NORTHSIDE INDEPENDENT SCHOOL DISTRICT Photo Album Index: Construction Projects In Progress Brennan High School Briscoe Middle School (Alamo Ranch MS) Behlau (Laurel Mountain Ranch) Elementary Martin (Canterbury Farm) Elementary Henderson (Kallison Ranch) Elementary Westwinds Elementary Lieck Elementary Facilities Construction Vernon Dunagin, AIA Assist. Superintendent of Facilities & Operations Leroy San Miguel Executive Director of Construction & Engineering Ceasar Ponce, AIA Director of Facilities Construction Schools Under Construction for N.I.S.D. Martin Elementary - Front Entrance Henderson Elementary - Front Entrance Meadow Village Elementary Addition Marshall High School Addition Clark High School Holmes High School Renovation Pease Middle School Addition John Glenn Elementary Addition Additions & Renovations Projects Warren High School Addition Oak Hills Terrace ES Addition Bandera North Elementary February 2010

Schools Under Construction for N.I.S.D

  • Upload
    lydat

  • View
    220

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Schools Under Construction for N.I.S.D

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Photo Album Index: Construction Projects In Progress

• Brennan High School

• Briscoe Middle School (Alamo Ranch MS)

• Behlau (Laurel Mountain Ranch) Elementary

• Martin (Canterbury Farm) Elementary

• Henderson (Kallison Ranch) Elementary

• Westwinds Elementary

• Lieck Elementary

Facilities Construction Vernon Dunagin, AIA

Assist. Superintendent of Facilities & Operations

Leroy San Miguel Executive Director of Construction & Engineering

Ceasar Ponce, AIA

Director of Facilities Construction

Schools Under Construction for

N.I.S.D.

Martin Elementary - Front Entrance Henderson Elementary - Front Entrance

• Meadow Village Elementary Addition

• Marshall High School Addition

• Clark High School

• Holmes High School Renovation

• Pease Middle School Addition

• John Glenn Elementary Addition

Additions & Renovations Projects

• Warren High School Addition

• Oak Hills Terrace ES Addition

• Bandera North Elementary

February 2010

Page 2: Schools Under Construction for N.I.S.D

Briscoe MS

Henderson ES

Brennan HSMartin ES

Behlau ES

New Schools from Bond 2007

Schools to Open in Summer 2010

Lieck ES

Westwinds Area ES

Schools to Open in Summer 2011 Bandera North ES

Schools to Open in Summer 2012

Page 3: Schools Under Construction for N.I.S.D

Pease MS

Clark HS

Warren HS

Holmes HS

Marshall HS

John Glenn ES

Additions & Renovations from Bond 2007

Schools to Open in Summer 2010

Oak Hills ES

Meadow Village ES

Page 4: Schools Under Construction for N.I.S.D

BRENNAN HIGH SCHOOL

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

a. Name and Location of Building:

Brennan High School

Potranco West

San Antonio, TX

b. Client/ Contact Person:

Northside Independent School District

Mr. Ceasar Ponce, AIA Director of Facilities Construction

San Antonio, TX 78238-2220

(210) 397-1200

c. Contractor:

Bartlett-Cocke, Inc.

d. Construction Cost:

$88,146,618.00

e. Construction Completion:

January, 2008 thru May, 2010

f. Managing Principal:

Bill Reeves, AIA

Marmon Mok Architects

g. Project Architect:

Monty Howard, AIA

h. Scope of Services Performed:

2800 Student High School (96% complete – Site & Building)

Rendering of Front Entrance at Brennan High School

Page 5: Schools Under Construction for N.I.S.D

BRENNAN HIGH SCHOOL

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Location Aerial of Brennan High School

School Site Location for Brennan High School

Wiseman Blvd.Lone Star Pkwy

LOO

P 1604

Page 6: Schools Under Construction for N.I.S.D

BRENNAN HIGH SCHOOL

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of Brennan High School (November 17, 2009)

Page 7: Schools Under Construction for N.I.S.D

BRENNAN HIGH SCHOOL

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of Brennan High School (November 17, 2009)

