www.oumstudents.tk Page 1 1) Software Engineering a) Software: Programs, documentation and configuration data which is needed to make programs operate correctly. i) Two types of Software Products: (1) Generic Products: Eg: word processors, databases, drawing packages and project management tools etc. (2) Customised Products: Eg: online registration system, banking system, realtime systems etc. b) Software Engineering: An engineering discipline, which is concerned with all aspects of software production from the early stages of system specification until maintaining the system. i) Engineering Discipline: Software engineers apply theories, methods and tools to solve problems concerning the software development process. ii) All Aspects of Software Production: It also includes project management activities and using tools, methods and theories to support software production. c) Software Process: A set of activities and results, which produce a software product. i) Four fundamental Software Process Activities: (1) Specification: Defines the requirements of the software and also the constraints involved. (2) Development Involves the production of the software. (3) Validation The software must be validated to ensure that it meets the customer’s satisfaction. (4) Evolution The software must evolve to meet any requirement changes by the users. d) Software Types: Eg: realtime software, webbased software, game software, multimedia software, embedded software and many more. e) Software Process Model: A simplified description of a software process. It consists of activities that are part of the software process, software products and the roles of people who are involved in software engineering. f) Software Engineering Method: A structured approach to software development. To facilitate the production of highquality software with adequate cost. i) Components in Software Engineering Methods (1) System Model Description: Descriptions of the system models, which should be developed, and the notation used to define these models. Eg: Object models, dataflow models, state machine models, etc. (2) Rules: Constraints that always apply to system models. Eg: Every entity must have a unique name. (3) Recommendations: Heuristics which characterise good design practice in this method. Eg: No object should have more than seven subobjects associated with it. (4) Process Guidance: Descriptions of the activities which may be followed to develop the system models and the organisation of these activities. Eg Object attributes should be documented before defining the operations associated with an object. g) Essential Characteristics of a Welldesigned Software System i) Maintainability: Software should be written in such a way that it may evolve to meet the changing needs of customers. As software change is an inevitable consequence of a changing business environment. ii) Dependability: Software dependability has a range of characteristics, including reliability, security, and safety. iii) Efficiency: Software should not make wasteful use of system resources such as memory and processor cycles. Efficiency therefore includes responsiveness, processing time, memory utilisation, etc. iv) Usability: Software must be usable, without undue effort, by the type of user for whom it is designed. This means that it should have an appropriate user and adequate documentation.

SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

  • Upload
    leanh

  • View
    213

  • Download
    1

Embed Size (px)

Citation preview

Page 1: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  1  

1) Software  Engineering  a) Software:  Programs,  documentation  and  configuration  data  which  is  needed  to  make  programs  operate  correctly.  

i) Two  types  of  Software  Products:  

(1) Generic  Products:  Eg:  word  processors,  databases,  drawing  packages  and  project  management  tools  etc.  

(2) Customised  Products:  Eg:  online  registration  system,  banking  system,  real-­‐time  systems  etc.    

 b) Software  Engineering:  An  engineering  discipline,  which  is  concerned  with  all  aspects  of  software  production  from  

the  early  stages  of  system  specification  until  maintaining  the  system.  

i) Engineering  Discipline:  Software  engineers  apply  theories,  methods  and  tools  to  solve  problems  concerning  the  software  development  process.  

ii) All  Aspects  of  Software  Production:  It  also  includes  project  management  activities  and  using  tools,  methods  

and  theories  to  support  software  production.    

c) Software  Process:  A  set  of  activities  and  results,  which  produce  a  software  product.    

i) Four  fundamental  Software  Process  Activities:  

(1) Specification:  Defines  the  requirements  of  the  software  and  also  the  constraints  involved.    

(2) Development  Involves  the  production  of  the  software.    

(3) Validation  The  software  must  be  validated  to  ensure  that  it  meets  the  customer’s  satisfaction.    

(4) Evolution  The  software  must  evolve  to  meet  any  requirement  changes  by  the  users.  

d) Software  Types:  Eg:  real-­‐time  software,  web-­‐based  software,  game  software,  multimedia  software,  embedded  software  and  many  more.    

e) Software  Process  Model:  A  simplified  description  of  a  software  process.  It  consists  of  activities  that  are  part  of  the  software  process,  software  products  and  

the  roles  of  people  who  are  involved  in  software  engineering.    

f) Software  Engineering  Method:  A  structured  approach  to  software  development.  To  facilitate  the  production  of  high-­‐quality  software  with  adequate  cost.  i) Components  in  Software  Engineering  Methods  

(1) System  Model  Description:  Descriptions  of  the  system  models,  which  should  be  developed,  and  the  notation  used  to  define  these  models.  Eg:  Object  models,  data-­‐flow  models,  state  machine  models,  etc.    

(2) Rules:  Constraints  that  always  apply  to  system  models.  Eg:  Every  entity  must  have  a  unique  name.    

(3) Recommendations:  Heuristics  which  characterise  good  design  practice  in  this  method.  Eg:  No  object  should  have  more  than  seven  sub-­‐objects  associated  with  it.    

(4) Process  Guidance:  Descriptions  of  the  activities  which  may  be  followed  to  develop  the  system  models  and  the  organisation  of  these  activities.  Eg  Object  attributes  should  be  documented  before  defining  the  operations  associated  with  an  object.  

 g) Essential  Characteristics  of  a  Well-­‐designed  Software  System  

i) Maintainability:  Software  should  be  written  in  such  a  way  that  it  may  evolve  to  meet  the  changing  needs  of  

customers.  As  software  change  is  an  inevitable  consequence  of  a  changing  business  environment.    ii) Dependability:  Software  dependability  has  a  range  of  characteristics,  including  reliability,  security,  and  safety.    iii) Efficiency:  Software  should  not  make  wasteful  use  of  system  resources  such  as  memory  and  processor  cycles.  

Efficiency  therefore  includes  responsiveness,  processing  time,  memory  utilisation,  etc.    iv) Usability:  Software  must  be  usable,  without  undue  effort,  by  the  type  of  user  for  whom  it  is  designed.  This  

means  that  it  should  have  an  appropriate  user  and  adequate  documentation.  

 

Page 2: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  2  

2) Software  Process  a) Software  Process  Model  (Software  Development  

Models):  A  structured  set  of  activities  required  to  develop  a  software  system.    i) The  Waterfall  Model:  This  model  is  separated  

phases  of  specification  and  development.    

(1) Phases  are:  (a) Requirement  Analysis  and  Definition  (b) System  and  Software  Design    

(c) Implementation  and  Unit  Testing    (d) Integration  and  System  Testing  (e) Operation  and  Maintenance  

(2) Three  Problems  with  Waterfall  Model:  (a) Inflexible  partitioning  of  the  project  into  distinct  stages;  (b) Waterfall  model  is  difficult  to  respond  to  changing  customer  requirements;  and  

(c) Waterfall  model  is  only  appropriate  when  the  requirements  are  well  understood.    

ii) Evolutionary  Development:  In  this  model,  specification  and  

development  are  interleaved  .  For  example,  an  initial  system  rapidly  developed  from  abstract  specifications.  This  is  then  refined  with  customer  input  to  produce  a  system  which  satisfies  the  

customer’s  needs.    

(1) Three  Problems  with  Evolutionary  Development  

(a) The  Process  is  Not  Visible    (b) Systems  are  Often  Poorly  Structured    

(c) Special  Tools  and  Techniques  maybe    

(2) This  approach  is  suitable  for  small  or  medium-­‐sized  systems.  But,  for  large,  long-­‐lifetime  systems,  a  mixed  process  that  

incorporates  the  waterfall  model  and  the  evolutionary  development  model  is  more  suitable.    

iii) Formal  Systems  Development:  Development  process  is  based  on  formal  mathematical  transformation  of  a  system  specification  to  an  executable  program.    

(1) Main  difference  between  Formal  systems  and  

Waterfall  model:    (a) The  software  requirements  specification  is  later  refined  into  a  detailed  

formal  specification  which  is  expressed  in  a  mathematical  notation;    (b) The  development  process  design,  implementation  and  unit  testing  are  

replaced  by  a  transformational  development  process.    

(2) Advantages  of  transformational  approach  (a) A  program  meets  its  specification,  where  the  distance  between  each  transformation  is  less  than  the  

distance  between  a  specification  and  a  program;  

(b) A  transformational  approach  made  up  of  a  sequence  of  smaller  steps  is  better.    

(3) Disadvantages  of  transformational  approach  (a) Processes  cased  on  formal  transformations  are  not  widely  used.  Hence  they  require  specialised  

expertise  and  the  system  interaction  is  not  amenable  to  formal  specification  and  this  takes  up  a  very  large  part  of  the  development  effort  for  most  software  systems.  

(4) This  approach  is  particularly  suited  to:  Development  of  systems  that  have  tough  safety,  reliability  or  

security  requirements.    

Page 3: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  3  

iv) Reuse-­‐based  Development  The  system  is  assembled  from  existing  components  or  reusable  components.    

(1) Four  main  stages:  (a) Component  Analysis  From  the  given  

requirements  specification    

(b) Requirements  Modification  to  reflect  the  available  components.    

(c) System  Design  with  Reuse  During  this  phase,  the  framework  of  the  system  is  designed  or  an  existing  

framework  is  reused  and  sometimes  some  new  software  may  have  to  be  designed  if  reusable  components  are  not  available.    

(d) Development  and  Integration  Lastly,  the  software  which  cannot  be  brought  in  is  developed  and  the  

components  and  Commercial-­‐Off-­‐The-­‐Shelf  (COTS)  systems  are  integrated  to  create  the  system.  

(2) Advantage  of  reuse-­‐  oriented  model  is  that  it  reduces  the  amount  of  software  to  be  developed,  reduces  

cost  and  risk  and  faster  delivery  of  the  software.  

(3) Disadvantages  of  reuse-­‐  oriented  model:  Requirements  compromises  are  inevitable  and  it  does  not  meet  the  real  needs  of  the  users.    

 b) Process  Iteration:  Can  be  applied  to  any  of  the  generic  models.  There  are  two  types:  

i) Incremental  Development:  In  this  approach,  the  

software  specification,  design  and  implementation  are  broken  down  into  a  series  of  increments.  Introduced  to  reduce  rework  in  the  development  

process.    

(1) Advantages:  (a) Customer  value  can  be  delivered  with  each  increment  so  system  functionality  is  available  earlier.  

(b) Early  increments  act  as  a  prototype  to  help  to  validate  requirements  for  later  increments.  (c) Lower  risk  of  overall  project  failure.  (d) The  highest  priority  system  services  tend  to  receive  the  most  testing.  

(2) Disadvantages:  (a) Increments  should  be  relatively  small.  (b) It  may  be  difficult  to  map  the  customer’s  requirements  onto  the  right  size  of  increments.  

(c) Most  systems  require  a  set  of  basic  facilities,  which  are  used  by  different  parts  of  the  system.  ii) Spiral  Development:  In  this  approach,  the  development  of  the  

system  spirals  outwards  from  an  initial  outline  through  to  the  final  

developed  system.  Process  is  represented  as  a  spiral  with  backtracking  and  each  loop  in  spiral  represents  a  phase  in  the  process.    

(1) Each  loop  divided  into  4  sectors:    (a) Objective  Setting:  Specific  objectives  for  the  phase  are  

identified.    (b) Risk  Assessment  and  Reduction:  Risks  are  assessed  and  

activities  put  in  place  to  reduce  the  key  risks.    

