28
Appendix 101 Environmental and Social Considerations 6 2 1 Screening Format Screening Format (1 st Draft: 26 th June 2014 ver.) Name of Proposed Project: The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development Committee (MCDC) Name, Address, Organization, and Contact Point of a Responsible Officer: Name: U Tint Lwin Title: Head of Department, Water and Sanitation Department Address: Corner of 26 th & 72 nd Street, Mandalay, Republic of the Union of Myanmar Organization: Mandalay City Development Committee (MCDC) Tel: (+95) 2-35928 Fax: (+95) 2-36170 E-Mail: [email protected] Date: Signature: Check Items Please write “to be advised (TBA)” when the details of a project are yet to be determined. Question 1: Address of project site See the figure below. Location map

Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix 101

Environmental and Social Considerations

6 2 1 Screening Format

Screening Format (1st Draft: 26th June 2014 ver.)

Name of Proposed Project:

The Project for Urgent Improvement of Water Supply System in Mandalay City

Project Proponent:

Mandalay City Development Committee (MCDC)

Name, Address, Organization, and Contact Point of a Responsible Officer:

Name: U Tint Lwin

Title: Head of Department, Water and Sanitation Department

Address: Corner of 26 th & 72nd Street, Mandalay, Republic of the Union of Myanmar

Organization: Mandalay City Development Committee (MCDC)

Tel: (+95) 2-35928

Fax: (+95) 2-36170

E-Mail: [email protected]

Date:

Signature:

Check Items

Please write “to be advised (TBA)” when the details of a project are yet to be determined.

Question 1: Address of project site

See the figure below.

Location map

Page 2: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix 102

Question 2: Scale and contents of the project

2-1. Project profile

1) Installation of disinfection equipment at 9 groundwater reservoir systems

2) Construction of water supply system in Pyi Gyi Tagon TS (Max. Q; 9,000 m3/d):

Intake well, transmission pipe line, reservoir tank, disinfection equipment, booster pump sets

and distribution pipe network.

2-2. How was the necessity of the project confirmed?

Is the project consistent with the higher program/policy?

NO

2-3. Did the proponent consider alternatives before this request?

NO

2-4. Did the proponent implement meetings with the related stakeholders before this

request?

If implemented, please mark the following stakeholders.

Administrative body (Divisional Secretariats of relevant divisions)

Local residents

Others (ADB)

Question 3: Is the project a new one or an ongoing one? In the case of an ongoing project, have you

received strong complaints or other comments from local residents?

New Ongoing (with complaints) Ongoing (without complaints)

Other

Question 4: Is an Environmental Impact Assessment (EIA), including an Initial Environmental

Examination (IEE) required for the project according to a law or guidelines of a host

country? If yes, is EIA implemented or planned? If necessary, please fill in the reason

why EIA is required.

Page 3: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix 103

(Reason why EIA is required: )

Other (The Government has not yet established own EIA/IEE system.)

Question 5:

In the case that steps were taken for an EIA, was the EIA approved by the relevant laws of the host

country? If yes, please note the date of approval and the competent authority.

supplementary conditionApproved with a

supplementary conditionUnder appraisal

(Date of approval: )

Appraisal process not yet started

Question 6:

If the project requires a certificate regarding the environment and society other than an EIA, please

indicate the title of said certificate. Was it approved?

Requires a certificate but not yet approved

Title of the certificate: (Permission of the land use for well drilling. )

Question 7:

Are any of the following areas present either inside or surrounding the project site?

If yes, please mark the corresponding items.

(coastline, wetlands, reserved area

for ethnic or indigenous people, cultural heritage)

international treaties

Page 4: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix 104

with special social value

Question 8:

Does the project include any of the following items?

If yes, please mark the appropriate items.

Groundwater pumping (scale: 9,000m3/day)

Not calculated yet.

Question 9:

Please mark related adverse environmental and social impacts, and describe their outlines.

Outline of related impact:

Noise and vibrations:

Noise and vibration will be foreseen since heavy machineries will be operated during construction phase.

However, the duration is just limited.

Question 10:

In the case of a loan project such as a two-step loan or a sector loan, can sub-projects be specified at

the present time?

Page 5: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix 105

Question 11:

Regarding information disclosure and meetings with stakeholders, if JICA’s environmental and social

considerations are required, does the proponent agree to information disclosure and meetings with

stakeholders through these guidelines?

