Scope Addressing the new paradigm shift new challenges brought by the increasing integration of: renewable energy sources in the electric power grid electric vehicle fast charging stations . . Seamless operation islanded & interconnected microgrids enabled by energy storage . Integrated system broad ADMS/DERMS/DRMS solutions for microgrid management: embedded smart charging and street light control algorithms . Site Efacec industrial premises, comprising a 250 kWp PV plant Maia, Portugal Project supported by: Goals Deployment of an isolated/interconnected microgrid private (e.g. industries) and public grids (e.g. electric cooperatives) Advanced demand response and control features flexible loads (street lighting, EV charging stations) + diesel genset Installation of a lithium ion battery system sizing: 208 kW /208 kWh LV and MV grid coupling via decoupling and step-up 250 kVA transformers IED and smart grid management systems integration protection relay, smart meters, power quality, sensors, automation

Scope - Efacec · 2019. 4. 24. · Efacec industrial premises, comprising a 250 kWp PV plant Maia, Portugal Project supported by: Goals Deployment of an isolated/interconnected microgrid

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • ScopeAddressing the new paradigm shiftnew challenges brought by the increasing integration of:

    renewable energy sources in the electric power gridelectric vehicle fast charging stations

    .

    .

    Seamless operationislanded & interconnected microgrids enabled by energy storage.

    Integrated systembroad ADMS/DERMS/DRMS solutions for microgrid management:

    embedded smart charging and street light control algorithms.

    SiteEfacec industrial premises, comprising a 250 kWp PV plantMaia, Portugal

    Project supported by:

    GoalsDeployment of an isolated/interconnected microgridprivate (e.g. industries) and public grids (e.g. electric cooperatives)

    Advanced demand response and control featuresflexible loads (street lighting, EV charging stations) + diesel genset

    Installation of a lithium ion battery systemsizing: 208 kW / 208 kWh

    LV and MV grid couplingvia decoupling and step-up 250 kVA transformers

    IED and smart grid management systems integrationprotection relay, smart meters, power quality, sensors, automation

  • Architecture

    Key components, by Efacec

    ADMS/DERMS/DRMS grid management platform Energy storage controller Protection relay

    Data aggregator and controller

    Secondary Substation Automation

    4-quadrant battery inverter (250 kVA) EV quick charger

    Step-uptransformer (250 kVA) MV switchgear

    storage

    Efacec Energia, Máquinas e Equipamentos Eléctricos, S.A.Via Francisco Sá Carneiro - Ap. 3078 | 4471-907 Moreira Maia | PortugalTelephone: +351 229 402 000e-mail: [email protected]: http://www.democrat-project.efacec.com

    mod: CS441I1904A1

    Due

    to o

    ur p

    olic

    y of

    con

    tinuo

    us d

    evel

    opm

    ent,

    spe

    cific

    atio

    ns m

    ay c

    hang

    e w

    hith

    out

    notic

    e. N

    ot v

    alid

    as

    a co

    ntra

    ctua

    l ite

    m.