sebgl -st4(6.1.2009)

Embed Size (px)

Citation preview

  • 8/2/2019 sebgl -st4(6.1.2009)

    1/28

    SEBGL - ST4

    GUIDELINES

    ON

    LONG FIRST MAINTENANCE PERIOD

    CORROSION PROTECTION SYSTEMS

    FOR STRUCTURAL STEELWORK

    A COST COMPARISON

    Structural Engineering Branch, ArchSD Page 1 of 28 19 - 1 -Page 1of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    2/28

    STRUCTURAL ENGINEERING BRANCH

    ARCHITECTURAL SERVICES DEPARTMENT

    January 2009 (Revised)

    Structural Engineering Branch, ArchSD Page 2 of 28 19 - 2 -Page 2of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    3/28

    Content

    Content Page

    1. Introduction . 3

    2. Classification of Environment ... 3

    3. Life of Coating . 4

    4. Choices for Long First Maintenance Systems .. 5

    5. Cost Comparison between Type C or D painting System and Hot-Dip Galvanizing

    Systems (including Type F Painting System) 6

    6. Recommendation .10

    7. References 11

    Appendix Detailed Cost Comparison for Steel Sections of Blast-Cleaning Followed by

    Type C or D Painting System and Hot-Dip Galvanizing Followed by Type F

    Painting System

    Structural Engineering Branch, ArchSD Page 3 of 28 19 - 3 -Page 3of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    4/28

    1. Introduction

    The protection of structural steelwork against corrosion can be achieved by many

    methods. The selection of a protective system, however, involves qualitative

    judgement on the relative importance of many factors that can vary widely according

    to the type of structure, its function, its general location, its immediate environment,

    and the required life to first maintenance. Cost, needless to say, also plays an

    important part in the selection. BS EN ISO 12944 andBS EN ISO 14713 (partially

    superseding BS 5493: 1977) has provided guidelines on the choices. The ArchSD

    General Specification for Building 2007(the G.SS. for Building (2007)) Table 15.7

    also suggests some systems for selection. In the selection of a protective system, the

    specifier should consider the environments of the steel structure and the

    durability required of the painting system for the first major maintenance of the

    painting.

    2. Classification of Environment

    According to BS EN ISO 12944-2, atmospheric environments are classified as six

    atmospheric-corrosivity categories (Table 1):

    Structural Engineering Branch, ArchSD Page 4 of 28 19 - 4 -Page 4of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    5/28

    Table 1 Classification of Corrosivity Category

    Corrosivity

    category

    Degree of

    corrosivity

    Examples of typical environments

    Exterior Interior

    C1 very low----

    Heated buildings with

    clean atmosphere, e.g.

    offices, schools

    C2 low

    Atmospheres with low

    level of pollution.

    Mostly rural areas

    Unheated buildings where

    condensation may occur,

    e.g. depots, sports halls

    C3 medium

    Urban and industrial

    atmospheres, moderate

    sulfur dioxide

    pollution. Coastal areas

    with low salinity

    Production rooms with

    high humidity and some

    air pollution, e.g. food-

    processing plants,

    laundries

    C4 high

    Industrial areas and

    coastal areas with

    moderate salinity

    Chemical plants,

    swimming pools, coastal

    ship and boatyards

    C5-Ivery high

    (industrial)

    Industrial areas with

    high humidity and

    aggressive atmosphere

    Buildings or areas with

    almost permanent

    condensation and with

    high pollution

    C5-M very high(marine)

    Coastal and offshoreareas with high salinity

    Buildings or areas with

    almost permanentcondensation and with

    high pollution

    (Source: Adapted fromBS EN ISO12944 2andBS EN ISO 14713)

    3. Life of Coating

    According to BS EN ISO 12944 and BS EN ISO 14713ISO 12944, the life or

    durability of coating is considered as the time which can elapse before the first

    major or general maintenance of the coating becomes necessary, or is more

    commonly known as the Life to First Maintenance. Experience shows that Type A

    painting to Table 15.7 of the G.S. for Building (2007), the life of the painting can

    achieve about 2 to 3 years in the environment of Hong Kong, whereas it will be about

    5 years for Type B painting.

    Structural Engineering Branch, ArchSD Page 5 of 28 19 - 5 -Page 5of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    6/28

    For Type C, D painting systems to Table 15.7 of the for Building (2007) and hot-dip

    galvanizing without painting system, Type C, D painting systems and hot-dip

    galvanizing with or without painting (Type F) are expected to have a long period of

    first maintenance period for about 10 to 15 years even for C3 or C4 environment in

    Hong Kong.Corus (2004) predicted the Life to First Maintenance based on their own

    practical experience and the corrosion rates given in BS EN ISO 12944 and BS EN

    ISO 14713, and their prediction is shown in Table 2:

    Table 2 Anticipated Life of First Maintenance

    with Different Corrosion Protection Systems

    Corrosion Protection Systems Corrosivity category Life to First Maintenance

    Type C Painting SystemC3 20 years

    C4 15 years

    Type D Painting SystemC3 25 years

    C4 15-20 years

    Hot-dip galvanizing (min

    85m) without painting

    system

    C3 40 years

    C4 30 years

    ( BS EN ISO 1461 specifies the standard hot-dip galvanized coating to be 85m

    for steel 6mm thick or more, and that thinner steel has thinner coatings.)

    However, it is considered that the prediction by Corus (2004) is generally on the

    high side, and our experience notes that Type C, D painting systems and hot-dip

    galvanizing with or without Type F painting system are expected to have a first

    maintenance period for about 10 to 15 years for C3 or C4 environment in Hong Kong.

    According toBS EN ISO 12944 andBS EN ISO 14713, the life or durability of

    coating is considered as the time which can elapse before the first major or general

    maintenance of the coating becomes necessary, or is more commonly known as the

    Life to First Maintenance. Experience shows that Type A painting to Table 15.7 of

    the GS for Building (2007), the life of the painting can achieve about 2 to 3 years in

    the environment of Hong Kong, whereas it will be about 5 years for Type B painting.

