19
Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our mutual commitment to better serve customers, Lancaster Choice Energy (LCE) and Southern California Edison (SCE) have come together to provide a comparison of common rates, average monthly charges, and the power sources we provide. Below you will find a representative comparison of our rates, average monthly bills, and power generation portfolio content based on customer class. To find your specific electric rate, please scroll down to your rate plan to view the rate and bill comparisons. RATE CLASS SCE RATE SCHEDULE LCE RATE SCHEDULE RESIDENTIAL ▪ D-CARE D ▪ D-CARE-SDP D ▪ D-CARE-SDP-O D ▪ DE / D D ▪ DE-FERA D ▪ DE-FERA-SDP D ▪ DE-SDP D ▪ DE-SDP-O D ▪ D-FERA D ▪ D-FERA-SDP D ▪ D-FERA-SDP-O D ▪ DM D ▪ DMS -2 D ▪ DOMESTIC D ▪ D-S D ▪ D-S-CARE D ▪ D-SDP D ▪ D-SDP-O D ▪ TD-TEV-C-SDP D ▪ TD-TEV-SDP D ▪ TOU-D-A TOU-D-B ▪ TOU-D-A-CARE TOU-D-B ▪ TOU-D-B TOU-D-B ▪ TOU-D-B-CARE TOU-D-B ▪ TOU-DE-T D ▪ TOU-D-T D ▪ TOU-D-T-CARE D ▪ TOU-DT-C-SDP D ▪ TOU-D-TEV D ▪ TOU-D-TEV-C D ▪ TOU-D-T-SDP D ▪ TOU-EV-1 TOU-EV-1

SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

  • Upload
    lycong

  • View
    218

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1

SCE – LCE JOINT RATE COMPARISONS

As part of our mutual commitment to better serve customers, Lancaster Choice Energy (LCE) and Southern California Edison (SCE) have come together to provide a comparison of common rates, average monthly charges, and the power sources we provide. Below you will find a representative comparison of our rates, average monthly bills, and power generation portfolio content based on customer class. To find your specific electric rate, please scroll down to your rate plan to view the rate and bill comparisons.

