25
site plan concept for land o’ lakes FINAL REPORT EnCitu Plan+Design Anna Dearman Ryan Estel Carson Gorecki Nathen Lamb John Todoroff June 12, 2015

SE Quadrant Site Planning

Embed Size (px)

Citation preview

site plan concept for land o’ lakesFINAL REPORT

EnCitu Plan+DesignAnna DearmanRyan EstelCarson GoreckiNathen LambJohn Todoroff

June 12, 2015

1Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

table of contents

Project Team . . . . . . . . . . . . . . . . . . . . . . . 2

Vision . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Site Context . . . . . . . . . . . . . . . . . . . . . . . 4

Opportunities and Constraints . . . . . . . . . . . . . 6

Regulatory Context . . . . . . . . . . . . . . . . . . . 7

Concept Alternatives . . . . . . . . . . . . . . . . . . 9

Preferred Alternative . . . . . . . . . . . . . . . . . 12

Site Cross-Section . . . . . . . . . . . . . . . . . . . 16

Dimensions of Site and Concept Plan . . . . . . . . 17

Site Circulation and Access . . . . . . . . . . . . . . 18

Street Cross-Sections . . . . . . . . . . . . . . . . . 19

2045 Vision . . . . . . . . . . . . . . . . . . . . . . 20

Sustainable Urbanism . . . . . . . . . . . . . . . . . 21

Project Financial Feasibility . . . . . . . . . . . . . . 22

Appendix: Financial Measures

2 Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

project team

Nathen LambRESEARCH LEAD

Since his first urban studies course at the University of Washington Tacoma, Nathen knew he would pursue urban planning to help make cities a great place to call home for everyone. He has always been fascinated with urban environments, and how they shape social,

political, and economic affairs. In his spare time, Nathen enjoys spending time outdoors, and visiting all of the pristine natural landmarks that the Pacific Northwest has to offer. Nathen remembers to never take himself too seriously, and always makes time to watch the stars.

John Todoroff DESIGN LEAD

Living in Portland for two decades has given John a front row seat to witness how urban planning decisions can affect the built environment and make cities great places to live. A student in the MURP program with an undergrad degree in Community Development,

he came to PSU after having worked as a graphic designer and marketing coordinator for an architecture firm. John spends his free time listening to music, enjoying Portland’s great food, taking photographs, or relaxing near the region’s beautiful rivers when weather permits.

Carson GoreckiCONCEPT SKETCHUP ARTIST

Hailing from St. Paul, MN, Carson is in his first year of the Master’s of Urban Regional Planning Program at PSU. He is fascinated by the living and breathing organisms that are cities and enjoys wandering those places that are often overlooked. Site Planning presented

the opportunity to add another lens through which to understand the urban environment, through its physical potential. Outside of school, he collects maps and will never turn down an offer to play cribbage or soccer.

Anna Dearman TRANSPORTATION ANALYST

As she pursues the Master of Urban and Regional Planning degree at PSU, Anna also works as an Assistant Planner with the local multidisciplinary architecture, engineering, and planning firm Mackenzie in the Vancouver, Washington, office. In the MURP program,

Anna has especially enjoyed classes such as Site Planning that involve more applied assignments, and she always appreciates the opportunity to get her hands dirty (at least digitally) in Adobe Creative Suite. Besides planning wonk, Anna enjoys climbing mountains, traveling the Pacific Northwest, and experimenting with recipes.

Ryan Estel REAL ESTATE FINANCE ANALYST

Since his early days at Portland State University during his undergraduate studies Ryan recognized his passion for the built environment, and the financial analysis that is used to determine a project’s feasibility. Ryan is currently a Master of Real Estate Development

candidate at PSU’s Center for Real Estate. In his free time, Ryan enjoys spending much of his time outdoors with his two Great Danes by his side. Although outdoor passions such as hiking, camping, snowboarding, surfing and motocross fill his weekends, he enjoys just as much getting down to the nuts and bolts of business.

EnCitu Plan+Design was organized as part of the USP 524 Site Planning course, a design-oriented elective in the Master of Urban & Regional Planning (“MURP”) program at Portland State University in Portland, Oregon. The course, taught by local planner

Ken Pirie of the landscape architecture firm Walker Macy, provides MURP students with a practical introduction to the design elements involved in studying land use, including site inventory and analysis, zoning analysis, conceptual development, concept feasibility and implementation, and concept presentation.

For the course project, student teams selected identified sites in the Southeast Quadrant of Portland to study and develop concept plans around. The EnCitu team studied what is known as the “Land O’ Lakes” site adjacent to the former Darigold factory, just southwest of the intersection of SE Division Place and SE 8th Avenue. The parcel is owned by developer Mike Tevis of Intrinsic Ventures, the firm that has redeveloped the nearby Ford Building as part of a master vision for the “Ford District,” an innovative and stimulating concentration of activity in the vicinity of the Land O’ Lakes site.

Urban planners at the City of Portland Bureau of Planning and Sustainability (BPS) also have great visions for the Land O’ Lakes site and the surrounding area, which include promoting employment opportunities through revised zoning and development standards. EnCitu Plan+Design, in consultation with BPS planners Derek Dauphin, Troy Doss, and others, developed this site plan for the Land O’ Lakes property with the employment, transportation, and economic development objectives of the recently released Southeast Quadrant Plan in mind.

3Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

Located at the heart of an emergent new district in the Southeast Quadrant of Portland’s Central East Side, the historic Land O’ Lakes site is poised for development. With the proposed expansion of the Employment Opportunity Subarea and reinterpretation of “industrial” land uses, this site presents a unique opportunity to catalyze sustainable, economically stimulating development in one of the few remaining affordable areas of employment land in the city — and to capitalize on significant new transit investments in the neighborhood. EnCitu Planning+Design proposes an ambitious and sensitive plan for the Land O’ Lakes site as a landmark of its district that hearkens back to the area’s historical and potential prominence as a creative, industrial office destination.

GOALS FOR THE SITE

• In alignment with the City of Portland’s Southeast Quadrant Plan, respect and enhance the industrial character of the neighborhood while improving employment density and enabling innovative businesses.

• Activate the site and surrounding area by developing a prominent building that acts as a landmark, visible from nearby thoroughfares, that draws attention and activity.

• Take advantage of the site’s excellent freight connectivity and nearby access to transit and active transportation routes, including two MAX Orange Line stations, several bus lines, bicycle routes, Tilikum Way, and arterial thoroughfares.

• Align with the City’s sustainability goals by incorporating green stormwater features, as well as improving energy efficiency by siting the buildings to take advantage of passive solar heating.

• Acknowledge market constraints with a feasible phased development plan that enables the developer to get return on investment as market conditions ripen in a neighborhood that is expected to soon undergo major new development and changes.

vision

(above) The existing 1930s building offers an opportunity to create flex space for creative offices or craft manufacturing

(left) The vacant portion of the site looks toward Division Place, the nearby MAX Orange Line, and Tilikum Way where they cross SE 8th Ave

4 Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

site context

HISTORICAL CONTEXTDairy cooperativeLand O’ Lakes was owned and operated by the Dairy Cooperative Association and Mayflower Farms from the mid 1930s to the late 1980s. Mayflower farms began as a small family owned operation at the turn of the 20th century. In 1929, thousands of Dairymen in the region organized and incorporated their operations into the Dairy Cooperative Association, with Mayflower Farms as the forerunner. The existing building was a feed mill for the Dairy Co-op, where they processed and shipped cattle and chicken feed. Sometime in the 1940s, the co-op added a garage addition, where they serviced their own delivery trucks. In the 1980s the co-op merged with a branch of Darigold in Seattle, presumably ceasing operations at the site, though it is unclear when the site became vacant.

j

8TH

9TH

GRAN

D

6TH

DIVISION

4TH

POWELL

TILIKUM

GRANT

7TH

WAT

ER

CARUTHERS

SHERMAN

WOODWARD

MAR

TIN

LUTH

ER K

ING

JR

IVON

TAGGART

CLINTON

GRAN

D AV

E-IV

ON

ST

MCLO

UGHLIN

BROOKLYN

WO

ODW

ARD ST-GRAND AVE

6TH

7TH

DIVISION

IVON

8TH

TILIKUM

6TH

GRAND

GRAN

D

4TH

9TH

GRAN

D

CARUTHERS

LegendStreet Centerlines

Land O'Lakes

Building FootprintsYEAR_BUILT

0 - 1920

1921 - 1940

1941 - 1960

1961 - 1980

1980 +

0 400 800200Feet [

Willamette River

ROSS ISLAND BRIDGE

j

8TH

9TH

GRAN

D

6TH

DIVISION

4TH

POWELL

TILIKUM

GRANT

7TH

WAT

ER

CARUTHERS

SHERMAN

WOODWARD

MAR

TIN

LUTH

ER K

ING

JR

IVON

TAGGART

CLINTON

GRAN

D AV

E-IV

ON

ST

MCLO

UGHLIN

BROOKLYN

WO

ODW

ARD ST-GRAND AVE

6TH

7TH

DIVISION

IVON

8TH

TILIKUM

6TH

GRAND

GRAN

D

4TH

9TH

GRAN

D

CARUTHERS

LegendStreet Centerlines

Land O'Lakes

Building FootprintsYEAR_BUILT

0 - 1920

1921 - 1940

1941 - 1960

1961 - 1980

1980 +

0 400 800200Feet [

Willamette River

ROSS ISLAND BRIDGE

j

8TH

9TH

GRAN

D

6TH

DIVISION

4TH

POWELL

TILIKUM

GRANT

7TH

WAT

ER

CARUTHERS

SHERMAN

WOODWARD

MAR

TIN

LUTH

ER K

ING

JR

IVON

TAGGART

CLINTON

GRAN

D AV

E-IV

ON

ST

MCLO

UGHLIN

BROOKLYN

WO

ODW

ARD ST-GRAND AVE

6TH

7TH

DIVISION

IVON

8TH

TILIKUM

6TH

GRAND

GRAN

D

4TH

9TH

GRAN

D

CARUTHERS

LegendStreet Centerlines

Land O'Lakes

Building FootprintsYEAR_BUILT

0 - 1920

1921 - 1940

1941 - 1960

1961 - 1980

1980 +

0 400 800200Feet [

Willamette River

ROSS ISLAND BRIDGE

Year Built

Age of surrounding buildings

j

8TH

9TH

GRAN

D

6TH

DIVISION

4TH

POWELL

TILIKUM

GRANT

7TH

WAT

ER

CARUTHERS

SHERMAN

WOODWARD

MAR

TIN

LUTH

ER K

ING

JR

IVON

TAGGART

CLINTON

GRAN

D AV

E-IV

ON

ST

MCLO

UGHLIN

BROOKLYN

WO

ODW

ARD ST-GRAND AVE

6TH

7TH

DIVISION

IVON

8TH

TILIKUM

6TH

GRAND

GRAN

D

4TH

9TH

GRAN

D

CARUTHERS

LegendStreet Centerlines

Land O'Lakes

Building FootprintsYEAR_BUILT

0 - 1920

1921 - 1940

1941 - 1960

1961 - 1980

1980 +

0 400 800200Feet [

Willamette River

ROSS ISLAND BRIDGE

(above) The site in 1934, when the Dairy Cooperative Associations’ feed division was moved to the Land O’ Lakes site .