    And our experience notes that Type C, D painting systems and hot-dip galvanizing

    Structural Engineering Branch, ArchSD Page 6 of 28 19 - 6 -Page 6of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    7/28

    with or without Type F painting system are expected to have a first maintenance

    period for about 15 years for C3 or C4 environment in Hong Kong.

    4. Choices for Long First Maintenance Systems

    4.1 For the Long First Maintenance Systems (i.e. 10-about 15 years), if in accordance

    with the G.S. for Building (2007), the choice in effect is between blast-cleaning

    followed by Type C (or D) painting systems and hot-dip galvanizing (with or

    withoutor Type F orand G painting systems). The factors that have to be taken into

    account for a choice include :-

    (a) cCost.

    (b) eEaste of control for quality.

    (c) pPerformance.

    4.2 From experience of the past ArchSD projects, the hot-dip galvanizing is generally

    easier to be used as long as the galvanizer is a well-established one; the difficult areas

    are only at fasteners and welded joints. Though hot-dip galvanized bolts and nuts are

    now readily available in Hong Kong, electro-plated fasteners are sometimes

    mistakenly used. It should be noted that electroplated bolts can corrode quickly within

    a few years. Therefore, hot-dip galvanized fasteners should always be used for long

    first maintenance protective system. PSE should brief the site staff to check the

    fasteners delivered to site.

    4.3 Type C or D painting systems in Table 15.7 of the GS for Building (2007) are in line

    with the painting systems A3.11, A4.14 or A4.15 ofBS EN ISO 12944, which can

    achieve 10 toabout 15 years first maintenance period for C3 or C4 environment.

    These systems are also in line with recommendation of the superseded BS 5493 in

    that systems SK3 and SL6 were suggested to provide for exterior exposed polluted

    inland.

    Structural Engineering Branch, ArchSD Page 7 of 28 19 - 7 -Page 7of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    8/28

    4.4 However, Type C (or D) painting systems, since it requires labour for blast cleaning

    and painting, demands more supervision and more control on workmanship. Further

    discussion on the choice of the corrosion protection system for different first

    maintenance can be found in SEB Guidelines ST3: Notes on Protective Coating of

    Steel Structures Against Corrosion.

    4.5 The following sectionparagraph will compare the cost between blast-cleaning

    followed by Type C or to D painting systems and hot-dip galvanizing (with or

    withoutincluding Type F painting system).

    5. Cost Comparison between Type C toor D Painting Systems and Hot-Dip

    Galvanizing Systems (including Type F Painting System)

    5.1 In 1994, this set of Guidelines was first issued to compare the cost of providing

    corrosion protection between the then Type C painting system (now Type C and D

    painting systems) and hot-dip galvanizing (including Type F painting system). At

    that time, extensive surveys of the paint manufacturers and/or suppliers had been

    conducted to obtain the then market price for the above corrosion protection systems.

    It was found that the cost blast-cleaning followed by Types C or D painting system

    was $120/m2, whilst the cost of galvanizing was $4/kg plus the cost of Type F

    painting system at $32/m2. With such data, the Guidelines in 1994 concluded that

    hot-dip galvanizing (including Type F painting system) became more cost-effective

    solution for steel sections with surface area greater than 33m2 per tonne.

    5.1 Painting Systems

    Type C to D painting systems in Table 15.7 of the G.S. for Building (2007) are in line

    with the painting systems A3.11, A4.14 or A4.15 ofBS EN ISO 12944, which can

    achieve 10 to 15 years first maintenance period for C3 or C4 environment. These

    systems are also in line with recommendation of partially superseded BS 5493 in

    that systems SK3 and SL6 were suggested to provide for exterior exposed polluted

    inland.

    5.22 Unit Cost of Painting

    Structural Engineering Branch, ArchSD Page 8 of 28 19 - 8 -Page 8of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    9/28

    In 1994, this Guidelines was first issued to compare the cost of providing corrosion

    protection between the then Type C painting system (now Type C to D painting

    systems) and hot-dip galvanizing (including Type F painting system). At that time,

    extensive surveys of the paint manufacturers and/or suppliers had been conducted to

    obtain the then market price for the above corrosion protection systems. It was found

    that the cost of Types C to D painting system was $120/m2, whilst the cost of

    galvanizing was $4/kg plus the cost of Type F painting system at $32/m2. With such

    data, the Guidelines in 1994 concluded that hot-dip galvanizing (including Type F

    painting system became more cost-effective solution for steel sections with surface

    area greater than 33m2 per tonne.

    5.2.2 For the purpose of this revision, this Guidelinesset of Guidelines has conducted

    another survey in November 2008 on the current market price for the above items.

    Four suppliers and/or contractors have been consulted, and the current prices for

    blast-cleaning followed by Type C or D painting system are as follows:

    Grit blasting to Sa 2 $36.5/m

    Cost of paint (including wastage) $84.0/m

    Labour $35.0/m

    Allow for 15% profit $14.5/m

    ___________

    Total $170/m

    5.33 Cost of Hot-Dip Galvanizing

    Structural Engineering Branch, ArchSD Page 9 of 28 19 - 9 -Page 9of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    10/28

    The market price for hot-dip galvanizing to BS EN ISO 1461 is $3.0/kg

    ($3000/tonne).

    5.44 Cost of Painting to Galvanized Steel

    Type F painting system surface involves applying British Rail T-Wash to the

    galvanized surface followed by two coats of finishing paint with a dry film thickness

    of 80 m. The market price of such painting system is:

    Cost : T-Wash + Painting = $38.5/m

    Labour = $35.0/m

    Profit = $6.5/m

    ___________

    Total $80/m

    5.55 Comparison of Cost of Protection for Long Life

    5.5.1 The cost of comparison between blast-cleaning followed by Type C orto D painting

    systems and hot-dip galvanizing (including Type F painting system) is attached in

    Appendix. The results are summarised in Figures 1.