(c) Development  and  Validation:  A  development  model  for  the  system  is  chosen  which  can  be  any  of  the  generic  models.    

(d) Planning:  The  project  is  reviewed  and  the  next  phase  of  the  spiral  is  planned.  (2) There  are  no  fixed  phases  such  as  specification  or  design  in  the  spiral  mode

Page 4: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  4  

c) Software  Specification  (aka  Requirements  Engineering):  Process  of  establishing  what  services  are  required  and  the  

constraints  on  the  system’s  operation  and  development.  Leads  to  the  production  of  requirements  document  (specification)  for  the  system.    i) Four  main  phases:  

(1) Feasibility  Study  To  identify  users  needs  such  as  software  and  hardware  technologies  that  should  be  used  on  the  new  system    

(2) Requirements  Analysis  To  derive  the  system  requirements  through  observation  of  existing  systems,    

(3) Requirements  Specification  To  translate  the  information  gathered  during  the  analysis  activity  into  a  document  that  defines  a  set  of  requirements.  Two  types;  user  requirements  and  system  requirements.    

(4) Requirements  Validation  To  check  the  requirements  for  realism,  consistency  and  completeness  and  errors  in  the  requirements  document  are  inevitably  discovered.      

d) Software  Design  and  Implementation:  Process  of  converting  the  system  specification  into  an  executable  system.  i) Divided  into  two  parts:  

(1) Software  Design:  Design  a  software  structure  that  realises  the  specifications  (a) Design  Methods:  Structured  methods  applied  successfully  in  many  large  projects  and  may  support  

some  or  all  of  the  following  models  of  a  system:  CASE  tools  developed  to  supports  these  methods.  (i) Data-­‐flow  model:  Where  the  system  modeling  is  done  using  the  data  transformations  which  

happen  when  it  is  processed;  (ii) Entity-­‐relation  model:  Used  to  describe  the  basic  entities  and  the  relations  between  them  in  the  

design  stage.  Normally  entity-­‐relation  models  are  used  to  describe  database  structures;  

(iii) Structural  model:  Indicates  the  system  components  and  their  documented  interactions;    (iv) Object-­‐oriented  methods:  Include  an  inheritance  model  of  the  system,  models  of  the  static  and  

dynamic  linkages  between  objects  and  a  model  of  interactions  between  objects  when  the  system  is  

executing.  

(2) Implementation:  Translate  the  structure  into  an  executable  program.    (a) Programming  and  Debugging:  

(i) Programming:  Process  of  translating  a  design  into  a  program  and  removing  errors.  

(ii) Debugging:  Process  of  identification  and  removal  of  localised  implementation  errors  or  bugs.  1. Testing  establishes  the  existence  of  defects    2. Debugging  is  concerned  with  locating  and  correcting  these  defects.  

ii) Design  descriptions  produced  from  different  stages:  

(1) Architectural  Design:  The  subsystems  that  make  up  the  system  and  their  relationships  

are  identified  and  documented.    

(2) Abstract  Specification:  For  each  subsystem,  an  abstract  specification  of  its  services  and  

the  operation  constraints  is  produced.    

(3) Interface  Design:  For  each  subsystem  involved,  its  interface  with  other  subsystems  is  designed  and  documented.    

(4) Component  Design:  Services  allocated  to  different  components  and  components  interfaces  are  designed.    

(5) Data  Structure  Design:  The  data  structures  which  are  used  in  the  system  implementation  are  designed  in  

detail  and  specified.    

(6) Algorithm  Design:  The  data  structures  which  are  used  in  the  system  implementation  are  designed  in  detail  and  specified.  

Page 5: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  5  

e) Software  Verification  and  Validation:  Intended  to  show  that  a  system  conforms  to  its  specification  and  meets  the  

requirements  of  the  system  customer.  It  involves  checking  and  review  processes  and  system  testing.  i) Testing  Process  Stages:  

(1) Unit  Testing:  Individual  components  are  tested.    

(2) Module  Testing:  Related  collections  of  dependent  components  are  tested.    

(3) Subsystem  Testing:  Modules  are  integrated  into  

subsystems  and  tested.  The  focus  here  should  be  on  interface  testing.    

(4) System  Testing:  Testing  of  the  system  as  a  whole  and  testing  of  emergent  properties.    

(5) Acceptance  Testing  Testing  with  customer  data  to  check  that  it  is  acceptable.    

ii) Two  types  of  Testing:  

(1) Alpha  Testing  (Acceptance  testing):  Continues  until  the  system  developer  and  client  agree  that  delivered  system  is  an  acceptable  implementation  of  system  requirements.  

(2) Beta  Testing:  Delivering  a  system  to  a  number  of  potential  customers  who  agree  to  use  the  system.  Often  used  when  system  is  to  be  marketed  as  a  software  product.    

f) Software  Evolution:  Concerned  with  modifying  existing  software  systems  to  meet  new  requirements.  Software  is  inherently  flexible  and  can  change.    

i) Software  Maintenance:  Process  of  changing  that  system  once  it  has  gone  into  use.    

3) Software  Prototyping  a) Software  Prototype:    

i) Supports  two  requirements  engineering  process  activities:  

(1) Requirements  Elicitation  

(2) Requirements  Validation  

ii) Can  be  used  as  a  risk  analysis  and  reduction  technique.  

iii) The  overall  development  costs  may  be  lower  

iv) Usually  leads  to  improvements  in  system  specification.  Once  a  prototype  is  available,  it  can  be  used  for  other  

purposes  such  as  user  training  and  system  testing  .  

v) Usually  increases  cost  in  the  

early  stages  of  the  software  process  but  reduces  later  costs.  

vi) Other  benefits:  (1) Misunderstandings  between  software  developers  &  users  identified  as  system  functions  are  demonstrated.  

(2) Software  development  staff  may  find  incomplete  or  inconsistent  requirements  as  the  prototype  is  developed.  

(3) A  working,  even  though  limited,  system  is  available  quickly  to  demonstrate  the  feasibility  and  usefulness  of  the  application  to  management.  

(4) The  prototype  may  be  used  as  a  basis  for  writing  the  specification  for  a  production-­‐quality.  

 

Page 6: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  6  

vii) Things  that  can  be  left  out  of  prototype  for  reducing  cost  and  accelerate  delivery  schedule:  (1) Some  additional  functionality;  

(2) Non-­‐functional  requirements  such  as  response  time  and  memory  utilization;  

(3) Error  handling  and  management;  and  

(4) Standards  of  reliability  and  program  quality.    

b) Prototyping  Approaches:    i) Evolutionary  Prototyping:  Starts  from  developing  an  

initial  implementation,  gets  comments  from  the  user  and  modifies  continuously  through  many  stages  until  an  

adequate  system  has  been  developed.    

(1) Objectives:  (a) To  deliver  a  working  system  to  end  users.    

(b) Should  be  developed  to  the  same  organisational  quality  standards  as  any  other  software  

(c) Starts  with  a  simple  system,  which  implements  the  most  important  user  requirements.  Then,  it  is  changed  and  improved  as  new  requirements  are  discovered.  In  the  end,  it  will  become  the  required  system  

(d) It  is  now  the  normal  technique  used  for  website  development  and  e-­‐commerce  applications  

(2) Advantages:  (a) Accelerated  Delivery  of  the  System  

(b) User  Engagement  with  the  System  

(3) Problems:  (a) Management  Problems:  Prototypes  evolve  very  fast  that  it  is  not  cost-­‐effective  to  produce  a  lot  of  

system  documentation.  (b) Maintenance  Problems:  Continual  change  tends  to  break  the  structure  of  the  prototype  system.  

(c) Contractual  Problems:  When  specification  is  not  available,  it  can  be  difficult  to  design  a  contract  for  the  system  development.  

(4) Incremental  Development:  System  components  are  

incrementally  developed  and  delivered  within  this  framework.  Once  these  parts  have  been  validated  and  delivered,  neither  the  framework  nor  the  

components  are  changed  unless  errors  are  discovered.    (a) More  manageable  than  evolutionary  

prototyping  because  the  normal  software  process  standards  are  followed.  Plans  and  documentation  must  be  produced  for  each  system  increment.  

ii) Throw-­‐away  Prototyping:  After  evaluation,  the  prototype  is  discarded  and  a  production-­‐quality  system  is  built  

(1) Objectives:    (a) To  validate  or  derive  the  system  requirements  (b) Has  a  very  short  lifetime.  It  can  be  changed  during  

development  but  long-­‐term  maintainability  is  not  required  

(c) Intended  to  help  refine  and  clarify  the  system  specification  (d) The  prototype  evaluation  informs  the  development  of  the  

detailed  system  specification  which  is  included  in  the  system  requirements  document  

(2) Usually  used  for  hardware  systems:  The  prototype  is  used  to  check  the  design  before  expensive  commitments  to  manufacturing  the  system  have  been  made.  

Page 7: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  7  

iii) Rapid  Prototyping  Techniques:  Development  techniques  that  emphasize  delivery  speed  rather  than  other  

system  characteristics  such  as  performance,  maintainability  or  reliability.  

(1) Dynamic  high-­‐level  language  development;  (a) Dynamic  high-­‐level  languages  (HLL)  are  programming  

languages  that  include  powerful  run-­‐time  data  management  facilities.  

(b) Things  to  consider  when  choosing  prototyping  language:  (i) Application  Domain  of  the  Problem  (ii) User  Interaction  is  Required  (iii) Support  Environment  Provided  with  the  Language  

(2) Database  Programming:  Is  a  specialised  language  that  embeds  knowledge  of  the  database  and  includes  operations  that  are  related  to  database  manipulation.  

(a) The  tools  that  are  included  in  a  4GL  environment    (i) SQL  is  normally  used  for  a  database  query  language.  

This  may  be  input  directly  or  generated  automatically  

from  the  forms  filled  in  by  an  end-­‐user.  (ii) Forms  for  data  input  and  display  is  created  by  using  

an  interface  editor.  

(iii) Spreadsheet  used  for  the  analysis  and  manipulation  of  numeric  information.  (iv) Report  generator  that  is  used  to  design  reports  from  information  in  the  database.  

(3) Component  Reuse  (Component  and  application  

assembly):  Prototyping  with  reusable  components  involves  developing  a  system  specification  by  considering  what  reusable  components  are  available.  

The    functionality  of  the  available  components  may  not  be  very  precise  for  the  user  requirements.  (a) Advantage:  A  lot  of  prototype  functionality  can  be  implemented  quickly  at  a  very  low  cost.  

(b) Disadvantage:  If  they  do  not  know  how  to  use  the  applications,  it  may  be  difficult  to  learn,  especially  they  may  be  confused  by  application  functionality  which  is  not  necessary  

iv) User  Interface  (UI)  Prototyping:  Prototyping  is  also  essential  for  parts  of  the  system  such  as  the  user  interface  

which  cannot  be  effectively  pre-­‐specified.  

(1) User-­‐Centered  Design:  Where  the  user  takes  part  in  the  interface  design  process.  Evolutionary  prototyping  with  end  -­‐user  involvement  is  very  important  to  develop  graphical  user  interfaces  for  software  systems.  

