14
APPENDIX X PUBLIC MEETING HANDOUTS (The meeting materials provided herein are used as "sample" materials, however, each meeting had city-specific information customized)

Scoping Report June 2010 - Appendix X -- Public …media.metro.net/projects_studies/eastside_phase2/images/...Agenda Metro Eastside Transit Corridor Phase 2 Scoping Meeting City of

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Scoping Report June 2010 - Appendix X -- Public …media.metro.net/projects_studies/eastside_phase2/images/...Agenda Metro Eastside Transit Corridor Phase 2 Scoping Meeting City of

APPENDIX X PUBLIC MEETING HANDOUTS

(The meeting materials provided herein are

used as "sample" materials, however, each

meeting had city-specific information

customized)

Page 2: Scoping Report June 2010 - Appendix X -- Public …media.metro.net/projects_studies/eastside_phase2/images/...Agenda Metro Eastside Transit Corridor Phase 2 Scoping Meeting City of

Agenda

Metro Eastside Transit Corridor Phase 2 Scoping Meeting

City of South El Monte

South El Monte Senior Center - Dining Room 1556 Central Avenue South El Monte, CA 91 733

Wednesday, February 24, 201 0

6:00 p.m. - 8:00 p.m.

1. Open House

2. Welcome and Introductions

3. Eastside Transit Corridor Phase 2 Presentation

4. Public Comment

Stay involved! For more information visit us at: Project website: www.metro.net/eastsidephase2 Project Hot l ine: 21 3-922-301 2 Fan us o n Facebook: www.facebook.com/metroeastsidephase2

10s Angeles County Metropolitan Transportation Authority

Page 3: Scoping Report June 2010 - Appendix X -- Public …media.metro.net/projects_studies/eastside_phase2/images/...Agenda Metro Eastside Transit Corridor Phase 2 Scoping Meeting City of

10-1

482m

r ©

2010

lac

mta

metro.net/eastsidephase2Summary of Alternatives* Resumen de alternativas*

SR-60 Freeway Ruta Estatal 60

Washington Boulevard Bulevar Washington

Length Longitud

6.9 9.3

Travel Time (Minutes) Tiempo de recorrido (minutos)

12.5 17.5

Ridership (Daily) Número de usuarios (diario)

12,270 15,660

Number of Stations Número de estaciones

4 6

Estimated Capital Costs (billions) Gastos de inversión estimados (mil millones)

$1.8 $2.2

*Based on the Alternatives Analysis Study. Numbers will be updated during the environmental process as more information is analyzed. In addition to the LRT alternatives, the Draft EIS/EIR will also evaluate a No Build alternative and a Transportation Systems Management (TSM) Alternative (i.e. service improvements to existing bus lines).

* Basado en el Estudio de Análisis de Alternativas. Las cifras serán actualizadas durante el proceso ambiental a medida que se vaya analizando más información. Además de las alternativas de LRT, el Borrador EIS/EIR también evaluará una Alternativa de No Construir y una alternativa de Administración de Sistemas de Transporte (TSM) (por ejemplo: mejoras al servicio en las líneas de autobuses existentes).

Contact UsPlease use the following contact tools to access more project information, ask a question or provide comments:

mail: Ms. Kimberly Yu, Project ManagerMetro One Gateway Plaza, 99-22-2 Los Angeles, CA 90012

call: 213.922.3012Messages are retrieved every business day.

e-mail: [email protected] be sure to include all of your contact information in the body of your e-mail.

web: metro.net/eastsidephase2

facebook: facebook.com/metroeastsidephase2

Alternative Fact SheetHoja Informativa de Alternativas

Comuníquese con nosotrosComuníquese con nosotros para recibir más información acerca del proyecto, hacer preguntas o someter un comentario:

correo: Ms. Kimberly Yu, Project ManagerMetro One Gateway Plaza, 99-22-2 Los Angeles, CA 90012

telefono: 213.922.3012Los mensajes se recuperan todos los días hábiles.

correo electronico: [email protected] favor asegúrese de incluir toda su información de contacto en el cuerpo de su correo electrónico.

internet: metro.net/eastsidephase2

facebook: facebook.com/metroeastsidephase2

Eastside Transit Corridor Phase 2 Corredor de Transporte hacia el Este Fase 2

Page 4: Scoping Report June 2010 - Appendix X -- Public …media.metro.net/projects_studies/eastside_phase2/images/...Agenda Metro Eastside Transit Corridor Phase 2 Scoping Meeting City of

