Configurable. Local. Reliable.Swagelok® Mechanical Seal Support Systems
Plan 11Flush Plan
Plan 12Flush with Strainer
Plan 21Cooled Flush
Plan 32External Flush
Plan 52Buffer Liquid
Seal Pot
Plan 72Buffer Gas
Plan 65APlan 72/76 Plan 65B
• The default flush plan for most pumps.• Removes heat from and ensures proper pressure in seal chamber
• Prevents orifice clogging through the addition of a strainer• Removes heat and flushes particulate from the seal chamber• Ensures proper pressure in the seal chamber to prevent pumped fluid from vaporizing
Plan 13Flush from
Chamber to Suction• Common for vertical pumps.• Removes heat and flushes particulate from the seal chamber
• Removes heat & flushes particulate from seal chamber
• Provides cooled flush fluid to process side of the seal• Removes heat & flushes particulate from seal chamber• Reduces coking or polymerization• Improves fluid vapor margin in seal chamber
• Strainer Prevents orifice clogging • Provides cooled flush fluid to process side of seal• Removes heat & flushes particulate from seal chamber• Reduces coking or polymerization• Improves vapor pressure margin in seal chamber
Plan 53BBarrier Liquid Pressurizedby Bladder Accumulator
• Provides heat removal from inner seal• Used with dual seal arrangement when process leakage to atmosphere cannot occur
• Supplies gas seal with clean, dry buffer gas• Serves as a containment seal in the event of primary seal failure
Plan 14Flush, combination
of Plan 11 & 13
Plan 23Cooled Flush,
Recirculated through Seal Chamber • Removes solids
from flush stream by incorporating a cyclone separator
Integral OrificeFlange AdapterReplace threaded orwelded flange assemblieswith a one-piece flangeadapter with integral orifice.
Swagelok Rotating Equipment Solutions
• Provides clean flush fluid to the seal chamber • Increases seal chamber pressure
Plan 41Cooled Flush withCyclone Separator
• Provides additional heat removal from inner seal• Acts as a secondary seal to prevent process fluid leakage to atmosphere
Plan 54Barrier Liquid
Pressurized byExternal System
Plan 53CBarrier Liquid
Pressurized byPiston Accumulator
Plan 55Buffer LiquidCirculated by
External System• Supplies gas seal with clean, dry buffer gas• Prevents process leakage to atmosphere in the event of a primary or secondary seal failure
Plan 75Condensing
Leakage Collection• Collects and monitors inner seal leakage that condenses at ambient temperatures• Typically with Plan 72
Plan 76Noncondensing
LeakageCollection
• Monitors inner seal leakage that does not condense at ambient temperatures• Typically used with Plan 72
• Supplies gas seal with clean, dry buffer gas• Serves as containment seal in the event of primary seal failure• Monitors inner seal leakage
• Collects leakage of condensing process fluid •Collects leakage of condensing process fluid
Buffer Gas &Noncondensing
Leakage Collection
Leakage Collectionwith Reservoir
Leakage Collectionwith Reservoir
Plan 74Barrier Gas
Plan 62• Prevents formation of, or clears, solids from atmospheric side of the seal faces
Quench fromExternal Source
All service marks and trademarks shown are owned and registered by Swagelok Company unless otherwise noted. © 2019 Swagelok Company.
API 682 Seal Plans• Process Side Plans • Between Seal Plans• Atmospheric Side Plans
• Provides clean & cooled flush fluid to seal chamber
Plan 31Flush with Cyclone
Separator
• Additional heat removal from inner seal • Used with dual seal arrangement when the seal chamber pressure can vary and process leakage to atmosphere cannot occur
Plan 53ABarrier Liquid Seal Pot
Pressurizedby Nitrogen
• Provides heat removal from inner seal • Used with dual seal arrangement when process leakage to atmosphere cannot occur
Thermowell TeesReduce threaded connections andmonitor temperaturewith integratedthermowell pre-weldedinto tube fitting tee.
Orifice UnionEasily add an orifice to a flush system with the orifice union.This fitting makes welding bulky flange assemblies unnecessary. Tagged for visual identification.
Extended Male ConnectorsFor direct connection into your gland. This fitting eliminates the need for a female adapter providing a transition to tubing outside the shroud. Available in 4- or 6-inch lengths with full hex or machine shank for use in tight spaces.
Plan 22Cooled Flush with Strainer
PI
PI PI
PI
TI
Plan 12
From Pump Discharge
To Seal
From Seal
To Pump Suction
From Pump Discharge
To Seal
SealTo Pump Suction
From Pump Discharge
To Seal
From Pump Discharge
Coolant In Coolant Out
Drain
From Pump Discharge
To Pump Discharge
To Seal
To Seal
Flush Source
To Seal
To Pump Suction
From Pump Discharge
• Reduces cooler duty extending the life of the close-clearance throat bushing
From Pump
Discharge
To SealDrain
Coolant In
Coolant Out
TI
Plan 52
TI
LSH
LSL
LT
PIPT
To Collection System
CoolantIn
CoolantOut
Buffer Fluid Drain
TI
Plan 53A
TI
LSH
LSL
LT
PIPT
CoolantIn
CoolantOut
Buffer Fluid Drain
From External Pressure Source
TI
Plan 53B
PI
PI
TI
TI
PI
Bladder Charge
CoolantIn
CoolantOut
Drain
DrainBarrier Fluid
Make-up
PI PI
TI
Plan 11
PI PI
TI
Plan 13
SealChamber
Plan 14
TI TI
PI PI
Plan 21
TI
PI
TI
PI
TI
PI
PI PI
TI
PI
Plan 22
TI
PI
TI
PI
Plan 23
To Seal
From Seal High-point Vent
Drain
Coolant Out
Low-point Drain
Coolant In
PI PI
FI
PI
TI
Plan 32
TI
TI
PI
PI
PI
Plan 41
Coolant Out
Drain
Coolant In
Plan 31
TI
PI
PI
PI
Oklahoma | West TexasTulsa • Oklahoma City • Amarillo • Odessa
918.258.8661 okwt.swagelok.com
Plan 51Quench from
Reservoir• Prevents icing on the atmospheric side of the seal• Is typically used on vertical pumps
PI
Plan 51
Fill