    Structural Engineering Branch, ArchSD Page 10 of 28 1 9 - 10 -Page10 of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

    SurfaceArea = 18 SurfaceArea = 33

  • 8/2/2019 sebgl -st4(6.1.2009)

    11/28

    Figure 1 Cost Comparison between Painting and

    Hot-Dip Galvanizing

    5.5.2 Figures 1 shows that the cost of protection differs depending on the surface area per

    unit tonne of section. For heavy section, i.e. less surface areas per tonne, less painting

    will be required thus the painting cost is less. On the other handHowever, , the costof galvanizing is relatively constant irrespective the less surface area.

    Two break-even points can therefore be found at surface area of 18m/tonne and 33

    m/tonne. The two breakeven points indicate that:

    (i) for section where the surface area is more than 18 m/tonne, blast-

    cleaning followed by Type C or D painting system is more cost

    effective than hot-dip galvanizing (without any painting system); and

    (ii) for section where the surface area is more than 33 m/tonne, It is found

    that blast-cleaning followed by Type C or D painting system is more

    cost effective than hot-dip galvanizing (including Type F painting

    system). in general except for light section where the surface area is

    more than 33 m/tonne.

    Structural Engineering Branch, ArchSD Page 11 of 28 1 9 - 11 -Page11 of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    12/28

    5.5.3 The following examples for UC, UB, channel, angle, CHS, SHS and RHS are chosen

    for comparison. They have been chosen as representatives for light-, medium- and

    heavy-weight members of ..each section.

    Structural Engineering Branch, ArchSD Page 12 of 28 1 9 - 12 -Page12 of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    13/28

    For example :-

    Area (m ) /tonne) Paint ing - Galva nizing Gal+

    Painting

    - Gal. +

    /Tonne ing nize UC

    ($ Per tonne of Section)

    152 x 152 x 37 kg/m 24.70 4199 3000 4976

    254x254x89 kg/m 16.90 2873 3000 4352

    305x305x158 kg/m 11.60 1972 3000 3928Pating

    UB ($ Per tonne of Section)

    203 x 133 x 3025 kg/m 36.400.80 61885236 3000 5912464

    356 x 127 x 39 kg/m 30.20 5134 3000 5416

    457 x 152 x 82 kg/m 18.40 3128 3000 4472

    UC

    152 x 152 x 37 kg/m 24.70 4199 3000 4976

    254x254x89 kg/m 16.90 2873 3000 4352

    305x305x158 kg/m 11.60 1972 3000 3928

    Channel s

    102 x 51 x 10.42 kg/m 36.30 6171 3000 5904

    127 x 64 x 14.90 kg/m 32.00 5440 3000 5760

    152 x 89 x 23.84 kg/m 26.00 4420 3000 5080

    Angle s

    65 x 65 x 4 mm 67.36 11451 3000 8389

    1200 x 1200 x 108 mm 34.3627.62 58414695 3000 57845209

    225 x 225 x 15 mm 18.15 3085 3000 4452

    CHS

    Structural Engineering Branch, ArchSD Page 13 of 28 1 9 - 13 -Page13 of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    14/28

    26.9x3.2mm 35.5 6035 3000 584088.9x3.2 mm 32.40 5508 3000 5592

    88.9x3.2 mm 32.40 5508 3000 5592193.7x5.0 mm 20.6 3502 3000 4648

    457x8.0mm 12.8 2176 3000 4024

    SHS

    90x90x3.6kg/m 36.30 6171 3000 5904

    140x140x5.0 kg/m 26.00 4420 3000 5080

    300x300x6.3 kg/m 20.40 3468 3000 4632

    RHS

    100x50x3.0mm 43.50 7395 3000 6480

    200x100x5.0 mm 26.00 4420 3000 5080

    450x250x8.0mm 16.20 2754 3000 4296

    6. Recommendations

    6.1 For 10-about 115 years first maintenance period, it is recommended that :-

    Use hot-dip galvanize if surface area 18m per tonne of Section.

    (a). If no painting to the finished galvanized surfaces is required and

    without too much touch up to welded areas is required, use hot-dip galvanizing

    if surface area 18m per tonne of section.

    (b). If aesthetic is an important consideration and that painting is required, use Type

    C or D painting system if surface area Use blast-cleaning followed by Type C

    painting or equivalent if surface area < 33 m per tonne of sSection, and

    hot-dip galvanizing +followed by Type F painting system when surface area >

    33 m per tonne of section.

    Structural Engineering Branch, ArchSD Page 14 of 28 1 9 - 14 -Page14 of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    15/28

    If no painting to the finished galvanized surfaces is required, use hot-dip

    galvanizing if surface area 18m per tonne of section.

    6.2 With this rule, most structural framework using universal beams and columns is to be

    protected by painting, and hot-dip galvanizing is for lightweight framework or lattice

    girders assembled by angles or channels or where additional painting is not required

    to the finished galvanized surfaces. For longer period of protection (e.g. 20 years or

    more), hot-dip galvanizing to more than 140 micron or sprayed zinc will be required;

    on thisBS EN ISO 12944 andBS EN ISO 14713 provides more information.

    6.3 However, the above rule is not rigid and consideration should be given to the

    particular situation of each project, e.g. type of structure, function, general and

    immediate environment and the staff requirement for supervision.

    In the earlier section, it has been stated that the hot-dip galvanizing is generally

    easier to be used as long as the galvanizer is a well-established one; the difficult areas

    are only at fasteners and welded joints. Hence, if the cost of hot-dip galvanizing is

    marginally (say 10%) higher than the cost of blast-cleaning followed by Type C or D

    panting system, PSE may prefer to choose hot-dip galvanizing instead. PSE should

    also make judgement on the combination of the sections used with different m2/tonne,

    eg. in the case of trusses with combination of I-beams, angles and channels.

    7. References

    British Standard Institution (1977), Code of Practice for Protective Coating of Ironand Steel Structures Against Corrosion (London: BSI).

    British Standard Institution (1998), BS EN ISO 12944-1: Paints and Varnishes -Corrosion Protection of Steel Structures by Protective Paint Systems - Part 1: Part 1:

    General Introduction (London:, BSI).

