SCHEDULE POWER SHUTDOWN & POWER ENERGIZE MESSRS : PT. TSUCHIYA PROJECT NAME : TSUCHIYA NEW FACTORY PROJECT WORK : POWER SHUTDOWN AT TSUCHIYA PROJECT NO WORK DESCRIPTION OKTOBER - NOVEMBER - DESEMBER 2013 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 1 PREPARATION 2 WIRING CABLE 20kV FROM EXISTING TO NEW ELECTRICAL ROOM 3 INCOMING TRAFO, PANEL MVMDB & LVMDB 4 SETTING TRAFO, PANEL MVMDB & LVMDB 5 WIRING CABLE 20kV FROM TRAFO TO INCOMING PANEL MVMDB 6 INSTAL SUPPORT & INSTAL CABLE RACK UILITY AREA 7 WIRING CABLE FROM PANEL LVMDB TO PANEL DISTRIBUTION 8 CEK FROM ANDALAN (STANDAR LAYAK OPERATIONAL ATAU SLO) Get Certificate 9 POWER SHUT DOWN MVMDB EXISTING 10 POWER SHUT DOWN SUBTATION CIKARANG LISTRINDO 11 TERMINATION CABLE 20Kv (RAYCHEM) - NEW & EXISTING ELECTRICAL ROOM 12 FINISHING AND CLEANING AREA ELECTRICAL ROOM NEW & EXISTING 13 POWER ENERGIZE 14 15 16 17 18 19 20 21 PREPARED BY : INDONESIA ENGINEERING

Schedulle Shutdown

  • Upload
    edy

  • View
    220

  • Download
    0

Embed Size (px)

DESCRIPTION

Breakdown for Schedule Shutdown

Citation preview

Page 1: Schedulle Shutdown

SCHEDULE POWER SHUTDOWN & POWER ENERGIZE

MESSRS : PT. TSUCHIYAPROJECT NAME : TSUCHIYA NEW FACTORY PROJECTWORK : POWER SHUTDOWN AT TSUCHIYA PROJECT

NO WORK DESCRIPTION OKTOBER - NOVEMBER - DESEMBER 2013

28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 41 PREPARATION

2 WIRING CABLE 20kV FROM EXISTING TO NEW ELECTRICAL ROOM

3 INCOMING TRAFO, PANEL MVMDB & LVMDB

4 SETTING TRAFO, PANEL MVMDB & LVMDB

5 WIRING CABLE 20kV FROM TRAFO TO INCOMING PANEL MVMDB

6 INSTAL SUPPORT & INSTAL CABLE RACK UILITY AREA

7 WIRING CABLE FROM PANEL LVMDB TO PANEL DISTRIBUTION

8 CEK FROM ANDALAN (STANDAR LAYAK OPERATIONAL ATAU SLO) Get Certificate

9 POWER SHUT DOWN MVMDB EXISTING

10 POWER SHUT DOWN SUBTATION CIKARANG LISTRINDO

11 TERMINATION CABLE 20Kv (RAYCHEM) - NEW & EXISTING ELECTRICAL ROOM

12 FINISHING AND CLEANING AREA ELECTRICAL ROOM NEW & EXISTING

13 POWER ENERGIZE

14

15

16

17

18

19

20

21

PREPARED BY :

INDONESIA ENGINEERING

Page 2: Schedulle Shutdown

( TEUKU BACHTIAR )

Page 3: Schedulle Shutdown

SCHEDULE POWER SHUTDOWN & POWER ENERGIZE

OKTOBER - NOVEMBER - DESEMBER 2013 REMARKS5 6 7 8 9 10 11 12 13 14 15

Standby Power

APPROVED BY :

Page 4: Schedulle Shutdown

( JULIANA WAGYU )