SAN G

ABRIEL

RIVER

RIO HONDO

LOS ANGELES RIVER

Santa Fe DamRecreation Area

MON

TEBEL

LO

WILLOWBROOK

BELL

BELL

DOWNEY

NORWALK

BELLFLOWER

WHITTIER

LA MIRADA

O R A N G EC O U N T Y

SOUTH EL MONTE

SOUTH SAN GABRIEL Whittier

Narrows Recreation

Area

ROSEMEAD

TEMPLE CITY

EL MONTE

LA PUENTE

PUENTEHILLS

MONTEREYHILLS

SILVERLAKE

HANCOCKPARK

HOLLYWOOD

LOS ANGELES

EASTLOS ANGELES MONTEREY PARK

MONTEBELLO

SOUTHPASADENA

SANGABRIEL

IRWINDALE

INDUSTRY

PICO RIVERA

SANTA FESPRINGS

PARAMOUNT

CUDAHY

BELLGARDENS

VERNONCOMMERCE

GARDENA

ATHENS

COMPTON

HYDEPARK

WESTADAMS

LIVE OAK

LIVE OAK

OLIVE

GLADSTONE

RAMONA

SAN BERNARDINO

DURF

EE

GRAND

FREM

ON

T

MONTEREY

MONTEREY

AV 52

MISSION

ATLA

NTI

C

SAN BERNARDINO FWY

GA

RFI

ELD

GARFIELD

AV 57

FIGUEROA

HUNTINGTON

GOLDEN STATE FWY

FLETCHER

EXPOSITION

FIGU

EROA

FIG

UER

OA

SANTA MONICA FWY

WASHINGTON

EXPOSITION

JEFFERSON

FIGUEROA

ALA

MED

A

1ST

WASHINGTON BL

3RD3RD

OLYMPIC

LORE

NA

ATLA

NTI

C

ARIZ

ONA

ATLA

NTI

C

SOTO

CESAR E CHAVEZ

EAST

ERN

IND

IAN

A

EAST

ERN

PASADENA FWY

POMONA FWY

GARVEY

DURFEE

SANTA ANITA

PECK

GARVEY

SAN

TA

AN

ITA

POMONA FW

Y

WOOKMAN MIL

L

PUENTE

VALLEY

SAN BERNARDINO FWY

SLAUSON

GAR

FIEL

D

WASHINGTON BL

TELEGRAPH

POMONA FWYTURNBULL CANYON

PHILADELPHIA

PENNWASHINGTON BL

PIC

KER

ING

WA

SHIN

GTO

N A

VE

SLAUSON

FLORENCE

LON

G B

EAC

H FW

Y

ATLA

NTI

C

OLYMPIC

WASHINGTON BL

EAST

ERN

SLAUSON

ATLANTIC

SANTA ANA FWY

SLAUSON

120TH

120TH

MANCHESTER

NO

RM

AN

DIE

IMPERIAL HWY

124TH

ATLA

NTI

C

119TH120TH

WILLOW

BR

OOK

FIRESTONEGARFIE

LD

MAIN

CENTURY FWY

CENTURY FWY

SANTA AN

A FWY

FIRESTONE

IMPERIAL

MARTINLUTHER

KING

FOSTER

SLAUSON

IMPERIAL HWY

MULBERRY

SAN

GAB

RIEL

RIV

ER F

WY

ATLA

NTI

CAT

LAN

TIC

SANTA ANA FWY

ATWATER AV

WHITTIER

WHITTIER

WH

ITTIER

WHITTIER

WHITTIER LAMBERT

RO

SEM

EAD

BL

ROSEMEAD

SAN

GA

BR

IEL

BL

SAN GABRIEL

SAN FERN

ANDO RD

BEVERLY

BEVERLY

BEVERLY

BEVERLY

HADLEY

EL SEGUNDO BL

MANCHESTER

LOS ANGELES ST

PASADENA AV

FLORENCE

FLORENCE

PARAMOUNT

PARAM

OUNT

ROSE

MEA

D

ROSEM

EAD

SANTA F

E SPRIN

GS RD

FLORENCE

BL

FLORENCE

PAR

AMO

UN

T

BL

ALHAMBRA RD

MONTEREYPASS R

D

LAKEW

OOD

STADIUM

WY

GARF

IELD

LAKE

WOO

D

111TH

368

COMMONWEALTH

SAN

GA

BR

IEL

RIV

ER F

WY

TYLE

R

PEC

K

DURFEE

MAR VISTA

5

5

5

5

5

605

605

605

105

710

710

10

10

710

10

605

10

110

110

105

110

110

19

60

72

19

91

60

60

60

5

105

2

2

72

42

42

42

42

1010

577X

577X

101

101 110

PICO/RIMPAUTRANSITCENTER

LOS ANGELES RIVER

LOS ANGELES RIVER

BELL

BELL

DOWNEYDOWNEYDOWNEYDOWNEY

LOS ANGELESLOS ANGELESLOS ANGELES

INDUSTRY

CUDAHYCUDAHY

BELLGARDENS

VERNON

RAMONA

DURF

EE

FIGU

EROA

FIG

UER

OA

EXPOSITION

FIGUEROA

ALA

MED

A

WASHINGTON BL

PASADENA FWY

POMONA FW

Y

POMONA FW

Y

WOOKMAN MIL

L

PUENTE

VALLEY

SAN BERNARDINO FWY

TURNBULL CANYON

SLAUSON

FLORENCE

LON

G B

EAC

H FW

YLO

NG

BEA

CH

FWY

LON

G B

EAC

H FW

YLO

NG

BEA

CH

FWY

LON

G B

EAC

H FW

Y

ATLA

NTI

CAT

LAN

TIC

EAST

ERN

SLAUSON

ATLANTIC

ATLANTIC

ATLANTIC

SLAUSON

FIRESTONEGARFIE

LD

MULBERRY

WHITTIER

MANCHESTER

FLORENCE

FLORENCE

FLORENCE

FLORENCE

FLORENCE

GARF

IELD

LAKE

WOO

D

SAN

GA

BR

IEELL

RRIIV

ERFW

YW

YW

710

10

10

110

19

60

7242

42

101 110

HOLLYWOOD/HIGHLAND

HOLLYWOOD/VINE

HOLLYWOOD/WESTERN

VERMONT/SUNSET

VERMONT/SANTA MONICA

WILSHIRE/WESTERN Wilshire/

Vermont

Vermont/Beverly

Expo/Vermont

Wilshire/Normandie

Westlake/MacArthur Park

Civic Center

Pico/Aliso

Maravilla AtlanticIndiana

Soto

Pershing Square

HARBOR FWYVERMONT

ROSECRANS

HAWTHORNE

CRENSHAWAVALON

IMPERIAL/WILMINGTON

LAKEWOOD NORWALK

COMPTON

HIGHLAND PARK

MISSION

Mariachi Plaza

East LACivic Center

Little Tokyo/Arts District7th Street/

Metro Center

Pico

23rd

Grand

San Pedro

WashingtonJefferson/USC

Slauson Slauson

Vernon

Florence

103rd St

FirestoneManchester

Expo Park/USC

CSULA

El Monte

Lincoln/Cypress

Union Station

Chinatown

Metro Rail Lines & StationLíneas y estaciones de Metro Rail

Metro Silver LineMetro Silver Line

Expo Line Phase 1(under construction)Expo Line Fase 1 (bajo construcción)

Potential Route (under study)Rutas potenciales (bajo estudio)

Amtrak/MetrolinkAmtrak/Metrolink

10-0948 ©2010 LACMTASubject to Change Sujeto a cambios

Líneas y estaciones de Metro Rail

Metro Silver Line

Expo Line Fase 1 (bajo construcción)

Rutas potenciales (bajo estudio)

Amtrak/Metrolink

10-0948 ©2010 LACMTASujeto a cambios

Líneas y estaciones de Metro Rail

Expo Line Fase 1 (bajo construcción)

Extensión hacia el Este de Metro Gold Line (bajo construcción)

Sección subterránea de Extensión hacia el Este

Rutas potenciales (bajo estudio)

