Bensberg GmbHScheduling agreement quality

Enhancement components

Scheduling agreement qualityCopyright 2007 Bensberg Unternehmensberatung GmbH

01.12.2007

Page 2: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Placement

Scheduling agreement quality

SAP R/3SAP R/3

SD

available

MM

available beginningof 2009

Page 3: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Delivery schedules (DS)

� Customers transmit their requirement quantities as delivery schedules,

which are saved in delivery schedule histories in the SAP-system:

Customer DSby EDI(IDOC) Scheduling

R/3

History 1

History 2

History 3(IDOC)

Customer DS'manual'(VA32)

Schedulingagreement

Forecast DSJIT DS

(Planning DS)

History n

The histories of the delivery schedules are the basis of the analysis and

evaluation options introduced in the course of this presentation:

Page 4: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Requirements fluctuations

� The requirements for a deadline may change with each incoming

delivery schedule

Requirements

Long-term period Medium-term period Short-term period

DS at5.1.2008

DS at20.2.2008

DS at1.7.2008

DS at1.9.2008

SHAG 1

RequirementsSep. 2008

DS at15.8.2008

� The closer the requirements fluctuations are to the requirements

deadline, the higher are the Trouble-shooting costs

Time

Page 5: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Procedures of the Scheduling agreement quality

Comparison Quantity Evaluation

Scheduling agreement quality

Comparison DS to DS

Quantityanalysis

Evaluation VDA 5009

DS = Delivery ScheduleVDA = Association of the German automobile supplier industry

Page 6: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Comparison of old Delivery schedule with new Delivery schedule

Comparison Quantity Evaluation

Scheduling agreement quality

Comparison DS to DS

Quantityanalysis

Evaluation VDA 5009

DS = Delivery ScheduleVDA = Association of the German automobile supplier industry

Page 7: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

• Monitoring of the quantity deviations of a delivery schedule by regarding the respective predecessor-delivery schedule

– Does the customer stand to the agreements (e.g. no quantity deviations within the short-term period)?

– Definition of limit values

Comparison of old Delivery schedule with new Delivery schedule

• Example: For the first 7 days no requirements deviations are permitted, for the following days deviations from 5% obtain a warning indication and from 10% an error indication

• Definition of limit values in days, weeks and months

• Definition: global, according to customer, material, plant...

– Operative monitoring if necessary with objection

– Procedure also available as IDoc-component (DELINS)

Schedule lines DS old/new

7 days

0% 0%

7 days

5% 10% Example

Page 8: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Quantity deviations – Delivery schedule old to Delivery schedule new

• The 1st overview shows the results of the defined monitoring parameters:

Parameters

For this example it has been agreed that quantity deviations within 1 week obtain a warning indication (yellow) when reaching 10% and from 20% an error indication (red). Maximum monitoring period: the first 3 weeks.

The monitoring period starts with the 1st schedule line in delivery schedule, differences in cumulative quantities are considered.

1 W

10%

1 W 1 W

20%

Page 9: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

• The detail view shows the single deadlines of a selected sold-to party according to time unit (here week):

Quantity deviations – Delivery schedule old to Delivery schedule new

The colored-indicated quantities are within the monitored period. A yellow indication means that the deviation for the schedule line week is > 10%, in case of a red indication > 20%.

This analysis can also be started as ALV.

Result:

Deviationin quantity

Requirements week

Page 10: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Quantity deviations – Delivery schedule old to Delivery schedule new

• The detail view shows the single deadlines of a selected sold-to party according to time unit (here week):

Requirements week

Result:

Deviationin %

The colored-indicated percent values are within the monitored period. A yellow indication means that the deviation for the schedule line week is > 10%, in case of a red indication > 20%.

This analysis can also be started as ALV.

Page 11: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

• Further details in respect to the deviation:

Display of the compared delivery schedules

Quantity deviations – Delivery schedule old to Delivery schedule new

Page 12: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Quantity analysis

Comparison Quantity Evaluation

Scheduling agreement quality

Comparison DS to DS

Quantity analysis

Evaluation VDA 5009

DS = Delivery ScheduleVDA = Association of the German automobile supplier industry

Page 13: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

• Display of the requirements development and their fluctuations

– Which requirements were/are available at the defined points in time

– Analysis of day, week and month deadlines (with harmonization)

– Results:

Quantity analysis

• Absolute quantities

• Average quantity of all delivery schedules within a time unit (day, week, month)

• Difference in respect to the predecessor as quantity and in %

• Delivery quantity of the time unit

• JIT quantities of the time unit

• Evaluation key figure according to VDA 5009

• Value (standard price or net value of the scheduling agreement)

VDA = Association of the German automobile supplier industry

Page 14: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Quantity analysis

Analysis requirements for

1.6.2007

2.6.2007

3.6.2007

4.6.2007

5.6.2007

6.6.2007

Day

Week 26/2007

Week27/2007

Week Month

Valid on 1.3.2007

Valid on1.4.2007

Valid on1.5.2007

Valid on1.6.2007

per month

10800 11200 11000 10500

Requirements

30.6.2007

29.6.2007

28.6.2007

6.6.2007

27/2007

Week 28/2007

Week 29/2007

June2007

at maximum 50 days/weeks/months into the past

- If necessary day, week and month quantities are distributed/ cumulated andassigned to the respective time unit by considering the calendars

