BUILDING DATA NOT TO SCALE DESCRIPTION OF WORK THE PROJECT SCOPE INCLUDES THE REPLACEMENT OF TWO EXISTING GAS FIRED (L.P.) BOILERS AND THE REPAIR OF EXISTING CLOSED-CIRCUIT COOLING TOWER. THE BOILERS WILL BE REPLACED WITH TWO NEW GAS FIRED BOILERS ALONG WITH THE ADDITION OF LOW TEMPERATURE VALVES WHICH REGULATE THE ENTERING WATER TEMPERATURE TO THE BOILER TO EXTEND THE LIFE OF THE EQUIPMENT. VENTING TO REMAIN THE SAME AS EXISTING WITH THE REMOVAL OF THE EXISTING BAROMETRIC DAMPERS AND NEW VENT PIPE TO REPLACE THE EXISTING REMOVED DURING DEMOLITION. ALL BAS CONTROL OF BOILERS AND ASSOCIATED EQUIPMENT TO BE REMAIN. REMOVAL AND REPLACEMENT OF BAS CONTROLS AS REQUIRED TO COMPLETE THE FINAL INSTALLATION. THE COOLING TOWER WILL BE REFURBISHED, CLEANED AND MOVING PARTS REPLACED. MOTORS, FANS, FAN SHAFTS, MOUNTING HARDWARE, FILL VALVES, ALL NECESSARY COMPONENTS TO MAKE THE TOWER LIKE NEW, ETC. ARE TO BE REPLACED. CONDENSER WATER PIPING FROM BELOW SLAB TO THE PENETRATION OF THE PUMP ROOMS EXTERIOR WALL IS TO BE REPLACED WITH NEW PIPE. EXISTING VALVES, PIPE, PIPE FITTINGS, 2-WAY CONTROL VALVES, BAS SENSORS, THERMOSTATS, GAUGES, ETC. TO BE REPLACED. ALL BAS CONTROL OF COOLING TOWER AND CONDENSER WATER SYSTEM TO REMAIN. REMOVAL AND REPLACEMENT OF BAS CONTROLS AS REQUIRED TO COMPLETE THE FINAL INSTALLATION. FACTORY MOUNTED CONTROLLERS SERVING THE EXISTING WATER SOURCE HEAT PUMP UNITS FOR THE KITCHEN AND DINING ROOM WILL BE REPLCED WITH NEW CONTROLLERS PROVIDED AND INSTALLED BY THE BAS CONTROLS CONTRACTOR. MRS. IDA D. WRIGHT MRS. LINDA CUTHBERT MR. CARL G. PERSIS MR. RUBEN COLON MS. JAMIE M. HAYNES DR. RONALD "SCOTT" FRITZ SCHOOL BOARD MEMBERS CHAIRMAN VICE CHAIRMAN MEMBER MEMBER MEMBER SUPERINTENDENT A. SURVEY PARCEL ID XXX B. LEGAL DESCRIPTION XXX C. OCCUPANCY TYPE XXX D. CONSTRUCTION TYPE TYPE XXX E. RISK CATEGORY N/A F. AUTOMATIC SPRINKLER N/A G. BUILDING AREA N/A H. BUILDING HEIGHT N/A I. OCCUPANT LOAD N/A LOCATION MAP ENGINEERS & CONSULTANTS VCS Project NO. 2047736 3155 PHONETIA DRIVE DELTONA, FLORIDA 32738 BOILER REPLACEMENT AND TOWER REPAIR SUNRISE ELEMENTARY SCHOOL Engineer's Statement of Compliance To the best of my knowledge, these drawings and the project manual are complete and comply with the Florida Building Code. MECHANICAL TRISTAR ENGINEERING GROUP, INC. 14522 SALINGER ROAD ORLANDO, FLORIDA 32828 407-567-9795 JUAN C. PESANTE, P.E. [email protected]WWW.TRISTARFL.COM VOLUSIA COUNTY SCHOOLS VOLUSIA COUNTY SCHOOLS VOLUSIA COUNTY SCHOOLS THE SCHOOL BOARD OF VOLUSIA COUNTY FLORIDA 200 North Clara Avenue Deland, Florida 32720 BID ISSUE JANUARY 9, 2019 JUAN C. PESANTE RLS RLS G000 COVER SHEET BOILER REPLACEMENT AND TOWER REPAIR VCS PROJECT NO. 2047736 3155 PHONETIA DRIVE DELTONA, FLORIDA 32738 XXXXXX 01/09/2020 Engineer SUNRISE ELEMENTARY SCHOOL NO. DATE DESCRIPTION DRAWING NO. SHEET TITLE AE PROJECT NUMBER DRAWN BY DESIGNED BY ARCH/ENGR OF RECORD ISSUE DATE DOCUMENT HISTORY REVISIONS J U A N C . P E S A N T E F L P E # 7 0 4 0 6
SCHOOL BOARD SUNRISE ELEMENTARY SCHOOL MEMBERS … · CONDENSER WATER PIPING FROM BELOW SLAB TO THE PENETRATION OF THE PUMP ROOMS EXTERIOR WALL IS ... these drawings and the project
DESCRIPTION OF WORKTHE PROJECT SCOPE INCLUDES THE REPLACEMENT OF TWO EXISTING GAS FIRED (L.P.) BOILERS AND THE REPAIR OFEXISTING CLOSED-CIRCUIT COOLING TOWER. THE BOILERS WILL BE REPLACED WITH TWO NEW GAS FIRED BOILERS ALONGWITH THE ADDITION OF LOW TEMPERATURE VALVES WHICH REGULATE THE ENTERING WATER TEMPERATURE TO THEBOILER TO EXTEND THE LIFE OF THE EQUIPMENT. VENTING TO REMAIN THE SAME AS EXISTING WITH THE REMOVAL OF THEEXISTING BAROMETRIC DAMPERS AND NEW VENT PIPE TO REPLACE THE EXISTING REMOVED DURING DEMOLITION. ALL BASCONTROL OF BOILERS AND ASSOCIATED EQUIPMENT TO BE REMAIN. REMOVAL AND REPLACEMENT OF BAS CONTROLS ASREQUIRED TO COMPLETE THE FINAL INSTALLATION.
THE COOLING TOWER WILL BE REFURBISHED, CLEANED AND MOVING PARTS REPLACED. MOTORS, FANS, FAN SHAFTS,MOUNTING HARDWARE, FILL VALVES, ALL NECESSARY COMPONENTS TO MAKE THE TOWER LIKE NEW, ETC. ARE TO BEREPLACED. CONDENSER WATER PIPING FROM BELOW SLAB TO THE PENETRATION OF THE PUMP ROOMS EXTERIOR WALL ISTO BE REPLACED WITH NEW PIPE. EXISTING VALVES, PIPE, PIPE FITTINGS, 2-WAY CONTROL VALVES, BAS SENSORS,THERMOSTATS, GAUGES, ETC. TO BE REPLACED. ALL BAS CONTROL OF COOLING TOWER AND CONDENSER WATER SYSTEMTO REMAIN. REMOVAL AND REPLACEMENT OF BAS CONTROLS AS REQUIRED TO COMPLETE THE FINAL INSTALLATION.
FACTORY MOUNTED CONTROLLERS SERVING THE EXISTING WATER SOURCE HEAT PUMP UNITS FOR THE KITCHEN ANDDINING ROOM WILL BE REPLCED WITH NEW CONTROLLERS PROVIDED AND INSTALLED BY THE BAS CONTROLSCONTRACTOR.
