9
SDLS Protocol Green Book initiation Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA

SDLS Protocol Green Book initiation

  • Upload
    elisa

  • View
    53

  • Download
    2

Embed Size (px)

DESCRIPTION

SDLS Protocol Green Book initiation. Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA. Background. Green Book definition: Intended to provide for the timely publication of a very broad range of general information for the CCSDS community. - PowerPoint PPT Presentation

Citation preview

Page 1: SDLS Protocol Green Book initiation

SDLS ProtocolGreen Book initiation

Ignacio Aguilar Sanchez (ESA)

CCSDS Spring Meeting 2010 | Portsmouth, VA

Page 2: SDLS Protocol Green Book initiation

Background

– Green Book definition:

– Intended to provide for the timely publication of a very broad range of general information for the CCSDS community.

– Informational documents are often published in support of an Experimental specification, a Draft Standard or a Recommended Standard.

– They may therefore contain descriptive material, supporting analysis, test results, scenarios, etc., which are otherwise inappropriate for the contents of a technical specification.

Page 3: SDLS Protocol Green Book initiation

Chapter 1 of ToC

– Introduction

– Purpose

– Scope

– Organization of this Report

– Conventions and Definitions

– References

Chapter 1 structure is standard. No particular adaptation to SDLS GB.

Page 4: SDLS Protocol Green Book initiation

Chapter 2 of ToC

– Overview

– SDLS protocol– A summary description of what is SDLS and how it relates to SDL protocol.

– Motivation– Provides the reasons why such protocol has been developed. Explains the

simple mission network topology.

– Interiperability for cross-support.

– Major design goals and constraints

– Security Services

– Compatibility with SDL Services

– Compatibility with SLE Services

– Independence of cryptographic algorithms and support to CCSDS cryptographic algorithms

Chapter 2 provides a summary introduction to SDLS.

Page 5: SDLS Protocol Green Book initiation

Chapter 3 of ToC

– Title to be found (design concepts? Summary of concept and rationale?)– Security services (selection)

– This section will present the rationale for the selection of the agreed security services (authentication, confidentiality, integrity and combinations thereof). The selected services are taken out of ISO OSI Security Architecture. A set of tables (one per SDL protocol) will document threats, risks, and other elements justifying the decision taken for each of those ISO OSI Security Services. An important element of information will be constituted by the residual risk for not implementing a security service or by considering the performance of the selected service.

– Protocol position– This section will present the placement of SDLS with respect to SDL in the

CCSDS protocol stacks and its rationale. Furthermore, it will identify and discuss the interfaces with other layers.

– Protocol data structures, fields and functions– Organization and description of the various protocol data structures and

fields with their corresponding function.– Justifications.

– Management– Presentation and discussion of management aspects. Among other things

Security Association and Security Context are treated here.

In line with GB template chapter 3 provides a detailed technical presentation and discussion of the major technical decisions behind SDLS development.

Page 6: SDLS Protocol Green Book initiation

Chapter 4 of ToC

– Concept of Operation

Integrates the content produced by CB on the GB Conops. In particular look at cryptographic service processing flow diagrams.

Page 7: SDLS Protocol Green Book initiation

Annexes

– To be completed

– Reference implementation

– ISO OSI Security Services tables vs. SDL protocols

– URD

– ….

Annexes will document detailed elements of information (e.g., analyses) not suitable for the main body of the document.

Page 8: SDLS Protocol Green Book initiation

Open Points

– Documenting detailed SDLS requirements?

– A summary of main requirements and their discussion will go into the GB.

– Should in addition detailed requirements be available for the reader? If so a reference can be made to the URD but the URD would need to be available (i.e., published) at www.ccsds.org.

– Alternatively, the URD becomes an Annex to this GB

– Any relevant experience in previous GBs?

Page 9: SDLS Protocol Green Book initiation

Next Actions

– Collect feedback on the meeting and afterwards

– Coordinate with SDLS Blue Book Technical Editor (Craig) to harmonize contents

– Assign content writers on agreed topics