Page 8: Schools Under Construction for N.I.S.D

BRENNAN HIGH SCHOOL

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of Brennan High School (February 12, 2010)

Page 9: Schools Under Construction for N.I.S.D

BRENNAN HIGH SCHOOL

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of Brennan High School (February 12, 2010)

Page 10: Schools Under Construction for N.I.S.D

BRENNAN HIGH SCHOOL

Page 11: Schools Under Construction for N.I.S.D

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

a. Name and Location of Building:

Briscoe Middle School

4265 Lone Star Parkway

San Antonio, TX 78253

b. Client/ Contact Person:

Northside Independent School District

Mr. Ceasar Ponce, AIA Director of Facilities Construction

Ms. Marilyn Sevedge, Senior Project Manager

5900 Evers Road

San Antonio, TX 78238-2220

(210) 397-1200

c. Contractor:

CM@Risk: Bartlett-Cocke, Inc.

d. Construction Cost:

$39,931,870.00

e. Construction Completion:

August, 2008 thru May, 2010

f. Managing Principal:

Joel Hernandez, AIA

PBK Architects

g. Project Architect:

Raul Llanas, Assoc. AIA

h. Scope of Services Performed:

1200 Student Middle School (93% complete)

BRISCOE MIDDLE SCHOOL

Rendering of Front Entry at Briscoe Middle School

Page 12: Schools Under Construction for N.I.S.D

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

BRISCOE MIDDLE SCHOOL

Location Aerial of Briscoe Middle School

School Site Location for Briscoe Middle School

Wiseman Rd.

LOO

P 1604Lo

nest

arPk

wy

Page 13: Schools Under Construction for N.I.S.D

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

BRISCOE MIDDLE SCHOOL

Aerial of Briscoe Middle School (February 12, 2010)

Page 14: Schools Under Construction for N.I.S.D

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

BRISCOE MIDDLE SCHOOL

Aerial of Briscoe Middle School (February 12, 2010)

Page 15: Schools Under Construction for N.I.S.D

BRISCOE MIDDLE SCHOOL

Page 16: Schools Under Construction for N.I.S.D

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

a. Name and Location of Building:

Behlau Elementary

San Antonio, TX

b. Client/ Contact Person:

Northside Independent School District

Mr. Ceasar Ponce, AIA Director of Facilities Construction

Ms. Marilyn Sevedge, Senior Project Manager

5900 Evers Road

San Antonio, TX 78238-2220

(210) 397-1200

c. Contractor:

Kunz Construction

d. Construction Cost:

$19,552,691.00

e. Construction Completion:November, 2008 thru May, 2010

f. Managing Principal:

Craig Noonan, AIA

Noonan Rittimann

g. Project Architect:

Craig Noonan, AIA

h. Scope of Services Performed:

800 Student Elementary School (89% complete)

BEHLAU ELEMENTARY

Rendering of Front Entry at Behlau Elementary School

Page 17: Schools Under Construction for N.I.S.D

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

BEHLAU ELEMENTARY

Location Aerial of Behlau Elementary

School Site Location for Behlau Elementary

Emory Peak

GrosenbacherR

oad

Loop 1604

Page 18: Schools Under Construction for N.I.S.D

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of Behlau E.S. (February 26, 2010)

BEHLAU ELEMENTARY

Page 19: Schools Under Construction for N.I.S.D

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of Behlau E.S. (February 26, 2010)

BEHLAU ELEMENTARY

Page 20: Schools Under Construction for N.I.S.D

BEHLAU ELEMENTARY

Page 21: Schools Under Construction for N.I.S.D

MARTIN ELEMENTARY

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

a. Name and Location of Building:

Martin Elementary

San Antonio, TX

b. Client/ Contact Person:

Northside Independent School District

Mr. Ceasar Ponce, AIA Director of Facilities Construction

Mr. Leroy San Miguel, AIA Project Manager

5900 Evers Road

San Antonio, TX 78238-2220

(210) 397-1200

c. Contractor:

Joeris General Contractors

d. Construction Cost:

$19,264,223.00

e. Construction Period:

