108
S.No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

SCDL 2009 Assignments - POM

  • Upload
    heshnar

  • View
    418

  • Download
    34

Embed Size (px)

DESCRIPTION

This is a collection of new format POM assignments. Please add your assignments to this and help others.

Citation preview

Page 1: SCDL 2009 Assignments - POM

S.No1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

Page 2: SCDL 2009 Assignments - POM

22

23

24

25

26

Page 3: SCDL 2009 Assignments - POM

sFW Taylor devised a system for classifying motions into basic divisions called Therbligs

Comprehensive business strategy consists of corporate objectives

Inspection should be avoided prior to long run of a manufacturing stage as it becomes duplication of work and cost

regular lubrication with carefully selected lubricants is an essential factor in the maintenance of high grade machine tools working under continuous load

Three times estimates are transformed into expected time before using it into a network

Production activity control (PAC) is not related with shop floor control (sfc)

Quality cannot be incorporated into a product by inspection but it can be incorporated only while manufacturing

Cost of proactive maintenance and cost of quality planning are examples of appraisal cost

Japanese people call inventory as necessary evil

The concept of 'Annualised Hours' was used exclusively in Japan

Normal time can not be equated to the standard time

It would not affect the project completion time if non critical activities take longer time than planned

In JIT, it is not possible for each and every item help as inventory

variations in time during study can be reduced to some extent but can not be eliminated totally

Scheduling should be done on a daily basis of the company makes promises in days

aggregate plans are tactical plans

In case of forward computation, the earliest event time of the first event is zero

Maintenance function must be decentralised apart from the size of the manufacturing organisation for its better functioning

The component produced on completely automatic machines may be subjected to sampling inspection while parts produced on semi automatic and completely manually operated machines require cent percent inspection

In case of backward pass computation, the latest event time of the burst event equals the smallest of the difference between the latest event time of the head event less duration of the activity converging on the head event

The component produced on completely automatic machines may be subjected to sampling inspection while parts produced on semi-automatic and completely manually operated machines require cent percent inspection

Page 4: SCDL 2009 Assignments - POM

Objective of work study is to improve productivity

root causes of many failures in meeting planned production can be attributed to poor medium / long range planning

The problems of congestion, bottlenecks and backtracking can not be visualised by using templates and models

The main purpose of kanban systems is to streamline manufacturing and procurement processes rather than relying on computer simulation to suggest when to order

Page 5: SCDL 2009 Assignments - POM

Answer0

1

0

1

1

0

0

0

1

0

1

1

1

1

1

1

1

1

1

1

0

Page 6: SCDL 2009 Assignments - POM

1

1

0

1

Page 7: SCDL 2009 Assignments - POM

S.No1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

Page 8: SCDL 2009 Assignments - POM

19

20

21

22

23

24

25

26

27

28

29

30

31

Page 9: SCDL 2009 Assignments - POM

Flow process chart (Materials) is also called as ______

The task of allocation of jobs to machines is carried out by the _____ in consultation with the shop foreman

The _____ is the probability that a good lot will be rejected by the sampling plan

_______ are used to create histograms such as shown on Pareto chart

American society of mechanical engineers and British standard institute have advocated _____ symbols for graphical method of recording in method study

a ______ is another typical chart which is used to record frequency of movements between work centers

_______ logic is used to support the order promising process

_______ is a series of time intervals that specifies what types of order changes are allowed

IN a hospital, inputs are ____ and outputs are cured patients

A _____ layout is one that reduces the material handling activities to minimum

_____ uses estimate arrival rates and serive rates to calculate an optimum staffing plan

Delay is indicated by _______ during recording for method study

_______ is computed by subtracting the sum of set up and processing times from the time remaining until the job's due date

The _____ is the maximum percentage defective that are for the purpose of sampling inspection can be considered satisfactory as a process average

REL chart exihibits relationship between ____ of departments in terms of degree of closeness desired

The term that refers to a complex web of thoughts, ideas, insights, experiences, goals, expertise, memories, perceptions and expectations that provides general guidance for specific actions in pursuit of particular ends is _____

____ is the card prepared by the dispatching section of PPC from the route laid down in the process sheet and is handed over to the operator as his authority to carry out the task specified therein

A ______ is the systematic recording and critical examination of existing and proposed ways of doing work, as a means of developing and applying easier and more effective methods and reducing costs

Page 10: SCDL 2009 Assignments - POM

Material flow in process layout is

duration of each activity is referred to as _____

______ is a statistical methodology used for determining the cause and effect relationship between process variables (xs) and output variable (Y)

production control work is ______ in case of floor inspection as compared with the centralised inspection

______ shows the hypothized relationship between potential causes and the problems under study

The _____ is the probability that a bad lot will be accepted by the sampling plan.