   

4) Software  Project  Management  a) Project  means  a  temporary  endeavour  undertaken  to  accomplish  a  unique  purpose.  

 b) Project  management  is  the  application  of  knowledge,  skills,  tools  and  techniques  to  project  activities  in  order  to  

meet  or  exceed  stakeholder  needs  and  expectations  from  a  project.  

c) Project  manager  is  the  person  responsible  to  manage  and  lead  the  project  team  towards  the  completion  of  a  project.    

d) Tracking  progress:  The  project  manager  needs  to  monitor  and  control  the  project  development  as  well  as  the  project  team’s  performance.  Thus,  he  prepares  a:    i) Project  Schedule:  Describes  the  software  development  cycle  for  a  particular  project  by  identifying  the  phases  

or  stages  of  a  project  and  breaking  them  into  discrete  tasks  or  activities  to  be  done.  The  schedule  also  portrays  the  interactions  among  these  activities  and  estimates  the  time  each  task  or  activity  will  take.  

 

Page 8: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  8  

e) Deliverables  that  need  to  be  prepared  To  keep  track  on  the  progress  of  the  project:  

i) Documents;  ii) Demonstrations  of  function;  iii) Demonstrations  of  subsystems;  

iv) Demonstrations  of  accuracy;  and  v) Demonstrations  of  reliability,  security  or  performance.  

 

f) Then,  the  project  activities  and  milestones  need  to  be  identified.  i) A  Milestone:  the  completion  of  an  activity,the  end  of  a  specially  designated    activity  ii) An  Activity:  part  of  the  project  that  takes  place  over  a  period  of  time,  and  has  a  beginning  and  an  end  

 g) Work  Breakdown  Structure  (WBS)  is  a  method  that  divides  the  project  

as  a  set  of  discrete  pieces  of  work.  It  can  be  used  to  show  activities  and  

milestone  for  developers  and  customers  but  it  does  not  give  indication  of  the  interdependence  of  the  work  units.  i) Usage  of  WBS:  

(1) Thought  Process  Tool  (2) Architectural  Design  Tool  (3) Planning  Tool  (4) Project  Status  Reporting  Tool  

 

h) Work  packages  are  smaller  components  and  more  manageable  units  of  work.    i) Provides  a  logical  basis  for  defining  the  project  activities  and  

assigning  resources  to  those  activities  in  order  to  identify  all  project  works.    

ii) Makes  it  possible  to  develop  a  project  plan,  schedule  and  budget  

and  later  monitor  the  project’s  progress.    

i) Estimating  Completion:  

i) Analogous  Approach  (Top-­‐down  estimate):  The  analogous  approach  uses  the  actual  costs  and  durations  of  previous,  similar  projects  as  the  basis  for  estimating  the  current  project.  

ii) Parametric  Modelling:  Uses  mathematical  parameters  to  predict  project  costs.  

iii) Bottom-­‐up  Estimate:  Estimates  the  cost  and  duration  of  the  individual  work  packages  from  the  bottom  row  of  activities  of  the  work  breakdown  structure,  and  then  totals  the  amounts  up  each  row  until  reaching  an  estimate  for  the  total  project.  

iv) Simulation:  A  computer  calculates  multiple  costs  or  durations  with  different  sets  of  assumptions.    

j) Project  Tracking  Tools:  Normally,  there  are  two  main  tools  used  in  

software  project  development:  i) Gantt  chart  is  a  chart  where  a  depiction  of  a  project.  The  activities  

are  shown  in  parallel,  with  the  degree  of  completion  indicated  by  a  colour  or  icon.    

ii) Network  Diagram  provides  a  visual  layout  of  the  sequence  in  which  

project  work  flows.  It  includes  detailed  information  and  serves  as  an  analytical  tool  for  project  scheduling  and  resource  management  problems  as  they  arise  during  the  life  of  the  project.

Page 9: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  9  

(1) Dependency  is  simply  a  relationship  that  exists  between  pairs  of  

activities.    (a) Finish-­‐  to-­‐Start  (FS)  task  A  must  be  completed  before  task  B  

can  begin  

(b) Finish-­‐to-­‐Finish  (FF)  task  B  cannot  finish  sooner  than  task  A.  (c) Start-­‐to-­‐Start  (SS)  task  B  may  begin  once  task  A  has  begun.  (d) Start-­‐to-­‐Finish  (SF)  is  a  little  more  complex  than  the  FS  and  SS  

dependencies.    

k) Project  Personnel:  The  assignment  of  staff  to  tasks  depends  on  project  

size,  staff  expertise  and  staff  experience.  There  are  good  advantages  in  assigning  different  responsibilities  to  different  sets  of  people  because  this  can  identify  faults  early  in  the  development  process.  

 l) Project  Organizing:  team  members  are  organised  to  enhance  the  fast  completion  of  quality  products.    

i) The  choice  of  an  appropriate  structure  for  software  project  depends  on:  

(1) The  backgrounds  and  work  styles  of  team  members.  

(2) The  number  of  people  on  the  team.  

(3) The  management  styles  of  the  customers  and  developers  ii) Egoless  approach  holds  everyone  equally  responsible  for  the  project.  The  process  is  separated  from  the  

individuals;  the  judgment  is  made  on  the  product  or  the  result,  

 m) Risk  Management:  

i) Risks  are  uncertain  events  or  conditions  that,  if  they  occur,  have  a  positive  or  negative  effect  on  the  project  

objectives.  The  purpose  of  risk  management  is  to  maximise  the  results  of  positive  events  and  minimize  the  results  of  undesirable  events.  

ii) Identifying  risk:  Major  categories  of  risks:  

(1) Technical  New  breakthroughs,  design  errors  or  omissions.    

(2) Administrative  Culture  of  the  organisation,  change  in  management  or  priorities,  office  politics.    

(3) Environmental  Culture  of  the  organisation,  change  in  management  or  priorities,  office  politics.    

(4) Financial  Budget  cuts,  cash  flow  problems,  corporate  unprofitability,  unchecked  expenditures,  changing  economic  conditions.    

(5) Resource  Availability  Specialised  skills  or  critical  equipment  not  available.    

(6) Human  Human  error,  poor  worker  performance,  personality  conflicts,  communication  breakdown.    

(7) Logistical  Inability  to  deliver  materials  to  work  face-­‐to-­‐face.    

(8) Governmental  Government  regulations.    

(9) Market  Product  fails  in  the  marketplace,  consumer  expectations  change,  and  new  competitor  products.  

iii) Assessing  Risk:  Mainly  focused  on  prioritising  risks  so  that  an  effective  risk  strategy  can  be  formulated.  

(1) Qualitative  Approaches:  Qualitative  risk  analysis  focuses  on  a  subjective  analysis  of  risks  based  upon  a  project  stakeholder’s  experience  or  judgement.  Techniques  are:  

(a) Expected  Value  An  average  or  mean  that  takes  into  account  both  the  probability  and  impact  of  various  events  or  outcomes.  

(b) Decision  Trees  It  provides  a  visual  or  graphical  view  of  various  decisions  and  outcomes.  

(c) Risk  Impact  Table  Used  to  analyse  and  prioritise  various  IT  project  risks.  

(2) Quantitative  Approaches:  Quantitative  approaches  to  project  analysis  include  mathematical  or  statistical  techniques  that  allow  the  team  to  model  a  particular  risk  situation.  Examples  are:  

(a) Discrete  Probability  Distribution  Use  only  integer  or  whole  numbers  where  fractional  values  are  not  allowed.  

Page 10: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  10  

(b) Continuous  Probability  Distribution  Useful  for  developing  risk  analysis  models  when  an  event  has  an  

infinite  number  of  possible  values  within  a  stated  range.  iv) Responding  to  Risk:  The  purpose  of  risk  response  is  to  minimise  the  probability  and  consequences  of  negative  

events  and  maximise  the  probability  and  consequences  of  positive  events.  They  are:  

(1) Planning  Responses:  A  response  plan  should  be  developed  before  the  risk  event  occurs.  Then,  if  the  event  occurs,  just  simply  execute  the  plan  that  already  developed.    

(2) Possible  Responses:  In  developing  a  response  plan,  consider  ways  to  avoid  the  risk,  transfer  it  to  someone  

else,  mitigate  it,  or  simply  accept  it.  

(3) Avoiding:  It  may  be  possible  to  eliminate  the  cause,  and  therefore,  prevent  the  risk  from  happening.  This  

may  involve  an  alternative  strategy  for  completing  the  project.    

(4) Transferring:  It  may  also  be  possible  to  transfer  some  risk  to  a  third  party,  usually  for  the  payment  of  a  risk  premium.    

(5) Mitigating:  Mitigation  plans  are  steps  taken  to  lower  the  probability  of  the  risk  event  happening  or  reduce  the  impact  that  will  occur.    

(6) Accepting:  When  there  is  a  low  likelihood  of  a  risk  event,  or  when  the  potential  impact  on  the  project  is  

low,  or  when  the  cost  of  mitigation  is  high,  a  satisfactory  response  may  be  to  accept  the  risk.    

(7) Response  Plan  Outcomes:  Contingency  plans  describe  the  actions  to  be  taken  if  a  risk  event  occurs.  Reserves  are  provisions  in  the  project  plan  to  mitigate  the  impact  of  risk  events.  

 

5) Software  Requirements  a) Requirements  are  the  descriptions  of  the  services  and  constraints  for  the  system.  

 

b) Requirements  engineering  is  the  process  of  finding  out,  analysing,  documenting  and  checking  the  services  and  constraints.    

c) Requirement  types:    i) User  Requirements:  This  requirement  consists  of  statements  of  the  

services  that  the  system  should  provide  and  the  constraints  of  the  

system.  Usually,  it  is  stated  using  natural  language  and  diagrams.    

(1) Potential  Problems  when  Requirements  are  Written  in  Natural  Language:  

(a) Lack  of  Clarity  (b) Requirements  Confusion  (c) Requirements  Combination  

(2) Simple  guidelines  for  requirements  should  be  followed  to  minimise  misunderstandings:  (a) Invent  a  standard  format  and  ensure  that  all  requirement  definitions  are  following  that  format;  

(b) Use  language  consistently  especially  when  differentiating  between  mandatory  and  desirable  reqs;  (c) Use  text  highlighting  such  as  bold  and  italic  to  pick  out  the  key  points  of  the  requirement;  and  (d) Try  to  avoid  using  computer  jargon.  On  the  other  hand,  sometimes  technical  terms  still  have  to  be  used  

in  the  user  requirements  but  they  should  be  explained  in  a  simpler  way.  ii) System  Requirements  (Functional  specifications):  This  requirement  will  describe  the  system  services  in  detail.  

Later,  the  documents  will  be  used  by  software  engineers  as  the  starting  point  for  the  system  design.  It    also  

includes  different  models  of  the  system,  eg  an  object  model  or  a  data-­‐flow  model.  It  should  state  what  the  system  should  do  and  not  how  it  should  be  implemented.  

(1) Reasons  why  most  of  the  design  information  are  included  in  system  requirement  document  

(a) An  initial  architecture  of  the  system  will  be  described  to  help  the  construction  the  requirements  specification.    

(b) Normally,  system  must  interoperate  with  other  existing  systems.    

(c) The  use  of  a  specific  design  may  be  an  external  system  requirement.  

Page 11: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  11  

(2) Problems  with  natural  language  can  arise  when  used  for  more  detailed  specification  such  as:  

(a) Natural  language  will  work  well  only  if  readers  and  writers  use  the  same  words  for  the  same  concept.    (b) Natural  language  requirements  specification  has  excess  flexibility.    (c) It  is  difficult  to  revise  or  amend  natural  language  requirements  and  find  all  related  requirements.  