Vía de transporte y estación

Amtrak/Metrolink

09-1957 ©2009 LACMTASujeto a cambios

SAN G

ABRIEL

RIVER

RIO HONDO

LOS ANGELES RIVER

Santa Fe DamRecreation Area

MON

TEBEL

LO

WILLOWBROOK

BELL

BELL

DOWNEY

NORWALK

BELLFLOWER

WHITTIER

LA MIRADA

O R A N G EC O U N T Y

SOUTH EL MONTE

SOUTH SAN GABRIEL Whittier

Narrows Recreation

Area

ROSEMEAD

TEMPLE CITY

EL MONTE

LA PUENTE

PUENTEHILLS

MONTEREYHILLS

SILVERLAKE

HANCOCKPARK

HOLLYWOOD

LOS ANGELES

EASTLOS ANGELES MONTEREY PARK

MONTEBELLO

SOUTHPASADENA

SANGABRIEL

IRWINDALE

INDUSTRY

PICO RIVERA

SANTA FESPRINGS

PARAMOUNT

CUDAHY

BELLGARDENS

VERNONCOMMERCE

GARDENA

ATHENS

COMPTON

HYDEPARK

WESTADAMS

LIVE OAK

LIVE OAK

OLIVE

GLADSTONE

RAMONA

SAN BERNARDINO

DURF

EE

GRAND

FREM

ON

T

MONTEREY

MONTEREY

AV 52

MISSION

ATLA

NTI

C

SAN BERNARDINO FWY

GA

RFI

ELD

GARFIELD

AV 57

FIGUEROA

HUNTINGTON

GOLDEN STATE FWYFLETCHER

EXPOSITION

FIGU

EROA

FIG

UER

OA

SANTA MONICA FWY

WASHINGTON

EXPOSITION

JEFFERSON

FIGUEROA

ALA

MED

A

1ST

WASHINGTON BL

3RD3RD

OLYMPIC

LORE

NA

ATLA

NTI

C

ARIZ

ONA

ATLA

NTI

C

SOTO

CESAR E CHAVEZ EA

STER

N

IND

IAN

A

EAST

ERN

PASADENA FWY

POMONA FWY

GARVEY

DURFEE

SANTA ANITA

PECK

GARVEY

SAN

TA

AN

ITA

POMONA FW

Y

WOOKMAN MIL

L

PUENTE

VALLEY

SAN BERNARDINO FWY

SLAUSON

GAR

FIEL

D

WASHINGTON BL

TELEGRAPH

POMONA FWYTURNBULL CANYON

PHILADELPHIA

PENNWASHINGTON BL

PIC

KER

ING

WA

SHIN

GTO

N A

VE

SLAUSON

FLORENCE

LON

G B

EAC

H FW

Y

ATLA

NTI

C

OLYMPIC

WASHINGTON BL

EAST

ERN

SLAUSON

ATLANTIC

SANTA ANA FWY

SLAUSON

120TH

120TH

MANCHESTER

NO

RM

AN

DIE

IMPERIAL HWY

124TH

ATLA

NTI

C

119TH120TH

WILLOW

BR

OOK

FIRESTONEGARFIE

LD

MAIN

CENTURY FWY

CENTURY FWY

SANTA AN

A FWY

FIRESTONE

IMPERIAL

MARTINLUTHER

KING

FOSTER

SLAUSON

IMPERIAL HWY

MULBERRY

SAN

GAB

RIEL

RIV

ER F

WY

ATLA

NTI

CAT

LAN

TIC

SANTA ANA FWY

ATWATER AV

WHITTIER

WHITTIER

WH

ITTIER

WHITTIER

WHITTIER LAMBERT

RO

SEM

EAD

BL

ROSEMEAD

SAN

GA

BR

IEL

BL

SAN GABRIEL

SAN FERN

ANDO RD

BEVERLY

BEVERLY

BEVERLY

BEVERLY

HADLEY

EL SEGUNDO BL

MANCHESTER

LOS ANGELES ST

PASADENA AV

FLORENCE

FLORENCE

PARAMOUNT

PARAM

OUNT

ROSE

MEA

D

ROSEM

EAD

SANTA F

E SPRIN

GS RD

FLORENCE

BL

FLORENCE

PAR

AMO

UN

T

BL

ALHAMBRA RD

MONTEREYPASS R

D

LAKEW

OOD

STADIUM

WY

GARF

IELD

LAKE

WOO

D

111TH

368

COMMONWEALTH

SAN

GA

BR

IEL

RIV

ER F

WY

TYLE

R

PEC

K

DURFEE

MAR VISTA

5

5

5

5

5

605

605

605

105

710

710

10

10

710

10

605

10

110

110

105

110

110

19

60

72

19

91

60

60

60

5

105

2

2

72

42

42

42

42

1010

577X

577X

101

101 110

PICO/RIMPAUTRANSITCENTER

LOS ANGELES RIVER

LOS ANGELES RIVER

BELL

BELL

DOWNEYDOWNEYDOWNEYDOWNEY

LOS ANGELESLOS ANGELESLOS ANGELES

INDUSTRY

CUDAHYCUDAHY

BELLGARDENS

VERNON

RAMONA

DURF

EE

FIGU

EROA

FIG

UER

OA

EXPOSITION

FIGUEROA

ALA

MED

A

WASHINGTON BL

PASADENA FWY

POMONA FW

Y

POMONA FW

Y

WOOKMAN MIL

L

PUENTE

VALLEY

SAN BERNARDINO FWY

TURNBULL CANYON

SLAUSON

FLORENCE

LON

G B

EAC

H FW

YLO

NG

BEA

CH

FWY

LON

G B

EAC

H FW

YLO

NG

BEA

CH

FWY

LON

G B

EAC

H FW

Y

ATLA

NTI

CAT

LAN

TIC

EAST

ERN

SLAUSON

ATLANTIC

ATLANTIC

ATLANTIC

SLAUSON

FIRESTONEGARFIE

LD

MULBERRY

WHITTIER

MANCHESTER

FLORENCE

FLORENCE

FLORENCE

FLORENCE

FLORENCE

GARF

IELD

LAKE

WOO

D

SAN

GA

BR

IEELL

RRIIV

ERFW

YW

YW

710

10

10

110

19

60

7242

42

101 110

HOLLYWOOD/HIGHLAND

HOLLYWOOD/VINE

HOLLYWOOD/WESTERN

VERMONT/SUNSET

VERMONT/SANTA MONICA

WILSHIRE/WESTERN Wilshire/

Vermont

Vermont/Beverly

Expo/Vermont

Wilshire/Normandie

Westlake/MacArthur Park

Civic Center

Pico/Aliso

Maravilla AtlanticIndiana

Soto

Pershing Square

HARBOR FWYVERMONT

ROSECRANS

HAWTHORNE

CRENSHAWAVALON

IMPERIAL/WILMINGTON

LAKEWOOD NORWALK

COMPTON

HIGHLAND PARK

MISSION

Mariachi Plaza

East LACivic Center

Little Tokyo/Arts District7th Street/

Metro Center

Pico

23rd

Grand

San Pedro

WashingtonJefferson/USC

Slauson Slauson

Vernon

Florence

103rd St

FirestoneManchester

Expo Park/USC

CSULA

El Monte

Lincoln/Cypress

Union Station

Chinatown

Metro Rail Lines & StationLíneas y estaciones de Metro Rail

Metro Silver LineMetro Silver Line

Expo Line Phase 1(under construction)Expo Line Fase 1 (bajo construcción)

Potential Route (under study)Rutas potenciales (bajo estudio)

Amtrak/MetrolinkAmtrak/Metrolink

10-0948 ©2010 LACMTASubject to Change Sujeto a cambios

Líneas y estaciones de Metro Rail

Metro Silver Line

Expo Line Fase 1 (bajo construcción)

Rutas potenciales (bajo estudio)

Amtrak/Metrolink

10-0948 ©2010 LACMTASujeto a cambios

Líneas y estaciones de Metro Rail

Expo Line Fase 1 (bajo construcción)

Extensión hacia el Este de Metro Gold Line (bajo construcción)

Sección subterránea de Extensión hacia el Este

Rutas potenciales (bajo estudio)

Vía de transporte y estación

Amtrak/Metrolink

09-1957 ©2009 LACMTASujeto a cambios

In 2007, Metro initiated an Alternatives Analysis Study (AA) which analyzed over 47 routes and yielded four alternatives for extension of the Metro Gold Line Eastside Extension Phase I from East Los Angeles to cities farther east. In January 2009, the Metro Board approved the AA Study including four recommended alternatives: SR-60, Beverly Boulevard, Beverly/Whittier Boulevards and Washington Boulevard.