The _______ technique builds the network from activities

_______ is normally set to cover a minimum of cumulative lead time plus time for lot sizing low-level components and for capacity changes of primary work

An operation is indicated by _____ during recording for method study

A _____ phase is the follow up phase after the implementation which serves as a monitoring and control mechanism during method study

______ of production management is viwed as the efficiency with which inputs are converted into output

An approach to scheduling that starts from the present time and schedules each job to start at the earliest possible moment, is known as _____

Page 11: SCDL 2009 Assignments - POM

AnswerOperation process chart

scheduler

producer's risk

DMAIC

five

travel chart

Make to Order

Time fence

decision making

Patients

good

Queuing theory

job card

Letter Dee

slack

acceptable quality level

method study

pairs

Page 12: SCDL 2009 Assignments - POM

discontinous

project duration

Design of experiments (DOE)

easier

cause and effect diagram

consumer's risk

Critical path method

planning horizion

Circle

critical examination

effectiveness

forward scheduling

Page 13: SCDL 2009 Assignments - POM

S.No1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

Page 14: SCDL 2009 Assignments - POM

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

Page 15: SCDL 2009 Assignments - POM

38

39

Page 16: SCDL 2009 Assignments - POM

QuestionsJIT needs a simple control system which is provided by

What do you understand by analysis of motions employed by workmen to perform a task

Which kind of preventative inspection detects some defects in moving parts, internal cracks and others when machine is under preplanned shutdown

Detachable tickets is the useful method of production feedback in case of

What do you understand by the timeframe for the maintenance needs of the equipment

What does tall of an arrow represent

The rule 'earliest due date (EDO) states

A way of scheduling the ordering or production of parts or raw materials so that they will be available when needed to meet the master schedule is known as

The process of changing inputs to outputs thereby adding some value to entity can be defined as

Previous on-hand inventory, minus the larger of next periods forecast to actual orders is termed as

Providing flexibility in plant layout means

Six sigma is a business strategy or approach for systematic improvement of business processes to achieve

The middle compartment of control board contains the copy / shop order of the item

A managerial statement of period by period (time phased) production rates, work force levels and inventory investment, given customer requirements and capacity limitations is referred to as

The diagram that focuses on efforts or problems that have the greatest potential for improvement by showing relative frequency and / or size in a descending bar graph is known as

The element governing operation of business and its contacts and relationships with society at large, customers, suppliers, employees, local community and other stakeholders is termed as

traditional manufacturing stresses "getting hands dirty" while JIT manufacturing emphasises "cleanliness and systematic work place improvement" for which Japanese recommend use of

Page 17: SCDL 2009 Assignments - POM

Main objective of a good plant layout is

What do you mean by the study of repetitive short cycle which involve quick hand / feet motions

What is represented by an arrow in a network

What do you unerstand by the selection of the job for the method on the basis of money saving potential of the job

The common form of JIT layout is

PERT is

As the precursor to developing strategic plan, it is desirable to conduct

The rule Random R states

What does tail of an arrow represent

What do you understand by totality of features and charecteristics of a product or service that bears on its ability to satisfy the customer

An approach to scheduling that starts from the present time and schedules each job to start at the ealriest possible moment is known as

Production planning includes

How to obtain the elemental time in case of fly back method

In management coefficient model, workforce in the previous period, ending inventory for previous period and forecast demand for the next period are brought togat

The dispatching function can be performed conveniently through the use of what is called as (?)

The scheduling chart with horizontal rows representing jobs or resources to be scheduled and vertical divisions representing time periods is known as

MPS balances demand with

The two aspects viz. allocation of resources and timing of resources are pertaining to

Selection of site among alternative locations is based on

What do you mean by planned corrective maintenance which provides an oppportunity to undertake design modifications in the equipment to eliminate or reduce frequency of breakdowns

Page 18: SCDL 2009 Assignments - POM

The middle compartment of control board contains the copy of work order / shop order of the item

_______ is the application of statistical methods to analyze data, study and monitor process capabilities and performance

Page 19: SCDL 2009 Assignments - POM

276Kanban

production plan

Method study

Internal inspection

Pareto Diagram

multiple production

maintenance inspection schedule

Start of an activity

The job with earlier due date goes first

Materials requirement planning

Values

operation

5 S technique

Projected on hand inventory

layout can be changed without much cost if required

bottom line profitability

to be processed next on the machine

Page 20: SCDL 2009 Assignments - POM

reduce material handling cost

micro motion study

activity

economic consideration

design-out maintenance

U-line

project evaluation and review technique

SWOT analysis

pick up any job in the queue with equal probability

Start of an activity

Quality

forward scheduling

predetermination of manufacturing requirements

by judgement of observer

production rate

Gantt Chart

Load chart

supply

scheduling

Total investment (?)