 

(3) Alternatives  that  are  used  to  add  structure  to  the  specification  and  to  reduce  ambiguity:  (a) Structured  Natural  Language  Structured  natural  language  depends  on  defining  standard  forms  or  

templates  to  express  the  requirements  specification.    (b) Design  Description  Language  Design  description  language  uses  a  language  like  a  programming  

language  but  with  more  abstract  features  to  specify  the  requirements  by  defining  an  operational  model  

of  the  system.    (i) Program  description  language  (PDL)  is  a  language  created  from  a  programming  language  like  Java  

or  Ada.    1. They  are  used  in  two  situations:  

a. When  an  operation  is  specified  as  a  sequence  of  simpler  actions  and  when  the  order  of  

execution  is  important.  This  is  because  descriptions  of  such  sequences  in  natural  language  are  sometimes  confusing.  

b. When  hardware  and  software  interfaces  have  to  be  specified.  Usually,  the  interfaces  

between  subsystems  are  defined  in  the  system  requirements  specification.  2. Disadvantages  of  using  this  approach  to  requirements  specification:  

a. The  language  that  is  used  to  write  the  specification  may  not  be  communicative  enough  to  

describe  the  system  functionality.  b. The  notation  can  only  be  understood  by  people  who  have  some  programming  language  

background.  

c. The  requirement  can  be  treated  as  a  design  specification  rather  than  a  model  to  help  the  user  to  understand  the  system.  

(c) Graphical  Notations  A  graphical  language,  supplemented  by  text  annotations,  is  used  to  define  the  

functional  requirements  for  the  system.  An  earlier  example  of  such  a  graphical  language  was  SADT.  More  recently,  use-­‐case  descriptions  have  been  used.    

(d) Mathematical  Specifications  These  are  notations  based  on  mathematical  concepts  such  as  finite-­‐state  

machines  or  sets.  These  unambiguous  specifications  reduce  the  arguments  between  customer  and  contractor  about  system  functionality.  However,  most  customers  do  not  understand  formal  specifications  and  are  reluctant  to  accept  them  as  a  system  contract.  

 

(4) Interface  Specification:  When  new  software  systems  need  to  be  installed  and  used,  most  of  the  time  it  must  operate  with  other  systems  which  have  been  implemented  and  installed  earlier.  If  the  new  system  

and  the  existing  systems  is  required  to  work  together,  the  interfaces  of  existing  systems  must  be  correctly  specified.    (a) Procedural  Interfaces  Existing  subsystems  offer  a  range  of  services  which  are  accessed  by  calling  

interface  procedures.    (b) Data  Structures  Data  structures  are  passed  from  one  sub-­‐system  to  another.  A  Java-­‐based  PDL  may  be  

used  for  this  with  the  data  structure  being  described  using  a  class  definition  with  attributes  

representing  fields  of  the  structure.    (c) Representations  of  Data  Representations  of  data  (such  as  the  ordering  of  bits)  have  been  established  

for  an  existing  subsystem.  

 iii) Software  Design:  This  document  consists  of  abstract  description  of  the  software  design  and  later  will  be  used  

for  more  detailed  design  and  implementation.  This  document  is  the  enhancement  of  the  system  requirements  specification.    

Page 12: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  12  

d) Software  system  requirements  are  classified  as:  

(1) Functional  requirements:  consist  of  statements  of  services  the  system  should  provide,  how  the  system  should  react  to  particular  inputs  and  how  the  system  should  behave  in  certain  situations,  and  sometimes,  it  also  states  what  the  system  should  not  do.  

(2) Non-­‐functional  requirements:  determine  the  constraints  on  the  system  services  or  functions.  They  include  timing  constraints,  constraints  on  the  development  process,  standards,  and  others.  

(3) Domain  requirements:  come  from  the  application  domain  of  the  system  reflecting  the  characteristics  of  

that  domain.  They  are  divided  into  functional  or  non-­‐functional  requirements.    

e) Software  requirements  document  (Software  Requirements  Specifications,  SRS)  is  the  official  statement  of  what  is  required  for  the  system  developers.  

       

f) The  Structure  of  a  Requirements  Document:  

Page 13: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  13  

6) Requirements  Engineering  Process  a) Requirements  Engineering:  Includes  all  of  the  activities  needed  to  create  and  maintain  a  system  requirements  

document.    b) 4  Requirements  Engineering  Process  Activities:  

i) Feasibility  Studies:  A  short  and  focused  

study.  Its  objective  is  to  answer:  

(1) Input:  Outline  description  of  the  system  and  how  it  will  be  used  within  an  

organisation.  

(2) Outcomes:  Feasibility  Report  shold  

(3) Questions  to  be  answered:  (a)  The  system  contribution  to  the  

overall  objectives  of  the  organisation.  (b) Possibility  of  implementing  the  system  using  current  technology  and  within  given  cost  and  schedule  

constraints.  (c) Possibility  of  integrating  the  system  with  other  systems,  which  are  already  in  place.  

(4) Activities:  Information  Assessment,  Information  Collection  and  Report  Writing.    

(5) Sources  of  Information:  (a) Department  managers  where  the  system  will  be  used;  

(b) Software  engineers  who  are  familiar  with  the  type  of  system  that  is  proposed;  (c) Technology  experts;  and  (d) End-­‐users  of  the  system.  

ii) Requirements  Elicitation  and  Analysis:  An  iterative  process  which  involves  domain  understanding,  requirements  collection,  classification,  structuring,  prioritisation  and  validation.  

(1) Stakeholders:  Everyone  who  has  some  direct  or  indirect  influence  on  the  system  requirements  

(2) It’s  a  Difficult  Process  Because:  (a) Stakeholders  often  do  not  really  know  what  they  want  from  the  

computer  system.  They  often  make  unrealistic  demands.  (b) Stakeholders  in  a  system  normally  express  requirements  in  their  own  

terms  and  with  own  knowledge  of  their  own  work.  (c) Stakeholders  with  different  job  descriptions  normally  have  different  

requirements  and  it  could  be  expressed  in  

several  different  ways.    (d) Political  Factor,  as  it  can  increase  influence    (e) Economic  and  business  environment  in  which  

the  analysis  takes  place  keeps  changing.  

(3) Techniques  of  Requirement  Elicitation  and  Analysis  

(a) Scenarios:  Descriptions  of  how  a  system  is  used  in  practice.  People  can  relate  to  these  more  readily  than  abstract  statement  of  what  they  

require  from  a  system.    (i) A  scenario  may  include:  

1. A  system  states  description  at  the  starting  of  the  scenario.  

2. A  description  of  the  normal  flow  of  events  that  happen  in  the  scenario.  3. A  description  of  what  can  go  wrong  and  how  to  handle  it.  4. Information  about  other  activities  that  could  be  happening  at  the  same  time.  

5. A  description  of  the  state  of  the  system  after  the  ending  of  the  scenario.  

Page 14: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  14  

(ii) Event  scenarios  are  used  to  document  the  system  behaviour  when  presented  with  specific  events.  

Includes  a  description  of  data  flows  and  the  actions  of  the  system  and  document  the  exceptions.  (iii) Use-­‐case:  A  scenario-­‐based  technique  for  requirements  elicitation,  will  identify  the  actors  involved  

in  an  interaction  and  will  name  the  type  of  interaction.  

(b) Ethnography  is  a  technique  of  observation  that  can  be  used  to  understand  social  and  organisational  requirements.  (i) System  analyst  involves  himself  in  the  working  environment  where  the  system  will  be  used.    

(ii) It  helps  discover  hidden  system  requirements  which  represent  the  actual  process.  (iii) Two  types  of  requirements  that  Ethnography  is  usually  useful  at  discovering:  

1. Requirements  taken  from  the  way  people  actually  work  rather  than  the  way  process  definitions  

say  they  should  work.  2. Requirements  that  are  taken  from  cooperation  and  knowledge  of  other  people’s  activities.  

iii) Requirements  Specification:  

iv) Requirements  Validation:  Proving  that  the  requirements  match  the  users’  requests.  Concerned  with  finding  problems  with  the  requirements.  

(1) Validation  is  important  because  errors  in  a  requirements  document  can  lead  to  extensive  modification  

costs  when  they  are  later  discovered  during  development  or  after  the  system  is  in  service.  

(2) Different  Types  of  Checks:  (a) Validity  Checks    (b) Consistency  Checks  Requirements  in  the  document  should  not  conflict  with  each  other.    (c) Completeness  Checks  The  requirements  document  should  include  requirements  that  define  all  

functions  and  constraints  requested  by  the  system  user.    (d) Realism  Checks  All  requirements  should  be  checked  to  make  sure  that  they  can  be  implemented  using  

existing  technology,  budget  and  schedule  for  the  system  development.    

(e) Verifiability  To  minimise  the  potential  for  disagreement  between  customer  and  contractor,  system  requirements  should  always  be  written  so  that  they  are  verifiable.    

(3) Requirement  Validation  Techniques:  

(a) Requirements  Reviews  Systematic  manual  analysis  of  the  requirements.    (b) Prototyping  It  is  using  an  executable  model  of  the  system  to  check  requirements.    (c) Test-­‐case  Generation  Developing  tests  for  requirements  to  check  testability.    

(d) Automated  Consistency  Analysis  Checking  the  consistency  of  a  structured  requirements  description.  

(4) Requirements  review  is  defined  as  a  manual  process  of  checking  the  requirements  document  for  abnormalies  and  omission  which  involves  the  client  and  contractor  staff.  

(a) Informal  Requirements  Review  just  involve  requirements  discussion  between  developers  with  as  many  system  users  as  possible.    

(b) Formal  Requirements  Review,  the  development  team  should  walk  the  client  through  the  system  

requirements,  explaining  the  implications  of  each  requirement.    

c) Requirements  management  is  the  process  to  understand  and  control  changes  to  system  requirements.  Business,  

organisational  and  technical  changes  inevitably  lead  to  changes  to  the  requirements  for  a  software  system.  i) New  requirements  appear  because:  

(1) Different  users  have  different  requirements  and  priorities.  

(2) The  people  who  pay  for  a  system  and  the  users  of  a  system  are  usually  not  the  same  people.    

(3) The  business  and  technical  environment  of  the  system  changes  frequently  and  these  changes  must  be  

reflected  in  the  system  itself.    ii) Three  principal  stages  to  a  change  management  process  

(1) Problem  Analysis  and  Change  Specification  

(2) Change  Analysis  and  Costing  (3) Change  Implementation  

Page 15: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  15  

7) User  Interface  Design  a) Graphical  User  Interface  (GUI):    

i) Advantages:    

(1) Easy  to  learn  and  Use  (2) Can  open  several  screens  for  system  interaction  

(3) Possible  to  have  fast  and  full  screen  interaction  with  immediate  access  to  anywhere  on  the  screen.  ii) Characteristics:  

(1) Windows:  Multiple  windows  allow  display  of  different  information  simultaneously.  

(2) Icons:  Represents  different  types  of  information,  easy  and  fast  to  understand.  

(3) Menus:  Commands  are  selected  from  a  menu  rather  than  typed  in  command  language.  

(4) Pointing:  Selecting  choices  are  fast  with  a  pointing  device  such  as  a  mouse.  