Page 6: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix

106

Page 7: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix

107

Page 8: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix

108

Page 9: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix

109

Page 10: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix

110

Page 11: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix

111

Page 12: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix

112

Page 13: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix

113

Page 14: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix

114

Page 15: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix

115

Page 16: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix

116

Page 17: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix

117

Page 18: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix-118

6 2 4 Attendees List of Stakeholder Meeting

NO. NAME POSITION AFFILIATION

1 U TUN KYI Committee Member(1) MCDC

2 U HAN SOE Committee Menber(3) MCDC

3 U TIN WAN Committee Member(4) MCDC

4 Dr.TWIN KYAW KYAW Committee Member(5) MCDC

5 U THIT LWIN Head of Department MCDC

6 U HTAY WIN Assistant Director MCDC

7 DAW KHIN MAY HTAY Head of Department MCDC

8 U KHIN MG MYINT Head of Department MCDC

9 U NAY WIN MYINT Head of Department MCDC

10 U KHIN MG NYUIT Assistant Engineer MCDC(STREET &Bridge)

11 DAW THAN THAN SWE Assistant Engineer MCDC(STREET &Bridge)

12 DAW THAN THAN SINT Assistant Engineer MCDC(STREET &Bridge)

13 U YE TUN Assistant Director MCDC(BUILDING)

14 U THIN MG WIN Assistant Director MCDC(BUILDING)

15 U HTET AUNG Ecusective Officer PYIGYITAGON TOWNSHIP

16 DAW NUN NUN TUN Assistant Director MCDC(BUILDING)

17 DAW LEI LEI KHAING Assistant Engineer MCDC(BUILDING)

18 U THAN OO Assistant Engineer MCDC(WATER&ClEAN)

19 DAW THAN MYAT OO Assistant Engineer MCDC(WATER&ClEAN)

20 U YE KYAW SWA Ecusective Officer MCDC

21 U ZAW WIN NAING Ecusective Officer MCDC

22 DAW TIN MG KYAW Assistant Director MCDC

23 DAW SAN DAR MON Assistant Director MCDC

24 U AUNG NAING Assistant Engineer (Elec.Power) MCDC

25 DAW EI EI PHYO Assistant Engineer (Civil) MCDC

26 U SOE MG HLA Assistant Engineer (Mech) MCDC

27 U OHN KYAW Assistant Engineer MCDC

28 U ZAY YA Assistant Director MCDC

29 U HTUN LIN SAW Ecusective Officer MCDC

30 U MYO SAW WIN MCDC

31 U TAUNG MYINT ADB ADB

32 U KIN MG WIN MCDC

33 DAW KHIN THIDA AUNG Sub Assistant Engineer MCDC

34 DAW LYDIA NAUNT NATUN Sub Assistant Engineer MCDC

35 DAW THU ZAR AUNG OFFICE SAFF MCDC

36 U MG MG LAY WARD OFFICER WARD

37 U TUN WARD STAFF WARD

38 U PAW THEIN WARD RESIDENT WARD

39 U MG MG AUNG WARD RESIDENT WARD

40 U THAN SWE WARD STAFF WARD

41 U BO WIN WARD STAFF WARD

42 U TIN HLAING TOWNSHIP OFFICER STAFF WARD

43 U MYA TWAE WARD STAFF WARD

44 U MYINT MIN WARD STAFF WARD

45 U PAN NEW WARD.4 WARD.4 COMMITTEE LEADER

46 U HTAY AUND WARD.4 WARD.4

47 U WIN BO WARD.4 WARD.4

48 U THAN THU AUNG WARD.4 WARD.4

49 U ZAW LIN OO WARD.4 WARD.4

50 U TIN MG AYE WARD.4 WARD.4

51 U MG MG MYINT WARD.4 WARD.4

52 U YE WIN WARD.4 WARD.4

53 U KYAW MIN SECRETARIAT WARD.4

54 U NYO LONE TOWNSHIP OFFICER PYIGYITAGON TOWNSHIP

55 U MIN MIN TUN SECRETARIAT PYIGYITAGON TOWNSHIP

56 U NAING LIN WARD OFFICER PYIGYITAGON TOWNSHIP

57 DAW SAGAR WAR SWE TOWNSHIP OFFICER WARD AND TOWNSHIP DEVELOPMET

58 U SOE AYE STAFF WARD 10

59 U THEIN SOE WARD OFFICER WARD 10

60 U MYINT OO WARD RESIDENT WARD 10