(right) This diagram created by the Sanborn Map Company accounts for structures on the site from 1908 to 1950 . Sanborn maps compiled in 1924–1928 show no structures existing on the site . Supplemental research reveals that the existing structure on the site was built sometime during the mid 1930s . The middle garage section was a mid-1940s addition, and the northern warehouse portion has since been demolished . It remains unclear when the warehouse was constructed and torn down . The existing structure at Land O’ Lakes

is one of the older buildings in the neighborhood, although even older structures do still exist in the area, such as the Ford Building and the Apple Foods warehouse .

5Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

Land uses, utilities and views Transportation connections

8TH

9TH

6TH

GRAN

D

POWELL

4TH

WOODWARD

7TH

TILIKUM

DIVISION

10TH

CLINTON

IVON

BROOKLYN

TAGGART

IVON

ST-

GRAN

D AV

E

GRAN

D AV

E-IV

ON

ST

WO

ODW

ARD ST-GRAND AVE

9TH

DIVISION

GRAND

4TH

10TH

IVON

GRAN

D

CLINTON

BROOKLYN

Ross Island Bridge

0 275 550Feet [

Legend

Street Centerlines

Land O'Lakes site

Building Uses

Commercial Office

Commercial Retail

Industrial

Single Family Residential

Vacant

Combined Gravity MainSanitary Gravity MainStorm Gravity Main

AB

Street Trees

CA. View of downtown and West HillsB. View of Ford Building and DivisionC. View of Mt. Hood

Willamette River

Direction of Slope

Ford Building

j

kj

kj

kj

SE DIVISION ST

SE 8

TH A

VE

SE 9

TH A

VE

SE FRANKLIN ST

SE 1

7TH

AVE

SE HARRISON ST

SE LINCOLN ST

SE GRANT ST

SE WATER AVE

SE 1

0TH

AVE

SE DIVISION PL

SE 7

TH A

VE

SE ELL

IOTT

AVE

SE IVON ST

SE STEPHENS ST

SE GIDEON ST

SE 6

TH A

VE

SE SHERMAN ST

SE 1

5TH

AVE

SE WOODWARD ST

SE 2

ND

PL

SE CARUTHERS ST

SE SPRUCE A

VE

SE 1

1TH

AVE

SE ORAN

GE AVE

SE 4

TH A

VE

SE TAGGART ST

SE L

ARCH

AVE

SE 1

2TH

AVE

SE BIRCH ST

SE G

RAN

D A

VE

SE 1

3TH

AVE

TILIKUM CROSSING BRG

SE M

ILW

AUK

IE A

VE

SE HICKORY ST

SE TILIKUM WAY

SE 1

4TH

AVE

SE 1

3TH

PL

SE PERSHING ST

SE LADD AVE

SE MULBERRY AVE

SE CLINTON ST

SE 3

RD A

VE

SE POWELL BLVD FRONTAGE RD

SE 4

TH P

L

SE 17TH AVE-POWELL BLVD RAMP

SE 1

6TH

AVE

SE BROOKLYN ST

SE KELLY ST

SE TAMARACK AVE

SE 1

5TH

AVE

SE ELL

IOTT

AVE

SE BROOKLYN ST

SE CLINTON ST

SE KELLY ST

SE 1

6TH

AVE

SE G

RAN

D A

VE

SE 1

3TH

AVE

SE 1

6TH

AVE

SE STEPHENS ST

SE CARUTHERS ST

SE IVON ST

SE HARRISON ST

SE 9

TH A

VE

SE 1

6TH

AVE

SE 7

TH A

VE

SE IVON ST

SE 8

TH A

VE

SE HARRISON ST

SE 6

TH A

VE

SE HARRISON ST

SE TAGGART ST

SE 1

4TH

AVE

SE 17TH AVE

SE 1

6TH

AVE

SE 1

0TH

AVE

SE TILI UM WAY

SE 6

TH A

VE

SE WOODWARD ST

SE BROOKLYN ST

SE DIVISION ST

SE G

RAN

D AV

E

SE 1

2TH

AVE

SE POWELL BLVD

SE 1

1TH

AVE

ROSS ISLAND BRG

SE M

ILW

AUKI

E AV

E

SE M

ARTI

N LU

THER

KIN

G JR

BLV

D

SE MCLOUGHLIN BLVD

SE 17TH AVE-POWELL BLVD RAM

P

SE 3RD AVE

I5 FW

Y

MARQUAM BRG

SE MCLOUGHLIN

BLVD-WOODW

ARD ST RAMP

SE MCLOUGHLIN BLVD

SE G

RAN

D AV

E

[

Bike Routes

Bus Lines

FigureGroundFigureGround

Streetcar

Street Centerlines

Orange Line

Orange Line Station

Land O’ Lakes Site

Willamette River

0 400 800200Feet

4,6,9,10,14,15, 31, 32, 33, 39

10 Minute Walk

j

j

8TH

9TH

6TH

GRAN

D

POWELL

4TH

WOODWARD

7TH

TILIKUM

DIVISION

10TH

CLINTON

IVON

BROOKLYN

TAGGART

IVON

ST-

GRAN

D AV

E

GRAN

D AV

E-IV

ON

ST

WO

ODW

ARD ST-GRAND AVE

9TH

DIVISION

GRAND

4TH

10TH

IVON

GRAN

D

CLINTON

BROOKLYN

Ross Island Bridge

0 275 550Feet [

Legend

Street Centerlines

Land O'Lakes site

Building Uses

Commercial Office

Commercial Retail

Industrial

Single Family Residential

Vacant

Combined Gravity MainSanitary Gravity MainStorm Gravity Main

AB

Street Trees

CA. View of downtown and West HillsB. View of Ford Building and DivisionC. View of Mt. Hood

