31
Schindler Elevator Corporation IFMA Spring Conference 2019 A Service Partnership

Schindler Elevator Corporation IFMA Spring Conference 2019 · Schindler InTruss Modernization An innovative solution for escalator upgrade. Using your existing truss, the Schindler

  • Upload
    others

  • View
    24

  • Download
    0

Embed Size (px)

Citation preview

Schindler Elevator Corporation IFMA Spring Conference 2019 A Service Partnership

– Industry Safety Leader

– Experienced airport vertical transportation provider

– A first-class, preventative maintenance program

– Local Regional National Global Support

– Global leader in escalators & moving walks

– Proven In-truss esc/mw modernization product

Why Partner with Schindler

© Schindler Elevator Corporation | Cincinnait | CVG | August 23, 2018 Slide 2

Transition Plan

© Schindler Elevator Corporation | Cincinnait | CVG | August 23, 2018 Slide 3

Transition Actions

4 weeks

before

start date

3 weeks

before

start date

2 weeks

before

start date

1 weeks

before

start date

Start Date 1st Week 2nd Week 1st Month2nd

Month

Identify Key Technicians

Badging

In-Depth Unit Surveys

Maintenance Planning

Assess spare parts / tooling needs

Ensure continuation of State Inspection Plan

Assess outstanding repairs/violations

Units Loaded in Schindler System

Pre-Start Meeting

Technician Onboarding

On Site Kick off Meeting

Deliver spare parts / tools

Performance Meetings

Staffing Plan

Base Bid, Excluded Repairs

Tech-1 Mon-Fri

Tech-2 Mon-Fri

Tech-3 Mon-Fri

Tech-4 Mon-Fri

Option 1, Comprehensive

Tech-1 Mon-Fri

Tech-2 Mon-Fri

Tech-3 Mon-Fri

Tech-4 Mon-Fri

Option 2, Comprehensive

Tech-1 Mon-Fri

Tech-2 Mon-Fri

Tech-3 Mon-Fri

Tech-4 Mon-Fri

Tech-5 Mon-Fri

Tech-6 Mon-Fri

11pm to 7am 7am - 3:30pm 4pm to Midnight

Midnight to 6am 6pm to Midnight

11pm to 7am 7am - 3:30pm 4pm to Midnight

6am to 6pm

© Schindler Elevator Corporation | Cincinnait | CVG | August 23, 2018 Slide 4

Sample MCP

© Schindler Elevator Corporation | Cincinnait | CVG | August 23, 2018 Slide 5

Schindler Dashboard

© Schindler Elevator Corporation | Cincinnait | CVG | August 23, 2018 Slide 6

IFMA Spring Conference 2019 Why Schindler

– #1 in SAFETY in the elevator/escalator industry – Top performing airport & transit authority service provider – Local service coverage/strength, best in class references – Service/”MCP” effectiveness – Modernization experience/strength: references – Reverse engineered competitor products (Otis Elevonics 20 years ago) – Best in Class - In Truss escalator modernization product: smooth/quiet/safe – National Service Support facility centrally located in Toledo, OH

– Housing National field technical support/engineers – On site competitor simulators – National field tech training site – PCB manufacture and repair – $22M parts support facility

– Leader in industry technology: in truss mods, destination dispatching, OSCAR, Dashboard, FieldLink, Service Delivery Model, AHEAD IoT

© Schindler Elevator Corporation | SEC Field Operations | Brad Baker | Cleveland, Ohio | September 25, 2018 Slide 7

– Cincinnati – Louisville – Cleveland – Baltimore Washington – Ronald Reagan – Dulles – Chicago O’Hare – Detroit – Minneapolis – Raleigh – Charlotte – Fort Lauderdale – Orlando – Tampa – Miami – Pittsburgh – Portland – Seattle – Salt Lake City

We Love Airports Current Schindler Service

© Schindler Elevator Corporation | Cincinnait | CVG | August 23, 2018 Slide 8

Schindler InTruss IFMA Spring Conference 2019

Why upgrade your Escalators/Moving Walks? Increase Reliability and Decrease Liability

Slide 10

Reassuringly Safer While superior performance and reliability are always of major importance, escalator safety is our highest priority.

Slide 11

− Controlled stop braking system

− Step-to-skirt gap guidance system

− Continuous roller monitors

− Lower-friction handrail guidance system

− Foot deflector brushes on skirts

− Yellow safety combfingers at step

entrance and exit

− Step demarcation lighting

− Signage reminds passengers of safe-

riding rules

− Emergency stop button.

Reassuringly Safer… While superior performance and reliability are always of major importance, escalator safety is our highest priority.