61 U THEIN NWET WARD RESIDENT WARD 10

62 U MG KYAW SOE WARD 2 OFFICER WARD 6

63 U KHIN MG MYINT WARD OFFICE STAFF WARD 6

64 U HLA NAING WARD OFFICE STAFF WARD 6

65 U MYO MYINT ZAW WARD OFFICE STAFF WARD 6

66 U WIN THEIN WARD OFFICE STAFF WARD6

67 U KYAW AYE WARD OFFICE STAFF WARD 6

68 U SOE LWIN WARD OFFICER WARD 5

69 U WIN MAW SECRETARIAT WARD 5

70 U MG SAN WARD STAFF WARD 5

71 U KYAW SOE WARD STAFF WARD 5

72 U AYE MIN TUN WARD STAFF PYIGYITAGON TOWNSHIP

73 U MIN KO WARD STAFF WARD 5

74 U MYAT THU VICE WARD OFFICER WARD AND TOWNSHIP DEVELOPMET

75 U CHUN WAERD STAFF WARD 5

Page 19: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix-119

Electric sounding survey

Figure 6-1 Location map of natural condition survey

Page 20: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix-120

Figure 6-2 A comparison of the geology of PTW-35 and PTW-36 and resistivity structure of No.0

Page 21: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix-121

Figure 6-3 Resistivity structure section (1)

Page 22: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix-122

Figure 6-4 Resistivity structure section (2)

Page 23: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix-123

Figure 6-5 Distribution of the upper surface depth of the 3rd aquifer

Page 24: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix-124

Results of test drilling

Figure 6-6 Integrated column and section (test well)

Page 25: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix-125

Figure 6-7 Well structure (test well)

Well structure

-150

-100

-50

0

-20m

-55m

-90m

-80m

-115m

25m

-127.5m

Cement grout

20in

Gravel Packing

Seal

by Bentonite or clay

Back filling

by drilling Cut-Fills

16.5in

Cap with key

12in Casing pipe

6.24m*14pcs + 3.64m

=91m

12in Screen pipe

6.24m*4pcs =25m

12in Casing pipe

6.24m*2pcs =12.5m

Bottom plug

-105m

Page 26: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix-126

Results of pumping test

Figure 6-8 Results of step-drawdown test (1)

Figure 6-9 Results of step-drawdown test (2)

0 120 240 360 480 600Time (min.)

10

5

0

Q=806.40m3/d

Q=938.88m3/d

Q=1143.36m3/d

Q=1272.96m3/d

s=3.674m

s=4.274m

s=5.170m

s=5.992m

Q=1301.76m3/d

s=6.314m

100 1000200 300 400 500 600 700 800900 2000 3000 4000 5000

Pumping Rate, Q (m3/day)

1

10

2

3

4

5

6

7

8

9

Page 27: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix-127

Figure 6-10 Results of step-drawdown test (3)

0.1 1.0 10.0 100.0 1000.0 10000.0

Time since pumping started,t (min)

10.0

9.0

8.0

7.0

6.0

5.0

4.0

3.0

2.0

1.0

0.0

t0=1.63E-26 min.

s=0.215 m

T=1138.04m2/dayS=3.21E-25

Figure 6-11 Analysis of continuous pumping test (Cooper-Jacob Method)

0 500 1000 1500 2000Pumping Rate, Q (m3/day)

0

0.002

0.004

0.006

0.008

0.01

B=3.88E-3 day/m2

C=6.68E-7day2/m5

s=3.88E-3Q+6.68E-7Q2

Page 28: Screening Format (1st Draft: 26 June 2014 ver.) · 2015-05-13 · The Project for Urgent Improvement of Water Supply System in Mandalay City Project Proponent: Mandalay City Development

Appendix-128

1E-005 1E-004 1E-003 1E-002 1E-001 1E+000

u

0.1

1

10

100

1E-009 1E-008 1E-007 1E-006 1E-005 1E-004

1E-013 1E-012 1E-011 1E-010 1E-009 1E-008

1E-017 1E-016 1E-015 1E-014 1E-013 1E-012

1E-006 1E-005 0.0001 0.001 0.01 0.1r2/t (m2/min)

1

10

100

1000

T=561.45m2/dayS=7.57E-12

u=1.00E-15W(u)=10

r2/t=2.06E-4s=1.898

Figure 6-12 Analysis of continuous pumping test (Theis Method)

Figure 6-13 Analysis of recovery test