    Structural Engineering Branch, ArchSD Page 15 of 28 1 9 - 15 -Page15 of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    16/28

    British Standard Institution (1998), BS EN ISO 12944-2: Paints and Varnishes -Corrosion Protection of Steel Structures by Protective Paint Systems - Part 2:

    Classification of Environments (London:, BSI).

    British Standard Institution (1998), BS EN ISO 12944-3: Paints and Varnishes -

    Corrosion Protection of Steel Structures by Protective Paint Systems - Part 3: DesignConsiderations (London:, BSI).

    British Standard Institution (1998), BS EN ISO 12944-4: Paints and Varnishes -Corrosion Protection of Steel Structures by Protective Paint Systems - Part 4: Types

    of Surface and Surface Preparation (London:, BSI).

    British Standard Institution (2007), BS EN ISO 12944-5: Paints and Varnishes -Corrosion Protection of Steel Structures by Protective Paint Systems - Part 5:

    Protective Paint Systems (London:, BSI).

    British Standard Institution (1998), BS EN ISO 12944-6: Paints and Varnishes -Corrosion Protection of Steel Structures by Protective Paint Systems - Part 6:

    Laboratory Performance Test Methods (London:, BSI).

    British Standard Institution (1998), BS EN ISO 12944-7: Paints and Varnishes -Corrosion Protection of Steel Structures by Protective Paint Systems - Part 7:

    Execution and Supervision of Paintwork(London:, BSI).

    British Standard Institution (1998), BS ENISO 12944-8: Paints and Varnishes -Corrosion Protection of Steel Structures by Protective Paint Systems - Part 8:

    Development of Specifications for New Work and Maintenance (London:, BSI).

    British Standard Institution (1999), BS EN ISO 1461: Hot Dip Galvanized Coatingson Fabricated Iron and Steel Articles Specification (London: BSI).Corus (2004), A Corrosion Protection Guide for Steelwork Exposed to Atmospheric

    Environments (Scunthorpe: Corus Construction & Industrial) (Available:

    http://www.corusconstruction.com , Accessed: 2 January 2009).

    British Standard Institution (1999),BS EN ISO14713: Protection Against Corrosionof Iron and Steel in Structures Zinc and Aluminium Coatings - Guidelines (London:BSI).

    Structural Engineering Branch, ArchSD Page 16 of 28 1 9 - 16 -Page16 of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

    http://www.corusconstruction.com/http://www.corusconstruction.com/
  • 8/2/2019 sebgl -st4(6.1.2009)

    17/28

    Structural Engineering Branch, ArchSD Page 17 of 28 1 9 - 17 -Page17 of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    18/28

    Appendix

    Detailed Cost Comparison for Steel Sections of Blast-Cleaning Followed by Type C

    or D Painting System and Hot-Dip Galvanizing Followed by Type F Painting System

    Structural Engineering Branch, ArchSD Page 18 of 28 1 9 - 18 -Page18 of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    19/28

    UC

    SectionSurface

    Area /tonneCost Comparison of Different Protection ($ / ton of section)

    mm (m2 /ton) Painting Galvanize only Gal+Painting

    356 x 406 x634

    3.98 HK$676.60 HK$3,000.0 HK$3,318.40 356 x 406 x551

    4.49 HK$763.30 HK$3,000.0 HK$3,359.20 356 x 406 x467

    5.19 HK$882.30 HK$3,000.0 HK$3,415.20 356 x 406 x393

    6.05 HK$1,028.50 HK$1,077.07 HK$3,000.0 HK$3,484.00 HK$3,506.86

    356 x 406 x340

    6.90 HK$1,173.00 HK$3,000.0 HK$3,552.00 356 x 406 x287

    8.05 HK$1,368.50 HK$3,000.0 HK$3,644.00 356 x 406 x235

    9.69 HK$1,647.30 HK$3,000.0 HK$3,775.20 356 x 368 x202

    10.80 HK$1,836.00 HK$3,000.0 HK$3,864.00 356 x 368 x177

    12.30 HK$2,091.00 HK$3,000.0 HK$3,984.00 356 x 368 x153

    14.10 HK$2,397.00 HK$2,286.50 HK$3,000.0 HK$4,128.00 HK$4,076.00

    356 x 368 x129

    16.60 HK$2,822.00 HK$3,000.0 HK$4,328.00 305 x 305 x283

    6.86 HK$1,166.20 HK$3,000.0 HK$3,548.80 305 x 305 x240

    7.94 HK$1,349.80 HK$3,000.0 HK$3,635.20 305 x 305 x198

    9.46 HK$1,608.20 HK$3,000.0 HK$3,756.80 305 x 305 x158

    11.60 HK$1,972.00 HK$2,014.74 HK$3,000.0 HK$3,928.00 HK$3,948.11

    305 x 305 x137

    13.30 HK$2,261.00 HK$3,000.0 HK$4,064.00 305 x 305 x118

    15.30 HK$2,601.00 HK$3,000.0 HK$4,224.00 305 x 305 x97

    18.50 HK$3,145.00 HK$3,000.0 HK$4,480.00 254 x 254 x167

    9.45 HK$1,606.50 HK$3,000.0 HK$3,756.00 254 x 254 x132

    11.70 HK$1,989.00 HK$3,000.0 HK$3,936.00 254 x 254 x107

    14.20 HK$2,414.00 HK$2,470.10 HK$3,000.0 HK$4,136.00 HK$4,162.40

    254 x 254 x89

    16.90 HK$2,873.00 HK$3,000.0 HK$4,352.00 254 x 254 x73

    20.40 HK$3,468.00 HK$3,000.0 HK$4,632.00 203 x 203 x86

    14.40 HK$2,448.00 HK$3,000.0 HK$4,152.00 203 x 203 x71

    17.20 HK$2,924.00 HK$3,000.0 HK$4,376.00 203 x 203 x60

    20.10 HK$3,417.00 HK$3,417.00 HK$3,000.0 HK$4,608.00 HK$4,608.00

    203 x 203 x52

    23.00 HK$3,910.00 HK$3,000.0 HK$4,840.00 203 x 203 x46

    25.80 HK$4,386.00 HK$3,000.0 HK$5,064.00 152 x 152 x37

    24.70 HK$4,199.00 HK$3,000.0 HK$4,976.00 152 x 152 x30

    30.00 HK$5,100.00 HK$5,292.67 HK$3,000.0 HK$5,400.00 HK$5,490.67

    152 x 152 x23

    38.70 HK$6,579.00 HK$3,000.0 HK$6,096.00

    Notes: Cost of blast-cleaning followed by Type C or D painting system is always less than 110% of the costof hot-dip galvanizing followed by Type F painting system,..

