8
Task 125 - Silvertown Reference Design Scheme Proposals – Consultation Drawings Transport for London October 2014

Scheme Proposals – Consultation Drawings · October 2014 . STWTN-ATK-GEN-XXXX-RP-Z-0018 1 Uncontrolled when printed Revision P01 Table of Contents Scheme Proposals – Consultation

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Scheme Proposals – Consultation Drawings · October 2014 . STWTN-ATK-GEN-XXXX-RP-Z-0018 1 Uncontrolled when printed Revision P01 Table of Contents Scheme Proposals – Consultation

Task 125 - Silvertown Reference Design Scheme Proposals – Consultation Drawings Transport for London

October 2014

Page 2: Scheme Proposals – Consultation Drawings · October 2014 . STWTN-ATK-GEN-XXXX-RP-Z-0018 1 Uncontrolled when printed Revision P01 Table of Contents Scheme Proposals – Consultation

STWTN-ATK-GEN-XXXX-RP-Z-0018 1 Uncontrolled when printed Revision P01

Table of Contents Scheme Proposals – Consultation Drawings

Document Number Document Title

STWTN-ATK-GEN-XXXX-DR-Z-0001 Silvertown River Crossing - Scheme Layout

STWTN-ATK-STU-TUXX-DR-D-0001 Silvertown River Crossing - Tunnel Plan & Profile

STWTN-ATK-HGN-ANXX-DR-D-0009 Northern Tie-in Existing and Proposed Junction Arrangements

STWTN-ATK-HGN-ASXX-DR-D-0011 Southern Tie-in Existing and Proposed Junction Arrangements

STWTN-ATK-STU-TUXX-DR-C-0005 Silvertown River Crossing - Bored Tunnel Cross Section Through a Typical Cross Passage

STWTN-ATK-STU-TUXX-DR-C-0011 Silvertown River Crossing - Cut-and Cover Tunnel Cross Section

Page 3: Scheme Proposals – Consultation Drawings · October 2014 . STWTN-ATK-GEN-XXXX-RP-Z-0018 1 Uncontrolled when printed Revision P01 Table of Contents Scheme Proposals – Consultation

M

e

a

n

H

ig

h

W

a

te

r

B

o

ro

C

o

n

s

t &

W

a

rd

B

d

y

CA

BLE

CA

R

W

E

S

T

E

R

N

E

N

T

R

A

N

C

E

(

C

L

O

S

E

D

)

CUT-AND-COVER

TUNNEL

G

R

E

E

N

W

IC

H

T

B

M

R

O

T

A

T

IO

N

/ R

E

-

L

A

U

N

C

H

C

H

A

M

B

E

R

LONDON UNDERGROUND

JUBILEE LINE NORTH

GREENWICH STATION

B

O

R

E

D

T

U

N

N

E

L

S

O

U

T

H

B

O

U

N

D

N

O

R

T

H

B

O

U

N

D

LONDON UNDERGROUND

JUBILEE LINE

DOCKLANDS

LIGHT RAILWAY

WOOLWICH

BRANCH VIADUCT

TBM LAUNCH

RECEPTION

CHAMBER

EMIRATES

ROYAL DOCKS

STATION

O

P

E

N

C

U

T

A

P

P

R

O

A

C

H

C

U

T

-

A

N

D

-

C

O

V

E

R

T

U

N

N

E

L

EMIRATES GREENWICH

PENINSULAR STATION

DOCKLANDS LIGHT

RAILWAY VIADUCT

SAFETY, HEALTH AND ENVIRONMENTAL

INFORMATION

In addition to the hazards/risks normally associated with the types of work

detailed on this drawing, note the following significant residual risks

(Reference shall also be made to the design hazard log).

