SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

Embed Size (px)

Citation preview

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    1/45

    SDR Site Installation Standards Fo

    Telenor Vega Swap Project(V1.0)

    Zhongxing Telecom Pakistan(Pvt.) LTD

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    2/45

    Contents

    Installation of SDR, Rectifier, Battery a• Fixing of brackets, ODU, RRU with PIM

    • Cabling, grounding and labeling

    • View and neatness of site

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    3/45

    © ZTE Corporation. All rights reserved.

    Installation of new U steel •

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    4/45

    © ZTE Corporation. All rights reserved.

    Installation of SDR and Rectifier Cabinets •

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    5/45© ZTE Corporation. All rights reserved.

    Installation of SDR, Rectifier, Battery for macro site

    • All ancient should be sSDR, rectifibattery for

    • All equipmeshould be innew U stee

    • Each rack oshall be inst

    and reliablyas per desig

    • Ensure equcan be openfreely afterrack installa

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    6/45© ZTE Corporation. All rights reserved.

    Installation of SDR for distributed site

    • Ancbe for

    • SDRinststeequ

    • Racinstreli

    as pdra

    • Enscanopefree

    inst

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    7/45© ZTE Corporation. All rights reserved.

    Installation of MW IDU• IDU

    shofirm

    scrrecforsite

    • IDU

    shofirmscrrecfor

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    8/45© ZTE Corporation. All rights reserved.

    Contents

    • Installation of SDR, Rectifier, Battery and IDU

    • Fixing of brackets, ODU, RRU with PIMDC

    • Cabling, grounding and labeling

    • View and neatness of site

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    9/45

    © ZTE Corporation. All rights reserved.

    Fixing of ODU brackets, ODU

    • ODU brackfixed firmlybolts on m

    of tower inper design

    • ODU of NEfixed firmly

    brackets inper design

    • Plain washwasher, numissing.

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    10/45

    © ZTE Corporation. All rights reserved.

    Fixing of ODU brackets, ODU

    • The brack

    on the tow

    be mountand fully w

    washer, sp

    and twin n

    according engineerin

    drawing.

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    11/45

    © ZTE Corporation. All rights reserved.

    Fixing of ODU Side strut at Tower

    • Horizonta

    support sh

    installed fantenna o

    This horizo

    suspensio

    must be inalong the

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    12/45

    © ZTE Corporation. All rights reserved.

    Fixing of RRU brackets, RRU with PIMDC

    • RRU brbe fixeU bolts

    materipositiodrawin

    • RRU wshouldfirmly o

    brackeas per drawin

    • Plain wwashebe mis

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    13/45

    © ZTE Corporation. All rights reserved.

    Fixing of RRU brackets, RRU with PIMDC

    • RRU bracbe fixed bolts on

    of towerper desig

    • RRU withbe fixed RRU brac

    position drawings

    • Plain waswasher, missing.

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    14/45

    Contents

    • Installation of SDR, Rectifier, Battery an

    • Fixing of brackets, ODU, RRU with PIM

    • Cabling, grounding and labeling

    • View and neatness of site

    bl f

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    15/45

    © ZTE Corporation. All rights reserved.

    Cabling of RRU, PIMDC

    • Ground cable of

    should be separa

    to bus bar, if no

    available within be grounded reli

    brace of tower th

    for angular towe

    • For tubular towe

    should be conneRRU/MW mount

    • Grounding cable

    connected from

    PIMDC ,then fro

    tower via C-clam

    C bli di d l b li f RRU

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    16/45

    © ZTE Corporation. All rights reserved.

    Cabling, grounding and labeling of RRU

    • All connectors of RRU shoufrom the bottom up as perinsulating tape + 3 layers o

    insulating plaster + 3 layertape.

    • Ground cable of RRU/PIMDshould be separately connbar, if no bus bar is availab

    then should be grounded wmaterial of tower through

    • All labels for outdoor site mprivate outdoor plastic lablabels 200mm away from t

    R8860E

    C bli di d l b li f RRU PIMDC

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    17/45

    © ZTE Corporation. All rights reserved.

    Cabling, grounding and labeling of RRU, PIMDC

    PIMDCR8882• All connectors of R

    wrapped from the

    1 layer of insulatin

    of waterproof insulayer of insulating

    • Ground cable of R

    dish should be sep

    to bus bar, if no bu

    within 5m then sh

    reliably with main through C-clamp.

    • All labels for outdo

    ZTE private outdoo

    with the labels 200

    the RRU.

    C ti & d t t bl i RRU ith P

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    18/45

    © ZTE Corporation. All rights reserved.

    Connecting power & dry contact cables in RRU with P

    • Connect the A-end of the power cable to the Device Side on the PIMDC: c

    cable to -48V port and connect the black cable to -48VRTN port. Connect

    blue dry contact cables to the Alarm ports.

