  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    1/33

    professionalise | re-prioritise | standardise | benchmark | improve industry relationships and industry performance | lead reform

    Australias

    Sea King Disposal2011 - 2012

    Request for Tender

    Industry Brief19th September 2011

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    2/33

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    3/33

    2011/12 2020/21 Disposals

    up to 24 ships

    up to 70 combat aircraft

    up to 110 other aircraft

    up to 120 helicopters

    up to 600 armoured vehicles up to 12,000 other vehicles, and

    a range of communications systems,

    weapons (such as rifles, howitzer, etc.,) andexplosive ordnance (such as missiles,torpedos and munitions)

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    4/33

    Up to 24 Ships - Indicative Program

    Total Ships Dry Weight: ~ 31,000 tonnes

    KDA Class

    2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

    Amphibious Lift

    Guided Missile Frigates (FFG)

    Mine Warfare

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    5/33

    Up to 12,000 Vehicles - Indicative Program

    *Disposal timeline is indicative only and is dependent on the delivery of the

    replacement vehicle fleet

    2012 2013 2014 2015 2016 2017 2018 2019 2020 TOTAL

    Lightweight fleet

    (Land Rover variant)600 450 475 475 260 260 260 260 260 3300

    Light trailers(< 2 tonnes)

    270 280 280 280 280 280 280 280 270 2500

    Medium-weight fleet

    (10 tonnes)136 262 262 136 349 1145

    Medium trailers

    (2-20 tonnes)75 75 75 75 300

    Heavy fleet

    (semi-trailer)18 36 36 18 110

    Heavy trailers(40ft, low-loader)20 20 20 20 80

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    6/33

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    7/33

    Australian Disposals 1997 2010

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    8/33

    Strategic Priorities

    Cost reduce and/or eliminate cost to return funding to thesustainment of current capability

    Revenue generate and then maximise revenue from thesale of Defences military assets

    Heritage ensuring that Defence heritage (and inparticular war heritage) is appropriately recognised and

    preserved Industry provide opportunity for industry to add value in

    the disposal of Defences military assets

    Reform continue to reform disposal processes to supportthe above four priorities

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    9/33

    Balancing Priorities

    V

    M2A2 Hamel

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    10/33

    Product Development / Management

    Defence Inputs Industry Inputs Output

    Spares

    Key

    DefenceAsset

    ExplosiveOrdinance

    SupportEquipment

    Training

    Upgrade

    Training

    OngoingSupport

    Refurbishment IntegratedProduct

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    11/33

    Disposal Vision / Process

    Strategy Market Activity Delivery

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    12/33

    Potential Disposal Options

    Foreign military, para-military, police or emergencyservices organisations

    Other government organisations

    International aid organisations

    OEMs for refurbishment and on-sale

    Spares harvesting

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    13/33

    Overall requirements

    Technical and financial feasibility;

    Best overall value for money return for theCommonwealth;

    Positive environmental management;

    Positive occupational safety management; and

    Compliance with all applicable laws andinternational conventions.

