33
SECARB Early Test at Cranfield Monitoring 4 Million Tons Susan Hovorka, PI Ramón Treviño, project manager Tip Meckel, geologist Bureau of Economic Geology Jackson School of Geosciences The University of Texas at Austin CSLF CO2 Monitoring workshop, April 18, 2013

SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

SECARB Early Test at Cranfield Monitoring 4 Million Tons

Susan Hovorka, PI Ramón Treviño, project manager Tip Meckel, geologist Bureau of Economic Geology Jackson School of Geosciences The University of Texas at Austin

CSLF CO2 Monitoring workshop, April 18, 2013

Page 2: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Federal collaborators Via FWP

Separately funded Stanford, Princeton, U Edinburgh, UT PGE & ICES (CFSES), U. Tennessee, USGS RITE, BP, CCP , Durham, AWWA

2

Gulf Coast Carbon Center Bureau of Economic Geology

Jackson School of Geosciences The University of Texas at Austin

Sandia Technologies Monitoring Systems Design, Installation,

HS&E

Denbury Resources Field owner and injection system

design, management, 4-D

survey, HS&E

LBNL Well-based geophysics, U-tube and lab design

and fabrication

LLNL ERT

ORNL PFT, Stable isotopes

NETL Rock-water interaction

USGS Geochemistry

Environmental Information Volumes

Walden Consulting

SSEB

50 Vendors e.g. Schlumberger Vendors

e.g. local landman

Vendors e.g. equipment

MSU UMiss Hydro & hydrochem

Core Lab UT DoG

Anchor QEA

NRAP VSP&

analysis

SECARB Anthropogenic Test At Plant

Barry/Citronelle

Curtin University, Perth

Organization

Page 3: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Real-time monitoring – BHP, BHT, AZMI, DTS

2008

2009

2010

2011

2012

Mill

ion

met

ric

tons

CO

2

Baseline 3-D

Repeat 3-D VSP Cross well

Baseline VSP Cross well

Start DAS injection

Start Phase 3 injection

Start Phase 2 injection

Geochemical monitoring

1 million ton/year rate

Surface monitoring

Logging

5

4

3

2

1

0

Project Status

Page 4: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Research-based Cranfield Monitoring Plan

• Research-based: not regulatory- or risk-based – Scoped, designed, and budgeted 2006, prior to

regulation

– Operator holds risk

• Designed to respond to DOE programmatic questions Lessons learned are derived products not processes to be duplicated

Page 5: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Cranfield Geologic Setting

Natchez Mississippi

Mississippi River

Illustration by Tip Meckel

Oil and gas field Discovery 1943 Depth 3000 m 15 m thick lower Tuscaloosa Fm. Heterogeneous fluvial sandstones Pipeline CO2 from Jackson Dome @ 1 Million metric tones/year

Mississippi

Page 6: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

DAS

Seismic line from 3-D survey, Cranfield reservoir, Mississippi interpretation Tip Meckel BEG

Tusc

aloo

sa F

m

Tuscaloosa D-E oil reservoir

Oil-water contact

Tuscaloosa confining system

W E Stacked Storage: Use in early stages (Now!) provides

access to long term storage

Step 1 Extract oil via CO2 EOR with storage Step 2 Storage in

adjacent brine-filed pore volumes

Page 7: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Regional Carbon Sequestration Program goal: Improve prediction of storage

capacities

7

Production history 37,590,000 Stock tank

barrels oil 672,472,000 MSCU

gas (Chevron, 1966)

7,754 acres x 90 ft net pay x 25.5% porosity

(Chevron, 1966)

Existing data on reservoir volumetrics

X E [pore volume occupancy (storage efficiency)] = Storage capacity

injection rate – limited by pressure response?

Measure saturation during multiphase plume evolution

Increase predictive capabilities by

validating numerical models

Observation: pore volume occupancy

was rate and dependent: not a

single number

Page 8: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Regional Carbon Sequestration Partnership program goal: Evaluate protocols to demonstrate that CO2 is

retained

Oil and gas trapped over geologic time

High confidence in storage permanence through characterization

Uncertainty and risk assessment

P&A well performance in retention?

Limited analogy between injected and natural fluid retention

AZMI pressure

IZ pressure Microseismic 4-D

Seismic 4-D VSP

Research Questions

Selected assessment approach

Material Risk of failing to retain

Well-pad vadose

gas Ground water chem.

shallow

deep

Semi-quantitative assessment via Certification Framework

Off structure migration?