MRS. IDA D. WRIGHTMRS. LINDA CUTHBERTMR. CARL G. PERSISMR. RUBEN COLONMS. JAMIE M. HAYNES
DR. RONALD "SCOTT" FRITZ
SCHOOL BOARDMEMBERS
CHAIRMANVICE CHAIRMAN
MEMBERMEMBERMEMBER
SUPERINTENDENT
A. SURVEY PARCEL ID XXX
B. LEGAL DESCRIPTION XXX
C. OCCUPANCY TYPE XXX
D. CONSTRUCTION TYPE TYPE XXX
E. RISK CATEGORY N/A
F. AUTOMATIC SPRINKLER N/A
G. BUILDING AREA N/A
H. BUILDING HEIGHT N/A
I. OCCUPANT LOAD N/A
LOCATION MAP
ENGINEERS & CONSULTANTS
VCS Project NO. 20477363155 PHONETIA DRIVE
DELTONA, FLORIDA 32738
BOILER REPLACEMENT ANDTOWER REPAIR
SUNRISE ELEMENTARY SCHOOL
Engineer's Statement of ComplianceTo the best of my knowledge, these drawings and the project manual are complete and comply withthe Florida Building Code.
STRAINER - BASKET TYPE W/ DRAIN VALVE, HOSE BIBB, & CAP
AutoCAD SHX Text
DEMOLITION
AutoCAD SHX Text
EXISTING TO REMAIN
AutoCAD SHX Text
< X >
AutoCAD SHX Text
EXISTING TO BE REMOVED
AutoCAD SHX Text
< R >
AutoCAD SHX Text
CAP EXISTING
AutoCAD SHX Text
< C >
AutoCAD SHX Text
DEMOLITION PIPING
AutoCAD SHX Text
DEMOLITION EQUIPMENT OR DUCT
AutoCAD SHX Text
EXISTING - NEW LOCATION
AutoCAD SHX Text
< NL >
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
1. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY MATERIALS AND CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY MATERIALS AND LABOR TO PROVIDE A COMPLETE, OPERATIONAL SYSTEM. 2. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION AND CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION AND CORRECT, AS REQUIRED, TO MEET ALL THE CODES, REGULATIONS, AND DISCREPANCIES BETWEEN EXISTING WORK SHOWN ON DRAWINGS AND WHAT IS INSTALLED ON SITE. 3. CONTRACTOR SHALL COORDINATE WORK WITH ALL OTHER TRADES. CONTRACTOR SHALL COORDINATE WORK WITH ALL OTHER TRADES. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING AND VERIFYING DIMENSIONS THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING AND VERIFYING DIMENSIONS PRIOR TO ORDERING MATERIALS AND INSTALLING EQUIPMENT. THE DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF MECHANICAL AND ELECTRICAL SYSTEMS AND OTHER WORK. MAKE REASONABLE MODIFICATIONS IN LAYOUT AND COMPONENTS TO PREVENT CONFLICT WITH WORK OF OTHER TRADES. SIGNIFICANT MODIFICATIONS IN LAYOUT AND COMPONENTS SHALL RECEIVE PRIOR REVIEW BY A/E. SUCH MODIFICATIONS SHALL NOT BE GROUNDS FOR ADDITIONAL COMPENSATION TO CONTRACTOR. 5. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS (INCLUDING EXISTING PIPE ROUTING AND CONTRACTOR SHALL SUBMIT SHOP DRAWINGS (INCLUDING EXISTING PIPE ROUTING AND EQUIPMENT LOCATIONS) TO ARCHITECT/ENGINEER FOR REVIEW PRIOR TO THE INSTALLATION OR PURCHASING OF ANY EQUIPMENT/MATERIALS. 6. THE CONTRACTOR IS EXPECTED TO ORDER ALL MATERIALS IN SUFFICIENT LEAD TIME THE CONTRACTOR IS EXPECTED TO ORDER ALL MATERIALS IN SUFFICIENT LEAD TIME TO AVOID DELAYING THE COMPLETION OF THE PROJECT. DELAY IN DELIVERIES WILL NOT BE CONSIDERED A JUSTIFIABLE REASON FOR SUBMISSION OF SUBSTITUTE MATERIALS. 7. THE CONTRACTOR PROVIDING THE EQUIPMENT SHALL BE RESPONSIBLE FOR ALL COST THE CONTRACTOR PROVIDING THE EQUIPMENT SHALL BE RESPONSIBLE FOR ALL COST INCURRED BY THE CONTRACTOR AND SUBCONTRACTORS TO MODIFY THE BUILDING PROVISIONS TO ACCEPT THE FURNISHED EQUIPMENT.
AutoCAD SHX Text
%%UGENERAL NOTES - HVAC
AutoCAD SHX Text
TRISTAR ENGINEERING GROUP, INC. 14522 SALINGER ROAD ORLANDO, FLORIDA 32828 407-567-9795 CA LIC No: 31573
MAKE-UP WATER AND CHEMICAL TREATMENT FLOW DIAGRAM
POT FEEDER FLOW DIAGRAM - DEMOLITION
POT FEEDER FLOW DIAGRAM - NEW PLAN
PIPE SUPPORT DETAIL
BOILE
R RE
PLAC
EMEN
T AN
D TO
WER
REP
AIR
VCS
PROJ
ECT
NO. 2
0477
3631
55 P
HO
NET
IA D
RIV
ED
ELTO
NA,
FLO
RID
A 32
738
XXXXXX01/09/2020
Engineer
SUNR
ISE
ELEM
ENTA
RY S
CHOO
LNO
.DA
TEDE
SCRI
PTIO
N
DRAWING NO.
SHEE
T TI
TLE
AE PROJECT NUMBER
DRAWN BYDESIGNED BY
ARCH/ENGR OF RECORD
ISSUE DATE
DOCU
MENT
HIS
TORY
REV
ISIO
NS
J U A N C . P E S A N T EF L P E # 7 0 4 0 6
SCHE
DULE
S AN
D FL
OW D
IAGR
AMS
M002
JUAN C. PESANTE
RLS RLS
AutoCAD SHX Text
%%UCT-1
AutoCAD SHX Text
SCALE: NOT TO SCALE
AutoCAD SHX Text
N.C.
AutoCAD SHX Text
3
AutoCAD SHX Text
DOMESTIC WATER TO WATER SOFTENER
AutoCAD SHX Text
2
AutoCAD SHX Text
EXISTING MAKE-UP WATER METER AT TOWER TO BE REPLACED. REPLACE WITH DLJ75, 5/8" X 3/4".
AutoCAD SHX Text
3
AutoCAD SHX Text
EXISTING BAC CLOSED CIRCUIT COOLING TOWER
AutoCAD SHX Text
1
AutoCAD SHX Text
4
AutoCAD SHX Text
EXISTING MAKE-UP WATER PIPE FROM BELOW SLAB
AutoCAD SHX Text
REFERENCE NOTES
AutoCAD SHX Text
5
AutoCAD SHX Text
CHEMICAL TREATMENT PANEL/PUMPS.
AutoCAD SHX Text
6
AutoCAD SHX Text
CHEMICAL TREATMENT TANK BELOW PANEL/PUMPS.
AutoCAD SHX Text
7
AutoCAD SHX Text
CHEMICAL TREATMENT TANK BELOW PANEL/PUMPS.
AutoCAD SHX Text
8
AutoCAD SHX Text
EXISTING 3" TO 2-1/2" PIPE MOUNTED ON I-BEAM TO SUPPORT 6" CWR PIPE.
AutoCAD SHX Text
GENERAL NOTES - CHEMICAL TREATMENT
AutoCAD SHX Text
5
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
8
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
CONDENSER WATER RETURN PIPE CONNECTION AT TOWER.
AutoCAD SHX Text
10
AutoCAD SHX Text
CONDENSER WATER SUPPLY PIPE CONNECTION AT TOWER.
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
11
AutoCAD SHX Text
TOWER SPRAY SUPPLY PIPE FROM SPRAY PUMP.
AutoCAD SHX Text
12
AutoCAD SHX Text
CHEMICAL TREATMENT PIPE CONNECTION AT SPRAY PUMP DISCHARGE PIPE.
AutoCAD SHX Text
13
AutoCAD SHX Text
13
AutoCAD SHX Text
CHEMICAL TREATMENT RETURN PIPE DISCHARGE INTO TOWER BASIN.
AutoCAD SHX Text
14
AutoCAD SHX Text
14
AutoCAD SHX Text
DOMESTIC WATER TO CHEMICAL TREATMENT TANKS FOR MIXING.