December, 2008 thru May, 2010

f. Managing Principal:

Jerry Lammers, AIA

Alamo Architects

g. Project Architect:

Jerry Lammers, AIA

h. Scope of Services Performed:

New Elementary School - 660 Students (80% complete)

Rendering of Martin Elementary

Page 22: Schools Under Construction for N.I.S.D

MARTIN ELEMENTARY

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

School Site Location for Martin Elementary

Canterbury

Callaghan R

oadLocation Aerial of Martin Elementary

New Callaghan Road

Culebra Road

Page 23: Schools Under Construction for N.I.S.D

MARTIN ELEMENTARY

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of Martin Elementary (November 18, 2009)

Page 24: Schools Under Construction for N.I.S.D

MARTIN ELEMENTARY

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of Martin Elementary (February 22, 2010)

Page 25: Schools Under Construction for N.I.S.D

MARTIN ELEMENTARY

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of Martin Elementary (February 22, 2010)

Page 26: Schools Under Construction for N.I.S.D

MARTIN ELEMENTARY

Page 27: Schools Under Construction for N.I.S.D

HENDERSON ELEMENTARY

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

a. Name and Location of Building:

Henderson Elementary

14605 Kallison Bend

San Antonio, TX 78254

b. Client/ Contact Person:

Northside Independent School District

Mr. Ceasar Ponce, AIA Director of Facilities Construction

Mr. Thomas Curiel, Project Manager

5900 Evers Road

San Antonio, TX 78238-2220

(210) 397-1200

c. Contractor:

Bartlett-Cocke, Inc.

d. Construction Cost:

$19,773,497.00

e. Construction Period:

Janurary, 2009 thru May, 2010

f. Managing Principal:

Monty Howard, AIA

Marmon Mok

g. Project Architect:

Monty Howard, AIA

h. Scope of Services Performed:

800 Student Elementary School (89% complete)

Elevation Rendering of Front Entrance at Henderson Elementary

Elevation Rendering of Bus Drop and Cafeteria Entrance at Henderson Elementary

Page 28: Schools Under Construction for N.I.S.D

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Location Aerial of Henderson Elementary

HENDERSON ELEMENTARY

School Site Location for Henderson Elementary

Kalli

son

Bend

Win

dgat

ePk

wy

FM 471

Page 29: Schools Under Construction for N.I.S.D

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of Henderson Elementary - February 22, 2010

HENDERSON ELEMENTARY

Page 30: Schools Under Construction for N.I.S.D

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of Henderson Elementary - February 22, 2010

HENDERSON ELEMENTARY

Page 31: Schools Under Construction for N.I.S.D

HENDERSON ELEMENTARY

Page 32: Schools Under Construction for N.I.S.D

MIRELES ELEMENTARY SCHOOL

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Rendering of Entrance at Westwinds Elementary

a. Name and Location of Building:

Westwinds Elementary School

San Antonio, TX

b. Client/ Contact Person:

Northside Independent School District

Mr. Ceasar Ponce, AIA Director of Facilities Construction

Ms. Marilyn Sevedge, Senior Project Manager

5900 Evers Road

San Antonio, TX 78238-2220

(210) 257-1200

c. Contractor:

Bartlett Cocke

d. Construction Cost Estimate:

$19,324,998.00

e. Construction Period:

December, 2009 thru May 2011

f. Managing Principal:

Joel Henandez, AIA

PBK Architects

g. Project Architect:

Joel Hernandez, AIA

h. Scope of Services Performed:

800 Elementary School (12% complete)

Page 33: Schools Under Construction for N.I.S.D

MIRELES ELEMENTARY SCHOOL

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Rendering of Westwinds Elementary Site Plan

Page 34: Schools Under Construction for N.I.S.D

MIRELES ELEMENTARY SCHOOL

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Location Aerial of Mireles Elementary

School Site Location for Mireles ElementaryRockwall Mill

Palmetto W

ay

Alam

o Pkwy

Page 35: Schools Under Construction for N.I.S.D

MIRELES ELEMENTARY SCHOOL

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of Westwinds Elementary (February 12, 2010)