Page 21: SCDL 2009 Assignments - POM

to be processed next on the machine

statistical process control

Page 22: SCDL 2009 Assignments - POM

S.No1

2

3

4

5

6

7

8

9

Page 23: SCDL 2009 Assignments - POM

10

11

12

13

14

15

16

17

18

Page 24: SCDL 2009 Assignments - POM

19

20

21

22

23

24

25

26

27

28

Page 25: SCDL 2009 Assignments - POM

29

30

31

32

33

Page 26: SCDL 2009 Assignments - POM

QuestionsScale model used for layout analysis have following advantages

The purpose of MPS can be stated in the following lines

The process of production planning and control includes

Which are the advantages of work sampling over time study

JIT purchasing is based on the following fundamental principles

IN an organisation there may not be a formal PPC department if

the work involved in production activity control (PAC) are

Which are the factors on which the structure of transportation cost depends

Which three of the following options can be used to reduce the duration of activity during project crashing

Page 27: SCDL 2009 Assignments - POM

IN management prospective, Kanban is a visual indicator that triggers replenishment of item such as

How work measurement is useful to figure out better method

DMAIC and DMADV are both

According to Bauer, functions of PAC are as follows

Quality is a customer satisfaction aimed at meeting the following

MPS is stated in end items. It has three parts

Value addition to an entity can be done by the following

In MPS, the following need to be clearly understood about the quantities

Which of the following is not the characteristic of project production

Page 28: SCDL 2009 Assignments - POM

The cost of quality can be divided into the following areas

External factors affecting scheduling are

which of the following are types of non-destructive testing

Components of production management include

Which of the following are regional factors which govern the selection of plant location

Aggregate planning has certain prerequired inputs which are inevitable. They include

The most typical causes of innovations that shift competitive advantage are as follows

The SMED can be implemented through stages which

Which of the work measurement techniques involve the direct observations

Which of the following situations highlights the need of proximity of plant location to sources of raw material

Page 29: SCDL 2009 Assignments - POM

Effective scheduling leads to meeting customer requirements through

Important improvements in manufacturing performance can be gained by introducing flexibility in scheduling,

Machining cells in place of conventional batch system result in

Which of the following work measurement techniques involve the direct observsations

Page 30: SCDL 2009 Assignments - POM

157Nontechnical person finds it easy to comprehendoverhead facilities can be shownmodels can be shifted easily

to establish the production schedule for the specific models/ options of productsto provide the schedule input for the MRP processto provide the schedule used by order processing to acknowledge delivery dates for the current and new orders

release production orderfollow up progresspurchase material

The observer need not be present at place of work for a longer timeWork sampling study can be interrupted at any time without affecting the resultswork sampling study gives unbiased results

suppliers facilities are an extension of buyer's own facilitiesdelivery lot size should be just enough to satisfy immediate higher level requirementrejections interrupt supply and hence must be eliminated

work is highly repetitive in natureplanning activities are performed by the line staffnumber of workmen is not large

To have activities performed as plannedTo report on operating resultsTo revise plan to achieve desired results

Medium of shipmentcharacteristics of the commodityaverage distance of shipment

allocating more manpower and machines than originally plannedworking additional shifts or overtimeawarding work to vendors who charge extra but expedite deliveries

Page 31: SCDL 2009 Assignments - POM

Cardbinrack

It identifies elements which consumes excessive timeit points out wasted motionsit draws attention to unnecessary work

Six Sigma methodologies used to drive defects to less than 3.4 per million opportunities.

Data intensive solution approaches.

Intuition has no place in Six Sigma -- only cold, hard facts.

Implemented by Green Belts, Black Belts and Master Black Belts.

Ways to help meet the business/financial bottom-line numbers.

Implemented with the support of a champion and process owner

schedulingmonitoringdispatching

stated needsunstated needsexpectations

master scheduleavailable to promise

alterationtransportinspection

The quantities represent production not demandthe quantities may consist of combination of customer order and demand forecaststhe quantities represent what needs to be produced and not what can be produced

continuous flow of materialhighly mechanised material handlingvirtually zero manufacturing cycle time

Page 32: SCDL 2009 Assignments - POM

appraisal costprevention costfailure and hidden cost

customers demandcustomers delivery dates

visual testingeddy currentmagnetic flow detectors

capacity planningjob designproduction planning

proximity to marketclimatic conditionindustrial and taxation laws

information about resources and facilities availableDemand forecast for the period for which the planning has to be donecost of various alternatives and resources

new technologies and quality practicesnew or shifting buyer needsemergence of new industry segment

Convert internal setup to external setupstreamline all aspects of setup operations time studyproduction studywork sampling

If raw materials are of perishable natureIf raw materials are expensive transport

