Contents
•
Installation of SDR, Rectifier, Battery a• Fixing of brackets, ODU, RRU with PIM
• Cabling, grounding and labeling
• View and neatness of site
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
3/45
© ZTE Corporation. All rights reserved.
Installation of new U steel •
•
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
4/45
© ZTE Corporation. All rights reserved.
Installation of SDR and Rectifier Cabinets •
•
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
5/45© ZTE Corporation. All rights reserved.
Installation of SDR, Rectifier, Battery for macro site
• All ancient should be sSDR, rectifibattery for
• All equipmeshould be innew U stee
• Each rack oshall be inst
and reliablyas per desig
• Ensure equcan be openfreely afterrack installa
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
6/45© ZTE Corporation. All rights reserved.
Installation of SDR for distributed site
• Ancbe for
• SDRinststeequ
• Racinstreli
as pdra
• Enscanopefree
inst
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
7/45© ZTE Corporation. All rights reserved.
Installation of MW IDU• IDU
shofirm
scrrecforsite
• IDU
shofirmscrrecfor
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
8/45© ZTE Corporation. All rights reserved.
Contents
• Installation of SDR, Rectifier, Battery and IDU
• Fixing of brackets, ODU, RRU with PIMDC
• Cabling, grounding and labeling
• View and neatness of site
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
9/45
© ZTE Corporation. All rights reserved.
Fixing of ODU brackets, ODU
• ODU brackfixed firmlybolts on m
of tower inper design
• ODU of NEfixed firmly
brackets inper design
• Plain washwasher, numissing.
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
10/45
© ZTE Corporation. All rights reserved.
Fixing of ODU brackets, ODU
• The brack
on the tow
be mountand fully w
washer, sp
and twin n
according engineerin
drawing.
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
11/45
© ZTE Corporation. All rights reserved.
Fixing of ODU Side strut at Tower
• Horizonta
support sh
installed fantenna o
This horizo
suspensio
must be inalong the
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
12/45
© ZTE Corporation. All rights reserved.
Fixing of RRU brackets, RRU with PIMDC
• RRU brbe fixeU bolts
materipositiodrawin
• RRU wshouldfirmly o
brackeas per drawin
• Plain wwashebe mis
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
13/45
© ZTE Corporation. All rights reserved.
Fixing of RRU brackets, RRU with PIMDC
• RRU bracbe fixed bolts on
of towerper desig
• RRU withbe fixed RRU brac
position drawings
• Plain waswasher, missing.
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
14/45
Contents
• Installation of SDR, Rectifier, Battery an
• Fixing of brackets, ODU, RRU with PIM
• Cabling, grounding and labeling
• View and neatness of site
bl f
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
15/45
© ZTE Corporation. All rights reserved.
Cabling of RRU, PIMDC
• Ground cable of
should be separa
to bus bar, if no
available within be grounded reli
brace of tower th
for angular towe
• For tubular towe
should be conneRRU/MW mount
• Grounding cable
connected from
PIMDC ,then fro
tower via C-clam
C bli di d l b li f RRU
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
16/45
© ZTE Corporation. All rights reserved.
Cabling, grounding and labeling of RRU
• All connectors of RRU shoufrom the bottom up as perinsulating tape + 3 layers o
insulating plaster + 3 layertape.
• Ground cable of RRU/PIMDshould be separately connbar, if no bus bar is availab
then should be grounded wmaterial of tower through
• All labels for outdoor site mprivate outdoor plastic lablabels 200mm away from t
R8860E
C bli di d l b li f RRU PIMDC
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
17/45
© ZTE Corporation. All rights reserved.
Cabling, grounding and labeling of RRU, PIMDC
PIMDCR8882• All connectors of R
wrapped from the
1 layer of insulatin
of waterproof insulayer of insulating
• Ground cable of R
dish should be sep
to bus bar, if no bu
within 5m then sh
reliably with main through C-clamp.
• All labels for outdo
ZTE private outdoo
with the labels 200
the RRU.
C ti & d t t bl i RRU ith P
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
18/45
© ZTE Corporation. All rights reserved.
Connecting power & dry contact cables in RRU with P
• Connect the A-end of the power cable to the Device Side on the PIMDC: c
cable to -48V port and connect the black cable to -48VRTN port. Connect
blue dry contact cables to the Alarm ports.
