97
SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction Materials: Thermal simulation and life-cycle assessment Swapna Krishnakumar Environmental Engineering Honours 03/07/2017 Unit Coordinator: Dr Gareth Lee Academic Supervisor: Dr Martin Anda E ENG470 ENGINEERING HONOURS THESIS FINAL REPORT ENG470 ENGINEERING AA acai THESIS FINAL REPORT An Industry Internship with LandCorp

SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY

ENG470 ENGINEERING HONOURS THESIS

A Comparative Analysis Of Building Construction Materials:

Thermal simulation and life-cycle assessment

Swapna Krishnakumar

Environmental Engineering Honours

03/07/2017

Unit Coordinator: Dr Gareth Lee

Academic Supervisor: Dr Martin Anda

E ENG470 ENGINEERING HONOURS THESIS FINAL REPORT

ENG470 ENGINEERING AA acai

THESIS FINAL REPORT

An Industry Internship with LandCorp

Page 2: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

ii

ABSTRACT

This thesis study investigates the environmentally, economically and socially viable

options building materials for Western Australian community. Building construction

has significant impact on the environment. Almost 23% of GHG emission comes

from building Industry. Therefore material selection should be carefully considered.

In this research, a typical 3 bedroom, 2 bathrooms, 2 garage detached single storey

house plan located in Perth, was considered as a case study house.

The first objectives of this research were to develop a comparative analysis of four

different building materials (Clay-fired Brick, Steel, Precast Concrete and Timber).

The estimated results showed that the least total estimated cost and least embodied

energy of material is timber cladding house with $191200 and 188.4 Giga Joule.

A secondary objective was to identify energy efficient house using a building

software IES-VE (Integrated Environmental Solutions Virtual Environment). The

results indicated that Steel cladded house shows minimum (6.63 degree Celsius) and

maximum air temperature (49.3degree Celsius) inside the house (assume doors and

windows of the house is closed).

Third objective was to identify life cycle assessment using eTool. The environmental

impacts were assessed using eTool, over a life cycle of 45 years. The results indicated

that Timber cladded house shows high embodied energy (1504 GJ) compared to other

four different design options and less global warming 61,828 kgCO2−eq.

Page 3: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

iii

DECLARATION

I Swapna Krishnakumar, confirms that this thesis report is my research work and the

suitable references used in this report have been duly acknowledged.

Swapna Krishnakumar

03/07/2017

Page 4: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

iv

ACKNOWLEDGEMENTS

I wish to express my sincere gratitude to my academic supervisor Dr Martin Anda.

Without his guidance and support, this project would not have been completed.

I would also like to thank LandCorp Sustainability and Innovation Manager Mr James

Butterfield & Sustainability Strategy Coordinator Nivia Giuffre for their support and

help throughout the project.

I would like to thank my family and friends for their moral support and

encouragement throughout this project and my university career.

Page 5: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

v

TABLE OF CONTENTS

ABSTRACT ........................................................................................................................ ii

DECLARATION ................................................................................................................. iii

ACKNOWLEDGEMENTS ................................................................................................... iv

LIST OF TABLES .............................................................................................................. vii

LIST OF FIGURES .............................................................................................................. ix

ABBREVIATIONS .............................................................................................................. xi

CHAPTER 1: INTRODUCTION ............................................................................................. 1

1.1 Research Aim ................................................................................................................... 1

1.2 Project Description........................................................................................................... 1

1.3 Scope ................................................................................................................................ 2

1.4 Research Objectives ......................................................................................................... 2

1.5 Constraints ....................................................................................................................... 3

CHAPTER 2: LITERATURE REVIEW ..................................................................................... 4

2.1 Introduction ...................................................................................................................... 4

2.2 Background ...................................................................................................................... 5

2.3 Sustainable Building Materials ........................................................................................ 6

2.3.1 Project materials ........................................................................................................ 6

2.4 Historical Building Construction ..................................................................................... 9

2.5 Current Trends in Green Building Materials ................................................................. 12

2.6 Measuring Impact .......................................................................................................... 14

2.6.1 Software analysis .................................................................................................... 14

2.7 Life Cycle Analysis (LCA) ............................................................................................ 15

CHAPTER 3: RESEARCH METHODOLOGY ......................................................................... 19

3.1 Introduction .................................................................................................................... 19

3.2 Material Analysis, Modelling, and Life Cycle Assessment ........................................... 20

3.3 Case Study House .......................................................................................................... 21

3.4 Four Different Design Options: Materials Used in the Case Study House Construction.

............................................................................................................................................. 23

3.4.1 Design Option 1: Clay fired Brick .......................................................................... 23

3.4.2 Design Option 2: Steel ............................................................................................ 24

3.4.3 Design Option 3: Precast Concrete ......................................................................... 25

3.4.4 Design Option 4: Timber ....................................................................................... 26

3.5 Microsoft Excel .............................................................................................................. 28

Page 6: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

vi

3.6 IES-VE Model Tool ....................................................................................................... 29

3.6.1 Introduction ............................................................................................................. 29

3.6.2 IES-VE Modelling Procedures ............................................................................... 30

3.6.3 Case Study: Single Storey House - General Description ....................................... 31

3.6.4 3D Modelling View of the Case Study House from the IES-VE Tool ................. 33

3.7 SunCast .......................................................................................................................... 35

3.8 Apache ........................................................................................................................... 37

3.9 eTool .............................................................................................................................. 39

CHAPTER 4: RESULTS ...................................................................................................... 43

4.1 Building Estimation Cost Using Excel .......................................................................... 43

4.2 Embodied Energy Calculation using Microsoft Excel Spread Sheet. ............................ 44

4.3 IES-VE Results .............................................................................................................. 48

4.3.1 Results of the 3D Modelling Drawings of Four Different Design Options. ........... 48

4.4 Solar shading analysis using SunCast ............................................................................ 51

4.5 Apache Thermal Calculation and Simulation Results ................................................... 53

4.6 Life-Cycle Assessment .................................................................................................. 54

4.7 Design Guidelines .......................................................................................................... 56

CHAPTER 5: DISCUSSION ................................................................................................ 58

CHAPTER 6: CONCLUSION AND FUTURE RESEARCH OPPURTUNITY. ................................. 66

References ..................................................................................................................... 68

Appendix A .................................................................................................................... 74

Appendix B .................................................................................................................... 77

Appendix C .................................................................................................................... 81

Page 7: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

vii

LIST OF TABLES

Table 1. Project materials. ........................................................................................................ 6

Table 2. The specifications and calculated area of case study house...................................... 22

Table 3. Design Option 1 – Clay fired Brick. ............................................................................. 23

Table 4. Design Option 2 – Steel .............................................................................................. 24

Table 5. Design Option 3 - Precast Concrete. .......................................................................... 25

Table 6. Design Option 4 – Timber........................................................................................... 26

Table 7. Shows the Applications and Function Performance in the IES-VE Modelling Software

................................................................................................................................................. 29

Table 8. AP Location Using IES-VE ............................................................................................ 31

Table 9. Showing the Thermal constructions used within the clay fired house model (Source:

Author, IES-VE 2017) ................................................................................................................ 39

Table 10. A Table summarising the total cost estimation of four different design options

calculated using Microsoft Excel spread sheet. ....................................................................... 43

Table 11. A Table summarising calculated embodied energy values for all four different

design options .......................................................................................................................... 45

Table 12. Thermal simulation results for all four different design options (Assume all doors

and windows are closed). (Source: Table 33 to 36, Author, IES-VE 2017) ............................... 53

Table 13. Life Cycle Assessment results using eTool for all four different options. ................ 55

Table 14. Total cost calculation result using Excel spread sheet for all four different options.

................................................................................................................................................. 59

Table 15. Embodied Energy results using Excel spread sheet for four different options. ....... 60

Table 16. Embodied energy calculation results for two different roof materials using eTool

for all four different design options. ........................................................................................ 61

Table 17. Global warming calculation results for two different roof materials using eTool for

all four different design options. ............................................................................................. 61

Table 18. Materials R- values (Source: Author, adapted from various sources) ..................... 74

Table 19. Material Densities (Source: Author adapted from various sources). ...................... 74

Table 20. Material Cost per Square Metre (Source: Rawlinsons 2015) ................................... 74

Table 21. Materials’ Local Availability (Source: Author) .......................................................... 74

Table 22. Advantage of building materials(Source: Author).................................................... 75

Table 23. Cost and Embodied Energy calculation of Clay fired brick house using Microsoft

Excel (Source: Author). ............................................................................................................ 75

Table 24. Cost and Embodied Energy Calculation of steel frame with Metal cladding house

using Microsoft Excel (Source: Author). .................................................................................. 75

Table 25. Cost and Embodied Energy calculation of Precast Concrete house using Microsoft

Excel (Source: Author). ............................................................................................................ 76

Table 26. Cost and Embodied Energy Calculation of Timber house using Microsoft Excel

(Source: Author). ...................................................................................................................... 76

Table 27. Cost and Embodied Energy calculation of Terracotta roof tile with clay fired brick

house using Excel (Source: Author). ........................................................................................ 76

Table 28. Data from IES-VE for Clay fired Brick House (Source: Author). ................................ 77

Table 29. Data from IES-VE for Steel House (Source: Author). ................................................ 77

Table 30. Data from IES-VE for Precast Concrete (Source: Author). ....................................... 78

Table 31. Data from IES-VE for Timber house (Source: Author). ............................................. 78

Page 8: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

viii

Table 32. Data from IES-VE Solar shading Analysis using SunCast (Source: Author). .............. 78

Table 33. Air temperature of clay fired brick wall house (Source: Author). ............................ 79

Table 34 Air temperature of Timberwall house (Source: Author). .......................................... 79

Table 35. Air temperature of precast concrete wall house (Source: Author). ........................ 79

Table 36. Air temperature of steel wall house (Source: Author). ............................................ 79

Table 37. Clay fired brick global warming (Source: Author). ................................................... 81

Table 38. Clay fired brick Embodied energy (Source: Author). ................................................ 81

Table 39. Steel Global warming (Source: Author). .................................................................. 82

Table 40. Steel Embodied energy (Source: Author). ................................................................ 82

Table 41. Precast concrete global warming (Source: Author). ................................................ 83

Table 42. Precast concrete embodied energy (Source: Author). ............................................. 83

Table 43. Timber Global warming (Source: Author). ............................................................... 84

Table 44. Timber Embodied energy (Source: Author). ............................................................ 84

Page 9: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

ix

LIST OF FIGURES Figure 1. Western Australian Map ............................................................................................. 5

Figure 2. Traditional Indigenous dome structures. .................................................................. 10

Figure 3. Australian Federation house (Australian architecture 2016). .................................. 11

Figure 4. Above: Location of Kerala, India. Below: Nilambur Kovilakam ................................. 12

Figure 5. IES-VE simulation conducted office building in U.A.E (IES-VE case study building

2016). ....................................................................................................................................... 15

Figure 6. Gen Y Housing LandCorp, White Gum Valley ........................................................... 17

Figure 7. Climate classification maps ....................................................................................... 20

Figure 8. .Ground floor plan of case study building. ................................................................ 22

Figure 9. Image for a clay fired brick home and cavity wall insulation .................................... 24

Figure 10. Image for a steel-framed metal cladding house and wall insulation ...................... 25

Figure 11. . Image for a precast concrete house and wall panel. ............................................ 26

Figure 12. Image for a timber framed house and wall insulation............................................ 27

Figure 13. IES-VE Model blank space page and ModellT work space. ..................................... 32

Figure 14. Floor plan of case study house drawn in Model Viewer model space .................. 33

Figure 15. Apache construction using Building Template Manager. ...................................... 34

Figure 16. Project construction using Building Template Manager. ....................................... 34

Figure 17. IES-VE software showing the 3D view of the proposed case study house based on

the respective floor area. ......................................................................................................... 35

Figure 18. Solar shading report using SunCast ........................................................................ 36

Figure 19. Analysis of sun shading during 01/January to 31/December using SunCast .......... 36

Figure 20. Solar shading analysis using SunCast of the 3D model ........................................... 37

Figure 21. CIBSE load using Apache. ....................................................................................... 38

Figure 22. Air temperature graphs for the whole year can be generated using an XY plot. ... 38

Figure 23. Picture of LCA description in e-Tool ........................................................................ 40

Figure 24. Screenshot of description page in e-Tool. .............................................................. 41

Figure 25. Screenshot of structural information in e-Tool. ..................................................... 41

Figure 26. Screenshot of selecting substructure and superstructure in e-Tool ...................... 42

Figure 27. Cost comparison of different design options.......................................................... 44

Figure 28. Embodied energy of comparison of different design options materials. ............... 46

Figure 29. Comparison of total cost & embodied energy comparison results of design option

1 with different roof material. ................................................................................................. 47

Figure 30. 3D image of a Clay fired brick house....................................................................... 49

Figure 31. 3D image of a Metal clad house. ............................................................................ 49

Figure 32. 3D image of a Precast concrete house. .................................................................. 50

Figure 33. 3D image of a timber clad house. ........................................................................... 50

Figure 34. Sun path for the single-family house 3D model design option .............................. 51

Figure 35. Sun path for the single-family house 3D model design option. ............................. 52

Figure 36. Comparisons of Embodied energy and Global warming eTool results of four

different design options. .......................................................................................................... 55

Figure 37. Embodied energy calculation results of a steel wall using eTool ........................... 63

Figure 38. Embodied energy calculation results of a timber wall using eTool ........................ 64

Figure 39. Global warming calculation results of a steel wall house using eTool. .................. 64

Page 10: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

x

Figure 40. Global warming calculation results of a timber wall house using eTool. ............... 65

Figure 41. Air temperature inside alfresco, portico and roof (all the other rooms) for the case

study house 3D model design option. ..................................................................................... 80

Page 11: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

xi

ABBREVIATIONS

BCA - Building Code of Australia

BREEAM - Building Research Establishment Environmental Assessment

Method

EE - Embodied Energy

EPD - Environmental Product Declaration

EIA - Environmental Impact assessment

GHG - Greenhouse Gas

GJ - Giga Joule

IES-VE - Integrated Environmental Solutions Virtual Environment.

kgC𝐎𝟐-eq - 1 Kilogram of Carbon dioxide equivalent

kWh - Kilo watt hour

LCA - Life Cycle Assessment

MJ - Mega Joule

R-value - Resistance value (measures resistance to heat transfer)

U- Value - U- value is a mathematical reciprocal of R- value (measures the rate

of heat transfer)

Page 12: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

xii

Page 13: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

1

CHAPTER 1: INTRODUCTION

1.1 Research Aim

This project’s aim is to investigate the cost efficiency and sustainability of different

building materials used in WA. The environmental impact of current building material

choices in WA is not well understood. The research will be based on a case study floor

plan of a single detached house. The research results will be used to provide

recommendations to improve cost effectiveness and sustainability within LandCorp’s

housing designs.