Page 33: SCDL 2009 Assignments - POM

If weight of raw materials is substantially reduced after processing

Improved delivery performancemeeting company's customer service goalsreducing production lead time

use of alternate routingsadjustments in labour assignmentsoverlap scheduling

simplification of material flowincreased material movement

time studyproduction studywork sampling

Page 34: SCDL 2009 Assignments - POM

S.No MTF1 Voice of customer

Critical to qualityDefectStable Operation

2 Store issue orderMove order

Machine setup orderForwarding Note

3 DispatchingBackward scheduling

tool order

inspection order

4

Master production schedule

manufacturing resource planing (MRP II)

capacity requirements planning (CRP)planning horizon

5 QuestionCrash cost of an activity

Normal time of an activity

Crash time of activity

Normal cost of an activity

QuestionInterruption for machine utilisation

Input for scheduling

Technique of scheduling

Scheduling Device

Page 35: SCDL 2009 Assignments - POM

QuestionTemperature of motor

Exhaust gas

Air leakage

Corrosion

QuestionForcasting requirement for indirect material

Inventory control by classification

Structure of the product

Material Planning for dependent demand

QuestionFirst off inspection

Critical operation inspection

Patrolling inspection

Key operation inspection

QuestionTemplate

REL chart

Flow diagram

Travel chart

QuestionToung

Eye

Nose

Ear

Questionunit production of very large product

High production volume low variety

Low production volume high variety

Grouping into families of similar product

QuestionEmerson Efficiency Plan

Craft

Work Sampling

Page 36: SCDL 2009 Assignments - POM

Gantt Chart

QuestionCommunity Facilities

Proximity to market

Industrial and labour attitude

Legislation and taxation

QuestionChange in chemical characteristic

Consumption of effort

Information given

Subtraction

QuestionBottom compartment of control board

Control board

Top compartment of control board

Middle compartment of control board

QuestionScale model

Factor Analysis

Minimization of production delays

Maximum visibility

QuestionFixation of inventory level

Symptom of ill planned purchasing

Factor influencing material planning

Net requirement of material under MRP

QuestionTable lubrication

Draining and refilling of oil reserviors of plunger pump

Parts lubricated with oil nipple

Tools and slideways

Question

Page 37: SCDL 2009 Assignments - POM

Pessimistic time

Expected time

Optimistic time

Most likely time

QuestionWhen to inspect

What to inspect

How to inspect

How much to inspect

QuestionFixed Position Layout

Product Layout

Process Layout

Combined Layout

Question

Two machines & processing time depends on sequence of job loading

Sufficient orders and resonable choice of machines

Production plan

Staffing plan

search decision rule

Dell

Capacity plan

Aggregate plan

Master production scheduleshort-term schedule

Scheduling of interrelated activities of small projects with consideration of uncertainty of duration of activities.

Time relationship between when a product is required and when it can be made available

Page 38: SCDL 2009 Assignments - POM

27

What your process can deliverAttributes most important toFailing to deliver what customerEnsuring consistant, predictable processes

Instructs stores department to conduct inventory of scrap materialInstructs workmen for movement of material from manufacturer to stockist

Instructs settlers to set up machine tools mentioned therein

execution of current production schedule relative to the current state of the production systemAn approach to scheduling that starts from a desired due date and works backward

instructs to keep necessary tools ready for issue

One for each stage of inspection

information about resources and facilities availablenormally set to cover a minimum of cumulative lead time

Correct Answer

Cc

Tn

Tc

Cn

Correct Answer

Preventive maintenance

Overlapping of operations

Critical Path Analysis

Strings

informs dispatch / finish parts stores regarding the description of the goods accompanying the note

A specific statement of exactly what, usually in terms of individualend terms or product models, will be produced in each time period

provides simulation capabilities and cost information for other functional areas of business

Page 39: SCDL 2009 Assignments - POM

Correct Answer

Body

Smell

Listen

Watch

Correct Answer

Past consumption analysis technique

ABC Analysis

BOM

MRP

Correct Answer

First piece produced after tool change

After whose no rework is possible

Inspection at the place of actual production

Costlier operation

Correct Answer

Two dimensional cutouts

Degree of closeness

Tracing movements

Distance and frequency of movements

Correct Answer

Sweet

Crack

Burnout

Impact

Correct Answer

Fixed Position Layout

Product Layout

Process Layout

Cellular Layout

Correct Answer

Wage Payment

Facilities Planning

Machine utilization

Page 40: SCDL 2009 Assignments - POM

Production Scheduling

Correct Answer

Educational facility

Fragile product

Productivity of labour

Licenses

Correct Answer

Chemical reaction

Posting a ledger

Giving directions or instructions

Removal of worn-out part from a machine

Correct Answer

Bunch of work orders arranged in a sequence in which they are to be processed.