AutoCAD SHX Text
1. REPLACE EXISTING CHEMICAL TREATMENT SCHEDULE 40 PVC PIPE WITH SCHEDULE 80 PVC PIPE FROM REPLACE EXISTING CHEMICAL TREATMENT SCHEDULE 40 PVC PIPE WITH SCHEDULE 80 PVC PIPE FROM CHEMICAL TREATMENT PANEL AND TANKS TO POINT OF CONNECTION FOR PIPES LABELED 12, 13 & 14 IN REFERENCE NOTES BELOW. 2. FIELD VERIFY EXISTING PIPE SIZES. COORDINATE WITH CHEMICAL TREATMENT VENDOR. FIELD VERIFY EXISTING PIPE SIZES. COORDINATE WITH CHEMICAL TREATMENT VENDOR. 3. PROVIDE UNITSTRUT SUPPORT FOR CHEMICAL TREATMENT PIPES ABOVE. MOUNT VERTICAL UNISTRUT TO PROVIDE UNITSTRUT SUPPORT FOR CHEMICAL TREATMENT PIPES ABOVE. MOUNT VERTICAL UNISTRUT TO COOLING TOWER I-BEAM SUPPORT AND PROVIDE HORIZONTAL SUPPORT UNISTRUT FOR MOUNTING NEW SCHEDULE 80 PIPE.
AutoCAD SHX Text
SCALE: NOT TO SCALE
AutoCAD SHX Text
PROVIDE UNISTRUT SUPPORT FOR CHEMICAL TREATMENT PIPING. REFER TO DETAIL, THIS SHEET.
AutoCAD SHX Text
%%UP-CL1
AutoCAD SHX Text
%%UP-CL2
AutoCAD SHX Text
SCALE: NOT TO SCALE
AutoCAD SHX Text
%%UP-CL1
AutoCAD SHX Text
%%UP-CL2
AutoCAD SHX Text
GENERAL NOTES - POT FEEDER
AutoCAD SHX Text
1. REPLACE EXISTING CHEMICAL POT FEEDER. REMOVE POT FEEDER AND PIPING AS SHOWN IN REPLACE EXISTING CHEMICAL POT FEEDER. REMOVE POT FEEDER AND PIPING AS SHOWN IN DEMOLITION PLAN. 2. PROVIDE NEW 5-GALLON LEG MOUNTED POT FEEDER. GRISWOLD WATER SYSTEMS MODEL PROVIDE NEW 5-GALLON LEG MOUNTED POT FEEDER. GRISWOLD WATER SYSTEMS MODEL DB-5-SB-CS-Z OR EQUIVALENT.
AutoCAD SHX Text
FD
AutoCAD SHX Text
EXISTING PIPING TO BE REMOVED.
AutoCAD SHX Text
REMOVE EXISTING POT FEEDER
AutoCAD SHX Text
PROVIDE NEW POT FEEDER 2.PROVIDE 2.PROVIDE PROVIDE NEW 5-GALLON LEG MOUNTED POT FEEDER. GRISWOLD WATER SYSTEMS MODEL DB-5-SB-CS-Z OR EQUIVALENT
AutoCAD SHX Text
CAP EXISTING PIPE AFTER DEMOLITION
AutoCAD SHX Text
FD
AutoCAD SHX Text
CWS
AutoCAD SHX Text
CWS
AutoCAD SHX Text
CONDENSER WATER FROM COOLING TOWER TO PUMPS
AutoCAD SHX Text
CONDENSER WATER TO BUILDINGS
AutoCAD SHX Text
PIPE CLAMP OVER SCHEDULE 80 PVC PIPE MOUNTED TO UNISTRUT SUPPORT
AutoCAD SHX Text
SCALE: NOT TO SCALE
AutoCAD SHX Text
EXISTING CONCRETE SUPPORT FOR COOLING TOWER
AutoCAD SHX Text
EXSITING I-BEAM SUPPORT FOR COOLING TOWER
AutoCAD SHX Text
NEW UNISTRUT SECURED TO I-BEAM SUPPORT
AutoCAD SHX Text
NEW UNISTRUT PIPE SUPPORT FOR CHEMICAL TREATMENT PIPING
AutoCAD SHX Text
EXISTING CONCRETE SLAB
AutoCAD SHX Text
TRISTAR ENGINEERING GROUP, INC. 14522 SALINGER ROAD ORLANDO, FLORIDA 32828 407-567-9795 CA LIC No: 31573
BUILDING 500 - CONDENSER WATER LOOP - DEMOLITION PLAN
BUILDING 500 - CONDENSER WATER LOOP - NEW WORK PLAN
BOILE
R RE
PLAC
EMEN
T AN
D TO
WER
REP
AIR
VCS
PROJ
ECT
NO. 2
0477
3631
55 P
HO
NET
IA D
RIV
ED
ELTO
NA,
FLO
RID
A 32
738
XXXXXX01/09/2020
Engineer
SUNR
ISE
ELEM
ENTA
RY S
CHOO
LNO
.DA
TEDE
SCRI
PTIO
N
DRAWING NO.
SHEE
T TI
TLE
AE PROJECT NUMBER
DRAWN BYDESIGNED BY
ARCH/ENGR OF RECORD
ISSUE DATE
DOCU
MENT
HIS
TORY
REV
ISIO
NS
J U A N C . P E S A N T EF L P E # 7 0 4 0 6
HVAC
PLA
N - D
EMOL
ITIO
N &
NEW
M101
JUAN C. PESANTE
RLS RLS
AutoCAD SHX Text
%%UB-2
AutoCAD SHX Text
%%UB-1
AutoCAD SHX Text
15
AutoCAD SHX Text
14
AutoCAD SHX Text
EXISTING WATER SOFTENER TO REMAIN
AutoCAD SHX Text
2
AutoCAD SHX Text
EXISTING SALT TANK TO REMAIN
AutoCAD SHX Text
3
AutoCAD SHX Text
9
AutoCAD SHX Text
EXISTING BAC CLOSED CIRCUIT COOLING TOWER
AutoCAD SHX Text
1
AutoCAD SHX Text
5
AutoCAD SHX Text
EXISTING SPRAY PUMP DISCONNECT TO REMAIN
AutoCAD SHX Text
10
AutoCAD SHX Text
4
AutoCAD SHX Text
EXISTING MAKE-UP WATER PIPE FROM BELOW SLAB
AutoCAD SHX Text
8
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
REFERENCE NOTES
AutoCAD SHX Text
7
AutoCAD SHX Text
EXISTING 120V DUPLEX OUT TO REMAIN
AutoCAD SHX Text
EXISTING 2ND STAGE FAN NORTH DISCONNECT TO REMAIN
AutoCAD SHX Text
6
AutoCAD SHX Text
EXISTING HIGH MAKE-UP AIR LOUVER. APPROXIMATELY 37X37 WITH 50% FREE AREA.
AutoCAD SHX Text
EXISTING KMC OUTSIDE AIR TEMPERATURE AND HUMIDITY SENSOR TO REMAIN.
AutoCAD SHX Text
EXISTING LED LIGHT TO REMAIN.
AutoCAD SHX Text
CONDENSER WATER RETURN PIPE FROM BUILDINGS. REMOVE PIPE BELOW SLAB, APPROXIMATELY 18" AND REPLACE WITH NEW.
AutoCAD SHX Text
16
AutoCAD SHX Text
CHEMICAL TREATMENT PANEL/PUMPS.
AutoCAD SHX Text
1
AutoCAD SHX Text
16
AutoCAD SHX Text
11
AutoCAD SHX Text
EXISTING 28X36 DRAIN
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
EXISTING 120V DUPLEX OUT TO REMAIN
AutoCAD SHX Text
9
AutoCAD SHX Text
EXISTING 2ND STAGE FAN SOUTH DISCONNECT TO REMAIN
AutoCAD SHX Text
10
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
EXISTING 120V DUPLEX OUT TO REMAIN
AutoCAD SHX Text
14
AutoCAD SHX Text
15
AutoCAD SHX Text
17
AutoCAD SHX Text
18
AutoCAD SHX Text
17
AutoCAD SHX Text
CHEMICAL TREATMENT TANK BELOW PANEL/PUMPS.