1.2 Project Description

Current standard building materials, such as brick, are not eco-friendly and may have

adverse effects on the surrounding natural environment and community well-being (Le

and Oanh 2010, 381). Hence, the purpose of this thesis project is to analyse different

types of building materials that will help reduce environmental impact. The results of

this project may produce practical building recommendations; therefore, the research

will also have a strong focus on the cost-effectiveness of potential sustainable materials

with pre-defined goals regarding the requirements set by Murdoch University as well as

LandCorp Strategy and Innovation Team and Design Manager.

LandCorp is a West Australian Government specialist land and property development

agency which has been engaged in the land development industry for the last 25 years.

The agency has been involved in numerous industrial, residential and commercial

projects in Western Australia (WA), including White Gum Valley (WGV) Sustainable

Page 14: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

2

Community Development and Alkimos Beach residential projects. LandCorp’s vision is

“To lead land development on behalf of the State Government for the benefit of the

Western Australian Community” (LandCorp 2014/ 2015).

1.3 Scope

The project will analyse four different building materials, based on a case study of a

house plan investigating the potential for improving sustainability and cost-

effectiveness in LandCorp’s housing designs in WA. The project will also contain a list

of the materials, and will include information advising LandCorp on how to

communicate the advantages of the sustainable materials to future customers.

The project results may assist in enabling others to make future sound engineering

decisions regarding sustainable residential building designs, which will have positive

impacts on the environment and community health.

1.4 Research Objectives

1. To estimate environmentally, economically and socially viable option building

material for the Western Australia community.

Analyse four different design options (building materials) via a case study house

plan.

Perform cost analysis on different materials using Microsoft Excel 2010.

Use a house plan to determine the embodied energy calculations of materials using

Microsoft Excel 2010.

2. To identify energy efficient house using a modelling tool.

Creating a 3DModel house using modelIT (IES-VE 2017) analysis tool.

Page 15: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

3

Solar shading analysis using SunCast (IES-VE 2017).

Material thermal analysis and performance using Apache (IES-VE 2017).

3. To estimate the life cycle environmental impact of the building using eTool.

Estimating the embodied energy of materials, transportation, construction, and

end of life using the eTool.

Estimating the Global warming (kgCO2-eq) using the eTool.

1.5 Constraints

The project limitations are identified below.

1. Housing design and size assumptions.

2. Material choice constraints.

Firstly, the project will focus on a house plan based on popular designs, as opposed to

sustainably designed houses. For example, a house built around a courtyard has

considerable environmental benefits compared to a standard design. Also, some of the

building plan cannot be disclosed (commercial confidentiality), and therefore the

project will assume a low- to medium-scale house plan. Secondly, the project brief

(from LandCorp) identifies that new building materials are not to contain volatile

organic chemicals (VOCs). Therefore, the project will try to avoid materials on the ‘red

list’ section of ‘materials containing chemicals with various adverse effects’, within the

WGV(White gum valley, LandCorp) design guideline materials (WGV Design

guidelines 2016).

Page 16: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

4

CHAPTER 2: LITERATURE REVIEW

2.1 Introduction

All building materials have an environmental impact, which can occur at any life cycle

stage, during, for instance, extraction, manufacturing, transportation, construction and

demolition. The total environmental impact of the building’s material throughout this

process is referred to its ‘embodied energy’ (Cabezza 2013). Certain building materials

may cause health problems to residents and users, a problem known as ‘sick building

syndrome’ (SBS). Common causes for such reactions can arise from volatile chemicals

that exist within paints, adhesives, carpets and vinyl (RSMeans 2010). In contrast,

characteristics of eco-friendly building materials have low embodied energies, are

sustainable, exhibit low water usage, present low carbon/GHG emissions and produce

minimal waste during construction and demolition (Pacheco-Torgal et al. 2013). With

the global population increasing and more people choosing to live in high-density cities,

there will be a significant increase in urbanisation and the built environment (UN 2014).

Selecting eco-friendly materials will help create a better sustainable built environment,

economy and social outcomes (Nachawit 2012).

The following literature review will discuss the four building materials to be

investigated in the research project, as well as cover historical/native eco-friendly

building materials, current trends and the analysis methods to be used. The analysis will

incorporate the ‘triple bottom line’ in considering the environmental, social and

economic aspects of the proposed materials. The purpose of conducting such a material,

Page 17: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

5

cost and embodied energy analysis for the different materials is to determine their

potential role in sustainable development in Western Australia (WA).

2.2 Background

According to Western Australian planning commission, the current population of

Western Australia is 2.5 million which is expected to reach 5.6 million by 2056

(Department of planning 2014). Urban re-zoning will be critical in ensuring that land

stocks can be sustained (WA Planning Commission 2016). Due to rapid urbanization

the current housing development (8.7 million houses) is expected to reach 12 million

houses by 2030. Almost 23% of GHG emission is coming from Australia’s building

industry; the commonly used building materials (bricks) are high in energy and carbon.

As a result this will have detrimental effect on the environment such as global warming

and other major consequences (Lawania et al. 2015).Future development housing

projects should look to reduce their impact on the surrounding environment.

Figure 1. Western Australian Map

(Source: Department of Land 2017)

(http://www.lands.wa.gov.au/I%20want%20to%20know%20about/Pages/Crown-land-enquiry-

form.aspx)

Page 18: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

6

2.3 Sustainable Building Materials

2.3.1 Project materials

The building materials to be investigated are listed in Table 1. The materials proposed

include popular and unpopular building materials in WA.

Table 1. Project materials.

(Source: Author, Adapted from literature reviews)

Building

Material

Advantages Disadvantages

1 Clay fired bricks High thermal mass, low

maintenance.

High embodied energy.

2 Metals Recyclable, Durable. High embodied energy,

expensive.

3 Precast Concrete High thermal mass, speed

of construction, minimal

waste.

Cost, high embodied

energy.

4 Timber Biodegradable product, low

embodied energy.

Transportation, cost, high

maintenance.

Clay fired brick

Clay fired brick is a popular construction material for houses in Australia and is more

suited to WA’s sandy soils compared to concrete. Furthermore, it is an excellent sound-

proofing material; moreover, it is fire resistant and a thermal insulator (Master Builders

2017). Consequently, clay fired brick construction is widely used in Australia, as it

requires less maintenance, has high durability, contains good thermal properties, and is

both affordable and readily available (Downton 2013).

Page 19: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

7

Metals

Metals are a highly durable building material, have zero wastage and are a completely

recyclable product (CPD Accreditation Service 2017). Metals are commonly used for

tubing, roofs or building structures, which mostly consist of aluminium, copper,

stainless steel and carbon steel. Steel decking is a long-lasting product that continues for

many years with less maintenance.

Precast Concrete

Concrete is an essential material for the construction industry, and it is one of the most

widely used resources in the world (Pacheco -Torgal et al. 2013). While concrete is

typically cast out on site, precast concrete is poured, moulded and set in a

manufacturing plant, from which then concrete pieces can be transported to the

construction site (McGee 2013). Concrete is made from three basic materials, which are

typically available locally all over the world (sand, gravel, cement); moreover, concrete

does not require chemical treatment (McGee 2013). Precast concrete construction is

another solution for durable floors, walls, roofs and multi-storey residential apartments

(Reardon 2013). The benefits of precast concrete include reduced waiting times

(concrete is already set/weather independent), reduced workforce and increased control

over quality.

Timber

Timber is well established in the construction industry; it is also biodegradable and can

be prepared with minimal chemical processes (Sassi 2006). However, the quality and

type of timber differs between forests and locations. Therefore, the transportation of

Page 20: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

8

timber across global markets increases their impact on carbon emissions (Ramage et al.

2017). Timber construction is a truly sustainable material and an excellent thermal

insulator; thus, it has the lowest environmental impact (Reardon 2013).

Insulation

According to insulation installation for a metal roof, bulk insulation such as glass wool

is good for Perth’s climate. It reduces condensation as well as noise on the roof (Mosher

2013). Glass wool fibres is a mixture of spun fibres of glass.It is more effective in

building projects for walls and roof insulation (National Institute of Environmental

Health Sciences 2012).

Double glazing

Glass operable walls and double-glazed windows are used in this case study house.

However, this also adds to embodied energy contribution. Double-glazed windows are

good for Perth’s climate (Reardon 2013). Glass windows are a major contributor to heat

loss and gain in most cold countries. Double-glazed windows are used for this case

study to reduce heat loss and gain. It is also an energy efficient choice the sealed air gap

of double-glazed windows functions as insulation. Hence, double-glazed windows are

an ideal choice rather than single-pane windows (Taleb 2014)

Ko et al. (2013) conducted an inter-industry analysis on ‘Rahmen’ or frame-structured

buildings in Korea. The researchers investigated how using precast concrete beams

reinforced with T-type steel could reduce emissions from bearing walls in apartment

buildings. Ko et al. (2013) discovered that precast concrete/steel structures emit lower

Page 21: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

9

levels of CO2, have faster construction times and are more structurally sound compared

with traditional concrete bearing walls.

Colorbond

Colorbond, a coated steel roofing material is also known as steel-ribbed decking, which

is colour coated; it is also among the biggest contributors to embodied energy.

Colorbond is steel decking that lasts for many years with less maintenance (Rapley

2013).

Plasterboard

Plasterboard is also known as gypsum plaster, It is commonly used in walls and ceilings

of buildings.It is cheap,good thermal insulation, versatile, low environmental impact,

fire resistant but not water resistant (Kolaitis et al.2017,23-35).

Fibre cement sheet

Fibre cement sheet is also used for wall cladding. It is made up of cement, sand and

fibre (plantation) (Lupsea et al.2014).

2.4 Historical Building Construction

Construction materials are no exception to technology advances and have improved and

evolved (Ko et al. 2013). Investigating historical building materials highlights local

resources before globalisation, thus focusing on that which may be more sustainable to

a local economy. Pre-European settlements in Australia by Indigenous peoples were

confined to local materials to create shelters. Types of materials and structures vary

depending on the region and climatic conditions. In WA, dome-shaped shelters were

Page 22: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

10

commonly crafted, using grass and mud for waterproofing. Such shelters (Figure 2)

were used as temporary homes as well as permanent structures along the Swan River

(Gardiner and Wells 2008).

Figure 2. Traditional Indigenous dome structures.

(Source: Gardiner and Wells 2008).

(http://www.australia.gov.au/about-australia/australian-story/austn-indigenous-architecture)

Troy (1995) analysed changes in building technologies during the 19th

century in

Australia. The use of bricks, galvanised iron, woodworking machines, and prefabricated

doors and windows had all been adopted from other countries (Troy 1995). In addition,

the use of terracotta roof tile, detached house with garden, durable, low-maintenance

homes occurred throughout the early 19th

century, during the ‘Federation houses’, as

shown in Figure 3 (Gardiner and Wells 2008).

Page 23: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

11

Figure 3. Australian Federation house (Australian architecture 2016).

(Source: Gardiner and Wells 2008)

http://www.australia.gov.au/about-australia/australian-story/austn-architecture)

Dili et al. (2010) analysed the sustainability of traditional and modern houses in Kerala,

India (Figure 4). These traditional houses were built 200-300 years ago, one of them

being the ‘Nilambur Kovilakam’ building, located in the north of Kerala India. The

researchers investigated how these buildings maintained a constant cool temperature,

despite outdoor temperatures reaching 30°C. The structure of traditional buildings in

Kerala is known as ‘naalukettu and ettukettu’, referring to a structure that consists of

four or eight blocks in one building. The buildings include a central courtyard, allowing

for sun, rain, and wind exposure. Dili et al. (2010) identified common materials

including mud, laterite, granite stone and lime mortar for walls, wood and bamboo for

roof structure, and with coconut palm leaves and clay tile for roof covering.