    Structural Engineering Branch, ArchSD Page 19 of 28 1 9 - 19 -Page19 of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    20/28

    Structural Engineering Branch, ArchSD Page 20 of 28 1 9 - 20 -Page20 of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    21/28

    UB

    SectionSurface

    Area /tonneCost Comparison of Different Protection ($ / ton of section)

    mm (m2 /ton) Painting Galvanize only Gal+Painting

    914 x 419 x388

    8.87 HK$1,507.90 HK$3,000.0 HK$3,709.60 914 x 419 x343

    9.95 HK$1,691.50 HK$3,000.0 HK$3,796.00 914 x 305 x289

    10.40 HK$1,768.00 HK$3,000.0 HK$3,832.00 914 x 305 x253

    11.80 HK$2,006.00 HK$1,955.57 HK$3,000.0 HK$3,944.00 HK$3,920.27

    914 x 305 x224

    13.30 HK$2,261.00 HK$3,000.0 HK$4,064.00 914 x 305 x201

    14.70 HK$2,499.00 HK$3,000.0 HK$4,176.00 838 x 292 x226

    12.40 HK$2,108.00 HK$3,000.0 HK$3,992.00 838 x 292 x194

    14.40 HK$2,448.00 HK$2,414.00 HK$3,000.0 HK$4,152.00 HK$4,136.00

    838 x 292 x176

    15.80 HK$2,686.00 HK$3,000.0 HK$4,264.00 762 x 267 x197

    13.00 HK$2,210.00 HK$3,000.0 HK$4,040.00 762 x 267 x173

    14.60 HK$2,482.00 HK$3,000.0 HK$4,168.00 762 x 267 x147

    17.10 HK$2,907.00 HK$2,694.50 HK$3,000.0 HK$4,368.00 HK$4,268.00

    762 x 267 x134

    18.70 HK$3,179.00 HK$3,000.0 HK$4,496.00 686 x 254 x170

    13.80 HK$2,346.00 HK$3,000.0 HK$4,104.00 686 x 254 x152

    15.40 HK$2,618.00 HK$3,000.0 HK$4,232.00 686 x 254 x140

    16.60 HK$2,822.00 HK$2,732.75 HK$3,000.0 HK$4,328.00 HK$4,286.00

    686 x 254 x125

    18.50 HK$3,145.00 HK$3,000.0 HK$4,480.00 610 x 305 x238

    10.30 HK$1,751.00 HK$3,000.0 HK$3,824.00 610 x 305 x179

    13.50 HK$2,295.00 HK$2,255.33 HK$3,000.0 HK$4,080.00 HK$4,061.33

    610 x 305 x149

    16.00 HK$2,720.00 HK$3,000.0 HK$4,280.00 610 x 229 x140

    15.10 HK$2,567.00 HK$3,000.0 HK$4,208.00 610 x 229 x125

    16.70 HK$2,839.00 HK$3,000.0 HK$4,336.00 610 x 229 x113

    18.40 HK$3,128.00 HK$3,004.75 HK$3,000.0 HK$4,472.00 HK$4,414.00

    610 x 229 x101

    20.50 HK$3,485.00 HK$3,000.0 HK$4,640.00 533 x 210 x122

    15.50 HK$2,635.00 HK$3,000.0 HK$4,240.00 533 x 210 x109

    17.20 HK$2,924.00 HK$3,000.0 HK$4,376.00 533 x 210 x101

    18.50 HK$3,145.00 HK$3,192.60 HK$3,000.0 HK$4,480.00 HK$4,502.40

    533 x 210 x92

    20.20 HK$3,434.00 HK$3,000.0 HK$4,616.00 533 x 210 x82

    22.50 HK$3,825.00 HK$3,000.0 HK$4,800.00 457 x 191 x98

    16.90 HK$2,873.00 HK$3,000.0 HK$4,352.00 457 x 191 x89

    18.50 HK$3,145.00 HK$3,000.0 HK$4,480.00 457 x 191 x82

    20.10 HK$3,417.00 HK$3,464.60 HK$3,000.0 HK$4,608.00 HK$4,630.40

    457 x 191 x74

    22.10 HK$3,757.00 HK$3,000.0 HK$4,768.00

    Structural Engineering Branch, ArchSD Page 21 of 28 1 9 - 21 -Page21 of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    22/28

    457 x 191 x67

    24.30 HK$4,131.00 HK$3,000.0 HK$4,944.00 457 x 152 x82

    18.40 HK$3,128.00 HK$3,000.0 HK$4,472.00 457 x 152 x74

    20.30 HK$3,451.00 HK$3,000.0 HK$4,624.00 457 x 152 x67

    22.30 HK$3,791.00 HK$3,879.40 HK$3,000.0 HK$4,784.00 HK$4,825.60

    457 x 152 x60

    24.90 HK$4,233.00 HK$3,000.0 HK$4,992.00 457 x 152 x52

    28.20 HK$4,794.00 HK$3,000.0 HK$5,256.00

    Structural Engineering Branch, ArchSD Page 22 of 28 1 9 - 22 -Page22 of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

    Cost of painting > 110% of Cost of gal + painting

  • 8/2/2019 sebgl -st4(6.1.2009)

    23/28

    UB (contd)