Response to pressure elevation?

Protocol Sensitivity & reliability

Page 9: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Monitoring layout

9

Phase II

Pipeline head& Separation facility

5km

GIS base Tip Meckel, BEG

Psite EGL-7

Detail Area Study (DAS)

Injector

Producer (monitoring point)

Observation Well

4-D seismic

RITE Microseismic

Page 10: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Monitoring Innovations

• Groundwater monitoring • Soil gas monitoring

Aquifer and USDW

Atmosphere

Biosphere

Vadose zone

CO2 plume

Shallow groundwater

• Pressure in above-zone monitoring interval

• Process-based vadose zone-gas method

• In situ rock-water-CO2 interaction test.

• Contaminated site approaches

• Stacked storage demonstration • Cross-well ERT at depth • Bore hole gravity • Methane exsolution • RITE microseismic

Page 11: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Monitoring Design

Soil gas

Atmosphere

Area tested Whole plume Focus study

Not tested Not tested

Active and P&A well pads

Groundwater

Shallow production

AZMI

Injection zone

Not tested

EGL-7 UM test well, Push-pull test

Not tested

Not tested

Geochemistry breakthrough

Geo- mechanics

RITE micro seismic study

GMT(failed)

“P site” methodology assessment

Monitoring well at each injector

DAS pressure and EGL 7 pressure + fluids

DAS multi-well multi tool array

Page 12: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

12

Detail Area Study DAS

H Zeng, BEG 10cm

5km

Seismically non-unique interpreted form lines

Lower Tuscaloosa sand and conglomerate fluvial depositional environment

Page 13: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

M. Kordi , BEG

Ambrose

Fluvial Facies concept

30-m apart

Page 14: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Time lapse seismic analysis DAS DAS

DAS

2007 Pre-injection 2010 1 year of injection about 1/4 million metric tons this area

Difference

Rui Zhang, CFSES & UTIG

Page 15: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Detailed Area Study (DAS) Injector CFU 31F1

Obs CFU 31 F2

Obs CFU 31 F3

Above-zone monitoring F1 F2 F3

Injection Zone

Above Zone Monitoring

10,500 feet BSL

Closely spaced well array to examine flow in complex reservoir

68m

112 m

Petrel model Tip Meckel

Tuscaloosa D-E reservoir

Page 16: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

LLNL Electrical Resistance Tomography- changes in response with saturation

F2 F3

C. Carrigan, X Yang, LLNL D. LaBrecque Multi-Phase Technologies

F1

Page 17: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Fluid sampling via U-tube yields data on flow processes

• Small diameter sampler with N2 drive brings fluids quickly and high frequency to surface with tracers intact

• High labor effort

• Unique data on fluid flow

UTDoG,

Adding tracer

Page 18: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

As injection rate increased, plume thickness increased

112 m

Injection at 1/8 million ton/year

8 days

Injection at 1/4 million ton/year

4 days? 8 days

March-April 2010 tracer studies: Jiemin Lu, Changbing Yang, GCCC Tommy Phelps ORNL

Page 19: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

100

200

300

400

500

600

5.E-21

1.E-06

2.E-06

3.E-06

4.E-06

5.E-06

4/12 4/17 4/22 4/27 5/2 5/7 5/12 5/17 5/22 5/27

Kg/m

in

Inj. rate

SF6

0

100

200

300

400

500

600

-1.E-06

0.E+00

1.E-06

2.E-06

3.E-06

4.E-06

4/12 4/17 4/22 4/27 5/2 5/7 5/12 5/17 5/22 5/27

Kg/m

in

SF6

Inj. rate

CFU31F-2, 68 m away from injector

CFU31F-3, 112 m away from injector

Travel time = 317 h

Travel time = 319 h

SF6

SF6

2nd SF6 on May 9 255 h

Arrive on May 20

Arrive on May18 211 h

Jiemin Lu, GCCC

Page 20: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Continuous field data from dedicated monitoring well • Large perturbations obvious • Even small perturbations observable (100’s tons/day flux from 1 km) • Fault observed to be sealing

Meckel et al., in review

Page 21: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

surface

Surface casing Cemented in

Cement to isolate

injection zone

AZMI Above zone monitoring interval Time

Pres

sure

Injection zone

AMZI

Confining = No fluid communication

Using above AZMI pressure to assess storage permanence

Page 22: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Pressure Monitoring

CO2 Injection Zone

Above-Zone Monitoring Interval (AZMI) – leakage detection

Within Injection Zone (IZ) reservoir management Daily injection rate

2000

1000

30 m

Metric ton/day

300

310

AZMI bars

300

350

400

IZ bars

T. Meckel BEG

Page 23: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Groundwater monitoring strategy