Page 24: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

12

Figure 4. Above: Location of Kerala, India. Below: Nilambur Kovilakam

(Source: Google Maps 2017a). (Source: City Guide n.d.)

2.5 Current Trends in Green Building Materials

Eco-friendly building materials are essential to sustainable development and are gaining

a bigger role in the construction industry. Vancouver architect and interior designer,

Michael Green is at the forefront of carbon-neutral buildings (Real estate monitor

worldwide 2015). Green designs often use timber structures as opposed to concrete and

metal, therefore allowing carbon sequestration and reduced emissions. Green won the

Page 25: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

13

2016 Wood Design Award and the 2017 Special Achievement Award for his seven-

story, 20438 m2‘T3 Minneapolis Project.’ The T3 is the largest modern timber building

in North America, with the purpose of using the character of the past with a modern

twist. Green demonstrated how a modern timber structure can be used to replace metal

and concrete materials, providing fast, clean and sustainable housing. Mass construction

with timber can be implemented using new technology and engineered materials, such

as nail-laminated timber panels and spruce glulam beams (Smith 2017).

Hybrid structures, consisting of timber with other materials, have been gaining

attention. Shigeru Ban, a Japanese ecological architect, has designed the tallest hybrid

timber structure in the world, named ‘Terrace House’, in Vancouver. While the full

structure has not yet been disclosed, the proposed images display a glass building fitted

with a sloped roof. Ban is a well-known ‘paper architect’, incorporating materials such

as cardboard, paper and beer crates. Using low-impact recycled materials is beneficial

to the environmental, through reducing waste, lower emissions and carbon storage

(Sayer 2016).

Urban development also considers expansion of non-residential buildings. The new Co-

operative Group headquarters, ‘One Angel Square’, in Manchester, has scored a

95.16% on sustainability according to the BREEAM standard. The building is designed

by 3DReid, and it boasts an open atrium and a double-skinned facade, allowing for

natural cooling and heating and lighting (BREEAM 2017; Boake 2003). BREEAM or

‘Building Research Establishment Environmental Assessment Method’, founded in

1990, is the world’s first sustainability assessment method for the construction industry.

The project’s objective is to achieve a 40-60% reduction in energy costs, as well as to

set the standard for offices in the United Kingdom (UK). The building modifies itself,

with the top facade open in summer, allowing for air circulation and cooling, while

Page 26: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

14

closed in winter and thus performing as building insulation. The structure combines

traditional building materials (steel) with new technologies to create one of the largest

sustainable buildings in Europe. The design also consists of heat recovery systems, grey

water recycling, rainwater storage and the use of energy efficient technology (e.g., lifts,

lights) (BREEAM 2017).

2.6 Measuring Impact

2.6.1 Software analysis

High-performance buildings incorporate energy efficiency, durability, life cycle and

user productivity. To determine if the materials can create a high-performance building,

this research project will run environmental simulations as well as build performance

and energy analysis. These simulations are critical to the design process for energy-

efficient buildings, as they can investigate material alternatives and compare the

environmental impact of each decision. IES-VE (Integrated environmental solutions

virtual environment) design software is a building analysis and energy modelling tool.

IES-VE tool is used to analyse various design options and evaluate environmental

performance and energy impact. For example, the software can be used to compare low

carbon technologies for buildings or assess passive house designs (Aksamija 2017).

Samia Mhenni, a Dr Owainati student excellence award winner, conducted a multiple

simulation on an office building in U.A.E using IES-VE to determine solutions to solar

passive design and reduce energy consumption of office buildings. The project

investigated 3D modelling to utilise east, west, north and south potential solar energy

savings using thermal simulation (IES-VE Case Studies 2015).

Page 27: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

15

.

Figure 5. IES-VE simulation conducted office building in U.A.E (IES-VE case study

building 2016). (Source:https://www.iesve.com/software/case-studies/info?building=Project-Shortlisted-for-

Student-Excellence-Award&id=5783)

2.7 Life Cycle Analysis (LCA)

EIAs cover the whole supply chain of materials, considering their complete embodied

energies from extraction to disposal. To assess building materials, the ‘Environmental

Product Declaration’ (EPD) focuses on constant reporting and provides transparent

information on material lifecycles (Strong and Burrows 2016, 46).

The EPD system is based on the environmental declarations from International

Organisation for Standardisation (ISO) (EPD 2017). Alternative software tools are also

able to determine life cycle impact, such as ‘eTool’. eTool evaluates a range of

environmental impacts on different building materials and has access to vast amounts of

material life cycle assessment data

Most of the eTool studies are used for determining embodied energy and global

warming emissions of building materials. eTool can determine different ranges of

Page 28: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

16

environmental impact of each building material such as products, end of life, recurring

and transportation (Lawania 2016).

The embodied energy of material is calculated considering the whole life cycle analysis

of materials by eTool in kWh; it includes transportation energy of materials,

replacement energy, end of life of the product and other calculations. Operational

energy such as cooling, heating, appliances and lighting energies are not included in

this stage.

Greenhouse gas emissions are another major contributor from the building industry. It

is measured as kgCO2 emissions. GHG (Greenhouse gas) emissions contain carbon

dioxide, methane and nitrous oxide which are very harmful for our global climate

(Moncaster and Symons 2013).

Case studies (eTool)

David Barr, an architect who won the step up Gen Y competition award, LandCorp

White Gum Valley, Perth for sustainable residential house, used eTool life cycle

assessments for a project which helped to determine (kgCO2) emissions from building

materials. He estimated that a building has low carbon emissions at an estimated 64

kgCO2 of emissions per occupant per year. The building uses low embodied energy

materials such as of low-impact timber framing, concrete slabs, recycled bricks and

additional features such as 9kWPV systems and low water usage (eTool case study

2015).

Page 29: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

17

Figure 6. Gen Y Housing LandCorp, White Gum Valley

(Source: http://etoolglobal.com/portfolio-item/gen-y-living/)

At 79 Kitchener Road, Melville, a Life Cycle Assessment has been carried out for

calculating greenhouse gas emissions. The house is 160 m^2 land area with a two-

bedroom house, guest room and a music studio. It consists of a north-facing central

courtyard with a small concrete pool. The western and northern walls of the house (79

Kitchener Road, Melville) are reverse brick veneer. Floorings are concrete, taking

advantage of thermal mass. The balance of the house is insulated timber frame with

cladding walls. Roofs are aluminium framed. Glazed windows and plywood cabinets

are other features in this house. This house saved 74% of total carbon emission per

year. (eTool case studies 2015).

As per the literature review, it can be concluded that there are different type of climate

and culture around the world and as per their cultures and climatic condition people

develop their houses. This can be understood with the help of an example. The type of

houses that are developed in Kerala, India it buildings named Nilambur Kovilakam. The

type of materials which are used includes laterite, mud, lime mortar and granite stone.

Page 30: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

18

This type of structure is helpful enough to make sure that the temperature is low inside

when compared with the temperature outside.

In order to develop any type of building, it requires certain period of time.

Improvement in technology has helped in reducing the total time that is required.

Improvement in technology is done so that high and better quality of services can be

delivered to clients. In construction there is negative impact of environment. For this

area, there is proper environmental assessment done and this covers whole supply chain

for the materials, this starts from extraction to disposal. In construction, at the initial

stage proper analysis is to be made for the type of materials that will be required. This is

helpful to determine the total cost that will be incurred. More specifically, people make

use of environmental product declaration. This is helpful to focus on the constant

reporting. Further, there is condition that is identified in which the construction that is

made does not go with the plan that is developed. This type of issue is faced due to lack

of monitoring. All the people involved in construction should be aware of the roles and

responsibilities that are has to be performed by them.

Page 31: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

19

CHAPTER 3: RESEARCH METHODOLOGY

3.1 Introduction

The following approach has been used to meet the objectives of the project. The

building materials will first be assessed using a wide range of literature, which provides

information about the sustainable materials. Materials have been selected according to

the building codes of Australia (Reardon 2013). The selection of materials is an

important aspect in the development of a building’s design. There are a few steps that

need to be followed for material selection, particularly when environmental

sustainability and cost effectiveness are priorities: firstly, local availability of the

building material; secondly, the material’s suitability for the design; and thirdly, the

properties of the material having the appropriate strength and elasticity.

The development of this thesis was based on the case study, the literature review, and

the data analysis. This chapter will discuss four different material analyses on a three-

bedroom, two-bath room house plan as a case study for the research using the IES-VE

modelling tool, eTool, and Microsoft Excel. It will then describe the methodology for

applying these tools to achieve the objectives shown below for attaining a cost-

effective, sustainable house in Western Australia. The information has been collected

from a variety of sources, including builders, building material shops and software

agencies (eTool, IES-VE).

Page 32: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

20

Figure 7. Climate classification maps (Source: Adapted from Bureau of meteorology 2016).

(http://www.bom.gov.au/jsp/ncc/climate_averages/climate-classifications/index.jsp)

3.2 Material Analysis, Modelling, and Life Cycle Assessment

Four different materials commonly used in WA housing were be compared for building

a sustainable residential project:

Clay fired Brick

Metals (Steel)

Precast Concrete

Timber

Microsoft Excel 2010 was used for the estimation of costs and embodied energy

calculation using Rawlinson’s Australian Construction Handbook, 2015 (Rawlinsons

2015). Also, Integrated Environmental solutions virtual environment modelling (IES-

Page 33: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

21

VE 2017) software was used for generating the 3D building geometry, solar shading

analysis and thermal calculation and simulation for the case study building.

The material data were used to estimate the embodied energy and global warming of the

case study house using eTool, which is a very effective environmental life cycle impact

tool that evaluates the whole life cycle of a building, including embodied energy (MJ),

and determines the total global warming (kgCO2-eq).

3.3 Case Study House

The aim of this thesis is to provide an economically, environmentally, and sustainably

viable residential building material. In addition to sustainability, each feature of

materials was considered in terms of the triple bottom line method.

In this thesis, the potential of different building materials to reduce embodied energy

and to make residential building construction more economically, environmentally, and

socially viable has been investigated, through an analysis of a single-storey detached

house, which consisted of three bedrooms, a living area, a home theatre, a laundry,

bathrooms, a kitchen, a garage, and an alfresco area (see Figure 8).

Page 34: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

22

Figure 8. .Ground floor plan of case study building. (Source: Adapted from Dream Start Homes).

(http://dreamstarthomes.com.au/new-homes/lot-width-15m/dream-series/dream-octavia/)

Table 2. The specifications and calculated area of case study house.

(Source: Author) Specifications Area(𝐦𝟐)

/ Numbers

Total outside wall area 150.8

Total inside wall area 122.9

Total floorings 163.1

Glass operable walls 13.7

Standard timber doors (Nos) 8

Double glazed windows 27.9

Total roofing 187.7

Total painting area 396.6

Page 35: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

23

3.4 Four Different Design Options: Materials Used in the

Case Study House Construction.

3.4.1 Design Option 1: Clay fired Brick

Table 3. Design Option 1 – Clay fired Brick.

(Source: Author)

Elements Materials

Floor Concrete

Floor finish Timber hardboard floor finish

External walls Double layer of clay fired bricks

Internal walls Single layer of clay fired bricks

Wall insulation Glass wool (R-1.5)

Roof Timber framed with steel-ribbed decking

Roof insulation Glass wool (R-4)

Windows Double-glazed windows

Doors Timber

Floors for the clay-fired brick house are concrete, 100mm in thickness, with a timber

hardboard floor finish, 5.5mm in thickness. The external walls are double layer of clay

fired bricks 270mm total thickness(cavity wall in two 110 mm skins) with glass wool

insulation of material R –value 1.5 while the internal walls are 110 mm in thickness,

with cement rendering. All the east, west, north, and south side windows are double-

glazed. The roofing is timber-framed, with steel-ribbed decking and glass wool

Page 36: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

24

insulation of material R-value 4, with a 50-year lifespan (eTool 2016). Glass operable

walls and standard timber doors are the other features in the house (Rawlinsons 2015).

Figure 9. Image for a clay fired brick home and cavity wall insulation

(Source: Adapted from Executive fired clay brick homes Modern Ghana)

(https://www.modernghana.com/estates/24384/317/executive-fired-clay-brick-homes.html) (Source: Wall Insulation by Spray Foam Solutions.)

(http: //www.foam-insulation.com.au/cavity-wall-insulation/)

3.4.2 Design Option 2: Steel

Table 4. Design Option 2 – Steel

(Source: Author)

Elements Materials

Floor Concrete

Floor finish Timber hardboard floor finish

External wall Steel frame with metal cladding

Internal wall Steel frame with metal cladding

Wall insulation Glass wool (R1.5)

Roof Timber framed with steel-ribbed decking

Roof Insulation Glass wool (R4)

Windows Double-glazed windows

Doors Timber

Page 37: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

25

Floors for the steel framed metal cladding house are concrete, 100mm in thickness, with

a timber hardboard floor finish of 5.5mm in thickness. External and internal wall

materials include steel frames, 0.8mm in thickness, with metal cladding and a glass

wool insulation of material R-value 1.5. Roofing is timber-framed, with steel-ribbed

decking and a glass wool insulation of material R-value 4, with a 50-year lifespan

(eTool 2016). Standard timber doors, operable glass walls, and double-glazed windows

are generally on all sides of the building (Rawlinson 2015).