In 2009, following additional technical analysis and community input provided during over 40 stakeholder briefings the alternatives were further reduced to two. As a result, in October 2009, the Metro Board approved that the two remaining alternatives – SR-60 andWashington Boulevard – be carried into the environmental process.

Alternative Descriptions The SR-60 and Washington Boulevard proposed alternatives use the same light rail technology (LRT)as the Gold Line Eastside Extension Phase 1, allowing a seamless extension to cities east of the existing Pomona and Atlantic terminus. The following is a detailed description of the two remaining alternatives:

SR-60This proposed alignment generally follows the southern edge of the SR-60 Freeway along the slope of the freeway on an elevated track crossing over freeway ramps and terminates at Peck Rd in the City of South El Monte. The proposed station locations include:

> Garfield Avenue Station > Montebello Town Center Mall > Santa Anita Avenue Station > Peck Road Station

Washington Boulevard This proposed alignment is entirely on elevated track, following the SR-60 Freeway to Garfield Av, and then traveling south to Washington Bl. From there, the alignment continues east and terminates at Lambert Rd in the City of Whittier. The proposed station locations include:

> Garfield Avenue Station > Whittier Boulevard Station > Greenwood Avenue Station > Rosemead Boulevard Station > Norwalk Avenue Station > Lambert Road Station

En el 2007, Metro inició un Estudio de Análisis de Alternativas (AA), el cual analizo más de 47 rutas y que produjo cuatro alternativas para extender aun más hacia el este la Extensión hacia el Este de Metro Gold Line Fase 1. En enero de 2009, la Junta Directiva de Metro aprobó el Estudio AA, incluyendo cuatro alternativas recomendadas: Ruta Estatal 60, Bulevar Beverly, Bulevares Beverly/Whittier y Bulevar Washington.

En el 2009, después de análisis técnicos adicionales y de recibir comentarios de la comunidad, por medio de más de 40 reuniones informativas que se llevaron a cabo con las personas interesadas en el proyecto, quedaron dos alternativas. Como resultado, en octubre de 2009, la Junta Directiva de Metro aprobó las dos alternativas restantes – Ruta Estatal 60 y Bulevar Washington – que continuarán su curso al proceso ambiental.

Descripción de las alternativas Las alternativas propuestas Ruta Estatal 60 y Bulevar Washington utilizan la misma tecnología de tren ligero (LRT) que la Extensión hacia el Este de Metro Gold Line Fase 1, permitiendo una extensión perfecta a las ciudades al este de las terminales existentes de Pomona y Atlantic. A continuación se ofrecen descripciones detalladas de las dos alternativas restantes:

Ruta Estatal 60 Esta alineación propuesta generalmente sigue el margen sur de la Ruta Estatal 60 a lo largo de la cuesta de la autopista en una vía elevada que cruza por encima de las rampas de la autopista y termina en Peck Road en la Ciudad de South El Monte. Las ubicaciones de las estaciones propuestas incluyen:

> Estación Garfield Avenue > Montebello Town Center Mall > Estación Santa Anita Avenue > Estación Peck Road

Bulevar Washington Esta alineación propuesta está ubicada sobre una vía elevada en su recorrido total, que sigue la Ruta Estatal 60 a la Avenida Garfield, y continúa hacia el sur hasta el Bulevar Washington. Desde allí, la alineación continúa hacia el este y termina en Lambert Road en la Ciudad de Whittier. Las ubicaciones de la estaciones propuestas incluyen:

> Estación Garfield Avenue > Estación Whittier Boulevard > Estación Greenwood Avenue > Estación Rosemead Boulevard > Estación Norwalk Avenue > Estación Lambert Road

Metro selects the SR-60 and Washington Boulevard Alternatives to move through the environmental phase. Metro selecciona las alternativas Ruta Estatal 60 y Bulevar Washington para continuar al proceso ambiental.

State Route 60 Light Rail Transit Ruta Estatal 60 transporte de tren ligero

Washington Boulevard Light Rail Transit Bulevar Washington transporte de tren ligero

Page 5: Scoping Report June 2010 - Appendix X -- Public …media.metro.net/projects_studies/eastside_phase2/images/...Agenda Metro Eastside Transit Corridor Phase 2 Scoping Meeting City of

Contact UsPlease use the following contact tools to access more project information, ask a question or provide comments:

mail: Ms. Kimberly Yu, Project ManagerMetro One Gateway Plaza, 99-22-2 Los Angeles, CA 90012

call: 213.922.3012Messages are retrieved every business day.

e-mail: [email protected] be sure to include all of your contact information in the body of your e-mail.

web: metro.net/eastsidephase2

facebook: facebook.com/metroeastsidephase2

Comuníquese con nosotrosComuníquese con nosotros para recibir más información acerca del proyecto, hacer preguntas o someter un comentario:

correo: Ms. Kimberly Yu, Project ManagerMetro One Gateway Plaza, 99-22-2 Los Angeles, CA 90012

telefono: 213.922.3012Los mensajes se recuperan todos los días hábiles.

correo electronico: [email protected] favor asegúrese de incluir toda su información de contacto en el cuerpo de su correo electrónico.

internet: metro.net/eastsidephase2

facebook: facebook.com/metroeastsidephase2

10-1

521m

r 10

-152

1mr

©20

10 l

acm

ta20

10 l

acm

ta

Overview Fact SheetInformación General

metro.net/eastsidephase2

Eastside Transit Corridor Phase 2 Corredor de Transporte hacia el Este Fase 2

Page 6: Scoping Report June 2010 - Appendix X -- Public …media.metro.net/projects_studies/eastside_phase2/images/...Agenda Metro Eastside Transit Corridor Phase 2 Scoping Meeting City of

Corridor Communities Comunidades a lo largo del corredor

Goals of the ProjectThere are four main goals of the study:

1. Identify alternatives that provide a transit connection to the Metro Gold Line Eastside Extension Phase 1

2. Link cities farther east of Los Angeles with the regional transit network

3. Improve mobility in the project area by enhancing transit options

4. Plan for projected growth in a sustainable manner

Study ProcessThe project development process is well defined by federal and state environmental requirements. The flow chart below highlights the major milestones in the process from beginning to end. Currently the project is in the Draft Environmental Impact Statement/Report (Draft EIS/EIR) study phase.