Page 36: Schools Under Construction for N.I.S.D

MIRELES ELEMENTARY SCHOOL

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of Westwinds Elementary (February 12, 2010)

Page 37: Schools Under Construction for N.I.S.D

MIRELES ELEMENTARY SCHOOL

Page 38: Schools Under Construction for N.I.S.D

LIECK ELEMENTARY SCHOOL

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial Rendering of Lieck Elementary

a. Name and Location of Building:

Lieck Elementary School

San Antonio, TX

b. Client/ Contact Person:

Northside Independent School District

Mr. Ceasar Ponce, AIA Director of Facilities Construction

Mr. Thomas Curiel, Project Manager

5900 Evers Road

San Antonio, TX 78238-2220

(210) 257-1200

c. Contractor:

Bartlett Cocke

d. Construction Cost Estimate:

$19,578,860.00

e. Construction Period:

January, 2010 thru May 2011

f. Managing Principal:

Craig Noonan, AIA

Noonan Rittimann

g. Project Architect:

John Rittimann, AIA

h. Scope of Services Performed:

800 Elementary School (6% complete)

Page 39: Schools Under Construction for N.I.S.D

LIECK ELEMENTARY SCHOOL

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

School Site Location for Lieck Elementary

Potranco Rd.

Location Aerial of Lieck Elementary

Grosenbacher R

d.

Talley Road

Page 40: Schools Under Construction for N.I.S.D

LIECK ELEMENTARY SCHOOL

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of Lieck Elementary - January 30, 2010

Page 41: Schools Under Construction for N.I.S.D

LIECK ELEMENTARY SCHOOL

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of Lieck Elementary - February 26, 2010

Page 42: Schools Under Construction for N.I.S.D

LIECK ELEMENTARY SCHOOL

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of Lieck Elementary - February 26, 2010

Page 43: Schools Under Construction for N.I.S.D

LIECK ELEMENTARY SCHOOL

Page 44: Schools Under Construction for N.I.S.D

Floor Plan - Rendering

PLANNORTH

MEADOW VILLAGE ELEMENTARY ADDITIONS AND RENOVATIONS

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

f. Managing Principal:

Chris Kim, AIA

West East Design Group

g. Project Architect:

Jeffrey Rodriquez, AIA

h. Scope of Services Performed:

Ten Classroom Addititon, Mechanical Upgrades and New Student Restrooms (69% complete)

a. Name and Location of Building:

Meadow Village Elementary

Additions & Renovations

1406 Meadow Way

San Antonio, TX 78227

b. Client/ Contact Person:

Northside Independent School District

Mr. Ceasar Ponce, AIA Director of Facilities Construction

Ms. Marilyn Sevedge, Senior Project Manager

5900 Evers Road

San Antonio, TX 78238-2220

(210) 397-1200

c. Contractor:

Galaxy Builders

d. Construction Cost:

$3,146,000.00

e. Construction Period:

May, 2009 thru August, 2010

Page 45: Schools Under Construction for N.I.S.D

MEADOW VILLAGE ELEMENTARY ADDITIONS AND RENOVATIONS

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Axonmetric View of Meadow Village ES - Addition

Page 46: Schools Under Construction for N.I.S.D

MEADOW VILLAGE ELEMENTARY

Page 47: Schools Under Construction for N.I.S.D

MARSHALL HIGH SCHOOLADDITION & RENOVATIONS

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Rendering of Entry Elevation of New Auditorium

a. Name and Location of Building:

Marshall High School

8000 Lobo Lane

San Antonio, TX 78240

b. Client/ Contact Person:

Northside Independent School District

Mr. Ceasar Ponce, AIA Director of Facilities Construction

San Antonio, TX 78238-2220

(210) 397-1200

c. CM @ Risk Contractor:

Satterfield & Pontikes

d. Construction Budget:

Package I thru VI

$12,246,916.00

e. Construction Completion:

May, 2009 thru August, 2010

f. Managing Principal:

Joel Hernandez, AIA

PBK Architects

g. Project Architect:

Joel Hernandez, AIA

h. Scope of Services Performed: (35% complete)

New Auditorium with Scene Shop, Drama Classroom, Choir Room and Practice Rooms, Gym AC, Roof Replacement, Campus Central Plant and Electrical Service Upgrades

Package I (Mech./Elect. Upgrades) - $1,943,050.00 (NTP Issued 4-29-09)

Package II (Demolition) - $192,527.00 (NTP Issued 5-19-2009)

Package III (Roofing) – $1,169,000.00(NTP Issued 5-19-2009)

Package IV (Foundation) – BIDS 6-2-09 $250,363.00

Package V (Building Package) – BIDS $7,441,409.00

Package VI (Stage Equipment) -- $1,250,567.00

Total - $12,246,916.00

Page 48: Schools Under Construction for N.I.S.D

MARSHALL HIGH SCHOOLADDITION & RENOVATIONS

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of Marshall High School (January 25, 2010)

Page 49: Schools Under Construction for N.I.S.D

MARSHALL HIGH SCHOOLADDITION & RENOVATIONS

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of Marshall High School (January 25, 2010)

Page 50: Schools Under Construction for N.I.S.D

MARSHALL HIGH SCHOOLADDITION & RENOVATIONS

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Rendered Floor Plan of “New Auditorium” at Marshall High School

Page 51: Schools Under Construction for N.I.S.D

MARSHALL HIGH SCHOOL

Page 52: Schools Under Construction for N.I.S.D

CLARK HIGH SCHOOL ADDITIONS & RENOVATION

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

a. Name and Location of Building:

Clark High School

5150 DeZavala

San Antonio, TX 78249

b. Client/ Contact Person:

Northside Independent School District

Mr. Ceasar Ponce, AIA Director of Facilities Construction

Mr. Jim Berg, AIA Project Manager

5900 Evers Road

San Antonio, TX 78238-2220

(210) 257-1200

c. CM@ Risk Contractor:

Bartlett Cocke

d. Construction Budget:

$12,230,347.38

e. Construction Completion:June, 2009 - August, 2010

f. Managing Principal:

Craig Noonan, AIA

Noonan Rittimann, LLC

g. Project Architect:

Craig Noonan, AIA

h. Scope of Services Performed:

(59% complete)

Ten Room Science Lab Addition, Gym AC, Central Plant Upgrade, Dressing Rooms and Infrastructure Upgrades.

Package I (Equipment) - $356,823.00 (NTP Issued March 26, 2009)

Package II (Athletics, Gym AC & Central Plant) - $3,618,638.00

Package III (Building Package) - $8,216,227.00

Total = $12,230,347.38

Page 53: Schools Under Construction for N.I.S.D

CLARK HIGH SCHOOL ADDITIONS & RENOVATION

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of “New Classroom Addition February 21, 2010

Page 54: Schools Under Construction for N.I.S.D

CLARK HIGH SCHOOL ADDITIONS & RENOVATION

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Site Plan of Additions/Renovations

Page 55: Schools Under Construction for N.I.S.D

CLARK HIGH SCHOOL

Page 56: Schools Under Construction for N.I.S.D

f. Managing Principal:

Craig Noonan, AIA

Noonan, Rittimann, LLC

g. Project Architect:

Craig Noonan, AIA

h. Scope of Services Performed:

(51% complete)

Fourteen Room Science Lab Addition, Gym A/C, Central Plant Upgrade, Dressing Rooms and Infrastructure Upgrades.