Figure 10. Image for a steel-framed metal cladding house and wall insulation (Source: Adapted from Montage 24ModernHomeswithExteriorMetalCladding, 2013)

(http://stylecarrot.com/2013/10/24/montage-18-modern-homes-exterior-metal-cladding/)

3.4.3 Design Option 3: Precast Concrete

Table 5. Design Option 3 - Precast Concrete.

(Source: Author)

Elements Materials

Floor Concrete

Floor finish Timber hardboard floor finish

External Wall Precast concrete

Internal Wall Precast concrete

Wall Insulation No Insulation

Page 38: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

26

Roof Timber framed with steel ribbed

decking

Roof Insulation Glass wool(R4)

Windows Double glazed windows

Doors Timber

Floors for the precast concrete house are 100mm in thickness, with a timber hardboard

floor finish, 5.5mm in thickness. External walls are precast concrete wall panels,

200mm in thickness with smooth finish both sides, and internal walls are precast

concrete wall panels, 150 mm in thickness (Rawlinson 2015). All the east, west, north,

and south side windows are double-glazed. The roofing is timber-framed, with steel-

ribbed decking and glass wool insulation of material R-value 4, with a 50-year lifespan

(eTool 2016). Paintings, glass operable walls, and timber doors are the other features in

the building.

Figure 11. . Image for a precast concrete house and wall panel.

(Source: http://www.reid.com.au/News/Precast_Panel_Homes.aspx)

3.4.4 Design Option 4: Timber

Table 6. Design Option 4 – Timber.

(Source: Author)

Elements Materials

Floor Concrete

Page 39: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

27

Floor finish Timber hardboard floor finish

External Walls Timber frame with hardwood cladding

Internal Walls Timber frame with hardwood cladding

Wall Insulation Glass wool (R-1.5)

Roof Timber framed with steel-ribbed decking

Roof Insulation Glass wool (R-4)

Windows Double-glazed windows

Doors Timber

Floors for the timber house are concrete, 100mm in thickness, with a timber hardboard

floor finish, 5.5mm in thickness. External and internal walls are timber frame with

hardboard timber cladding, 25mm in thickness, and glass wool insulation with material

R-value of 1.5. The roofing is timber-framed, with steel-ribbed decking and glass wool

insulation of material R-value 4, with a 50-year lifespan (eTool 2016). Operable glass

walls, standard timber doors, and double-glazed windows are other features in the

building (Rawlinsons 2015).

Figure 12. Image for a timber framed house and wall insulation. (Source: Modern Timber frame house).

(http://itsokblog.com/modern-timber-frame-houses-building-techniques/modern-timber-frame-

houses-image/)

Page 40: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

28

3.5 Microsoft Excel

Cost estimation and embodied energy (materials) calculation of four different design

options are done in Microsoft Excel 2010 using Rawlinson’s Australian Construction

Handbook data (Rawlinsons 2015). Total cost is estimated using area and cost per metre

square of each type of building material. Cost estimation for each option is shown in the

Results section Table 10.

Equation 1

𝑇𝑜𝑡𝑎𝑙 𝐶𝑜𝑠𝑡 = 𝐶𝑜𝑠𝑡/(𝑚2) × 𝐴𝑟𝑒𝑎(𝑚2)

To analyse the possibilities of sustainable building materials, embodied energy is

calculated using the mass of the respective material (density × volume) in (kg) used in

each area (m2) multiplied by the respective embodied energy (MJ/kg) of each material.

The sum of embodied energy values represents total embodied energy for the building,

as shown in the Results section Table 11.

An example of how the calculation was carried out to obtain the embodied energy value

of building materials is shown below.

Equation 2

∑∑ 𝐸𝐸 𝑚𝑎𝑡𝑒𝑟𝑖𝑎𝑙(𝑐𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡)𝑖 =𝑛𝑖=1 ∑ [𝑉𝑜𝑙𝑢𝑚𝑒(𝑚3) × 𝑑𝑒𝑛𝑠𝑖𝑡𝑦 (

𝑘𝑔

𝑚3) ×𝑛𝑖=1

𝑒𝑚𝑏𝑜𝑑𝑖𝑒𝑑 𝑒𝑛𝑒𝑟𝑔𝑦 𝑐𝑜𝑒𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑡(𝑀𝐽

𝐾𝐺)] (𝑐𝑜𝑚𝑝𝑜𝑛𝑒𝑛𝑡)𝑖

EE material (MJ) = Embodied energy (MJ/kg) x Density (kg/m³) x Area (m²) x

Thickness (m)

Page 41: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

29

3.6 IES-VE Model Tool

3.6.1 Introduction

IES-VE (2017) was used to analyse simulations of the performance of buildings and

energy modelling for existing buildings, renovation, or new constructions. IESVE is

used by architects, engineers, urban planners, interior designers, and energy and green

building consultants to design and evaluate energy-efficient buildings (IES-VE User

Guide 2017).

For expanding a model in the virtual environment programme (VE) software, the

geometry of the case study house was needed for drawing the 3D model of the house in

the IES-VE software. Thus, the house’s information, including building measurements,

was added to carry out this case study as a modelling tool for determining the 3D

modelling and thermal analysis of the case study house.

For the 3D model construction, thermal analysis of house, and solar shading, IES-VE

software was used. More specifically, a modelling tool known as ModelIT was used to

determine basic geometries. Also, in investigating the 3D modelling of four different

design options houses, the researcher used SunCast for solar shading analysis and

Apache for thermal calculations and simulation.

Table 7. Shows the Applications and Function Performance in the IES-VE Modelling

Software

(Source: IES-VE User guide 2017)

APPLICATIONS(IESVE)

PERFORMANCE

ModelIT Building Modeller

SunCast Solar shading Analysis

Apache Thermal calculation and simulation

Page 42: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

30

3.6.2 IES-VE Modelling Procedures

Firstly, the virtual environment programme starts with a blank model space initialised

using the ModelIT workspace. To select the specific selection of the model, the

application navigator bar on the left-hand side of the blank model space is used. The

application specific toolbar is at the top of the blank model space. The toolbar is on the

upper left of the blank model space. The 3D modelling of the house, solar shading

analysis, and thermal calculation and simulation process is carried out as described

below:

Location of the case study building can be set using the APlocate module in the

Tools pull-down menu.

The structural floor plan of the case study house was drawn on the blank model

space of the virtual environment using ModelIT.

All the rooms, windows, doors, and roofs can be created using the application

specific toolbar.

Materials for the selected building elements are assigned using the Assign

Texture function.

3D modelling of the case study building can be generated using the model

viewer in the generic toolbar.

Solar shading analysis, sun path images and animations can be generated using

SunCast.

Thermal calculation and simulations of the building can be done using Apache.

Page 43: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

31

3.6.3 Case Study: Single Storey House - General Description

A single, detached, one-storey house in Perth (Latitude: 31.93S, Longitude: 115.97E)

was used as a case study for this research. APLocate (ModelIT) was employed for

location and weather data. The case study house is a single residential detached house,

separated into eleven rooms including three bedrooms, two bathrooms, a home theatre,

a living room, a garage, an alfresco, and a laundry.

The orientation of the house’s living room is due north, and the house is located in

Perth, Western Australia. According to the Building Code of Australia, there are seven

standard geographical classifications for Australian climate zones, and Perth is in zone

five: warm temperate. The main characteristics of this zone are a moderate diurnal

temperature range near the coast to a high diurnal range inland; four distinct seasons,

where summer and winter can exceed the human comfort range; spring and autumn are

ideal for human comfort; mild winters with low humidity; and hot to very hot summers

with moderate humidity (Horne and Carolyn 2008,121).

Table 8. AP Location Using IES-VE

(Source: IES-VE, 2017, student version). Location Perth Airport, Australia

Latitude 31.93 S

Longitude 115.97 E

Elevation(m) 20.0

Time zone (hours ahead of

GMT)

8

For designing the 3D model in the model viewer, the designing can be done using Prism

drawings. The grid settings are used for aid in model creation for example, x-axis

0.1000 and y-axis 0.1000. All the rooms can be created using ‘draw extruded shape’

from the application-specific toolbar to the case study floor plan. Adjacent rooms can

Page 44: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

32

be connected using ‘connect the merger space’ in the application toolbar. For

generating the roof for the whole building, select all the room areas on the drawings

created in the model space and then select ‘generate roof for the selected spaces’ in the

application toolbar. For adding windows, doors, and openings, select ‘add windows,

add doors, and add hole’ from the application toolbar, and insert values for the width

and height of the windows, doors, and holes, e.g. the base height 1.00, width 2.5, and

height:1.100. All the closed rooms need to be connected to the roof using

connect/merger spaces in the application toolbar.

Figure 13. IES-VE Model blank space page and ModellT work space.

(Source: IES-VE, 2017, student version).

Tool Bar Applications &Navigator

Model Browser

ModelIT Work space

Location

Page 45: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

33

3.6.4 3D Modelling View of the Case Study House from the IES-VE

Tool

Using the calculated area and volume of the case study house, a 3D model of the clay

fired brick house is generated in the ModelIT workspace. Similarly, we can repeat the

same procedure for the other three options.

Figure 14. Floor plan of case study house drawn in Model Viewer model space

(Source: IES-VE, 2017, student version).

For assigning different types of material texture, ‘building template manager’ was

selected in the generic toolbar and then selected construction. If materials need to be

changed, then ‘Apache construction database’ can be edited to the requirements in the

project construction page.

Page 46: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

34

Figure 15. Apache construction using Building Template Manager. (Source: IES-VE, 2017, student version).

Figure 16. Project construction using Building Template Manager.

(Source: IES-VE, 2017, student version).

3D modelling of the house can be viewed using Model Viewer on the application

toolbar.

Page 47: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

35

Figure 17. IES-VE software showing the 3D view of the proposed case study house

based on the respective floor area. (Source: IES-VE, 2017, student version)

3.7 SunCast

Solar shading analysis performance was determined using ‘SunCast’ in IESVE, which

is essential in the modelling stage to understand the effect of sun intensity and the

exposure of the building. The simulation can be done through ‘calculation’ in the

application toolbar, and then selecting ‘solar shading’ in Apache. The SunCast

simulation results are generated by selecting the start button of solar shading

calculation. These simulated data are then loaded and applied to the simulation

building.

Page 48: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

36

Figure 18. Solar shading report using SunCast (Source: IES-VE, 2017, student version)

Figure 19. Analysis of sun shading during 01/January to 31/December using SunCast

(Source: IES-VE 2017, student version).

The animated views of the sun path and shadows can be viewed using the solar arc

on/off and component shadows buttons, which show the sun path and shading of the

house during the selected period.

Page 49: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

37

Figure 20. Solar shading analysis using SunCast of the 3D model

(Source: IES-VE, 2017, student version).

3.8 Apache

In Apache, thermal settings can be changed in CIBSE loads. The CIBSE load is

calculated and the Apache simulation result is then generated. The air temperature of

the house can be determined with the help of the generated result.

Automatic shading file generation is produced using ‘load shading result’. The

maximum, mean, and minimum temperature inside the house can be determined using

the ‘Synopsis’ key in the application toolbar. CIBSE load result is used in the Apache

Sim to generate air temperature inside the house.

Page 50: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

38

Figure 21. CIBSE load using Apache. (Source: IES-VE, 2017, student version).

Figure 22. Air temperature graphs for the whole year can be generated using an XY

plot. (Source: IES-VE, 2017, student version).

A table showing calculated total R- value (Material Resistance value), U value

(Reciprocal of R-value), thickness regarding the simulated building materials using

IES-VE, are shown below in Table 9. The other three different design options results

are shown in (see Table 28 to 31, Appendix B)

Page 51: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

39

Table 9. Showing the Thermal constructions used within the clay fired house model (Source: Author, IES-VE 2017)

Category Materials U value(W/𝐦𝟐K) R-value

(K 𝐦𝟐/W)

Thickness(m)

Ground Floor Concrete 0.2226 4.3353 0.2682

Internal ceiling floor Wood 1.0477 0.7203 0.2825

External wall Clay fired Brick 0.2594 3.6778 0.2089

Internal Partition Clay fired Brick 1.8754 0.2990 0.0750

Door Wood 2.1659 0.2846 0.0370

Roof Steel-ribbed

decking

0.1794 5.4163 0.3170

3.9 eTool

Building constructions are responsible for one-fifth of GHG emissions in Australia

(McGee, 2013). In this sense, buildings are a primary source of GHG emission. Hence,

it is important to evaluate good solutions for reducing the energy usage of building

constructions and develop a new approach for a sustainable environment (Rauf and

Robert, 2015 140).