    SectionSurface

    Area /tonne

    Cost Comparison of Different Protection ($ / ton of section)

    mm (m2 /ton) PaintingGalvanize

    onlyGal+Painting

    406 x 178 x74

    20.30 HK$3,451.00 HK$3,000.0 HK$4,624.00 406 x 178 x67

    22.30 HK$3,791.00 HK$3,000.0 HK$4,784.00 406 x 178 x60

    24.80 HK$4,216.00 HK$4,029.00 HK$3,000.0 HK$4,984.00 HK$4,896.00

    406 x 178 x54

    27.40 HK$4,658.00 HK$3,000.0 HK$5,192.00 406 x 140 x46

    29.20 HK$4,964.00 HK$3,000.0 HK$5,336.00 406 x 140 x39

    34.20 HK$5,814.00 HK$5,389.00 HK$3,000.0 HK$5,736.00 HK$5,536.00

    356 x 171 x

    6720.60 HK$3,502.00 HK$3,000.0 HK$4,648.00

    356 x 171 x57

    24.10 HK$4,097.00 HK$3,000.0 HK$4,928.00 356 x 171 x51

    26.70 HK$4,539.00 HK$4,734.50 HK$3,000.0 HK$5,136.00 HK$5,228.00

    356 x 171 x45

    30.10 HK$5,117.00 HK$3,000.0 HK$5,408.00 356 x 127 x39

    30.20 HK$5,134.00 HK$3,000.0 HK$5,416.00 356 x 127 x33

    35.40 HK$6,018.00 HK$3,000.0 HK$5,832.00 305 x 165 x54

    23.30 HK$3,961.00 HK$3,000.0 HK$4,864.00 305 x 165 x46

    27.10 HK$4,607.00 HK$4,601.33 HK$3,000.0 HK$5,168.00 HK$5,165.33

    305 x 165 x

    4030.80 HK$5,236.00 HK$3,000.0 HK$5,464.00

    305 x 127 x48

    22.70 HK$3,859.00 HK$3,000.0 HK$4,816.00 305 x 127 x42

    25.80 HK$4,386.00 HK$4,391.67 HK$3,000.0 HK$5,064.00 HK$5,066.67

    305 x 127 x37

    29.00 HK$4,930.00 HK$3,000.0 HK$5,320.00 305 x 102 x33

    30.80 HK$5,236.00 HK$3,000.0 HK$5,464.00 305 x 102 x28

    35.40 HK$6,018.00 HK$6,018.00 HK$3,000.0 HK$5,832.00 HK$5,832.00

    305 x 102 x25

    40.00 HK$6,800.00 HK$3,000.0 HK$6,200.00 254 x 146 x43

    25.10 HK$4,267.00 HK$3,000.0 HK$5,008.00 254 x 146 x

    37 29.00 HK$4,930.00 HK$5,003.67 HK$3,000.0 HK$5,320.00 HK$5,354.67254 x 146 x31

    34.20 HK$5,814.00 HK$3,000.0 HK$5,736.00 254 x 102 x28

    31.90 HK$5,423.00 HK$3,000.0 HK$5,552.00 254 x 102 x25

    35.60 HK$6,052.00 HK$6,120.00 HK$3,000.0 HK$5,848.00 HK$5,880.00

    254 x 102 x22

    40.50 HK$6,885.00 HK$3,000.0 HK$6,240.00 203 x 133 x30

    30.80 HK$5,236.00 HK$3,000.0 HK$5,464.00 203 x 133 x25

    36.40 HK$6,188.00 HK$5,712.00 HK$3,000.0 HK$5,912.00 HK$5,688.00

    203 x 102 x23

    34.20 HK$5,814.00 HK$3,000.0 HK$5,736.00 178 x 102 x19 38.80 HK$6,596.00 HK$3,000.0 HK$6,104.00 152 x 89 x 16 39.80 HK$6,766.00 HK$3,000.0 HK$6,184.00 Structural Engineering Branch, ArchSD Page 23 of 28 1 9 - 23 -Page

    23 of 28File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    24/28

    127 x 76 x 13 41.30 HK$7,021.00 HK$3,000.0 HK$6,304.00 203 x 133 x30

    30.80 HK$5,236.00 HK$3,000.0 HK$5,464.00 203 x 133 x25

    36.40 HK$6,188.00 HK$5,712.00 HK$3,000.0 HK$5,912.00 HK$5,688.00

    203 x 102 x23

    34.20 HK$5,814.00 HK$3,000.0 HK$5,736.00 178 x 102 x19 38.80 HK$6,596.00 HK$3,000.0 HK$6,104.00 152 x 89 x 16 39.80 HK$6,766.00 HK$3,000.0 HK$6,184.00 127 x 76 x 13 41.30 HK$7,021.00 HK$3,000.0 HK$6,304.00

    UC

    SectionSurface

    Area /tonneCost Comparison of Different Protection ($ / ton of section)

    mm (m2 /ton) Painting Galvanize only Gal+Painting

    356 x 406 x634

    3.98 HK$676.60 HK$3,000.0 HK$3,318.40 356 x 406 x551

    4.49 HK$763.30 HK$3,000.0 HK$3,359.20 356 x 406 x467

    5.19 HK$882.30 HK$3,000.0 HK$3,415.20 356 x 406 x393

    6.05 HK$1,028.50 HK$1,077.07 HK$3,000.0 HK$3,484.00 HK$3,506.86

    356 x 406 x340

    6.90 HK$1,173.00 HK$3,000.0 HK$3,552.00 356 x 406 x287 8.05 HK$1,368.50 HK$3,000.0 HK$3,644.00 356 x 406 x235

    9.69 HK$1,647.30 HK$3,000.0 HK$3,775.20 356 x 368 x202

    10.80 HK$1,836.00 HK$3,000.0 HK$3,864.00 356 x 368 x177

    12.30 HK$2,091.00 HK$3,000.0 HK$3,984.00 356 x 368 x153

    14.10 HK$2,397.00 HK$2,286.50 HK$3,000.0 HK$4,128.00 HK$4,076.00

    356 x 368 x129

    16.60 HK$2,822.00 HK$3,000.0 HK$4,328.00 305 x 305 x283

    6.86 HK$1,166.20 HK$3,000.0 HK$3,548.80 305 x 305 x240

    7.94 HK$1,349.80 HK$3,000.0 HK$3,635.20 305 x 305 x198 9.46 HK$1,608.20 HK$3,000.0 HK$3,756.80 305 x 305 x 11.60 HK$1,972.00 HK$2,014.74 HK$3,000.0 HK$3,928.00 HK$3,948.11

