

12' - 0"

A.F.F.2' x 2' ACT System

10' - 0" A.F.F.2' x 2' ACT System

9' - 0" A.F.F.2' x 2' ACT System

9' - 0" A.F.F.2' x 2' ACT System

9' - 0"

Open to Structure

Above

Open to Structure

Above

Open to Structure Above

A.F.F.2' x 2' ACT System

9' - 8"

5A302

13A403

1' -

2"

1' - 10 5/8"

9 7/

8"

1' - 6"1' - 8 5/8"

1' -

5 7/

8"

5A403

2

7777

445

5 5

6

9A200

7A200

78

95

CHECKED BY:DATE ISSUED: DRAWN BY:

PROJECT NUMBER:

DISCLAIMER:

PROFESSIONAL SEAL:

DRAWING TITLE:

SHEET NUMBER:

IFB

19-1

2-33

7

Indi

anap

olis

Pub

lic T

rans

porta

tion

Cor

pora

tion

This construction document is the property of The Etica Group, Inc. It is intended solely for use by The Etica Group, Inc., its heirs, and assigns. Modification or reuse of the document without permission from The Etica Group, Inc. is prohibited. Use of this document for any purpose other than that intended by The Etica Group, Inc. constitutes an impermissible misuse. The Etica group, inc. is not responsible for any damage or injury resulting from misuse of this document. The Etica Group, Inc. disclaims all warranties, express or implied , relating to the use of this document for any purpose other than that intended by The Etica Group, Inc.

BFPS

2/24

/202

0 4:

28:1

0 P

MB

IM 3

60://

Indy

Go

Trai

ning

Fac

ility/

18-1

20.5

Tra

inin

g Fa

cilit

y.rv

t

A100

180024.05

JANUARY13, 2020

NEW

TR

AIN

ING

FAC

ILIT

Y

1100

Wes

t 21s

t Stre

etIn

dian

apol

is, I

N 4

6202

FLOOR PLAN &REFLECTED

CEILING PLAN

A100 1/8" = 1'-0" REF:3 A400 First Floor Plan1

9. PAINT EXPOSED PIPING, DUCTWORK, CONDUIT, ETC IN THIS AREA.

8. HOLLOW METAL FRAME. REFER TO DOOR SCHEDULE.

7. 5/8" GWB ON METAL STUD FRAMING. FRAMED OPENING AT 8'-10".

6. METAL SOFFIT PANEL ON LIGHT GUAGE METAL FRAMING @ 24" O.C. OR SPACING ASRECOMMENDED BY MANUFACTURER.

5. EXPOSED STRUCTURE ABOVE, UNPAINTED.

4. 5/8" GYPSUM BOARD CEILING ON CEILING SUSPENSION SYSTEM.

3. OPERABLE PANEL PARTITION TRACK AND FRAMED BULKHEAD. REFER TO DETAIL2/A403

2. CEILING MOUNTED PROJECTOR. REFER TO ELECTRICAL DRAWINGS.

1. MOTORIZED CEILING MOUNTED PROJECTION SCREEN.

REFLECTED CEILING PLAN KEYNOTES

19. AUTO-DOOR OPERATOR18. BOLLARD

17. WALL PRTOTECTION CORNER GUARDS (SECTION 102600)

16. FLOOR DRAIN. REFER TO PLUMBING DRAWINGS.

15. HORIZONTAL LOUVER BLINDS MOUNTED AT WINDOW HEAD. REFER TO SECTION 122113"HORIZONTAL LOUVER BLINDS."

14. FIRE EXTINGUISHER AND CABINET. REFER TO SECTION 104400 "FIRE PROTECTIONSPECIALTIES."

13. PLASTIC-LAMINATE-FACED ARCHITECTURAL CABINETS AND BUILT UP SOLID SURFACECOUNTERTOPS. REFER TO INTERIOR ELEVATIONS.

12. ICE MACHINE (BY OWNER). REFER TO PLUMBING & ELECTRICAL DRAWINGS.

11. 24" X 24" MOP SINK. REFER TO PLUMBING DRAWINGS.

10. SLIDING ALUMINUM TRANSACTION WINDOW.

9. FULL SIZE REFRIGERATOR (BY OWNER). REFER TO PLUMBING & ELECTRICAL DRAWINGS.8. VENDING MACHINE (BY OWNER). REFER TO ELECTRICAL DRAWINGS.

7. ELECTRIC WATER COOLER. REFER TO PLUMBING DRAWINGS.

6. OWNER PROVIDED T.V. SCREENS.

5. COPIER/ PRINTER (BY OWNER).

4. 4"X4" PRE-FINISHED ALUMINUM DOWNSPOUT.

3. BRICK VENEER.

2. MANUALLY OPERATED FOLDING PANEL PARTITION. REFER TO SECTION 102239.

1. VIDEO PROJECTION SCREEN: RECESSED CEILING MOUNTED MOTORIZED VIDEO SCREEN INPLENUM RATED STEEL CASE AND A TUBULAR MOTOR-IN-ROLLER DESIGN WITH 16:9 ASPECTRATIO VIEW AREA OF 65” X 119” (133” DIAGONAL). PROVIDE WITH HIGH CONTRAST GRAYVIEWING SURFACE. PROVIDE QUIET MOTOR OPTION WITH BUILT-IN LOW VOLTAGECONTROL. PROVIDE WITH 12” DROP. BASIS-OF-DESIGN IS DRAPER, ACCESS FIT SERIES E133IN CONTRAST GREY XH800E. OTHER ACCEPTABLE MANUFACTURERS MEETINGREQUIREMENTS ARE DALITE AND STEWART.

FLOOR PLAN KEYNOTES

4" INTERIOR WALL 4" INTERIOR WALL

5. PROVIDE MINIMUM 20 GAUGE 3 5/8" METAL STUDS 16" O.C. BRACE TOP OFWALL TO STRUCTURE ABOVE 36" O.C.

4. PROVIDE MINIMUM 16 GUAGE 6" METAL STUDS, 16" O.C. REFER TOSTRUCTURAL DRAWINGS.

3. SOUND BATT INSULATION FULL DEPTH AND HEIGHT OF METAL STUD WALLCAVITY.

2. 5/8" GYPSUM WALL BOARD.

1. PROVIDE MINIMUM 20 GAUGE 35/8" METAL STUDS 16" O.C.

WALL TYPE NOTES

1

22

WALL CONSTRUCTION EXTENDS FULL HEIGHT TO ROOF DECK

EXTEND WALL CONSTRUCTION 6" ABOVE CEILING

2

A100 1/8" = 1'-0" REF:3 A400 Reflected Ceiling Plan2

I. REFER TO SHEETS S201 & S202 FOR SHEAR WALL LOCATIONS.

H. ALL INTERIOR WALLS ARE TYPE "W1" UNLESS NOTED OTHERWISE.

G. INSTALL BLOCKING INSIDE WALL FOR INSTALLATION OF WALL HUNG EQUIPMENTINCLUDING OWNER PROVIDED EQUIPMENT. COORDINATION LOCATION OF BLOCKING WITHARCHITECT PRIOR TO INSTALLATION.

F. MANUFACTURER'S LISTED IN THE CONSTRUCTION DOCUMENTS ARE FOR"BASIS-OF-DESIGN". SUBSTITUTIONS SHALL MEET OR EXCEED THE PERFORMANCEREQUIREMENTS AND ASTM STANDARDS LISTED IN THE SPECIFICATIONS TO BE CONSIDEREDAN APPROVED EQUAL BY THE OWNER AND ARCHITECT OF RECORD.

E. REFER TO SHEET A600 FOR DOOR SCHEDULE, AND A601 FOR ROOM FINISH SCHEDULE.

D. ALL GYPSUM WALL BOARD IS 5/8” TYPE “X” UNLESS NOTED OTHERWISE.

C. SEAL ALL JOINTS BETWEEN DISSIMILAR MATERIALS.

B. ALL DOOR FRAMES ARE LOCATED 4” FROM ADJACENT WALL UNLESS NOTED OTHERWISE.

A. ALL DIMENSIONS ARE SHOWN TO FACE OF STUD, MASONRY, OR COLUMN CENTERLINESUNLESS NOTED OTHERWISE. DIMENSIONS DESIGNATED AS “CLR” OR “CLEAR” INDICATE ACLEAR DIMENSION FROM FACE OF FINISH TO FACE OF FINISH.

GENERAL FLOOR PLAN NOTES

D. ALL CEILINGS TO BE 2' x 2' ACOUSTIC PANEL CEILING, TYPE A UNLESS NOTEDOTHERWISE. REFER TO SPECIFICATION SECTION 095113.

C. ALL SPINKLER HEADS TO BE CENTERED IN CEILING TILE UNLESS NOTED OTHERWISE.

B. COORDINATION OF DUCTWORK, PIPING, LIGHTS, AND CEILING SUPPORTS ARE THERESPONSIBILITY OF ALL TRADE CONTRACTORS. CONTRACTORS WILL TAKERESPONSIBILITY TO RELOCATE ITEMS TO CONFLICT DUE TO LACK OF COORDINATION.

A. ALL GRIDS ARE CENTERED IN ROOMS UNLESS NOTED OTHERWISE.

GENERAL CEILING PLAN NOTES

WALL CONSTRUCTION EXTENDS FULL HEIGHT TO ROOF DECK

1

22

6" INTERIOR WALL

3

5

3

REVISION SCHEDULE

# DESCRIPTION DRAWN BY DATE ISSUED

2 Addendum 2 2/21/2020

2

2

2

A4007

A400

6

5 3

4

2

12

1' - 6"1' - 6"

6

5

7

110

1' - 6"

BREAK RM.110

RR114

11 4

9

A400 12

11

10

13

3' -

1"

1' -

6"5'

- 7

1/2"

3' -

1"4'

- 4

1/4"

3' -

0"1'

- 6"

5' -

6 1/

2"3'

- 1"

3' -

1"

1

10

24

19

11 15

6 14

11

57

1

10

14

9

1115

614

11

5 7

11

9

A400

13Sim

11Sim

12

Sim

10

Sim

F

E

D

13 13

2' -

10"

1' - 0"

3' - 0" 3' - 0" 3' - 4"

16

3

2

17

12

3' - 0"3' - 0"1' - 0"

1' -

9"3'

- 0"

2' -

10"

4"

3' -

0"

3' - 0"

36

"

39"

- 41

" 1

8"

5

7

6

14

20

21

`

10

1

22EQ EQ

2' - 0"

6"

First Floor Plan0' - 0"

22

20

21

5

7

EQ EQ

14

61' - 0"

3' - 0"

18" M

in.

11 4

C

First Floor Plan0' - 0"

4"

2' -

0"

22

20

21

EQ EQ

First Floor Plan0' - 0"

10

122

20

21

4"

EQ 2' - 0" 2' - 0" EQ

2' -

0" T

YP

2' -

10"

C

22

20 21

3' -

4"

13

4"

22

20 21

22

10

1

2' -

10"

3' -

0"

22

5

76

14

20 21

1

1024 15

3' -

0"

3' -

4"

6"

F

6

14 21 20

7

5

22

3' -

0"

1' - 0"

3' - 4"

11 4

A400 9

8

10A200

A600

8

2

8

8 2

SECURITYOFFICE

101

A4014

A4012

A4013

F

E

12

4' - 6" 1'

- 1"

18

4' - 3"2' - 1"

18

2

8

PLASTIC LAMINATEEND PANEL

4' -

0"2'

- 10

"

2' - 1"2' - 2"

3A401

4"

2' -

6"

2' - 0" 2' - 0" 5' - 4 1/2"

2

16 8

2' - 7 3/4"

2' - 1"

3A401

8" 8" 8 5/8"

1 1/

4"

2' - 0 1/8"

5 3/4"

2' -

9 3/

8"

1/2"x4" SOLID SURFACINGBACKSPLASH

1/2" SOLID SURFACING COUNTERTOPOVER 3/4" WATER-RESISTANT TREATEDPARTICLE BOARD

BUILT UP SOLID SURFACESKIRT

LAVATORY # 815 AS MANUFACTUREDBY CORIAN OR APPROVED EQUAL,ADHERED TO THE BOTTOM OF THESOLID SURFACE COUNTERTOP

PLASTIC-LAMINATE OVER 3/4"PARTICLE BOARD

METAL CLIPS FOR REMOVABLE PANEL

5 1/

8"1'

- 6"

9"4"

2' -

0"

10 1/2"x4" SOLID SURFACE SIDESPLASH

/16 A400

8

PLASTIC-LAMINATE FACED ENDPANEL AND INTERMEDIATESUPPORTS AT 3'-0" O.C.

25

22

21

20 4"

CHECKED BY:DATE ISSUED: DRAWN BY:

PROJECT NUMBER:

DISCLAIMER:

PROFESSIONAL SEAL:

DRAWING TITLE:

SHEET NUMBER:

IFB

19-1

2-33

7

Indi

anap

olis

Pub

lic T

rans

porta

tion

Cor

pora

tion

This construction document is the property of The Etica Group, Inc. It is intended solely for use by The Etica Group, Inc., its heirs, and assigns. Modification or reuse of the document without permission from The Etica Group, Inc. is prohibited. Use of this document for any purpose other than that intended by The Etica Group, Inc. constitutes an impermissible misuse. The Etica group, inc. is not responsible for any damage or injury resulting from misuse of this document. The Etica Group, Inc. disclaims all warranties, express or implied , relating to the use of this document for any purpose other than that intended by The Etica Group, Inc.

BFPS

2/24

/202

0 4:

28:5

7 P

MB

IM 3

60://

Indy

Go

Trai

ning

Fac

ility/

18-1

20.5

Tra

inin

g Fa

cilit

y.rv

t

A400

180024.05

JANUARY13, 2020

NEW

TR

AIN

ING

FAC

ILIT

Y

1100

Wes

t 21s

t Stre

etIn

dian

apol

is, I

N 4

6202

ENLARGED PLANS& ELEVATIONS

A400 1/4" = 1'-0" REF:1 A100 Enlarged Plan (112 & 114)1

A400 1/4" = 1'-0" REF:1 A100 Enlarged RR Plan (111 & 113)14

A400 1/4" = 1'-0" REF:1 A400 Interior Elevation - Break Room7

A400 1/4" = 1'-0" REF:1 A400 Interior Elevation - South (RR 114)6

A400 1/4" = 1'-0" REF:1 A400 Interior Elevation - West (RR 114)5

A400 1/4" = 1'-0" REF:1 A400 Interior Elevation - North (RR 114)4

A400 1/4" = 1'-0" REF:1 A400 Interior Elevation - East (RR 114)3

A400 1/4" = 1'-0" REF:14 A400 Interior Elevation - Men's RR East Wall12

A400 1/4" = 1'-0" REF:14 A400 Interior Elevation - Men's RR South Wall13

A400 1/4" = 1'-0" REF:14 A400 Interior Elevation - Men's RR West Wall10

A400 1/4" = 1'-0" REF:14 A400 Interior Elevation - Men's RR North Wall11

25. 5/8" GYPSUM BACKER BOARD PER SPECIFICATIONS.