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    14/33

    LOTS 1 to 5

    Fleet status is correct

    as at

    8th September 2011

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    15/33

    LOT 1 N16 114

    20-Nov-11420 daysR8 Due on

    21-Jan-12315 daysR7 Due on

    10-Aug-11210 daysR6 Due on

    10-Aug-11105 daysR5 Due on

    62.8 A/F Hrs400hrlyR4 Due in

    36.7 A/F Hrs300hrlyR3 Due in

    34.4 A/F Hrs100hrlyR2 Due in33.6 A/F Hrs50 hrlyR1 Due in

    8983.2 Air Frame Hours. This aircraft has retired fromservice.

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    16/33

    LOT 2 N16 125

    30-Jul-12420 daysR8 Due on

    29-Dec-11315 daysR7 Due on

    3-Jan-12210 daysR6 Due on

    20-Sep-11105 daysR5 Due on

    202.1 A/F Hrs400hrlyR4 Due in

    136.7A/F Hrs300hrlyR3 Due in

    86.7 A/F Hrs100hrlyR2 Due in

    36.7 A/F Hrs50 hrlyR1 Due in

    8209.8 Air Frame Hours. Retires from service 31 Dec 11.

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    17/33

    LOT 3 N16 238

    26-Jan-10420 daysR8 Due on

    5-Jul-10315 daysR7 Due on

    9-Mar-10210 daysR6 Due on

    17-Mar-10105 daysR5 Due on

    3.6 A/F Hrs400hrlyR4 Due in

    0.5 A/F Hrs300hrlyR3 Due in

    3.6 A/F Hrs100hrlyR2 Due in15.9 A/F Hrs50 hrlyR1 Due in

    7770.5 Air Frame Hours. This aircraft has retired fromservice.

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    18/33

    LOT 4 N16 239

    7-Feb-12420 daysR8 Due on

    11-Mar-12315 daysR7 Due on14-Aug-11210 daysR6 Due on

    14-Aug-11105 daysR5 Due on

    111.2 A/F Hrs400hrlyR4 Due in

    109.3 A/F Hrs300hrlyR3 Due in

    9.3 A/F Hrs100hrlyR2 Due in8.0 A/F Hrs50 hrlyR1 Due in

    7732.2 Air Frame Hours. This aircraft is scheduled to retirefrom service in Oct 11

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    19/33

    LOT 5 N16 918

    27-Aug-12420 daysR8 Due on

    28-Sep-11315 daysR7 Due on

    26-Jan-12210 daysR6 Due on

    13-Oct-11105 daysR5 Due on

    188.2 A/F Hrs400hrlyR4 Due in

    164.2 A/F Hrs300hrlyR3 Due in

    64.2 A/F Hrs100hrlyR2 Due in

    14.2 A/F Hrs50 hrlyR1 Due in

    8005.5 Air Frame Hours. Retires from service 31 Dec 11.

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    20/33

    LOT 6 Simulator

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    21/33

    LOT 6 Simulator

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    22/33

    LOTS 7 to 9

    Ex UK MoD Mk 6 Airframes

    XZ 571XZ 647

    XV 710 All aircraft have exceeded 10,000

    airframe hours and have beenharvested for spare parts

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    23/33

    LOTS 7 to 9

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    24/33

    LOTS 7 to 9 Harvested Items

    Some floor panels

    Some fuel cells

    Tail pylons Most avionic and electrical repairable items

    Some instruments

    Transmissions

    Engines

    Drive train items Blades

    Some flight control components

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    25/33

    LOT 10 Unique Sea King Repairable

    Items & Break Down Spares transmission change units

    main and tail rotor assemblies

    sponsons tail pylons

    fairings

    fuel cells flooring

    avionics and electrical systems

    lightweight radar

    generators

    inverters

    automatic flight control systems

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    26/33

    LOT 11 Ground Support Equipment,

    special tooling, etc servicing platforms

    rigging kits

    aircraft blanks and covers

    special tools

    1st line test equipment (used on aircraft) including

    Pitot Static Test Set

    Shut Off Cock Actuator Test Set

    Flight Control Test Set

    2nd line test equipment (used at workshops) including, Lightweight Radar Test station

    Radalt Test Station etc

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    27/33

    LOT 12 Uninstalled RR Gnome Engines

    up to seven complete uninstalled Gnome Mk 3020 and3021 engines

    engine housings exhaust casings

    wiring harnesses overspeed trip units

    compressor blades

    fuel computers

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    28/33

    LOT 13 METS

    T700 / Gnome Engine Test System / Mobile Engine Test Stand(METS) including

    control cabin

    test trailer

    Dynamometer

    electrical harnesses etc

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    29/33

    Location

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    30/33

    Sea King RFT Timing

    Tender Release

    1 September 2011

    Inspection Day

    13 October 2011

    Tender Close

    1 November 2011

    Delivery

    first half of 2012

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    31/33

    Other HelicoptersSquirrel helicopter Seahawk helicopter

    Kiowa helicopter Black Hawk helicopter

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    32/33

    Defence Disposals Agency

    Help Desk [email protected]

    Write to: The DirectorDefence Disposals Agency

    Level 12, Defence Plaza

    270 Pitt St

    Sydney NSW 2000

    Phone: 02 9393 2914

    Fax: 02 9393 3542

  • 8/3/2019 Sea King Disposal RFT Industry Briefing

    33/33