Seattle Multimodal Terminal at Colman Dock ProjectSeattle Multimodal Terminal at Colman Dock Project
Seattle Design Commission BriefingSea e es g Co ss o e gFebruary 6, 2014y ,
11
TEXTTEXT
Project team• Genevieve Rucki WSF – Project ManagerGenevieve Rucki, WSF Project Manager
Mark Scott WSDOT Facilities Architect• Mark Scott, WSDOT – Facilities Architect
• Burt Miller, WSF – Permitting Lead
• David Yuan, NBBJ – Consultant Project Manager
• Randy Benedict, NBBJ – Project Designer
• Bruce Gabert, NBBJ – Project Architect, j
• Justin McCaffree EnviroIssues – Communications and outreachJustin McCaffree, EnviroIssues Communications and outreach
2
TEXTTEXT
Why is Colman Dock important?Th C l D k f ilit t
y p• The Colman Dock facility supports
transportation between downtowntransportation between downtown Seattle and communities in Kitsap County and the Olympic Peninsula.
• The terminal is the largest terminal in the Washington State Ferries (WSF) systemsystem.
• In 2013, Colman Dock served over 8.5 million riders including 4 4 million footmillion riders, including 4.4 million foot passengers.
3
TEXTTEXT
Why is the project needed?• Key components of Colman Dock are aging andKey components of Colman Dock are aging and
seismically deficient.
• The layout of today’s facility creates safety Timber pile from • The layout of today s facility creates safety concerns and operational inefficiencies due to
Colman Dock that has been removed
conflicts between vehicles, bicycles, and pedestrian traffic
and replaced due to deterioration.pedestrian traffic.
• Preserving the role of Colman Dock as a regional multimodal transportation hub providingregional multimodal transportation hub providing safe and reliable ferry service is a priority.y p y
The project will reduce conflictsThe project will reduce conflicts between vehicles and pedestrians. 4
TEXTTEXT
Wh t d th ti j t i l d ?What does the preservation project include? • Replacing the timber portion of the
dock with a new and reconfigured steel and concrete dockand concrete dock
• Replacing the main terminal building• Replacing the main terminal building and constructing a new entrance building along Alaskan Way
• Replacing the vehicle transfer span and overhead loading structures (Slip 3)overhead loading structures (Slip 3)
Replacing the passenger only facility• Replacing the passenger-only facility with funding from King County
A i l i f C l D k l ki th tg g y
• Providing improved pedestrian Aerial view of Colman Dock looking southeast
o d g p o ed pedest aconnections to transit
5
TEXTTEXT
Wh t th i t l b fit ?What are the environmental benefits?• Removing 7,400 tons of toxic material (i.e.
today’s creosote-treated timber piles) fromtoday s creosote-treated timber piles) from the heart of Seattle’s waterfront.
• Removing fill underneath the north trestle, opening up an area of shoreline and near-shore habitat.shore habitat.
• Providing water quality treatment for all new• Providing water quality treatment for all new and replaced areas of the terminal, improving water quality and aquatic habitat.
• An opportunity to prevent the spread of existing contaminated sediments The project will remove more than 3% of the creosote-existing contaminated sediments.
Miti ti f dditi l t t
The project will remove more than 3% of the creosotetreated timber left in Puget Sound
• Mitigation for additional permanent overwater coverage (approximately 5,000 ft2)
6
TEXTTEXT
Wh t i th j t ti li ?What is the project timeline?• 2011 - 2014 – Environmental process/preliminary design
• 2014 - 2015 – Design
2015 2016 P t• 2015 - 2016 – Procurement
• 2016 - 2021 – On-site construction2016 2021 On site construction
Note: Construction will occur in three phases over five years to allow for continuous operation of the facility.
How much will the project cost?How much will the project cost?• The total project budget is $268 million and is divided into three main components:• The total project budget is $268 million and is divided into three main components:
o Terminal Building and North Trestle Replacement: $207 milliono Terminal Building and North Trestle Replacement: $207 million
o Slip 3 Overhead Loading and Transfer Span Replacement: $48 milliono Slip 3 Overhead Loading and Transfer Span Replacement: $48 million
o Passenger-Only Ferry Facility Replacement: $13 million (funding to be provided by King County)o Passenger-Only Ferry Facility Replacement: $13 million (funding to be provided by King County)
• The project budget includes a risk reserve and relies on a combination of federal and state funding sources• The project budget includes a risk reserve and relies on a combination of federal and state funding sources, with local funding required for the replacement passenger-only ferry facility.