24. 30" DEEP URINAL PARTITION, SOLID PHENOLIC, WALL MOUNTED WITH CONTINUOUSSTAINLESS STEEL BRACKET AND HARDWARE. PROVIDE 2X2 POST AT END OF SCREEN.

23. 22"D X 1 1/2" THICK PLASTIC LAMINATE FACED END PANEL

22. 24" X 24" PORCELAIN WALL TILE.

21. "L" STAINLESS STEEL COVE BASE TRANSITION TRIM.

20. LVT FLOOR WRAPPED UP WALL. REFER TO DETAIL 16/A400.

19. URINAL. SEE PLUMBING SCHEDULE.

18. CR LAWRENCE, SATIN ANODIZED HORIZONTAL SLIDING DAISY MODEL PASSTHROUGH ASSEMBLY WITH D6 OVERHEAD TRACK AND JAMBS: #D1041A, 4'-6" HIGH X3'-6" WIDE. 1/4" TEMPERED GLASS.

17. 12" DEEP PLASTIC LAMINATE WALL CABINETS.

16. 24" DEEP PLASTIC LAMINATE BASE CABINETS.

15. TOILET PARTITION, SOLID PHENOLIC, FLOOR MOUNTED, OVERHEAD BRACKED WITHSTAINLESS STEEL HARDWARE.

14. WATER CLOSET. SEE PLUMBING SCHEDULE FOR MODEL & HARDWARE.

13. STAINLESS STEEL ELECTRIC HAND DRYER.

12. REFRIGERATOR BY OWNER.

11. TOILET PAPER DISPENSER BY OWNER.

10. FRAMELESS MIRROR. SIZE INDICATED ON INTERIOR ELEVATIONS.

9. SANITARY NAPKIN DISPOSAL.

8. HEAVY-DUTY ADA COMPLIANT COUNTERTOP BRACKET, MAX. 3'-0" O.C., PROVIDESOLID BLOCKING IN WALLS AT SPACING REQUIRED. PROVIDE LAMINATE FACE ATEXPOSED SIDE PANEL.

7. 42" STAINLESS STEEL GRAB BAR. REFER TO TYPICAL ELEVATION FOR LOCATION.

6. 36" STAINLESS STEEL GRAB BAR. REFER TO TYPICAL ELEVATION FOR LOCATION.

5. 18" STAINLESS STEEL GRAB BAR. REFER TO TYPICAL ELEVATION FOR LOCATION.

4. PROVIDE BLOCKING FOR TOILET PAPER DISPENSERS AND GRAB BARS.

3. 4" HIGH TOE KICK WITH VINYL BASE.

2. 1-1/2" BUILT UP SOLID SURFACE COUNTERTOP WITH 4"H BACKSPLASH AT ALL WALLSURFACES. REFER TO A600 FOR FINISHES. REFER TO SECTION DETAIL 4/301 FORSECURITY DESK SECTION.

1. SOLID SURFACE COUNTERTOP WITH INTEGRAL SOLID SURFACE SINKS AND 4"HBACKSPLASH AT ALL WALL SURFACES. REFER TO A601 FOR FINISHES. REFER TOSECTION DETAIL 15/A400.

ENLARGED PLAN KEYNOTES

D. MANUFACTURERS LISTED IN THE CONSTRUCTION DOCUMENTS SHALL BECONSIDERED "BASIS-OF-DESIGN." ANY SUBSTITUTIONS SHALL MEET OR EXCEED THEPERFORMANCE AND ASTM STANDARDS SPECIFIED.

C. ALL WORK SHALL BE PERFORMED IN COMPLIANCE WITH APPLICABLE CODES.

B. ALL WALL DIMENSIONS ARE TO FACE OF STUD UNLESS NOTED OTHERWISE.

A. PROVIDE CONTINUOUS WOOD BLOCKING IN WALLS FOR SUPPORT OF CASEWORK,COUNTERTOPS, SUPPORT BRACKETS, RESTROOM ACCESSORIES AND OTHER ITEMSTHAT REQUIRED SECURE ATTACHMENT.

ENLARGED PLAN GENERAL NOTES

A400 1/4" = 1'-0" REF:1 A100 Enlarged Plan - Security (101)2

A400 1/4" = 1'-0" REF:2 A400 Interior Elevation - Security South Wall8

A400 1/4" = 1'-0" REF:2 A400 Interior Elevation - Security East Wall9

A400 1 1/2" = 1'-0" Typical Lavatory Section15

A400 3" = 1'-0" Restroom Cove Base Detail16

(WOMEN'S RR SIM)

REVISION SCHEDULE

# DESCRIPTION DRAWN BY DATE ISSUED

2 Addendum 2 2/21/2020

2

5

11' - 0" PARTITION Ht

12' - 0" 2X4 ACT

2X4 ACT

GWB

METAL STUD

GWB

STEEL BEAM. REFER TO STRUCTURAL

OVERHEAD ACCOUSTIC PARTITION TRACK

1' -

0"

2 LAYERS 5/8" GWB EXTEND TO ROOF DECK. REFER TO OPERABLE PARTITION MANUFACTURERS STANDARD DETAIL.

ACOUSTIC BATT INSULATION CONT. TO ROOF DECK

EQEQ

4' - 11"

8' - 10"

9' - 0"

10' - 0"2X2 ACOUSTIC PANEL CEILING

5/8" GWB

BATT INSULATION

3 5/8" METAL STUD FRAMING 16" O.C.

D

5/8" GWB,BOTH SIDES

BATT INSULATION

METAL STUDHEADER

HM DOOR FRAME

FLUSH WOOD DOOR,REFER TO DOOR

SCHEDULE

SEALANT BOTHSIDES

VARIES 5/8" GWB,BOTH SIDES

BATT INSULATION

METAL STUD HEADER

HM FRAMEFLUSH WOOD DOOR,

REFER TO DOORSCHEDULE

SEALANT,BOTH SIDES

1/4" LAMINATED GLASS

HM STOP

HM FRAME

METAL STUDWALL FRAMING

5/8" GWBVARIES

SEALANT,BOTH SIDES

5/8" GWB

METAL STUDHEADER

5/8” GWBSEE 2/A101

¼” LAMINATEDGLASS WITH STOP

HM FRAME

FLUSH WOOD DOORSEE SCHEDULE

SEALANT,BOTH SIDES

VARIES

G

5

STEEL COLUMN, REFERTO STRUCTURAL

5/8" GWB

BACKER ROD & SEALANT

OPERABLE PARTITIONJAMB

STRAPPING. REFER TO STRUCTURAL

BLOCKING AS REQUIRED

FIBER CEMENT CLADDING ON METAL SUBFRAMING

2 1/2" CONTINUOUS INSULATION WITH COMPOSITE FRAMING, 16" O.C.

WEATHER BARRIER OVER PLYWOOD SHEATHING

PLYWOOD SHEATHING, REFER TO STRUCTURAL DRAWINGS

PREFINISHED ALUMINUM, 0.032"THICK PERFORATED

BACKER ROD & SEALANT

ALUMINUM STOREFRONT (OR CURTAINWALL) SYSTEM WITH 1" INSULATED GLASS

5/8" GWB

METAL STUD HEADER. REFER TO STRUCTURAL DRAWINGS

KAWNEER 451-T

G

4 1/2"1"

ALUMINUM STOREFRONT (OR CURTAINWALL) SYSTEM WITH 1" INSULATED GLASS

PRE-FINISHED ALUMINUM CLOSURE, 0.32" THICK (MATCH FIBER CEMENT)

PLYWOOD SHEATHING, REFER TO STRUCTURAL DRAWINGS

2X4 TREATED WOOD BLOCKING

FIBER CEMENT CLADDING ON METAL SUBFRAMING

2 1/2" CONTINUOUS INSULATION WITH COMPOSITE FRAMING, 16" O.C.

2X TREATED WOOD BLOCKING

5/8" GWB

BACKER ROD & SEALANT BOTH SIDES FULL PERIMETER OF FRAME

G

KAWNEER 451-T

WEATHER BARRIER OVER PLYWOOD SHEATHING

4 1/2"1"

PLYWOOD.REFER TO STRUCTRAL

METAL STUD

5/8" GWB

FACE OF BRICKBEYOND

CAST STONESLILL BEYOND

FIBER CEMENTPANELS

METAL CHANNEL

ALUMINUM CLOSURE PROFILE BY FIBER CEMENT PANEL MANUFACTURER

ALUMINUM CURTAINWALLSYSTEM

WRAP AIR BARRIER INTO STUD WALL

2X TREATEDWOOD BLOCKING

10"

6"

5/8" GWB

6" METAL STUD FRAMING 16" O.C.REFER TO STRUCTURAL

PANEL DOOR JAMB

1/4" THICK CUSTOM STEEL PLATE FABRICATION. ALL WELDS GROUND

SMOOTH. REFER TO S001 FOR FINISH.

PREFINISHED TRACK AND GUIDESOVERHEAD DOOR SUPPLIER

FIBER CEMENT PANEL

CAST STONE RETURN

BRICK RETURN

PREFINISHED, INSULATIONOVERHEAD COILING DOOR

1 1/4"

CAST STONE SILL WITH BRICK BELOW

5" 3" 6"

11 3/8"

6"

4"3/

4"

2 1/2" RIGID INSULATION

8A403

WEATHER BARRIER OVERSHEATHING. LAP OVERALUMINUM FLASHING

2 1/2" INSULATION

FIBER CEMENT CLADDING

PRE-FINISHED ALUMINUMSILL FLASHING, 0.032" THICK

SPRAY FOAM INSULATION IN HEADER CAVITY

5/8" GWB

6" METAL STUD FRAMINGAND BOX HEADER

PRE-FINISHED OVERHEADCOILING DOOR AND HOOD

PRE-FINISHED TRACK ANDGUIDES BY OVERHEAD DOOR MANUF.

4"1"

1/4" THICK CUSTOM STEEL PLATE FABRICATION. ALL WELDS GROUND SMOOTH. REFER TO S001 FOR FINISH.

6"

2"

11 3/8"

CHECKED BY:DATE ISSUED: DRAWN BY:

PROJECT NUMBER:

DISCLAIMER:

PROFESSIONAL SEAL:

DRAWING TITLE:

SHEET NUMBER:

IFB

19-1

2-33

7

Indi

anap

olis

Pub

lic T

rans

porta

tion

Cor

pora

tion

This construction document is the property of The Etica Group, Inc. It is intended solely for use by The Etica Group, Inc., its heirs, and assigns. Modification or reuse of the document without permission from The Etica Group, Inc. is prohibited. Use of this document for any purpose other than that intended by The Etica Group, Inc. constitutes an impermissible misuse. The Etica group, inc. is not responsible for any damage or injury resulting from misuse of this document. The Etica Group, Inc. disclaims all warranties, express or implied , relating to the use of this document for any purpose other than that intended by The Etica Group, Inc.

BFPS

2/24

/202

0 4:

35:1

7 P

MC

:\Use

rs\tw

inig

er\D

ocum

ents

\18-

120.

5 Tr

aini

ng F

acili

ty_t

win

iger

.rvt

A403

180024.05

JANUARY13, 2020

NEW

TR

AIN

ING

FAC

ILIT

Y

1100

Wes

t 21s

t Stre

etIn

dian

apol

is, I

N 4

6202

ENLARGEDDETAILS

A403 1 1/2" = 1'-0"REF:2 A100 Wall Section - Accoustic Door Partition13

A403 1" = 1'-0" REF:2 A100 Section At Corridor Bulkhead5

A403 1 1/2" = 1'-0" HM Head Detail1

A403 1 1/2" = 1'-0" HM Jamb Detail2

A403 1 1/2" = 1'-0" HM Transom Jamb4

A403 1 1/2" = 1'-0" HM Transom Head and Sill3

A403 1 1/2" = 1'-0"REF:1 A100 Accoustic Door Partition Jamb10

A403 3" = 1'-0" REF:4 A101 AL Head Exterior Fiber Cement12

A403 3" = 1'-0" REF:2 A300 AL Jamb Exterior Fiber Cement11

A403 3" = 1'-0" Transom Jamb Detail7

A403 1 1/2" = 1'-0"REF:3 A300 Door Threshold Detail6

A403 1 1/2" = 1'-0"REF:1 A302 Coiling Door Jamb8

A403 1 1/2" = 1'-0"REF:2 A302 Bus Bay North Wall Coiling Door Head9

NOTE:CONTRACTOR TO COORDINATE FRAME DEPTH REQUIRED FOR WALL TYPE.

ALUMINUM DOOR

ALUMINUM THRESHOLD,SET IN BED OF SEALANT

1/2" EXPANSIONMATERIAL

CONC. WALK, REFER TOCIVIL AND STRUCTURAL

2" RIGID INSULATION

CONC. FOOTING & SLAB,REFER TO STRUCTURAL

REVISION SCHEDULE

# DESCRIPTION DRAWN BY DATE ISSUED

1 Revision 1 Date 1

1

1

twiniger
Text Box
ADDENDUM 2
twiniger
Text Box
2/25/20

S7

S7

S2

S2S3

S5

S5

S5

S2

S7

S3

S1

S1

S1

2

33

6TYP.

CRCR

SINGLE-STORYPROPOSEDBUILDING

FWM

FWM

FWM

FWM

DWM

DWM

DWM

DWM

DWM

DWM

DWM

DWM

DWM

DWM

DWM

SLAT

SLAT

SLAT

SLAT

SLAT

SLAT

SLAT

SLAT

SLAT

SLAT

SLAT

SLAT CO

PROPOSED PUBLICPARKINGPR

OPO

SED

STAF

FPA

RKIN

G

x x x x x x x x x x x x x x x x x x x x x x x x x x x

x x

x

xx

xx

xx

xx

xx

xx

xx

xx

xx

xx

xx

xx

xx

x

x

FWM

x

CO

TWO-STORYPROPOSEDBUILDING

x

S89° 44' 28"W 334.46'

N00°

23'

16"

W

833.

00'

S00°

25'

13"

E 8

33.0

0'

S4

S6

117

CR

7

8

FUTURE25kW GENERATOR

IPL PROVIDEPOLE MOUNTEDTRANSFORMERS

9

10

10

10

10

111111

12

12

B

B

BB

14

15 MDP#4

LP-1#9,11

LP-1#9,11

3/4"C. (2)#10AWG(1) #10 GND.

3/4"C. (2)#10AWG(1) #10 GND.

LP-1#9,11 3/4"C. (2)#10AWG(1) #10 GND.

LP-1#9,11

3/4"C. (2)#10AWG(1) #10 GND.

LP-1#13,15

3/4"C. (2)#10AWG(1) #10 GND.

LP-1#13,15

3/4"C. (2)#10AWG(1) #10 GND.