RATE CLASS SCE RATE SCHEDULE LCE RATE SCHEDULE

RESIDENTIAL ▪ D-CARE D

▪ D-CARE-SDP D

▪ D-CARE-SDP-O D

▪ DE / D D

▪ DE-FERA D

▪ DE-FERA-SDP D

▪ DE-SDP D

▪ DE-SDP-O D

▪ D-FERA D

▪ D-FERA-SDP D

▪ D-FERA-SDP-O D

▪ DM D

▪ DMS -2 D

▪ DOMESTIC D

▪ D-S D

▪ D-S-CARE D

▪ D-SDP D

▪ D-SDP-O D

▪ TD-TEV-C-SDP D

▪ TD-TEV-SDP D

▪ TOU-D-A TOU-D-B

▪ TOU-D-A-CARE TOU-D-B

▪ TOU-D-B TOU-D-B

▪ TOU-D-B-CARE TOU-D-B

▪ TOU-DE-T D

▪ TOU-D-T D

▪ TOU-D-T-CARE D

▪ TOU-DT-C-SDP D

▪ TOU-D-TEV D

▪ TOU-D-TEV-C D

▪ TOU-D-T-SDP D

▪ TOU-EV-1 TOU-EV-1

Page 2: SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 2

RATE CLASS SCE RATE SCHEDULE LCE RATE SCHEDULE

COMMERCIAL AND INDUSTRIAL ▪ GS-1 TOU-GS-1-A

▪ GS-1-APSE TOU-GS-1-A

▪ TOU-EV-3 TOU-GS-1-A

▪ TOU-GS1A TOU-GS-1-A

▪ TOU-GS1A-AE TOU-GS-1-A

▪ TOU-GS1A-C TOU-GS-1-A

▪ TOU-GS1B TOU-GS-1-B

▪ TOU-GS1B-AE TOU-GS-1-B

▪ GS-2/GS-1 TOU-GS-2-A

▪ GS-2-AE/GS-1 TOU-GS-2-A

▪ GS-2-APSE TOU-GS-2-A

▪ TOU-GS2A TOU-GS-2-A

▪ TOU-GS2A-AE TOU-GS-2-A

▪ TOU-GS3A TOU-GS-2-A

▪ TOU-GS3A-AE TOU-GS-2-A

▪ TOU-GS2B TOU-GS-2-B

▪ TOU-GS2B-AE TOU-GS-2-B

▪ TOU-GS2B-C TOU-GS-2-B

▪ TOU-GS2B-S TOU-GS-2-B

▪ TOU-GS2R-AE TOU-GS-2-R

▪ TOU-GS2R TOU-GS-2-R

▪ TOU-GS3R TOU-GS-2-R

▪ TGS3-C-CPP TOU-GS-3-B

▪ TGS3-CPP TOU-GS-3-B

▪ TOU-GS3B TOU-GS-3-B

▪ TOU-GS3B-AE TOU-GS-3-B

▪ TOU-GS3B-S TOU-GS-3-B

▪ TOU-8-PRI-A TOU-8-PRI-A

▪ TOU-8-PRI-R TOU-8-PRI-A

▪ TOU-8-PRI-R-APSE TOU-8-PRI-A

▪ TOU-8-PRI-B TOU-8-PRI-B

▪ TOU-8-PRI-CPP TOU-8-PRI-B

▪ TOU-8-PRI-S TOU-8-PRI-B

▪ TOU-8-SEC-A TOU-8-SEC-A

▪ TOU-8-SEC-R-APSE TOU-8-SEC-A

▪ TOU-8-SEC-R TOU-8-SEC-A

▪ TOU-8-SEC-B TOU-8-SEC-B

▪ TOU-8-SEC-B-CPP TOU-8-SEC-B

▪ TOU-8-SUB-B TOU-8-SUB-B

▪ TOU-8-SUB-S TOU-8-SUB-B

RATE CLASS SCE RATE SCHEDULE LCE RATE SCHEDULE

AGRICULTURE ▪ TOU-PA2A TOU-PA-2-A

▪ PA-1 TOU-PA-2-B

▪ PA-2 TOU-PA-2-B

▪ TOU-PA2B TOU-PA-2-B

▪ TPA2-SOP1 TOU-PA-2-B

▪ TPA2-SOP2 TOU-PA-2-SOP-2

▪ TOU-PA2-SOP2 TOU-PA-2-SOP-2

▪ TOU-PA3B TOU-PA-3-B

Page 3: SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 3

RATE CLASS SCE RATE SCHEDULE LCE RATE SCHEDULE

STREET AND OUTDOOR LIGHTING ▪ AL-2 SL

▪ LS-A-ALLNITE SL

▪ LS-2 SL

▪ LS-2-B SL

▪ LS-3 SL

▪ OL-1 SL

▪ TC-1 TC-1

Definitions

Generation Rate reflects the cost of producing or purchasing electricity to power your home or business. This rate will vary depending on your service provider and rate plan.

SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home or business. This rate depends on usage.

Surcharges represent the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

Where Do I Find My Electric Rate Schedule? Need some help finding your electric rate? Go to the “Details of your new charges” section of your energy statement – You’ll find your electric rate in the upper left.

Page 4: SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 4

RESIDENTIAL

DOMESTIC / D

2017 Schedule D SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.07477 $0.06485 $0.06485

SCE Delivery Rate ($/kWh) $0.12757 $0.12208 $0.12208

Surcharges ($/kWh) N/A $0.01503 $0.01503

Total Costs ($/kWh) $0.20234 $0.20196 $0.20196

Smart Choice Premium N/A N/A $10.00

Average Monthly Bill ($) $136.78 $136.52 $146.52

Monthly Usage: 676 kWh

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical Schedule D residential customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 676 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable SCE Schedule D (non-CARE) service accounts within the jurisdiction of the City of Lancaster and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

RESIDENTIAL

DOMESTIC / D-CARE

2017 Schedule D-CARE SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.07477 $0.06634 $0.06634

SCE Delivery Rate ($/kWh) $0.05684 $0.05684 $0.05684

Surcharges ($/kWh) N/A $0.00034 $0.00034

Total Costs ($/kWh) $0.13161 $0.12352 $0.12352

Smart Choice Premium N/A N/A $5.00

Average Monthly Bill ($) $76.99 $72.26 $77.26

Monthly Usage: 585 kWh

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical Schedule D residential CARE customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 585 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable SCE D-CARE service accounts within the jurisdiction of the City of Lancaster and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

