Statement of Work IV-1 OBJECTIVES: The Key Objective for this project will be the successful delivery of training courses in support of the county and municipal emergency managers continuing professional development. Five courses have been identified by the Pennsylvania Emergency Management Agency (PEMA) as core training. 1. GENERAL OBJECTIVE (Contractor): a. Present Federal Emergency Management Agency (FEMA) courses. The specific FEMA courses are: i. FEMA G-291, Joint Information System – Joint Information Center Planning ii. FEMA G-311, Hazardous Materials Contingency Planning iii. FEMA G-364, Multi-Hazard Emergency Planning for Schools iv. FEMA G-366, Planning for the Needs of Children in Disasters v. FEMA G-358, Evacuation and Re-Entry Planning vi. FEMA G-489, Management of Spontaneous Volunteers in Disasters b. Present a train-the-trainer course to qualify prospective trainers. c. Develop the Minimum Standard of Accreditation (MSA) Documents 2. SPECIFIC OBJECTIVES (Contractor): a. Develop a final exam sufficient to validate student mastery of objectives for each course that does not have a final exam. This final exam will consist of no less than 20 multiple choice questions. b. Present the PEMA courses (listed in IV-1, 1.a and 1.b above) to the target audience within the time reference as stipulated in IV-4 TASKS. c. Develop a Gantt chart for deliverables and course presentations. d. Develop MSA documents based upon template and guidance given by PEMA to ensure compliance with requirements set forth by the Pennsylvania State Fire Academy. No information security classification

Scope of Work for 2010 Spring Wx Exercise · Web viewFEMA G-311, Hazardous Materials Contingency Planning FEMA G-364, Multi-Hazard Emergency Planning for Schools FEMA G-366, Planning

  • Upload
    votruc

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Scope of Work for 2010 Spring Wx Exercise · Web viewFEMA G-311, Hazardous Materials Contingency Planning FEMA G-364, Multi-Hazard Emergency Planning for Schools FEMA G-366, Planning

Statement of Work

IV-1 OBJECTIVES: The Key Objective for this project will be the successful delivery of training courses in support of the county and municipal emergency managers continuing professional development. Five courses have been identified by the Pennsylvania Emergency Management Agency (PEMA) as core training.

1. GENERAL OBJECTIVE (Contractor): a. Present Federal Emergency Management Agency (FEMA) courses. The specific

FEMA courses are: i. FEMA G-291, Joint Information System – Joint Information Center Planningii. FEMA G-311,Hazardous Materials Contingency Planningiii. FEMA G-364, Multi-Hazard Emergency Planning for Schools iv. FEMA G-366, Planning for the Needs of Children in Disastersv. FEMA G-358, Evacuation and Re-Entry Planning vi. FEMA G-489, Management of Spontaneous Volunteers in Disasters

b. Present a train-the-trainer course to qualify prospective trainers.c. Develop the Minimum Standard of Accreditation (MSA) Documents

2. SPECIFIC OBJECTIVES (Contractor):a. Develop a final exam sufficient to validate student mastery of objectives for each

course that does not have a final exam. This final exam will consist of no less than 20 multiple choice questions.

b. Present the PEMA courses (listed in IV-1, 1.a and 1.b above) to the target audience within the time reference as stipulated in IV-4 TASKS.

c. Develop a Gantt chart for deliverables and course presentations.d. Develop MSA documents based upon template and guidance given by PEMA to

ensure compliance with requirements set forth by the Pennsylvania State Fire Academy.

No information security classification

Page 2: Scope of Work for 2010 Spring Wx Exercise · Web viewFEMA G-311, Hazardous Materials Contingency Planning FEMA G-364, Multi-Hazard Emergency Planning for Schools FEMA G-366, Planning

2013 Statement of Work for PEMA G-Series training

IV-2 NATURE and SCOPE of the PROJECT: 1. The outcome of this project will be the completion of continuing professional education for

the target audience in compliance with Title 35 Pennsylvania Consolidated Statutes, Section 7502.