LP-1#13,15

3/4"C. (2)#10AWG(1) #10 GND.

LP-1#14

LP-1#14,163/4"C. (2)#10AWG(1) #10 GND.

LP-1#10,12

3/4"C. (2)#10AWG(1) #10 GND.

LP-1#10,12

3/4"C. (2)#10AWG(1) #10 GND.

LP-1#10,12

3/4"C. (2)#10AWG(1) #10 GND.

LP-1#10

3/4"C. (2)#10AWG(1) #10 GND.

5'-0

"

5'-0"

J

MDP#6

J

MDP#7

J

MDP#8 5

LP-1#12

13

4

1212

MATCHLINE DRAWING E202MATCHLINE DRAWING E202

S4LP-1#12

S4

LP-1#12

PC16ACCU-1

01/

2"1"

2"

CHECKED BY:DATE ISSUED: DRAWN BY:

DISCLAMIER:

DRAWING TITLE:

SHEET NUMBER:

IFB

19-1

2-33

7

This construction document is the property of The EticaGroup, Inc. It is intended solely for use by The EticaGroup, Inc., its heirs, and assigns. Modification or reuseof the document without permission from The EticaGroup, Inc. is prohibited. Use of this document for anypurpose other than that intended by The Etica Group, Inc.constitutes an impermissible misuse. The Etica group,inc. is not responsible for any damage or injury resultingfrom misuse of this document. The Etica Group, Inc.disclaims all warranties, express or implied , relating to theuse of this document for any purpose other than thatintended by The Etica Group, Inc.

PROFESSIONAL SEAL:

Indi

anap

olis

Pub

lic T

rans

porta

tion

Cor

pora

tion

AESI

Pro

j. N

o:O

RIG

INAL

SH

EET

SIZE

IS 2

4" X

36"

(AR

CH

D)

1/13/20

1/6/

2020

7:5

8:18

AM

180024.5

DAG LDH1/13/2020

NEW

TR

AIN

ING

FAC

ILIT

Y

1100

Wes

t 21s

t Stre

etIn

dian

apol

is, I

N 4

6202

18-0

64

REVISION SCHEDULE

# DESCRIPTION DRAWIN BY DATE ISSUED

ELECTRICAL SITEPLAN

E201

SCALE:ELECTRICAL SITE PLAN

1" = 20'-0"

1. REFER TO DRAWING E002 FOR GENERAL NOTES.

GENERAL NOTES:

1. PROVIDE TWO (2) 10'-0” X 3/4" DIA. GROUND RODS. DRIVE INTO THE GROUND 3'-0”(MIN.) BELOW FINISHED GRADE. GROUND RODS SHALL BE SPACED A MINIMUM OF20'-0” APART FROM EACH OTHER.

2. AS GROUNDING CONDUCTOR ENTERS THE BUILDING STRUCTURE THECONDUCTOR SHALL BE INSTALLED IN 1” PVC CONDUIT. CONDUIT AND GROUNDINGCONDUCTOR SHALL TERMINATE AT MAIN GROUNDING POINT. REFER TO DRAWINGE503 FOR ADDITIONAL INFORMATION.

3. PROVIDE 10'-0” BY 3/4" DIA. GROUND ROD. DRIVE INTO THE GROUND OUTSIDEFOUNDATION PERIMETER AND 3'-0” (MIN.) BELOW FINISHED GRADE. PROVIDE #3/0COPPER GROUNDING CONDUCTOR (BARE) TO MDP GROUND BUS (TMGB) INELECTRICAL ROOM.

4. PROVIDE SIMPLEX VEHICLE CARD READER WITH PEDESTAL, PROVIDE BASE FORPEDESTAL AS REQUIRED, COORDINATE WITH SIMPLEX REPRESENTATIVE ON STYLEAND REQUIREMENTS.

5. PROVIDE LEVITON ELECTRIC VEHICULE CHARGING STATION WITH PEDESTALEVR30-B18 OR APPROVED EQUAL. PROVIDE 2"C, (2) #1/0 AWG, (1) #1/0 GND. TOPANEL AND CIRCUIT NUMBER INDICATED. PROVIDE BASE AND BOLTS AS REQUIREDBY MANUFACTURER.

6. PROVIDE LIGHT FIXTURE, POLE AND CONCRETE BASE. REFER TO DETAIL 7 & 8 ONDRAWING E501 FOR ADDITIONAL INFORMATION.

7. DEVICE IS FUTURE CARD READER FOR PEDESTRIAN GATE, PROVIDE FLUSH INGRADE BOX (TIER 8 RATED ENCLOSURE) NEAR HINGE SIDE OF GATE, RACEWAYAND PULL STRING SECURED AT BOTH ENDS. PROVIDE 1" RACEWAY ROUTEDALONG EXTERIOR OF BUILDING AND THROUGH FOUNDATION WALL AND UPTHROUGH FLOOR IN ELECTRICAL ROOM TO A J-BOX NEAR ACCESS CONTROLPANEL, PROVIDE LABEL ON J-BOX.

8. POLE MOUNTED TRANSFORMER(S) PROVIDED BY IPL. PROVIDE THREE (3) 4"CONDUIT FROM TRANSFORMER LOCATION, WIRE SHALL BE PROVIDED BY IPL, STUBUP LOCATION SHALL BE COORDINATED WITH IPL. PROVIDE TEMPORARY /CONSTRUCTION POWER REQUIRED FOR ALL TRADES, COORDINATE WITH IPL.

9. CURRENT TRANSFORMER ENCLOSURE & METER CABINET FURNISHED BY IPLINSTALLED BY ELECTRICAL CONTRACTOR, PROVIDE MOUNTING HARDWARE ASREQUIRED.

10. PROVIDE CAMERA, MOUNTING BRACKETS, RACEWAY AND WIRE AS REQUIRED.RACEWAY AND WIRE SHALL BE ROUTED BACK TO TELECOM RACK. PROVIDERACEWAY FOR CABLES WITHIN LIGHT FIXTURE POLE AND PENETRATE POLE ATCAMERA LOCATION AND ENCLOSURE LOCATION. MOUNTING HEIGHT OF CAMERASHALL BE 18'-0" ABOVE GRADE, COORDINATE MOUNTING HEIGHT WITH POLEMANUFACTURER.

11. PROVIDE ROUGH-IN LOCATION FOR FUTURE BUS CHARGING STATIONS.COORDINATE WITH OWNER ON ROUGH-IN LOCATION PRIOR TO STARTINGCONSTRUCTION. PROVIDE FLUSH IN GRADE BOX (TIER 8 RATED ENCLOSURE) INGRASS AREA ADJACENT TO ROUGH-IN LOCATION AND (2) 4" CONDUIT WITH PULLSTRING SECURED AT EACH END. PROVIDE RACEWAY UP ALONG EXTERIOR OFBUILDING WITH LB AT ELEVATION ABOVE LAY-IN CEILING, RACEWAY SHALL BEROUTED IN BUILDING ABOVE LAY-IN CEILING TO ELECTRICAL ROOM WITH J-BOX INELECTRICAL ROOM LABELED AS SPARE BUS CHARGING STATION.

12. PROVIDE VERACITY LONGSPAN VLS-1P-C PoE EXTENDERS AND NEMA TYPE 3ENCLOSURE. MOUNT PoE EXTENDERS WITHIN ENCLOSURE, MOUNT ENCLOSURETO LIGHT POLE +/- 24" ABOVE GRADE, COORDINATE MOUNTING HEIGHT WITHOWNER, SIZE ENCLOSURE AS REQUIRED BY EXTENDERS MANUFACTURERSREQUIREMENTS. PROVIDE WETHER TIGHT HUBS ON RACEWAYS THAT ENTERENCLOSURE. RACEWAY SHALL BE ROUTED THROUGH LIGHT POLE AND PENETRATEPOLE ONLY AT ENCLOSURE AND CAMERA MOUNTING LOCATION. PENETRATIONSSHALL BE SEALED WITH WEATHER TIGHT HUBS.

13. PROVIDE SIMPLEX BUS TAG STYLE READER ON PEDESTAL, PROVIDE BASE FORPEDESTAL AS REQUIRED, COORDINATE WITH SIMPLEX REPRESENTATIVE ON STYLEAND REQUIREMENTS.

14. PROVIDE FLUSH BOX (TIER 8 RATED ENCLOSURE) IN GRASS FLUSH WITH GRADEFOR FUTURE POWER NEEDS AT STREET SIGN. PROVIDE TWO (2) 1" CONDUITSFROM BUILDING ELECTRICAL ROOM WITH J-BOX LABELED INSIDE BUILDING. ONERACEWAY IS FOR FUTURE POWER AND ONE RACEWAY IS FOR FUTURE DATA.PROVIDE PULL STRING AND SECURE AT EACH END. COORDINATE WITH OWNER ONLOCATION OF QUAZITE BOX NEAR STREET SIGN.

15. PROVIDE 1-1/2"C, (3) #2/0 AWG, (1) #6 GND FOR ACCU-1 FROM PANEL AND CIRCUITINDICATED ON DRAWING. SAFETY SWITCH SHALL BE FURNISHED BY MECHANICALEQUIPMENT MANUFACTURER, INSTALLED BY ELECTRICAL CONTRACTOR.COORDINATE LOCATION WITH MECHANICAL CONTRACTOR. PROVIDE WATER TIGHTHUBS AS REQUIRED.

16. PROVIDE PHOTOCELL FOR LIGHTING CONTACTOR LC-1, MOUNT HIGH ON EXTERIORWALL AND AIM TO NORTH SKY. COORDINATE FINAL LOCATION WITH ARCHITECTAND OWNER, REFER TO LIGHTING CONTACTOR DETAIL FOR ADDITIONALINFORMATION.

17. PROVIDE COPPER GROUNDING CONDUCTOR TO SEWER, CONNECTION ANDLOCATION AS REQUIRED.

PLAN NOTES:#

DAG LDH

1

ADDENDUM 2 DAG 02/25/20

1

1

1

AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
F

RE

F.

RE

F.

ATS

S5S5S5S5S5

S5S6S6S6S6

S7

S5

S7

RE

F.

RE

F.

ATS

MIC

RO

FS

TS

FF

AVAVAV

V

AV

VV

V V

AV

V

CR

CR

V

FF

AV

PB

JJ

J

J

SD

AS

S

SS

SS

SS

S

CR

RX

ES

ES

DS

DS

DSES

RX

FF

J

J

J

J

J

J

J

J

J

AV

SD

V

JJ

J

J

J

J

J

J

J

J

V

JJ

J

CR

DSESRX

J

J

J

RX

DS

ES

JJ

ATS

V

J

CR

DS

RX

ES

J

G

F

E

D

C

BA

123456

Sim Room106 Office

104Shared Office

102

Lactation112

Storage123

Mechanical115

Women's113

Men's111

Electrical116

Water118

Security Office101

Vestibule100

RC-1

S1S1S1

S3

S2 S2

S2S2

S2

S2S2S2

FAAP

FACP

F3

F6

F6FX

F6F6F7a

F5 F5

F4

F4

F4

F4

F1

F1

F1

F1

F1F1 F1 F1

F5

F1

F5

F1

F7a

F1 F1

F5 F5

F1 F1 F1 F1

F7aF7a

F6

F6

F3F3

F3

S8

F3F3F3F3

F3 F3 F3

S8

F3

F3

S8

F3

F3F3

F3F3

F3

S8

F1

F1F1

F1

LP-1

F5

S8

F2 F2

F1

S8

FX FXFXFX

EM EM EM

EM EM

F3F3

F3

Dispatch / IT108

Break Rm.110

RR114

F7a

F7a

F7a

F1

F2

F1

F1

F1

F1F1

F2

F5F5

F4

F4

F4

F4F4

F4

F4

F4F4

F4

F4

F4F4

F4

F4

F4F4F4

F4

F4

F4 F4

F4

F4

F4

F4

F4

F4

F7a

F7a

F7aF7a

EM

EM

EM

EM EM

d

e

e

d d

d

d

d c

c

c

c c

c

c

c

b

b

b

b b

b

b

b b

b

a

a

F5

F5

LP-1# 5LP-1# 5 LP-1# 5

LP-1# 7 LP-1# 6

b

b

b

b

LP-1# 3

LP-1# 3LP-1# 1LP-1# 1

LP-1# 4LP-1# 4

LP-1# 4

LP-1# 2

LP-1# 2

LP-1# 2

LP-1# 2

LP-1# 2

LP-1# 2

LP-1# 1LP-1# 1

LP-1# 1

1313

1313

13

13 1313

13

1313

13

13 13 13

131313

13

13

13

Training Room103

S4

F2 F2

Storage105

S1

S8

EM

FX

EM

PS

28

29

38

38

Training Room107

Room109

Custodial125

Bus Bay121

Storage120

F6

F1

F1

LP-1# 1

F1

EM

F5

14'-6"

8'-6"

8'-6"8'-6"

8'-6"

PS

28

F5

FX

S2

FX S2

F1

13

S3

S3 S3

F7b

F7b

F7b

F7b

F7b

F7b

F7b

F7b

F7b

F7b

F7b

F7b

F7b

F7b F7b

F7b F7b

F7b

F7b

F7bF7b

F7b

F7b

F7b

S2

S2

29

LP-1# 8

13

F7a

F7aLP-1# 2

13

FX

S8

44

F5b

F5b

F5b

LP-1# 12

LP-1# 12

LP-1# 12

45

S3

G

F

E

D

C

BA

123456

Sim Room106

Office104

Shared Office102

Lactation112

Storage123

Mechanical115

Women's113

Men's111

Electrical116

Water118

Security Office101

Vestibule100

Break Rm.110 Dispatch / IT

108

RR114

360 360

AV

5

5

5 5

3030

FAAP

FACP

E3013

Training Room103

AA

BB

B

B

360

30

A

DWH-1

RP-1#8

RP-1#11

DHWP-1

RP-1#1

TV

1111

11

AVRP-1#4

RP-1#4

RP-1#17

RP-1#4

RP-1#17

RP-1#4

RP-1#17

RP-1#17 RP-1#3

RP-1#23

RP-1#3

RP-1#3

RP-1#3

RP-1#25

9

RP-1#17

RP-1#32

RP-1#2

RP-1#16

RP-1#15

RP-1#15

RP-1#15

RP-1#2

XRP-1#1RP-1#7

RP-1#7RP-1#13

RP-1#10RP-1#19RP-1#4

RP-1#19

RP-1#27

RP-1#19

14

1414

14

14

RP-1#21

16

17

18

19

2020

4

4

4

14

B 5

21

22

15

22

TV21

12

Storage105

Training Room107

RP-1#5RP-1#6

24

RP-1#28

25

MDP#9

RP-1#29

RP-1#31

HWP-1

PUH-1

RP-1#22

26

B-2

B-1

PUH-3

CUH-1

RP-1#1826

RP-1#20

RP-1#26

26

WS-1

MDP#5

WP

RP-1#3

AP

AC

AP

AC

AP

AC

APAC

AC

23

1414

14

26

14

14

APAP

ACAP

32

14 14

RP-1#9

14

23

33

AC

AC

VAV-02

VAV-03

VAV-05

VAV-06

VAV-04

VAV-01

VAV-07

VAV-08

VAV-09

VAV-10

RP-1#34

RP-1#34

RP-1#34

RP-1#34

RP-1#34

RP-1#36

RP-1#36

RP-1#36

RP-1#36

RP-1#36

36

36

36

36

36

36

36

36

36

36

AC-1

MDP#10

360

30

A

Custodial125

RP-1#30 RP-1#14

RP-1#14

RP-1#12

RP-1#12

RP-1#12

RP-1#12

RP-1#12

RP-1#12

RP-1#14

RP-1#14

RP-1#19

RP-1#33

RP-1#33

RP-1#33

RP-1#33

RP-1#35

RP-1#35

RP-1#35

RP-1#35

30

BAC

AC

B

30

RP-1#17

MOTOR DAMPER 1RP-1#43

31

31

RP-1#43MOTOR DAMPER 2

31

RP-1#43MOTOR DAMPER 3

40

39

22

41

IR-1

42

MDP#11

MDP#12

RP-1#45

MDP#13

CO SENSOR

43

22

21TV

27

TYP.