Page 5: SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 5

RESIDENTIAL

TOU-D-A/TOU-D-B

2017 Schedule TOU-D-B SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.05635 $0.05790 $0.05790

SCE Delivery Rate ($/kWh) $0.13218 $0.12669 $0.12669

Surcharges ($/kWh) N/A $0.01486 $0.01486

Total Costs ($/kWh) $0.18853 $0.19945 $0.19945

Smart Choice Premium N/A N/A $10.00

Average Monthly Bill ($) $118.02 $124.86 $134.86

Monthly Usage: 626 kWh

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical Schedule TOU-D-B residential customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 626 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable SCE Schedule TOU-D-A (non-CARE) service accounts within the SCE service territory and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

RESIDENTIAL

TOU-D-A-CARE/TOU-D-B

2017 Schedule TOU-D-B SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.04726 $0.05932 $0.05932

SCE Delivery Rate ($/kWh) $0.07321 $0.07321 $0.07321

Surcharges ($/kWh) N/A $0.00009 $0.00009

Total Costs ($/kWh) $0.12047 $0.13262 $0.13262

Smart Choice Premium N/A N/A $5.00

Average Monthly Bill ($) $64.81 $71.35 $76.35

Monthly Usage: 538 kWh

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical Schedule TOU-D-B residential customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 538 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable SCE Schedule TOU-D-A-CARE service accounts within the SCE service territory and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

Page 6: SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 6

RESIDENTIAL

TOU-D-B/TOU-D-B

2017 Schedule TOU-D-B SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.06843 $0.05955 $0.05955

SCE Delivery Rate ($/kWh) $0.11447 $0.10898 $0.10898

Surcharges ($/kWh) N/A $0.01497 $0.01497

Total Costs ($/kWh) $0.18290 $0.18350 $0.18350

Smart Choice Premium N/A N/A $10.00

Average Monthly Bill ($) $247.46 $248.28 $258.28

Monthly Usage: 1,353 kWh

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical Schedule TOU-D-B residential customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 1,353 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable SCE Schedule TOU-D-B (non-CARE) service accounts within the SCE service territory and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

RESIDENTIAL

TOU-D-B-CARE/TOU-D-B

2017 Schedule TOU-D-B SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.06983 $0.06047 $0.06047

SCE Delivery Rate ($/kWh) $0.05672 $0.05672 $0.05672

Surcharges ($/kWh) N/A $0.00030 $0.00030

Total Costs ($/kWh) $0.12655 $0.11749 $0.11749

Smart Choice Premium N/A N/A $5.00

Average Monthly Bill ($) $149.20 $138.52 $143.52

Monthly Usage: 1,179 kWh

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical Schedule TOU-D-B residential customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 1,179 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable SCE Schedule TOU-D-B-CARE service accounts within the SCE service territory and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

Page 7: SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 7

RESIDENTIAL

TOU-D-T/D

2017 Schedule D SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.07353 $0.06634 $0.06634

SCE Delivery Rate ($/kWh) $0.14717 $0.14168 $0.14168

Surcharges ($/kWh) N/A $0.01502 $0.01502

Total Costs ($/kWh) $0.22070 $0.22304 $0.22304

Smart Choice Premium N/A N/A $10.00

Average Monthly Bill ($) $262.85 $265.64 $275.64

Monthly Usage: 1,191 kWh

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical Schedule D residential customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 1,191 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable SCE Schedule TOU-D-T(non-CARE) service accounts within the SCE service territory and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

RESIDENTIAL

TOU-D-T-CARE/D

2017 Schedule D SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.07524 $0.06634 $0.06634

SCE Delivery Rate ($/kWh) $0.07640 $0.07640 $0.07640

Surcharges ($/kWh) N/A $0.00034 $0.00034

Total Costs ($/kWh) $0.15164 $0.14308 $0.14308

Smart Choice Premium N/A N/A $5.00

Average Monthly Bill ($) $162.10 $152.95 $157.95

Monthly Usage: 1,069 kWh

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical Schedule D residential customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 1,069 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable SCE Schedule TOU-D-T-CARE service accounts within the SCE service territory and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