(5) Graphics:  Graphical  elements  can  be  mixed  with  text  on  the  same  display.  iii) User  Interface  Design  Process:    

(1) Exploratory  development  is  considered  the  most  effective  design.    

(2) This  prototyping  process  can  begin  with  simple  

paper-­‐based  interface  test  design  before  starting  to  develop  screen-­‐based  designs  that  simulate  user  interaction.    

(3) A  user-­‐centered  approach  should  be  used,  where  the  end-­‐users  of  the  system  playing  an  active  

part  in  the  design  process.  iv) Techniques  Used  to  understand  the  user’s  needs:  Task  analysis,  Ethnographic  studies,  User  interviews  and  

Observations  or  a  mixture  of  all  of  these  techniques.  

b)  User  Interface  Design  Principles:  i) User  Familiarity  Principle  stated  that  users  should  not  be  forced  to  adapt  to  an  interface  because  it  is  

convenient  to  implement.    

(1) The  interface  should  use  terms  and  concepts  which  are  drawn  from  the  experience  of  the  people  who  will  make  most  use  of  the  system  

ii) Consistency  Principle:  System  commands  and  menus  should  have  the  same  format,  command  punctuation  

should  be  the  same  and  parameters  should  be  passed  to  all  commands  in  the  same  way.    

(1) The  interface  should  be  consistent  in  that,  wherever  possible,  comparable  operations  should  be  activated  in  the  same  way.  

iii) Minimal  Surprise  Principle:  User  can  get  irritated  when  a  system  behaves  unexpectedly    

(1) Users  should  never  be  surprised  by  the  behaviour  of  a  system.  iv) Recoverability  Principle:  Users  cannot  avoid  from  making  mistakes  when  using  a  system.    

(1) The  interface  should  include  mechanisms  to  allow  users  to  recover  from  errors.  v) User  Guidance  (Assistance)  Principle:  stated  that  interfaces  should  have  built-­‐in  user  help  facilities.  

(1) The  interface  should  provide  meaningful  feedback  when  errors  occur  and  provide  context-­‐sensitive  user  help  facilities.  

vi) User  Diversity  Principle:  States  that,  there  are  different  types  of  users  for  many  interactive  systems.    

(1) The  interface  should  provide  appropriate  interaction  facilities  for  different  types  of  system  user  

(2) There  are  two  types  of  users:  (a) Casual  Users:  users  who  interact  occasionally  with  the  system.  

(b) Power  Users:  users  who  use  the  system  for  several  hours  each  day.  vii) Principle  of  acknowledging  user  diversity  can  conflict  with  the  other  interface  design  principles.  The  reason  is  

that  some  types  of  user  may  prefer  to  have  very  rapid  interaction  rather  than  user  interface  consistency.

Page 16: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  16  

c) User  interaction:  Giving  commands  and  

data  to  the  computer  system.  i) Direct  Manipulation:  For  example,  

to  delete  a  file,  a  user  can  drag  it  to  

a  trashcan  on  the  screen.    ii) Menu  Selection:  A  user  selects  a  

command  from  a  list  of  choices    

iii) Form  Fill-­‐in:  Filling  the  form  fields  iv) Command  Language:  Issuing  a  

special  command  and  related  

parameters  to  instruct  the  system  what  to  do.    

v) Natural  Language:  In  order  to  delete  a  file,  the  user  could  type  ‘delete  the  file  named  xxx’.  

 d) Information  Presentation:  By  separating  the  presentation  

system  from  the  data,  the  representation  on  the  user’s  

screen  can  be  changed  without  changing  the  basic  computational  system.  i) Model-­‐View-­‐Controller  (MVC):  First  used  in  Smalltalk.  It  is  a  useful  way  to  support  multiple  presentations  of  

data  and  users  can  interact  with  each  presentation  using  a  style  that  is  more  suitable  to  it.  The  data  to  be  displayed  is  encapsulated  together  in  a  model  

object.  Each  model  object  can  have  several  separate  view  objects  associated  with  it  where  each  view  is  a  

different  display  representation  of  the  model.  ii) Factors  to  be  considered  to  decide  on  how  to  present  information:  

(1) User  interest  in  specific  information  or  in  the  relationships  between  different  data  values.  

(2) Information  values  change  rate.  

(3) User  response  to  information  change.  

(4) User  interaction  with  the  displayed  information.  

(5) Type  of  information  to  be  displayed.  For  example:  textual  or  numeric.  iii) Guidelines  for  Effective  Color  Use  in  User  Interfaces:  

(1) Limit  the  colors  and  be  conservative  on  how  they  are  used  

(2) Use  color  change  to  show  a  change  in  system  status  

(3) Use  color  coding  to  support  the  task  which  users  are  trying  to  perform  

(4) Use  color  coding  in  a  thoughtful  and  consistent  way  (5) Be  careful  about  color  pairing  

iv) Two  most  frequent  Errors  made  by  designers  when  using  colour  in  a  user  interface:  

(1) Using  too  many  colours  in  a  display,    

(2) Associating  meanings  with  particular  colours.  Color  should  not  be  used  to  represent  meaning  because:  

(a) About  10%  of  men  are  colour-­‐blind  (b) Human  colour  perceptions  are  different  and  there  are  different  interpretations  in  different  professions  

about  the  meaning  of  particular  colours.  

 e) User  Support:  Help  systems  are  one  part  of  user  interface  design.  It  is  used  for  user  guidance.  

i)  Three  areas  covered  by  User  Support  Help  Systems:  

(1) The  message  created  by  the  system  to  react  to  user  actions.  

(2) The  online  users  help  system.  

(3) The  documentation  given  with  the  system.  

Page 17: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  17  

ii) Factors  that  should  be  considered  when  designing  help  text  or  error  messages:  

(1) Context:  Be  aware  of  what  the  user  is  doing  and  should  adjust  the  output  message  to  the  current  context.    

(2) Experience:  Should  provide  both  long  meaningful  messages  (for  beginners)  and  short  messages  (for  more  experienced  users)  and  allow  the  user  to  control  message  conciseness.    

(3) Skill  Level:  Messages  should  be  tailored  to  the  users’  skills  as  well  as  their  experience  (terminologies  etc).  

(4) Style  Messages  should  be  positive  rather  than  negative.  They  should  use  the  active  rather  than  the  passive  

mode  of  address.  They  should  never  be  insulting  or  try  be  funny.    

(5) Culture  Wherever  possible,  the  designer  of  messages  should  be  familiar  with  the  culture  of  the  country  where  the  system  is  sold.  A  suitable  message  for  one  culture  might  be  unacceptable  in  another.  

iii) Error  Messages:  Very  important  as  it  can  be  the  first  impression  users  have  about  a  system.  Error  messages  should  constantly  be  polite,  concise,  consistent  and  constructive.  Good  error  message  should  suggest  how  the  error  can  be  corrected  and  provide  a  link  to  a  help  system.  

iv) Help  System  Design:  The  structure  of  the  help  frame  network  is  usually  hierarchical  

with  cross-­‐links.  General  information  is  held  at  the  top  of  the  hierarchy  while  detailed  

information  is  located  at  the  bottom.      

f) User  Documentation  (System  Manual):  is  important  to  guide  the  users  on  how  to  use  a  particular  system.  

i) Functional  Description:  Describes,  very  briefly,  the  services  which  the  system  provides  

ii) Installation  Document:  Contains  details  of  how  to  install  the  system    

iii) Introductory  Manual:  Presents  an  informal  introduction  to  the  system,  describing  its  normal  usage,  how  to  get  

started  and  how  end-­‐users  might  use  the  common  system  facilities.    iv) Reference  Manual:  Explains  the  system  facilities  and  their  usages,  gives  a  list  of  error  messages  and  possible  

causes  and  explains  how  to  recover  from  detected  errors.    

v) Administrator’s  Manual:  Explain  the  messages  generated  when  the  system  interacts  with  other  systems  and  how  to  respond  to  these  messages.      

g) Interface  Evaluation:  Process  of  testing  the  usability  of  an  interface  and  testing  whether  it  meets  user  requirement.  i) Usability  Attributes:  

(1) Learnability  How  long  does  it  take  a  new  user  to  become  productive  with  the  system?    

(2) Speed  of  Operation  How  well  does  the  system  response  match  the  user’s  work  practice?    

(3) Robustness  How  tolerant  is  the  system  of  user  error?    

(4) Recoverability  How  good  is  the  system  at  recovering  from  user  errors?    

(5) Adaptability  How  closely  is  the  system  tied  to  a  single  model  of  work?  ii) Simpler,  Less  Expensive  Techniques  of  User  Interface  Evaluation:  

(1) Questionnaires  that  are  used  to  collect  information  about  user’s  opinion  of  the  interface.  

(2) Observation  and  Interview  of  users  working  with  the  system.  

(3) Video  recording  of  usual  system  use.  

(4) The  insertion  in  the  software  of  code  that  collects  information  about  the  most-­‐used  facilities  and  most  common  errors.  

Page 18: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  18  

8) Design  with  Re-­‐Use  a) Design  with  Re-­‐Use:  involves  designing  the  software  

based  on  existing  examples  of  good  design  and  use  these  software  components  where  available  and  suitable.  

b)  Two  types  of  Re-­‐Use:  

i) Opportunistic  Re-­‐Use:  Used  in  programming  when  components  are  suitable  for  a  requirement.  

ii) Systematic  Re-­‐Use:  Needs  a  design  process  that  

looks  at  how  existing  designs  can  be  reused,  and  that  use  the  design  in  available  software  components.  

c)  Reused-­‐based  Software  Engineering:  An  approach  to  software  development  where  it  tries  to  maximise  the  reuse  

of  existing  software.  d) There  are  three  main  requirements  for  component  Re-­‐Use:  

i) The  components  that  are  reusable  need  to  be  kept  for  future  use.    

ii) The  people  who  reuse  the  components  must  have  confidence  that  the  components  are  reliable  and  functional.    iii) The  reusable  components  must  have  related  documentation  to  help  the  people  who  want  to  reuse  these  

components  to  understand  them  and  use  them  in  a  new  application.  

e) Advantages  of  Software  Re-­‐Use:  i) Reduce  in  Overall  Development  Costs:  Fewer  software  components  will  be  specified,  designed,  implemented  

and  validated.    

ii) Increased  Reliability:  Reused  components  that  have  been  implemented  in  working  systems  should  be  more  reliable  than  new  components.    

iii) Reduced  Process  Risk:  The  uncertainty  in  the  cost  of  reusing  software  component  is  less  than  developing  a  new  

component.    iv) Effective  Use  of  Specialists:  The  application  specialists  can  develop  reusable  components  that  use  their  

knowledge  instead  of  doing  the  same  work  on  different  projects.    

v) Standard  Compliance:  The  use  of  standard  user  interfaces  enhances  reliability  as  users  make  fewer  mistakes  when  given  a  familiar  interface.    

vi) Accelerated  Development:  Speed  of  system  production  is  increased  because  time  for  both  development  and  

validation  should  be  reduced.  f) Disadvantages  of  Software  Re-­‐Use:  

i) Increased  Maintenance  Costs:  Reused  elements  of  the  system  may  become  incompatible  with  system  changes,  

if  source  code  is  not  available.    ii) Lack  of  Tool  Support:  It  is  difficult  to  find  a  tool  to  support  component  reuse.  Eg:  CASE  tools  doesn’t  support  it.  iii) Not-­‐invented-­‐here  Syndrome  Writing  new  software  viewed  more  challenging  than  reusing  other’s  software.    

iv) Finding  and  Adapting  Reusable  Components  Software  components  have  to  be  searched  in  a  library  or  archive,  understood  and  adapted  to  work  in  a  new  environment.    

g) Generator-­‐Based  Re-­‐Use:  Re-­‐usable  knowledge  is  included  in  a  program  generator  system  that  can  be  programmed  in  a  domain-­‐oriented  language  i) Cost-­‐effective  

ii) Depends  on  the  identification  of  conventional  domain  abstractions.  iii) Used  in  business  data  processing,  language  processing  and  in  command  and  control  systems.  iv) Easier  for  end-­‐users  to  develop  programs.  

h) Component-­‐Based  Development:  Introduced  due  to  the  insufficient  use  of  object-­‐oriented  

development.  i) Stand-­‐alone  Providers:  Means  that  when  a  system  needs  some  service,  it  will  call  on  a  component  to  provide  

that  service  without  any  concern  about  where  that  component  is  executing  or  the  programming  language  used  

to  develop  the  component.  