46

ACCU-1

VF-1

EF-1

47

48

48

37

AC

RP-1#37

RP-1#40RP-1#38

23

1

1

49

49

C

B

RP-1

LP-1

MDP

1

2

3

3

4

10

XRP-1

3

ACCESSCONTROL

XRP-1#7

RP-1#19

6

7

XRP-1#3

XRP-1#5

8

Electrical116

22

XRP-1#9

RP-1#2426

PUH-2

14

35

34

01/2

"1"

2"

CHECKED BY:DATE ISSUED: DRAWN BY:

DISCLAMIER:

DRAWING TITLE:

SHEET NUMBER:

IFB 1

9-1

2-3

37

This construction document is the property of The Etica

Group, Inc. It is intended solely for use by The Etica

Group, Inc., its heirs, and assigns. Modification or reuse

of the document without permission from The Etica

Group, Inc. is prohibited. Use of this document for any

purpose other than that intended by The Etica Group, Inc.

constitutes an impermissible misuse. The Etica group,

inc. is not responsible for any damage or injury resulting

from misuse of this document. The Etica Group, Inc.

disclaims all warranties, express or implied , relating to the

use of this document for any purpose other than that

intended by The Etica Group, Inc.

PROFESSIONAL SEAL:

Indianapolis Public Transportation Corporation

AE

SI P

roj. N

o:

OR

IGIN

AL S

HE

ET

SIZ

E IS

24"

X 3

6"

(AR

CH

D)

1/13/20

2/2

3/2

02

0 4

:25:0

7 P

M

E301

180024.5

DAG LDH1/13/2020

NEW TRAINING FACILITY

1100 W

est 21st Street

Indianapolis, IN 46202

FIRST FLOOR

LIGHTING AND

POWER &

SYSTEMS PLANS

18-0

64

1. PROVIDE 1200A SERVICE ENTRANCE RATED DISCONNECT FUSIBLE SWITCH, REFER TO DETAIL 1 ON DRAWING E503 FOR ADDITIONAL INFORMATION.

2. PROVIDE 1200A 120/208V MAIN DISTRIBUTION PANELBOARD (MDP), REFER TO RISER AND PANEL SCHEDULE ON DRAWING E503 & E601 FOR ADDITIONAL INFORMATION.

3. PROVIDE 120/208V LIGHTING PANEL (LP-1), POWER PANEL (RP-1) AND POWER PANEL (XRP1). REFER TO PANEL RISER AND SCHEDULES ON DRAWING E503 & E601 FOR ADDITIONAL INFORMATION.

4. PROVIDE J-BOX AND MAINTAIN 3' OF WALL SPACE FOR FUTURE 200A, 3 POLE, 120/208V THREE PHASE, OPEN TRANSITION AUTOMATIC TRANSFER SWITCH, NEMA 1 ENCLOSURE. ATS NOT PROVIDED FOR THIS PROJECT.

5. PROVIDE DATA JACK AND CAMERA, JACK FOR PoE CAMERAS SHALL BE LOCATED INSIDE THE BUILDING IN ACCESSIBLE LOCATION ABOVE CEILING. PROVIDE RACEWAY AND CABLE THROUGH WALL AS REQUIRED. SOUTH SIDE CAMERAS SHALL BE MOUNTED AT 11'-0" ABOVE GRADE AND NORTH SIDE CAMERAS SHALL BE MOUNTED AT 13'-0" ABOVE GRADE. COORDINATE FINAL LOCATION AND FIELD OF VIEW OF CAMERA WITH OWNER'S SECURITY GROUP PRIOR TO DATA JACK AND CAMERA INSTALLATION. PROVIDE CAMERA WITH MOUNTING BRACKETS AS REQUIRED.

6. PROVIDE MAIN GROUNDING BUSBAR (MGB), REFER TO DETAIL 2 ON DRAWING E503.7. PROVIDE 3/4" FIRE RETARDANT PLYWOOD FROM 6" AFF TO 8'-6" AFF, LENGTH AS SHOWN ON DRAWING. PLYWOOD SHALL BE INSTALLED ON

WALL ADJACENT TO RACK.8. BDF EQUIPMENT FRAME, REFER TO DETAIL 3 ON DRAWING E502.9. PROVIDE POWER TO OVERHEAD SCREEN, THIS INCLUDES ROUGH-IN, RACEWAY AND WIRE. OVERHEAD SCREEN AND SWITCH PROVIDED BY

DIVISION 11 CONTRACTOR, COORDINATE WITH ARCHITECT ON LOCATION. 10. PROVIDE SIMPLEX C-CURE 9000 ACCESS CONTROL CONTROLLER PANEL. ALL DEVICES AND EQUIPMENT SHALL BE A SIMPLEX SYSTEM, REFER

TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. POINT OF CONTACT IS RICH MCGEE WITH JOHNSON CONTROL, PHONE 317-917-5028. PROVIDE DATA JACK AND CABLE DEDICATED FOR ACCESS CONTROL PANEL, COORDINATE WITH SIMPLEX ON TERMINATION OF DATA CABLE. PROVIDE TWO (2) POWER SUPPLIES AS REQUIRED, ONE FOR POWER TO CONTROL PANEL AND OTHER POWER SUPPLY IS FOR BUS TAG READER FOR NORTH LOT ENTRY.

11. PROVIDE AV RACK AND CONTROLLER(S) FOR 1, 2 & 3 ROOM OPERATION. THE EAST SIDE OF ROOM IS THE MAIN SIDE VIEWED WHEN IN SINGLEROOM, WEST ROOMS ARE SECONDARY SIDE. WHEN PARTITION IS CLOSED THE MAIN AND SECONDARY SIDES WILL OPERATE INDEPENDENTLY FROM EACH OTHER. WHEN PARTITION(S) ARE OPEN THE SECONDARY SIDES BECOME PART OF MAIN SIDE. THE AV SYSTEM SHALL CONSIST OF CONTROLLER(S), SPEAKERS, AV RACK AND WIRELESS MICROPHONE FOR PRIMARY SIDE ONLY. SYSTEM SHALL BE A DELEGATED DESIGN, REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. SCREEN AND DISPLAY/TV SHALL BE PROVIDED BY DIVISION 11 CONTRACTOR. COORDINATE WITH ARCHITECT ON PLACEMENT OF DISPLAYS AND SCREEN PRIOR TO ROUGH-IN.

12. PROVIDE OVERHEAD PROJECTOR AND COORDINATE WITH PROJECTOR AND SCREEN MANUFACTURERS ON LOCATION PRIOR TO ROUGH-IN. PROVIDE RACEWAY AND CABLES FROM AV RACK TO PROJECTOR AS REQUIRED, REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

13. CONNECT LIGHTING FIXTURES IN THIS ROOM TO CIRCUIT INDICATED AND LIGHTING CONTROL AS SHOWN, REFER TO DETAIL SHEETS FOR ADDITIONAL INFORMATION.

14. CONNECT RECEPTACLES IN THIS ROOM TO CIRCUIT INDICATED UNLESS NOTED OTHERWISE.15. PROVIDE MOMENTARY REMOTE DOOR RELEASE TIED INTO ACCESS CONTROL SYSTEM. COORDINATE WITH OWNER ON LOCATION AND STYLE

OF BUTTON PRIOR TO ROUGH-IN.16. PROVIDE POWER 3/4"C (3) #8 AWG & (1) #10 GND TO AHU-1 FROM POWER SOURCE SHOWN. SAFETY SWITCH AND VFD FOR AHU-1 SHALL BE

FURNISHED BY MECHANICAL CONTRACTOR AND INSTALLED BY ELECTRICAL CONTRACTOR, COORDINATE WITH MECHANICAL DRAWINGS ON LOCATION.

17. PROVIDE GFCI RECEPTACLE, DEDICATED CIRCUIT FOR WS-1, COORDINATE WITH MECHANICAL CONTRACTOR FOR LOCATION OF EQUIPMENT AND LENGTH OF CORD.

18. PROVIDE POWER 3/4"C (2) #10 AWG & (1) #10 GND TO B-1 (BASE BID) & B-2 (ALTERNATE) FROM POWER SOURCE SHOWN. MOTOR STARTER FOR B-1 & B-2 FURNISHED BY MECHANICAL CONTRACTOR AND INSTALLED BY ELECTRICAL CONTRACTOR, COORDINATE LOCATION WITH MECHANICAL DRAWINGS ON LOCATION.

19. FIRE ALARM DUCT DETECTOR SHALL BE INSTALLED WITHIN RETURN DUCT, COORDINATE WITH MECHANICAL CONTRACTOR ON LOCATION. UPON SMOKE DETECTED A CONTROL MODULE SHALL SHUT DOWN AHU, COORDINATE WITH MECHANICAL CONTROLS CONTRACTOR ON SHUT DOWN CIRCUIT.

20. PROVIDE SPECIAL PURPOSE RECEPTACLES FOR AV SYSTEM - ONE BOX AT 18" AND 1 BOX AT 48". THE BOX AT 18" SHALL INCLUDE HDMI INPUT, VGA INPUT AND THE BOX AT 48" SHALL INCLUDE VOLUME CONTROL AND SELECTOR SWITCH FOR SELECTING MEDIA INPUTS. DEVICES MUST BE COMPATIBLE WITH MANUFACTURER OF AV EQUIPMENT AND BE PROVIDED WITH PROPER COVER PLATE. PROVIDE RACEWAY AND CABLES TO AV RACK AS REQUIRED, REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

21. COORDINATE MOUNTING HEIGHT OF DEVICE WITH ARCHITECTURAL PLANS AND OWNER PRIOR TO ROUGH-IN.22. PROVIDE DEVICES, RACEWAY, WIRING, AND TERMINATIONS FOR ACCESS CONTROL SYSTEM. CONNECT SYSTEM TO ROOM POWER CIRCUIT.

PROVIDE PROPER CABLE, RACEWAY, TERMINATIONS, ETC FOR COMPLETE SYSTEM, WIRED TO ELECTRICAL ROOM. COORDINATE WITH OWNER, REFER TO DRAWING E503 FOR ADDITIONAL INFORMATION.

23. PROVIDE POWER 3/4"C (2) #10 AWG & (1) #10 GND TO HAND DRYER FROM POWER SOURCE SHOWN. COORDINATE WITH ARCHITECTURAL DRAWINGS ON LOCATION.

24. PROVIDE POWER 3/4"C (2) #12 AWG & (1) #12 GND TO EF-1 FROM POWER SOURCE SHOWN. COORDINATE LOCATION WITH MECHANICAL DRAWINGS.

25. PROVIDE POWER 3/4"C (3) #12 AWG & (1) #12 GND TO HWP-1 FROM POWER SOURCE SHOWN. MOTOR STARTER FOR HWP-1 SHALL BE FURNISHED BY MECHANICAL CONTRACTOR AND INSTALLED BY ELECTRICAL CONTRACTOR, COORDINATE LOCATION WITH MECHANICAL DRAWINGS.

26. PROVIDE POWER 3/4"C (2) #12 AWG & (1) #12 GND TO UNIT HEATER FROM POWER SOURCE SHOWN. DISCONNECT SWITCH SHALL BE FURNISHED BY MECHANICAL CONTRACTOR AND INSTALLED BY ELECTRICAL CONTRACTOR, COORDINATE LOCATION WITH MECHANICAL DRAWINGS.

27. PROVIDE SPEAKERS AS PART OF DELEGATED DESIGN, QUANTITY SHALL BE VERIFIED WITH TYPE SELECTED AND SIZE OF ROOM.28. PROVIDE PARTITION SENSOR FOR LIGHTING CONTROL, REFER TO DETAIL 1 ON DRAWING E501. COORDINATE WITH ARCHITECTURAL DETAILS

ON TYPE OF FURNITURE PARTITION.29. OCCUPANCY SENSOR SHALL BE STEM MOUNTED AT SAME ELEVATION AS BOTTOM OF LIGHTING FIXTURES IN THIS SPACE.30. PROVIDE DATA JACK AND CAMERA, JACK FOR PoE CAMERAS SHALL BE LOCATED IN ACCESSIBLE LOCATION ABOVE CEILING OR HIGH ON WALL

IN EXPOSED TO DECK AREA. CAMERA SHALL BE CEILING MOUNTED COORDINATE FINAL LOCATION AND FIELD OF VIEW OF CAMERA WITH OWNER'S SECURITY GROUP PRIOR TO DATA JACK AND CAMERA INSTALLATION. PROVIDE CAMERA WITH MOUNTING BRACKETS AS REQUIRED.

31. PROVIDE POWER 3/4"C (2) #12 AWG & (1) #12 GND TO DAMPER MOTOR FROM POWER SOURCE SHOWN. MECHANICAL CONTRACTOR SHALL PROVIDE CONTROL TRANSFORMER, COORDINATE LOCATION WITH MECHANICAL DRAWINGS.

32. PROVIDE J-HOOKS AS REQUIRED FOR SUPPORT OF DATA CABLES. MOUNT ABOVE CEILING IN ACCESSIBLE LOCATION ALONG WALL OF CORRIDOR TO ELECTRICAL ROOM.

33. PROVIDE TRIP UNIT FOR GFCI RECEPTACLE ABOVE SINK IN ACCESSIBLE LOCATION. COORDINATE LOCATION WITH OWNER AND ENGINEER PRIOR TO ROUGH-IN.

34. PROVIDE (2) EZ-PATH SMOKE 3" SQUARE ASSEMBLIES FOR HORIZONTAL CABLES. COORDINATE HEIGHT AND LOCATION WITH CABLE RUNWAY AND OTHER TRADES.