2. PEMA will provide:a. G Series course material from the FEMA Emergency Management Institute (EMI) to

be printed for use during courses by Contractor.b. Training for two people on the PA Prepared Learning Management System (LMS) at

a mutually agreed upon date and time at PEMA Headquarters, 2605 Interstate Drive, Harrisburg PA.

c. A template example of the MSA to be developed for each of the courses noted in general objectives.

d. Lodging for students only, and will handle all lodging contracts in accordance with Commonwealth Travel Policies.

e. A copy either electronic or in print of the Commonwealth Style Guide for use in creation of any electronic media or print documents not provided by FEMA through the Commonwealth

3. [DELIVERABLE] Contractor will develop an overall project time line (Gantt chart) that includes courses, dates, and analysis of course feedback.

4. [DELIVERABLE] Contractor will develop an MSA for each of the five (5) courses listed in this SOW

5. The Contractor will meet with the PEMA project manager within ten (10) days of contract award to begin planning.

6. [DELIVERABLE] Contractor will develop a time line (Gantt chart) for producing course and exam material. A DRAFT version of this time line is due ten (10) days after meeting with the PEMA Training and Exercise Division (TED) Project Manager.

7. [DELIVERABLE] Contractor will develop a course schedule with locations. A DRAFT version of this time line is due fifteen (15) days after the first meeting with the PEMA TED Project Manager. The final draft is due twenty (20) days after the first meeting with the project manager.

8. Contractor will coordinate closely with PEMA to determine the best possible facilities for conducting training.

9. [DELIVERABLE] Contractor will provide a list of a minimum of five (5) identified instructors for each course and any subject matter experts. This list must identify the courses for which the instructors are being recommended. The contractor must present the identified instructors qualifications prior to the prospective candidate delivering any course. Course credentials (letters of reference are not acceptable) must accompany any recommended instructor.

10.[DELIVERABLE] The contractor will provide a copy of any handouts, and final exams (including student exam and Instructor Reference sheet) that are developed for use in this program in grammatically correct English. Microsoft Office 2007 or Adobe PDF electronic format is preferred for the delivery of this material.

Confidential Page 2 of 10 18 AUG 1309Z

Page 3: Scope of Work for 2010 Spring Wx Exercise · Web viewFEMA G-311, Hazardous Materials Contingency Planning FEMA G-364, Multi-Hazard Emergency Planning for Schools FEMA G-366, Planning

2013 Statement of Work for PEMA G-Series training

11.[DELIVERABLE] The Contractor will provide all printed materials needed for the delivery of all courses.

12.[DELIVERABLE] Develop or update as needed all course final exams. All final exams will include an Instructors Reference sheet. The Instructors Reference sheet will list, for each final exam question, the correct response and the location in the student manual and instructor manual of the correct answer.

13.[DELIVERABLE] Develop and deliver to PEMA course announcements for distribution in grammatically correct English, no later than sixty (60) days prior to the start of course.

14.[DELIVERABLE] All course announcements and course listings in LMS will have listed as a point of contact the PEMA TED Project Manager. No Contractor staff may be utilized to answer questions related to the programs, attendance, or registration.

15.[DELIVERABLE] The Contractor will maintain all course agendas or timelines for educational continuity. All courses will be delivered at the FEMA maximum length for course deliveries.

16.Contractor will not have any expectation of copyright or proprietary claim on any course material developed from or included in this project.

17.Contractor will develop, for each course, an agenda for a Train-the-Trainer (T-t-T) course. T-t-T courses will be delivered immediately after the base course and last no longer than six hours. The T-t-T agenda will address (at a minimum):

a. Administration requirementsb. Final exam - policy on failures, quick review, and retaking the final exam.c. Tips on communicating current Pennsylvania customs, policies, plans, and law that

the target audience can directly relate with.d. Instructor Qualifications and Code of Professionalism adopted by PEMAe. Materials and support provided by PEMA and the Community College system.

18.Contractor will deliver a draft T-t-T course agenda to the PEMA TED Project Manager within twenty (20) days after meeting with the Project Manager.