•
Connect the B-end of the power cable to the PWR port of the RRU, and t
W t fi f O td J C bl
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
19/45
© ZTE Corporation. All rights reserved.
Waterproofing of Outdoor Jumper Cable
• Spiral-wrap one layer of insulating adhesive tape: After the feeder is connected, spir
insulating adhesive tape around the connector with 50% overlapping, ensuring that
mm insulating adhesive tape is reserved at the tail of the connector. Remember tha
proper force while spiral-wrapping the insulating tape.
• Spiral-wrap three layers of waterproof adhesive tape: Stretch the waterproof adhes
as long as its original length. Use approximately 50 cm waterproof adhesive tape for
Spiral-wrap three-layer waterproof adhesive tape around the connector in the direc
tighten the feeder. This can protect the feeder from being loosened during the spira
Smooth over the waterproof adhesive tape by applying proper force to secure it on
Cabling and labeling of jumper connected to GSM ant
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
20/45
© ZTE Corporation. All rights reserved.
Cabling and labeling of jumper connected to GSM ant
• The jumper connector to GSMshould be wrapped from the bper 1 layer of insulating tape +
waterproof insulating plaster +insulating tape.
• Near the connector of a jumpeantenna, the jumper should kefor 300mm.
•
Extra jumper should be routed• All labels for outdoor site must
private outdoor plastic labels, labels 200mm away from the bantenna.
Cabling of optical fibers
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
21/45
© ZTE Corporation. All rights reserved.
Cabling of optical fibers
• The power cable is bundseparately from signal cafibers with a spacing of m
3cm in between. No crooverlapping or inter-twi
• Extra Optical fiber to be properly for each sectoron top of horizontal laddsector wise.
• For Optical fiber connecto RSU use the rack specfor routing between 2 ra
Lack of blue cable
Fiber routing hole
Cabling of optical fibers
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
22/45
© ZTE Corporation. All rights reserved.
Cabling of optical fibers
• The power caand laid separsignal cables awith a spacing3cm in betweor overlappingis allowed.
• For ZXSDR BS8side of rack to
Optical fibers there is main main groundin
• All the cables properly tie uinside cabinet
Cabling of optical fibers
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
23/45
© ZTE Corporation. All rights reserved.
Cabling of optical fibers
• The optical fibers are conn
correct sectors.
• The bends of optical fibers
smooth and consistent, wradius at least 20 times th
external diameter.
• Optical fibers should not i
when they are laid.
• Outdoor optical fibers sho
with a proper tightness tocables moving flexibly in t
• Fiber in the cabinet should
covered with protective fl
• All labels for must be ZTE
plastic labels.
Cabling of optical fibers
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
24/45
© ZTE Corporation. All rights reserved.
Cabling of optical fibers
• The power cable islaid separately froand tail fibers withmore than 3cm in crossing or overlaptwist is allowed.
• Extra Optical fiberproperly for each placed on top of h
ladder in series se• Outdoor optical fib
bundled with a proto prevent the cabflexibly in the ties.
S1-OPR
S2-OPR
S3-OPR
Outdoor Labeling of ODU Dish IF and Grounding Cable
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
25/45
© ZTE Corporation. All rights reserved.
Outdoor Labeling of ODU,Dish IF and Grounding Cable
• The connec
IF cable sho
labeled to
cable lengt
Tx/Rx routi
• ODU, Dish,
IF cables sh
labeled at
20mm
• Metallic la
used on ou
IF Cable Laying
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
26/45
© ZTE Corporation. All rights reserved.
IF Cable Laying
• Before con
leave more
cable as th
IF cable sho
orderly and
looking, wi
intersectio
damage, anwith fixing
intervals of
IF Power grounding cable IDU and circuit breaker lab
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
27/45
© ZTE Corporation. All rights reserved.
IF, Power ,grounding cable ,IDU and circuit breaker lab
• Proper label
on IF, Groun
IDU, Modem
Breakers as p
standards
• Proper Sleev
be done on I
Grounding c
Power cable
• Link Budget for each link
and standard
Routing and colors of power cable & grounding cable
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
28/45
© ZTE Corporation. All rights reserved.
Routing and colors of power cable & grounding cable
• New A
be pro
to the
The bushould
below
condu
AC ca
Cabling & labeling of DC cables between SDR and REC
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
29/45
© ZTE Corporation. All rights reserved.