35. PROVIDE SECTION OF 12" LADDER CABLE RUNWAY. HEIGHT SHALL BE COORDINATED WITH TOP OF EQUIPMENT FRAME TO ENSURE CABLE TRANSITION FROM TRAY TO EQUIPMENT RACK.

36. PROVIDE POWER 3/4"C (2) #12 AWG & (1) #12 GND TO VAV BOX FROM POWER SOURCE SHOWN. MECHANICAL CONTRACTOR SHALL PROVIDE CONTROL TRANSFORMER, COORDINATE LOCATION WITH MECHANICAL DRAWINGS.

37. PROVIDE 30A GENERAL DUTY 240V NON-FUSED SAFETY SWITCH. SWITCH SHALL BE TYPE 1 ENCLOSURE. MOUNT SWITCH TO WALL, PROVIDE CHANNEL STRUT FRAME AS REQUIRED. COORDINATE LOCATION WITH MECHANICAL CONTRACTOR AND OTHER TRADES.

38. COORDINATE SWITCH LOCATION WITH ARCHITECT.39. PROVIDE ELECTRICAL CONNECTION FOR VF-1. PROVIDE 3/4"C, (3) #12 AWG, (1) #12 GND TO PANEL AND CIRCUIT SHOWN. COORDINATE WITH

CONTROLS CONTRACTOR, REFER TO SEQUENCE OF OPERATION. EC SHALL INSTALL FURNISHED DISCONNECT.40. PROVIDE HEAVY DUTY NEMA 3, 60A, 240V RATED NON-FUSED SAFETY DISCONNECT SWITCH FOR AC-1. MOUNT SWITCH ON WALL NEAR UNIT,

PROVIDE CHANNEL STRUT FRAME AS REQUIRED. PROVIDE 3/4"C, (3) #8 AWG, (1) #10 GND TO PANEL AND CIRCUIT SHOWN.41. PROVIDE ELECTRICAL CONNECTION FOR IR-1. PROVIDE 3/4"C, (3) #12 AWG, (1) #12 GND TO PANEL AND CIRCUIT SHOWN. COORDINATE WITH

MECHANICAL CONTRACTOR ON LOCATION.42. PROVIDE HEAVY DUTY NEMA 3, 30A, 240V RATED NON-FUSED SAFETY DISCONNECT SWITCH FOR OVERHEAD DOOR. MOUNT SWITCH ON WALL

NEAR DOOR OPERATOR, PROVIDE CHANNEL STRUT FRAME AS REQUIRED. PROVIDE 3/4"C, (3) #12 AWG, (1) #12 GND TO PANEL AND CIRCUIT SHOWN.

43. PROVIDE ELECTRICAL CONNECTION FOR CO SENSOR. PROVIDE 3/4"C, (3) #12 AWG, (1) #12 GND TO PANEL AND CIRCUIT SHOWN. COORDINATEWITH MECHANICAL CONTRACTOR ON LOCATION.

44. PROVIDE ROOM CONTROLLER WITHIN PLENUM RATED ENCLOSURE, INSTALL ABOVE LAY-IN CEILING, MOUNT HIGH ON WALL NEAR DOOR. COORDINATE LOCATION WITH OWNER. PROVIDE LABEL ON ROOM CONTROLLER J-BOX OR ENCLOSURE. REFER TO DETAIL FOR ADDITIONAL INFORMATION.

45. PROVIDE LIGHTING CONTACTOR LC-1, REFER TO LIGHTING CONTACTOR DETAIL FOR ADDITIONAL INFORMATION.46. POWER FOR ACCU-1 SHOWN ON DRAWING E201.47. PROVIDE RACEWAY AND CABLES FROM AV RACK TO TV/MONITOR AS REQUIRED, REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.48. PROVIDE COAX JACK ADJACENT TO DATA JACK, ROUTE COAX CABLE INTO ELECTRICAL ROOM WITH ENOUGH SLACK FOR TERMINATION TO

TAKE PLACE AT EQUIPMENT RACK, TERMINATION TO BE DONE BY OWNER, COORDINATE WITH OWNER.

PLAN NOTES:#

1. REFER TO DRAWING E002 FOR GENERAL NOTES.

GENERAL NOTES:

Scale: 1/8" = 1'-0"

FIRST FLOOR LIGHTING PLAN

Scale: 1/8" = 1'-0"

FIRST FLOOR POWER & SYSTEMS PLAN

Scale: 1/4" = 1'-0"

ENLARGED ELECTRICAL ROOM PLAN3

REVISION SCHEDULE

# DESCRIPTION DRAWIN BY DATE ISSUED

1 ADDENDUM 2 DAG 2/25/20

1

1

1

1

11

1

1

1

1

11

49. PROVIDE DATA OUTLET CONSISTING OF FOUR (4) DATA JACKS IN EACH OUTLET, TWO JACKS SHALL BE COLOR OF BLUE AND TWO JACKS SHALL BE COLOR OF WHITE TO MATCH REST OF NETWORK JACKS, COORDINATE COLOR WITH OWNER.

1

1

1

NOTE:

1. SENSORS SHALL CONTROL ALL FIXTURES WITHIN ROOM / AREA.2. FOLLOW ALL MANUFACTURES INSTRUCTIONS FOR INSTALLATION.

3. ALL LIGHTING SHALL TURN ON AUTOMATICALLY AND OFF AUTOMATICALLY AFTER TIME-OUT

PERIOD.4. REFER TO PLANS FOR DEVICE QUANTITY AND TYPE.

5. PROVIDE UL 924 EMERGENCY POWER CONTROL AS REQUIRED.

LIGHTING LOAD

HOTBLK

COMMONWHT

OUTPUTBLKCONTROL

HOTBLK

COMMONWHT

OUTPUTBLKCONTROL

HOT

NEUTRAL

LIGHTING LOAD

OCCUPANCY SENSOR(S)

CEILING MOUNTED

OCCUPANCY SENSOR(S)

CEILING MOUNTED

30" DIA.

30

" M

IN.

6'-0

"

FLUSH WHEN INSTALLED INSIDEWALK AREA. 0'-2" ABOVEGRADE WHEN INSTALLED INGREEN SPACES. 30" WHENINSTALLED IN VEHICULARAREA

24" DIA.

GROUNDING LUG SHALLBE PROVIDED IN BASE

FINISH GRADE

(6) #8 BARS WITH#3 TIES @ 16" O.C.

1" CONDUIT CAPPED 12"BEYOND BASE FORFUTURE CONNECTIONS,PROVIDE PULL STRING INRACEWAY

GROUT

PVC SCH-80CONDUIT FEEDCONTINUOUS TO PREVIOUSLIGHT FIXTURE OR SOURCE

#6CU BARE (EXOTHERMICALLYWELD TO ENCASED STEELCONCRETE FOR UFER GROUND)

PVC SCH-80CONDUIT FEEDCONTINUOUS TO NEXTLIGHT FIXTURE

FIELD VERIFY BOLT PATTERN

PVC TO GRC COUPLING,ENCASE IN CONCRETE (TYP)

GRC CONDUIT

3'-0

"

1'-6"

30

" M

IN.

1'-6

"

2" CL.

3"

CL.

1'-6"

2" ABOVE GRADEWHEN INSTALLEDIN GREEN SPACE.FLUSH WHENINSTALLEDIN SIDEWALK AREA

#5 (TYP.)

#4 TIES @ 12"

(4) #5'S

#4 TIES @ 12"

CONC. FOOTER

CONDUIT FEEDCONTINUOUS TONEXT LIGHT FIXTUREOR SOURCE

LIGHTING FIXTURE BASEFIELD VERIFY BOLTPATTERN

CONDUIT FEEDCONTINUOUS TONEXT LIGHTFIXTURE OR SOURCE

FINISH GRADE

CHAMFER ONLY WHENINSTALLED IN GREEN SPACE

#6CU BARE (EXOTHERMICALLYWELD TO ENCASED STEELCONCRETE FOR UFER GND)

GROUNDING LUG SHALLBE PROVIDED IN BASE

SECTIONSCALE: NTS

POWER PACKHOT 120V

LIGHTING LOAD

NEUTRAL

BLK

BLU

RE

D

0-10 VOLTCONTROL WIRING

RED

WHITE

BLACK

GND

ON/OFFSWITCH

24VDC CEILINGOR WALLOCCUPANCYSENSOR(S)

+24 VDC

COMMON

OUTPUT

CONTROL

RED

BLK

BLU

SENSOR

0-10V

CONTROL

BLU

GRAY

BLU

0-10VVIOLET

COMMONBLACK

24VDCRED

GND

RED

NOTES:

1. BASIS OF DESIGN IS A WATTSTOPPER SYSTEM, COORDINATE WITH

OTHER MANUFACTURERS ON COMPONENTS NEED FOR A COMPLETESYSTEM.

2. REFER TO PLANS AND SCHEDULES FOR TYPE AND QUANTITY OF

SENSORS & KEYPADS AND NUMBER OF ZONES.3. IN LIEU OF A COMPLETE CONDUIT SYSTEM, THE LIGHTING CONTROL

CAT5E AND CLASS 2 DIMMING CONTROL WIRE CAN BE INSTALLED IN

A SKELETAL TYPE CONDUIT SYSTEM USING PLASTIC PUSH-ONBUSHINGS (ARLINGTON INDUSTRIES) ON CONDUIT ENDS AND

APPROPRIATE SUPPORTS FROM BUILDING STRUCTURE OR BRIDLE

RINGS / J-HOOKS THAT ARE ATTACHED TO BUILDING STRUCTURE,SPACE NO FARTHER THAN 5'-0" APART AND 10" MINIMUM ABOVE

CEILING. WIRING NOT IN CONDUIT SHALL BE PLENUM RATED.

NOTE:

1. BASIS OF DESIGN IS WATTSTOPPER LMSW-105

2. BUTTONS SHALL HAVE MANUFACTURE APPLIED ENGRAVING ON SWITCH AS SHOWN.

3. REFER TO PLANS FOR LOCATION AND QUANTITIES.

SCENE SWITCH

ROCKERENGRAVE: UP/DN

SCENE 1ENGRAVE: ON ALL

SCENE 2ENGRAVE: MED DIM

SCENE 3ENGRAVE: LOW DIM

SCENE 4ENGRAVE: OFF ALL

NOTE:

1.BASIS OF DESIGN IS WATTSTOPPER LMSW-102.

2.BUTTONS SHALL HAVE MANUFACTURE APPLIED ENGRAVING ON SWITCH AS SHOWN.

MASTER SWITCH

ON

OFF

ON

DIP

12

34

56

78

1 2 3 4 5 6 7 8 910

RED LOAD 'a'

NEUTRAL

HOT 120VUNSWITCHED

BLK

GND

CAT5E CABLE

ROOM CONTROLLER

0-10 VOLTCONTROL WIRING

CEILINGMOUNTEDOCCUPANCYSENSOR(S)

SEQUENCE OF OPERATION:NOTES:

1. BASIS OF DESIGN IS A WATTSTOPPER SYSTEM, COORDINATE WITH

OTHER MANUFACTURERS ON COMPONENTS NEED FOR A COMPLETE

SYSTEM.2. REFER TO PLANS AND SCHEDULES FOR TYPE AND QUANTITY OF

SENSORS & KEYPADS AND NUMBER OF ZONES.

3. IN LIEU OF A COMPLETE CONDUIT SYSTEM, THE LIGHTING CONTROLCAT5E AND CLASS 2 DIMMING CONTROL WIRE CAN BE INSTALLED IN

A SKELETAL TYPE CONDUIT SYSTEM USING PLASTIC PUSH-ON

BUSHINGS (ARLINGTON INDUSTRIES) ON CONDUIT ENDS ANDAPPROPRIATE SUPPORTS FROM BUILDING STRUCTURE OR BRIDLE

RINGS / J-HOOKS THAT ARE ATTACHED TO BUILDING STRUCTURE,

SPACE NO FARTHER THAN 5'-0" APART AND 10" MINIMUM ABOVECEILING. WIRING NOT IN CONDUIT SHALL BE PLENUM RATED.

PLAN NOTES:

1. PARTITION INTERFACE - LMIO-102 IS USED FOR BASIS OF DESIGN.

X

LOAD 'b'YEL

1. TWO BUTTON SWITCH ON / OFF MANUAL CONTROL.2. SCENE SWITCH SHALL HAVE FOUR (4) SCENE BUTTONS ALONG WITH A RAISE

/ LOWER ILLUMINATION ON THE ACTIVE SCENE.

3. SEQUENCE WHEN PARTITION IS OPEN3.1. SCENE BUTTON 1 - ALL FIXTURES ON.

3.2. SCENE BUTTON 2 - FIXTURES "a" OFF, FIXTURES "b", "c", "d" & "e" DIM

DOWN TO 70%.3.3. SCENE BUTTON 3 - FIXTURES "a" OFF, FIXTURES "b", "c", "d" & "e" DIM

DOWN TO 30%.

3.4. SCENE BUTTON 4 - ALL FIXTURES OFF.4. SEQUENCE WHEN PARTITION IS CLOSED. EACH SPACE SHALL BE

CONTROLLED INDEPENDENT FROM EACH OTHER.

5. TRAINING ROOM 107 (CENTER ROOM) DOES NOT HAVE SCENE CONTROL

BUTTONS. WHEN BOTH PARTITIONS ARE CLOSED THIS ROOM SHALL HAVEONLY ON / OFF FUNCTION.

3.1. SCENE BUTTON 1 - ALL FIXTURES ON.

3.2. SCENE BUTTON 2 - FIXTURES "a" & "e" OFF, FIXTURES "b" & "d" DIM DOWNTO 70%.

3.3. SCENE BUTTON 3 - FIXTURES "a" & "e"OFF, FIXTURES "b" & "d" DIM DOWN

TO 30%.3.4. SCENE BUTTON 4 - ALL FIXTURES OFF.

4. LIGHTS SHALL TURN ON MANUALLY VIA PUSH BUTTON.

5. LIGHTS SHALL TURN OFF AUTOMATICALLY AFTER TIME-OUT OR MANUALLYVIA PUSH BUTTON.

6. LOW END TRIM SET HIGH ENOUGH SO FIXTURES DO NOT APPEAR TO DIM TO

OFF.

CAT5E CABLE

ON/OFFSWITCH

SCENESWITCH

RED LOAD 'd'

NEUTRAL

HOT 120VUNSWITCHED

BLK

GND

ROOM CONTROLLER

0-10 VOLTCONTROL WIRING

PART-SENSOR

1A OR 2A

+24V

DC

1

LOAD 'c'BLU

CAT5E CABLE

LOAD 'e'YEL

HO

A

1

3

2

4

LINE NEUTRAL

C1

PC

C1

C2

1. HAND-OFF-AUTOMATIC SELECTOR SWITCH IN COVER OF CONTACTOR. PROVIDE

NEMA-1 ENCLOSURE FOR CONTACTOR.