Project AlternativesIn 2007, Metro initiated an Alternatives Analysis Study (AA) which analyzed over 47 routes in various combinations of alignments, technologies and configurations and yielded four alternatives for extension of the Metro Gold Line Eastside Extension Phase 1, from East Los Angeles to cities farther east. After extensive technical analysis and community input provided at over 40 stakeholder briefings, the alternatives were further reduced to two. In October 2009, the Metro Board approved two light rail transit (LRT) alternatives for further environmental analysis in the Draft EIS/EIR:

> State Route 60 LRT > Washington Boulevard LRT

Metas del proyectoHay cuatro metas principales del estudio:

1. Identificar alternativas que proveerán una conexión de transporte a la Extensión hacia el Este de Metro Gold Line Fase 1

2. Unir las ciudades que están ubicadas más al este de Los Angeles con la red de tránsito regional

3. Mejorar la movilidad en el área del proyecto, mejorando las opciones de transporte

4. Planear el crecimiento proyectado en forma sostenible

Proceso del estudioEl desarrollo del proyecto está bien definido en conformidad con los requisitos ambientales federales y estatales. La tabla mostrada obajo, resalta los acontecimientos importantes en el proceso, de principio a fin. Actualmente, el proyecto está en la etapa del Borrador de la Declaración/Reporte del Impacto Ambiental (Borrador EIS/EIR).

Alternativas del proyectoEn el 2007, Metro inició un Estudio de Análisis de Alternativas (AA), el cual analizo más de 47 rutas en varias combinaciones de alineamientos, tecnologías y configuraciones, que produjo cuatro alternativas para extender aun más hacia el este la Extensión hacia el Este de Metro Gold Line Fase 1. Después de análisis técnicos adicionales y de recibir comentarios de la comunidad, por medio de más de 40 reuniones informativas que se llevaron a cabo con las personas interesadas en el proyecto, quedaron dos alternativas. En octubre de 2009, la Junta Directiva de Metro aprobó dos alternativas de transporte de tren ligero (LRT) para continuar a los análisis ambientales en el Borrador EIS/EIR:

> Ruta Estatal 60 LRT > Bulevar Washington LRT

The Los Angeles County Metropolitan Transportation Authority (Metro) is studying alternatives to extend the Gold Line Eastside Extension from its existing terminus at Atlantic and Pomona Boulevards to cities farther east.

The Phase 2 project study area covers 80 square miles and includes 13 cities and parts of unincorporated Los Angeles County.

The project area is home to 673,000 residents, representing seven percent of the population of Los Angeles County. Over the next 25 years it is expected that the population in this area will grow by 23 percent, and employment will increase by 14 percent.

The project area is also home to a number of highly congested freeways and arterials including the I-5, SR-60, I-10 and Beverly and Whittier Boulevards. Every day, approximately 50,000 commuters leave the study area bound for downtown Los Angeles, and 115,000 make local trips within the study area itself.

La Autoridad de Transporte Metropolitano del Condado de Los Angeles (Metro) está estudiando diferentes alternativas para extender aun más hacia el este la Extensión hacia el Este de Metro Gold Line desde la terminal existente en los bulevares Atlantic y Pomona.

El área de estudio de la segunda fase del proyecto cubre una superficie de 80 millas cuadradas e incluye 13 ciudades y partes no incorporadas del Condado de Los Angeles.

El área del proyecto alberga a 673,000 residentes, los cuales representan el siete por ciento de la población del Condado de Los Angeles. Se espera que en los próximos 25 años esta población crezca un 25%, y la tasa de empleo un 14%.

El área del proyecto también es un punto de autopistas y arterias altamente congestionadas, incluyendo las autopistas 5, 60, 10 y los bulevares Beverly y Whittier. Todos los días, alrededor de 50,000 viajeros salen del área de estudio hacia el centro de Los Angeles, y 115,000 hacen viajes locales dentro del área de estudio.