Cabling & labeling of DC cables between SDR and REC
• The powershould be cby copper
connectingrectifier anthen fixed ensure sou
• DC cable oshould be printing labaway from
SDR RECNo Label
No Label
Breaker distribution of SDR cabinet
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
30/45
© ZTE Corporation. All rights reserved.
Breaker distribution of SDR cabinet
• Connections tcabinet shoulto numberingleft to right is
following.a. Breaker slo
RRUs accord
b. Breaker slo
c. Breaker slo
• DC cable of ca
pasted printinaway from the
• All the modulwithout manushould be labe
Cabling & labeling of DC cables between SDR and PIM
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
31/45
© ZTE Corporation. All rights reserved.
Cab g & abe g o C cab es bet ee S a d
• DC cable bcabinet andshould be f
outdoor plthe end.
• The powershould be ithe turningshould be awith consisradius overless than 2cable’s extediameter).
SDR RECPIMDC
Grounding of DC cables between SDR and PIMDC
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
32/45
© ZTE Corporation. All rights reserved.
g
• DC cable betw
and PIMDC sho
private outdo
the end.
• DC cable betw
and PIMDC sh
with ground cl
the same as di
cable groundin
•DC Ground clipwrapped from
per 1 layer of i
layers of wate
plaster + 3 laye
tape with prop
Grounding of IF Cables and BTS
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
33/45
© ZTE Corporation. All rights reserved.
g
• There shouldoubling onspace availacable can be
other side o• Upon comp
all connectiochecked for contact. Chedone on bol
clamps, sleeand all hardto the bondelements ofnetwork.
SDR
Fiber and DC cables routing
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
34/45
© ZTE Corporation. All rights reserved.
g
• The power ca
and laid sepa
signal cables
with a spacin3cm in betwe
or overlappin
is allowed.
• The wiring is
uniform, cabcabinet is pe
within 1m wi
and twisting.
Outdoor cables near cabinet
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
35/45
© ZTE Corporation. All rights reserved.
• Outdoor cab
equipment
flexible pipe
with proper200mm.
• GI Flexible p
in accordan
of the cable
• Length of G
should be at
under the B
Outdoor cables near cabinet
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
36/45
© ZTE Corporation. All rights reserved.
• The prot
Flexible
tied withprotecti
• Silicon f
should bboth the
Flexible.
Cables Inlet and Outlet
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
37/45
© ZTE Corporation. All rights reserved.
• The cable
holes of c
should beproperly.
• Use prop
Roxtec in
with the ediameter
REC
SDR
Fiber Protection and Jumpers Routing
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
38/45
© ZTE Corporation. All rights reserved.
• The cable-th
should be se
• The cable co
fixing reliabl
•The pigtail shor intersecti
couple pigta
proper force
• The pigtails c
strap ring, rig
turning is str
• There shouldpressing on t
bending diam
than 80mm.
• The protecti
with anti-cut
No Protection
Tube on Fiber
Protection Tube
on Fiber
Labeling
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
39/45
© ZTE Corporation. All rights reserved.
• PowegrounE1 calabel
Thesepasteneatlposit20mm
• All thcablemanushouper Tstand
No Protection
Tube on Fiber
Heat-Shrink Tube
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
40/45
© ZTE Corporation. All rights reserved.
• The cop
termina
put up
shrink t
wrappe
least tw
adhesiv
tape.
No Protection
Tube on Fiber
Heat Shrink
TubesHeat Gun Not
Used
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
41/45
Contents
• Installation of SDR, Rectifier, Battery an
• Fixing of brackets, ODU, RRU with PIM
• Cabling, grounding and labeling
• View and neatness of site
View and neatness of the ground for distributed site
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
42/45
© ZTE Corporation. All rights reserved.
• The site
clean an
such sun
waste pa
should b
• The surp
such as e
black ouscrews, a
dross sh
removed
Removed!
View of the ground for macro site
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
43/45
© ZTE Corporation. All rights reserved.
• The site
clean an
such sun
waste pa
should b
• The surp
such as e
black ouscrews, a
dross sh
removed
View of the tower for distributed site
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
44/45
© ZTE Corporation. All rights reserved.
•
•
8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)
45/45
www.zte.com.cn