To investigate the relationship between global warming and the embodied energy of

four different design options houses, eTool is used. The embodied energy and GHG

emission of a single detached residential building was calculated for a building service

life cycle of 45 years (eTool 2016). The life cycle assessment study was conducted by

eTool ISO14044 and EN15978 (European Standard). eTool is used to investigate the

life cycle impact of buildings. It is free software, but one needs to register to access it.

The picture below (Figure 23) illustrates the LCA concept.

Page 52: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

40

Figure 23. Picture of LCA description in e-Tool (Source: Life cycle assessment, certified energy, 2016)

The life cycle assessment of the case study house for different design options was

carried out as described below.

Firstly, at the start-up of the e-tool LCD, a new project page is initialised (see Figure

23).

In the project section, the land area, house address, project name, and building

descriptions need to be given to get the exact location of the building.

Page 53: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

41

Figure 24. Screenshot of description page in e-Tool. (Source: eTool, Author)

In the next step, the structural information of the design options of the building

needs to be added to know the selection of materials, scope, and description of

the building.

Figure 25. Screenshot of structural information in e-Tool. (Source: eTool, Author)

Page 54: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

42

The third step is to find design criteria by adding building descriptions, such as

the area of the house, storey, fully-enclosed areas, and non-enclosed areas.

The fourth step is to add the building’s substructure, superstructure, internal

finishes, etc. in the ‘design section’ using the ‘add template tool’, which are

needed for the life cycle impact calculation.

Finally, a report for each design option is generated in the ‘design section report

tab’. Here, the availability of each design option or a comparison of different

design options, e.g. embodied energy, global warming, etc. is also present.

Figure 26. Screenshot of selecting substructure and superstructure in e-Tool

(Source: eTool, Author)

Life cycle assessment using eTool is fast and accurate, estimating embodied energy and

global emissions of all the materials used in building construction. It also provides a

choice of materials that can be edited or can be used from the data stored in the eTool.

The life cycle assessment study has been undertaken for embodied energy and global

warming. Energy used in all phases of construction, transport, end of life, recurring and

other has been considered. It also considers the life span of each material.

Page 55: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

43

CHAPTER 4: RESULTS

4.1 Building Estimation Cost Using Excel

Based on the research study carried out in four different design options, an approximate

total cost estimation is calculated for each design options using Excel spread sheet

shown in Table 10.

For basic construction, the essential element of a building is its substructure and

superstructure. So the cost estimation only included substructure, superstructure and

labour charge of materials. Other extra charges such as plumbing, fencing, landscaping,

preliminary works, internal finishes and other charges are not included.

Total cost estimation can be obtained using Equation 1, section 3.5 on p.28. The cost

($ /m2) of each material is multiplied with area (m2) for deriving cost estimate and then

adding together to get the total cost. Please refer Table 23 to 27 (Appendix A).

Table 10. A Table summarising the total cost estimation of four different design options

calculated using Microsoft Excel spread sheet.

(Source: Table 23 to 27, Appendix A)

No Options Cost ($)

1 Clay fired Brick 194,400

2 Steel Frame with Metal cladding 206,400

3 Precast Concrete 217,200

4 Timber 191,200

In the construction cost as shown in Figure 28, a precast concrete house’s total

estimated cost is high due to the high cost of concrete panel. The estimated total cost is

also high for steel house, despite the minimal use of wall cladding compared to other

three design options. The timber house is economically feasible due to its cheaper price

(Reardon 2013); also, clay fired brick is also cheaper due to its lower maintenance

Page 56: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

44

(Downton 2013). It is good to note that timber house show the least cost among the

other three options. Considering economically and environmentally feasible house,

timber house shows the better choice (Figure 27).

Figure 27. Cost comparison of different design options.

(Source: Table 10, Author)

4.2 Embodied Energy Calculation using Microsoft Excel

Spread Sheet.

The embodied energy of selected design options was estimated by entering the

quantities of basic elements such as substructure and superstructure into a Microsoft

Excel spread sheet. The area of each quantity (m2) is multiplied by the thickness of

each quantity to find out the volume (m3). The volume is multiplied by the density of

each quantity (materials) to get the mass of the material (kg). The embodied energy of

each quantity can be obtained using the multiplied mass of each quantity with each

embodied energy coefficient (MJ/kg). Total embodied energy can be obtained by

Page 57: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

45

adding all the embodied energy values. However, this case study’s focus is on four

different materials and other materials included in substructure and superstructure. The

embodied energy of material can be obtained using Equation 2, on p.28. Embodied

energy calculation and results of four different design options is shown in Table 23 to

27 (Appendix A).

Table 11. A Table summarising calculated embodied energy values for all four

different design options

(Source: Table 23 to 27, Appendix A)

Materials EE in GJ

Clay fired Bricks 585.2

Steel 554.7

Precast Concrete 414.1

Timber 201.2

The analysis showed that, among the four different design options, this study found that

the clay fired brick house had the highest embodied energy of 585.2 GJ. The timber

house contributed 201.2GJ that is 65% less than the clay fired brick house building.

Design option 2, the steel-framed with metal cladding house had 554.7 GJ embodied

energy that is 63% higher than timber house materials. Design option 3, precast

concrete contributed 414.1GJ embodied energy, 51% higher than the timber house

materials. This is a good approach to understand and to reduce the embodied energy in

building construction. This study found that clay fired brick and steel were the largest

embodied energy contributors. This project found that some sustainable alternatives

fixtures like glass operable walls contribute to embodied energy. Timber materials still

require some energy for manufacturing and transportation. However, more use of

sustainable materials would reduce the embodied energy of building construction.

Page 58: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

46

.

Figure 28. Embodied energy of comparison of different design options materials. (Source: Table 11, Author)

From the above calculated results of cost and embodied energy using Excel, Timber

house is the cost and embodied energy efficient compared the other three different

design options.

Page 59: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

47

A brief comparison of cost and Embodied Energy comparison of Clay fired brick

house with steel roof and Clay fired brick house with terracotta tile roof house

(Microsoft Excel spread sheet 2010).

Figure 29. Comparison of total cost & embodied energy comparison results of design

option 1 with different roof material.

(Source: Table 23 and 27, Appendix A)

Figure 29 shows, comparison of total cost and embodied energy results of clay fired

brick with steel roof and clay fired brick with terracotta roof (Design option 1). Clay

fired brick with steel roof house shows highest embodied energy result compared to

clay fired brick with terracotta roof house (Design option 1).This is due to embodied

energy of steel (38MJ/kg) is higher than terracotta tile (2.5MJ/kg) (Table 23 and Table

27, Appendix A).When it is compared with the cost, for these materials it is almost

similar.

Page 60: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

48

4.3 IES-VE Results

As mentioned in the methodology chapter, among the given IES-VE applications

selected options by the software, 3D modelling, SunCast and Apache were used in this

thesis.

4.3.1 Results of the 3D Modelling Drawings of Four Different Design

Options.

Figure 30 to 33 below gives a 3D model of the four different design options for the

single residential houses used for this study’s thermal analysis. The quantities and

elements were taken from the case study house plan such as doors, walls, material

textures all included. The material textures and specifications are provided for four

different design options are shown below in Figure 30, 31, 32 and 33.

Page 61: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

49

Figure 30. 3D image of a Clay fired brick house.

(Source: Author, IES-VE 2017)

Figure 31. 3D image of a Metal clad house.

(Source: Author, IES-VE 2017)

Page 62: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

50

Figure 32. 3D image of a Precast concrete house.

(Source: Author, IES-VE 2017)

Figure 33. 3D image of a timber clad house.

(Source: Author, IES-VE 2017)

Page 63: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

51

4.4 Solar shading analysis using SunCast

The Figure 34, provides information about the sunrise and sunset hours and the

respective azimuth angle of the sun for the Perth location of the proposed single

residential house. The information along with the sun path diagram for the coordinates

of the location generated by the IES-VE software is given in Figure 34. The SunCast

results shown below in Figure 34, demonstrate how much solar light is received on the

house, and this result is used in the Apache thermal analysis of the building (IES-VE

2017).

The solar radiation can be viewed using SunCast module in IES-VE Software. Thermal

simulation can be carried out using solar shading calculation to determine the impact on

heating and cooling energy as explained in the methodology section. Figure 34 shows

that the highest solar radiation is received from November to February between

11:00a.m and 14:00p.m hours, whereas less solar radiation is received on the model

surfaces in the months of May, June, July and August.

Figure 34. Sun path for the single-family house 3D model design option

(Source: Author, IES-VE 2017)

Through the application of IES-VE software, the effect of solar shading using Suncast

is shown below Figure 35. An analysis reveals that the north façade area (case study

Page 64: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

52

house) receives 2456.30kWh/m2 solar irradiation level, meaning 8842.68 MJ/m2

(1KWh/m2) is (3.6MJ/m2). Analysis of the south-east wall (case study house) is

shaded; hence, the south area receives 424.72kWh/m2 (1528MJ/m2), and the east area

(case study house) receives 1643.67kWh/m2 (5917.21 MJ/m2 ) solar radiation level.

Analysis of west facade area of case study house receives 1237.35kWh/m2

(4454.46MJ/m2) solar radiation level. The house design and partitions of the single

residential house have been made in consideration of utilising the maximum possible

solar radiation in each season. The house is in an east-west direction. The living room,

kitchen, bedroom and large windows are located in the north to utilise the maximum

possible solar radiation. The east-facing windows are minimal in this house; also, in

winter, solar radiation is much less. The southern windows of the house are also small

because of the possibility of heat loss during winter. The west windows are also kept

minimal due to afternoon sun and the difficulty of shading (Synergy 2016).

Figure 35. Sun path for the single-family house 3D model design option.

(Source: Author, IES-VE 2017)

Page 65: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

53

4.5 Apache Thermal Calculation and Simulation Results

The outside weather is an important driving force affecting thermal conditions in a

house. The thermal simulation using Apache was done for finding the air temperature

inside the house for the selected period as shown below in Table 12. In the Apache

thermal simulation, air temperature inside the house is considered for identifying how

much heating, cooling and natural ventilation is required for the house. As we see in the

below graph, temperature conditions were moderate because assumes the temperature is

calculated for closed house (doors and windows are closed). The steel-cladded house

shows lowest temperature and highest temperature. Precast concrete shows highest

minimum air temperature. From this, we can understand how much heating and cooling

is required for this type of house.

Table 12. Thermal simulation results for all four different design options (Assume all

doors and windows are closed). (Source: Table 33 to 36, Author, IES-VE 2017)

Materials Min. Temperature

(Deg. C)

Max.Temperature

(Deg. C)

Mean

Temperature(Deg.C)

Clay fired brick 8.27 46.29 28.14

Steel 6.63 49.3 28.06

Pre cast concrete 9.52 44.17 28.02

Timber 6.91 48.67 28.07

We can see that the highest level of direct air temperature appears in March and the

lowest level of air temperature inside case study house reaches in June, July and

August. So, based upon solar shading analysis result using, SunCast, Apache thermal

calculation is done. It is able to generate graph for one year, a day or a specific time.

Page 66: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

54

4.6 Life-Cycle Assessment

The eTool calculate the whole life cycle assessment of a building material such as

manufacturing, transportation, end of life, disposal of the building materials.

The Embodied energy and global warming associated with transportation, construction,

and the end of life.

Based on the study carried out on four design options shown below in Figure 36, the

design option for the timber has the highest embodied energy, 1504 GJ. The embodied

energy of design option of steel is the lowest, 1098GJ, followed by the design option

for clay fired brick with the value of 1207GJ and precast concrete with the value of

1401GJ. The lower embodied energy of design option of steel is due to the steel frame

with metal cladding which is lightweight, fully recyclable, low transportation cost and

less maintenance (personal communication with the eTool staff 2017). Furthermore,

except the wall materials, the windows, floorings, doors, glass operable walls and roofs

are considered as the same for all design options. For analysing differences in

greenhouse gas emissions (GHG) and embodied energy by using same materials except

wall materials in its construction for considering the differences of houses in its.

Operational energy such as heating and cooling, appliances, lighting, refrigerator, etc.

are not included in this calculation.

Calculated global warming results show that timber is the least 61,828 kgCO2

compared to other three different design options and precast concrete is the highest with

100,110kgCO2. The second-highest carbon emission shows clay fired brick

77,863 kgCO2 and the second least is steel 64,214 kgCO2 . Timber is least in carbon

Page 67: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

55

emission, meaning the least effect on global warming. Please refer the calculated value

(eTool) (Table 37 to 44, Appendix C)

Table 13. Life Cycle Assessment results using eTool for all four different options.

(Source: Table 37to 44, Appendix C. Author, IES-VE 2017)

Materials Global Warming (KgCo2-eq) Embodied Energy(GJ)

Clay fired brick 77,863 1,207

Steel 64,214 1098

Precast concrete 100,110 1,401

Timber 61,828 1,504

Figure 36. Comparisons of Embodied energy and Global warming eTool results of four

different design options. (Source: Table 13, Author, IES-VE 2017)

From Figure 36, it can be stated that embodied energy is high in timber (Design option

4) when it is compared with other different design options. Further, global warming is

less compared to other different design options.