19.Contractor will coordinate closely with TED as TED will select and approve candidates to attend all T-t-T courses. This coordination is also critical as instructor candidates who have completed any of the certification courses prior to the Contractors offerings may be authorized by TED to attend any of the TTT courses.

IV- 3 REQUIREMENTS: 1. The use of sound Instructional Systems Design (ISD) methodology is required for course

development. The ADDI Model is a good example.2. Class size will be a maximum of 30 students and a minimum of ten (10) students. A

course of nine (9) or less students maybe cancelled after coordination with PEMA TED. The Commonwealth will bear no financial responsibility for costs associated with cancelled courses. If a course is cancelled it will be rescheduled within the contract period.

3. Courses will be delivered by the use of lecture, facilitated discussion, small group exercises and activities, and facilitated scenario response. All audio, movies, or multimedia must be preapproved by TED.

Confidential Page 3 of 10 18 AUG 1309Z

Page 4: Scope of Work for 2010 Spring Wx Exercise · Web viewFEMA G-311, Hazardous Materials Contingency Planning FEMA G-364, Multi-Hazard Emergency Planning for Schools FEMA G-366, Planning

2013 Statement of Work for PEMA G-Series training

4. The Contractor will use PA Prepared Learning Management System (LMS) to schedule and track student registration, capture student course critique, document student participation, document final exam grades, and issue course certificates. Registration for PEMA courses will only be accomplished through PA Prepared LMS.

5. The Contractor is responsible for managing the PA Prepared LMS grade book for each of the assigned classes for fourteen (14) days after the completion of the course. After 14 days all original copies must be returned to the PEMA TED Project Manager.

6. The Contractor will ensure that a sign-in roster is utilized for each day of the course. The roster must include course name, date, location, student’s name, student’s signature, title, agency or jurisdiction, phone number, e-mail address, and State Employee Number if applicable). Additionally the course roster must include course start and end times for each day and denote when meal periods were taken. For record keeping purposes the Instructors should be the last entry on the sign-in roster.

7. The Contractor will ensure that documentation is maintained during classes of any student arriving late, leaving early, or missing more than 20% of course hours.

8. The Contractor will be responsible to provide PEMA TED all sign-in rosters, documentation related to attendance (noted in item 7 of IV-3 Requirements), and final exams within fourteen (14) days of course completion. This may be accomplished through the use of electronic format such as e-mail or fax.

9. The Contractor is responsible to provide PEMA TED course announcements for each individual course offering at least twice. Once must be sixty (60) days prior to the start of the course, and the second must be thirty (30) days prior to the start of the course.

10.The target audience for these courses will be emergency management professionals from Pennsylvania state, county, and municipal governments.

11.The target audience for the train-the-trainer courses will be emergency management professionals from Pennsylvania state, county, and municipal governments and Pennsylvania state agencies that qualify under the Pennsylvania State Fire Academy Instructor Classification System and Code of Professionalism, Policy 2001-1.

12.Selection of students for the courses will be performed by PEMA TED.13.An adult-methodology approach to instruction will be used in consideration of the target

audience.14.Course material will mimic (as close as possible) the Federal Emergency Management

Agency (FEMA) lesson plan format and style, particularly PowerPoint slide shows, as used in current G and E series courses.

15.Common backgrounds or “slide master” must be created in accordance with the Commonwealth of Pennsylvania Style Guide, and approved by PEMA TED. No corporate or company logos or insignias permitted. Refer to Management Directive 205.40 “Commonwealth Branding.” Enclosure 1

16.All written material will be provided in grammatically correct English, unencrypted Microsoft Word version 2007 format. Only fonts and styles common to Microsoft Word may be used.

17.The Contractor will ensure at least five (5) qualified instructors are presented for approval and must have a minimum of two (2) available at all times throughout each course. Instructors will, at a minimum, possess the following qualifications. These qualifications must be included in the bid package.