Bell Commerce Downey El Monte Industry

Los Angeles Montebello Monterey Park Pico Rivera Rosemead

Santa Fe Springs South El Monte Whittier

SAN G

ABRIEL

RIVER

RIO HONDO

LOS ANGELES RIVER

Santa Fe DamRecreation Area

MON

TEBEL

LO

WILLOWBROOK

BELL

BELL

DOWNEY

NORWALK

BELLFLOWER

WHITTIER

LA MIRADA

O R A N G EC O U N T Y

SOUTH EL MONTE

SOUTH SAN GABRIEL Whittier

Narrows Recreation

Area

ROSEMEAD

TEMPLE CITY

EL MONTE

LA PUENTE

PUENTEHILLS

MONTEREYHILLS

SILVERLAKE

HANCOCKPARK

HOLLYWOOD

LOS ANGELES

EASTLOS ANGELES MONTEREY PARK

MONTEBELLO

SOUTHPASADENA

SANGABRIEL

IRWINDALE

INDUSTRY

PICO RIVERA

SANTA FESPRINGS

PARAMOUNT

CUDAHY

BELLGARDENS

VERNONCOMMERCE

GARDENA

ATHENS

COMPTON

HYDEPARK

WESTADAMS

LIVE OAK

LIVE OAK

OLIVE

GLADSTONE

SAN BERNARDINO

DURF

EE

GRAND

FREM

ON

T

MONTEREY

MONTEREY

AV 52

MISSION

ATLA

NTI

C

SAN BERNARDINO FWY

GA

RFI

ELD

GARFIELD

AV 57

FIGUEROA

HUNTINGTON

GOLDEN STATE FWY

FLETCHER

EXPOSITION

FIG

UER

OA

SANTA MONICA FWY

WASHINGTON

EXPOSITION

JEFFERSON

FIGUEROA

ALA

MED

A

1ST

WASHINGTON BL

3RD3RD

OLYMPIC

LORE

NA

ATLA

NTI

C

ARIZ

ONA

ATLA

NTI

C

SOTO

CESAR E CHAVEZ

EAST

ERN

IND

IAN

A

EAST

ERN

PASADENA FWY

POMONA FWY

GARVEY

DURFEE

SANTA ANITA

PECK

GARVEY

SAN

TA

AN

ITA

POMONA FW

Y

WOOKMAN MIL

L

PUENTE

VALLEY

SLAUSON

GAR

FIEL

D

WASHINGTON BL

TELEGRAPH

POMONA FWYTURNBULL CANYON

PHILADELPHIA

PENNWASHINGTON BL

PIC

KER

ING

WA

SHIN

GTO

N A

VE

SLAUSON

FLORENCE

LON

G B

EAC

H FW

Y

ATLA

NTI

C

OLYMPIC

WASHINGTON BL

EAST

ERN

SLAUSON

ATLANTIC

SANTA ANA FWY

SLAUSON

120TH

120TH

MANCHESTER

NO

RM

AN

DIE

IMPERIAL HWY

124TH

ATLA

NTI

C

119TH120TH

WILLOW

BR

OOK

FIRESTONEGARFIE

LD

MAIN

CENTURY FWY

CENTURY FWY

SANTA ANA FWY

FIRESTONE

IMPERIAL

MARTINLUTHER

KING

FOSTER

SLAUSON

IMPERIAL HWY

MULBERRY

SAN

GAB

RIEL

RIV

ER F

WY

ATLA

NTI

CAT

LAN

TIC

SANTA ANA FWY

ATWATER AV

WHITTIER

WHITTIER

WH

ITTIER

WHITTIER

WHITTIER LAMBERT

RO

SEM

EAD

BL

ROSEMEAD

SAN

GA

BR

IEL

BL

SAN GABRIEL

SAN FERN

ANDO RD

BEVERLY

BEVERLY

BEVERLY

BEVERLY

HADLEY

EL SEGUNDO BL

MANCHESTER

LOS ANGELES ST

PASADENA AV

FLORENCE

FLORENCE

PARAMOUNT

PARAM

OUNT

ROSE

MEA

D

ROSEM

EAD

SANTA F

E SPRIN

GS RD

BL

FLORENCE

PAR

AMO

UN

T

BL

ALHAMBRA RD

MONTEREYPASS R

D

LAKEW

OOD

STADIUM

WY

GARF

IELD

LAKE

WOO

D

111TH

368

COMMONWEALTH

SAN

GA

BR

IEL

RIV

ER F

WY

TYLE

R

PEC

K

DURFEE

MAR VISTA

5

5

5

5

5

605

605

605

105

710

710

10

10

710

10

605

10

110

110

105

110

110

19

60

72

19

91

60

60

60

5

105

2

2

72

42

42

42

42

1010

577X

577X

101

101 110

PICO/RIMPAUTRANSITCENTER

LOS ANGELES RIVER

LOS ANGELES RIVER

BELL

BELL

DOWNEYDOWNEYDOWNEYDOWNEY

LOS ANGELESLOS ANGELESLOS ANGELES

INDUSTRY

CUDAHYCUDAHY

BELLGARDENS

VERNON

DURF

EE

FIG

UER

OA

EXPOSITION

FIGUEROA

ALA

MED

A

WASHINGTON BL

PASADENA FWY

POMONA FW

Y

POMONA FW

Y

WOOKMAN MIL

L

PUENTE

VALLEY

TURNBULL CANYON

SLAUSON

FLORENCE

LON

G B

EAC

H FW

YLO

NG

BEA

CH

FWY

LON

G B

EAC

H FW

YLO

NG

BEA

CH

FWY

LON

G B

EAC

H FW

Y

ATLA

NTI

CAT

LAN

TIC

EAST

ERN

SLAUSON

ATLANTIC

ATLANTIC

ATLANTIC

SLAUSON

FIRESTONEGARFIE

LD

MULBERRY

WHITTIER

MANCHESTER

FLORENCE

FLORENCE

FLORENCE

FLORENCE

GARF

IELD

LAKE

WOO

D

SAN

GA

BR

IEELL

RRIIV

ERFW

YW

YW

710

10

10

110

60

7242

101 110

HOLLYWOOD/HIGHLAND

HOLLYWOOD/VINE

HOLLYWOOD/WESTERN

VERMONT/SUNSET

VERMONT/SANTA MONICA

WILSHIRE/WESTERN Wilshire/

Vermont

Vermont/Beverly

Expo/Vermont

Wilshire/Normandie

Westlake/MacArthur Park

Civic Center

Pico/Aliso

Maravilla AtlanticIndiana

Soto

Pershing Square

HARBOR FWYVERMONT

ROSECRANS

HAWTHORNE

CRENSHAWAVALON

IMPERIAL/WILMINGTON

LAKEWOOD NORWALK

COMPTON

HIGHLAND PARK

MISSION

Mariachi Plaza

East LACivic Center

Little Tokyo/Arts District7th Street/

Metro Center

Pico

23rd

Grand

San Pedro

WashingtonJefferson/USC

Slauson

Vernon

Florence

103rd St

Firestone

CSULA

El Monte

Union Station

Chinatown

Metro Rail Lines & StationLíneas y estaciones de Metro Rail

Metro Silver LineMetro Silver Line

Expo Line Phase 1(under construction)Expo Line Fase 1 (bajo construcción)

Potential Route (under study)Rutas potenciales (bajo estudio)

Amtrak/MetrolinkAmtrak/Metrolink

10-0948 ©2010 LACMTASubject to Change Sujeto a cambios

Líneas y estaciones de Metro Rail

Metro Silver Line

Expo Line Fase 1 (bajo construcción)

Rutas potenciales (bajo estudio)

Amtrak/Metrolink

10-0948 ©2010 LACMTASujeto a cambios

Líneas y estaciones de Metro Rail

Expo Line Fase 1 (bajo construcción)

Extensión hacia el Este de Metro Gold Line (bajo construcción)

Sección subterránea de Extensión hacia el Este

Rutas potenciales (bajo estudio)

Vía de transporte y estación

Amtrak/Metrolink

09-1957 ©2009 LACMTASujeto a cambios

Eastside Transit Corridor Phase 2 Corredor de Transporte hacia el Este Fase 2

alternatives analysis

analisis de alternativas

draft environmental

impact statement/report

(draft eis/eir)borrador de la

declaracion/reporte del impacto ambiental

final designdiseño final

constructionconstruccion

start-up/revenue operations

operaciones de comienzo de

servicio/ingreso

Project Development Process Proceso del desarrollo del proyecto

public involvement participacion del publico

final environmental

impact statement/report

(final eis/eir)declaracion/reporte

del impacto ambientalfinal

preliminary engineering

ingienieria preliminar

Page 7: Scoping Report June 2010 - Appendix X -- Public …media.metro.net/projects_studies/eastside_phase2/images/...Agenda Metro Eastside Transit Corridor Phase 2 Scoping Meeting City of

Contact UsPlease use the following contact tools to access more project information, ask a question or provide comments:

mail: Ms. Kimberly Yu, Project ManagerMetro One Gateway Plaza, 99-22-2 Los Angeles, CA 90012

call: 213.922.3012Messages are retrieved every business day.

e-mail: [email protected] be sure to include all of your contact information in the body of your e-mail.

web: metro.net/eastsidephase2

facebook: facebook.com/metroeastsidephase2

Comuníquese con nosotrosComuníquese con nosotros para recibir más información acerca del proyecto, hacer preguntas o someter un comentario:

correo: Ms. Kimberly Yu, Project ManagerMetro One Gateway Plaza, 99-22-2 Los Angeles, CA 90012

telefono: 213.922.3012Los mensajes se recuperan todos los días hábiles.

correo electronico: [email protected] favor asegúrese de incluir toda su información de contacto en el cuerpo de su correo electrónico.