Pictorial view of machine loading activity

Work order of item currently being worked on the machine

Work order of item to be processed next on the machine

Correct Answer

Layout analysis

Method to evaluate layouts

Objective of good layout

Principles of good layout

Correct Answer

Reorder level

Over ordering

Lead time

Stock on hand

Correct Answer

Weekly

Yearly

Daily

two to three times a day

Correct Answer

Page 41: SCDL 2009 Assignments - POM

b

Te

a

m

Correct Answer

Stages of inspection

Specification

Inspection devices

Sampling or cent percent inspection

Correct Answer

Project Layout

Line Layout

Functional Layout

Mixed Layout

Correct Answer

Critical Path Analysis

Johnson's Two Machine Algorithm

Index Method

Critical Ratio Scheduling

Linear decision rule

service aggregate plan

manufacturing aggregate plan

depend upon aggregate

Which makes sure that there is enough

Page 42: SCDL 2009 Assignments - POM

execution of current production schedule relative to the current state of the production system

Page 43: SCDL 2009 Assignments - POM

Production & Operational Management

 Select The Blank

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

Page 44: SCDL 2009 Assignments - POM

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

Page 45: SCDL 2009 Assignments - POM

  Correct Answer  

Page 46: SCDL 2009 Assignments - POM

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

Page 47: SCDL 2009 Assignments - POM

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

Page 48: SCDL 2009 Assignments - POM

 Select The Blank

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

Page 49: SCDL 2009 Assignments - POM

 True/False

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

Page 50: SCDL 2009 Assignments - POM

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

Page 51: SCDL 2009 Assignments - POM

 True/False

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

Page 52: SCDL 2009 Assignments - POM

 True/False

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

Page 53: SCDL 2009 Assignments - POM

  Correct Answer  

Page 54: SCDL 2009 Assignments - POM

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

Page 55: SCDL 2009 Assignments - POM

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

Page 56: SCDL 2009 Assignments - POM

 Select The Blank

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

Page 57: SCDL 2009 Assignments - POM

  Question  

  Correct Answer  

Page 58: SCDL 2009 Assignments - POM

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

Page 59: SCDL 2009 Assignments - POM

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

Page 60: SCDL 2009 Assignments - POM

 True/False

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Select The Blank

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

Page 61: SCDL 2009 Assignments - POM

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 True/False

  Question  

Page 62: SCDL 2009 Assignments - POM

  Correct Answer  

Page 63: SCDL 2009 Assignments - POM

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 True/False

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer

  Question  

  Correct Answer  

 Multiple Choice Multiple Answer

  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

Page 64: SCDL 2009 Assignments - POM

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

Page 65: SCDL 2009 Assignments - POM

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer

Page 66: SCDL 2009 Assignments - POM

  Question  

  Correct Answer  

Page 67: SCDL 2009 Assignments - POM

 True/False  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

Page 68: SCDL 2009 Assignments - POM

 True/False  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

Page 69: SCDL 2009 Assignments - POM

 True/False  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

Page 70: SCDL 2009 Assignments - POM

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

Page 71: SCDL 2009 Assignments - POM

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

Page 72: SCDL 2009 Assignments - POM

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

Page 73: SCDL 2009 Assignments - POM

  Correct Answer  

Page 74: SCDL 2009 Assignments - POM

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

Page 75: SCDL 2009 Assignments - POM

 True/False  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 Multiple Choice Multiple Answer  Question  

  Correct Answer  

 True/False  Question  

  Correct Answer  

 Multiple Choice Single Answer  Question  

  Correct Answer  

Page 76: SCDL 2009 Assignments - POM

Production & Operational Management

Unexpected

Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule

Unidirectional

Which kind of natural delays and interruptions are considered during estimation of activity time?

Shop efficiency , Breakdowns , Absenteeism

Which of the following aspects are essential to ensure quality of purchased items?

1

Which characteristics are verified in cent percent sampling?All important characteristics

Storage , Delay , Transport

One

Where the ignorance towards the degradation of machine leads to?Eventual breakdown

Which are three different bases to establish an activity time?Past experience , Judgement , Historical data

What are the uses of failure statistics analysis?

One detachable ticket is prepared for each ________.Operation

The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions.

Which of the following schedules are recommended to prepare and follow as a part of preventive maintenance system?

One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow should be

Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements

An activity should represent an operation or set of operations which can be performed using a particular kind of equipment or a special skill.

Which of the following symbols are used in flow process chart but not used in operation process chart?

OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________.

To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection

Page 77: SCDL 2009 Assignments - POM

Micromotion study

Inspection order

Condition monitoring

0

Merge event

Quality control

Which of the following is a cause of plant breakdown?Overloading of machines

Who prepares the daily production report?Shop Supervisor

Why graphical method of recording is preferred over the descriptive method during method study?