- It is possible to parallel analyze several requirements deadlines

- By a dynamic monitoring period either the current or an arbitrary situation of the past can be analyzed

- An offsetting of FDS against JDS is possible

Valid on Mo W25

Valid onMo W26

Valid onMo W27

Valid onMo W28

per week

Valid on6.6.2007

Valid on7.6.2007

Valid on8.6.2007

Valid on 9.6.2007

per day

Page 15: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

• Example: Analysis of the quantity development of all schedule lines for month 07.2008,6 months into the past starting on 31.07.2008 each time at the 1st of the month:

Quantity analysis – Example month

Selection:

Result with complete aggregation:

Page 16: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Same result:Result with aggregation to customer and material:

Quantity analysis – Example month

Columns for additional criterions can be activated (Layout)

Page 17: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

• Each result cell is interactive and branches to the display of the single schedule lines in the delivery schedule:

Quantity analysis – Example month

Page 18: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

• Comparison of 2 values with detail analysis:

Quantity analysis – Example month

Page 19: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Selection:

Quantity analysis – Displayable values

Page 20: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Quantity analysis – VDA 5009

Page 21: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

• It is possible to also analyze several deadlines at the same time, here 7 months:

Quantity analysis – Several requirements deadlines

Selektion:

Result with complete aggregation:

Besides the complete aggregation also other aggregation levels are possible, e.g. customer and material

Also here the display of all values including evaluation key-figures is possible

Page 22: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Quantity analysis – Several requirements deadlines as chart

Based on the result matrix presentable charts can easily be created by means of the ALV-technics.

The colored bars represent the schedule line quantities of the schedule line quantities of the respective month06.2007 – 10.2007 each for a different valuation date.

In the month 08.2007 the sold-to party evaluated here had vacation close-down.

Page 23: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Evaluation VDA 5009

Comparison Quantity Evaluation

Scheduling agreement quantity

ComparisonDS to DS

Quantity analysis

EvaluationVDA 5009

DS = Delivery ScheduleVDA = Association of the German automobile supplier industry

Page 24: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Evaluation VDA – Sequence of delivery schedules according to scheduling agreement

DS on 5.1.2007

DS on20.2.2007

DS on1.5.2007

DS on+1.9.2007

TimeSHAG 1

� The delivery schedule sequence for scheduling agreements is both customer and

material-specific:

DS on3.1.2007

DS on28.2.2007

DS on15.6.2007

DS on 20.8.2007

TimeSHAG 2

5.1.2007 20.2.2007 1.5.2007 on+1.9.2007

� The scheduling agreement quality is always measured according to scheduling agreement and

separately for each delivery schedule type

� Each scheduling agreement obtains its individual FQ and TS-key figure

� FQ = Forecast-Quality key figure

� TS = Tracking-Signal DS = Delivery ScheduleVDA = Association of the German automobile supplier industry

Page 25: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Evaluation VDA – Requirements period

TimeSHAG 1

� Definition: Period, for which requirements fluctuations are measured

Sep. 2007

Week 35 or

1.9.2007 or

DS on5.1.2007

DS on20.2.2007

DS on1.5.2007

DS on1.9.2007

Time

� The requirements period represents either 1 month, 1 week or 1 day

� The schedule lines within this period are 'harmonized' (distributed or cumulated)

� The analysis can be started parallel for exactly 1 period or for several periods

Page 26: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Evaluation VDA – Reference date

TimeSHAG 1

� Basis date, from which the deviations of the delivery schedule quantities of the

requirements period are measured into the past

Sep. 2007

DS on5.1.2007

DS on20.2.2007

DS on1.5.2007

DS on 1.9.2007

Time

� In respect to time the reference date can lie behind/at the beginning of the requirements period

= analysis instrument

� In respect to time the reference date can lie before the requirements period = control instrument

� The reference date applies to the delivery schedule valid at this moment

Reference date

Page 27: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Evaluation VDA – Prognosis period

TimeSHAG 1

� Definition: Period, in which the requirements fluctuations of the requirements period

are measured:

Sep. 2007

There were which fluctuations in the delivery schedules of the prognosis period 1.2.-1.9. for the requirements period September, 2007 based on the reference quantity of 1.9.?