Willamette River

Direction of Slope

Ford Building

j

kj

kj

kj

SE DIVISION ST

SE 8

TH A

VE

SE 9

TH A

VE

SE FRANKLIN ST

SE 1

7TH

AVE

SE HARRISON ST

SE LINCOLN ST

SE GRANT ST

SE WATER AVE

SE 1

0TH

AVE

SE DIVISION PL

SE 7

TH A

VE

SE ELL

IOTT

AVE

SE IVON ST

SE STEPHENS ST

SE GIDEON ST

SE 6

TH A

VE

SE SHERMAN ST

SE 1

5TH

AVE

SE WOODWARD ST

SE 2

ND

PL

SE CARUTHERS ST

SE SPRUCE A

VE

SE 1

1TH

AVE

SE ORAN

GE AVE

SE 4

TH A

VE

SE TAGGART ST

SE L

ARCH

AVE

SE 1

2TH

AVE

SE BIRCH ST

SE G

RAN

D A

VE

SE 1

3TH

AVE

TILIKUM CROSSING BRG

SE M

ILW

AUK

IE A

VE

SE HICKORY ST

SE TILIKUM WAY

SE 1

4TH

AVE

SE 1

3TH

PL

SE PERSHING ST

SE LADD AVE

SE MULBERRY AVE

SE CLINTON ST

SE 3

RD A

VE

SE POWELL BLVD FRONTAGE RD

SE 4

TH P

L

SE 17TH AVE-POWELL BLVD RAMP

SE 1

6TH

AVE

SE BROOKLYN ST

SE KELLY ST

SE TAMARACK AVE

SE 1

5TH

AVE

SE ELL

IOTT

AVE

SE BROOKLYN ST

SE CLINTON ST

SE KELLY ST

SE 1

6TH

AVE

SE G

RAN

D A

VE

SE 1

3TH

AVE

SE 1

6TH

AVE

SE STEPHENS ST

SE CARUTHERS ST

SE IVON ST

SE HARRISON ST

SE 9

TH A

VE

SE 1

6TH

AVE

SE 7

TH A

VE

SE IVON ST

SE 8

TH A

VE

SE HARRISON ST

SE 6

TH A

VE

SE HARRISON ST

SE TAGGART ST

SE 1

4TH

AVE

SE 17TH AVE

SE 1

6TH

AVE

SE 1

0TH

AVE

SE TILI UM WAY

SE 6

TH A

VE

SE WOODWARD ST

SE BROOKLYN ST

SE DIVISION ST

SE G

RAN

D AV

E

SE 1

2TH

AVE

SE POWELL BLVD

SE 1

1TH

AVE

ROSS ISLAND BRG

SE M

ILW

AUKI

E AV

E

SE M

ARTI

N LU

THER

KIN

G JR

BLV

D

SE MCLOUGHLIN BLVD

SE 17TH AVE-POWELL BLVD RAM

P

SE 3RD AVE

I5 FW

Y

MARQUAM BRG

SE MCLOUGHLIN

BLVD-WOODW

ARD ST RAMP

SE MCLOUGHLIN BLVD

SE G

RAN

D AV

E

[

Bike Routes

Bus Lines

FigureGroundFigureGround

Streetcar

Street Centerlines

Orange Line

Orange Line Station

Land O’ Lakes Site

Willamette River

0 400 800200Feet

4,6,9,10,14,15, 31, 32, 33, 39

10 Minute Walk

j

j

8TH

9TH

6TH

GRAN

DPOWELL

4TH

WOODWARD

7TH

TILIKUM

DIVISION

10TH

CLINTON

IVON

BROOKLYN

TAGGART

IVON

ST-

GRAN

D AV

E

GRAN

D AV

E-IV

ON

ST

WO

ODW

ARD ST-GRAND AVE

9TH

DIVISION

GRAND

4TH

10TH

IVON

GRAN

D

CLINTON

BROOKLYN

Ross Island Bridge

0 275 550Feet [

Legend

Street Centerlines

Land O'Lakes site

Building Uses

Commercial Office

Commercial Retail

Industrial

Single Family Residential

Vacant

Combined Gravity MainSanitary Gravity MainStorm Gravity Main

AB

Street Trees

CA. View of downtown and West HillsB. View of Ford Building and DivisionC. View of Mt. Hood

Willamette River

Direction of Slope

Ford Building

j

500 Feet800 Feet

SITE CONTEXT DIAGRAMS

The site is located between the OMSI and Clinton Orange Line MAX Stations . SE Tilikum Way is within close walking distance of the site, making it easily accessible for pedestrians and cyclists coming from either direction on SE Tilikum Way . There are also several bus lines within a ten minute walking distance . Highways 99E and U .S . 26 are also in close proximity to the site .

