SCOPE_OF_WORK_-_19[1].09.2009

  • Upload
    rbr

  • View
    219

  • Download
    0

Embed Size (px)

Citation preview

  • 8/14/2019 SCOPE_OF_WORK_-_19[1].09.2009

    1/4

    1

    SCOPE OF WORK AND LIST OF COMPULSARY REPLACEMENT SPARES FOR REPAIR & OVERHAULINGOF HYT MAKE NEW GENERATION UNDER FLOOR WHEEL LATHE MACHINE MODEL NO.NGUF-8

    INSTALLED AT COACHING DEPOT, SOUTH CENTRAL RAILWAY, SECUNDERABAD.

    PROBLEM NOTICED AS PERJOINT INSPECTION REPORT

    SCOPE OF WORK(REPAIRNG AND OVERHAULING)

    COMPULSARYREPLACEMENT

    SPARES

    1. Machine wiring is damageddue to rodent menace andneeds rewiring. Also theelectrical / hydraulic circuitdrawing supplied bymanufacturer does not matchwith machine and is nothelping for trouble shooting.Correct circuit drawings to besupplied by the firms afterrewiring.

    1. Replacement of all the machine wiringup to control panel by new one.

    2. Replacement of Control panelsdamaged wiring and other will bedressed up properly.

    3. Control panel testing will be carried outand safety interlocks, operatingsequence will be checking and verified.

    4. All the control panel will be cleanedfrom inside thoroughly by SKC.

    5. Electrical Circuit drawings will beprovided.

    1. Complete set of allthe electric cablesfor machine up tocontrol panel forrewiring.

    2. Cable for controlpanel if required.

    3. Circuit Drawings.

    2 On both side gear oil isleaking badly through maindrive motors and planetarygear box joint and planetarygear box is getting overheated. It should be attendedon priority.

    1. Replacement of both sides oil seals ofplanetary gear box.

    2. Replacement of both sides O rings ofplanetary gear box.

    3. Replacement of both sides bearings ofplanetary gear box.

    4. Replacement of gaskets for main drivemotor.

    1. Set of oil seals2. Set of O rings.3. Set of Bearings.4. Set of gaskets.

  • 8/14/2019 SCOPE_OF_WORK_-_19[1].09.2009

    2/4

  • 8/14/2019 SCOPE_OF_WORK_-_19[1].09.2009

    3/4

    3

    8 Both sides tracer valve withtracer head assembly to beattended.

    1. Replacement of Complete Tracer headassembly by new one.

    2. Overhauling and cleaning of Tracervalve with replacement of O rings.

    3. Replacement of Tracer Template(turning and facing) will be done.

    4. Replacement of both side Dial gauges.5. Replacement of Tracer Valve if required

    1. Tracer headassembly RH & LH

    2. O rings for tracervalves.

    3. Set of Tracer Template (turning& facing)

    4. Dial Gauges.

    9 Overhauling of tool postassembly on both sides.

    1. Cross slide and Longitudinal slidealignment matched by scrapingprocess.

    2. Grinding and Scraping of slide guideways.

    3. Grinding and scraping of slide liners.4. Replacement of taper and parallel

    wedges.5. Replacement of hydraulic seals & O

    rings of cross and longitudinal slidecylinders.

    6. Replacement of all the way wipers.

    1. Set of Wedges(Taper & Parallel)

    2. Seal kit for Cross &Longitudinal slidecylinders.

    3. Set of Way wipers.

    10 Replacement of filterelements.

    1. Replacement of all the filter element(Return line & Pressure line)

    2. Replacement of filter element ofLubrication systems.

    1. Set of Filters forreturn line andpressure line.

    2. Both sidelubricationsystems filter

    elements.

  • 8/14/2019 SCOPE_OF_WORK_-_19[1].09.2009

    4/4

    4

    11 Replacement of LED

    indicators on all solenoidvalves connections.

    1. Replacement of solenoid valves caps

    along with LED indicators.

    1. Set of Solenoid

    valve caps along withLED indicators.

    12 Replacement of Joysticks onboth sides.

    1. Replacement of both side Joystickswitches.

    1. Both Side Fourdirection JoystickSwitch makeEUCHNER.

    13 Lighting arrangement to bedone near tool post on bothsides.

    1. Machine lamp will be provided. 1. Machine Lamps