Upload
cine-wanka-nemfiusfilms
View
231
Download
0
Embed Size (px)
Citation preview
8/14/2019 Scream House
1/14
Universal elements and all related indicia 2006 Universal Orlando. All rights reserved.
Please note that this project is not recommended for children. It requires a moderate degree of skill, and the use of a cutting blade, which is extremelydangerous. When using cutting blades always use protective eyewear. Color printing is recommended. This model was designed to be printed onMatte Paper Heavyweight, and the use of white glue is recommended. There are many folds in the model, and it is recommended that you score the fold first, using a dull cutting blade, or other fine, blunt tipped instrument.Black dashed lines represent a mountain fold (a fold which point upward), and orange dashed lines represent a valley fold (the fold points downward). The orange dashed lines are accompanied by a red + at each end. These are to be used as pin guides, so you can poke small holes at the +, flip thesheet over, and score between the holes for a clean valley fold. Read the instructions and study the illustrations carefully before beginning.
Before removing pieces fromsheet, cut all indicated slots.
Optional:Score, cut and fold4 window inserts11A
Optional:Remove windowsfrom first floorsections 1A, 7A, 9A.
Cut T-shape on frontdoor 1A and fold doors
inward.
Page 1 o
8/14/2019 Scream House
2/14
Universal elements and all related indicia 2006 Universal Orlando. All rights reserved.
1A 2A
4A1A, 2A, 4A shown face down andglued along tab edges.Glue window inserts in place.
Fold and glue the4 pillar pieces 6B.
Fold and glue the
porch roof 6A as shown.
Insert porch tabs into slotsof the front wall, and glue thebottom of the pillars withinthe squares on the porch.
Fold down tabs.
Fold down tabs.
5A
3A
6A6B
6B
6B
6B
Fold down the roof 4A.Insert front tab into roof slot.
Glue roof to side tabs.
Insert blue tabs through the 8slots in the porch roof 6A. Fold down and glue pillar tabs.
Slide piece 3A tabs into therear 3 slots around front door.
Glue down tabs on outside.Porch should extend beyond
the front wall.
Fold and glue 3A as shown.
Page 2 o
8/14/2019 Scream House
3/14
Universal elements and all related indicia 2006 Universal Orlando. All rights reserved.
Fold and glue cupola piece 5B as shown.
Fold and glue 2 chimneypieces 11C as shown.
Insert chimney tabs intoroof slots.
Fold and glue 8 chimneystacks 11D as shown and glue
to squares on top of chimneys .
Glue the bottom edges of the brackets to the walls.
Glue left and right sectionsto the middle structure.
Attach 11E and 11F to bothsides of cupola
Glue edge tabsof 9A, 10A and 4C
Glue edge tabsof 7A, 8A and 4B
Glue roof to side taband insert front tab
through slot.Insert floor pieces
8B and 10Bup into bottoms.
Glue cupola piece 5B to dark rectangular area on the roof as show
Page 3 o
9A
4C 4B
8A10A
11Cx211Dx8
7A
10B8B
11E
11F
8/14/2019 Scream House
4/14
SLOT>
SLOT>
SLOT>
SLOT>< SLOT
< SLOT
< SLOT
4A
4 B
4 C
4 C
4 B
4 A
Page 4 o
8/14/2019 Scream House
5/14
1 1 A
x 4
11E
11F
11D x8
1 1 C x 2
Page 5 o
8/14/2019 Scream House
6/14
8 S L O T S
> >
6B
6B
6B
6B
6B x 46A
Page 6 o
8/14/2019 Scream House
7/14
5 S L O T S
>
>
>
>
>
1 A
Page 7 o
8/14/2019 Scream House
8/14
2 A
Page 8 o
8/14/2019 Scream House
9/14
7A
Page 9 o
8/14/2019 Scream House
10/14
8A8B
Page 10
8/14/2019 Scream House
11/14
3A
Page 11 o
8/14/2019 Scream House
12/14
1 S L O T >
5A
5B
Page 12
8/14/2019 Scream House
13/14
10A10B
Page 13
8/14/2019 Scream House
14/14
9A
Page 14