Page 19: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  19  

ii) Two  Characteristics  of  a  Reusable  Component:  

(1) The  component  is  treated  as  an  independent  executive  entity,  source  code  not  available.  

(2) Components  bring  out  their  interface  and  all  interactions  are  made  through  that.  iii) Component  Interfaces:    

(1) Requires  Interface:  Indicates  what  services  must  be  available  from  the  system  which  is  using  component.  

(2) Provides  Interface:  Describes  the  services  provided  by  the  component.  

iv) Five  Different  Levels  of  Abstraction:  (1) Functional  Abstraction:  The  component  uses  a  single  function  such  as  mathematical  function.    

(2) Casual  Groupings:  The  component  is  a  collection  of  loosely  related  entities  that  could  consist  of  data  

declarations,  functions  and  many  more.    

(3) Data  Abstractions:  The  component  symbolises  a  data  abstraction  or  class  in  an  object-­‐oriented  language.    

(4) Cluster  Abstractions:  The  component  is  a  group  of  interrelated  classes  that  work  together.  These  classes  

are  sometimes  known  as  frameworks.    

(5) System  Abstractions:  The  component  is  an  entire  self-­‐contained  system.  Reusing  system-­‐level  abstractions  

is  sometimes  called  COTS  (Commercial-­‐Off-­‐The-­‐Shelf)  product  reuse.    v) Objects  were  the  most  appropriate  abstraction  for  use,  suggests  users  of  object  -­‐oriented  development.  vi) Frameworks  (or  application  frameworks):  Subsystem  design  that  consists  of  a  collection  of  abstract  and  

concrete  classes  and  also  the  interface  between  them.    

(1) Three  classes  of  frameworks:  (a) System  Infrastructure  Frameworks:  Supports  the  development  of  system  infrastructures  like  

communications,  user  interfaces  and  compilers.  (b) Middleware  Integration  Frameworks:  Consists  of  a  set  of  standards  and  associated  object  classes  that  

support  component  communication  and  information  exchange.  Eg:  CORBA,  DCOM,  Java  Beans  etc.  

(c) Enterprise  Application  Frameworks:  Related  to  specific  application  domains.  Eg:  telecom  system.  

(2) Primary  problem  with  frameworks  is  their  inherent  complexity  and  the  time  it  takes  in  order  to  learn  how  to  use  them,  high  cost  of  introduction.  

vii) Commercial-­‐Off-­‐The-­‐Shelf  (COTS):  Offered  by  a  third-­‐party  vendor.  Related  to  the  reuse  of  large-­‐scale,  off-­‐the-­‐shelf  systems.  These  provide  a  lot  of  functionally  and  their  reuse  hugely  reduces  costs  and  development  time.  

(1) Advantages  of  COTS:  COTS  offers  more  functionalities  than  specialised  components.  

(2) Four  Problems  with  COTS  System  Integration:  (a) Lack  of  Control  over  Functionality  and  Performance  (b) Problems  with  COTS  System  Interoperability  

(c) No  Control  over  System  Evolution  (d) Support  from  COTS  Vendors  

viii) Component  Development  for  Reuse:    

(1) Implement-­‐based  process:  Reusable  components  are  constructed  from  existing  components  that  have  been  successfully  reused  

(2) Component  characteristics  that  lead  to  reusability:  (a) Stable  domain  abstractions:  The  main  concepts  in  the  application  domain  that  slowly  change.  (b) The  component  should  not  reveal  the  way  its  state  is  represented  and  should  provide  operations  that  

allow  the  state  to  be  accessed  and  updated  (c) The  component  should  be  as  independent  as  possible,  Stand-­‐alone.  (d) All  exceptions  must  be  part  of  the  component  interface.  

 i) Design  Patterns:  In  software  design,  design  patterns  have  been  linked  with  object-­‐oriented  design.  usually  rely  on  

object  characteristics  like  inheritance  and  equally  applicable  to  all  approaches  to  software  design:  

i) Four  Essential  Elements  of  a  Design  Patterns:  (1)  Name       (2)  Description  of  the  Problem  Area    (3)  Solution  Description   (4)  Statement  of  Consequences  or  Results  and  Profits  of  using  the  pattern.  

Page 20: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  20  

9) Verification  &  Validation  a) Verification  and  Validation:  Process  of  looking  for  defects  in  a  software  system.  Conducted  throughout  the  whole  

project  lifecycle.  It  starts  with  requirements  reviews  and  continues  through  design  reviews  and  code  inspections  to  product  testing.    i) Verification:  Process  of  checking  software  to  conform  it  meets  the  specification.  ii) Validation:  More  general  process.  Ensures  the  software  meets  the  expectations  of  the  customer.    iii) Main  goal  of  software  verification  and  validation:  is  to  make  sure  that  the  software  is  good  enough  for  its  

original  purpose.    iv) Should  include  activities  like    

(1) Draw  up  standards  and  procedures  for  software  inspections  and  testing,    (2) Establish  checklists  to  drive  program  inspections  and  define  the  software  test  plan.  

b) Debugging:  The  process  of  locating  and  correcting  defects  are  called.  c) Regression  Testing:  Re-­‐inspecting  the  program  or  repeating  previous  test  runs,  to  check  that  the  new  changes  to  a  

program  do  not  create  new  errors  into  the  system.  

 d) The  required  confidence  of  Software  depends  on:  

i) Software  Function:  Level  of  confidence  depends  on  how  important  a  software  is  to  an  organization.  ii) User  Expectations:  Many  users  have  low  expectations  of  their  software.    

 e) System  checking  and  analysis  techniques  that  can  be  used  for  verification  and  validation  process:  

i) Software  Testing:  Executing  an  implementation  of  the  software  with  test  data  and  examining  the  outputs,  and  

its  operational  behaviour,  to  find  out  if  it’s  performing  as  required.  (1) Two  distinct  types  of  testing  that  may  be  used  in  different  stages  in  the  software  process  are:  

(a) Defect  testing  is  aimed  to  find  inconsistencies  between  a  program  and  its  specification.  These  

inconsistencies  are  normally  caused  by  program  faults  or  defects.  (b) Statistical  testing  is  done  to  assess  the  program’s  performance  and  reliability  and  to  test  how  it  works  

under  operational  conditions.  Tests  are  planned  to  show  the  actual  user  inputs  and  their  frequency.  

(2) Testing  is  very  important  for:  reliability  assessment,  performance  analysis  and  user  interface  validation  and  to  check  whether  the  software  requirements  are  the  same  as  the  user  specifications.  

(3) Major  Components  of  a  Test  Plan:  (a) Testing  Process:  Description  of  the  major  phases  of  the  testing  process  (b) Requirements  Traceability:  Plan  testing  so  that  all  requirements  are  tested  individually  

(c) Tested  Items:  Software  process  products,  which  will  be  tested,  should  be  identified.  (d) Testing  Schedule:  Overall  testing  schedule,  includes  resource  allocation  (e) Test  Recording  Procedure:  Test  results  should  be  systematically  recorded,  for  ease  of  auditing  etc.  

(f) Hardware  &  Software  Requirements:  Determines  software  tools  and  estimated  hardware  required  (g) Constrains:  that  affect  the  testing  process,  like  staff  shortage  

 

ii) Software  Inspections:  To  ensure  that  the  software  being  developed  does  not  contain  error.  Involves  the  activities  of  analysing  and  checking  system  representations  like  requirements  document,  design  diagrams,  codes  etc.  Can  be  implemented  in  all  stages  of  the  process.  (1) Inspection  techniques  consist  of:    

(a) Program  inspections,    (b) Automated  source  code  analysis    

(c) Formal  verification.    

(2) Two  reasons  why  Inspections  are  more  effective  than  testing  to  discover  defects:  (a) During  a  single  inspection  session,  a  lot  of  different  defects  may  be  detected.  Testing,  detect  only  one  

error  per  test.  (b) Reviews  and  inspections  reuse  domain  and  programming  language  knowledge.    

Page 21: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  21  

(3) Program  Inspection:  Widely  used  nowadays  to  detect  program  defect.  .  The  inspection  process  should  be  

guided  by  a  defect  checklist.  Program  code  is  often  thoroughly  checked  by  a  small  team.    (a) Roles  of  team  members  in  the  Inspection  Process:  

(i) Author  or  Owner:  Programmer  or  designer  responsible  for  producing  the  program  or  document.    

(ii) Inspector:  Responsible  for  finding  errors,  omissions  and  inconsistencies  in  programs  and  documents.    

(iii) Reader:  Responsible  for  rephrasing  the  code  or  document  at  an  inspection  meeting.    

(iv) Scribe:  Responsible  for  recording  the  results  of  the  inspection  meeting.    (v) Chairman  or  Moderator:  Responsible  for  managing  the  process  and  facilitates  the  inspection.    (vi) Chief  Moderator  Responsible  for  inspection  of  process  improvements,  checklist  updating,  

standards  development  and  many  more.  (b) Among  the  responsibilities  of  the  moderator  are:  

(i) Selecting  an  inspection  team;  

(ii) Organising  a  meeting  room;    (iii) Making  sure  that  the  material  to  be  inspected  and  its  specifications  are  complete.  

(c) Before  a  program  inspection  starts,  it  is  important  that:  

(i) The  inspection  team  prepares  an  accurate  specification  of  the  code  to  be  inspected.    (ii) The  members  of  the  inspection  team  know  the  organisational  standards  very  well.  

(iii) The  latest  and  syntactically  correct  version  of  the  code  is  available.    (d) Inspection  Process:  

(i) Program  is  given  to  the  inspection  

team  during  overview  stage,  where  author  describes  what  the  program  is  supposed  to  do.  

(ii) A  Period  of  Individual  Preparation  follows  this,  where  each  member  tries  to  find  defects,  anomalies  and  non-­‐compliance  with  standard  in  code,  not  suggesting  how  to  correct  these.    

(iii) After  inspection  completes,  programmer  corrects  the  identified  problems.  (iv) In  the  follow-­‐up  stage,  moderator  must  decide  whether  re-­‐inspection  of  code  is  needed.  (v) Lastly,  the  document  is  approved  by  the  moderator  for  release.  

(e) Inspection  Checks  (also  Automated  Static  Analysis  Checks):  (i) Data  Faults:  Variables  initialised  before  their  values  are  used?  Etc.  (ii) Control  Faults:  Condition  statements  correct?  Is  each  loop  certain  to  terminate?  Etc.  