Construction

Not Applicable

Maintenance / Cleaning

Not Applicable

Use

Not Applicable

Decommissioning / Demolition

Not Applicable

Date

Designed / Drawn

Revision

Scale

Drawing Number

Drawing Title

Project TitleDrawing Status

DO

N

OT

S

CA

LE

Date Date Date

Checked ApprovedClient

Original Size

Suitability

Millim

etre

s1

00

10

0

A1

Plo

tte

d: O

ct 1

0, 2

01

4 - 8

:5

6a

m b

y: B

IR

D7

41

3

Drawn / Des DateCheckedRev Approved

Description

Authorised

Copyright C Atkins Limited (2014)

Woodcote Grove

Ashley Road

Epsom

Surrey

KT18 5BW

www.atkinsglobal.com

Tel:

Fax:

+44 (0)1372 726140

+44 (0)1372 740055

SILVERTOWN TUNNEL

REFERENCE DESIGN

SILVERTOWN RIVER CROSSING

SCHEME LAYOUT

STWTN-ATK-GEN-XXXX-DR-Z-0001 P03

S0WORK IN PROGRESS

1:2500 DB

08/10/14

MJC

08/10/14

YD

08/10/14 ---

P03 DB MJC YD 08/10/14

Issue for Public Consultation

P02 JC JC MK 10/07/14

First Issue

P01 JC JC JC 10/07/14

First Issue

O2 ARENA

R

I

V

E

R

T

H

A

M

E

S

NORTH

GREENWICH

SILVERTOWN

With Minor Amendments

KEY

RETAINING WALL

DIAPHRAGM WALL TO UNDERSIDE OF

CARRIAGEWAY

DIAPHRAGM WALL WITH VERTICAL

UPSTAND

NON MOTORISED USER ROUTE

LANDSCAPING

EARTHWORK

HARDENED VERGE

VEHICLE CROSSOVER

Crown copyright and database rights 2014 Ordance Survey 100035971

Scale 1:2500

50m 0m 50m 100m 150m

MK

O

P

E

N

C

U

T

A

P

P

R

O

A

C

H

SO

UT

H

PO

RT

AL

LONDON UNDERGROUND JUBILEE LINE

N

O

R

T

H

P

O

R

T

A

L

CA

BLE

CA

R

EDMUND HALLEY

WAY

TUNNEL SERVICES AND

VENTILATION BUILDINGS

PROPOSED BOORD

STREET FOOTBRIDGE

(REPLACING EXISTING)

A102 BLACKWALL

TUNNEL APPROACH

MILLENNIUM WAY

PROPOSED BLACKWALL

SOUTHBOUND OVERBRIDGE

BLACKWALL TUNNEL

NORTHBOUND BORE

BLACKWALL TUNNEL

SOUTHBOUND BORE

SILVERTOWN TUNNEL - SCHEME LAYOUT

TUNNEL SERVICES

AND VENTILATION

BUILDINGS

A1011

SILVERTOWN

WAY

A1020 LOWER LEA

CROSSING

MODIFIED

TIDAL BASIN

ROUNDABOUT

A1020 SILVERTOWN WAY

DOCKLANDS LIGHT

RAILWAY BECKTON

BRANCH

REALIGNED

DOCK ROAD

BRIDGE STRUCTURE

c

BOORD STREET

L

O

N

D

O

N

U

N

D

E

R

G

R

O

U

N

D

D

O

C

K

L

A

N

D

S

L

I

G

H

T

R

A

I

L

W

A

Y

C

A

N

N

I

N

G

T

O

W

N

S

T

A

T

I

O

N

ROYAL VICTORIA

DOCK

Page 4: Scheme Proposals – Consultation Drawings · October 2014 . STWTN-ATK-GEN-XXXX-RP-Z-0018 1 Uncontrolled when printed Revision P01 Table of Contents Scheme Proposals – Consultation
Page 5: Scheme Proposals – Consultation Drawings · October 2014 . STWTN-ATK-GEN-XXXX-RP-Z-0018 1 Uncontrolled when printed Revision P01 Table of Contents Scheme Proposals – Consultation

SAFETY, HEALTH AND ENVIRONMENTAL

INFORMATION

In addition to the hazards/risks normally associated with the types of work

detailed on this drawing, note the following significant residual risks

(Reference shall also be made to the design hazard log).