2. PHOTOELECTRIC CONTROL (PC) - PARAGON #CW201-00 OR EQUAL, MOUNT 30"

ABOVE ROOF LINE

3. 120V COIL OF PHOTOCELL CONTROLLED LIGHTING CONTACTOR.

4. CONTACTS - TWO FIELD CONVERTABLE FOR CONTROL OF LIGHTING CIRCUITS.

MECHANICALLY HELD WITH TWO WIRE CONTROL. PROVIDE FUSE PROTECTION

FOR COIL CIRCUITS.

DIAGRAM NOTES:#

C3

C4

C5

C6

LP-1#10

SPARE

SPARE

SITE LIGHTINGFLAG POLE

PANELLP-1

SPARE

LP-1#12 EXTERIOR BUILDINGMOUNTED LIGHTING

LP-1#16EXTERIOR BUILDINGMOUNTED LIGHTING

01/2

"1"

2"

CHECKED BY:DATE ISSUED: DRAWN BY:

DISCLAMIER:

DRAWING TITLE:

SHEET NUMBER:

IFB 1

9-1

2-3

37

This construction document is the property of The Etica

Group, Inc. It is intended solely for use by The Etica

Group, Inc., its heirs, and assigns. Modification or reuse

of the document without permission from The Etica

Group, Inc. is prohibited. Use of this document for any

purpose other than that intended by The Etica Group, Inc.

constitutes an impermissible misuse. The Etica group,

inc. is not responsible for any damage or injury resulting

from misuse of this document. The Etica Group, Inc.

disclaims all warranties, express or implied , relating to the

use of this document for any purpose other than that

intended by The Etica Group, Inc.

PROFESSIONAL SEAL:

Indianapolis Public Transportation Corporation

AE

SI P

roj. N

o:

OR

IGIN

AL S

HE

ET

SIZ

E IS

24"

X 3

6"

(AR

CH

D)

1/13/20

2/2

3/2

02

0 4

:24:2

9 P

M

E501

180024.5

DAG LDH1/13/2020

NEW TRAINING FACILITY

1100 W

est 21st Street

Indianapolis, IN 46202

ELECTRICAL

DETAILS

18-0

64

Scale: NTS

TYPICAL LIGHTING CONTROL FOR NON-DIMMING - LINE VOLTAGE3

Scale: NTS

POLE BASE DETAIL7

Scale: NTS

FLAGPOLE LIGHT BASE DETAIL8

Scale: NTS

LIGHTING CONTROL DIAGRAM FOR SMALL OFFICE2

Scale: NTS

BUTTON CONTROLLER DETAIL - S74

Scale: NTS

BUTTON CONTROLLER DETAIL - S65

Scale: NTS

LIGHTING CONTROL DIAGRAM FOR ROOM CONTROLLER - RC11

Scale: NTS

LIGHTING CONTACTOR LC-16

REVISION SCHEDULE

# DESCRIPTION DRAWIN BY DATE ISSUED

1 ADDENDUM 2 DAG 2/25/20

1

1

PHONE JACK LOCATION

FACE PLATE CONFIGURATION

SYMBOL LEGEND

VOICE ONLY

XXX-1

D

SINGLE GANG BOXWITH TILE RING

1" EMT STUBBED ABOVECEILING TO NEARESTDISTRIBUTION SYSTEM

D

PANDUIT #CHB2XX-X

PANDUIT #CHF2XX-X

PANDUIT #CJ688TGWH FOR CAT. 6

PANDUIT #CBEIXX

1. IN WALL CONSTRUCTION SHALL BE COLOR WHITE.

NOTES:

101-A01

1. EACH OUTLET SHALL CONSISTS OF (2) DATA JACKS ONLY ONE SHALL BE WIRED

TO BDF AND OTHER SHALL BE SPARE.

2. LETTER DESIGNATION INDICATES ROOM NUMBER - PANEL LETTER & SLOT

NUMBER. THE ABOVE TAG, 101-A01 WOULD BE ROOM NUMBER 101, PANEL A,

SLOT 01.

3. LABELING JACKS IN A SINGLE ROOM CONSISTS OF STARTING AT THE FIRST

OUTLET LEFT OF DOOR AND PROCEEDING CLOCKWISE AROUND ROOM.

NOTES:

7'-0

"

PANDUIT #WMPVHC45E

CHATWORTH EQUIPMENT#55053-703 (OR EQUAL)

VE

RT

ICA

L W

IRE

MA

NA

GE

ME

NT

VE

RT

ICA

L W

IRE

MA

NA

GE

ME

NT

PANDUIT#DP48688TGYFOR CAT. 6TYPICAL

OWNERPROVIDEDSWITCH

1. PROVIDE THREE (3) 48-PORT, 2RU PATCH PANELS.

2. OWNER SHALL PROVIDE SWITCH, COORDINATE SPACE REQUIREMENTS WITHIN

RACK WITH OWNER.

3. OWNER WILL PROVIDE ALL PATCH CABLES FOR THE CROSS-CONNECTORS

FROM PATCH PANEL TO THE SWITCH.

4. PATCH PANEL B SHALL BE DEDICATED TO DISPATCH / IT ROOM 110 DROPS

ONLY.

5. PROVIDE VERACITY RACK-MOUNTED PoE EXTENDERS LONG RANGE VLS-1P-B

WITH 1RU PANEL VLS-1U OR APPROVED EQUAL. PROVIDE PATCH CABLES

FROM RACK MOUNTED EXTENDERS TO SWITCH. CONTRACTOR SHALL

COORDINATE WITH SITE PLAN DRAWING ON QUANTITY OF EXTENDERS

NEEDED.

6. PROVIDE LABELS ON ALL USED DATA PORTS.

NOTES:

PATCH PANEL ADATA

PATCH PANEL BDATA FOR DISPATCHROOM

PATCH PANEL CCAMERA

RACK-MOUNTED POECAMERA EXTENDERS

101-A-01116-101-A-01

101-A01 101-A02

116-101-A02

116-101-A01

101-A02

101-A01

CATEGORY 6DATA CABLE

PATCH PANEL IN ELECTRICAL / TELECOMROOM 116

FACEPLATE IN ROOM 101

101-A01/A02

BDF/IDF ROOM NUMBER

ROOM NUMBER

PANEL DESIGNATION

CABLE LABEL AT OUTLET CABLE LABEL AT BDF/IDF

ROOM NUMBER

JACK DESIGNATION

SLOT DESIGNATION

SLOT DESIGNATION

GROUNDING DETAIL NOTES:

6

7

8

5

9

4

1

3

2

10

11

1. TYP. SECTIONS OF 3/4" FIRE RATED PLYWOOD TERMINAL BOARDS

MOUNTED TO WALLS.

2. TYP. SECTIONS OF 12" LADDER CABLE RUNWAY MOUNTED TO

PLYWOOD TERMINAL BOARD AND WALL WITH SHELF BRACKETS.

3. TYP. CABLE RUNWAY "L" BRACKET ATTACHED TO CABLE RUNWAY.

4. TYP. DATA EQUIPMENT FRAME.

5. TYP. TELECOMMUNICATIONS MAIN GROUNDING BUSBAR (TMGB).

6. TYP. 1" EMT CONDUIT WITH #3/0 BONDING CONDUCTOR FOR

TELECOMMUNICATIONS (TBC) FROM BUILDING MAIN ELECTRICAL

SERVICE GROUND CONNECTION POINT. ATTACH TO "TMGB".

USING TWO HOLE (5/8" SPACING) LONG BARREL COMPRESSION

LUGS WITH TWO INDENTS.

7. TYP. #2 "THHN" GREEN COMMON BONDING NETWORK

CONDUCTOR (CBN). CONNECT TO TMGB USING TWO HOLE (5/8"

SPACING) LONG BARREL COMPRESSION LUGS WITH TWO

INDENTS - PANDUIT #LCC2-14AW-Q.

8. TYP. ATTACH "CBN" TO TERMINAL BOARD USING NYLON CABLE

TIE MOUNT, PANDUIT #TMEH-S10-Q0 WITH #10 SCREW AND

PANDUIT #PLT1.5S-C CABLE TIE.

9. TYP. ATTACH "CBN" TO "L" BRACKETS USING NYLON CABLE TIE

MOUNT, PANDUIT #TMEH-S10-Q0 WITH 10/24 BOLT AND PANDUIT

#PLT1.5S-C CABLE TIE.

10. TYP. #6 "THHN" GREEN BONDING JUMPER FROM "CBN" TO CABLE

TRAY. ATTACH TO CABLE TRAY USING TWO HOLE (5/8" SPACING)

LONG BARREL COMPRESSION LUGS WITH TWO INDENTS -

PANDUIT #LCC6-14JAW-L - MOUNTED TO SIDE OF TRAY USING

1/4-20 BOLTS. SCRAPE PAINT FROM SIDE OF TRAY PRIOR TO

INSTALLATION. ATTACH TO "CBN" USING PANDUIT "HTAP" CABLE

SPLICE #HTCT2-2-1 WITH CLEAR PLASTIC COVERS #CLRCVR2-1.

11. TYP. #6 "THHN" GREEN BONDING JUMPER FROM "CBN" TO

EQUIPMENT FRAME. ATTACH TO FRAME USING TWO HOLE (5/8"

SPACING) LONG BARREL COMPRESSION LUGS WITH TWO

INDENTS - PANDUIT #LCC6-14JAW-L - MOUNTED TO EQUIPMENT

FRAME USING 1/4-20 BOLTS. ATTACH TO "CBN" USING PANDUIT

"HTAP" CABLE SPLICE #HTCT2-2-1 WITH CLEAR PLASTIC COVER

#CLRCVR2-1.

12. TYP. #6 "THHN" GREEN BONDING JUMPER FROM TMGB AND BOND

TO BUILDING STEEL.

13. TYP. #8 "THHN" GREEN BONDING JUMPER TO ELECTRICAL PANEL

THAT SERVES TELECOM EQUIPMENT.

12

#

13

GRID

GRID

3/4"C

GROUNDBUSHING

EXOTHERMICWELD

BONDINGCONDUCTOR

PANDUIT #CBEIW-2GYWITH (2) PANDUIT #CJ688TGWH FOR CAT 6,(1) PANDUIT #CHS2IW-X AND (3)PANDUIT #CHB2IW-X BLANK MODULES

1/2" DOUBLE GANGPLASTER RING

SUSPENDED CEILING

UNISTRUT (UNISTRUT P4000,B-LINE B54, OR B-LINE B56)

3/8" THREADED RODS ATTACHED TOSTRUCTURAL BEAM OR OTHER UNISTRUTTO BE RIGID TO MOVEMENT AND MOUNTED8' - 10' AFF

**1" EMT EXTENDING FROM

BOX TO DISTRIBUTION SYSTEM

*EMT NOT REQUIRED IF WITHIN

12" OF DISTRIBUITION, SNAP-IN

BUSHING IN BOX IS REQUIRED

**CISCO AP UNIT ATTACHED TO UNISTRUTWITH CISCO AP MOUNTING PLATENOT TO EXCEED 18" FROM CEILING TILE.JUMPERS AND ANTENNAS TO BE PROVIDED BY OWNER

5" H x 5" W x 2 7/8" DSTEEL BOX

DATA JACK LOCATION

FACE PLATE CONFIGURATION

SYMBOL LEGEND

XXAP-A/B

CISCO AIR-CAP3702-B-K9 orCISCO AIR-CAP3802-B-K9

CISCO AIR-ANT2524VAC

NOTE:COORDINATE WITH OWNERON WIRELESS ACCESS POINTEQUIPMENT MANUFACTURER.FOR BIDDING USE MANUFACTURELISTED.

01/2

"1"

2"

CHECKED BY:DATE ISSUED: DRAWN BY:

DISCLAMIER:

DRAWING TITLE:

SHEET NUMBER:

IFB 1

9-1

2-3

37

This construction document is the property of The Etica

Group, Inc. It is intended solely for use by The Etica

Group, Inc., its heirs, and assigns. Modification or reuse

of the document without permission from The Etica

Group, Inc. is prohibited. Use of this document for any

purpose other than that intended by The Etica Group, Inc.

constitutes an impermissible misuse. The Etica group,

inc. is not responsible for any damage or injury resulting

from misuse of this document. The Etica Group, Inc.

disclaims all warranties, express or implied , relating to the

use of this document for any purpose other than that

intended by The Etica Group, Inc.

PROFESSIONAL SEAL:

Indianapolis Public Transportation Corporation

AE

SI P

roj. N

o:

OR

IGIN

AL S

HE

ET

SIZ

E IS

24"

X 3

6"

(AR

CH

D)

1/13/20

2/2

3/2

02

0 4

:23:5

8 P

M

E502

180024.5

DAG LDH1/13/2020

NEW TRAINING FACILITY

1100 W

est 21st Street

Indianapolis, IN 46202

ELECTRICAL

DETAILS

18-0

64

Scale: NTS

FLUSH MOUNTED DATA ONLY JACK1

Scale: NTS

DATA FACEPLATE LABELS2

Scale: NTS

BDF EQUIPMENT FRAME3

Scale: NTS

TYPICAL TELECOM LABELING4

Scale: NTS

BDF GROUNDING DETAIL5

Scale: NTS

TYPICAL STEEL BONDING DETAIL7

Scale: NTS

ABOVE CEILING WAP6

REVISION SCHEDULE

# DESCRIPTION DRAWIN BY DATE ISSUED

1 ADDENDUM 2 DAG 2/25/20

1

1

1

ATS100A

25 KWGENERATOR

MAING

1. 2"C, 4-#3/0, & #6 GND. (200A,4W)

2. 1 1/4"C, 4-#3, & #8 GND. (100A,4W)

3. FOUR (4) SETS OF 3"C, 4-#350 KCM (1200A,4W)

4. GENERATOR, ATS AND RACEWAY AND WIRE SHALL BE FUTURE.

PROVIDE J-BOX AND SPLICE ABOVE ATS LOCATION FOR FUTURE

INSTALLATION OF ATS.

5. FUTURE - NOT INSTALLED.

6. THE NEUTRAL AND GROUND SHALL BE TIED TOGETHER, REFER TO

DETAIL 2/E503 FOR GND.

# RISER PLAN NOTES:

MDPPANELXRP-1

2

PANELRP-1

1

PANELLP-1

1 23

4

4

5

TO CT & METERENCLOSURE

6

GENERATOR

FUTURE

LOCATED INSIDE MAINELECTRICAL ROOM

#4 AWG BARE COPPER TO BUILDINGFOOTER "UFER" GROUND - NEC250.52(A)(3)

#3/0 IN PVC CONDUIT TO METALWATER PIPING - NEC 250.52(A)(1)WITHIN 5' OF BUILDING ENTRY

#3/0 IN PVC CONDUIT TO BUILDINGMETAL STRUCTURE - NEC 250.52(A)(2)

TO "OTHER" METAL PIPING - NEC250.104(B)

NON-REVERSIBLEDOUBLE LUGCONNECTION (TYPICAL)

GROUNDING CONDUCTOR IN CONDUITTO GROUND BUS "TMGB" IN IDF

GROUND ROD, IRREVERSIBLECRIMP TYPE CONNECTOR(SUITABLE FOR UNDERGROUND)TO GROUND RODS - NEC250.52(A)(5)

1. E.C. TO PROVIDE PERMANENT LABELS ON ALL GROUNDING ELECTRODE

CONDUCTORS THAT TERMINATE ON MAIN GROUNDING POINT INDICATING

GROUNDING ELECTRODE TYPE AND TERMINATION.