    Connect the B-end of the power cable to the PWR port of the RRU, and t

    W t fi f O td J C bl

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    19/45

    © ZTE Corporation. All rights reserved.

    Waterproofing of Outdoor Jumper Cable

    • Spiral-wrap one layer of insulating adhesive tape: After the feeder is connected, spir

    insulating adhesive tape around the connector with 50% overlapping, ensuring that

    mm insulating adhesive tape is reserved at the tail of the connector. Remember tha

    proper force while spiral-wrapping the insulating tape.

    • Spiral-wrap three layers of waterproof adhesive tape: Stretch the waterproof adhes

    as long as its original length. Use approximately 50 cm waterproof adhesive tape for

    Spiral-wrap three-layer waterproof adhesive tape around the connector in the direc

    tighten the feeder. This can protect the feeder from being loosened during the spira

    Smooth over the waterproof adhesive tape by applying proper force to secure it on

    Cabling and labeling of jumper connected to GSM ant

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    20/45

    © ZTE Corporation. All rights reserved.

    Cabling and labeling of jumper connected to GSM ant

    • The jumper connector to GSMshould be wrapped from the bper 1 layer of insulating tape +

    waterproof insulating plaster +insulating tape.

    • Near the connector of a jumpeantenna, the jumper should kefor 300mm.

    Extra jumper should be routed• All labels for outdoor site must

    private outdoor plastic labels, labels 200mm away from the bantenna.

    Cabling of optical fibers

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    21/45

    © ZTE Corporation. All rights reserved.

    Cabling of optical fibers

    • The power cable is bundseparately from signal cafibers with a spacing of m

    3cm in between. No crooverlapping or inter-twi

    • Extra Optical fiber to be properly for each sectoron top of horizontal laddsector wise.

    • For Optical fiber connecto RSU use the rack specfor routing between 2 ra

    Lack of blue cable

    Fiber routing hole

    Cabling of optical fibers

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    22/45

    © ZTE Corporation. All rights reserved.

    Cabling of optical fibers

    • The power caand laid separsignal cables awith a spacing3cm in betweor overlappingis allowed.

    • For ZXSDR BS8side of rack to

    Optical fibers there is main main groundin

    • All the cables properly tie uinside cabinet

    Cabling of optical fibers

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    23/45

    © ZTE Corporation. All rights reserved.

    Cabling of optical fibers

    • The optical fibers are conn

    correct sectors.

    • The bends of optical fibers

    smooth and consistent, wradius at least 20 times th

    external diameter.

    • Optical fibers should not i

    when they are laid.

    • Outdoor optical fibers sho

    with a proper tightness tocables moving flexibly in t

    • Fiber in the cabinet should

    covered with protective fl

    • All labels for must be ZTE

    plastic labels.

    Cabling of optical fibers

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    24/45

    © ZTE Corporation. All rights reserved.

    Cabling of optical fibers

    • The power cable islaid separately froand tail fibers withmore than 3cm in crossing or overlaptwist is allowed.

    • Extra Optical fiberproperly for each placed on top of h

    ladder in series se• Outdoor optical fib

    bundled with a proto prevent the cabflexibly in the ties.

    S1-OPR

    S2-OPR

    S3-OPR

    Outdoor Labeling of ODU Dish IF and Grounding Cable

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    25/45

    © ZTE Corporation. All rights reserved.

    Outdoor Labeling of ODU,Dish IF and Grounding Cable

    • The connec

    IF cable sho

    labeled to

    cable lengt

    Tx/Rx routi

    • ODU, Dish,

    IF cables sh

    labeled at

    20mm

    • Metallic la

    used on ou

    IF Cable Laying

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    26/45

    © ZTE Corporation. All rights reserved.

    IF Cable Laying

    • Before con

    leave more

    cable as th

    IF cable sho

    orderly and

    looking, wi

    intersectio

    damage, anwith fixing

    intervals of

    IF Power grounding cable IDU and circuit breaker lab

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    27/45

    © ZTE Corporation. All rights reserved.

    IF, Power ,grounding cable ,IDU and circuit breaker lab

    • Proper label

    on IF, Groun

    IDU, Modem

    Breakers as p

    standards

    • Proper Sleev

    be done on I

    Grounding c

    Power cable

    • Link Budget for each link

    and standard

    Routing and colors of power cable & grounding cable

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    28/45

    © ZTE Corporation. All rights reserved.

    Routing and colors of power cable & grounding cable

    • New A

    be pro

    to the

    The bushould

    below

    condu

    AC ca

    Cabling & labeling of DC cables between SDR and REC

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    29/45

    © ZTE Corporation. All rights reserved.