    Structural Engineering Branch, ArchSD Page 24 of 28 1 9 - 24 -Page24 of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

    Cost of painting > 110% of Cost of gal + painting

  • 8/2/2019 sebgl -st4(6.1.2009)

    25/28

    158

    305 x 305 x137

    13.30 HK$2,261.00 HK$3,000.0 HK$4,064.00 305 x 305 x118

    15.30 HK$2,601.00 HK$3,000.0 HK$4,224.00 305 x 305 x97

    18.50 HK$3,145.00 HK$3,000.0 HK$4,480.00 254 x 254 x167 9.45 HK$1,606.50 HK$3,000.0 HK$3,756.00 254 x 254 x132

    11.70 HK$1,989.00 HK$3,000.0 HK$3,936.00 254 x 254 x107

    14.20 HK$2,414.00 HK$2,470.10 HK$3,000.0 HK$4,136.00 HK$4,162.40

    254 x 254 x89

    16.90 HK$2,873.00 HK$3,000.0 HK$4,352.00 254 x 254 x73

    20.40 HK$3,468.00 HK$3,000.0 HK$4,632.00 203 x 203 x86

    14.40 HK$2,448.00 HK$3,000.0 HK$4,152.00 203 x 203 x71

    17.20 HK$2,924.00 HK$3,000.0 HK$4,376.00 203 x 203 x60

    20.10 HK$3,417.00 HK$3,417.00 HK$3,000.0 HK$4,608.00 HK$4,608.00

    203 x 203 x52 23.00 HK$3,910.00 HK$3,000.0 HK$4,840.00 203 x 203 x46

    25.80 HK$4,386.00 HK$3,000.0 HK$5,064.00 152 x 152 x37

    24.70 HK$4,199.00 HK$3,000.0 HK$4,976.00 152 x 152 x30

    30.00 HK$5,100.00 HK$5,292.67 HK$3,000.0 HK$5,400.00 HK$5,490.67

    152 x 152 x23

    38.70 HK$6,579.00 HK$3,000.0 HK$6,096.00

    Remarks: Cost of painting is always less than the cost of gal + painting in this case, and therefore use paintingas corrosion protection system for UC sections is recommended.

    Structural Engineering Branch, ArchSD Page 25 of 28 1 9 - 25 -Page25 of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

  • 8/2/2019 sebgl -st4(6.1.2009)

    26/28

    Channel

    SectionSurface Area

    /tonne

    Cost Comparison of Different Protection ($ / ton of section)

    mm (m2 /ton) Painting Galvanize only Gal+Painting

    432x102 18.60 HK$3,162.00 HK$3,000.0 HK$4,488.00 381x102 20.30 HK$3,451.00 HK$3,000.0 HK$4,624.00 305x102 20.90 HK$3,553.00 HK$3,000.0 HK$4,672.00 305x89 22.10 HK$3,757.00 HK$3,000.0 HK$4,768.00 254x89 23.00 HK$3,910.00 HK$3,000.0 HK$4,840.00 254x76 27.40 HK$4,658.00 HK$3,000.0 HK$5,192.00 229x89 23.50 HK$3,995.00 HK$3,000.0 HK$4,880.00 229x76 27.80 HK$4,726.00 HK$3,000.0 HK$5,224.00 203x89 24.20 HK$4,114.00 HK$3,000.0 HK$4,936.00 203x76 28.30 HK$4,811.00 HK$3,000.0 HK$5,264.00 178x89 25.00 HK$4,250.00 HK$3,000.0 HK$5,000.00 178x76 30.00 HK$5,100.00 HK$3,000.0 HK$5,400.00 152x89 26.00 HK$4,420.00 HK$3,000.0 HK$5,080.00 152x76 32.20 HK$5,474.00 HK$3,000.0 HK$5,576.00 127x64 32.00 HK$5,440.00 HK$3,000.0 HK$5,560.00 102x51 36.30 HK$6,171.00 HK$3,000.0 HK$5,904.00 76x38 42.10 HK$7,157.00 HK$3,000.0 HK$6,368.00

    Angle

    SectionSurface Area

    /tonneCost Comparison of Different Protection ($ / ton of section)

    mm (m2 /ton) Painting Galvanize only Gal+Painting

    400x400x21 11.25 HK$1,912.50 HK$3,000.0 HK$3,900.00 350x350x18 14.86 HK$2,526.20 HK$3,000.0 HK$4,188.80 300x300x18 14.06 HK$2,390.20 HK$3,000.0 HK$4,124.80 240x240x15 18.05 HK$3,068.50 HK$3,000.0 HK$4,444.00 225x225x15 18.15 HK$3,085.50 HK$3,000.0 HK$4,452.00 200x200x15 18.26 HK$3,104.20 HK$3,000.0 HK$4,460.80 165x165x10 26.83 HK$4,561.10 HK$3,000.0 HK$5,146.40 120x120x10 27.62 HK$4,695.40 HK$3,000.0 HK$5,209.60 115x115x8 34.07 HK$5,791.90 HK$3,000.0 HK$5,725.60 100x100x8 34.36 HK$5,841.20 HK$3,000.0 HK$5,748.80 90x90x6 45.00 HK$7,650.00 HK$3,000.0 HK$6,600.00 80x80x6 45.45 HK$7,726.50 HK$3,000.0 HK$6,636.00 65x65x4 67.36 HK$11,451.20 HK$3,000.0 HK$8,388.80 60x60x4 67.42 HK$11,461.40 HK$3,000.0 HK$8,393.60 50x50x4 68.97 HK$11,724.90 HK$3,000.0 HK$8,517.60

    Structural Engineering Branch, ArchSD Page 26 of 28 1 9 - 26 -Page26 of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

    Cost of painting > 110% of Cost of gal + painting

  • 8/2/2019 sebgl -st4(6.1.2009)