Delivery performance

Rectangular

With a general OC curve, probability of acceptance of lots of good quality is never unity.

1

What do you mean by the study of repetitive short cycle operations which involve quick hand / feet motions?

The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company.

The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking.

In case of backward pass computation, the latest event time of the end event equals to the earliest event time minus duration of that activity.

What do you mean by a single event which represents the joint completion of more than one activities?

The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable.

It segregates effective part form ineffective parts , It reduces effort involved in writing , Critical examinations easier and more effective

Capacity decisions have a direct influence on performance of production system in respect of ________

An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL .

What do you understand by identification of defects in materials, components, machining processes or men to fix responsibility of defectives, thereby preventing or minimising occurance of defectives?

Page 78: SCDL 2009 Assignments - POM

Preventive function

Page 79: SCDL 2009 Assignments - POM

What is the nature of the sampling plan for critical defects?Tight

The steeper the OC curve, the better is the discrimination between good and bad lots.

1

Systematic maintenance system can completely eliminate the wear and tear of machines.

0

Operation Process Chart provides information on time and distances0

The event numbers as far as possible reflect the logical relationships of the activities.

1

Quality control system

easier

What is the relation between duration of an activity and length of an arrow?No relation

Process Sheets for parts in batch production are not maintained as standard process sheet

0

Three time estimates are transformed into expected time before using it into a network.

1

Specifications

Which of the following situations demand the technical consideration while selecting a job for method study?

Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work

The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm.

Production control work is ________ in case of floor inspection as compared with the centralised inspection.

The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product.

Which of the following situations demand that the human consideration should be given preference over other considerations?

Inconsistent earnings where the earnings are tied to output , Poor morale evidenced by petty or trivial complaints , Repeated cases of accidents and health hazards

Page 80: SCDL 2009 Assignments - POM

Which of the following are examples of specifications?Commercial standards , Assembly and testing instructions , Bill of material

Activity cost slope

Document raised by Sales department for goods manufactured to stock is calledShipment order

How many of the following are types of specification?Material specifications , Dimensional specifications , Performance specifications

Which of the following are activities of corrective maintenance?Modifications and improvements , Overhauling , Emergency repairs

Scrap allowance is added to net requirement of material while ordering for material1

A properly designed sampling plan can control sampling errors and completely eliminate them.

0

Which of the following cases indicated that the operation has occurred?

Which manufacturing method is ideal for the use of air gauges as inspection device?

Mass

Cost effective method

Any premise in which persons are employed for purpose of making any product/s is called

Factory

Cent percent inspection does not mean inspection of component for 100% quality characteristics.

1

How to reveal the capability of the sampling plan to discriminate between good lots and bad lots?

Operating characteristics curve ( OC )

Which of the following may be the objectives of project crashing?

What does the additional cost incurred to reduce the duration of an activity by one unit of time represent?

Movement of components to assembly section , Raw material movement , A worker's trip to grinder to sharpen the tools

Out of two basic criteria for the selection of a manufacturing method, one is, it must be able to meet the specifications of final product and the other is, it must be

To achieve uniformity in requirement of resources , To complete the project in the least possible time , To reduce project cost below it's normal cost

Page 81: SCDL 2009 Assignments - POM

Acceptable quality level

Which are the different methods of recording actual progress of work?Display boards , Progress cards , Network updating

Provision of drainage facilities is important for the following type of industryChemical Process

0

Lubrication survey should never be done for a new machine.0

Which are the subtasks of the maintenance phase of the method study?Monitoring and control , Performance appraisal , Audit on savings

Material specifications

Who is responsible for return of surplus material?Dispatcher

The ratio of output to input of a production system is commonly known asProductivity

Which of the following information is available in summary of part in a chart during methods study?

Frequency of each symbol , Total time for each symbol , Total distance travelled by the object

Bending , Positioning , Unloading

Which of the following causes can be responsible for derailing the production schedule in a factory?

Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism

Which is the ideal place to write a description of an activity in a network?Above the arrow

Which of the following cases indicates change in physical characteristic?Turning , Grinding , Drilling

The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average.

Under MRP system for common items order for procurement is placed based on requirement for each product

What do you understand by the metallergical aspects of product which forms the vital part of engineering function?

Which of the following are examples of consumption of physical effort during recording for method study?

Page 82: SCDL 2009 Assignments - POM

Objective of Work Study is to improve Productivity1

Which are the major types of defects?Minor , Major , Critical

A ________ is another form of subcontracting.Hiring capacity

Equipment history card

Work measurement

Concurrent activities

Which of the following products should be produced by using mass production?Refrigerator , Tyre for automobile , Television Set

Control board

A good maintenance system is not a luxary but a ________.Necessity

Production Planning is a centralised activity which includes functions such as ________

Scheduling

The process of changing inputs into outputs thereby adding some value to entity can be defined as

Operation

1

As a general rule, the number of tail event of an activity is more than that of it's head event.