    Cabling & labeling of DC cables between SDR and REC

    • The powershould be cby copper

    connectingrectifier anthen fixed ensure sou

    • DC cable oshould be printing labaway from

    SDR RECNo Label

    No Label

    Breaker distribution of SDR cabinet

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    30/45

    © ZTE Corporation. All rights reserved.

    Breaker distribution of SDR cabinet

    • Connections tcabinet shoulto numberingleft to right is

    following.a. Breaker slo

    RRUs accord

    b. Breaker slo

    c. Breaker slo

    • DC cable of ca

    pasted printinaway from the

    • All the modulwithout manushould be labe

    Cabling & labeling of DC cables between SDR and PIM

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    31/45

    © ZTE Corporation. All rights reserved.

    Cab g & abe g o C cab es bet ee S a d

    • DC cable bcabinet andshould be f

    outdoor plthe end.

    • The powershould be ithe turningshould be awith consisradius overless than 2cable’s extediameter).

    SDR RECPIMDC

    Grounding of DC cables between SDR and PIMDC

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    32/45

    © ZTE Corporation. All rights reserved.

    g

    • DC cable betw

    and PIMDC sho

    private outdo

    the end.

    • DC cable betw

    and PIMDC sh

    with ground cl

    the same as di

    cable groundin

    •DC Ground clipwrapped from

    per 1 layer of i

    layers of wate

    plaster + 3 laye

    tape with prop

    Grounding of IF Cables and BTS

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    33/45

    © ZTE Corporation. All rights reserved.

    g

    • There shouldoubling onspace availacable can be

    other side o• Upon comp

    all connectiochecked for contact. Chedone on bol

    clamps, sleeand all hardto the bondelements ofnetwork.

    SDR

    Fiber and DC cables routing

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    34/45

    © ZTE Corporation. All rights reserved.

    g

    • The power ca

    and laid sepa

    signal cables

    with a spacin3cm in betwe

    or overlappin

    is allowed.

    • The wiring is

    uniform, cabcabinet is pe

    within 1m wi

    and twisting.

    Outdoor cables near cabinet

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    35/45

    © ZTE Corporation. All rights reserved.

    • Outdoor cab

    equipment

    flexible pipe

    with proper200mm.

    • GI Flexible p

    in accordan

    of the cable

    • Length of G

    should be at

    under the B

    Outdoor cables near cabinet

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    36/45

    © ZTE Corporation. All rights reserved.

    • The prot

    Flexible

    tied withprotecti

    • Silicon f

    should bboth the

    Flexible.

    Cables Inlet and Outlet

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    37/45

    © ZTE Corporation. All rights reserved.

    • The cable

    holes of c

    should beproperly.

    • Use prop

    Roxtec in

    with the ediameter

    REC

    SDR

    Fiber Protection and Jumpers Routing

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    38/45

    © ZTE Corporation. All rights reserved.

    • The cable-th

    should be se

    • The cable co

    fixing reliabl

    •The pigtail shor intersecti

    couple pigta

    proper force

    • The pigtails c

    strap ring, rig

    turning is str

    • There shouldpressing on t

    bending diam

    than 80mm.

    • The protecti

    with anti-cut

    No Protection

    Tube on Fiber

    Protection Tube

    on Fiber

    Labeling

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    39/45

    © ZTE Corporation. All rights reserved.

    • PowegrounE1 calabel

    Thesepasteneatlposit20mm

    • All thcablemanushouper Tstand

    No Protection

    Tube on Fiber

    Heat-Shrink Tube

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    40/45

    © ZTE Corporation. All rights reserved.

    • The cop

    termina

    put up

    shrink t

    wrappe

    least tw

    adhesiv

    tape.

    No Protection

    Tube on Fiber

    Heat Shrink

    TubesHeat Gun Not

    Used

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    41/45

    Contents

    • Installation of SDR, Rectifier, Battery an

    • Fixing of brackets, ODU, RRU with PIM

    • Cabling, grounding and labeling

    • View and neatness of site

    View and neatness of the ground for distributed site

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    42/45

    © ZTE Corporation. All rights reserved.

    • The site

    clean an

    such sun

    waste pa

    should b

    • The surp

    such as e

    black ouscrews, a

    dross sh

    removed

    Removed!

    View of the ground for macro site

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    43/45

    © ZTE Corporation. All rights reserved.

    • The site

    clean an

    such sun

    waste pa

    should b

    • The surp

    such as e

    black ouscrews, a

    dross sh

    removed

    View of the tower for distributed site

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    44/45

    © ZTE Corporation. All rights reserved.

  • 8/20/2019 SDR Site Installation Standards for Telenor Vega Swap Project(V1.0) (1)

    45/45

    www.zte.com.cn