Construction

None

Maintenance / Cleaning

None

Use

None

Decommissioning / Demolition

None

Date

Designed / Drawn

Revision

Scale

Drawing Number

Drawing Title

Project TitleDrawing Status

DO

N

OT

S

CA

LE

Date Date Date

Checked ApprovedClient

Original Size

Suitability

Millim

etre

s1

00

10

0

A1

Plo

tte

d: O

ct 0

8, 2

01

4 - 4

:1

7p

m b

y: B

IR

D7

41

3

Drawn / Des DateCheckedRev Approved

Description

Authorised

Copyright C Atkins Limited (2014)

Woodcote Grove

Ashley Road

Epsom

Surrey

KT18 5BW

www.atkinsglobal.com

Tel:

Fax:

+44 (0)1372 726140

+44 (0)1372 740055

Crown copyright and database rights 2014 Ordance Survey 100035971c

EARTHWORK

HARDENED VERGE

SAFETY, HEALTH AND ENVIRONMENTAL

INFORMATION

In addition to the hazards/risks normally associated with the types of work

detailed on this drawing, note the following significant residual risks

(Reference shall also be made to the design hazard log).

Construction

None

Maintenance / Cleaning

None

Use

None

Decommissioning / Demolition

None

LANDSCAPING

ROADS RESTRAINT SYSTEM

VEHICLE CROSSOVER

Scale 1:1250

10m 0m 10m 30m 50m 70m 90m

SAFETY, HEALTH AND ENVIRONMENTAL

INFORMATION

In addition to the hazards/risks normally associated with the types of work

detailed on this drawing, note the following significant residual risks

(Reference shall also be made to the design hazard log).

Construction

Not Applicable

Maintenance / Cleaning

Not Applicable

Use

Not Applicable

Decommissioning / Demolition

Not Applicable

SILVERTOWN TUNNEL

REFERENCE DESIGN

SILVERTOWN NORTHERN TIE-IN

EXISTING AND PROPOSED

JUNCTION ARRANGEMENTS

STWTN-ATK-HGN-ANXX-DR-D-0009 P01

S0WORK IN PROGRESS

1:1250 DB

08/10/14

MJC

08/10/14

YD

08/10/14 ---

P01 DB MJC YD 08/10/14

Issue for Public Consultation

KEY

NON MOTORISED USER ROUTE

RETAINING WALL

10m LIGHTING COLUMN

ANTI-RECIRCULATION WALL

Crown copyright and database rights 2014 Ordance Survey 100035971c

Scale 1:1250

10m 0m 10m 30m 50m 70m 90m

DOCKLANDS LIGHT RAILWAY BECKTON BRANCH

T

ID

A

L

B

A

S

IN

R

O

A

D

A

1

0

2

0

L

O

W

E

R

L

E

A

C

R

O

S

S

I

N

G

S

C

A

R

A

B

C

L

O

S

E

D

O

C

K

R

O

A

D

S

I

L

V

E

R

T

O

W

N

W

A

Y

D

O

C

K

L

A

N

D

S

L

I

G

H

T

R

A

I

L

W

A

Y

W

O

O

L

W

I

C

H

B

R

A

N

C

H

MODIFIED TIDAL

BASIN ROUNDABOUT

(SIGNALISED)

D

O

C

K

R

O

A

D

TUNNEL SERVICES AND

VENTILATION BUILDINGS

C

U

T

-

A

N

D

-

C

O

V

E

R

T

U

N

N

E

L

BORED

TUNNEL

SILVERTOWN - NORTHERN TIE-IN PROPOSED LAYOUTEXISTING LAYOUT

DOCKLANDS LIGHT RAILWAY BECKTON BRANCH

T

ID

A

L

B

A

S

IN

R

O

A

D

A

1

0

2

0

L

O

W

E

R

L

E

A

C

R

O

S

S

I

N

G

S

C

A

R

A

B

C

L

O

S

E

D

O

C

K

R

O

A

D

S

I

L

V

E

R

T

O

W

N

W

A

Y

D

O

C

K

L

A

N

D

S

L

I

G

H

T

R

A

I

L

W

A

Y

W

O

O

L

W

I

C

H

B

R

A

N

C

H

REALIGNED ROAD

EXTENT OF CONCRETE GROUND SLAB

SECANT PILE RETAINING WALL

Page 6: Scheme Proposals – Consultation Drawings · October 2014 . STWTN-ATK-GEN-XXXX-RP-Z-0018 1 Uncontrolled when printed Revision P01 Table of Contents Scheme Proposals – Consultation

SAFETY, HEALTH AND ENVIRONMENTAL

INFORMATION

In addition to the hazards/risks normally associated with the types of work

detailed on this drawing, note the following significant residual risks

(Reference shall also be made to the design hazard log).