internet: metro.net/eastsidephase2

facebook: facebook.com/metroeastsidephase2

10-1

545m

r 10

-154

5mr

10-1

545m

r ©

2010

lac

mta

metro.net/eastsidephase2

Environmental Fact SheetHoja Informativa Medioambiental

Eastside Transit Corridor Phase 2 Corredor de Transporte hacia el Este Fase 2

Page 8: Scoping Report June 2010 - Appendix X -- Public …media.metro.net/projects_studies/eastside_phase2/images/...Agenda Metro Eastside Transit Corridor Phase 2 Scoping Meeting City of

BackgroundIn 2007, Los Angeles County Metropolitan Transportation Authority (Metro) began an Alternatives Analysis Study (AA) that considered extending transit services from the terminus of the Metro Gold Line Eastside Extension at Pomona and Atlantic Boulevards to destinations farther east. In October 2009, the Metro Board considered the results of the AA Study together with additional technical screening and community input and approved two build alternatives to move forward into environmental analysis. The Draft Environmental Impact Statement/Report (Draft EIS/EIR) will examine the following two build alternatives along with the required No Build and Transportation System Management (TSM) alternatives:

> State Route 60 Light Rail Transit

> Washington Boulevard Light Rail Transit

NEPA and CEQA ProcessThe National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA) are federal and state laws that require government agencies to identify the significant environmental impact of their actions and to avoid, minimize or mitigate any adverse effects. For any project requiring a federal action (including receipt of federal funding) that may result in significant adverse environmental affects, the project must be studied in an Environmental Impact Statement (EIS) to comply with NEPA. Additionally, in California any project that could result in potentially significant environmental impacts requires preparation of an Environmental Impact Report (EIR) in compliance with CEQA.

The Eastside Transit Corridor Study Phase 2 will complete a joint EIS/EIR document that considers the proposed project’s environmental impacts on a wide range of topics such as air quality, cultural and historic resources, community effects, noise, visual impacts, soil, traffic and safety, water, biological resources and others. This document will evaluate these impacts for both the construction period as well as during project operations. Mitigation measures will be developed where necessary to minimize identified environmental impacts.

AntecedentesEn el 2007, La Autoridad de Transporte Metropolitano del Condado de Los Angeles (Metro) empezó un Estudio de Análisis de Alternativas (AA) que consideraba extender más hacia el este los servicios de transporte de los terminales de la Extensión hacia el Este de Metro Gold Line en los bulevares Pomona y Atlantic. En octubre de 2009, la Junta Directiva de Metro consideró los resultados del Estudio AA en conjunto con evaluación técnica adicional y comentarios de la comunidad y aprobó dos alternativas de construcción para avanzar hacia un análisis ambiental. El Borrador de la Declaración/Reporte del Impacto Ambiental (Borrador EIS/EIR) examinará las siguientes dos alternativas de construcción junto con las alternativas de No Construir y de Administración de Sistemas de Transporte (TSM):

> Ruta Estatal 60 transporte de tren ligero

> Bulevar Washington transporte de tren ligero

Proceso de NEPA y CEQALa Ley de Política Ambiental Nacional (NEPA) y la Ley de Calidad Ambiental de California (CEQA) son leyes federales y estatales que requieren que agencias gubernamentales identifiquen los impactos significantes de sus acciones hacía el medioambiente y eviten, reduzcan o mitiguen cualquier efecto desfavorable. Para cualquier proyecto que requiere una acción federal (incluyendo fondos federales) que pueda resultar en efectos ambientales adversos significantes, el proyecto debe ser estudiado en una Declaración de Impacto Ambiental (EIS) para cumplir con NEPA. Adicionalmente, en California cualquier proyecto que pueda resultar en impactos ambientales potencialmente significantes requiere la preparación de un Reporte de Impacto Ambiental (EIR) de acuerdo con CEQA.

El Estudio del Corredor de Transporte hacia el Este Fase 2 completará un EIS/EIR en conjunto que considerará los impactos medioambientales del proyecto propuesto en una gran variedad de temas como calidad de aire, recursos culturales e históricos, efectos a la comunidad, ruido, impactos visuales, tierra, tráfico y seguridad, agua, recursos biológicos y otros. Este documento evaluará estos impactos para el periodo de construcción y durante la operación del proyecto. Conforme sea necesario, se desarrollarán medidas de mitigación para minimizar los impactos ambientales identificados.

How Can I Participate in the Environmental Process?There are several steps in the EIS/EIR process that provide agencies, project stakeholders and the general public the chance to review the project and provide comments. The flow diagram below illustrates the process and opportunities for community input and review.

¿ Cómo puedo participar en el proceso ambiental?Hay varios pasos en el proceso del EIS/EIR que proveen a las agencias, personas interesadas en el proyecto y público en general la oportunidad para revisar el proyecto y someter sus comentarios. El diagrama de abajo ilustra el proceso y las oportunidades para que el público revise el proyecto y provee comentarios.

To initiate the environmental process an 80-day public scoping period will be held to notify the public of the proposed project and invite comments on the scope of alternatives and evaluation methodologies. Metro will host community Scoping Meetings in convenient locations within the project area to ensure that the public has the opportunity to attend and provide input. These meetings will be well publicized and comments will be encouraged.

Para iniciar el proceso ambiental, un periodo de alcance público de 80 días se llevará a cabo para notificar al público del proyecto propuesto y permitirle someter comentarios sobre el alcance de alternativas y metodologías de evaluación. Metro realizará reuniones de alcance en lugares convenientes dentro del área del proyecto para asegurar que el público tenga la oportunidad de asistir y someter sus comentarios. Estas reuniones serán publicitadas y comentarios serán bienvenidos.

As part of the environmental evaluation, Metro will study potential impacts across a wide range of elements, including but not limited to air quality, cultural and historical resources, community effects, noise, visual impacts, soil, transportation and safety, water, biological resources and others. This extensive evaluation will be supported by ad-hoc community workshops and stakeholder briefings focused on either environmental topics or alignment specific design issues. The intent of the workshops and/or briefings held with key stakeholders in the community will be to improve the alternative designs and minimize impacts.

Como parte de la evaluación ambiental, Metro estudiará impactos potenciales a lo largo de una amplia variedad de elementos, incluyendo, y no limitándose a, la calidad de aire, recursos culturales e históricos, efectos a la comunidad, ruido, impactos visuales, tierra, transporte y seguridad, agua, recursos biológicos y otros. Esta extensa evaluación será apoyada por talleres comunitarios y resúmenes de las personas interesadas en el proyecto enfocados en temas ambientales o asuntos del diseño de alineamientos. El propósito de estos talleres y/o resúmenes será para mejorar el diseño de las alternativas y para minimizar los impactos.

Following the completion of the Draft EIS/EIR, Metro will release the document for a 60-day public review and comment period. The environmental document will be available for review at public locations as well as online, and Metro will host community meetings and formal public hearings to capture comments.