(iii) Input/Output  Faults:  All  input  variables  used?  Output  variables  assigned  to  a  value?  Etc.  (iv) Interface  Faults:  Correct  No.  of  Parameters  for  functions?  Parameter  types  match?  Etc.  (v) Storage  Management  Faults:  Have  all  links  been  correctly  reassigned  after  modification?  Etc.  

(vi) Exception  Management  Faults: Have  all  possible  error  condition  been  taken  into  account?    

(4) Automated  Static  Analysis:    

(a) Static  Program  Analysers:  Software  tools  that  are  used  to  scan  the  source  text  of  a  program  and  detect  possible  faults  and  abnormalities.    

(b) 5  Stages  of  Static  Analysis    (i) Control  Flow  Analysis:  Looks  for  loops  with  multiple  exit  or  entry  points  and  unreachable  code.    (ii) Data  Use  Analysis:  This  stage  emphasises  how  variables  in  the  program  are  used.  

(iii) Interface  Analysis:  Inspects  the  consistency  of  routine  and  procedure  declarations  and  their  use.    (iv) Information  Flow  Analysis  The  process  of  identifying  the  dependencies  between  input  variables  

and  output  variables.  

(v) Path  Analysis  This  semantic  phase  detects  all  possible  paths  through  the  program  and  creates  the  statements  executed  in  that  path.  

Page 22: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  22  

f) Cleanroom  Software  Development:  Software  

development  philosophy  that  uses  a  rigorous  inspection  process  to  avoid  software  defect.  Its  purpose  is  to  produce  zero-­‐defect  software.  

i) 5  Main  Characteristics  of  Cleanroom  SD  

(1) Formal  Specification:  The  software  that  will  be  developed  is  formally  specified.    

(2) Incremental  Development:  The  software  is  divided  into  increments,  developed  and  validated  separately.  

(3) Structured  Programming:  Where  only  partial  number  of  control  and  data  abstraction  constructs  are  used.    

(4) Static  Verification:  The  software  being  developed  is  statically  verified  using  rigorous  software  inspections.    (5) Statistical  Testing  of  the  System:  In  order  to  determine  the  reliability  of  integrated  software  increment,  it  

is  tested  statistically,  derived  from  an  operational  profile,  developed  in  line  with  the  system  specification.  

ii) Cleanroom  Process  Teams:  

(1) Specification  Team:  Responsible  for  developing  and  maintaining  system  specifications.  

(2) Development  Team:  Responsible  for  Developing  and  Verifying  the  software.  

(3) Certification  Team:  Responsible  for  developing  statistical  tests  to  test  the  software  as  it  is  developing.    

10) Software  Testing:  a) Defect  testing:  Discover  hidden  defects  in  the  

software  system  before  it  is  delivered  to  customer.    (1) A  successful  defect  test  is  a  test  which  will  

cause  the  system  to  perform  improperly  and  

then  reveal  a  defect.  (2) Test  Cases:  Specifications  of  test  inputs,  expected  system  output  with  a  statement  of  what  is  being  tested.  

(3) Guidelines  for  Testing:  (a) All  system  functions  that  are  linked  through  menus  must  be  tested.  (b) Combinations  of  functions  must  be  tested.  Eg:  text  formatting  that  is  linked  

through  the  same  menu  (c) If  user  input  is  required  by  system,  all  functions  are  tested  with  both  correct  

and  incorrect  input.  

ii) Exhaustive  Testing:  Testing  every  program  execution  sequence  (This  is  impractical).  iii) Defect  Testing  Techniques:  

(1) Black-­‐Box  (Functional)  Testing:  Tests  are  designed  based  on  the  program  or  

component  specification.  The  tester  gives  input  to  the  component  or  the  system  and  examines  the  corresponding  outputs.  If  the  outputs  are  not  as  expected,  then  a  problem  has  been  detected.  It  does  not  require  access  to  source  code  

(2) Equivalent  Partitioning:  A  way  of  building  test  cases,  which  depends  on  finding  partitions  in  the  input  and  output  data  sets  and  running  the  program  with  values  from  these  partitions.  Tests  are  successful  if  program  handles  

invalid  output  groups  successfully.    (a) Input  Equivalence  Partitions:  Sets  of  data  where  all  set  members  must  be  

processed  in  equivalent  way.  

(b) Output  Equivalence  Partitions:  Program  outputs,  which  have  common  characteristics  so  it  can  be  considered  as  a  separate  class.  

(3) Structural  (White-­‐Box,  Glass-­‐Box,  Clear-­‐Box)  Testing:  Tests  are  derived  from  knowledge  of  software’s  

structure  and  implementation.  Purpose  of  structural  testing  is  to  make  sure  each  independent  program  path  is  executed  at  least  once.  

(a) Applied  to  small  program  units:  Subroutine  or  operations  related  with  an  object.  

Page 23: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  23  

(b) Code  Analysis:  Used  to  find  out  how  many  test  cases  are  needed  to  make  sure  that  all  of  the  

statements  in  program  or  component  are  executed  at  least  once.  

(4) Path  testing  is  a  structural  testing  strategy  and  its  objective  is  to  implement  every  independent  execution  path  through  a  component  

or  program.    (a) If  every  independent  path  is  executed  then  all  statements  in  the  

component  should  have  been  executed  at  least  once.  

(b) Used  at  the  unit  testing  and  module  testing  stages  of  the  testing  process.  

(c) Skeletal  Model:  A  starting  point  testing,  a  program  flow  graph,  

which  consists  of  all  paths  through  the  program.  (d) No.  of  Independent  Paths  in  a  program  can  be  found  by  

computing  the  Cyclomatic  Complexity  (CC)  of  any  connected  

graph  (G)  and  it  can  be  computed  according  to  the  following:    

 b) Integration  Testing:  A  process  that  involves  building  the  system  and  testing  the  

complete  system  for  problems  that  are  caused  by  component  interactions.  

Integration  tests  should  be  built  from  the  system  specification.    

(1) Main  problem:  Localising  errors  found  during  the  process.  

ii) Incremental  Approach:  Used  to  make  it  easier  to  locate  errors,  minimal  system  configuration  is  integrated  and  tested.  Then  add  components  to  this  minimal  configuration  and  test  after  each  added  increment.  

iii) Top-­‐Down  and  Bottom-­‐Up  Testing:    

(1) Top-­‐down  testing  is  an  essential  part  of  a  top-­‐down  development  process  where  the  development  process  begins  with  high-­‐level  

components  and  goes  down  to  the  components  hierarchy.  

(2) Bottom-­‐up  testing  

involves  integrating  and  testing  the  modules  at  the  lower  levels  in  the  

hierarchy,  and  then  goes  up  the  hierarchy  of  modules  until  the  final  module  is  tested.  

iv) Interface  Testing:  To  detect  errors  that  could  be  introduced  into  the  system  because  of  interface  errors  or  invalid  input  to  the  interfaces.  Very  important  for  Object-­‐Oriented  development.  

(1) Types  of  Interface  Errors:  (a) Parameter  Interfaces:  Data  passed  from  one  procedure  to  another.    (b) Shared  Memory  Interfaces:  Block  of  memory  is  shared  between  procedures    (c) Procedural  Interfaces:  Subsystem  encapsulates  a  set  of  procedures  to  be  called  by  other  sub-­‐systems.    

(d) Message  Passing  Interfaces:  Subsystems  request  services  from  other  subsystems.  

(2) Classes  (Three  Categories)  of  Interface  Errors:  (a) Interface  Misuse:  Calling  component  calls  another  component  later  making  error  in  interface  usage.  (b) Interface  Misunderstanding:  Calling  component  misunderstands  the  interface  specification  of  the  

called  component,  and  makes  wrong  assumption  about  the  behaviour  of  the  called  component.  

(c) Timing  Errors:  Occur  in  real-­‐time  systems  using  shared  memory,  or  message  passing  interface.  v) Stress  Testing:  Planning  a  series  of  tests  where  the  load  is  steadily  increased  until  the  system  performance  

become  unacceptable.  

Page 24: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  24  

c) Testing  Workbench  Tools:  

i) Test  Manager:  Used  to  manage  the  execution  of  program  tests.    ii) Test  Data  Generator:  This  is  used  to  generate  test  data  for  the  

program  to  be  tested.    

iii) Oracle:  Used  to  generate  predictions  of  expected  test  results.    iv) File  Comparator:  Used  to  compare  the  results  of  program  tests  

with  previous  test  results  and  reports  differences  between  them.    

v) Report  Generator:  Used  to  provide  report  definition  and  generation  facilities  for  test  results.    

vi) Dynamic  Analyser:  Used  to  add  code  to  a  program  to  count  how  many  times  each  statement  had  executed.    

vii) Simulator:    

(1) Target  simulators  simulate  the  machine  where  program  will  be  executed.    

(2) User  interface  simulators  are  script-­‐driven  programs  that  simulate  multiple  simultaneous  user  interactions.  

 

11) Process  Improvement  and  Software  Quality  Assurance:  a) Process  improvement:  includes  process  analysis,  standardisation,  measurement  and  change.  

 

b) Process  Characteristics:  i) Understandability  To  what  extent  is  the  process  explicitly  defined  and  how  easy  is  it  to  understand  definition?    ii) Visibility  Do  the  process  activities  culminate  in  clear  results,  so  that  progress  of  process  is  externally  visible?    

iii) Supportability  To  what  extent  can  the  process  activities  be  supported  by  CASE  tools?    iv) Acceptability  Is  the  defined  process  acceptable  to  and  usable  by  the  engineers  for  producing  the  software?    v) Reliability  Is  process  designed  so  that  process  errors  are  avoided  or  trapped  before  resulting  in  product  errors?    

vi) Robustness  Can  the  process  continue  in  spite  of  unexpected  problems?    vii) Maintainability  Can  the  process  evolve  to  reflect  changing  organisational  requirements?    

viii) Rapidity  How  fast  can  the  process  of  delivering  a  system  from  a  given  specification  be  completed?    

c) Process  Improvement  Procedure:  

i) Process  Analysis:  Includes  the  activities  of  checking  existing  processes  and  producing  a  process  

model  in  order  to  document  and  understand  the  process.    

ii) Improvement  Identification:  Using  

the  process  analysis  results  to  identify  quality,  schedule  or  cost  problems  where  process  factors  might  influence  the  product  quality.    

iii) Process  Change  Introduction:  Introducing  new  procedures,  methods,  

and  tools  and  integrating  them  with  other  process  activities.    iv) Process  Change  Training:  It  is  impossible  to  get  the  full  benefits  from  

process  changes  without  training.    

v) Change  Tuning:  When  minor  problems  are  discovered;  modifications  to  the  process  are  proposed  and  are  introduced.  Should  continue  for  several  months  until  software  engineers  are  satisfied  with  new  

process.    

d) Purpose  of  process  improvement:  To  reduce  the  No.  of  product  defects.  

e) Large  Projects:  The  main  factor  of  products  quality  is  the  software  process  i) Biggest  problems  with  large  projects:  Integration,  project  

management  and  communications.  

f) Small  Projects:  The  quality  of  the  development  team  is  more  important  than  the  development  process  used.  