AutoCAD SHX Text
18
AutoCAD SHX Text
CHEMICAL TREATMENT TANK BELOW PANEL/PUMPS.
AutoCAD SHX Text
19
AutoCAD SHX Text
19
AutoCAD SHX Text
EXISTING LOW MAKE-UP AIR LOUVER. APPROXIMATELY 36X72 WITH 50% FREE AREA.
AutoCAD SHX Text
21
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
EXISTING BOILER PUMP P-BLC1 MOTOR STARTER
AutoCAD SHX Text
21
AutoCAD SHX Text
EXISTING BOILER PUMP P-BLC2 MOTOR STARTER
AutoCAD SHX Text
22
AutoCAD SHX Text
22
AutoCAD SHX Text
EXISTING L.P. GAS LINE TO REMAIN
AutoCAD SHX Text
23
AutoCAD SHX Text
23
AutoCAD SHX Text
LAKOS SOLIDS SEPARATOR, PUMP AND POWER TO BE REMOVED
AutoCAD SHX Text
24
AutoCAD SHX Text
24
AutoCAD SHX Text
EXISTING CHEMICAL POT FEEDER TO BE REMOVED AND REPLACED.
AutoCAD SHX Text
25
AutoCAD SHX Text
EXISTING 3" TO 2-1/2" PIPE MOUNTED ON I-BEAM TO SUPPORT 6" CWR PIPE.
AutoCAD SHX Text
26
AutoCAD SHX Text
DUPLEX OUTLET MOUNTED ON UNISTRUT, 120V POWER FOR WATER SOFTENER TO REMAIN
AutoCAD SHX Text
27
AutoCAD SHX Text
DUPLEX OUTLET MOUNTED 33" AFF
AutoCAD SHX Text
12"W X 8"H CONCRETE COOLIING TOWER SUPPORT
AutoCAD SHX Text
6-1/2"W X 8"H I-BEAM COOLING TOWER SUPPORT MOUNTED ON 12" CONCRETE SUPPORT BASE.
AutoCAD SHX Text
26
AutoCAD SHX Text
27
AutoCAD SHX Text
28
AutoCAD SHX Text
28
AutoCAD SHX Text
DUPLEX OUTLET MOUNTED 12" AFF
AutoCAD SHX Text
29
AutoCAD SHX Text
29
AutoCAD SHX Text
QUAD OUTLET MOUNTED 38" AFF
AutoCAD SHX Text
%%UB-2
AutoCAD SHX Text
%%UB-1
AutoCAD SHX Text
15
AutoCAD SHX Text
14
AutoCAD SHX Text
EXISTING WATER SOFTENER TO REMAIN
AutoCAD SHX Text
2
AutoCAD SHX Text
EXISTING SALT TANK TO REMAIN
AutoCAD SHX Text
3
AutoCAD SHX Text
9
AutoCAD SHX Text
EXISTING BAC CLOSED CIRCUIT COOLING TOWER
AutoCAD SHX Text
1
AutoCAD SHX Text
5
AutoCAD SHX Text
EXISTING SPRAY PUMP DISCONNECT TO REMAIN
AutoCAD SHX Text
10
AutoCAD SHX Text
4
AutoCAD SHX Text
EXISTING MAKE-UP WATER PIPE FROM BELOW SLAB. REFER TO M003 FOR CONTINUATION.
AutoCAD SHX Text
8
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
REFERENCE NOTES
AutoCAD SHX Text
7
AutoCAD SHX Text
EXISTING 120V DUPLEX OUT TO REMAIN
AutoCAD SHX Text
EXISTING 2ND STAGE FAN NORTH DISCONNECT TO REMAIN
AutoCAD SHX Text
6
AutoCAD SHX Text
EXISTING HIGH MAKE-UP AIR LOUVER. APPROXIMATELY 37X37 WITH 50% FREE AREA.
AutoCAD SHX Text
EXISTING KMC OUTSIDE AIR TEMPERATURE AND HUMIDITY SENSOR TO REMAIN.
AutoCAD SHX Text
EXISTING LED LIGHT TO REMAIN.
AutoCAD SHX Text
CONDENSER WATER RETURN PIPE FROM BUILDINGS. REMOVE PIPE BELOW SLAB, APPROXIMATELY 18" AND REPLACE WITH NEW. POUR NEW CONCRETE AND FINISH TO MATCH EXISTING.
AutoCAD SHX Text
16
AutoCAD SHX Text
CHEMICAL TREATMENT PANEL/PUMPS.
AutoCAD SHX Text
1
AutoCAD SHX Text
11
AutoCAD SHX Text
EXISTING 28X36 DRAIN
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
EXISTING 120V DUPLEX OUT TO REMAIN
AutoCAD SHX Text
9
AutoCAD SHX Text
EXISTING 2ND STAGE FAN SOUTH DISCONNECT TO REMAIN
AutoCAD SHX Text
10
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
EXISTING 120V DUPLEX OUT TO REMAIN
AutoCAD SHX Text
14
AutoCAD SHX Text
17
AutoCAD SHX Text
18
AutoCAD SHX Text
17
AutoCAD SHX Text
CHEMICAL TREATMENT TANK BELOW PANEL/PUMPS.
AutoCAD SHX Text
18
AutoCAD SHX Text
CHEMICAL TREATMENT TANK BELOW PANEL/PUMPS.
AutoCAD SHX Text
19
AutoCAD SHX Text
19
AutoCAD SHX Text
EXISTING LOW MAKE-UP AIR LOUVER. APPROXIMATELY 36X72 WITH 50% FREE AREA.
AutoCAD SHX Text
21
AutoCAD SHX Text
20
AutoCAD SHX Text
20
AutoCAD SHX Text
EXISTING BOILER PUMP P-BLC1 MOTOR STARTER
AutoCAD SHX Text
21
AutoCAD SHX Text
EXISTING BOILER PUMP P-BLC2 MOTOR STARTER
AutoCAD SHX Text
22
AutoCAD SHX Text
22
AutoCAD SHX Text
EXISTING L.P. GAS LINE TO REMAIN
AutoCAD SHX Text
24
AutoCAD SHX Text
24
AutoCAD SHX Text
NEW CHEMICAL POT FEEDER. REFER TO M003 FOR PIPE DIAGRAM.
AutoCAD SHX Text
25
AutoCAD SHX Text
EXISTING 3" TO 2-1/2" PIPE MOUNTED ON I-BEAM TO SUPPORT 6" CWR PIPE.
AutoCAD SHX Text
26
AutoCAD SHX Text
DUPLEX OUTLET MOUNTED ON UNISTRUT, 120V POWER FOR WATER SOFTENER TO REMAIN
AutoCAD SHX Text
27
AutoCAD SHX Text
DUPLEX OUTLET MOUNTED 33" AFF
AutoCAD SHX Text
25
AutoCAD SHX Text
12"W X 8"H CONCRETE COOLIING TOWER SUPPORT
AutoCAD SHX Text
6-1/2"W X 8"H I-BEAM COOLING TOWER SUPPORT MOUNTED ON 12" CONCRETE SUPPORT BASE.
AutoCAD SHX Text
26
AutoCAD SHX Text
27
AutoCAD SHX Text
28
AutoCAD SHX Text
28
AutoCAD SHX Text
DUPLEX OUTLET MOUNTED 12" AFF
AutoCAD SHX Text
29
AutoCAD SHX Text
29
AutoCAD SHX Text
QUAD OUTLET MOUNTED 38" AFF
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
GENERAL NOTES - BUILDING 500
AutoCAD SHX Text
GENERAL NOTES - BUILDING 500
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
6"
AutoCAD SHX Text
PROVIDE UNISTRUT SUPPORT FOR CHEMICAL TREATMENT PIPING (TYP.).