Page 8: SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 8

RESIDENTIAL

TOU-EV-1/TOU-EV-1

2017 Schedule TOU-EV-1 SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.05080 $0.04831 $0.04831

SCE Delivery Rate ($/kWh) $0.10786 $0.10237 $0.10237

Surcharges ($/kWh) N/A $0.01481 $0.01481

Total Costs ($/kWh) $0.15866 $0.16549 $0.16549

Smart Choice Premium N/A N/A $10.00

Average Monthly Bill ($) $52.68 $54.94 $64.94

Monthly Usage: 332 kWh

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical Schedule TOU-EV-1 residential customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 332 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable SCE Schedule TOU-EV-1 (non-CARE) service accounts within the SCE service territory and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

COMMERCIAL & INDUSTRIAL

GS-1 / GS-1

2017 Schedule GS-1 SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.07743 $0.06632 $0.08132

SCE Delivery Rate ($/kWh) $0.10597 $0.10048 $0.10048

Surcharges ($/kWh) N/A $0.01344 $0.01344

Total Costs ($/kWh) $0.18340 $0.18024 $0.19524

Average Monthly Bill ($) $155.89 $153.20 $165.95

Monthly Usage: 850 kWh

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical small commercial customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 850 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable GS-1 service accounts within the jurisdiction of the City of Lancaster and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

Page 9: SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 9

COMMERCIAL & INDUSTRIAL

TOU-GS1A/TOU-GS-1-A

2017 Schedule TOU-GS-1-A SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.07806 $0.06648 $0.08148

SCE Delivery Rate ($/kWh) $0.10597 $0.10048 $0.10048

Surcharges ($/kWh) N/A $0.01345 $0.01345

Total Costs ($/kWh) $0.18403 $0.18041 $0.19541

Average Monthly Bill ($) $156.43 $153.35 $166.10

Monthly Usage: 850 kWh

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical small commercial customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 850 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable SCE TOU-GS-1-A and GS-1 service accounts within the jurisdiction of the City of Lancaster and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

COMMERCIAL & INDUSTRIAL

TOU-GS1B/TOU-GS-1-B

2017 Schedule TOU-GS-1-B SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.06710 $0.05535 $0.07035

SCE Delivery Rate ($/kWh) $0.06578 $0.06029 $0.06029

Surcharges ($/kWh) N/A $0.01335 $0.01335

Total Costs ($/kWh) $0.13288 $0.12899 $0.14399

Average Monthly Bill ($) $312.14 $303.00 $338.23

Monthly Usage: 2,349 kWh Monthly Demand: 6 kW

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical small commercial customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 2,349 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable SCE TOU-GS-1-B service accounts within the jurisdiction of the City of Lancaster and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

Page 10: SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 10

COMMERCIAL & INDUSTRIAL

TOU-GS2A / TOU-GS-2-A

2017 Schedule TOU-GS-2-A SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.07703 $0.06270 $0.07770

SCE Delivery Rate ($/kWh) $0.15438 $0.14889 $0.14889

Surcharges ($/kWh) N/A $0.01292 $0.01292

Total Costs ($/kWh) $0.23141 $0.22451 $0.23951

Average Monthly Bill ($) $1,294.74 $1,256.13 $1,340.06

Monthly Usage: 5,595 kWh Monthly Demand: 31 kW

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical large commercial customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 5,595 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable TOU-GS-2-A service accounts within the jurisdiction of the City of Lancaster and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

COMMERCIAL & INDUSTRIAL

TOU-GS2B / TOU-GS-2-B

2017 Schedule TOU-GS-2-B SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.06971 $0.05749 $0.07249

SCE Delivery Rate ($/kWh) $0.09327 $0.08778 $0.08778

Surcharges ($/kWh) N/A $0.01285 $0.01285

Total Costs ($/kWh) $0.16298 $0.15812 $0.17312

Average Monthly Bill ($) $2,158.34 $2,093.98 $2,292.63

Monthly Usage: 13,243 kWh Monthly Demand: 41 kW

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical large commercial customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 13,243 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable TOU-GS-2-B service accounts within the jurisdiction of the City of Lancaster and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

Page 11: SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 11

COMMERCIAL & INDUSTRIAL

TOU-GS2R / TOU-GS-2-R

2017 Schedule TOU-GS-2-R SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.03984 $0.03311 $0.04811

SCE Delivery Rate ($/kWh) $0.35198 $0.34649 $0.34649

Surcharges ($/kWh) N/A $0.01258 $0.01258

Total Costs ($/kWh) $0.39182 $0.39218 $0.40718

Average Monthly Bill ($) $1,418.00 $1,419.30 $1,473.58

Monthly Usage: 3,619 kWh Monthly Demand: 77 kW

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical large commercial customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 3,619 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable TOU-GS-2-R service accounts within the jurisdiction of the City of Lancaster and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