0

Which of the following concepts must be understood for the achievement of quality?

Quality of conformance , Purpose of product , Quality of design

An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service.

What do you understand by the measurement of work to establish allowed time for a job for the defined method?

Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish?

A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine.

The problems concerning movements can be better visualized by drawing a diagram, either, flow diagram or string diagram.

Page 83: SCDL 2009 Assignments - POM

Which of the following factors affect the quality control function?Quality of workmanship , Production aids , Manufacturing facilities

Which portion of the perforated route sheet should be signed by the operator or supervisor?

Lower portion

Work study is also called ________ studyTime and Motion

Which are the factors on which the structure of the transportation cost depends?Average distance of shipment , Characteristics of the commodity , Medium of shipment

Design tolerance

Quality can not be inspected into a product, it must be manufactured into it by the supplier.

1

A good plant layout helps inReducing handling costs

0

Forwarding note

1

Which of the following are characteristics of an operating characteristics curve?Producer risk , Consumer Risk , Acceptable Quality Level

Technique of Value Engineering can be effectively employed in design of a product to

To meet the intended function at lowest cost

Technique which can help an organization to reduce inventory is calledMRP

Since value of c can never be negativee, hence" if LCLp works out to be negative, it is taken as zero."

1

What do you understand by the difference between the specification limits within which manufacturing process is expected to produce?

Floor inspection delays the identification of faults which can not be rectified immediately before large lots are spoiled.

Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference.

In case of two handed process chart, inspection symbol is used when check by touch or feel is involved.

Page 84: SCDL 2009 Assignments - POM

A sampling plan which perfectly discriminates will have vertical OC curve.1

Which of the following are examples of gross materials?Timber , Iron ore , Sugar cane

The time chart, if necessary, may be modified considering the limitations of resource.

1

The ________ is the probability that a good lot will be rejected by the sampling plan.

Producer's risk

What are the benefits of inspection and quality control?

Preventive Maintenance

Inadequate production capacity ultimately leads toPoor Customer Service

The ________ is the probability that a bad lot will be accepted by the sampling plan.

Consumer's risk

Which document is used for returning the surplus material?Stores Return Note

Tolerance

How should a dummy activity be represented in a network?By dotted line

When should operator or supervisor is supposed to sign the perforated route sheet?After completion of operation

Which of the following observations are expected from the preventive maintenance person?

Wrong allignments , Overheating defects , Excessive play

Route Sheet generally contains following informationMaterial Specification , Sequence of operation , Skill of Labour

Adequate maintenance of quality , Ensures parts are within specified limits of accuracy , Gives economy in production through reduction of defective work

The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive

The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts.

Page 85: SCDL 2009 Assignments - POM

1

In case of Batch Production which kind of labour is expected?Skilled in one specific Manufacturing Process

Following are some of the factors considered for evaluation of alternative layoutsFlow of Material , Equipment utilization , Ease of supervision

Material Planning is an integral part ofProduction Planning

What is the meaning of surplus material in context with stores issue order?Materials issued are not fully consumed

Which are the subfactors of community facilities or social infrastructure?Accomodation , Educational , Entertainment

Environmental specifications

Which is the alternative way of indicating the load other than numerical way, in case of Gantt chart ?

Graphical approach

Shop order is one of the subsidiary order1

Overtime working

Which symbol is used to represent event in a network ?Circle

Data from Process Sheet can be used toPrepare load and schedule charts

Which three of the following are causes of continuous upward pattern of Xbar-R control chart?

Wear of tool , Abnormal rise in temperature , Accumulation of dirt

The operator should not stop production if first piece is not approved by the inspector.

0

What are the advantages of templates over diagrams?

In case of forward pass computation, the earliest event time of a plain event equals the earliest event time of the preceding event plus duration of activity emanating from the preceding event.

The ________ pertain to the climatic conditions which the component , product or material should withstand.

The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________.

Page 86: SCDL 2009 Assignments - POM

Can be conveniently moved on the graph paper , Less laborious , Saves time

Page 87: SCDL 2009 Assignments - POM

Chart

Site selection should also take into account topography and soil structure of the land.

1

Which are the different types of flow process charts used for method study?Equipment type , Man type , Material type

Which of the following method can be used to record the facts during the method study?

Micromotion study , Cyclegraph , Chronocyclegraph

Which are the distinguished features of TQM ?

Which of the following possibilities can be explored by using flow process chart?

It pays in the long run to inform the customer regarding expected delays in the deliveries.

1

Which are the basic requirements of the " Quality of Design "?