Slide 12

Measurably more efficient Schindler uses three simple, integrated strategies to reduce escalator power consumption by up to 30%.

Slide 13

Noticeably better appearance First impressions are everything and the Schindler 9300AE escalator never fails to make a good one.

© Schindler Elevator Corporation | InTruss Modernization | December 4, 2015 Slide 14

With configuration packages and rises up to

42 feet (higher rises up to 65 feet available

upon request), the Schindler 9300AE

escalator is striking. Create your own unique

design statement from our selection of

materials, finishes and colors using standard

and optional variants that include:

− Steps

− Handrails

− Balustrades

− Skirts

− Deckings

− Optional lighting for visual impact and safety

− Optional color choices for handrails, steps,

skirt

Schindler InTruss Modernization An innovative solution for escalator upgrade.

Using your existing truss, the Schindler InTruss escalator

modernization can make your old, outdated escalators comparable to a

new Schindler 9300 AE, the industry’s premier commercial escalator.

Slide 15

Slide 16

InTruss Video

Schindler InTruss Solutions Approved Types for Application

Company OEM Types for Application

Westinghouse Modular 100, 220, 250

N, L, Pre-War type

Otis J type

RB type

OH

O type

506 (Some restrictions apply)

KONE / Montgomery HR/E series

E5000

HR Roundtube Truss

Escalaire

O&K RTK type

Peele

Schindler Haughton

Hitachi

SWE/SWU – with retaining of track block and tracks

ED

1200 V-N

Slide 17

Schindler InTruss Modernization

A complete moving walk upgrade

Escalator Truss

Schindler InTruss Modernization

Aesthetic Outer components

–Standard commercial finishes

–Glass balustrades

–Stainless steel balustrades

–Painted steel balustrades

–Painted steel or stainless steel skirts

–Stainless steel decking

–Other finishes and colors available

Newel End & Handrail Inlet

Combplate

Walk-on Plates

Skirt

Outer Decking

Inner Decking

Balustrade

Schindler InTruss Modernization Internal Components

The drive or top end of the

moving walk: – Main drive machine (motor)

– Main Controller

– Main gear (bull gear)

– Handrail drive

– Disconnect

– 3 phase power enters here from the

building source

– Lubricating systems (manual or

automatic)

– Analog phone line enters here for

remote monitoring

Bull Gear

Handrail Drive

Main Controller

Machine

Lubricating System

Handrail

Text may be inserted in either white, red or black on full-sized images.

Schindler InTruss Modernization Internal Components

Tension End

– Located at the end opposite

the drive or lower end of the

inclined moving walk.

– Redundant controller

monitors all operations

including speed and

operating devices.

– Several safety switches/

devices are located

throughout the unit to

protect both the equipment

and the riding public.

Schindler InTruss Escalator Modernization One Houston Center

Week 2 Week 3 Week 4

Slide 22

Schindler InTruss Escalator Modernization One Houston Center

Week 4 Week 5

Week 5 Week 6

Slide 23

Schindler InTruss Escalator Modernization One Houston Center

Week 8 Week 8

Slide 24

Schindler InTruss Escalator Modernization One Houston Center

Week 12 Week 12

Slide 25

Schindler InTruss Escalator Modernization Austin Convention Center – Kone HR

Schindler InTruss Escalator Modernization Typical Barricading

Slide 27

Schindler InTruss…

…minimizes building disruption

Retention of existing truss allows the building to continue

normal operations during installation

…reduces tenant inconvenience

Shortened lead and completion time returns escalator to

normal service faster

…enhances escalator performance

New components and technology improve passenger

comfort and safety as well as equipment reliability

…improves aesthetics

Contemporary design and stylish materials create a bold, fresh look

…increases energy efficiency

Technology upgrades significantly lower energy consumption

Slide 28

It’s not rocket science. It’s a Schindler 9300 escalator installed in an existing truss.

© Schindler Elevator Corporation | InTruss Modernization | March 27, 2018 Slide 29

Questions?

© Schindler Elevator Corporation | InTruss Modernization | December 4, 2015 Slide 30

Copyright © Schindler. All rights reserved

Schindler owns and retains all copyrights and other intellectual property rights in this presentation. It may not be

reproduced, modified or copied nor used for any commercial purposes (e.g. manufacturing), nor communicated to any

third parties without our written consent.

Schindler undertakes all reasonable efforts to ensure that the information in this presentation is accurate, complete

and derives from reliable sources. Schindler however, does not represent nor warrant (either expressly or implicitly)

accuracy, reliability, timeliness or completeness of such information. Therefore, Schindler is not liable for any errors,

consequence of acts or omissions based on the entirety or part of the information available in this presentation.

Thank you for your attention.