6 Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

opportunities and constraints

(above) Dilapidated buildings in the area such as this one on SE Division Place and SE 6th Ave are an eyesore . Some of them have been designated as unsafe buildings to inhabit- with the distinguishable red “U” sign, placed by Portland Fire and Rescue .

(right) There are already functional storm, sanitary, and combined main sewer utility systems directly east of the site below SE 8th Ave, and directly north of the site below Se Division Place . Interestingly, the site is slightly sloped from the southwest corner to the northeast, presenting an opportunity to mitigate stormwater during heavy rainfall .

(above) This picture taken from SE 8th Ave . looking west, shows that future tenants of the site will have great views of downtown and the West Hills . With a tall enough building, tenants will also capture views of Mt . Hood .

(left) This view from SE Division Place, at a two-minute walking distance from the Ford Building, shows the north end of the site which has a direct view of activity in the Ford District, presenting a unique opportunity to capture the attention of future patrons and passersby traveling south from the Division St . commercial corridor .

(above) There is no vegetation on the site . Future redevelopment could take advantage of open space by incorporating landscape designs that deduct impermeable surfaces, and replace them with green infrastructure that include native trees and plants .

(above) Increased activity in the area could put pedestrians and active transportation commuters at risk due to the industries that use large freight trucks, such as the ones pictured here at Darigold . Also, noise from several types of freight trucks and trailers may be a nuisance for future use of the site .

7Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

regulatory contextZONINGIG1 ZoneThe Land O’ Lakes site falls within Portland’s IG1 (General Industrial 1) zone, which implements the Industrial Sanctuary designation of the Comprehensive Plan. The updated language to the Industrial Sanctuary designation allows for a broader, more contemporary, and forward-thinking interpretation of “industrial” uses—at least as the definition is applied to the city’s Southeast Quadrant, the location of the Land O’ Lakes site. Non-traditional manufacturing such as that of bike components and shoes, and industries such as distilling and high-tech, are being encouraged in addition to the heavy manufacturing and warehouse uses that have existed in the Southeast Quadrant since it was first developed.

IG1 represents older industrial areas of the General Industrial zoning designation, which are, according to the City of Portland zoning code, “intended to allow new development which is similar in character to existing development. The intent is to promote viable and attractive industrial areas.” Table 1 on this page includes uses allowed outright or conditionally in the IG1 base zone.

Employment Opportunity SubareaWe can also assume that the Land O’ Lakes site will fall within the expanded Employment Opportunity Subarea (EOS). In the EOS, up to 5,000 square feet of the floor area plus the exterior display and storage areas on a site may be in retail sales and service; however, more than 5,000 square feet in retail sales and service on a site is prohibited. The same allowances apply to the traditional office and industrial office uses, as well, though these are conditionally allowed at up to 60,000 square feet.

Despite the constraints of the zoning requirements, the Land O’ Lakes site is poised for development opportunity, like other notable buildings in the emerging Ford District and in the Central Eastside Industrial District.

It is quite possible that the uses we propose will be only conditionally allowed, meaning that our application would have to go through conditional use review and be subject to greater public exposure; however, considering the forward-thinking approach that city planners are taking with the Southeast Quadrant in general and the EOS in particular, we are optimistic that even a project that proposes to literally and figuratively push the development envelope on the Land O’ Lakes site would have a good chance of being successful, is certainly viable, and should be risked in an area with such great, yet unrealized, potential.

Table 1: Allowed Uses in IG1 Base Zone

Use Category Allowance

Household Living Conditional Use

Retail Sales and Service Limited/Conditional Use

Office Limited/Conditional Use

Quick Vehicle Servicing Allowed

Vehicle Repair Allowed

Commercial Parking Conditional Use

Self-Service Storage Allowed

Commercial Outdoor Recreation Conditional Use

Major Event Entertainment Conditional Use

Manufacturing and Production Allowed

Warehouse and Freight Movement Allowed

Wholesale Sales Allowed

Industrial Service Allowed

Railroad Yards Allowed

Waste-Related Limited/Conditional Use

Basic Utilities Allowed/Conditional Use

Parks and Open Areas Allowed

Daycare Limited/Conditional Use

Agriculture Limited

Aviation and Surface Passenger Terminals Conditional Use

Detention Facilities Conditional Use

Mining Conditional Use

Radio Frequency Transmission Facilities Limited/Conditional Use

Rail Lines and Utility Corridors Allowed

Community Service Limited/Conditional Use

Source: City of Portland Zoning Code Title 33

Pertinent zoning requirements for IG1 + EOS

Floor-Area-Ratio (FAR) limit: 3:1Maximum coverage: 100% of site area Maximum height: No limitMinimum/maximum setbacks: None Landscaping: No requirements (site does not abut an R zone)Exterior display setback: 5 feet; exterior goods, storage, and work activities allowedProjections: AllowedGround floor window standards: NoneParking requirements: NoneTree protection: n/aView corridor restrictions: n/a

Diagram of potential maximum building massing with FAR limit of 3:1 and 100% site coverage

Zoning standards for the IG1 zone contain virtually no restrictions that would constrain the massing of development on the site. The EOS overlay’s 3:1 FAR limit allows for a building of nearly 327,000 square feet on the 108,970 square-foot lot — much larger than any building in the neighborhood, and larger than most office buildings downtown. The diagram above shows a 3-story massing that covers the entire site. A more realistic massing option would be to take advantage of the IG1 zone’s lack of a height limit — allowing a tower or tall slab structure on a portion of the site while leaving room for parking and preservation of the existing structures.