7
TEXTTEXT
S ttl t f t j t di tiSeattle waterfront project coordination• WSF is coordinating construction, traffic impacts and
project design with other projects planned along Seattle’s f i l diwaterfront, including:
o Elliott Bay Seawall Replacement Project (City ofo Elliott Bay Seawall Replacement Project (City of Seattle)
- Topics related to design development, op cs e ated to des g de e op e t,construction coordination and access, including replacement
o Waterfront Seattle planning effort (City of Seattle)- Design of future Seattle waterfront andDesign of future Seattle waterfront and
configuration of Alaskan Way, including coordination on development of public access concepts for Colman Dock and replacement of Marion Street Pedestrian Bridge
- Colman Dock Transit Hub (in coordination with KC Metro))
o Alaskan Way Viaduct Replacement Program (WSDOT)(WSDOT)
- AWV construction-related impacts to WSF operationsp
8
TEXTTEXT
Existing facility
9
TEXTTEXT
Operational constraints of existing facility with narrow west faceOperational constraints of existing facility with narrow west face
• East-west linear terminal
• Narrow face at west end of building limits efficientbuilding limits efficient passenger circulation to slips, particularly Slip 1, and results in “funneling”g
• Stacked area behind turnstiles prevents timely passenger loading;passenger loading; disembarking passengers from Slip 1 cut through thefrom Slip 1 cut through the terminal building to access the Marion Street Bridge, increasing congestiong g
• Provides limited public views pof waterfront
10
TEXTTEXT
Operational benefits of North South orientation with broad west faceOperational benefits of North-South orientation with broad west face
• Reduces stack loading effect, lti i f tresulting in faster, more
efficient passenger circulation through the terminal
• Keeps pedestrians closer to vessel slips for loadingp g
• Keeps disembarking passengers from exiting through the terminal reducingthrough the terminal, reducing congestion
• Provides expanded public views of the water and vesselviews of the water and vessel operations
• Building configuration allows f ti ti d ifor continuous operation during phased construction of project
11
TEXT DRAFTTEXT DRAFT
Concept plan: Bird’s eye viewConcept plan: Bird s-eye view
12
TEXT DRAFTTEXT DRAFT
Concept plan: View looking north
13
TEXTConcept plan diagram DRAFTTEXTConcept plan diagram DRAFT
14
TEXT DRAFTTEXT DRAFT
15
TEXT DRAFTTEXT DRAFT
T i l B ildi E t i iTerminal Building – Exterior views
View from Elliott Bay looking east
16
TEXT DRAFTTEXT DRAFT
T i l B ildi E t i iTerminal Building – Exterior views
View looking southeast
17
TEXT DRAFTTEXT DRAFT
T i l B ildi E t i iTerminal Building – Exterior views
View looking west
18
TEXT DRAFTTEXT DRAFT
T i l B ildi E t i iTerminal Building – Exterior views
View looking northwest
19
TEXT DRAFTTEXT DRAFT
T i l B ildi E t i iTerminal Building – Exterior views
View looking northeast
20
TEXT DRAFTTEXT DRAFT
T i l B ildi S tiTerminal Building – Section
21
TEXT DRAFTTEXT DRAFT
T i l B ildi I t iTerminal Building – Interior
22
TEXT DRAFTTEXT DRAFT
T i l B ildi I t iTerminal Building – Interior
23
TEXT DRAFTTEXT DRAFT
Al k W t b ildi E t i iAlaskan Way entry building – Exterior views
View looking north
24
TEXT DRAFTTEXT DRAFT
Al k W t b ildi E t i iAlaskan Way entry building – Exterior views
View along Alaskan Way looking west
25
TEXT DRAFTTEXT DRAFT
Al k W t b ildi E t i iAlaskan Way entry building – Exterior views
View along Alaskan Way
26
TEXT DRAFTTEXT DRAFT
Al k W t b ildi E t i iAlaskan Way entry building – Exterior views
View from Marion Street Bridge27
View from Marion Street Bridge
TEXT DRAFTTEXT DRAFT
Al k W t b ildi E t i iAlaskan Way entry building – Exterior views
View along Alaskan Way looking south
28
TEXT DRAFTTEXT DRAFT
E t i iExterior views
View looking southeast
29
TEXT DRAFTTEXT DRAFT
View looking east
30
TEXT DRAFTTEXT DRAFT
31
TEXT DRAFTTEXT DRAFT
Questions?Questions?