AutoCAD SHX Text
NEW SCHEDULE 80 PVC PIPE FOR CHEMICAL TREATMENT SYSTEM. ROUTE FROM PANEL TO POINT OF CONNECTION OR TERMINATION (TYP. OF 3). REFER TO PIPE SUPPORT DETAIL.
AutoCAD SHX Text
30
AutoCAD SHX Text
EXISTING 10" VENT PIPE. REMOVE VENT UP TO AND INCLUDING THE BAROMETRIC DAMPER.
AutoCAD SHX Text
30
AutoCAD SHX Text
30
AutoCAD SHX Text
23
AutoCAD SHX Text
23
AutoCAD SHX Text
23
AutoCAD SHX Text
PROVIDE NEW LOW TEMPERATURE 3-WAY VALVE IN BYPASS PIPE. REFER TO M202 FOR PIPE DIAGRAM.
AutoCAD SHX Text
1. REFER TO M202 FOR NEW PIPE ROUTING AND DEVICES. REFER TO M202 FOR NEW PIPE ROUTING AND DEVICES. 2. REPLACE THE FOLLOWING COOLING TOWER COMPONENTS WITH ORIGINAL EQUIPMENT MANUFACTURER PARTS: REPLACE THE FOLLOWING COOLING TOWER COMPONENTS WITH ORIGINAL EQUIPMENT MANUFACTURER PARTS: 2.1. (2) FAN MOTORS (2) FAN MOTORS 2.2. (2) PILLOW BLOCK BEARINGS FOR EACH FAN SHAFT (2) PILLOW BLOCK BEARINGS FOR EACH FAN SHAFT 2.3. (2) FAN SHAFTS (2) FAN SHAFTS 2.4. FAN MOTOR MOUNTING HARDWARE FOR EACH FAN MOTOR FAN MOTOR MOUNTING HARDWARE FOR EACH FAN MOTOR 2.5. FAN AND FAN BLADES FOR EACH FAN ASSEMBLY FAN AND FAN BLADES FOR EACH FAN ASSEMBLY 2.6. MOTOR AND FAN SHEAVES MOTOR AND FAN SHEAVES 2.7. BELTS BELTS 2.8. FAN MOUNTING HARDWARE PER ORIGINAL INSTALLATION. FAN MOUNTING HARDWARE PER ORIGINAL INSTALLATION. 2.9. PARTIAL FILL AS INDICATED ON DRAWING M301. PARTIAL FILL AS INDICATED ON DRAWING M301. 3. INSTALL NEW BOILERS AND MAKE ALL NEW CONNECTIONS FOR GAS, HOT WATER SUPPLY, RETURN PIPING AND INSTALL NEW BOILERS AND MAKE ALL NEW CONNECTIONS FOR GAS, HOT WATER SUPPLY, RETURN PIPING AND ELECTRICAL CONNECTIONS. 4. INSTALL NEW 10" FLUE FOR EACH BOILER. INSTALL NEW 10" FLUE FOR EACH BOILER. 4.1. TEST VENT FOR LEAKS. TEST VENT FOR LEAKS. 5. CONTRACTOR TO VERIFY DRAFT READINGS WHILE THE UNIT IS IN STABLE OPERATION. RANGE 0.02 TP 0.08 IN. CONTRACTOR TO VERIFY DRAFT READINGS WHILE THE UNIT IS IN STABLE OPERATION. RANGE 0.02 TP 0.08 IN. W.C. 6. REINSTALL J-BOXES ON BACK OF NEW BOILERS FOR THE CONTROL OF THE BOILER CIRCULATING PUMPS. REINSTALL J-BOXES ON BACK OF NEW BOILERS FOR THE CONTROL OF THE BOILER CIRCULATING PUMPS. 7. INSTALL NEW POT FEEDER. REFER TO M003 FOR PIPE FLOW DIAGRAM. INSTALL NEW POT FEEDER. REFER TO M003 FOR PIPE FLOW DIAGRAM. 8. CONTROLS CONTRACTOR TO VERIFY OPERATION OF BOILERS, COOLING TOWER AND CONDENSER WATER SYSTEM, CONTROLS CONTRACTOR TO VERIFY OPERATION OF BOILERS, COOLING TOWER AND CONDENSER WATER SYSTEM, COMMISSION, WITH THE ENGINEER OF RECORD PRIOR TO ACCEPTANCE BY THE OWNER. ADDITIONAL WORK MAY BE REQUIRED AS A RESULT OF OPERATIONAL TESTING.
AutoCAD SHX Text
1. REFER TO M201 FOR EXISTING LAYOUT AND DEMOLITION NOTES. REFER TO M201 FOR EXISTING LAYOUT AND DEMOLITION NOTES. 2. DRAIN SYSTEM AND REMOVE EXISTING 6" CONDENSER WATER PIPING AS SHOWN FOR DEMOLITION. DRAIN SYSTEM AND REMOVE EXISTING 6" CONDENSER WATER PIPING AS SHOWN FOR DEMOLITION. 3. CLOSE MAKE-UP WATER VALVE SHOWN AT REFERENCE NOTE 4 BELOW. CLOSE MAKE-UP WATER VALVE SHOWN AT REFERENCE NOTE 4 BELOW. 4. CLOSE GAS VALVES FOR BOTH BOILERS. CLOSE GAS VALVES FOR BOTH BOILERS. 5. LOCK-OUT / TAG OUT ALL ELECTRICAL FEEDS TO COOLING TOWER EQUIPMENT, INCLUDING CONDENSER WATER LOCK-OUT / TAG OUT ALL ELECTRICAL FEEDS TO COOLING TOWER EQUIPMENT, INCLUDING CONDENSER WATER PUMPS, SPRAY PUMP, CHEMICAL TREATMENT SYSTEM AND BOILERS. 6. CLEAN COOLING TOWER. UTILIZE SERVICES OF AQUA-CHEM OR OTHER APPROVED VENDOR FOR COMPLETE CLEAN COOLING TOWER. UTILIZE SERVICES OF AQUA-CHEM OR OTHER APPROVED VENDOR FOR COMPLETE CLEANING OF ALL SURFACES. REMOVE ALL DEBRIS FROM TOWER BASIN. 7. REMOVE 3/4" MAKE-UP WATER METER AND READY FOR NEW METER INSTALLATION. REMOVE 3/4" MAKE-UP WATER METER AND READY FOR NEW METER INSTALLATION. 8. REMOVE EXISTING POT FEEDER AND READY PIPING FOR REPLACEMENT. REFER TO M003 DETAIL FOR PIPE REMOVE EXISTING POT FEEDER AND READY PIPING FOR REPLACEMENT. REFER TO M003 DETAIL FOR PIPE FLOW DIAGRAM. 9. REMOVE CONCRETE SLAB AT CONDENSER WATER RETURN PIPE. REMOVE PIPE BELOW THE SLAB TO THE ELBOW REMOVE CONCRETE SLAB AT CONDENSER WATER RETURN PIPE. REMOVE PIPE BELOW THE SLAB TO THE ELBOW AT THE UNDERGROUND PIPE. 10. REMOVE EXISTING 2-WAY CONTROL VALVES. REMOVE EXISTING 2-WAY CONTROL VALVES. 11. REMOVE EXISTING 10" BOILER VENTS UP TO AND INCLUDING THE BAROMETRIC DAMPERS. REMOVE EXISTING 10" BOILER VENTS UP TO AND INCLUDING THE BAROMETRIC DAMPERS.12. REMOVE GAS, HOT WATER SUPPLY AND RETURN PIPING AT UNIONS TO PREPARE FOR REMOVAL OF EXISTING REMOVE GAS, HOT WATER SUPPLY AND RETURN PIPING AT UNIONS TO PREPARE FOR REMOVAL OF EXISTING BOILERS. 13. REMOVE LOW VOLTAGE J-BOXES ON BACK OF BOILERS FOR CONTROL OF CIRCULATING PUMPS. J-BOXES AND REMOVE LOW VOLTAGE J-BOXES ON BACK OF BOILERS FOR CONTROL OF CIRCULATING PUMPS. J-BOXES AND WIRING TO BE REINSTALLED ON NEW BOILERS.