8 Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

Type II or Type III conditional use reviewDevelopment of the Land O’ Lakes site is likely to trigger either a Type II or Type III conditional use review process. This process is meant to ensure that proposed conditional uses are consistent with the approval criteria if not meeting them explicitly, to help mitigate those effects, or to deny the use if it fails to meet the approval criteria as decided by staff.

LAND USE REVIEW PROCESSES AND TIMELINES

PRE-APPLICATION CONFERENCE

Must occur before submittal to land use review

SUBMITTAL OF DEVELOPMENT PROPOSAL

REVIEW BY STAFF

POSTINGApplicant must post the site

30 days before hearing

PUBLIC NOTICEUpon receipt of complete

application, notice mailed at least 20 days prior to hearing to property owners within 400 feet of site and to recognized

organizations within 1,000 feet

HEARINGOccurs within 51 days after

application determined complete

DECISIONMade by review body

following public hearing

APPEALTo City Council; appeal of Type III decision made by City Council appealed to

State Land Use Board of Appeals (LUBA)

Diagram 2: Type III Land Use Review Process and Timeline

PRE-APPLICATION CONFERENCEOptional unless specifically required because of land use application type

(e.g. design review, site plan, etc.)

COMPLETENESSStaff notifies applicant of any

missing information or materials within 14 days of submittal

PUBLIC NOTICEUpon completeness, public notice mailed to all property owners within 150 feet of site and to recognized organizations within 400 feet. At

least 21 days are allowed for public comment

DECISIONMade administratively by staff within 28 days

after application determined complete

APPEALTo local hearing bodies depending

on land use review type

Diagram 1: Type II Land Use Review Process and Timeline

Final decision 120 days after receipt of completed application

View of southeast corner of the site from across SE 8th Ave .

9Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

concept alternatives

1 LOW-INTENSITY DEVELOPMENT

SE POW

ELL BLVD

SE GRAND AVESE GRAND AVE

SE 8TH AVE

Renovate existing building

OutdoormarketPa

rkin

g

SE POW

ELL BLVD

SE GRAND AVESE GRAND AVE

SE 8TH AVE

Renovate existing building

Shipping container structures

Cont

aine

rs

Cont

aine

rs

Shared plazaPa

rkin

g

Our first alternative is envisioned as a low-intensity activation of the undeveloped northern part of the site. The existing building would remain and be renovated as a flex space. The existing unused surface parking lot would be converted to an outdoor venue and utilized as a market or light industrial makerspace. One intriguing possibility is the utilization of upcycled shipping containers or cargotecture.

Shipping containers have the benefits of affordability and flexible of configuration. They would reflect the industrial character, aesthetic, and history of the district. Most importantly, the low-intensity and low-risk nature of this alternative allows for the market to mature, potentially supporting more intensive development in the future, while simultaneously activating the site. The industrial nature of the area may also make the viability of a retail use uncertain. The lack of parking capacity in the immediate vicinity is another downside to this alternative.

Outdoor market concept

Renovation of the existing building for flexible office space should keep a raw aesthetic and open floorplans to appeal to creative office tenants

Shipping containers can be upcycled and flexibly configured to create a lively outdoor-oriented cluster of retail or light manufacturing spaces

With minimal investment, the existing parking lot can be put to use hosting outdoor markets or other events

“Cargotecture” concept

10 Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

2 INDUSTRIAL OFFICE BUILDING ANCHORED BY LANDMARK ROCK CLIMBING TOWER

(above) View from northeast(left) View from southeast

Street-level view from northeast

Our second alternative also employs a renovation of the existing building. On the north end of the site, a new development would center around a tall, all glass tower which is envisioned as a iconic district landmark. Flanking the rock climbing tower are two wings of flexible industrial office space. Attention will be drawn to the northeast corner of the site, which looks to the intersection of SE 8th Ave and Division Place as well as the MAX Orange Line. Visitors to the nearby emerging Ford District will be drawn toward this unique design feature.

This alternative would align with the City goal of increased employment density in the SE Quadrant. The distinctive nature of the proposed building would serve to increase the visibility of the district and the rock climbing center would create a unique amenity. However, the retail/commercial component of the alternative could adversely affect the industrial character as well as freight movement of the area. Similarly, a lack of sufficient parking capacity could create issues of congestion. There are also questions regarding the ability to find tenants to fill the large and somewhat distinctive space that would be created.

11Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

(above and left) Precedent images of distinctive rock climbing facilities

Plan view with transportation access diagram

FREIG

HT A

CC

ESS

PARKING

SE

8TH

AVE

DRIVEWAY

200 Feet

12 Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

preferred alternativePHASED DEVELOPMENTOur preferred alternative combines a low density alternative such as the cargotecture marketplace along with new construction of unique and flexible industrial office buildings.

The advantages of the low density development are twofold. It will allow the market to mature while at the same time activate the site and attract attention to the area.

The south building is envisioned as a flexible light industrial or makerspace. The building could also serve as a warehouse and manufacturers’ showroom. Freight accessibility is focused on the south side in between new and existing buildings to facilitate these activities.

View of proposed buildings from south

13Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

GREEN ROOFS AND SOLAR ENERGYA south-facing glass facade will encourage passive solar energy transfer as well as great views of the green roofs, green infrastructure, and common spaces below. The north and east setbacks will consist of public spaces and stormwater facilities.