Construction

Not Applicable

Maintenance / Cleaning

Not Applicable

Use

Not Applicable

Decommissioning / Demolition

Not Applicable

Date

Designed / Drawn

Revision

Scale

Drawing Number

Drawing Title

Project TitleDrawing Status

DO

N

OT

S

CA

LE

Date Date Date

Checked ApprovedClient

Original Size

Suitability

Millim

etre

s1

00

10

0

A1

Plo

tte

d: O

ct 0

8, 2

01

4 - 4

:1

4p

m b

y: B

IR

D7

41

3

Drawn / Des DateCheckedRev Approved

Description

Authorised

Copyright C Atkins Limited (2014)

Woodcote Grove

Ashley Road

Epsom

Surrey

KT18 5BW

www.atkinsglobal.com

Tel:

Fax:

+44 (0)1372 726140

+44 (0)1372 740055

SILVERTOWN TUNNEL

REFERENCE DESIGN

GREENWICH PENINSULA SOUTHERN TIE-IN

EXISTING AND PROPOSED

JUNCTION ARRANGEMENTS

STWTN-ATK-HGN-ASXX-DR-D-0011 P01

S0WORK IN PROGRESS

1:1250 DB

08/10/14

MJC

08/10/14

YD

08/10/14 ---

P01 DB MJC YD 08/10/14

Issue for Public Consultation

Crown copyright and database rights 2014 Ordance Survey 100035971c

KEY

RETAINING WALL

EXTENT OF CONCRETE GROUND SLAB

SECANT PILE RETAINING WALL

LANDSCAPING

EARTHWORK

HARDENED VERGE

ROADS RESTRAINT SYSTEM

BUS LANE

10m LIGHTING COLUMN

ANTI-RECIRCULATION WALL

Scale 1:1250

10m 0m 10m 30m 50m 70m 90m

Date

Designed / Drawn

Revision

Scale

Drawing Number

Drawing Title

Project TitleDrawing Status

DO

N

OT

S

CA

LE

Date Date Date

Checked ApprovedClient

Original Size

Suitability

Millim

etre

s1

00

10

0

A1

Plo

tte

d: O

ct 0

8, 2

01

4 - 4

:1

4p

m b

y: B

IR

D7

41

3

Drawn / Des DateCheckedRev Approved

Description

Authorised

Copyright C Atkins Limited (2014)

Woodcote Grove

Ashley Road

Epsom

Surrey

KT18 5BW

www.atkinsglobal.com

Tel:

Fax:

+44 (0)1372 726140

+44 (0)1372 740055

BRIDGE STRUCTURE

Crown copyright and database rights 2014 Ordance Survey 100035971c

Scale 1:1250

10m 0m 10m 30m 50m 70m 90m

E

D

M

U

N

D

H

A

L

L

E

Y

W

A

Y

M

IL

L

E

N

N

IU

M

W

A

Y

GAS HOLDER

W

E

S

T

P

A

R

K

S

I

D

E

T

U

N

N

E

L

A

V

E

N

U

E

A

1

0

2

B

L

A

C

K

W

A

L

L

T

U

N

N

E

L

A

P

P

R

O

A

C

H

B

O

O

R

D

S

T

R

E

E

T

BUS ONLY ROAD

TUNNEL SERVICES AND

VENTILATION BUILDINGS

PROPOSED BLACKWALL

SOUTHBOUND OVERBRIDGE

PROPOSED BOORD

STREET FOOT BRIDGE

(REPLACING EXISTING)