AutoCAD SHX Text
25
AutoCAD SHX Text
%%UCT-1
AutoCAD SHX Text
%%UCT-1
AutoCAD SHX Text
16
AutoCAD SHX Text
15
AutoCAD SHX Text
REMOVE CONCRETE SLAB TO ALLOW REMOVAL OF PIPE BELOW SLAB TO FIRST ELBOW.
AutoCAD SHX Text
REPLACE PIPE BELOW SLAB AND POUR NEW SLAB TO MATCH EXISTING. PROVIDE SLEEVE FOR PIPE AT SLAB PENETRATION AND SEAL WATERTIGHT.
AutoCAD SHX Text
REMOVE EXISTING CHEMICAL TREATMENT AND MAKE-UP WATER PIPING.
AutoCAD SHX Text
REMOVE BOILERS AND PIPING UP TO UNIONS.
AutoCAD SHX Text
31
AutoCAD SHX Text
31
AutoCAD SHX Text
EXISTING 6" CWR PIPING TO CONDENSER WATER PUMPS.
AutoCAD SHX Text
30
AutoCAD SHX Text
PROVIDE NEW 10" VENT CONECTION FROM BOILER TO EXISTING VENT, TYPE B VENT, DOUBLE WALL.
AutoCAD SHX Text
31
AutoCAD SHX Text
31
AutoCAD SHX Text
EXISTING 6" CWR PIPING TO CONDENSER WATER PUMPS.
AutoCAD SHX Text
30
AutoCAD SHX Text
30
AutoCAD SHX Text
GENERAL NOTES - BUILDING 400
AutoCAD SHX Text
1. CONTROLS CONTRACTOR TO REMOVE EXISTING FACTORY MOUNTED CONTROLS FOR TWO WATER SOURCE HEAT CONTROLS CONTRACTOR TO REMOVE EXISTING FACTORY MOUNTED CONTROLS FOR TWO WATER SOURCE HEAT PUMP UNITS LOCATED IN BUILDING 400 SERVING THE KITCHEN AND DINING AREAS. 2. EXISTING SENSORS AND DEVICES TO CURRENTLY INSTALLED WITH THE INTENT OF INDICATING STATUS OR FOR EXISTING SENSORS AND DEVICES TO CURRENTLY INSTALLED WITH THE INTENT OF INDICATING STATUS OR FOR THE PURPOSE OF STARTING OR STOPPING THE UNIT VIA THE EXISTING CONTROL SYSTEM TO REMAIN INTACT AND OPERATIONAL. 3. CONTROLS CONTRACTOR TO VERIFY OPERATION OF UNIT PRIOR TO DEMOLITION OF EXISTING FACTORY MOUNTED CONTROLS CONTRACTOR TO VERIFY OPERATION OF UNIT PRIOR TO DEMOLITION OF EXISTING FACTORY MOUNTED CONTROLS. ISSUES RELATED TO OPERATION OF THE UNITS, CONDITION OF EXISTING SENSORS OR DEVICES TO REMAIN ARE TO BE REPORTED TO THE OWNER, IN WRITING, PRIOR TO COMMENCEMENT OF THE WORK.
AutoCAD SHX Text
GENERAL NOTES - BUILDING 400
AutoCAD SHX Text
1. CONTROLS CONTRACTOR TO PROVIDE AND INSTALL NEW CONTROLLERS FOR TWO WATER SOURCE HEAT PUMP CONTROLS CONTRACTOR TO PROVIDE AND INSTALL NEW CONTROLLERS FOR TWO WATER SOURCE HEAT PUMP UNITS LOCATED IN BUILDING 400 SERVING THE KITCHEN AND DINING AREAS. 2. CONTROLS CONTRACTOR TO PROVIDE ADDITIONAL PROGRAMMING FOR THE UNITS, AS REQUIRED, TO MAKE UNITS CONTROLS CONTRACTOR TO PROVIDE ADDITIONAL PROGRAMMING FOR THE UNITS, AS REQUIRED, TO MAKE UNITS OPERATIONAL PER THE OWNERS REQUIREMENTS. 3. CONTROLS CONTRACTOR TO VERIFY OPERATION OF UNIT, COMMISSION, WITH THE ENGINEER OF RECORD PRIOR CONTROLS CONTRACTOR TO VERIFY OPERATION OF UNIT, COMMISSION, WITH THE ENGINEER OF RECORD PRIOR TO ACCEPTANCE BY THE OWNER. ADDITIONAL WORK MAY BE REQUIRED AS A RESULT OF OPERATIONAL TESTING.
AutoCAD SHX Text
TRISTAR ENGINEERING GROUP, INC. 14522 SALINGER ROAD ORLANDO, FLORIDA 32828 407-567-9795 CA LIC No: 31573
CONDENSER WATER FLOW DIAGRAM - DEMOLITION
BOILE
R RE
PLAC
EMEN
T AN
D TO
WER
REP
AIR
VCS
PROJ
ECT
NO. 2
0477
3631
55 P
HO
NET
IA D
RIV
ED
ELTO
NA,
FLO
RID
A 32
738
XXXXXX01/09/2020
Engineer
SUNR
ISE
ELEM
ENTA
RY S
CHOO
LNO
.DA
TEDE
SCRI
PTIO
N
DRAWING NO.
SHEE
T TI
TLE
AE PROJECT NUMBER
DRAWN BYDESIGNED BY
ARCH/ENGR OF RECORD
ISSUE DATE
DOCU
MENT
HIS
TORY
REV
ISIO
NS
J U A N C . P E S A N T EF L P E # 7 0 4 0 6
COND
ENSE
R W
ATER
LOO
P FL
OW D
IAGR
AM -
DEM
OLIT
ION
M201
JUAN C. PESANTE
RLS RLS
AutoCAD SHX Text
%%UCT-1
AutoCAD SHX Text
CWR
AutoCAD SHX Text
CWS
AutoCAD SHX Text
%%UB-1
AutoCAD SHX Text
%%UB-2
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
%%UP-BLC2
AutoCAD SHX Text
%%UP-BLC1
AutoCAD SHX Text
1
AutoCAD SHX Text
7
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
7
AutoCAD SHX Text
LPG
AutoCAD SHX Text
LPG
AutoCAD SHX Text
14
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
11
AutoCAD SHX Text
15
AutoCAD SHX Text
14
AutoCAD SHX Text
EXISTING THERMOMETER
AutoCAD SHX Text
2
AutoCAD SHX Text
EXISTING AUTOMATIC AIR VENT
AutoCAD SHX Text
3
AutoCAD SHX Text
9
AutoCAD SHX Text
EXISTING BOILER BYPASS VALVE - CLOSED
AutoCAD SHX Text
1
AutoCAD SHX Text
5
AutoCAD SHX Text
EXISTING UNION
AutoCAD SHX Text
10
AutoCAD SHX Text
4
AutoCAD SHX Text
EXISTING PRESSURE GAUGE
AutoCAD SHX Text
EXISTING PRESSURE RELIEF SAFETY VALVE
AutoCAD SHX Text
8
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
REFERENCE NOTES
AutoCAD SHX Text
3
AutoCAD SHX Text
7
AutoCAD SHX Text
EXISTING DIELECTRIC UNION
AutoCAD SHX Text
EXISTING FLOOR DRAIN
AutoCAD SHX Text
6
AutoCAD SHX Text
8
AutoCAD SHX Text
8
AutoCAD SHX Text
EXISTING 2X4 J-BOX. CONTROL POWER FOR CIRCULATING PUMP.
AutoCAD SHX Text
10
AutoCAD SHX Text
10
AutoCAD SHX Text
EXISTING 2-WAY AUTOMATIC CONTROL VALVE
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
2
AutoCAD SHX Text
11
AutoCAD SHX Text
11
AutoCAD SHX Text
EXISTING PRESSURE GAUGE PIPE. GAUGE NOT INSTALLED.
