Stormwater Planter: Details Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program (SCVURPPP) SCVURPPP GSI Details Workshop #2 April 24, 2018

SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Stormwater Planter:Details

Jill Bicknell, P.E., EOA, Inc.Santa Clara Valley Urban Runoff Pollution

Prevention Program (SCVURPPP)

SCVURPPP GSI Details Workshop #2April 24, 2018

Page 2: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Outline of Presentation Stormwater Planter Design Considerations

Streetscape Planter Details• Parking vs. no parking along curb

• Planter box vs. sloped sided

• Curb inlets and check dams

Parking Lot Planter Details• Planter box vs. sloped sided

• Edge options

Page 3: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Stormwater Planter DesignConsiderations

Bioretention facilities similar to stormwater curb extensions but typically in the parkway zone of street (next to sidewalk)

Can also be in flexible zone (to separate bike lane from street) or in median if reverse crowned

Can fit between existing features in park-way zone (e.g., driveways, street fixtures)

Less interference with cyclists and parking but need to consider pedestrian safety and access

Page 4: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Design Considerations, cont. Bioretention Streetscape Planter

• Can have vertical or sloped sides

• May need short fences, curb, or step-out zone to prevent pedestrians from falling into depressed area

• When next to street parking, step-out zone of 12-36 inches should be provided

• Should also provide crossing areas between street parking and sidewalk

Page 5: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Bioretention Streetside Planter

Graphic courtesy of Washington DC DOT

Note:• Step-out zone along

street• Curb cuts and

trench drains directing runoff into planter

• Pedestrian crossing• Fence or curb

surrounding planter

Page 6: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

DC Concept - Before

Graphic courtesy of Washington DC DOT

Page 7: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

DC Concept - After

Graphic courtesy of Washington DC DOT

Page 8: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Roadside Planter with Parking

SFPUC Detail BP 2.1

Page 9: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Photo courtesy of City of San Jose

Street Planter with Parking

Central Coast LIDI Detail SW-2

Page 10: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

El Cerrito –Street Planter with Parking

Page 11: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

El Cerrito – Street Planter

Page 12: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Sloped Sided Bioretention with Parking

Detail image courtesy of Daniel Apt, Olaunu

Central Coast LIDIDetail SW-1

Page 13: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Hacienda Ave Planters

Graphics/photos courtesy of Callendar Associatesand City of Campbell

Page 14: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Hacienda Ave Planters

Photo courtesy of City of Campbell

Page 15: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Roadside Planter without Parking

SFPUC Detail BP 3.1

Page 16: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Street Planter without Parking

Central Coast LIDIDetail SW-4

Page 17: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Cesar Chavez St. SF

Page 18: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Street Sloped Sided Bioretentionwithout Parking

Central Coast LIDIDetail SW-3

Page 19: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Curb Inlets - Ineffective

Page 20: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Better Curb Inlet

From SFPUC Detail BC 2.2

Page 21: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Better Curb Inlet

Cesar Chavez St., San Francisco

Page 22: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Better Curb Inlet - Section

From SFPUC Detail BC 2.2

Page 23: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Alternative Curb Inlet

Central Coast LIDIDetail SW-17

Page 24: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Inlet to Trench Drain

From SFPUC Detail BC 3.3

Page 25: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Check Dams

From SFPUC Detail BC 6.2

Page 26: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Check Dams, cont.

From SFPUC Detail BC 6.2

Page 27: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Design Considerations Bioretention Parking Lot Planter

• Can have vertical or sloped sides

• Optimize flat bottom dimensions, and use check dams if longitudinal slope

• No step-out zone needed

• Provide crossing areas for people walking through the parking lot

• Use curbs or wheel stops to keep car wheels from the edge

Page 28: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Parking Lot Sloped Sided Bioretention

Central Coast LIDIDetail SW-6

Page 29: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Detail

Detail image courtesy of Daniel Apt, Olaunu

Parking Lot Planter

Central Coast LIDIDetail SW-7

Page 30: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Parking Lot Bioretention

Photos courtesy of City of San Jose

Sloped-sided Planter

Page 31: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Parking Lot Edge Options

Deep Curb

Curb and Gutter

Flush Curb with Wheel Stops

Central Coast LIDIDetail SW-16

Page 32: SCVURPPP GSI Details Workshop #2 April 24, 2018 Stormwater ...scvurppp.org/wp-content/uploads/2018/08/GSI... · 4/24/2018  · Stormwater Planter Design Considerations Bioretention

Questions?

Jill Bicknell, P.E.408-720-8811 x1

[email protected]