B

O

R

E

D

T

U

N

N

E

L

C

U

T

-

A

N

D

-

C

O

V

E

R

T

U

N

N

E

L

GAS HOLDER

PROPOSED SILVERTOWN

TUNNEL NORTH BOUND

PROPOSED SILVERTOWN

TUNNEL SOUTH BOUND

MILLENNIUM WAY

PROPOSED RE-CONNECTION

OF TUNNEL AVENUE

PROPOSED LAYOUTEXISTING LAYOUT GREENWICH PENINSULA - SOUTHERN TIE-IN

E

D

M

U

N

D

H

A

L

L

E

Y

W

A

Y

M

IL

L

E

N

N

IU

M

W

A

Y

T

U

N

N

E

L

A

V

E

N

U

E

A

1

0

2

B

L

A

C

K

W

A

L

L

T

U

N

N

E

L

A

P

P

R

O

A

C

H

B

O

O

R

D

S

T

R

E

E

T

W

E

S

T

P

A

R

K

S

I

D

E

BLACKWALL

GATEHOUSE

BLACKWALL

GATEHOUSE

VEHICLE CROSSOVER

NON MOTORISED USER ROUTE

Page 7: Scheme Proposals – Consultation Drawings · October 2014 . STWTN-ATK-GEN-XXXX-RP-Z-0018 1 Uncontrolled when printed Revision P01 Table of Contents Scheme Proposals – Consultation

600

75

600

1200

23

00

7300

1200

75

75

5100 (5030+

70 F

OR

S

AG

C

UR

VE

)

CLE

AR

AN

CE

250 A

DD

IT

IO

NA

L

CLE

AR

AN

CE

APPROXIMATELY 24250

VARIES ALONG THE TUNNEL ( LESS NEAR THE CUT-AND-COVER TUNNEL SECTIONS )

AA

23

00

2500

2500

45

50

30

00

65

0

Ø

1

2

3

5

0

Ø

1

1

4

5

0

Ø

1

0

9

0

0

3000

9400

10

0

Ø3750

Ø

10740

Ø4150

Ø

4

5

5

0

SAFETY, HEALTH AND ENVIRONMENTAL

INFORMATION

In addition to the hazards/risks normally associated with the types of work

detailed on this drawing, note the following significant residual risks

(Reference shall also be made to the design hazard log).

Construction

HAZ 012. Tunneling shallow under the River Thames bed,

(applicable to some cross passages only)

HAZ 015. Tunnelling in land possibly contaminated by former gasworks.

Contaminants could be coal tars and it's derivatives, spent oxide, foul lime,

benzene, sulphur, cyanide and the solid fuel resides such as coke, clinker

and ash.

HAZ 016. Hand mining in possibly contaminated land.

HAZ 017. Risk of encountering historical man made obstructions buried

deep below the ground level while tunnelling.

Maintenance / Cleaning

Not Applicable

Use

Not Applicable

Decommissioning / Demolition

Not Applicable

Date

Designed / Drawn

Revision

Scale

Drawing Number

Drawing Title

Project TitleDrawing Status

DO

N

OT

S

CA

LE

Date Date Date

Checked ApprovedClient

Original Size

Suitability

Millim

etre

s1

00

10

0

A1

Plo

tte

d: O

ct 0

8, 2

01

4 - 4

:2

0p

m b

y: B

IR

D7

41

3

Drawn / Des DateCheckedRev Approved

Description

Authorised

Copyright C Atkins Limited (2014)

Woodcote Grove

Ashley Road

Epsom

Surrey

KT18 5BW

www.atkinsglobal.com

Tel:

Fax:

+44 (0)1372 726140

+44 (0)1372 740055

SILVERTOWN TUNNEL

REFERENCE DESIGN

SILVERTOWN RIVER CROSSING

BORED TUNNEL CROSS SECTION

THROUGH A TYPICAL CROSS PASSAGE

STWTN-ATK-STU-TUXX-DR-C-0005 P01

S0WORK IN PROGRESS

1:50 AP

08/10/14

MK

08/10/14

MK

08/10/14

---

---

P01 AP MK MK 08/10/14

Issue for Public Consultation

NOTES

1. ALL DIMENSIONS ARE IN MILLIMETRES.

2. CLEARANCES AND TOLERANCES IN ACCORDANCE WITH ATKINS REPORT No. STWTN-ATK-STU-TUXX-RP-C-0002 '' TUNNEL SPACE PROOFING ''