020000400006000080000100000120000

0200400600800

1000120014001600

Glo

bal

war

min

g (k

g C

o2

eq

)

Emb

od

ied

En

erg

y(G

J)

Design options

Embodied Energy and Global warming

Embodied Energy(GJ)

Global Warming(KgCo2-eq)

Page 68: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

56

4.7 Design Guidelines

This part of the document provides design guidelines for building materials for

residential buildings. There are some environmental aspects that need to be protected in

future residential development.

• To minimise GHG (greenhouse gas emissions) from new residential development.

• To provide environmentally, economically, and socially viable options to energy

efficient design.

Building Orientation

Design Objectives

• To maximise opportunities for passive solar design through the orientation of

buildings.

Guidelines

Orientate buildings in an east-west or north – south direction. The living room, kitchen,

bedroom and large windows are located in the north to utilise the maximum possible

solar radiation.

Consider east-facing windows minimal in this house; also, in winter, solar radiation is

much less.

The southern windows of the house keep small because of the possibility of heat loss

during winter.

The west windows kept minimal due to afternoon sun and the difficulty of shading.

Building Materials

Objectives

Material selection should also take into account for determining the viable option of

sustainability, for example, the embodied energy and GHG emissions required in the

production of the material.

Guidelines

Consider building materials such as light weight framed timber, steel and minimal

concrete for floors, walls and roof, can contribute to good comfort and environmental

performance. It is also good thermal insulator.

Page 69: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

57

Consider Multi-residential timber framed construction (MRTFC), a new innovative

product for light weight framing, fire and sound- rated timber. It is cost-effective and

low mass housing solution.

Avoid the excessive use of high embodied energy precast concrete walls and clay fired

bricks.

External finishes should be of low reflectivity to minimise glare and reflection.

Consider Double glazed windows, an energy efficient choice. It acts as an excellent

insulator for heat loss and heat gain.

Consider reflective or bulk Insulation such as glass wool, earth wool to reduce

condensation on roof and thermal insulation for walls.

Consider plasterboard for ceiling linings which is recyclable, fire resistant, low

environmental impact, cheap and versatile.

Roof Forms

Objectives

• To minimise the environmental impact of roofing and structural support to timber

framed house.

Guidelines

Consider colorbond (metal) roof forms to provide structural support to the light weight

framed house and visual beauty to the house whilst providing very durable.

Page 70: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

58

CHAPTER 5: DISCUSSION

The aim of this study was to analyse the feasibility of sustainable housing for a Western

Australian community using thermal simulation and life cycle assessment tools. The

cost estimation was done using Excel spread sheet (Appendix A), 3D modelling and

thermal simulation of model house was done by IES-VE building software(Appendix

B) and a life cycle assessment of building materials(Appendix C) for different design

options was done using eTool. The cost estimation and embodied energy calculation

results are summarised in the Results section, Tables 10 and 11.

The 3D modelling is also summarised in Figure 30 to 33. Thermal simulations can be

obtained from the Apache results in Table 12 and the life cycle assessment of different

design option houses also can be obtained from the eTool results in Table 13.

Studies have analysed four different design options in order to obtain the best possible

results concerning material quality differences, cost, embodied energy and global

warming including different roof material (e.g., terracotta) in order to understand the

difference between steel-ribbed decking, colour-coated and timber-framed terracotta

roof tile (Appendix A).

From the above calculations and estimated results, the researcher observed that there is

a lot of variation in the results among Excel embodied energy results and eTool

embodied energy results. The results are shown in Tables 11 and 13.

Page 71: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

59

In Excel

For analysing and understanding the differences between the two different roof

materials, a steel roof and terracotta with four different design options are shown below

in Table 14. Also, some variations in cost and embodied energy differences of a steel

roof house and a terracotta roof tile house could be noticed. A timber-cladded house

with a steel roof shows the least cost; this could be that a terracotta roof tile is more

costly than a steel roof tile that is $191,200 (Rawlinson Construction Handbook).

Table 14. Total cost calculation result using Excel spread sheet for all four different

options.

(Source: Table 23 to 27, Appendix A)

Materials Cost of Steel roof house($) Cost of Terracotta tile roof house($)

Clay fired Brick 194,400 194,600

Steel 206,400 206,600

Precast concrete 217,200 217,400

Timber 191,200 191,400

Timber-cladded houses with a terracotta roof show the least embodied energy: 139GJ.

This could be because the density of a terracotta roof tile is 1200kg/m3 and the

embodied energy is 2.5MJ/kg; compared to a steel roof, steel’s density is 8050kg/m3

and the embodied energy is 38MJ/kg. Further, the total cost of precast concrete is

highest when compared with other materials. On the other hand, the total cost of Timber

house is lowest as per the Table 14 given above. Further, the cost for the Terracotta tile

roof house is more when compared with the cost of steel roof house (Table 14).

Page 72: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

60

Table 15. Embodied Energy results using Excel spread sheet for four different options.

(Source: Table 23 to 27, Appendix A)

Materials Embodied Energy of steel

roof house (GJ)

Embodied energy of Terracotta

roof tile(GJ)

Clay fired Brick 585.2 523

Steel 554.7 492.5

Pre cast concrete 414.1 351.9

Timber 201 139

eTool:

In this project, a comparison of global warming and embodied energy calculation using

eTool is also described. Using a thorough study and findings from the extant literature,

the researcher determined the embodied energy calculations using eTool and calculated

the whole life cycle assessment of all the materials, such as products, end of life,

recurring and transport. In contrast, a whole life cycle assessment calculation using

Excel spread sheet is a complex task; therefore, material-embodied energy calculation

was done using volume (m3) × density (kg/m3) × embodied energy coefficient (MJ/kg)

in Excel spread sheet.

Terracotta roof tiles only have a 64-year life span, compared to a steel roof’s 150-year

life span (eTool 2017). That means a terracotta roof tile need more recurring costs

compared to a steel roof, so the embodied energy is higher. A timber frame also needs

more maintenance via termite attack, fire safety or replacement of materials compared

to a steel-framed house (personal communication with the eTool staff 2017).

Page 73: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

61

Table 16. Embodied energy calculation results for two different roof materials using

eTool for all four different design options.

(Source: Author, Appendix C)

In terms of global warming, timber houses show the least carbon emission compared to

all other different design options, and the highest is precast concrete with a terracotta

roof tile: 104,164 kgCO2 − eq.

Table 17. Global warming calculation results for two different roof materials using

eTool for all four different design options.

(Source:Author, Appendix C)

Materials Global warming of Steel

roof house(kg𝐂𝐎𝟐-eq)

Global warming of Terracotta

roof house(kg𝐂𝐎𝟐-eq)

Clay fired brick 77,863 81,917

Steel 64,214 68,268

Precast Concrete 100,110 104,164

Timber 61,828 65,882

To better visualise the differences in embodied energy of a steel wall house and the

embodied energy of a timber wall house, the products, end of life, recurring,

construction and transport are described below.

The embodied energy of a timber-cladding house is higher than a steel house, showing

23% more recurring compared to a steel-cladding house. Materials are higher in a steel

wall compared to a timber wall, but end of life, construction and transport are almost

same in the two graphs Figure 37 and Figure 38 (eTool results).

Materials Embodied Energy of

Steel roof house (GJ)

EmbodiedEnergyof

Terracotta roof house (GJ)

Clay fired brick 1207 1262

Steel 1098 1153

Precast Concrete 1401 1456

Timber 1504 1559

Page 74: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

62

This is due to a number of factors such as construction waste, material life, disposal and

recovery method.

Construction Waste

Construction waste is assumed to be 5% for steel as steel members are crafted and

ordered with specific lengths and connections which allow them to be installed quite

readily onsite. Timber construction will involve a carpenter onsite who will modify

parts to fit specific needs. Modifications will be made through sawing or sanding which

accounts for 10% more construction waste produced by timber. When any type of

activities that are set for construction, there are situations in relation with waste is

occurred and these wastage can be determined to be losses that are faced. It is important

to make sure that proper steps are considered through which the rate of wastage can be

reduced. In this context, the steel is the only materials that can be recycled 100 %

(eTool 2017).

Material Life

Steel is estimated to have a higher material life as it does not readily decompose and

will not require long-term treatments to retain its durability (assumed replacement after

150 years). Timber will, however, need regular treatments to withstand rot or termite

treatments and will need to be replaced within an estimated time frame of 69

years. When compared with all the other construction materials, it can be stated that

steel is the only one that have long life span exist is higher than other materials.

Page 75: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

63

Disposal and Recovery Method (end of life)

More than 95% of structural steel can recover, reused or recycled at the end of building

life. eTool has used the assumption wherein 80% of steel is recycled while the

remaining 20% is directed to landfill. All the other construction materials are difficult to

recycle. In this context, clay fired bricks are the one that causes serious issues with

respect, to recycling. This material is made from clay and it is difficult to handle as

when it falls, then high damage is caused. In this context, it becomes highly difficult to

recycle (eTool 2017).

Timber is a more difficult product to recover and reuse structurally as parts tend to lose

their structural integrity through paints, adhesives and damage through demolition.

eTool has estimated that 100% of timber is directed to a wood landfill (eTool 2017).

Figure 37. Embodied energy calculation results of a steel wall using eTool (Source: Table 40, Appendix C)

Page 76: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

64

Figure 38. Embodied energy calculation results of a timber wall using eTool

(Source: Table 44, Appendix C)

Figure 39 and Figure 40 below shows the carbon footprint, expressed as Global

Warming Potential (GWP) measured in kgCO2eq, of the steel wall house compared to a

timber wall house. Given all the materials and services involved in products, end of life,

recurring, construction, transport fabricating, the timber wall house produces the least

carbon, 38% compared to a steel-framed house see (Appendix C)

.

Figure 39. Global warming calculation results of a steel wall house using eTool. (Source: Table 39, Appendix C)

Page 77: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

65

Figure 40. Global warming calculation results of a timber wall house using eTool. (Source: Table 43 Appendix C)

Unlike the timber house’s embodied energy value described by other authors (Monahan

and Powell, 2011), the embodied energy calculation results for timber house using

eTool had a high value (Table 13) compared to other three different design options.

The probability and possibilities of higher embodied energy of a timber-walled material

house in eTool could be a selection of a timber template (eTool 2017) as weather board

hardwood cladding. One may also select a steel frame instead of a timber frame in a

timber-cladding house, so there is some possibility of reducing the embodied energy

value in eTool; it would be a fair comparison.

Solar shading analysis for the whole building determines the maximum and minimum

solar radiation received on the building surface for whole year or a specific period. This

also helps to determine suitable locations for solar PV as well as possible design models

to increase solar access. Heating, cooling, ventilation and air conditioning requirements

of rooms can be calculated using Apache thermal calculation (IES-VE 2017).

Page 78: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

66

CHAPTER 6: CONCLUSION AND FUTURE

RESEARCH OPPURTUNITY.

Eco-friendly building materials are uncommon in urban housing development. State

governments, communities and the construction industry need to have a better

understanding of the material’s embodied energies and create initiatives to use

sustainable materials. The research presented here is a stepping stone to creating more

sustainable houses in Western Australia. Further research should be used to inform

consumers about the environmental impact of different products, as well as increase

awareness of the sustainable materials used globally.

The conclusion from this study:

Timber framed with steel ribbed decking colour coated roof (Design option 4)

shows economically feasible and environmentally friendly compared to all other

three design options (Table 10 and 11), as obtained from Excel Spreadsheet

calculation results in this study.

Timber framed with steel ribbed decking colour coated (Design option 4) shows

less GHG emission which environmentally friendly but high Embodied energy

(eTool results, Table 13) compared to other three different design options. This

(Timber wall house) is due to maintenance, manufacturing and transportation

(Figure 38 and 40) (Personal communication with eTool staff).

The 3D model house plan was converted to energy model house using IES-VE

tool bars for simulation purpose. The simulated values are used in SunCast and

Apache to generate solar and thermal analysis of the case study house.

Page 79: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

67

This study has proven that the Timber framed with steel ribbed decking colour coated

roof (Design option 4) is more cost effective and less GHG emission. However, the

embodied energy value of timber house is high, in eTool results. Therefore, need a

further research on Timber template (eTool), a life cycle assessment tool. Although

timber could face some termite attacks and fire risk, timber is a renewable building

material and a natural insulator. Moreover, it takes and stores carbon from the

atmosphere. As per the building code of Australia, a lightweight framed house such as

timber and steel could bring comfort and environmental performance (Reardon 2013).

A timber-framed steel-ribbed decking and colour-coated roof completes the house.

Nowadays, innovative timber-framed wall products are used in multi-residential house

which help to reduce fires and sound risks. Multi-residential timber-framed construction

walls are very cost effective, have low thermal mass, and respond quickly to climate

change. (Reardon 2013).

Page 80: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

68

References

Aksamija, A.2017. Integrating Innovation in Architecture: Design, Methods and

Technology for Progressive Practise and Result. John Wiley and Sons.

Australian Bureau of statistics, 2013. Standard Australian geographical classifications.

Boake, T. 2003. “Understanding the General Principles of the Double Skin Façade.”

www.tboake.com/pdf/double_facade_general.pdf

BREEAM (Building Research Establishment Environmental Assessment Method).