2. GENERATOR SHALL BE FUTURE.

3. WHERE CONDUIT WILL BE INSTALLED WITHIN A PLENUM SPACE RACEWAY SHALL

BE METAL NOT PVC. WHERE RACEWAY IS METAL, BOND ENDS OF METAL

CONDUIT TO GROUND WIRE WITH BUSHING.

NOTES:

#4/0 TO SERVICE ENTRANCESWITCH

J

RE

FE

R T

OA

RC

HIT

EC

TU

RA

LD

OC

UM

EN

TS

REFER TOARCHITECTURAL

DRAWINGS

CEILING

POWER SUPPLY(ON SECURE SIDEMAY INSTALL INJ-BOX)

3/4" EMT CONDUIT

1/2" METALLICFLEX CONDUIT

CARD READER,(1) GANG ELEC.BOX (W/ VERT. SING.GANG OPENING)

POWER SWITCH(ON SECURE SIDE)

1" EMT CONDUIT

3/4" EMT CONDUIT

1/2" METALLICFLEX CONDUIT

PROVIDE BOX INDOOR FRAME FORCONNECTION OFPOWER TRANSFEROR ELECTRIC LOCK

BOX IN DOOR FRAMEFOR DOOR POSITIONSWITCH

J-BOX HOFFMAN #A-12N124 WITH #A-12N12P OR EQUAL (INSTALL ON SECURE SIDE)

1. ALL LOCATIONS ARE RECOMMENDED. DEVICES MAY HAVE TO BE PLACEDDIFFERENTLY DUE TO WALL, CEILING AND DOOR SPACE AVAILABILITY.

2. REFER TO DOOR HARDWARE SPEC FOR ADDITIONAL INFORMATION.

3. PROVIDE DEVICES AS SPECIFIED WITHIN SPECIFICATIONS.4. COORDINATE ROUGH-IN AND INSTALLATION WITH OWNER.

5. ALL J-BOXES SHALL BE LABELED AS CARD READER.

6. PROVIDE WIRING AS REQUIRED MY MANUFACTURER.

NOTES:

120V

TO ACCESS CONTROL PANEL

3/4" EMT CONDUIT

J

RE

FE

R T

OA

RC

HIT

EC

TU

RA

LD

OC

UM

EN

TS

REFER TOARCHITECTURAL

DRAWINGS

CEILING

POWER SUPPLY(ON SECURE SIDEMAY INSTALL INJ-BOX)

3/4" EMT CONDUIT

1/2" METALLICFLEX CONDUIT

CARD READER,(1) GANG ELEC.BOX

POWER SWITCH(ON SECURE SIDE)

1" EMT CONDUIT

3/4" EMT CONDUIT

1/2" METALLICFLEX CONDUIT

PROVIDE BOX INDOOR FRAME FORCONNECTION OFPOWER TRANSFEROR ELECTRIC LOCK

BOX IN DOOR FRAMEFOR DOOR POSITIONSWITCHES

J-BOX HOFFMAN #A-12N124 WITH #A-12N12P OR EQUAL (INSTALL ON SECURE SIDE)

1. ALL LOCATIONS ARE RECOMMENDED. DEVICES MAY HAVE TO BE PLACED

DIFFERENTLY DUE TO WALL, CEILING AND DOOR SPACE AVAILABILITY.2. REFER TO DOOR HARDWARE SPEC FOR ADDITIONAL INFORMATION.

3. PROVIDE DEVICES AS SPECIFIED WITHIN SPECIFICATIONS.

4. COORDINATE ROUGH-IN AND INSTALLATION WITH OWNER.5. ALL J-BOXES SHALL BE LABELED AS CARD READER.

6. PROVIDE WIRING AS REQUIRED MY MANUFACTURER.

NOTES:

PANIC BAR (OTHER SIDE)

120V

TO ACCESS CONTROL PANEL

3/4" EMT CONDUIT

01/2

"1"

2"

CHECKED BY:DATE ISSUED: DRAWN BY:

DISCLAMIER:

DRAWING TITLE:

SHEET NUMBER:

IFB 1

9-1

2-3

37

This construction document is the property of The Etica

Group, Inc. It is intended solely for use by The Etica

Group, Inc., its heirs, and assigns. Modification or reuse

of the document without permission from The Etica

Group, Inc. is prohibited. Use of this document for any

purpose other than that intended by The Etica Group, Inc.

constitutes an impermissible misuse. The Etica group,

inc. is not responsible for any damage or injury resulting

from misuse of this document. The Etica Group, Inc.

disclaims all warranties, express or implied , relating to the

use of this document for any purpose other than that

intended by The Etica Group, Inc.

PROFESSIONAL SEAL:

Indianapolis Public Transportation Corporation

AE

SI P

roj. N

o:

OR

IGIN

AL S

HE

ET

SIZ

E IS

24"

X 3

6"

(AR

CH

D)

1/13/20

2/2

3/2

02

0 4

:22:5

7 P

M

E503

180024.5

DAG LDH1/13/2020

NEW TRAINING FACILITY

1100 W

est 21st Street

Indianapolis, IN 46202

ELECTRICAL

DETAILS

18-0

64

Scale: NTS

ELECTRICAL RISER DIAGRAM1

Scale: NTS

MAIN GROUNDING DIAGRAM2

Scale: NTS

SINGLE DOOR ELECTRIC STRIKE LOCK DETAIL3

Scale: NTS

DOUBLE DOOR ELECTRIC STRIKE LOCK DETAIL4

REVISION SCHEDULE

# DESCRIPTION DRAWIN BY DATE ISSUED

1 ADDENDUM 2 DAG 2/25/20

1

1

01/2

"1"

2"

CHECKED BY:DATE ISSUED: DRAWN BY:

DISCLAMIER:

DRAWING TITLE:

SHEET NUMBER:

IFB 1

9-1

2-3

37

This construction document is the property of The Etica

Group, Inc. It is intended solely for use by The Etica

Group, Inc., its heirs, and assigns. Modification or reuse

of the document without permission from The Etica

Group, Inc. is prohibited. Use of this document for any

purpose other than that intended by The Etica Group, Inc.

constitutes an impermissible misuse. The Etica group,

inc. is not responsible for any damage or injury resulting

from misuse of this document. The Etica Group, Inc.

disclaims all warranties, express or implied , relating to the

use of this document for any purpose other than that

intended by The Etica Group, Inc.

PROFESSIONAL SEAL:

Indianapolis Public Transportation Corporation

AE

SI P

roj. N

o:

OR

IGIN

AL S

HE

ET

SIZ

E IS

24"

X 3

6"

(AR

CH

D)

1/13/20

2/2

3/2

02

0 4

:21:1

3 P

M

E601

180024.5

DAG LDH1/13/2020

NEW TRAINING FACILITY

1100 W

est 21st Street

Indianapolis, IN 46202

ELECTRICAL

SCHEDULES

18-0

64

Total Load (KVA) 109 101 110

Other Load (KVA) 10 80 8

Motor Load (KVA) 29 125 37 LSIG Molded Case with Electronic Trip Unit (LSIG)

Heating Load (KVA) 0 100 0 LSI Molded Case with Electronic Trip Unit (LSI)

Receptacle Load (KVA) 18 78 14 LI Molded Case with Electronic Trip Unit (LI)

Lighting Load (KVA) 6 100 6 Molded Case with Fixed Trip Unit

Connected KVA Demand Factor Demand Kva Trip Type Trip Unit Description Note:

Sub-Total in KVA: 6 kVA 18 kVA 43 kVA 29 kVA

2019181716151413 CO SENSOR 3 20 A 20 A 0 kVA12 VF-1 3 20 A 20 A 1 kVA11 OVERHEAD DOOR 3 20 A 20 A 0 kVA10 AC-1 3 50 A 50 A 9 kVA9 HWP-1 - 2HP 3 15 A 15 A LI 2 kVA8 Vehicle Charging Station 2 40 A 40 A LI 6 kVA7 Vehicle Charging Station 2 40 A 40 A LI 6 kVA6 Vehicle Charging Station 2 40 A 40 A LI 6 kVA5 AHU-1 - 10HP 3 40 A 40 A LI 6 kVA4 ACCU-1 3 175 A 175 A LI 29 kVA3 XRP-1 3 100 A 100 A LSI 2 kVA 1 kVA2 RP-1 3 200 A 200 A LSI 16 kVA 6 kVA1 LP-1 3 200 A 200 A LSI 6 kVA

Ckt Load Name Pole Frame Trip Trip... Basis of Design Lights Receptacles Power Motor

Feed From: Enclosu... Type 1 Feeder: See One Line Applied Engineering Services (317) 810-4141

Voltage: 120/208 Wye Amp: 1200 A Kaic... 65,000 Date: 1/13/2020

SPD: Yes No Main: MCB Mounting: FLOOR Project Number: 180024.5

Panel Name: MDP New/Exi... NEW Location: Electrical 116 Project Name: NEW TRAINING FACILITY

SWITCHBOARD SCHEDULE

Total Load (KVA) 6.27 6.27

Other Load (KVA)

Motor Load (KVA)

Heating Load (KVA) Molded Case with Electronic Trip iUnit (LSI)

Receptacle Load (KVA) NEC Molded Case with Electronic Trip Unit (LI)

Lighting Load (KVA) 6.27 1.00 6.27 Molded Case with Fixed Trip UnitConnected KVA Demand Factor Demand KVA Trip Unit Description Notes:

3.36 kVA 1.5 kVA 1.4 kVA

29 Spare 1 20 A -- 0.00 0.00 -- 20 A 1 Spare 30

27 Spare 1 20 A -- 0.00 0.00 -- 20 A 1 Spare 28

-- -- -- -- 0.25 0.00 -- 20 A 1 Spare 26

23,... Site Lighting - North Lot 2 20 A Lighting 0.25 0.00 -- 20 A 1 Spare 24

-- -- -- -- 0.33 0.00 -- 20 A 1 Spare 22

19,... Site Lighting - North Lot 2 20 A Lighting 0.33 0.00 -- 20 A 1 Spare 20

17 Spare 1 20 A -- 0.00 0.00 -- 20 A 1 Spare 18

-- -- -- -- 0.25 0.00 -- 20 A 1 Spare 16

13,... Site Lighting - South Lot 2 20 A Lighting 0.25 0.08 Lighting 20 A 1 Site lighting Building Mounted 14

-- -- -- -- 0.33 0.08 Lighting 20 A 1 Site Lighting Building Mounted 12

9,11 Site Lighting - South Lot 2 20 A Lighting 0.33 0.03 Lighting 20 A 1 Site Lighting - Flag Pole 10

7 Lighting Training Room-1 107 A-1 1 20 A Lighting 0.48 1.25 Lighting 20 A 1 Lighting Bus Bay 121 8

5 Lighting Mechanical 115, 113, 111 1 20 A Lighting 0.27 0.48 Lighting 20 A 1 Lighting Training Room 103 6

3 Lighting Security Office 101, Corr 117 1 20 A Lighting 0.14 0.41 Lighting 20 A 1 Lighting Shared Office 102, 104, 106, 108 4

1 Lighting Corridor 117 west 1 20 A Lighting 0.39 0.35 Lighting 20 A 1 Lighting Break Rm 112, 110, 112A,114, 116... 2

Ckt Load Name Pole Rating Type Load... A B C Load... Type Rating Pole Load Name Ckt

Feed From: MDP Enclosure: Type 1 Feeder: SEE DRAWING E503 Applied Engineering Services (317) 810-4141

Voltage 120/208 Wye Amp: 200 A Kaic Rating: 65,000 Date 1/13/2020

SPD: No Main: MCS Mounting: Surface Project No. 180024.5

Branch Panel... LP-1 New: Yes Location: Electrical 116 Project Name: NEW TRAINING FACILITY

PANELBOARD SCHEDULE

Total Load (KVA) 33.34 28.42

Other Load (KVA) 10.18 0.80 8.14

Motor Load (KVA)

Heating Load (KVA) 125.00 VA 1.00 125.00 VA Molded Case with Electronic Trip iUnit (LSI)

Receptacle Load (KVA) 15.78 NEC 12.89 Molded Case with Electronic Trip Unit (LI)

Lighting Load (KVA) Molded Case with Fixed Trip UnitConnected KVA Demand Factor Demand KVA Trip Unit Description Notes:

11.86 kVA 12.5 kVA 9.0 kVA

47 Spare 1 20 A -- 0.00 0.00 -- 20 A 1 Spare 48

45 Power Bus Bay 121 1 20 A Power 0.20 0.00 -- 20 A 1 Spare 46

43 Power 1 20 A Power 0.18 0.00 -- 20 A 1 Spare 44

41 Spare 1 20 A -- 0.00 0.00 -- 20 A 1 Spare 42

39 Spare 1 20 A -- 0.00 2.00 Other 20 A 1 Other Men's 111 40

37 Receptacle 1 20 A Receptacle 0.18 2.00 Other 20 A 1 Other Women's 113 38

35 Receptacle Bus Bay 121 1 20 A Receptacle 0.72 0.25 Power 20 A 1 VAV Power 36

33 Receptacle Bus Bay 121 1 20 A Receptacle 0.72 0.25 Power 20 A 1 VAV Power 34

31 B-2 - Alternate 1 30 A Power 0.50 0.18 Receptacle 20 A 1 Corridor 117 - Water Fountain 32

29 B-1 1 30 A Power 0.50 0.18 Receptacle 20 A 1 Printer - Receptacle 30

27 Receptacle Lactation Rm 112A - Fridge 1 20 A Receptacle 1.00 0.70 Power 20 A 1 EF-1 28

25 Power Training Room 103 - Screen 1 20 A Power 0.50 0.50 Power 20 A 1 PUH-3 26

23 AV Rack - Receptacle Training Room 103 1 20 A Receptacle 0.36 0.13 Heating 20 A 1 PUH-2 24

21 FACP 1 20 A Other 0.00 0.50 Power 20 A 1 PUH-1 22

19 Break Rm 112, 112A, 114 & 116 1 20 A Receptacle 1.26 0.50 Power 20 A 1 CUH-2 20

17 Training Rm 107 B, Vest 100, Corr 117 1 20 A Receptacle 1.08 0.50 Power 20 A 1 CUH-1 18

15 Receptacle Secutity Office 101 1 20 A Receptacle 1.08 0.90 Receptacle 20 A 1 Receptacle Shared Office 106 16

13 Break Rm 112 - Micro 1 20 A Receptacle 1.00 0.72 Receptacle 20 A 1 Receptacle Office 104 14

11 Water Softener - WS-1 1 20 A Receptacle 0.18 1.08 Receptacle 20 A 1 Receptacle Shared Office 102 12

9 Hand Dryer - Rest Room 114 1 25 A Other 2.00 1.00 Receptacle 20 A 1 Receptacle Break Rm 112 Fridge 10

7 Receptacle Breake Area 112 1 20 A Other;... 1.08 1.65 Appliance -... 20 A 1 Power Custodial 109 8

5 Hand Dryer - Men's 111 1 25 A Other 2.00 2.00 Other 25 A 1 Hand dryer Women's 113 6

3 Receptacle Training Room 103 1 20 A Receptacle 0.90 1.26 Receptacle 20 A 1 Receptacle Mechanical 115, 118, 113, 111,... 4