    27/28

    CHS

    SectionSurface

    Area /tonneCost Comparison of Different Protection ($ / ton of section)

    mm (m2 /ton) Painting Galvanize only Gal+Painting

    508x8.0 12.7 HK$2,159.00 HK$3,000.0 HK$4,016.00 457.0x8.0 12.8 HK$2,176.00 HK$3,000.0 HK$4,024.00 406.4x6.3 16.2 HK$2,754.00 HK$3,000.0 HK$4,296.00 323.9x6.3 16.2 HK$2,754.00 HK$3,000.0 HK$4,296.00 273.0x5.0 20.4 HK$3,468.00 HK$3,000.0 HK$4,632.00 244.5x12 8.76 HK$1,489.20 HK$3,000.0 HK$3,700.80 219.1x5.0 20.5 HK$3,485.00 HK$3,000.0 HK$4,640.00 193.7x5.0 20.6 HK$3,502.00 HK$3,000.0 HK$4,648.00 168.3x5.0 20.6 HK$3,502.00 HK$3,000.0 HK$4,648.00 139.7x5.0 20.7 HK$3,519.00 HK$3,000.0 HK$4,656.00 114.3x3.2 32.1 HK$5,457.00 HK$3,000.0 HK$5,568.00 88.9x3.2 32.4 HK$5,508.00 HK$3,000.0 HK$5,592.00 76.1x3.2 32.6 HK$5,542.00 HK$3,000.0 HK$5,608.00 60.3x3.2 32.9 HK$5,593.00 HK$3,000.0 HK$5,632.00 18.3x3.2 33.6 HK$5,712.00 HK$3,000.0 HK$5,688.00 42.4x3.2 33.8 HK$5,746.00 HK$3,000.0 HK$5,704.00 26.9x3.2 35.5 HK$6,035.00 HK$3,000.0 HK$5,840.00

    SHS

    SectionSurface

    Area /tonneCost Comparison of Different Protection ($ / ton of section)

    mm (m2 /ton) Painting Galvanize only Gal+Painting

    400x400x10.0 12.9 HK$2,193.00 HK$3,000.0 HK$4,032.00 350x350x8.0 16.2 HK$2,754.00 HK$3,000.0 HK$4,296.00 300x300x6.3 20.4 HK$3,468.00 HK$3,000.0 HK$4,632.00 250x250x6.3 20.5 HK$3,485.00 HK$3,000.0 HK$4,640.00 200x200x5.0 25.9 HK$4,403.00 HK$3,000.0 HK$5,072.00 180x180x6.3 20.7 HK$3,519.00 HK$3,000.0 HK$4,656.00 160x160x5.0 26 HK$4,420.00 HK$3,000.0 HK$5,080.00 150x150x5.0 26 HK$4,420.00 HK$3,000.0 HK$5,080.00 140x140x5.0 26.00 HK$4,420.00 HK$3,000.0 HK$5,080.00 120x120x5.0 26.20 HK$4,454.00 HK$3,000.0 HK$5,096.00 100x100x4.0 32.80 HK$5,576.00 HK$3,000.0 HK$5,624.00 90x90x3.6 36.3 HK$6,171.00 HK$3,000.0 HK$5,904.00 80x80x3.0 36.5 HK$6,205.00 HK$3,000.0 HK$5,920.00 70x70x3.0 36.6 HK$6,222.00 HK$3,000.0 HK$5,928.00 60x60x3.0 43.9 HK$7,463.00 HK$3,000.0 HK$6,512.00 50x50x3.0 44.1 HK$7,497.00 HK$3,000.0 HK$6,528.00 40x40x3.0 44.6 HK$7,582.00 HK$3,000.0 HK$6,568.00

    Structural Engineering Branch, ArchSD Page 27 of 28 1 9 - 27 -Page27 of 28

    File code : ST-4.doc

    Guidelines on Long First Maintenance Period CorrosionProtection Systems

    CTW/MKL/IL/

    Issue No./Revision No. : 1/1 Issue/Revision Date : January 2009

    Cost of painting > 110% of Cost of gal + painting

  • 8/2/2019 sebgl -st4(6.1.2009)

    28/28

    RHS

    SectionSurface

    Area /tonneCost Comparison of Different Protection ($ / ton of section)

    mm (m2 /ton) Painting Galvanize only Gal+Painting

    500x300x8.0 16.1 HK$2,737.00 HK$3,000.0 HK$4,288.00 450x250x8.0 16.2 HK$2,754.00 HK$3,000.0 HK$4,296.00 400x200x8.0 16.2 HK$2,754.00 HK$3,000.0 HK$4,296.00 300x200x6.3 20.5 HK$3,485.00 HK$3,000.0 HK$4,640.00 300x100x8.0 16.3 HK$2,771.00 HK$3,000.0 HK$4,304.00 250x150x5.0 25.9 HK$4,403.00 HK$3,000.0 HK$5,072.00 250x100x10 13.2 HK$2,244.00 HK$3,000.0 HK$4,056.00 200x150x8.0 16.4 HK$2,788.00 HK$3,000.0 HK$4,312.00 200x120x5.0 26 HK$4,420.00 HK$3,000.0 HK$5,080.00 200x100x5.0 26 HK$4,420.00 HK$3,000.0 HK$5,080.00 160x80x4.0 32.6 HK$5,542.00 HK$3,000.0 HK$5,608.00 150x100x5.0 26.2 HK$4,454.00 HK$3,000.0 HK$5,096.00 120x80x5.0 26.3 HK$4,471.00 HK$3,000.0 HK$5,104.00 120x60x3.6 36.2 HK$6,154.00 HK$3,000.0 HK$5,896.00 100x60x3.6 36.5 HK$6,205.00 HK$3,000.0 HK$5,920.00 100x50x3.0 43.5 HK$7,395.00 HK$3,000.0 HK$6,480.00 90x50x3.6 41.3 HK$7,021.00 HK$3,000.0 HK$6,304.00 80x40x3.2 44.1 HK$7,497.00 HK$3,000.0 HK$6,528.00 60x40x3.0 42.1 HK$7,157.00 HK$3,000.0 HK$6,368.00

    Cost of painting > 110% of Cost of gal + painting