COMMERCIAL & INDUSTRIAL

TOU-GS3B / TOU-GS-3-B

2017 Schedule TOU-GS-3-B SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.06313 $0.05154 $0.06654

SCE Delivery Rate ($/kWh) $0.07255 $0.06706 $0.06706

Surcharges ($/kWh) N/A $0.01204 $0.01204

Total Costs ($/kWh) $0.13568 $0.13064 $0.14564

Average Monthly Bill ($) $15,247.85 $14,681.45 $16,367.17

Monthly Usage: 112,381 kWh Monthly Demand: 257 kW

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical large commercial customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 112,381 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable TOU-GS-3-B service accounts within the jurisdiction of the City of Lancaster and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

Page 12: SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 12

COMMERCIAL & INDUSTRIAL

TOU-GS3R / TOU-GS-2-R

2017 Schedule TOU-GS-2-R SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.05342 $0.04626 $0.06126

SCE Delivery Rate ($/kWh) $0.12543 $0.11994 $0.11994

Surcharges ($/kWh) N/A $0.01196 $0.01196

Total Costs ($/kWh) $0.17885 $0.17816 $0.19316

Average Monthly Bill ($) $7,203.54 $7,175.75 $7,779.91

Monthly Usage: 40,277 kWh Monthly Demand: 238 kW

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical large commercial customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 40,277 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable TOU-GS-3-R service accounts within the SCE service territory and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

COMMERCIAL & INDUSTRIAL

TOU-8-PRI-B / TOU-8-PRI-B

2017 Schedule TOU-8-PRI-B SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.05782 $0.05220 $0.06720

SCE Delivery Rate ($/kWh) $0.06427 $0.05878 $0.05878

Surcharges ($/kWh) N/A $0.01053 $0.01053

Total Costs ($/kWh) $0.12209 $0.12151 $0.13651

Average Monthly Bill ($) $91,034.82 $90,602.35 $101,786.91

Monthly Usage: 745,637 kWh Monthly Demand: 1,581 kW

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical large commercial customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 745,637 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable TOU-8-PRI-B service accounts within the SCE service territory and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

Page 13: SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 13

COMMERCIAL & INDUSTRIAL

TOU-8-PRI-R/ TOU-8-PRI-R

2017 Schedule TOU-8-PRI-R SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.05128 $0.04554 $0.06054

SCE Delivery Rate ($/kWh) $0.09175 $0.08626 $0.08626

Surcharges ($/kWh) N/A $0.01047 $0.01047

Total Costs ($/kWh) $0.14303 $0.14227 $0.15727

Average Monthly Bill ($) $26,543.79 $26,402.75 $29,186.48

Monthly Usage: 185,582 kWh Monthly Demand: 711 kW

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical large commercial customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 185,582 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable TOU-8-PRI-R service accounts within the SCE service territory and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

COMMERCIAL & INDUSTRIAL

TOU-8-SEC-B / TOU-8-SEC-B

2017 Schedule TOU-8-SEC-B SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.06127 $0.05503 $0.07003

SCE Delivery Rate ($/kWh) $0.07166 $0.06617 $0.06617

Surcharges ($/kWh) N/A $0.01126 $0.01126

Total Costs ($/kWh) $0.13293 $0.13246 $0.14746

Average Monthly Bill ($) $41,214.02 $41,068.30 $45,718.94

Monthly Usage: 310,043 kWh Monthly Demand: 722 kW

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical large commercial customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 310,043 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable TOU-8-SEC-B service accounts within the SCE service territory and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

Page 14: SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 14

COMMERCIAL & INDUSTRIAL

TOU-8-SEC-R/ TOU-8-SEC-A

2017 Schedule TOU-8-SEC-A SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.05595 $0.05015 $0.06515

SCE Delivery Rate ($/kWh) $0.10683 $0.10134 $0.10134

Surcharges ($/kWh) N/A $0.01121 $0.01121

Total Costs ($/kWh) $0.16278 $0.16270 $0.17770

Average Monthly Bill ($) $23,526.92 $23,515.36 $25,683.34

Monthly Usage: 144,532 kWh Monthly Demand: 617 kW

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical large commercial customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 144,532 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable TOU-8-SEC-R service accounts within the SCE service territory and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