Characterize shallow groundwater geochemistry

Identify a set of geochemical parameters for detecting CO2 leakage

Lab experiments

Field experiments (Push-pull tests)

Numerical modeling

Test and validation

Groundwater chemistry monitoring for detecting CO2 leakage

Application

Changbing Yang BEG

Page 24: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Groundwater Monitoring

• Each injection well has a 200-300 ft deep groundwater well

• Quarterly geochemical monitoring by University of Mississippi,& Mississippi State

• Sensitivity studies: lab to field

CO2 injection

Changbing Yang, BEG

Page 25: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Using a push-pull field test to validate models under insitu redox conditions

0.0

0.1

0.2

0.3

0.4

0 5000 10000 15000 20000

As (

µg/l)

Water volume pumped out during the pulling phase

Mixing Meas.

bkg. inj.

Changbing Yang, BEG (AWWA)

4.5

5.0

5.5

6.0

6.5

7.0

0 5000 10000 15000 20000

pH

Water volume pumped out during the pulling phase

Mixing Meas.

bkg. inj.

Page 26: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Vadose Zone Monitoring via Process Accounting

Katherine Romanak BEG

Page 27: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Leak

Mask signal

Soil moisture Soil carbonate

Dampen signal

Organics → CO2

Plant activity

Produce CO2 Concentrate CO2

Consume CO2

Disperse CO2

Produce, consume, redistribute CO2

Background “noise”

Weather fronts

Challenges to Near-Surface Monitoring

Stored CO2

Failed containment

Vadose zone

Katherine Romanak BEG

Page 28: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

CO2 concentrations at different depths CO2 concentration alone may not reliable indicator for leakage

detection

• CO2 concentrations show variations in depth, average CO2 conc. ~350 ppm in the atmosphere, ~630 ppm at depth of 1.5 m below surface show, and ~99000 ppm at depth of 3 m over the observation time period

12/3/09 0:00 1/22/10 0:00 3/13/10 0:00 5/2/10 0:00 6/21/10 0:00

300

400

500

600

700

800

CO

2 (p

pm)

90000

100000

110000

120000

CO

2(pp

m)

at 1.5m

at 3m at atmosphere

Near-surface observatory

Katherine Romanak Changbing Yang

Page 29: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Soil gas composition - Unique leakage signal

CH4 < 34 vol. %

CO2 < 45 vol. %

N2 42-85%

O2 2- 21%

Soil gas distribution

CH4+2O2 CO2+ 2H2O

CH2O+ 2O2 CO2+ H2O

Methane oxidation

Org. oxidation

Katherine Romanak BEG

Page 30: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Remaining Activities • Knowledge sharing

– Technical and public and policy • Analysis of data collected

– Joint/comparative inversions – NRAP – SIM-SEQ – Basic Energy Sciences – EFRC’s

• Continued data collection – Report volumes injected and pressure response – Continue groundwater and soil gas observation – EGL7 deconstruction (DOE-Schlumberger Carbon Services)

• RITE microseismic array – collect microseismic data • Use of DAS obs. well for DOE-LBNL CO2 geothermal test • Support for CCUS concept

Page 31: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Conclusions • Stacked Storage Demonstrated • Project objectives attained

– Long term monitoring continues • Innovative techniques for permanence

assessment: – AZMI pressure – Groundwater testing to determine sensitivity – Fixed gas soil gas method

• Capacity is rate dependent

Page 32: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Bibliography Please see www.gulfcoastcarbon.org “bookshelf” Special volume of International Journal of Greenhouse Gas Control on Cranfield.

32

Page 33: SECARB Early Test at Cranfield Monitoring 4 Million Tons · SECARB Early Test at Cranfield Monitoring 4 Million Tons. Susan Hovorka, PI . Ramón Treviño, project manager . Tip Meckel,

Gulf Coast Carbon Center

LBNL LLNL ORNL NETL SNL Mississippi State U U of Mississippi SECARB UT-PGE UT Chem-E CFSES- BES

UT- CIEEP UT- DoGS UT- LBJ school BEG- CEE JSG – EER Univ. Edinburgh Univ. Durham RITE CO2-CRC