3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE FOLLOWING DRAWINGS:

a. STWTN-ATK-STU-TUXX-DR-D-0001

b. STWTN-ATK-GEN-XXXX-DR-Z-0001

TYPICAL EMERGENCY / ESCAPE CROSS PASSAGE

( VIEW UP THE CHAINAGE )

SCALE 1;50

CROSS PASSAGE SECTION A-A

SCALE 1: 50

BORED TUNNEL TYPICAL CROSS

SECTION AT A CROSS PASSAGE

Page 8: Scheme Proposals – Consultation Drawings · October 2014 . STWTN-ATK-GEN-XXXX-RP-Z-0018 1 Uncontrolled when printed Revision P01 Table of Contents Scheme Proposals – Consultation

80

12

00

TB

C

78

01

12

00

TB

C

600

75

600

1200

75

75

1200

18

00

( 1

72

0+

80

)

23

00

31

45

5100 ( 5030+

70 F

OR

S

AG

C

LE

AR

AN

CE

)

CLE

AR

AN

CE

250 A

DD

IT

IO

NA

L

CLE

AR

AN

CE

500 1200

TBC

500500

4925

9850 500

4925

98501200

TBC

1200

TBC

1200

TBC

VARIES

7300

Date

Designed / Drawn

Revision

Scale

Drawing Number

Drawing Title

Project TitleDrawing Status

DO

N

OT

S

CA

LE

Date Date Date

Checked ApprovedClient

Original Size

Suitability

Millim

etre

s1

00

10

0

A1

Plo

tte

d: O

ct 0

8, 2

01

4 - 4

:2

4p

m b

y: B

IR

D7

41

3

Drawn / Des DateCheckedRev Approved

Description

Authorised

Copyright C Atkins Limited (2014)

Woodcote Grove

Ashley Road

Epsom

Surrey

KT18 5BW

www.atkinsglobal.com

Tel:

Fax:

+44 (0)1372 726140

+44 (0)1372 740055

SILVERTOWN TUNNEL

REFERENCE DESIGN

SILVERTOWN RIVER CROSSING

CUT-AND-COVER TUNNEL

CROSS SECTION

STWTN-ATK-STU-TUXX-DR-C-0011 P01

S0WORK IN PROGRESS

1:50 AP

08/10/14

MK

08/10/14

MK

08/10/14

---

---

P01 AP MK MK 08/10/14

Issue for Public Consultation

NOTES

1. ALL DIMENSIONS ARE IN MILLIMETRES.

2. CLEARANCES AND TOLERANCES IN ACCORDANCE WITH ATKINS REPORT No. STWTN-ATK-STU-TUXX-RP-C-0002 '' TUNNEL SPACE PROOFING ''

3. CUT-AND-COVER TUNNEL ENGINEERING COVERED IN ATKINS REPORT No. STWTN-ATK-STU-TUXX-RP-0008 "CUT-AND-COVER TUNNEL STRUCTURES REPORT".

4. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE FOLLOWING DRAWINGS:

a. STWTN-ATK-STU-TUXX-DR-C-0001

b. STWTN-ATK-STU-XXXX-DR-Z-0001

SAFETY, HEALTH AND ENVIRONMENTAL

INFORMATION

In addition to the hazards/risks normally associated with the types of work

detailed on this drawing, note the following significant residual risks

(Reference shall also be made to the design hazard log).

Construction

HAZ 011 – Tunnelling in possibly contaminated by former gasworks land.

Contaminants could be coal tars, it's derivatives, spent oxide, foul lime,

benzene, sulphur, cyanide and the solid fuel resides such as coke, clinker

and ash.

HAZ 013 – Tunnelling in an area previously occupied by the gas production

facilities i.e. Rotors, possibility of encountering left in situ deep buried

foundations

HAZ 014 – Tunnelling in possibly contaminated by benzene and tar ground

water

HAZ 015 – High risk of encountering unexploded ordnance during the civil

works

Maintenance / Cleaning

Not Applicable

Use

Not Applicable

Decommissioning / Demolition

Not Applicable

CUT-AND-COVER TUNNEL

CROSS SECTION