Package I (Equipment) - $457,211.00 (NTP Issued March 26, 2009)

Package II (Athletics, Gym AC & Central Plant) - $2,959,392.00

Package III (Building Package) - $8,430,598.00 (Pending Board Approval)

Total - $11,847,201.00

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

OLIVER W. HOLMES HIGH SCHOOL ADDITIONS AND RENOVATIONS

a. Name and Location of Building:

Oliver Wendell Holmes High School

Additions & Renovations

6500 Ingram Road

San Antonio, TX 78238

b. Client/ Contact Person:

Northside Independent School District

Mr. Ceasar Ponce, AIA Director of Facilities Construction

Mr. Jim Berg, AIA Project Manager

5900 Evers Road

San Antonio, TX 78238-2220

(210) 257-1200

c. CM@ Risk Contractor:

Bartlett Cocke

d. Construction Budget:

$11,847,201.00

e. Construction Period:

June, 2009 - August, 2010

Page 57: Schools Under Construction for N.I.S.D

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

OLIVER W. HOLMES HIGH SCHOOL ADDITIONS AND RENOVATIONS

Aerial of “New Classroom Addition - February 21, 2010

Page 58: Schools Under Construction for N.I.S.D

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

OLIVER W. HOLMES HIGH SCHOOL ADDITIONS AND RENOVATIONS

Site Plan of Holmes High School

Page 59: Schools Under Construction for N.I.S.D

OLIVER W. HOLMES HIGH SCHOOL

Page 60: Schools Under Construction for N.I.S.D

PEASE MIDDLE SCHOOL ADDITIONS AND RENOVATIONS

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

a. Name and Location of Building:

Pease Middle School

201 Hunt Lane

San Antonio, TX 78245

b. Client/ Contact Person:

Northside Independent School District

Mr. Ceasar Ponce, AIA Director of Facilities Construction

Mr. Thomas Curiel, Project Manager

5900 Evers Road

San Antonio, TX 78238-2220

(210) 397-1200

c. Contractor:

Joeris General Contractors

d. Construction Budget:

$11,647,505.00

e. Construction Period:

April, 2009 thru August, 2010

f. Managing Principal:

Jesse Garza, AIA

Garza Architecture, Inc.

g. Project Architect:

Jesse Garza, AIA

h. Scope of Services Performed:

Nineteen Classroom Addition (69% complete)

Package I (Site) - $2,014,895.00 (NTP Issued May 15, 2009)

Package II (Bldg. Package) - $9,632,610.00

Total = $11,647,505.00

Project Scope – 2 Story, Nineteen Classroom Addition with 9 Science Labs, 3 Computer Labs, 2 Art Labs and 5 General Classrooms, Gym AC, Site Parking, Admin. and Library Renovations.

Rendering of Northwest Elevation at Pease Middle School

Page 61: Schools Under Construction for N.I.S.D

PEASE MIDDLE SCHOOL ADDITIONS AND RENOVATIONS

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of “New Classroom Addition - March 2, 2010

Page 62: Schools Under Construction for N.I.S.D

PEASE MIDDLE SCHOOL ADDITIONS AND RENOVATIONS

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial of “New Classroom Addition - March 2, 2010

Page 63: Schools Under Construction for N.I.S.D

PEASE MIDDLE SCHOOL

Page 64: Schools Under Construction for N.I.S.D

JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

a. Name and Location of Building:

John Glenn Elementary

2385 Horal

San Antonio, TX 78227

b. Client/ Contact Person:

Northside Independent School District

Mr. Ceasar Ponce, AIA Director of Facilities Construction

Mr. Jim Berg, Project Manager

5900 Evers Road

San Antonio, TX 78238-2220

(210) 397-1200

c. CM@ Risk Contractor:

Guido Brothers Construction

d. Construction Cost:

$8,079,000.00

e. Construction Completion:June, 2009 - August, 2010

f. Managing Principal:

Mark Oppelt, AIA

O’Neil Conrad Oppelt

g. Project Architect:

Lowell Tacker, AIA

h. Scope of Services Performed:

(67% complete)

Classroom Replacement (20 General Classroom’s, 2 Computer Labs and 4 Small Classroom’s)

Package I (Site & Central Plant) - $2,251,000.00 (NTP Issued April 20, 2009)

Package II (Building Package) - $5,828,000.00

Total - $8,079,000.00

Page 65: Schools Under Construction for N.I.S.D

JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial at John Glenn ES - February 2010

Page 66: Schools Under Construction for N.I.S.D

JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Aerial at John Glenn ES - February 2010