Confidential Page 4 of 10 18 AUG 1309Z

Page 5: Scope of Work for 2010 Spring Wx Exercise · Web viewFEMA G-311, Hazardous Materials Contingency Planning FEMA G-364, Multi-Hazard Emergency Planning for Schools FEMA G-366, Planning

2013 Statement of Work for PEMA G-Series training

a. Completed a recognized course in adult methodology instruction (at least 35 hours). Formal instructor training such as National Wildlife Coordinating Group Facilitative Instructor M-410 Course, Emergency Management Institute Master Trainer Program, National Fire Academy instructor methodology class, or DHS Office of Grants and training’s Instructor training Certification Course, US military technical or academic instructor courses or equivalent courses meet this requirement. A bachelor’s degree in education or Pennsylvania teaching credentials is preferred.

b. Certificate of completion of: i. IS/ICS-100(any) Introduction to the Incident Command System. ii. IS/ICS-200(current version) Incident Command for Single Resources and Initial

Action Incidents.iii. IS-700a National Incident Management System (NIMS), An Introduction.iv. IS-235 Emergency Planning.v. IS-393.a Introduction to Hazard Mitigation.vi. IS-701 NIMS Multi-agency Coordination Systems.vii. IS-702 NIMS Public Information Systems.viii. IS-703 NIMS Resource Management.ix. IS-775 EOC Management and Operations.x. IS-800(current version) National Response Framework, An Introduction.xi. ICS 300, Intermediate Incident Command System.xii. ICS 400, Advanced Incident Command System.xiii. FEMA Professional Development Series (PDS).xiv. E/L/G series version of the course assigned to teach.

c. All instructors must have eight (8) years of professional experience in the area of the course of instruction.

d. Be of professional image and of such moral character as to exemplify a professional decorum, which facilitates the transfer of knowledge and fosters a positive learning environment for students.

18.While it is understood that resumes, curriculum vitas, or summaries of work will be provided it is incumbent upon the Contractor to ensure that documentation is given supporting eight (8) years of specific experience in the specific subject matter area that each of the proposed instructors is planning on presenting.

19.Any documentation developed by the Contractor for this SOW will be written at no higher than the eighth-grade reading level.

20.The Contractor will arrange for any subject matter experts for courses as needed. Any subject matter expert chosen to assist in the delivery of a course must be preapproved by PEMA TED. A Resume or Curriculum Vitae and appropriate training information must be provided. Use of a subject matter expert does not release the contractor from providing two (2) qualified instructors.

21.PEMA approval of altered or created course content is required before the course is presented.

Confidential Page 5 of 10 18 AUG 1309Z

Page 6: Scope of Work for 2010 Spring Wx Exercise · Web viewFEMA G-311, Hazardous Materials Contingency Planning FEMA G-364, Multi-Hazard Emergency Planning for Schools FEMA G-366, Planning

2013 Statement of Work for PEMA G-Series training

22.The Contractor will ensure that instructors are appropriately attired as defined in the Pennsylvania State Fire Academy Instructor Classification System and Code of Professionalism, Policy 2001-1.

23.The Contractor will ensure that instructor attire does not display corporate logos.24.The Contractor must abide by all aspects of Management Directive 215.8 as Amended

“Contractor Integrity Provisions for Commonwealth Contracts.”

IV-4 TASKS:

1. The contractor will provide at least two (2) individuals who will act as System Learning Managers to manage course documentation in PA Prepared Learning Management System (LMS)

2. The contractor will be responsible for:a. Management of grade books.b. Provide students a reasonable time for a lunch break period for the given area

where the course is being conducted. The lunch break meal will not be provided by the contractor or PEMA.

c. Ensuring that a consistent time is given each day for the lunch break period.3. Coordinate course dates with the TED so that there is a maximum amount of lead time

before the courses start date.4. Present the courses:

a. The geographical area assigned to the PEMA Area Offices (Eastern, Central and Western) will be used for the purpose of dividing Pennsylvania for presenting courses. A centralized location in each area will be used that will minimize the cost of travel to students, avoid premium or high-cost conference facilities, and allow maximum student participation.

b. Each of the five courses will be presented once in each of the three PEMA areas. Unless otherwise directed by PEMA TED.

c. The Contractor will present the courses as scheduled in the course schedule deliverable in IV2 Nature and Scope above.

d. Courses will be scheduled so that presentations are complete within twelve (12) months of award of the contract.

e. Certification courses will not be presented concurrently; however, the train-the-trainer course will be presented immediately after its base course.

f. Only one instructor is required to deliver the train-the-trainer. It is acceptable if the last day of the course is a half day in length to present the train-the-trainer immediately after the completion of the course. The contractor will only bill for one instructor for the train-the-trainer portion.