AutoCAD SHX Text
12
AutoCAD SHX Text
EXISTING THERMOWELL WITH BAS TEMPERATURE SENSOR (ABANDONED)
AutoCAD SHX Text
13
AutoCAD SHX Text
EXISTING THERMOWELL WITH BAS TEMPERATURE SENSOR.
AutoCAD SHX Text
LIQUID PROPANE GAS LINE FROM UNDERGROUND STORAGE TANKS.
AutoCAD SHX Text
15
AutoCAD SHX Text
CONDENSER WATER RETURN PIPE FROM BUILDINGS
AutoCAD SHX Text
16
AutoCAD SHX Text
16
AutoCAD SHX Text
CONDENSER WATER RETURN PIPE TO CONDENSER WATER PUMP INLETS.
AutoCAD SHX Text
SCALE: NOT TO SCALE
AutoCAD SHX Text
REMOVE PIPING AND BYPASS ISOLATION VALVE TO ACCOMMODATE NEW LOW TEMPERATURE VALVE (TYP.)
AutoCAD SHX Text
REMOVE HIGH PRESSURE SAFETY VALVE AND PIPING AS REQUIRED FOR REMOVAL OF EXISTING BOILER. VALVE TO BE REPLACED WITH NEW BOILER INSTALLATION (TYP.).
AutoCAD SHX Text
REMOVE BOILER VENT UP TO AND INCLUDING THE BAROMETRIC DAMPER (TYP.).
AutoCAD SHX Text
REMOVE EXISTING CONDENSER WATER PIPE BEYOND THE EXISTING LAKOS SOLIDS SEPARATOR INSIDE OF BOILER ROOM. SOLIDS SEPARATOR PIPING, PUMP AND ELECTRICAL TO BE REMOVED.
AutoCAD SHX Text
DEMOLISH ALL CONDENSER WATER PIPING AS INDICATED.
AutoCAD SHX Text
REMOVE SLAB AND DEMOLISH PIPE TO FIRST ELBOW BELOW GRADE.
AutoCAD SHX Text
GENERAL NOTES - DEMOLITION
AutoCAD SHX Text
1. CLOSED CIRCUIT COOLING TOWER TO REMAIN. INTERNAL COMPONENTS TO BE REMOVED AND CLOSED CIRCUIT COOLING TOWER TO REMAIN. INTERNAL COMPONENTS TO BE REMOVED AND REPLACED. 2. LOCK OUT / TAG OUT EXISTING COOLING TOWER FANS, CONDENSER WATER PUMPS AND SPRAY LOCK OUT / TAG OUT EXISTING COOLING TOWER FANS, CONDENSER WATER PUMPS AND SPRAY PUMP PRIOR TO BEGINNING WORK. 3. FANS, FAN MOTORS, FAN SHAFTS, BEARINGS, BELTS, SHEAVES AND ALL COMPONENTS RELATED TO FANS, FAN MOTORS, FAN SHAFTS, BEARINGS, BELTS, SHEAVES AND ALL COMPONENTS RELATED TO THE FAN ASSEMBLY TO BE DEMOLISHED. 4. DEMOLISH THE EXISTING 2-WAY CONTROL VALVES. VALVES TO BE REPLACED. WIRING AND CONDUIT DEMOLISH THE EXISTING 2-WAY CONTROL VALVES. VALVES TO BE REPLACED. WIRING AND CONDUIT TO REMAIN FOR NEW VALVES. 5. DEMOLISH EXISTING CHEMICAL TREATMENT AND MAKE-UP WATER PIPING AS SHOWN ON M002 AND DEMOLISH EXISTING CHEMICAL TREATMENT AND MAKE-UP WATER PIPING AS SHOWN ON M002 AND M101. PIPING TO BE REPLACED AND INSTALLED ON NEW PIPE SUPPORT STRUCTURE.
AutoCAD SHX Text
TRISTAR ENGINEERING GROUP, INC. 14522 SALINGER ROAD ORLANDO, FLORIDA 32828 407-567-9795 CA LIC No: 31573
CONDENSER WATER FLOW DIAGRAM - NEW WORK
CONDENSER WATER DEVICE SCHEDULE
DEVICE ID SYSTEM SERVICE SIZE MANUFACTURER MODEL DESCRIPTION
AAV CW 1 CONDENSER WATER CT HIGH POINT VENT 3/4" WATTS FV-4M1 BRASS BODY AND COVER AND SILICONE RUBBER SEAL. HIGHTEMPERATURE RESISTANT POLYETHYLENE FLOAT.
CV CW 1 CONDENSER WATER -RETURN TO TOWER
CONTROL VALVE (N.O.) 6" BELIMO SEEDESCRIPTION
CAST IRON, LUG-BODY, EPDM LINER, ALUMINUM BRONZE DISC ANDSTEM WITH LOCKABLE HANDLE. 24VAC/DC, ON/OFF CONTROL.SELECTION BY BAS CONTRACTOR TO MATCH EXISTING VALVE ANDACTUATOR.
CV CW 2 CONDENSER WATER -TOWER BYPASS
CONTROL VALVE (N.C.) 6" BELIMO SEEDESCRIPTION
CAST IRON, LUG-BODY, EPDM LINER, ALUMINUM BRONZE DISC ANDSTEM WITH LOCKABLE HANDLE. 24VAC/DC, ON/OFF CONTROL.SELECTION BY BAS CONTRACTOR TO MATCH EXISTING VALVE ANDACTUATOR.
PI CW 1 CONDENSER WATER CWR PRESSURE 4" WIKA 233.54 4" FACE, ALL STAINLESS, BOURDON TIBE, LOWER NPT MOUNT, 0-100PSI RANGE, GLYCERINE FILLED.
PI CW 2 CONDENSER WATER CWR PRESSURE 4" WIKA 233.54 4" FACE, ALL STAINLESS, BOURDON TIBE, LOWER NPT MOUNT, 0-100PSI RANGE, GLYCERINE FILLED.
TI CW 1 CONDENSER WATER CWR TEMPERATURE 12" TRERICE CX9 2 403 02 12" ADJUSTABLE, BRASS STEM, 3.5" STEM, 0-100F RANGE
TI CW 2 CONDENSER WATER CWS TEMPERATURE 12" TRERICE CX9 2 403 02 12" ADJUSTABLE, BRASS STEM, 3.5" STEM, 0-100F RANGE
TS CW 1 CONDENSER WATER CWR TEMPERATURESEE
DESCRIPTION
SEE DESCRIPTION SEEDESCRIPTION
NEW TEMPERATURE SENSOR BY BAS TO REPLACE SENSORREMOVED UNDER THE DEMOLITION PHASE.
TW CW 1 CONDENSER WATER CWR TEMPERATURE N/A TRERICE 3-4-J-2 3/4" NPT, 6" STEM, BRASS
TW CW 2 CONDENSER WATER CWR TEMPERATURE N/A TRERICE 3-4-J-2 3/4" NPT, 6" STEM, BRASS
TW CW 3 CONDENSER WATER CWR TEMPERATURESEE
DESCRIPTION
SEE DESCRIPTION SEEDESCRIPTION
NEW THERMOWELL BY BAS TO REPLACE SENSOR REMOVED UNDERTHE DEMOLITION PHASE.