Page 67: Schools Under Construction for N.I.S.D

JOHN GLENN ELEMENTARY

Page 68: Schools Under Construction for N.I.S.D

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Front Elevation - New Construction Careers Academy at Warren HS

WARREN HIGH SCHOOL ADDITIONS AND RENOVATIONS

a. Name and Location of Building:

Warren High School

Additions & Renovations

9411 Military Drive West

San Antonio, TX 78251

b. Client/ Contact Person:

Northside Independent School District

Mr. Ceasar Ponce, AIA Director of Facilities Construction

Mr. Jim Berg, AIA Project Manager

5900 Evers Road

San Antonio, TX 78238-2220

(210) 397-1200

c. Contractor:

Joeris General Contractor

d. Construction Budget:

$7,167,464.00

e. Construction Period:June, 2009 - July, 2010

f. Managing Principal:

Roy Lewis, AIA

Garza Bomberger

g. Project Architect:

Roy Lewis, AIA

h. Scope of Services Performed:

New Construction Careers Academy that will include a Building Trades Shop, Plumbing/Pipefitting Trades Shop, HVAC Trades Shop, Electrical Trades Shop, Director’s Office, Boys and Girls Locker Rooms, 10 Classrooms, One Computer Lab, and a Large Instructional Room.

(53% complete)

Page 69: Schools Under Construction for N.I.S.D

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

WARREN HIGH SCHOOL ADDITIONS AND RENOVATIONS

Aerial of New Careers Academy at Warren HS – February 5, 2010

Page 70: Schools Under Construction for N.I.S.D

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

WARREN HIGH SCHOOL ADDITIONS AND RENOVATIONS

Aerial of New Careers Academy at Warren HS – February 5, 2010

Page 71: Schools Under Construction for N.I.S.D

WARREN HIGH SCHOOL

Page 72: Schools Under Construction for N.I.S.D

OAK HILLS TERRACE ELEMENTARY SCHOOLADDITIONS & RENOVATIONS

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Rendering of “New Entrance” at Oak Hills Terrace Elementary

a. Name and Location of Building:

Oak Hills Terrace Elementary School

5710 Cary Grant Dr.

San Antonio, TX 78240

b. Client/ Contact Person:

Northside Independent School District

Mr. Ceasar Ponce, AIA Director of Facilities Construction

Ms. Marilyn Sevedge, Senior Project Manager

5900 Evers Road

San Antonio, TX 78238-2220

(210) 257-1200

c. Contractor:

Kopplow Construction

d. Construction Cost Estimate:

$3,396,593.00

e. Construction Period:

August, 2009 thru August 14, 2010

f. Managing Principal:

Kent Nieman, AIA

Pfluger & Associates

g. Project Architect:

Kent Nieman, AIA

h. Scope of Services Performed:

(19% complete)

Library and New Admin. Addition, Playground Upgrades and ADA Access

Page 73: Schools Under Construction for N.I.S.D

OAK HILLS TERRACE ELEMENTARY SCHOOL

Page 74: Schools Under Construction for N.I.S.D

BANDERA ROAD NORTH ELEMENTARY

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

a. Name and Location of Building:

Bandera Road North Elementary

San Antonio, TX

b. Client/ Contact Person:

Northside Independent School District

Mr. Ceasar Ponce, AIA Director of Facilities Construction

Mr. Thomas Curiel, Project Manager

5900 Evers Road

San Antonio, TX 78238-2220

(210) 397-1200

c. Contractor:

TBD

d. Construction Cost Estimate:

$20,500,000.00

c. Construction Period:

January, 2010 thru May, 2012

f. Managing Principal:

Mark Oppelt, AIA

OCO Architects

g. Project Architect:

Lowell Tacker, AIA

h. Scope of Services Performed:

800 Student Elementary School

(0% complete)

Rendering of Front Entrance at Bandera Road North E.S.

Page 75: Schools Under Construction for N.I.S.D

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

Rendering Site Plan of Bandera Road North E.S.

BANDERA ROAD NORTH ELEMENTARY

Page 76: Schools Under Construction for N.I.S.D

THANK YOUCOMMITTEE MEMBERS

END OF PRESENTATION