2017. http://www.breeam.com/index.jsp?id=598

Cabeza, L., C. Barreneche, L. Miró, M. Martínez, A. I. Fernández and D. Vorsatz.

"Affordable Construction towards Sustainable Buildings: Review on Embodied Energy

in Building Materials." Current Opinion in Environmental Sustainability 5(2): 229-236.

Science Direct.

"Certain glass wool fibers (inhalable).2012.” In National Institute of Environmental

Health Sciences Pamphlets. National Institute of Environmental Health Sciences,

http://go.galegroup.com.libproxy.murdoch.edu.au/ps/i.do?p=ITOF&sw=w&u=murdoch

&v=2.1&it=r&id=GALE%7CA306971000&sid=summon&asid=f00d496f7f1b425a246

85a1c877c7f74.

City Guide.n.d. Nilambur Kovilakam (Nilambur, Kerala)

http://cityguide.ibphub.com/viewplace.php?iCityguideID=374&sPlacename=Nilambur

%20Kovilakam

CPD Certification Service. 2017. Sustainable Steel Building.

http://www.bdonline.co.uk/cpd-6-2017-sustainable-steel-buildings/5087008.article.

Department of planning.2014. State planning strategy 2050.

https://www.planning.wa.gov.au/dop_pub_pdf/State_Planning_Strategy_2050.pdf

Dili, A., M. A. Naseer and T. Z. Varghese. 2010. “Passive Control Methods of

Kerala Traditional Architecture for a Comfortable Indoor

Environment: Comparative Investigation during Various Periods of

Rainy Season. Building and Environment 45(10): 2218-2230. Research Gate.

Page 81: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

69

Downton.2013.Materials, Brickwork and Blockwork-Your home Australia’s

Guide to Environmentally Sustainable Homes,5th

Edition.

http://www.yourhome.gov.au/materials/brickwork-and-blockwork

EPD. 2017. The International EPD System. http://www.environdec.com/

eToolLCD.2016.eTool: Life Cycle assessment and software

consulting. https://etoollcd.com/

eToolLCD. 2015. Sustainable building case studies using LCA-eTool projects.

https://etoollcd.com/

Gardiner,D.,andK.Wells.2008.AustralianIndigenousArchitecture.

http://www.australia.gov.au/about-australia/australian-story/austn-

indigenousarchitecture.

Horne, R., and C. Hayles. 2008. “Towards Global Benchmarking for Sustainable

Homes: An International Comparison of the Energy Performance of Housing.” Journal

of Housing and the Built Environment 23:119-130.

“How to Design Energy Efficient Home.”Synergy.

Last modified 2016. https://selfserve.synergy.net.au/docs/energy_efficient_home.pdf

IES.2015.All case studies-IES Online management platform

https://www.iesve.com/software/case-studies/info?building=Project-Shortlisted-for-

Student-Excellence-Award&id=5783

Ko, H-J., W. K. Hong, S. C. Park, G. T. Lim, J. H. Kim and J. T. Kim. 2013.

“Reduction Effect of Toxic Substances for Apartment Buildings with an Ecofriendly

Pre-cast Composite Structural System.” Indoor and Built Environment 22(1): 110-116.

Research Gate.

Kolaitis, Dionysios I., Eleni K. Asimakopoulou, and Maria A. Founti.

2017; 2016; Fire behaviour of gypsum plasterboard wall assemblies:

CFD simulation of a full-scale residential building. Case Studies in Fire Safety 7: 23-

35.

LandCorp. 2016. Design guidelines-LandCorp

https://www.landcorp.com.au/Documents/Projects/Metropolitan/White%20Gum%20Va

lley/WGV%20Design%20Guidelines%20February%202016.pdf

LandCorp. 2014/2015. LandCorp Statement of Corporate Intent.

http://www.parliament.wa.gov.au/publications/tabledpapers.nsf/displaypaper/3912340a

97a5dfb7369380b148257d8d002fcc84/$file/2340.pdf

Page 82: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

70

Lawania, Krishnakumar.2016. Improving the sustainability performance of Western

Australian house construction: A life cycle management approach. PhD thesis Curtin

University.

Lawania, Krishna, Prabir Sarker, and Wahidul Biswas. 2015. Global warming

implications of the use of by-products and recycled materials in Western Australia’s

housing sector. 8 (10): 6909.

Le, Hoang Anh, and Nguyen Thi Kim Oanh. 2010. Integrated assessment of brick kiln

emission impacts on air quality. Environmental Monitoring and Assessment 171 (1):

381-94.doi:http://dx.doi.org.libproxy.murdoch.edu.au/10.1007/s10661-009-1285-y.

http://libproxy.murdoch.edu.au/login?url=https://search-proquest-

com.libproxy.murdoch.edu.au/docview/807434435?accountid=12629.

Lupsea, Maria, Ligia Tiruta-Barna, and Nicoleta Schiopu. 2014. Leaching of hazardous

substances from a composite construction product--an experimental and modelling

approach for fibre-cement sheets. Journal of Hazardous Materials 264: 236-45.

Master Builders. 2017. Bricks. http://www.mbawa.com/bricks/

McGee, C. 2013.Energy: Your Home. www.yourhome.gov.au/materials

http://www.yourhome.gov.au/energy.

McGee, C. 2013. Materials: Your Home. www.yourhome.gov.au/materials

McGee, C. 2013. Passive Design: Your Home. http://www.yourhome.gov.au/passive-

design

"Michael Green Architecture Plans to Construct World's Tallest Wood Building in

Paris." Real Estate Monitor Worldwide, June 2, 2015. General OneFile

(accessedAugust28,2017).

http://go.galegroup.com.libproxy.murdoch.edu.au/ps/i.do?p=ITOF&sw=w&u=murdoch

&v=2.1&it=r&id=GALE%7CA416129709&sid=summon&asid=6aa2f5ec6e1f0418b19

f4cb19cd128bc.

Moncaster, A. M., and K. Symons. 2013. “A Method and Tool for Cradle to Grave

Embodied Carbon and Energy Impacts of UK Buildings in Compliance with the New

TC350 Standards.” Energy and Buildings (66): 514-523. Elsevier.

Page 83: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

71

Mosher, M., McGee, Caitlin, and Dick Clarke. 2013. Passive Design, Insulation - Your

Home: Australia's Guide to Environmentally Sustainable Homes, 5th Edition.Canberra,

Australia. http://www.yourhome.gov.au/passivedesign/orientation

Monahan, J., and J. C. Powell. 2011. An embodied carbon and energy analysis of

modern methods of construction in housing: A case study using a lifecycle assessment

framework. Energy & Buildings 43 (1): 179-88.

"Michael Green Architecture Plans to Construct World's Tallest Wood Building in

Paris." Real Estate Monitor Worldwide, June 2, 2015. General OneFile

(accessedAugust30,2017).

http://go.galegroup.com.libproxy.murdoch.edu.au/ps/i.do?p=ITOF&sw=w&u=murdoch

&v=2.1&it=r&id=GALE%7CA416129709&sid=summon&asid=6aa2f5ec6e1f0418b19

f4cb19cd128bc.

Nachawit, T. 2012. Selecting materials for environmental-friendly buildings: The need

for improved environmental impact data. Civil Engineering Dimension 14 (1): 42.

Pacheco-Torgal, F., L. Cabeza, M. Mistretta, A. Kaklauskas, and C. G. Granqvist. 2013.

“Nearly Zero Energy Building Refurbishment. A Multidisciplinary Approach.”

ProQuest.

Ramage, M., H. Burridge, M. Busse-Wicher, G. Fereday, T. Reynolds, D. U. Shah, G.

Wu, L. Yu and P. Fleming. 2017. “The Wood from the Trees: The Use of Timber in

Construction.” Renewable and Sustainable Energy Reviews 68(1): 333-359. Science

Direct.

Rapley, Lisa. 2013. "New Technology Makes Colorbond Steel More Durable." Bpn.

http://libproxy.murdoch.edu.au/login?url=https://search-proquest-

com.libproxy.murdoch.edu.au/docview/1447711108?accountid=12629.

Rauf, Abdul, and Robert H. Crawford. 2015. Building service life and its effect on the

life cycle embodied energy of buildings. Energy 79 (C): 140-8.

Rawlinsons. 2015. Construction Cost Guide. Rawlinson’s publishing

Page 84: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

72

Reardon, C. 2013.Materials, light weight framing -Your Home Australia’s Guide to

EnvironmentallySustainableHomes,5thEdition

http://www.yourhome.gov.au/materials/lightweight-framing

Reardon, C.2013.Materials, Precast concrete -Your Home Australia’s Guide to

EnvironmentallySustainableHomes,5thEdition

http://www.yourhome.gov.au/materials/precast-concrete

Reardon, C. 2013.Passive Design, Design for Climate -Your Home Australia’s Guide to

Environmentally Sustainable Homes, 5th Edition http://www.yourhome. gov.au/

introduction/Australian-climate-zones

Reardon, Chris, Caitlin McGee, and Geoff Milne. 2013. Passive Design, Thermal Mass

- Your Home: Australia's Guide to Environmentally Sustainable Homes,

5thEdition.Canberra, Australia. http://www.yourhome.gov.au/passivedesign/thermal-

mass

Reardon, Chris, and Paul Downton. 2013a. Materials, Construction Systems - Your

Home Australia's Guide to Environmentally Sustainable Homes, 5th Edition.

http://www.yourhome.gov.au/materials/construction-systems

RSMeans, eds. 2010. Green Building: Project Planning and Cost Estimating. 3rd edn.

Kingston: Means Company Ltd. Wiley Online Library.

Sassi, P. 2006. “Biodegradable Building, Design and Nature 111: Comparing Design in

Nature with Science and Engineering.” WIT Transactions on Ecology and the

Environment (87): 1743-3541. WitPress.

Sayer, J. 2016. “Shigeru Ban Lines Up His First Project in Canada: A Hybrid Timber

Tower with Luxury Apartments.” The Architects Newspaper, July18.

http://archpaper.com/2016/07/shigeru-ban-vancouver-hybrid-timbert-tower

Smith, C. 2017. “Vancouver Architect Michael Green Spurs Global Movement for Tall

WoodBuildings.”http://www.straight.com/news/881601/vancouver-architect-

michaelgreen-spurs-global-movement-tall-wood-buildings

Strong, D., and V. Burrows. 2017. A Whole System Approach to High Performance

Green Building. Artech House.

Page 85: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

73

Taleb, Hanan M. 2014. Using passive cooling strategies to improve thermal

performance and reduce energy consumption of residential buildings in U.A.E.

buildings. 3 (2): 154-65.

Troy, P. N., ed. 1995. Technological Change and the City. New South Wales:

Federation Press.

United Nations (UN). 2014. World Urbanization Prospects, The 2014 Revision:

Highlights.https://esa.un.org/unpd/wup/Publications/Files/WUP2014-Highlights.pdf

VE 2017. IES Virtual Environment. https://www.iesve.com/VE2017

Western Australian Planning Commission, 2016. State planning policy 2.5.Rural

Planning.https://www.planning.wa.gov.au/dop_pub_pdf/SPP_2-

5_Rural_Planning_Dec_2016.pdf

WGV Design Guide Lines. 2016.

https://www.landcorp.com.au/Documents/Projects/Metropolitan/White%20Gum%

Page 86: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

74

Appendix A

Material Specifications

Table 18. Materials R- values (Source: Author, adapted from various sources)

Material R-value

Clay-fire Brick 0.80

Timber 1.35

Metal (Steel) 0.61

Concrete 0.3

Table 19. Material Densities (Source: Author adapted from various sources).

Materials Density(kg/m^3)

Double Brick 1690

Concrete 2400

Timber 480-670

Metal 8050

Table 20. Material Cost per Square Metre (Source: Rawlinsons 2015)

Materials

Cost per square metre in ($)

Clay- fire Brick 181.50

Concrete 75 Timber 170 Steel 133

Precast Concrete 345

Table 21. Materials’ Local Availability (Source: Author)

Materials Suppliers Suppliers

Concrete Boral BGC

Bricks Midland Bricks Austral Bricks

Timber Wesbeam Austim

Pine timber

Fremantle Timber

Page 87: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

75

Table 22. Advantage of building materials(Source: Author)

Material Advantages

Clay Fire Brick (Double

layer brick)

High thermal mass, Low maintenance.

Steel Recyclable.

Precast Concrete High thermal mass, minimal waste, speed of

construction

Timber Biodegradable product, low embodied energy

Concrete Floor(100mm) High Thermal mass

Hardwood floor

finish(5.5m)

Durable.

Glass wool (R 1.5) It act as a insulation and vapour barrier inside

cladded house

Glass wool(R4) It act as a insulation and vapour barrier inside

cladded house

Double glazed

windows(1m^2)

It act as a sound proof, insulator, energy efficient

Fully glazed operable

wall

Energy efficient.

Standard timber door Biodegradable product

Ceiling Lining(12mm

Plaster board)

Low embodied energy

Table 23. Cost and Embodied Energy calculation of Clay fired brick house using

Microsoft Excel (Source: Author).

Table 24. Cost and Embodied Energy Calculation of steel frame with Metal cladding

house using Microsoft Excel (Source: Author).