Page 25: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  25  

g) Process  Analysis  &  Modeling:  Require  studying  existing  processes  and  developing  an  abstract  model  of  these  

processes  that  identifies  their  main  characteristics.  i) Process  Analysis:  The  study  of  existing  processes  

to  know  relationships  between  different  parts  of  

the  process.  ii) Process  Analysis  Techniques:  

(1) Questionnaires  &  Interviews:  Asking  software  engineers  on  the  project  about  what  happens  in  the  project.  The  answered  to  which  are  then  used  during  personal  

interviews  with  those  involved  in  the  process.  

(2) Ethnographic  Studies:  Used  to  understand  the  nature  of  software  development  as  a  

human  activity.  iii) Process  Model  Elements:    è  iv) Process  Exceptions:  examples  of  

exception  types  that  a  project  manager  must  handle  are:  

(1) Several  important  people  

become  ill  at  the  same  time  just  before  an  important  project  review.  

(2) A  communications  line  or  network  failure  that  causes  electronic  mail  cannot  be  

used  for  several  days.  

(3) An  organisational  reorganisation  that  cause  the  

managers  to  spend  most  of  their  time  working  on  organisational  matters  rather  

than  on  project  management.  

(4) An  unexpected  request  for  new  project  proposals  being  made.  Instead  of  

concentrating  on  the  project,  the  team  has  to  work  on  a  proposal.  

 h) Process  Measurement:  Consist  of  quantitative  data  about  the  software  process.  

i) Process  Metrics:  Can  be  used  to  assess  whether  or  not  the  efficiency  of  a  process  has  been  improved.  

(1) Three  Classes  of  Process  Metrics:  (a) Time  Taken  for  a  Particular  Process  to  be  completed.  Eg:  Total  time  dedicated  to  the  process.  (b) Resources  Required  for  a  particular  process.  Eg:  Total  effort  in  person-­‐days.  (c) Number  of  Occurrences  of  a  particular  event.  Eg:  No  of  errors  found  during  code  inspection.    

 

Page 26: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  26  

ii) Goal-­‐Question-­‐Metric  (GQM)  paradigm:  Used  to  help  the  developers  to  decide  what  measurements  should  be  

taken  and  how  they  should  be  used  

(1) GQM  Measurement:  (a) Goals:  What  is  the  organisation  trying  to  achieve?  The  objective  of  process  improvement  is  to  satisfy  

these  goals.  (b) Questions:  Questions  about  areas  of  uncertainty  related  to  the  goals.  You  need  process  knowledge  to  

derive  these.  

(c) Metrics:  Measurements  to  be  collected  to  answer  the  questions.  

(2) Advantage  GQM:    (a) It  separates  organisational  concerns  or  goals  from  specific  process  concerns  or  questions.    

(b) It  focuses  on  data  collection  and  proposes  that  collected  data  should  be  analysed  in  different  ways  depending  on  the  question  it  should  answer.  

iii) SEI  Software  Capability  Maturity  Model  (CMM):    

(1) Categorises  software  processes  as:    (a) Initial:  Essentially  uncontrolled  (b) Repeatable:  Product  management  

procedures  defined  and  used  (c) Defined:  Process  management  procedures  

and  strategies  defined  and  used  (d) Managed:  Quality  management  strategies  

defined  and  used  

(e) Optimising:  Process  improvement  strategies  defined  and  used  

(2) Three  problems  in  CMM:  

(a) The  model  focuses  entirely  on  project  management  rather  than  product  development.  (b) It  does  not  include  risk  analysis  and  

resolution  as  key  process  

(c) The  area  of  applicability  of  the  model  is  not  defined.  

(3) Capability  Assessment:  Relies  on  a  

standard  questionnaire  that  is  intended  to  identify  the  main  processes  in  the  organisation.    

(4) Six  Sigma  strategy  is  a  rigorous  and  disciplined  methodology  that  uses  data  and  statistical  analysis  to  measure  and  improve  a  company’s  operational  performance  by  identifying  and  eliminating  ‘defects’  in  

manufacturing  and  service-­‐related  processes.  (a) 3  Core  Steps:  

(i) Define  customer  requirements,  deliverables  and  project  goals  via  well-­‐defined  methods  of  

customer  communication.  (ii) Measure  the  existing  process  and  its  output  to  determine  current  quality  performance.  (iii) Analyse  defect  metrics  and  determine  causes.  

(b) 2  Additional  Steps  Suggested  for  existing  software  processes  in  place  (DMAIC)  (i) Improve  the  process  by  eliminating  the  root  causes  of  defects.  (ii) Control  the  process  to  ensure  that  future  work  does  not  reintroduce  the  causes  of  defects.  

(c) 2  Additional  Steps  Suggested  for  if  an  organisation  is  developing  a  software  process  (DMADV)  (i) Design  the  process  to:  

1. Avoid  the  root  causes  of  defects  

2. Meet  customer  requirements.  (ii) Verify  that  the  process  model  will  avoid  defects  and  meet  customer  requirements.  

Page 27: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  27  

(5) ISO  9000  Quality  Standard:  Describes  a  quality  assurance  system  in  general  that  can  be  applied  to  any  

business  regardless  of  the  products  or  services  offered.  (a) ISO  9001:2000:  The  quality  assurance  standard  that  applies  to  software  engineering.  The  standard  

contains  20  requirements  that  must  be  present  for  an  effective  quality  assurance  system.  

(b) ISO  9000-­‐3:  Developed  to  help  interpret  the  standard  for  use  in  the  software  process  because  the  ISO  9001:2000  standard  is  applicable  to  all  engineering  disciplines.    

i) Process  Classification:  Different  types  of  Processes:  i) Informal  Processes  These  are  the  

processes  where  there  is  no  strictly  

defined  and  clear  process  model  required.    

ii) Managed  Processes  These  are  the  

processes  where  there  is  a  defined  process  model  prepared.  This  is  used  to  guide  the  development  process.    

iii) Methodical  Processes  These  are  the  processes  where  some  defined  development  method  or  methods  like  

systematic  methods  for  object-­‐oriented  design  are  used.    iv) Improving  Processes  These  are  the  processes  that  have  inherent  improvement  objectives.  There  is  a  specific  

budget  for  process  improvements  and  procedures  ready  for  introducing  such  improvements.    

12) Software  Change:  a) Three  Different  Strategies  for  Software  Change:  i  

i) Software  Maintenance:  Changes  to  the  software  are  made  to  response  to  the  requirements  change  but  the  

basic  structure  of  the  software  remains  stable.  This  is  the  most  frequent  approach  used  to  system  change.    ii) Architectural  Transformation:  This  is  a  very  drastic  software  change  approach  compared  to  maintenance  

because  it  involves  making  major  changes  to  the  architecture  of  the  software  system.  For  example,  systems  

change  from  a  centralised,  data-­‐centric  architecture  to  client-­‐server  architecture.    iii) Software  Reengineering:  In  this  strategy,  the  system  is  modified  to  make  it  easier  to  understand  and  change.    

b) Configuration  Management:  The  management  of  changing  software  products.  

c) Program  evolution  dynamics:  The  study  of  system  change.  d) Lehmans  Laws:  

i) Continuing  Change:  A  program  that  is  used  in  a  real-­‐world  environment  necessarily  must  change  or  become  progressively  less  useful  in  that  environment.    

ii) Increasing  Complexity:  As  an  evolving  program  changes,  its  structure  tends  to  become  more  complex.    

iii) Large  Program  Evolution:  Program  evolution  is  a  self-­‐regulating  process.  System  attributes  such  as  size,  time  between  releases  and  the  numbers  of  reported  errors  are  approximately  invariant  for  each  to  system  release.  

iv) Organisational  Stability:  Over  a  program’s  lifetime,  its  rate  of  development  is  approximately  constant  and  

independent  of  the  resources  devoted  to  system  development.    v) Conservation  of  Familiarity:  Over  the  lifetime  of  the  system,  the  incremental  change  in  each  release  is  

approximately  constant.  

e) Software  maintenance  is  the  normal  process  of  changing  a  system  after  it  has  been  delivered.  i) Types  of  Maintenance:  

(1) Maintenance  to  Repair  Software  Faults  (Bug  Fixing):  Coding  errors  is  normally  inexpensive;  design  errors  

are  more  costly.  Requirements  errors  are  the  most  expensive  to  be  repaired.    

(2) Maintenance  to  Adapt  the  Software  to  a  Different  Operating  Environment:  This  maintenance  type  is  needed  when  some  aspect  of  the  system’s  environment  such  as  the  hardware,  the  platform  operating  

system  or  other  support  software  changes.  

(3) Maintenance  to  Add  to  OR  Modify  the  System’s  Functionality:  This  type  of  maintenance  is  essential  when  the  system  requirements  change  in  line  with  organisational  or  business  change.    

Page 28: SE Module Summary (FULL) - OUM Students from Maldives · PDF file , Page5, e) Software+Verificationand+Validation:,Intendedtoshow,that,a,system,conformsto,itsspecification,and,meets,the,

www.oumstudents.tk  Page  28  

ii) Overall  lifetime  costs  can  be  reduced  if  more  effort  is  given  during  

system  development  to  produce  a  maintainable  system.    iii) One  main  reason  why  maintenance  costs  are  high  is  that  it  is  more  

expensive  to  add  functionality  after  a  system  is  already  in  operation  

than  to  implement  the  same  functionality  during  development.  iv) The  Main  Factors  that  Differentiate  Development  and  Maintenance  that  Lead  to  Higher  Maintenance  Costs:  

(1) Team  Stability:  After  a  system  has  been  released  to  users,  usually  the  development  team  will  disintegrate  

and  they  will  work  on  new  projects.    

(2) Contractual  Responsibility:  The  contract  to  maintain  a  system  is  normally  different  from  the  system  development  contract.    

(3) Staff  Skills:  Maintenance  staffs  are  usually  inexperienced  and  unfamiliar  with  the  application  area.    

(4) Program  Age  and  Structure:  As  programs  grow  old,  their  structure  is  likely  to  be  degraded  by  change  and  

they  become  harder  to  understand  and  change.    v) Maintenance  Process:  Different  between  one  

organisation  to  another  depending  on  the  

software  being  maintained  as  well  as  the  development  processes  used  in  an  organisation  and  the  people  involved  in  the  process  

(1) Change  requests:  Requests  for  system  

changes  from  users,  customers  or  

management.  

(2) 3  Reasons  that  some  change  requests  must  be  implemented  urgently:  

(a) Fault  repair  (b) Changes  to  the  system’s  environment  (c) Urgently  required  business  changes  

vi) Maintenance  Prediction:  Maintenance  prediction  is  concerned  with  assessing  which  parts  of  the  system  may  cause  problems  and  

have  high  maintenance  costs  

(1) Predicting  the  number  of  changes  requires  and  understanding  of  the  relationships  

between  a  system  and  its  environment.  

(2) Tightly  coupled  systems  require  changes  whenever  the  environment  is  changed.  

(3) Factors  influencing  this  relationship  are  (a) Number  and  complexity  of  system  

interfaces;  

(b) Number  of  inherently  volatile  system  requirements;  

(c) The  business  processes  where  the  system  is  used.  

(4) Process  measurements  may  be  used  to  assess  maintainability  (a) Number  of  requests  for  corrective  maintenance;  

(b) Average  time  required  for  impact  analysis;  (c) Average  time  taken  to  implement  a  change  request;  (d) Number  of  outstanding  change  requests.  

(5) If  any  or  all  of  these  is  increasing,  this  may  indicate  a  decline  in  maintainability