(above left) The green roof at Port of Portland headquarters is a beautiful amenity for workers(above right) Stormwater features at Portland State University enhance public space

(above) The proposed buildings will have pedestrian and bicycle access, as well as industrial style architecture, similar to this building at University of Nottingham

14 Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

VISIBILITYThe north building is tall relative to the surrounding neighbors so as to attract attention, particularly from the transportation nexus to the northeast of the site where 8th Avenue crosses the tracks and connects with Division Street.

This design for a building at the Amazon campus in Seattle is larger in scale than our proposal, but demonstrates the concept of upper floors wrapped in glass for excellent lighting and views .

The Collaborative Life Sciences building in Portland is a good model for the character of the north building and how it will interact with the area northeast of the site . Green infrastructure and a small plaza will allow the building to interact with the streetscape and passersby .

15Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

In Washington DC, removable bollards and a paved surface will help create the atmosphere as required, inviting or utilitarian .

AN INDUSTRIAL WOONERFThe space between the two buildings is the focal point of activity on the site. Envisioned as a type of “industrial woonerf,” it will facilitate the mixing of commercial activity, both loading activities and pedestrians.

The south building will evoke a new industrialism with open well-lit spaces that are both flexible and easily accessible for various potential users . Our proposed building will feature functional loading spaces like this building at Southern California Institute of Architecture .

16 Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

AS VIEWED FROM THE EAST ON 8TH AVENUE

CROSSSECTION

50 100 feet

(above) Site cross section including existing building(left) Cross-section of new buildings only

site cross-section

17Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

SE 8TH AVE

SE 6TH AVE

SE 7TH AVE

LP

NOI

SIVID E

S

SE DIV

ISIO

N ST

SE

WO

OD

WA

RD

ST

0 100 200 FT.

500'

196'

dimensions of site and concept plan

1 2 3 4 5

Entire parcel 500 x 196 ft.

1. Existing building 190 x 250 ft.

2. South driveway 54 ft. wide

3. South building 138 x 70 ft.

4. Woonerf 50 ft. wide

5. North building 158 x 75 ft.

1

2

3

4

5

18 Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

site circulation and access

**

Bike-ped route

Freightturnaround

Passenger vehiclesright-in, right-out;freight 2-way

**

Parking entrance

Loading bays

100 200 feet**

Parking entrance

Loading bays

19Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

existing and proposed street cross-sections

Location of cross-sectionon SE 8th Ave.

12' sidewalk

12' sidewalk

12' sidewalk

12' sidewalk

6'parking

lane

6'parking

lane

6'parking

lane

5'parking

lane

12'driving lane

12'driving lane

12'driving lane

11'driving lane

60' parking lot to fence

60' right of way

2' bike lane

buffer

EXISTING

PROPOSED

Existing Street Only one street is adjacent to the Land O’ Lakes site—SE 8th Avenue. Currently, the street features the usual 60-foot building-to-building (or, in this case, parking lot-to-fence) frequently seen in Portland streetscapes. With 12-foot sidewalks and 6-foot seemingly semi-official parking spaces on either side of the 12-foot driving lanes, SE 8th Avenue is accessible to freight vehicles and is becoming more and more frequented by bike commuters headed toward the even more frequented bike commute corridor of SE Division Street.

Proposed StreetBecause the Land O’ Lakes site is within a designated freight district, it is most important to preserve freight vehicle accessibility to and through the site with any proposed redesign. It is also important to promote active modes of transportation such as biking, so the project team has come up with the following compromise in order to meet both the goals of freight and cyclists at the site: the team proposes narrowing the southbound (west) driving lane to the minimum requirement of 11 feet and providing a 5-foot bike lane and 2-foot bike lane buffer (note: the bike lane and buffer could be provided on either or both sides of the right-of-way, depending on parking and freight needs).

As with on-site parking, the team is actually proposing that the developer of the Land O’ Lakes site provide the minimum required parking, rather than attempting to over-provide on-site parking to meet district demand, which the team recommends should be provided through a different development first.

Looking south on SE 8th Avenue

20 Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

2045 vision

THE SITEIn 2045 all phases of the preferred alternative will be complete, with full occupancy in the existing flex space building, new makerspace building, and in the new landmark industrial office building—each functioning at a healthy capacity. The redevelopment of Land O’ Lakes in phases gave the site ample time to activate the neighborhood, attract anchor tenants, and leverage compatibility. The site has grown to support hundreds of jobs in specialty manufacturing, light industrial uses, and the pharmaceutical and biomedical research industry. Increased activity in the neighborhood is synchronized with conjunct logistical operations from the various industries, allowing the Land O’ Lakes site to thrive. The circulation of the site balances the needs of small freight trucks, cars, active transportation, and is pedestrian friendly for employees and passersby.

Streetscape redevelopment incorporated a boulevard-type design along SE 8th Avenue which contains appealing facades, ground floor windows, bioswales, vegetation, and wide sidewalks that emphasize pedestrian use. Employees and pedestrians are able to walk five minutes to the Clinton Station to catch the MAX Orange Line westbound, or southbound. Industry at Land O’ Lakes has created knowledge spillovers, and contributed social and economic capital, as the Orange Line helped facilitate new linkages between the SE Quadrant, South Waterfront and downtown.