Clay - fired brick andCement rendering Cost per m^2($)/Numbers

Area

( m^2)

Cost

estimated($)

Approx

thickness(m)

Volume

(m^3)

Density

(kg/m^3)

Mass

(Kg)

Embodied

energy(MJ/kg)

Total

embodied

energy(MJ)

External wall area(Double brick, 270mm ) 227 150.8 34231.6 0.27 40.72 1900 77360.4 2.5 193401.0

External wall Insulation(glasswool R1.5, 50mm) 9.5 150.8 1432.6 0.05 7.54 20 150.8 28 4222.4

Internal seprating walls(110mm) 112.2 122.9 13789.4 0.11 13.52 1900 25686.1 2.5 64215.3

Flooring concrete 100mm thickness 64.7 163.1 10552.6 0.1 16.31 2400 39144.0 1.9 74373.6

Total Roofing (Timber framed steel ribbed ) 256 187.7 48051.2 0.00075 0.14 8050 1133.2 38 43063.1

Roofing Insulation(glasswool R4) 15.35 163.1 2503.6 0.215 35.07 20 701.3 28 19637.2

Ceiling Lining(12mm PB) 47.5 163.1 7747.3 0.012 1.96 668 1307.4 4.4 5752.6

Internal wall outside cement rendering 40.9 122.9 5026.6 0.013 1.60 1150 1837.4 5.6 10289.2

Internal wall inside cement rendering 40.9 122.9 5026.6 0.013 1.60 1150 1837.4 5.6 10289.2

External wall inside cement rendering 40.9 150.8 6167.7 0.013 1.96 1150 2254.5 5.6 12625.0

Timber hardboard floor finish 5.5mm 31.1 163.1 5072.4 0.055 8.97 500 4485.3 24.2 108543.1

Painting(Internal walls)(Acrylic,latex) 11.35 396.6 4501.4 0.001 0.40 1150 456.1 61.5 28049.5

Fully glazed operable walls 1750 13.7 23975.0 0.01 0.14 2580 353.5 12.7 4488.9

Double glazed windows(1m^2) 760 27.9 21204.0 0.006 0.17 2580 431.9 12.7 5485.0

Standard timber door (Nos) 645 8 5160.0 0.03 0.24 380 91.2 8.5 775.2

Total 4052.4 194441.9 585210.3

Steel frame and Metal cladding Cost per m^2($)/Numbers

Area

(m^2)

Cost

estimated($)

Approx

thickness(m)

Volume

(m^3)

Density

(kg/m^3)

Mass

(Kg)

Embodied

energy(MJ/kg)

Total

embodied

energy(MJ)

External wall steel frame (75*32mm studs at 450mm) 56.3 150.8 8490.0 0.005 0.75 8050 6069.7 20.1 122001.0

External wall inside sheet metal cladding( 0.75 mm galvanised steel ) 133 150.8 20056.4 0.00075 0.11 8050 910.5 20.1 18300.1

External wall outside sheet metal cladding(0.75 mm galvanised steel) 133 150.8 20056.4 0.00075 0.11 8050 910.5 20.1 18300.1

External wall Insulation(Glasswool R1.5, 50 mm) 9.5 150.8 1432.6 0.05 7.54 20 150.8 28 4222.4

Internal wall steel frame (75*32mm studs at 600mm) 52.1 122.9 6403.1 0.005 0.61 8050 4946.7 20.1 99429.2

Internal wall inside sheet metal cladding (0.75 mm galvanised steel) 133 122.9 16345.7 0.00075 0.09 8050 742.0 20.1 14914.4

Internal wall outside sheet metal cladding (0.75 mm galvanised steel) 133 122.9 16345.7 0.00075 0.09 8050 742.0 20.1 14914.4

Internal wall insulation(Glasswool R1.5, 50mm) 9.5 122.9 1167.6 0.00075 0.09 20 1.8 28 51.6

Flooring concrete 100mm thickness 64.7 163.1 10552.6 0.1 16.31 2400 39144.0 1.9 74373.6

Timber hardboard floor finish 5.5mm 31.1 163.1 5072.4 0.055 8.97 500 4485.3 24.2 108543.1

Total Roofing(Timber framed steel ribbed) 256 187.7 48051.2 0.00075 0.14 8050 1133.2 38 43063.1

Roofing Insulation(glasswool R4) 15.35 163.1 2503.6 0.215 35.07 20 701.3 28 19637.2

Ceiling Lining(12mm PB) 47.5 163.1 7747.3 0.012 1.96 668 1307.4 4.4 5752.6

Fully glazed operable walls 1750 12 21000.0 0.01 0.12 2580 309.6 12.7 3931.9

Double glazed windows 760 27.9 21204.0 0.006 0.17 2580 431.9 12.7 5485.0

Standard timber doors 645 8 0.03 0.24 380 91.2 8.5 775.2

Total 4229.05 206428.5 553694.9

Page 88: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

76

Table 25. Cost and Embodied Energy calculation of Precast Concrete house using

Microsoft Excel (Source: Author).

Table 26. Cost and Embodied Energy Calculation of Timber house using Microsoft

Excel (Source: Author).

Table 27. Cost and Embodied Energy calculation of Terracotta roof tile with clay fired

brick house using Excel (Source: Author).

Precast-concrete Cost per m^2($)/Numbers

Area

(m^2)

Cost

estimated($)

Approx

thickness(m)

Volume

(m^3)

Density

(kg/m^3)

Mass

(Kg)

Embodied

energy(MJ/kg)

Total

embodied

energy(MJ)

Precast-concrete External walls 200mm 345 150.8 52026.0 0.2 30.16 2400 72384.0 1.9 137529.6

Precast concrete Internal walls 150mm 297 122.9 36501.3 0.15 18.44 2400 44244.0 1.9 84063.6

Flooring Concrete 100mm thicknesss 64.7 163.1 10552.6 0.1 16.31 2400 39144.0 1.9 74373.6

Timber hardboard floor finish 5.5mm 31.1 163.1 5072.4 0.0055 0.90 500 448.5 24.2 10854.3

Total Roofing(Timber frame steel ribbed) 256 187.7 48051.2 0.00075 0.14 8050 1133.2 38 43063.1

Roofing Insulation(glasswool R4) 15.35 163.1 2503.6 0.215 35.07 20 701.3 28 19637.2

Ceiling Lining(12mm PB) 47.5 163.1 7747.3 0.012 1.96 668 1307.4 4.4 5752.6

Painting(Internal walls) 11.35 396.6 4501.4 0.001 0.40 1150 456.1 61.5 28049.5

Fully glazed operable walls 1750 13.7 23975.0 0.01 0.14 2580 353.5 12.7 4488.9

Double glazed windows 760 27.9 21204.0 0.006 0.17 2580 431.9 12.7 5485.0

Standard timber Doors 645 8 5160.0 0.03 0.24 380 91.2 8.5 775.2

Total 4223 217294.7 414072.7

Timber Cost per m^2($)/Numbers

Area

(m^2)

Cost

estimated($)

Approx

thickness(m)

Volume

(m^3)

Density

(kg/m^3)

Mass

(Kg)

Embodied

energy(MJ/kg)

Total

embodied

energy(MJ)

External wall Timber frame 100*50mm 52.9 150.8 7977.3 0.005 0.75 840 633.4 2 1266.7

External wall outside cladding ( Hardwood cladding 25mm) 96.5 150.8 14552.2 0.025 3.77 840 3166.8 2 6333.6

External wall inside cladding (Hardwood 25mm thick) 89.8 150.8 13541.8 0.025 3.77 840 3166.8 2 6333.6

External wall insulation(Glasswool R1.5, 75mm) 10.2 150.8 1538.2 0.075 11.31 20 226.2 28 6333.6

Internal wall framing 100*38 mm 48.4 122.9 5948.4 0.005 0.61 840 516.2 2 1032.4

Internal wall outside cladding (Hardwood 25mm thick) 89.8 122.9 11036.4 0.025 3.07 840 2580.9 2 5161.8

Internal wall inside cladding(Hardwood 25 mm thick) 89.8 122.9 11036.4 0.025 3.07 840 2580.9 2 5161.8

Internal wall insulation(Glasswool R1.5, 75mm) 10.2 122.9 1253.6 0.075 9.22 20 184.4 28 5161.8

Total Roofing(Timber framed steel ribbed) 256 187.7 48051.2 0.00075 0.14 8050 1133.2 38 43063.1

Roofing Insulation(glasswool R4) 15.35 163.1 2503.6 0.215 35.07 20 701.3 28 19637.2

Ceiling Lining(12mm PB) 47.5 163.1 7747.3 0.012 1.96 668 1307.4 4.4 5752.6

Flooring concrete 100 mm thickness 64.7 163.1 10552.6 0.1 16.31 2400 39144.0 1.9 74373.6

Timber hardboard floor finish 5.5mm 31.1 163.1 5072.4 0.0055 0.90 500 448.5 24.2 10854.3

Fully glazed operable walls 1750 13.7 23975.0 0.01 0.14 2580 353.5 12.7 4488.9

Double glazed windows 760 27.9 21204.0 0.006 0.17 2580 431.9 12.7 5485.0

Standard timber doors 654 8 5232.0 0.03 0.24 380 91.2 8.5 775.2

Total 4066.25 191222.3 201215.3

Clay - fired brick andCement rendering Cost per m^2($)/Numbers

Area

( m^2)

Cost

estimated($)

Approx

thickness(m)

Volume

(m^3)

Density

(kg/m^3)

Mass

(Kg)

Embodied

energy(MJ/kg)

Total

embodied

energy(MJ)

External wall area(Double brick, 270mm ) 227 150.8 34231.6 0.27 40.72 1900 77360.4 2.5 193401.0

External wall Insulation(glasswool R1.5, 50mm) 9.5 150.8 1432.6 0.05 7.54 20 150.8 28 4222.4

Internal seprating walls(110mm) 112.2 122.9 13789.4 0.11 13.52 1900 25686.1 2.5 64215.3

Flooring concrete 100mm thickness 64.7 163.1 10552.6 0.1 16.31 2400 39144.0 1.9 74373.6

Total Roofing (Timber framed terracotta tiles ) 257 187.7 48238.9 0.02 3.75 1200 4504.8 2.5 11262.0

Roofing Insulation(glasswool R4) 15.35 163.1 2503.6 0.215 35.07 20 701.3 28 19637.2

Ceiling Lining(12mm PB) 47.5 163.1 7747.3 0.012 1.96 668 1307.4 4.4 5752.6

Internal wall outside cement rendering 40.9 122.9 5026.6 0.013 1.60 1150 1837.4 5.6 10289.2

Internal wall inside cement rendering 40.9 122.9 5026.6 0.013 1.60 1150 1837.4 5.6 10289.2

External wall inside cement rendering 40.9 150.8 6167.7 0.013 1.96 1150 2254.5 5.6 12625.0

Timber hardboard floor finish 5.5mm 31.1 163.1 5072.4 0.055 8.97 500 4485.3 24.2 108543.1

Painting(Internal walls)(Acrylic,latex) 11.35 396.6 4501.4 0.001 0.40 1150 456.1 61.5 28049.5

Fully glazed operable walls 1750 13.7 23975.0 0.01 0.14 2580 353.5 12.7 4488.9

Double glazed windows(1m^2) 760 27.9 21204.0 0.006 0.17 2580 431.9 12.7 5485.0

Standard timber door (Nos) 645 8 5160.0 0.03 0.24 380 91.2 8.5 775.2

Total 4053.4 194629.6 553409.2

Page 89: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

77

Appendix B IES-VE

Table 28. Data from IES-VE for Clay fired Brick House (Source: Author).

Table 29. Data from IES-VE for Steel House (Source: Author).

Page 90: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

78

Table 30. Data from IES-VE for Precast Concrete (Source: Author).

Table 31. Data from IES-VE for Timber house (Source: Author).

Table 32. Data from IES-VE Solar shading Analysis using SunCast (Source: Author).

Page 91: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

79

Data from IES-VE Thermal calculation using Apache

Table 33. Air temperature of clay fired brick wall house (Source: Author).

Table 34 Air temperature of Timberwall house (Source: Author).

Table 35. Air temperature of precast concrete wall house (Source: Author).

Table 36. Air temperature of steel wall house (Source: Author).

Page 92: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

80

Figure 41. Air temperature inside alfresco, portico and roof (all the other rooms) for the

case study house 3D model design option.

(Source: Author, IES-VE 2017)

Page 93: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

81

Appendix C Data /Result from eTool

Table 37. Clay fired brick global warming (Source: Author).

Table 38. Clay fired brick Embodied energy (Source: Author).

Page 94: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

82

Table 39. Steel Global warming (Source: Author).

Table 40. Steel Embodied energy (Source: Author).

Page 95: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

83

Table 41. Precast concrete global warming (Source: Author).

Table 42. Precast concrete embodied energy (Source: Author).

Page 96: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

84

Table 43. Timber Global warming (Source: Author).

Table 44. Timber Embodied energy (Source: Author).

Page 97: SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY · SCHOOL OF ENGINEERING AND INFORMATION TECHNOLOGY ENG470 ENGINEERING HONOURS THESIS A Comparative Analysis Of Building Construction

85