5. Contractor will provide a student manual to each student. The manual pages will be printed on both sides (duplex style), in black and white, tabbed and assembled in a durable three-ring binder. Additionally each student manual will include a CD-ROM of all printed material provided during the course.

Confidential Page 6 of 10 18 AUG 1309Z

Page 7: Scope of Work for 2010 Spring Wx Exercise · Web viewFEMA G-311, Hazardous Materials Contingency Planning FEMA G-364, Multi-Hazard Emergency Planning for Schools FEMA G-366, Planning

2013 Statement of Work for PEMA G-Series training

6. The Contractor will include in the proposal an itemized list of specific Costs of Supplies and Materials and specific costs for each item.

IV-5 REPORTS AND PROJECT CONTROLS:1. Contractor will provide a report within fourteen (14) days after a course indicating final

exam grades and instructor reports of student conduct, attendance and other pertinent issues. Student evaluations are not required as LMS has a course survey.

2. A sign-in roster is required for every course. A separate roster will be completed for each day of a course and will document the course, course date, course location and, the student’s name, student’s written signature, title, agency or jurisdiction, phone number, e-mail address and State Employee Number. No Social Security Numbers (SSN) or parts of the SSN or date-of birth will be recorded on the roster or by the contractor for any purposes. All instructors for the course will sign-in as last entries on the student roster for record keeping purposes. The original copy of all student sign-in rosters will be forwarded to PEMA TED no later than fourteen (14) days after the last day of the course.

3. The Contractor will provide to PEMA TED a monthly status of training report that lists all courses (sorted by course then by date) that have been presented (complete), including dates, location, and number of students.

4. All final exams will be consolidated into a single file and sent to the PEMA TED no later than fourteen (14) days after the last day of the course.

5. The Contractor will provide to PEMA TED a monthly Spend Detail Report for each course detailing the actual costs of each course.

6. Invoices.  All invoices will be delivered to Commonwealth of Pennsylvania, P.O. Box 69180, Harrisburg, PA 17106.  Payment may be delayed for invoices without the required information and those lacking proper documentation.  Every invoice will, at a minimum, include the following information to support the totals indicated:

a. Company name, address, phone and FAX numbers plus a phone number and e-mail for a single point-of-contact for the invoice. The point-of-contact must be able to correct errors and resolve issues in the invoice.

b. The PEMA Purchase Order number and project title must be clearly visible on the invoice.  The invoice will have the specific period of time (billing period) the invoice covers and a date of invoice within thirty days of the billing period.

c. The list of work performed will document each employee’s labor, one employee per line entry.  On one line list the employee, title, pay rate, date, location, hours charged, and total for that day.

d. List each day worked on a separate line.  A copy of the corporate time sheet indicating dates, times, locations, and totals referenced to this project will be attached for verification of work performed.

e. Travel expense lists will have only one expense per line.  Every line entry must identify the traveler, date, brief description of the expense, point of origin, destination, and the expense in US dollars. A copy of the receipt is required for validation of every line entry and will be included with the invoice.  Entries without receipt verification are unacceptable.  Per Diem and mileage must not exceed the

Confidential Page 7 of 10 18 AUG 1309Z

Page 8: Scope of Work for 2010 Spring Wx Exercise · Web viewFEMA G-311, Hazardous Materials Contingency Planning FEMA G-364, Multi-Hazard Emergency Planning for Schools FEMA G-366, Planning