Employees utilize the woonerf and ecoroof on their breaks, while pedestrians and cyclists stop to admire the ecoroof from a distance, or stop to take a break in the woonerf on the way to their destination. The site has helped the city enhance wayfinding in the industrial eastside, by facilitating orientation to the waterfront with signage, and aesthetically pleasing infrastructure in the woonerf. In addition, Land O’ Lakes has reduced its concrete ground coverage since redevelopment in 2015 by planting native plants and trees in bioswales, which achieve effective stormwater management while mitigating environmental contamination from industrial pollutants after heavy rainfall. The green infrastructure in the building setbacks blend well with the streetscape, and provide green space for the industrial neighborhood.

Precedent images show the type of utilitarian industrial style of architecture envisioned for the proposed new buildings, and expected to proliferate in the SE Quadrant as new development flourishes in coming decades .

21Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

GREEN STORMWATER INFRASTRUCTURE AND ENERGY EFFICIENCYLand O’ Lakes will contribute to sustainable urbanism by allocating space to green infrastructure on the ground level of the site, both in the shared woonerf space, and the setback spaces surrounding the site’s buildings. Land O’ Lakes will also offer an intensive ecoroof and plaza combination on top of the industrial office building to reduce the environmental impact of the development, and provide an amenity for employees. Ground level infrastructure will consist primarily of bioswales that are aesthetically pleasing and compatible with the site. Bioswales and stormwater planters will be privately owned and managed to promote private sector stewardship of the Industrial Sanctuary. The infrastructure will also incorporate pervious paving materials, helping mitigate the influx of stormwater runoff from the southwestern slope of the Darigold site. The ecoroof will utilize otherwise unused space for the benefits of slowing and reducing the impact of stormwater during heavy rainfall, moderate the urban heat island effect in the summer months, and help improve air quality by capturing airborne pollution particles. In addition, the industrial office building will be oriented east and west, taking advantage of passive lighting through the south facing glass facade.

sustainable urbanism

(above) A large bioretention facility such as this will be placed behind the existing flex space building in the southwest corner of the site . This infrastructure will serve as additional green space for employees, while also capturing substantial amounts of stormwater runoff after heavy rainfall .

(left) The woonerf at Land O’ Lakes will contribute to sustainable urbanism by utilizing a combination of stormwater planters, pervious pavement, and seating, similar to Bell St . Park in Seattle . The woonerf will use a higher ratio of woody materials to pervious pavement, enhancing the compatibility of the woonerf in the industrial area .

(above) The orientation and glazing of the proposed north building enables passive solar heating for energy efficiency, like the Terry Thomas building in Seattle .

22 Final Report: Site Plan Concepts | Land O’ Lakes | ENCITU

The 240 Clay building in Portland, soon to begin construction, is an example of a comparable project that is similar to the buildings in the proposed plan, with new industrial office space at a similar scale and at a location in the central eastside near the Land O’ Lakes site .

project financial feasibility

FINANCIAL PROJECTIONSAt EnCitu Plan + Design, after we decide a sites program and confirm that it correlates with the city wide goals and vision the next step is determining the likelihood that the project will be a success. To do this involves a fair amount of due diligence, followed by bringing in the bean-counters. Ultimately, to project possible financial outcomes given what we know about an areas financial markets, real estate markets, demographics, zoning, and a variety of other variables.

With the Land-O-Lakes site, our designers, architects, and planners wanted to utilized the existing structures on the site and develop two new structures to maximize the footprint of the site. The existing building would be integrated into industrial flex-space, a newly developed industrial warehouse/manufacturing building, another 5 story industrial office building, and an entire level of underground parking providing 143 spaces. The firm’s objective is to build, hold, and sell the property at end of year 10. To start we identify what the market will bear and what are the demand drivers. This is followed by using data from local and national commercial real estate companies to determine achievable rents, for specific use types (Appendix A: Table 1.0). Third, data derived from our local builders to identify construction cost, both to retrofit existing structures and to build new, shedding light on overall cost of the project (Appendix A: Tables 1.1-1.3).

Consequently, when we use institutional capital we mitigate risk and actually achieve greater returns, so at this stage we turn to lenders and investors to finance the bulk of the project.

This project is estimated to cost approximately $26 million, of which we plan on financing 80% at a favorable 30 year fixed-rate mortgage loan of 5%. Due to EnCitu’s outstanding relationship with our lender we are required to meet a debt coverage ratio (DCR) of only 1.15, of which we project to make just that. DCR is the ratio between our property’s net operating income for the year and our annual debt service (Appendix A: Tables 1.4 & 1.5).

Taking into account the above mentioned, our financial team projects the property’s net operating income for year one. This one year projection takes into account a variety of variables; operating expenses, vacancy rates, insurance, tenant improvements, property taxes and so on (Appendix A: Tables 1.6-1.8). This provides what should be a positive cash flow for year one. In the case of Land-O-Lakes, there is a positive outcome of $200,000 (Appendix A: Table 1.8).

The final stage of determining financial feasibility, and given it is a build, hold, sell project is to project the properties financial performance during and at the end of 10 years (Appendix A: Table 1.10). What is derived from this 10 year projection, taking into account assumptions made in Appendix A: Table 1.12, is that the project has a 16% internal rate of return, and a positive net present value of cash flows amounting to $3.2 million, and positive return on investment for all 10 years. Overall, the Land-O-Lakes project is financially feasible dependent upon our market trends and assumption remain in close correlation.

appendix: financial measures

Table 1.12

Appendix A: Financial MeasuresTable 1.0

Table 1.1

Table 1.2

Table 1.3

Table 1.4 Table 1.5

Table 1.6

Table 1.7 Table 1.11

Table 1.8

Table 1.10