COMMERCIAL & INDUSTRIAL

TOU-8-SUB-B / TOU-8-SUB-B

2017 Schedule TOU-8-SUB-B SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.05407 $0.04506 $0.06006

SCE Delivery Rate ($/kWh) $0.03708 $0.03159 $0.03159

Surcharges ($/kWh) N/A $0.00985 $0.00985

Total Costs ($/kWh) $0.09115 $0.08650 $0.10150

Average Monthly Bill ($) $352,855.41 $334,854.56 $392,921.83

Monthly Usage: 3,871,151 kWh Monthly Demand: 7,142 kW

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical large commercial customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 3,871,151 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable TOU-8-SUB-B service accounts within the SCE service territory and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

Page 15: SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 15

AGRICULTURE

TOU-PA2A / TOU-PA-2-A

2017 Schedule TOU-PA-2-A SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.06305 $0.05781 $0.07281

SCE Delivery Rate ($/kWh) $0.10187 $0.09638 $0.09638

Surcharges ($/kWh) N/A $0.01215 $0.01215

Total Costs ($/kWh) $0.16492 $0.16634 $0.18134

Average Monthly Bill ($) $1,204.58 $1,214.95 $1,324.51

Monthly Usage: 7,304 kWh Monthly Demand: 47 kW

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical agricultural customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 7,304 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable TOU-PA-2-A service accounts within the jurisdiction of the City of Lancaster and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

AGRICULTURE

TOU-PA2B / TOU-PA-2-B

2017 Schedule TOU-PA-2-B SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.06837 $0.06222 $0.07722

SCE Delivery Rate ($/kWh) $0.10187 $0.09638 $0.09638

Surcharges ($/kWh) N/A $0.01220 $0.01220

Total Costs ($/kWh) $0.17024 $0.17080 $0.18580

Average Monthly Bill ($) $1,243.43 $1,247.52 $1,357.08

Monthly Usage: 7,304 kWh Monthly Demand: 47 kW

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical agricultural customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 7,304 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable TOU-PA-2-B service accounts within the jurisdiction of the City of Lancaster and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

Page 16: SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 16

AGRICULTURE

TOU-PA3B / TOU-PA-3-B

2017 Schedule TOU-PA-3-B SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.05204 $0.04448 $0.05948

SCE Delivery Rate ($/kWh) $0.06159 $0.05610 $0.05610

Surcharges ($/kWh) N/A $0.01051 $0.01051

Total Costs ($/kWh) $0.11363 $0.11109 $0.12609

Average Monthly Bill ($) $9,873.65 $9,652.94 $10,956.34

Monthly Usage: 86,893 kWh Monthly Demand: 257 kW

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical agricultural customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 86,893 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable TOU-PA-3-B service accounts within the SCE service territory and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

AGRICULTURE

TOU-PA2-SOP2 / TOU-PA-2-SOP-2

2017 Schedule TOU-PA-2-SOP-2 SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.04990 $0.04372 $0.05872

SCE Delivery Rate ($/kWh) $0.08624 $0.08075 $0.08075

Surcharges ($/kWh) N/A $0.01203 $0.01203

Total Costs ($/kWh) $0.13614 $0.13650 $0.15150

Average Monthly Bill ($) $1,812.84 $1,817.63 $2,017.37

Monthly Usage: 13,316 kWh Monthly Demand: 70 kW

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical agricultural customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 13,316 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable TOU-PA2-SOP2 service accounts within the SCE service territory and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

Page 17: SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 17

STREET AND OUTDOOR LIGHTING

AL-2 / SL

2017 Schedule SL SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.04171 $0.04837 $0.06337

SCE Delivery Rate ($/kWh) $0.03542 $0.02993 $0.02993

Surcharges ($/kWh) N/A $0.00588 $0.00588

Total Costs ($/kWh) $0.07713 $0.08418 $0.09918

Average Monthly Bill ($) $209.72 $228.89 $269.67

Monthly Usage: 2,719 kWh

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical street and outdoor lighting customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 2,719 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable AL-2 service accounts within the jurisdiction of the City of Lancaster and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