Después de completar el Borrador EIS/EIR, Metro hará público el documento por 60 días para revisión pública y comentarios. El documento estará disponible en lugares públicos así como por Internet y Metro realizará reuniones comunitarias y audiencias públicas formales para recibir comentarios.

Metro will prepare responses to all comments received during the Draft EIS/EIR public comment period, select a locally preferred alternative (LPA) and circulate the Final EIS/EIR for public review at least 30 days prior to the Metro Board adoption of the LPA and approval from the Federal Transit Administration.

Metro preparará respuestas para todos los comentarios recibidos durante el periodo de comentario público del Borrador EIS/EIR, seleccionará una alternativa preferida localmente (LPA) y circulará el EIS/EIR Final para revisión pública por lo menos 30 días antes de la adopción de la Junta Directiva de Metro del LPA y la aprobación por parte de la Administración de Transito Federal.

public scoping period (early 2010) periodo de alcance publico (principios de 2010)

draft eis/eir evaluation and preparation evaluacion y preparacion del borrador eis/eir

public comment period for draft eis/eir periodo de comentario publico para el borrador eis/eir

prepare and circulate the final eis/eir preparar y circular el eis/eir final

Key Environmental Milestones for Community InvolvementAcontecimientos ambientales notables para la participación de la comunidad

Page 9: Scoping Report June 2010 - Appendix X -- Public …media.metro.net/projects_studies/eastside_phase2/images/...Agenda Metro Eastside Transit Corridor Phase 2 Scoping Meeting City of
Page 10: Scoping Report June 2010 - Appendix X -- Public …media.metro.net/projects_studies/eastside_phase2/images/...Agenda Metro Eastside Transit Corridor Phase 2 Scoping Meeting City of

t i n a m % f ~ & h * a ~ 1 transit for your community. r -I& plan 14

ti, transporte para su comunidad. p-

si

Metre is initiglaing t h mirmmmtaf wwk far thk Eastside Tramsit Coktrtixior Phase z by hdding lieapiq Mdingr Fw the V ~ T ~ O U S dtbtnatiuas indudinp; One Gateway Plaza

99-8-2 Los Angeles, CA 90012

b S@D Roue 60 L~@P Rail Transit

> W&in@n Boutward Light Rail fiansit

The smping m e t i n s a o the first step In the 1[ pepamtien of a Dm Envir~snmntal lmpaa Wm~MfRepor f in iccerd~nm with NEPA a d CZQA requ1ments. This 1s y w r opportzllnity to & ah@& the prdp~dZd praj~d and provide c m m t s . Cantent p~~\r i&d at hme meetings wif! be identical.

LIB r ~ ~ n i ~ m ~ d6 B ~ G O ~ C ~ son Jes primrro~ ps03 ttn k@ pmpam5idn #@ Len &m&r cls /a &claracid~/R~p~M dr l m p c r ~ AvnBi~tal, de #cd(~FdO r n ~ lo$ I Q ~ U I L ~ ~ J S ~shblccldar par NEPA y CEQA. Erta dd SLI ~ p o ~ k n f l i d ~ d psrm ffpr@n&r sobm bl prarys@s proptresd~ y rem&f r;smsntad@$. E! corM;rmErZo qorr ss pmrents ian m~uknes PB& d W I I S ~ . &tw mds I @ W M I P & C ~ ~ , ~ I G ) W ~ @ 01 a$3.933.3af2 o vbiM m@. n&/&~s&cpkclm y$iPe6B~ak.t~m/mmeat(iideph~1$~~.

Page 11: Scoping Report June 2010 - Appendix X -- Public …media.metro.net/projects_studies/eastside_phase2/images/...Agenda Metro Eastside Transit Corridor Phase 2 Scoping Meeting City of

l fyou would like to speak and provide comments, please fill out his card and drop it of f at the Registration table.

Speakers will have two minutes to make their comments.

Name:

Organization (if any):

Address:

If you would like to speak and provide comments, please fill out his card and drop it of f at the Registration table.

Speakers will have two minutes to make their comments.

Name:

Organization (if any):

Address:

Page 12: Scoping Report June 2010 - Appendix X -- Public …media.metro.net/projects_studies/eastside_phase2/images/...Agenda Metro Eastside Transit Corridor Phase 2 Scoping Meeting City of

Si le gustaria proveer comentarios, por favor Ilene esta tarjeta y entreguela a la mesa de registro.

Cada orador tendra dos rninutos pa ra proveer sus comentarios.

Nombre:

Organizacibn (si la hay):

Direccion:

S i le gustaria proveer comentarios, por favor Ilene esta tarjeta y entreguela a la mesa de registro.

Cada orador tendra dos minutos para proveer sus comentarios.

Nombre:

Organization (si la hay):

Direcci~n:

Page 13: Scoping Report June 2010 - Appendix X -- Public …media.metro.net/projects_studies/eastside_phase2/images/...Agenda Metro Eastside Transit Corridor Phase 2 Scoping Meeting City of

Metro Eastside Transit Corridor Phase 2 South. El Monte Scoping Meeting

S. El Monte Senior Center - Dining Room, 1556 Central Avenue, S. El Monte February 24, 201 0, 6:00 p.m. - 8:00 .p.m.

Comment Sheet

Name:

Affiliation (i.e. organization, resident, business):

Address:

Phoneltell:

Email:

Thank you for your interest in this Metro project. We welcome your comments on the alternatives or on any other project information.

Please use the reverse side for additional comments. Comments may also be mailed by April 14, 2010 to: Kimberly Yu, Project Manager, Metro, One Gateway Plaza, 99-22-2, Los Angeles, CA 90012, emailed to yt lk i@mWauet . or faxed to 21 3-922-3005.

Page 14: Scoping Report June 2010 - Appendix X -- Public …media.metro.net/projects_studies/eastside_phase2/images/...Agenda Metro Eastside Transit Corridor Phase 2 Scoping Meeting City of

Corredor de Transporte Hacia el Este Fase 2 I

Reuni6n de Alcance en South El Monte S. El Monte Senior Center - Dining Room, 1556 Central Avenue, S. El Monte

24 de febrero de 2010, 6:00 p.m. - 8:00 .p.m.

Tarjeta de Comentarios

Nombre:

Afiliacidn (organizaci6n, residente, negocio):

Dornicilio:

Nurnero de Tel6fono/Ceiular

Correo Electr6nico:

Gracias por su inter& en este proyecto de Metro. Agradecernos sus comentarios relacionados con las alternativas o cualquier otro aspect0 de este proyecto

Por favor utilice el lado inverso para comentarios adicionales. Los comentarios pueden ser enviados por correo antes del 14 de abril a: Kimberly Yu, Directors del proyecto, Metro, One Gateway Plaza, 99-22-2, Los Angeles, CA 90012 o por correo electr6nico a [email protected] o fax 21 3-922-3005.