1 DHWP-1 1 20 A Power 0.53 1.08 Receptacle 20 A 1 Receptacle Sim Room 108, Corr 117 2

Ckt Load Name Pole Rating Type Load... A B C Load... Type Rating Pole Load Name Ckt

Feed From: MDP Enclosure: Type 1 Feeder: SEE DRAWING E503 Applied Engineering Services (317) 810-4141

Voltage 120/208 Wye Amp: 200 A Kaic Rating: 65,000 Date 1/13/2020

SPD: No Main: MCS Mounting: Surface Project No. 180024.5

Branch Panel... RP-1 New: Yes Location: Electrical 116 Project Name: NEW TRAINING FACILITY

PANELBOARD SCHEDULE

1. PROVIDED WITH EMERGENCY BATTERY PACK WITH SELF-DIAGNOSTICS WITH REMOTE SWITCH. COORDINATE REMOTE SWITCH LOCATION WITH OWNER.NOTES:

LIGHTING FIXTURE SCHEDULE

TYPE DESCRIPTION MOUNTING VOLT Lamp Type MANUFACTURERS WATT NOTES

EM EMERGENCY LIGHT - UV THERMOPLASTIC HOUSING, WHITETEXTURED FINISH, SELF-DIAGNOSTIC, FULL ADJUSTABLE

INTEGRAL LAMP HEADS, NIMH BATTERY 90 MIN EMERGENCYLIGHT, UL 924 LISED

UNIVERSALMOUNT

120V

LED

DUAL LITE EV SERIES, MOBERN LIGHTINGEQUAL, EATON EQUAL, LITHONIA LIGHTING

EQUAL

2 W

F1 2X2 ARCHITECTURAL TROFFER - HOUSING ARE DIE FORMEDCODE GAGE COLD ROLLED STEEL, EXTRUDED ACRYLIC FROSTCURVED LENS, WHITE MATTE FINISH, 60,000 HOUR LEDS AT L80,

0-10V DIMMING.

SEE PLANS 120VLED 4000K, 80 CRI,

1700 LUMENS

COLUMBIA LIGHTING LCAT22, MOBERNLIGHTING RDISE, METALUX 24CZ, LITHONIA

LIGHTING 2BLT

14 W

F2 2X2 ARCHITECTURAL TROFFER - HOUSING ARE DIE FORMEDCODE GAGE COLD ROLLED STEEL, EXTRUDED ACRYLIC FROSTCURVED LENS, WHITE MATTE FINISH, 60,000 HOUR LEDS AT L80,

0-10V DIMMING.

SEE PLANS 120VLED 4000K, 80 CRI,

2200 LUMENS

COLUMBIA LIGHTING LCAT22, MOBERNLIGHTING RDISE, METALUX 24CZ, LITHONIA

LIGHTING 2BLT

18 W

F3 2X2 ARCHITECTURAL TROFFER - HOUSING ARE DIE FORMEDCODE GAGE COLD ROLLED STEEL, EXTRUDED ACRYLIC FROSTCURVED LENS, WHITE MATTE FINISH, 60,000 HOUR LEDS AT L80,

0-10V DIMMING.

SEE PLANS 120VLED 4000K, 80 CRI,

2800 LUMENS

COLUMBIA LIGHTING LCAT22, MOBERNLIGHTING RDISE, METALUX 24CZ, LITHONIA

LIGHTING 2BLT

23 W

F4 2X2 ARCHITECTURAL TROFFER - HOUSING ARE DIE FORMEDCODE GAGE COLD ROLLED STEEL, EXTRUDED ACRYLIC FROSTCURVED LENS, WHITE MATTE FINISH, 60,000 HOUR LEDS AT L80,

0-10V DIMMING.

SEE PLANS 120VLED 4000K, 80 CRI,

3500 LUMENS

COLUMBIA LIGHTING LCAT22, MOBERNLIGHTING RDISE, METALUX 24CZ, LITHONIA

LIGHTING 2BLT

28 W

F5 6" RECESSED ROUND DOWNLIGHT - HOUSING 22 GAUGENON-CORROSIVE STEEL, PRE-WIRED J-BOX WITH SNAP-ON

COVER, SEMI-DIFFUSE ALUMINUM REFLECTOR, 0-10V DIMMING,SUITABLE FOR WET LOCATIONS.

SEE PLANS 120VLED 4000K, 80 CRI,

1000 LUMENS

PRESCOLITE LC6SL, SPECTRUM LIGHTINGSGE6LEDOS, EATON PORTFOLIO LD6B,

LITHONIA LIGHTING LDN6

13 W

F5b 6" RECESSED ROUND DOWNLIGHT - HOUSING 22 GAUGENON-CORROSIVE STEEL, PRE-WIRED J-BOX WITH SNAP-ON

COVER, SEMI-DIFFUSE ALUMINUM REFLECTOR, 0-10V DIMMING,SUITABLE FOR WET LOCATIONS. EMERGENCY BATTERY PACK

WITH SELF DIAGNOSTIC REMOTE SWITCH.

SEE PLANS 120V

LED 4000K, 80 CRI,1000 LUMENS

PRESCOLITE LC6SL, SPECTRUM LIGHTINGSGE6LEDOS, EATON PORTFOLIO LD6B,

LITHONIA LIGHTING LDN6

13 W 1

F6 6" RECESSED ROUND DOWNLIGHT - HOUSING 22 GAUGENON-CORROSIVE STEEL, PRE-WIRED J-BOX WITH SNAP-ON

COVER, SEMI-DIFFUSE ALUMINUM REFLECTOR, 0-10V DIMMING,SUITABLE FOR WET LOCATIONS.

SEE PLANS 120VLED 4000K, 80 CRI,

1400 LUMENS

PRESCOLITE LC6SL, SPECTRUM LIGHTINGSGE6LEDOS, EATON PORTFOLIO LD6B,

LITHONIA LIGHTING LDN6

18 W

F7a INDUSTRIAL LIGHT - HOUSING IS CODE-GAGE STEEL, WHITEBAKED ENAMEL FINISH, 50,000 HOURS AT L80 LUMEN

MAINTENANCE

CHAIN 120VLED 4000K, 80 CRI,

2600 LUMENS

COLUMBIA LIGHTING LCL, MOBERN LIGHTINGLSAR, EATON METALUX SNLED, LITHONIA

LIGHTING CLX

19 W

F7b INDUSTRIAL LIGHT - HOUSING IS CODE-GAGE STEEL, WHITEBAKED ENAMEL FINISH, 50,000 HOURS AT L80 LUMEN

MAINTENANCE

CHAIN 120VLED 4000K, 80 CRI,

6400 LUMENS

COLUMBIA LIGHTING LCL, MOBERN LIGHTINGLSAR, EATON METALUX SNLED, LITHONIA

LIGHTING CLX

52 W

FX EXIT SIGN WITH BATTERY PACK - ALUMINUM FRAME, WHITEHOUSING AND FACE, DIRECTIONAL ARROWS, UNIVERSAL MOUNT,

STENCIL FACE, GREEN LETTER, NICAD BATTERY, SOLID STATECHARGER WITH LOW VOLTAGE DISCONNECT, SELF-TESTING /

SELF-DIAGNOSTICS ELECTRONICS WITH TIME DELAY RELAY ANDTEST LAMP SWITCH, UL 924 LISTED.

UNIVERSALMOUNT

120V

LED

DUAL LITE SE SEMPRA SERIES, EVENLITESENTRY CCDS SERIES, LITHONIA SIGNATURELES SERIES, BARRON EXITRONIX 400 SERIES

2. SENSOR SHALL BE SET TO OCCUPANCY MODE.

1. PROVIDE WITH MANUFACTURER POWER PACK AS REQUIRED

NOTES:

LIGHTING CONTROLLER SCHEDULE

TYPE DESCRIPTION MOUNTING SENSOR VOLT TIMEOUT PERIOD MANUFACTURERS NOTES

S1 DUAL TECHNOLOGY CEILING MOUNTEDSENSOR DETECTS 360 DEGREE MAJOR ANDMINOR MOTION. SENSOR COVERAGE SHALL

BE A MINIMUM 100- SQ. FT. FOR A 36 FTWIDE BY 36 FT LONG SPACE

CEILING DUAL TECHNOLOGY(ULTRASONIC &

INFRARED)

24VDC 20 MIN. ORAUTOSENSING

WATTSTOPPER LMDC SERIES,HUBBELL EQUAL, GREENGATE

EQUAL, ACUITY BRANDS EQUAL

1,2

S2 DUAL TECHNOLOGY CEILING MOUNTEDSENSOR DETECTS 360 DEGREE MAJOR ANDMINOR MOTION. SENSOR COVERAGE SHALL

BE A MINIMUM 1000 SQ. FT. FOR A 36 FTWIDE BY 36 FT LONG SPACE

CEILING DUAL TECHNOLOGY(ULTRASONIC &

INFRARED)

120V 20 MIN. ORAUTOSENSING

WATTSTOPPER DT355 SERIES,HUBBELL EQUAL, GREENGATE

EQUAL, ACUITY BRANDS EQUAL

1,2

S3 DUAL TECHNOLOGY WALL MOUNTEDSENSOR DETECTS 180 DEGREE MAJOR ANDMINOR MOTION. SENSOR COVERAGE SHALL

BE 1000 SQ. FT. WITH MANUAL ON/OFFBUTTON.

WALL DUAL TECHNOLOGY(ULTRASONIC &

INFRARED)

24VDC 20 MIN. ORAUTOSENSING

WATTSTOPPER DW-100-24SERIES, HUBBELL EQUAL,

GREENGATE EQUAL

1,2

S4 DUAL TECHNOLOGY WALL MOUNTEDSENSOR DETECTS 180 DEGREE MAJOR ANDMINOR MOTION. SENSOR COVERAGE SHALL

BE 1000 SQ. FT. WITH DIM UP & DOWNBUTTONS

WALL DUAL TECHNOLOGY(ULTRASONIC &

INFRARED)

120V 20 MIN. ORAUTOSENSING

WATTSTOPPER DW-311 SERIES,HUBBELL EQUAL, GREENGATE

EQUAL, ACUITY BRANDS EQUAL

1,2

S5 DIMMING WALL SWITCH - ON/OFFRAISE/LOWER BUTTONS. USED TO

MANNUALLY TURN ON/RAISE/LOWER/OFFTHE LIGHTING FIXTURES.

WALL N/A 24VDC N/A WATTSTOPPER DCLV2 SERIES,HUBBELL EQUAL, GREENGATE

EQUAL, ACUITY BRANDS EQUAL

S6 WALL SWITCH - ON/OFFBUTTONS. USED TOMANNUALLY TURN ON/OFF THE LIGHTING

FIXTURES.

WALL N/A 120V N/A WATTSTOPPER LMSW 102SERIES, HUBBELL EQUAL,

GREENGATE EQUAL, ACUITYBRANDS EQUAL

S7 FIVE BUTTON SCENE WALL SWITCHSTATION TO MANUALLY TURN ON/OFFLIGHT FIXTURES AND ADJUST SCENE

CONTROL.

WALL N/A 120V N/A WATTSTOPPER LMSW-105SERIES, HUBBELL EQUAL,

GREENGATE EQUAL, ACUITYBRANDS EQUAL

S8 DUAL TECHNOLOGY CEILING MOUNTEDSENSOR DETECTS 360 DEGREE MAJOR ANDMINOR MOTION. SENSOR COVERAGE SHALL

BE A MINIMUM 1000 SQ. FT. FOR A 36 FTWIDE BY 36 FT LONG SPACE

CEILING DUAL TECHNOLOGY(ULTRASONIC &

INFRARED)

24VDC 20 MIN. ORAUTOSENSING

WATTSTOPPER DT-300 SERIES,HUBBELL EQUAL, GREENGATE

EQUAL, ACUITY BRANDS EQUAL

1,2

Total Load (KVA) 3.52 3.48

Other Load (KVA) 0.18 0.80 0.14

Motor Load (KVA)

Heating Load (KVA) Molded Case with Electronic Trip iUnit (LSI)

Receptacle Load (KVA) 2.34 NEC 2.34 Molded Case with Electronic Trip Unit (LI)

Lighting Load (KVA) Molded Case with Fixed Trip UnitConnected KVA Demand Factor Demand KVA Trip Unit Description Notes:

2.30 kVA 0.9 kVA 0.4 kVA

17 Spare 1 20 A -- 0.00 0.00 -- 20 A 1 Spare 18

15 Spare 1 20 A -- 0.00 0.00 -- 20 A 1 Spare 16

13 Spare 1 20 A -- 0.00 0.00 -- 20 A 1 Spare 14

11 Spare 1 20 A -- 0.00 0.00 -- 20 A 1 Spare 12

9 Access Control Bus Tag PS - Elecrical 116 1 20 A Power 0.50 0.00 -- 20 A 1 Spare 10

7 Access Control panel - Electrical 116 1 20 A Power 0.50 0.00 -- 20 A 1 Spare 8

5 IT Rack - Receptacle Electrical Rm 116 1 20 A Receptacle 0.36 0.00 -- 20 A 1 Spare 6

3 IT Rack - Receptacle Electrical Rm 116 1 20 A Receptacle 0.36 0.00 -- 20 A 1 Spare 4

1 Receptacle Dispatch / IT Room 110 1 20 A Other;... 1.80 0.00 -- 20 A 1 Spare 2

Ckt Load Name Pole Rating Type Load... A (KVA) B (KVA) C (KVA) Load... Type Rating Pole Load Name Ckt

Feed From: MDP Enclosure: Type 1 Feeder: SEE DRAWING E503 Applied Engineering Services (317) 810-4141

Voltage 120/208 Wye Amp: 100 A Kaic Rating: 65,000 Date 1/13/2020

SPD: No Main: MCS Mounting: Surface Project No. 180024.5

Branch Panel... XRP-1 New: Yes Location: Electrical 116 Project Name: NEW TRAINING FACILITY

PANELBOARD SCHEDULE

REVISION SCHEDULE

# DESCRIPTION DRAWIN BY DATE ISSUED

1 ADDENDUM 2 DAG 2/25/20

1

1