STREET AND OUTDOOR LIGHTING

LS-1 / SL

2017 Schedule SL SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.03972 $0.04837 $0.06337

SCE Delivery Rate ($/kWh) $0.03917 $0.03368 $0.03368

Surcharges ($/kWh) N/A $0.00586 $0.00586

Total Costs ($/kWh) $0.07889 $0.08791 $0.10291

Average Monthly Bill ($) $13.73 $15.30 $17.91

Monthly Usage: 174 kWh

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical small commercial customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 174 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable LS-1 service accounts within the jurisdiction of the City of Lancaster and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

Page 18: SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 18

STREET AND OUTDOOR LIGHTING

LS-2 / SL

2017 Schedule SL SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.03972 $0.04837 $0.06337

SCE Delivery Rate ($/kWh) $0.03917 $0.03368 $0.03368

Surcharges ($/kWh) N/A $0.00586 $0.00586

Total Costs ($/kWh) $0.07889 $0.08791 $0.10291

Average Monthly Bill ($) $48.36 $53.89 $63.08

Monthly Usage: 613 kWh

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical street and outdoor lighting customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 613 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable LS-2 service accounts within the jurisdiction of the City of Lancaster and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

STREET AND OUTDOOR LIGHTING

LS-3 / SL

2017 Schedule SL SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.03972 $0.04837 $0.06337

SCE Delivery Rate ($/kWh) $0.04426 $0.03877 $0.03877

Surcharges ($/kWh) N/A $0.00586 $0.00586

Total Costs ($/kWh) $0.08398 $0.09300 $0.10800

Average Monthly Bill ($) $64.75 $71.70 $83.27

Monthly Usage: 771 kWh

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical street and outdoor lighting customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 771 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable LS-3 service accounts within the jurisdiction of the City of Lancaster and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

Page 19: SCE LCE JOINT RATE COMPARISONS - Lancaster … · Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 1 SCE – LCE JOINT RATE COMPARISONS As part of our

Lancaster Choice Energy SCE-LCE Joint Rate Comparison (January 1, 2017) Page 19

STREET AND OUTDOOR LIGHTING

OL-1 / SL

2017 Schedule SL SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.03972 $0.04837 $0.06337

SCE Delivery Rate ($/kWh) $0.03917 $0.03368 $0.03368

Surcharges ($/kWh) N/A $0.00586 $0.00586

Total Costs ($/kWh) $0.07889 $0.08791 $0.10291

Average Monthly Bill ($) $8.28 $9.23 $10.81

Monthly Usage: 105 kWh

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical street and outdoor lighting customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 105 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable OL-1 service accounts within the jurisdiction of the City of Lancaster and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.

STREET AND OUTDOOR LIGHTING

TC-1 / TC-1

2017 Schedule TC-1 SCE LCE Clear Choice (35% Renewable)

LCE Smart Choice (100% Renewable)

Generation Rate ($/kWh) $0.05715 $0.06587 $0.08087

SCE Delivery Rate ($/kWh) $0.15682 $0.15133 $0.15133

Surcharges ($/kWh) N/A $0.00999 $0.00999

Total Costs ($/kWh) $0.21397 $0.22719 $0.24219

Average Monthly Bill ($) $39.80 $42.26 $45.05

Monthly Usage: 186 kWh

Rates are current as of January 1, 2017

*This comparison illustrates the estimated electricity costs for a typical street and outdoor lighting customer within the jurisdiction of the City of Lancaster with an average monthly consumption of 186 kilowatt-hours (kWh). This comparison is based on billed usage from December 1, 2015 to November 30, 2016 for all applicable TC-1 service accounts within the jurisdiction of the City of Lancaster and LCE's published rates as of February 1, 2016. Generation Rate reflects the cost of producing or purchasing electricity to power your home. This rate will vary depending on your service provider and rate plan. SCE Delivery Rate is a charge assessed by SCE to deliver electricity to your home. This rate depends on usage. Surcharges represents the Cost Responsibility Surcharge (CRS) and Franchise Fee (FF) that are applicable to Community Choice Aggregation (CCA) customers. The CRS recovers costs of power purchase commitments that become stranded as a result of CCA initiating service. The FF recovers taxes owed to a city in exchange for allowing SCE to utilize electrical distribution lines throughout the property of the city. SCE acts as the collection agency for the FF surcharge which is levied by cities and counties for all customers.