DS on5.1.2007

DS on20.2.2007

DS on1.5.2007

DS on1.9.2007

Time

� In respect to time the prognosis period lies before the reference date

� The prognosis period is classified in short, medium and long-term for days, weeks, months

� All delivery schedules within the prognosis period are used for the VDA-evaluation (measure

points) by comparing them with the requirements valid at the reference date

Reference datePrognosis period

Page 28: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Evaluation VDA – Calculation example

� Example of an evaluation for the requirements period month 09.2007

Reference requirement

Page 29: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Evaluation VDA - Dynamic prognosis horizon

� Dynamic prognosis horizon

DayWeekMonth

Long-term Medium-term Short-term

DS on5.1.2007

DS on20.2.2007

DS on1.5.2007

DS on1.9.2007

TimeSHAG1

Sep. 2007

Reference datePrognosis period

Page 30: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Evaluation VDA - Dynamic prognosis horizon

� Dynamic prognosis horizon

Langfristhorizont/Monat Woche -9 bis -x Mittelfristhorizont/Woche

Woche -3 bis -8

5%

10%

15%

10%

8%

Kurzfristhorizont/Tag Woche 0 bis -2

0

-2

-8-x

Langfristhorizont/Monat Woche -9 bis -x Mittelfristhorizont/Woche

Woche -3 bis -8

5%

10%

15%

10%

8%

Kurzfristhorizont/Tag Woche 0 bis -2

0

-2

-8-x

Long-term horizonWeek -9 until -X

Medium-term horizon

Week -3 until -8

Short-term horizonWeek 0 until -2

� For each prognosis horizon the

Source: VDA-recommendation 5009

Referenzwert

10%

15%

10%

5%

10%

3%

8%

3%

Legende:gut

mittel

schlecht

Referenzwert

10%

15%

10%

5%

10%

3%

8%

3%

Legende:gut

mittel

schlecht

result is displayed separately

� The parameter settings for the

dynamic time horizons are

defined in tables

Page 31: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Evaluation VDA - Analysis

� Example of the result of an analysisRequirements Month 12.2007Reference date 1.12.2007Short-term 7 daysMedium-term 6 weeksLong-term 3 month

Page 32: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Evaluation VDA - Analysis

� Details for the horizons

Development short-term

Resultshort-term

Development medium-term

Resultmedium-term

Development long-term

Resultlong-term

Page 33: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Evaluation VDA - Analysis

� Details for the VDA-evaluation

Page 34: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Evaluation VDA - Analysis

� Details for the VDA-evaluation

Page 35: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Others

• Requirements and Cumulative quantities

• Harmonization of the schedule line deadlines

• Forecast delivery schedule / JIT-delivery schedule

Page 36: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Requirements and Cumulative quantities

� Upon the comparison of delivery schedules the difference in the cumulative

quantities received is considered

02.2008 1000

DS of 1.1.2008CQR 100.000

02.2008 1000

DS 2 of 1.2.2008CQR 100.500

0 + 500

Differenceswithout CQ with CQ

02.2008 1000

03.2008 1500

04.2008 1500

05.2008 1700

...2008 ....

02.2008 1000

03.2008 1700

04.2008 1300

05.2008 2000

...2008 ....

0 + 500

+ 200 + 700

- 200 +300

+ 300 + 800

.... ....

Used for the analyses

Page 37: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Harmonization of the schedule line deadlines)

� Requirements in delivery schedules are transmitted as schedule lines in month,

week and/or day deadlines:

W 05.2008

W 06.2006

W 07.2008

W ...2008

.....

.....

.....

.....

Week requirements

Day requirementsOriginal delivery schedule

T 01.02.2008

T 03.02.2008

W 06.2008

M 02.2008

200

200

1700

3800

W ...2008 .....T 01.02.2008

T 04.02.2008

T 05.02.2008

T ...02.2008

.....

.....

.....

.....

M 02.2008 .....

Month requirement

� Settings of the component� with distribution/cumulation of the deadlines in respect to the required requirements period

(standard)

� without distribution, on the selected deadline type is considered (D, W, M)

Page 38: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

Forecast delivery schedule/ JIT delivery schedule

� JIT delivery schedules influence the requirement quantities of the forecast

delivery schedules:

M 02.2008

M 03.2008

M 04.2008

2000

2200

3000

Forecast DS

T 01.02.2008

T 04.02.2008

T ...02.2008

110

120

....

JIT DSHorizon 15.2.2008

T 01.02.2008

T 04.02.2008

T ...02.2008

110

120

....

Comparison basis

FDS

M 04.2008

M 05.2008

3000

3800

� Analysis

� pure contemplation of the delivery schedules

Offsetting FDS / JDS

T ...02.2008

T 15.02.2008

....

100

T ...02.2008

T 15.02.2008

....

100

M 02.2008

M 03.2008

M 04.2008

M 05.2008

1000

2200

3000

3800

FDS

JDS afterHorizon

Page 39: scheduling agreement quality [Kompatibilit tsmodus]€¦ · by EDI (IDOC) Scheduling R/3 History 1 History 2 History 3 Customer DS 'manual' (VA32) agreement Forecast DS JIT DS (Planning

Bensberg GmbHScheduling agreement quality

We thank you very much you for your time and interest.

In case you still have questions and/or need further information

please contact us.

Contact

please contact us.

Posthof 2

D-53783 Eitorf

Germany

Bensberg Unternehmensberatung GmbH

Phone:

Fax:

0049 (0) 2243 83822

0049 (0) 2243 80502

www.bensberg.de

[email protected]