2013 Statement of Work for PEMA G-Series training

Federal maximums for the area, type and style of travel or expense.  Note: Reimbursement for alcoholic beverages is prohibited.

f. Reimbursable expense lists will have only one expense per line with a copy of the receipt included for verification.

g. The profit a company expects to make from this project, sometimes called a fee, must be listed as such and not concealed in other entries.

h. Please find a sample invoice at Attachment C

Confidential Page 8 of 10 18 AUG 1309Z

Page 9: Scope of Work for 2010 Spring Wx Exercise · Web viewFEMA G-311, Hazardous Materials Contingency Planning FEMA G-364, Multi-Hazard Emergency Planning for Schools FEMA G-366, Planning

2013 Statement of Work for PEMA G-Series training

ATTACHMENT CSample Invoice

PEMA Learning Management System

(Insert Your Company Name Here)                                                      Invoice date:  MM/DD/YYYY(Company Address phone and FAX)                             Billing period: MM/DD/YYY thru MM/DD/YYYY(Company project identification)(Federal Tax ID #YY-YYYYYYY)

Commonwealth of Pennsylvania                                   Billing point of contact:PO Box 69180                                                          Mrs. Smith (phone number)Harrisburg, PA 17106                                                 smith@ e-mail

PO #XXXXXXXXXX         PO Title: (insert title from the PEMA Purchase Order)

Labor chargesEmployee title rate Date Location hours COST

Jones Admin $50.00 MM/19 City, state, ZIP 2.0 $100.00Doe Manage

r$75.00 MM/19 (Company address, ZIP) 2.0 $150.00

Doe Manager

$75.00 MM/20 City, state, ZIP 5.0 $375.00

Doe Manager

$75.00 MM/20 (Company address, ZIP) 8.0 $600.00

Smith Admin $6.15 MM/25 (Company address, ZIP) 8.0 $49.20Total 25.0 $1274.20

Travel chargesEmployee date description Origin Destination Miles COST

Doe MM/19 Meeting Corporate office City and ZIP 100 $55.00Doe MM/19 Lodging City and ZIP 0 $99.00Doe MM/20 Meals City and ZIP 0 $25.00Doe MM/20 Return City and ZIP Corporate office 100 $55.00Total $234.00

OverheadITEM Description DATE COST

FEE Expense authorized on PO MM/DD $30.00TOTAL $30.00

Reimbursable costsITEM Date Each COST

5 CD-ROM of report MM/DD $2.00 each $10.00One WEB Conference Call MM/DD $5.6725 Comb bound, plastic cover, full color final reports MM/DD $12.00 each $300.00TOTAL $315.67

TOTALConfidential Page 9 of 10 18 AUG 1309Z

Page 10: Scope of Work for 2010 Spring Wx Exercise · Web viewFEMA G-311, Hazardous Materials Contingency Planning FEMA G-364, Multi-Hazard Emergency Planning for Schools FEMA G-366, Planning

2013 Statement of Work for PEMA G-Series training

Labor $1274.20Travel $234.00Overhead $30.00Reimbursable $315.67INVOICE TOTAL $1853.20

IV-6 CONTRACT REQUIREMENTS:

This portion of the DGS template should be left as is and includes standard contracting language.

IV-7 DEFINITION OF CHANGE CONTROL PROCESS: The agency and the contractor will mutually define and document acceptance criteria to be reviewed by the executive change control board. These criteria will be based on functional requirements. Upon approval of these criteria by the change control board, the agency and the contractor will mutually agree to the revised criteria. Successfully meeting the acceptance criteria as documented with the Pennsylvania Statement of Work form and signed for approval by designated agency staff shall constitute "acceptance". Milestones for acceptance will be incorporated into the project plan and managed by the assigned Contractor personnel.

Project Objective

=

Confidential Page 10 of 10 18 AUG 1309Z

The overall goal is to provide a relevant, consistent and current block of core courses to county and municipal emergency managers for professional qualification. All blocks in courses must be in compliance with current PEMA circulars and Directives which delineate the minimum training required for these critical positions in government.