V CW 1 CONDENSER WATER CT ISOLATION 6" KEYSTONE FIG. 222 CAST IRON, LUG-BODY, EPDM LINER, ALUMINUM BRONZE DISC ANDSTEM WITH LOCKABLE HANDLE
V CW 2 CONDENSER WATER CT ISOLATION 6" KEYSTONE FIG. 222 CAST IRON, LUG-BODY, EPDM LINER, ALUMINUM BRONZE DISC ANDSTEM WITH LOCKABLE HANDLE
V CW 3 CONDENSER WATER CT ISOLATION 6" KEYSTONE FIG. 222 CAST IRON, LUG-BODY, EPDM LINER, ALUMINUM BRONZE DISC ANDSTEM WITH LOCKABLE HANDLE
V CW 4 CONDENSER WATER CT HIGH POINT VENT 3/4" APOLLO 77-140 2-PIECE BRONZE BODY FULL PORT BALL VALVE, 316SS BALL & STEM
V CW 5 CONDENSER WATER CWR PRESSURE 3/4" APOLLO 77-140 2-PIECE BRONZE BODY FULL PORT BALL VALVE, 316SS BALL & STEM
HOT WATER DEVICE SCHEDULEDEVICE ID SYSTEM SERVICE SIZE MANUFACTURER MODEL DESCRIPTION
V HW 1 HOT WATER BOILER B-1 1-1/2" LOCHINVAR 100171919 3-WAY LOW TEMPERATURE VALVE (LTV). CONTRACTOR TO FIELDVERIFY SIZE.
V HW 2 HOT WATER BOILER B-2 1-1/2" LOCHINVAR 100171919 3-WAY LOW TEMPERATURE VALVE (LTV). CONTRACTOR TO FIELDVERIFY SIZE.
BOILE
R RE
PLAC
EMEN
T AN
D TO
WER
REP
AIR
VCS
PROJ
ECT
NO. 2
0477
3631
55 P
HO
NET
IA D
RIV
ED
ELTO
NA,
FLO
RID
A 32
738
XXXXXX01/09/2020
Engineer
SUNR
ISE
ELEM
ENTA
RY S
CHOO
LNO
.DA
TEDE
SCRI
PTIO
N
DRAWING NO.
SHEE
T TI
TLE
AE PROJECT NUMBER
DRAWN BYDESIGNED BY
ARCH/ENGR OF RECORD
ISSUE DATE
DOCU
MENT
HIS
TORY
REV
ISIO
NS
J U A N C . P E S A N T EF L P E # 7 0 4 0 6
COND
ENSE
R W
ATER
LOO
P FL
OW D
IAGR
AM -
NEW
WOR
K
M202
JUAN C. PESANTE
RLS RLS
AutoCAD SHX Text
%%UCT-1
AutoCAD SHX Text
%%UB-1
AutoCAD SHX Text
%%UB-2
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
%%UP-BLC2
AutoCAD SHX Text
%%UP-BLC1
AutoCAD SHX Text
7
AutoCAD SHX Text
2
AutoCAD SHX Text
4
AutoCAD SHX Text
7
AutoCAD SHX Text
LPG
AutoCAD SHX Text
LPG
AutoCAD SHX Text
14
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
3
AutoCAD SHX Text
8
AutoCAD SHX Text
8
AutoCAD SHX Text
15
AutoCAD SHX Text
16
AutoCAD SHX Text
6"%%C CWS
AutoCAD SHX Text
6"%%C CWR
AutoCAD SHX Text
SCALE: NOT TO SCALE
AutoCAD SHX Text
B
AutoCAD SHX Text
A
AutoCAD SHX Text
C
AutoCAD SHX Text
B
AutoCAD SHX Text
A
AutoCAD SHX Text
C
AutoCAD SHX Text
V-CW-1
AutoCAD SHX Text
V-CW-2
AutoCAD SHX Text
V-CW-3
AutoCAD SHX Text
V-CW-4
AutoCAD SHX Text
AAV-CW-1
AutoCAD SHX Text
TI-CW-2
AutoCAD SHX Text
TI-CW-1
AutoCAD SHX Text
TW-CW-1
AutoCAD SHX Text
TW-CW-2
AutoCAD SHX Text
V-CW-5
AutoCAD SHX Text
PI-CW-1
AutoCAD SHX Text
V-CW-6
AutoCAD SHX Text
PI-CW-2
AutoCAD SHX Text
TW-CW-3
AutoCAD SHX Text
TI-HW-1
AutoCAD SHX Text
TI-HW-2
AutoCAD SHX Text
TI-HW-1
AutoCAD SHX Text
TI-HW-2
AutoCAD SHX Text
11
AutoCAD SHX Text
15
AutoCAD SHX Text
14
AutoCAD SHX Text
EXISTING THERMOMETER
AutoCAD SHX Text
2
AutoCAD SHX Text
EXISTING AUTOMATIC AIR VENT
AutoCAD SHX Text
3
AutoCAD SHX Text
9
AutoCAD SHX Text
NOT USED
AutoCAD SHX Text
1
AutoCAD SHX Text
5
AutoCAD SHX Text
EXISTING UNION
AutoCAD SHX Text
10
AutoCAD SHX Text
4
AutoCAD SHX Text
EXISTING PRESSURE GAUGE
AutoCAD SHX Text
NEW PRESSURE RELIEF SAFETY VALVE. ROUTE PIPING TO EXISTING FLOOR DRAIN.
AutoCAD SHX Text
8
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
REFERENCE NOTES
AutoCAD SHX Text
7
AutoCAD SHX Text
EXISTING DIELECTRIC UNION
AutoCAD SHX Text
EXISTING FLOOR DRAIN
AutoCAD SHX Text
6
AutoCAD SHX Text
EXISTING 2X4 J-BOX. CONTROL POWER FOR CIRCULATING PUMP. REINSTALL ON NEW BOILERS.
AutoCAD SHX Text
NOT USED
AutoCAD SHX Text
NOT USED
AutoCAD SHX Text
NOT USED
AutoCAD SHX Text
NOT USED
AutoCAD SHX Text
LIQUID PROPANE GAS LINE FROM UNDERGROUND STORAGE TANKS.
AutoCAD SHX Text
CONDENSER WATER RETURN PIPE FROM BUILDINGS
AutoCAD SHX Text
16
AutoCAD SHX Text
CONDENSER WATER RETURN PIPE TO CONDENSER WATER PUMP INLETS.
AutoCAD SHX Text
TS-CW-1
AutoCAD SHX Text
CV-CW-2
AutoCAD SHX Text
CV-CW-1
AutoCAD SHX Text
TRISTAR ENGINEERING GROUP, INC. 14522 SALINGER ROAD ORLANDO, FLORIDA 32828 407-567-9795 CA LIC No: 31573
BOILE
R RE
PLAC
EMEN
T AN
D TO
WER
REP
AIR
VCS
PROJ
ECT
NO. 2
0477
3631
55 P
HO
NET
IA D
RIV
ED
ELTO
NA,
FLO
RID
A 32
738
XXXXXX01/09/2020
Engineer
SUNR
ISE
ELEM
ENTA
RY S
CHOO
LNO
.DA
TEDE
SCRI
PTIO
N
DRAWING NO.
SHEE
T TI
TLE
AE PROJECT NUMBER
DRAWN BYDESIGNED BY
ARCH/ENGR OF RECORD
ISSUE DATE
DOCU
MENT
HIS
TORY
REV
ISIO
NS
J U A N C . P E S A N T EF L P E # 7 0 4 0 6
COOL
ING
TOW
ER -
DETA
ILS
M301
JUAN C. PESANTE
RLS RLS
AutoCAD SHX Text
REPLACE PARTIAL FILL ON ACCESS DOOR SIDE OF TOWER.
AutoCAD SHX Text
REPLACE FILL VALVE AND FLOAT ASSEMBLY TO MATCH EXISTING.
AutoCAD SHX Text
REPLACE FAN MOTORS, FAN SHAFTS, FANS, PULLEYS, BEARINGS, BELTS AND ALL MOUNTING HARDWARE.
AutoCAD SHX Text
REPLACE MOTORS, BELTS AND PULLEYS.
AutoCAD SHX Text
REPLACE WIRING FROM MOTORS TO MOTOR STARTERS.
AutoCAD SHX Text
REPLACE ALL MOUNTING HARDWARE FOR MOTORS AND FANS.
AutoCAD SHX Text
REPLACE FAN SHAFTS, BEARINGS AND ALL MOUNTING HARDWARE.
AutoCAD SHX Text
REPLACE FANS, FAN SHAFTS, BEARINGS AND ALL MOUNTING HARDWARE.
AutoCAD SHX Text