Which of the following technique is event oriented ?Project Evaluation & Review Technique

Following is not a function of PPCProduct Planning

Product layout offer following advantagesThere is economy in manufacturing time

1

Tool breakage has got nearly zero chances in case of eventual breakdown.0

Technical consideration

What is the name of the document on which details of the process are recorded by the symbols and charting conventions?

Covers all kinds of industries , Gradual removal of interdepartmental barriers , Continuous improvement

Eliminating the operations or combining the operations with another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses

Identification of right product , Selection of appropriate features , Ensure that product renders satisfactory service to customer

Quality control determines what, when, and how much to inspect while inspection actually conducts examination of goods.

What do you mean by the selection of the job for the method study on the basis of manufacturing difficulties?

Page 88: SCDL 2009 Assignments - POM

Which kind of labour force is required in case of Jobbing Production?Highly Skilled

A set of activities to keep an equipment in the specified condition is called as ________.

Maintenance

Sampling inspection suffice to check the work of line inspectors and stage inspectors.

1

Which of the following can be subtypes of corrective maintenance?Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance

What do you understand by the quality specified by the designer on behalf the customer?

Quality of design

Scale model used for layout analysis have following advantages

Following are the commonly used factors considered for evaluation of layout in factor analysis method

Flow of material , Equipment utilization , Working condition

Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses.

1

Work Sampling Studies

Order preparation process for products manufatured to order requires following documents

Sales Order , Work order , Shop order

What are uses of diagrams in method study?

How to exercise control over quality?

1

Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily

Which of the following techniques is used by industrial engineering department to obtain the utilisation index?

Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material.

Periodical analysis of inspecting reports to establish causes of rejections , Preperation of quality standard and specifications , Exercising control over inputs

In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking action regarding rejection or rework.

Page 89: SCDL 2009 Assignments - POM

The ________ must ensure that the product satisfy the functional requirements of it's usage.

Quality of design

1

Which of the following is not the characteristic of Project Production?

What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart?

Following is one of the tasks of Production ControlActual issue of forms and documents

Which are the three basic types of control chart by attribute?p-chart , c-chart , np-chart

Status of PPC department in an organization depends on following factormanufacturing process

In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.

0.01 to 10%

What does tail of an arrow represent?Start of an activity

Which rule is used for numbering of events?Fulkerson's Rule

MRP is based on the concept of inventory demand which is of following typeDependent and independent

Which varaible is taken along the abscissa or X axis?Time

F W Taylor devised a system for classifying motions into basic divisions called Therbligs

0

What do you mean by the project duration for which the total cost is minimum?Optimum duration

Regular lubrication with carefully selected lubricants is an essential factor in the maintenance of high grade machine tools working under continuous load.

Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time

Biases in measurements , Recording done without actual measurements , Improper selection of samples

Page 90: SCDL 2009 Assignments - POM

1

As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and future expansion.

Page 91: SCDL 2009 Assignments - POM

Process planning is the process ofestablishing shortest and most economic path of production

The term ________ emplies the foregone profit due to inability of company to produce.

Opportunity cost

Latest finishing date is the latest event time of the tail event.0

Which are the distinct functions of scientific quality control?Acceptance function , Preventive function , Assurance function

1

For p-chart, "Inspection by variables" is much faster than "Inspection by attributes"0

Shutdown Maintenance

Which of the following industries justify the use of move order?Power plant , Steel plant , Heavy machinery manufacturing

Which of the following is the most popular technique for Project Production?PERT & CPM

Fixed position layout is adopted whenproduct is very heavy involving assembly of large number of parts

Plant location decisions concern following type of organizationsManufacturing and service organizations

Product layout is suitable whenProducts have reasonable stable demand

1

Which utilities are considered as infrastructural requirements?Disposal of waste , Power , Water

0

Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout

The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines.

While numbering as per Fulkerson's rule, arrows emerging from the initial event are deleted so as to create one or more initial events.

The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models.

Page 92: SCDL 2009 Assignments - POM

Prevailing wage pattern , Productivity of labour , Industrial relations

Exemption from excise duty , Soft loans , Subsidy in electrical charges

Which details are recorded in columns when each square of progress card is split up into columns?

Date , Shift , Quantity produced

Economic consideration

Who has introduced the useful concept of control chart in 1931?Walter Shewhart

A network can have more than one starting event but completion event must be only one.

0

Need for change in layout can occur due to following reasonintroduction of new product

An activity can share the same tail event and same head event with any other activity.

0

Network

Inspection

The ________ is the defect level for which lots are regarded as bad lots.Lot Tolerance Percentage Defective

How non-critical activities are shown in the time chart during project scheduling?Thin lines

Every network does not necessarily have a critical path.0

Backward pass computation

Which of the following factors related to the labour and wages are considered while deciding the plant location?

Which of the following are examples of incentives offered by the Central and State Governments for setting up industries in particular locations?

What do you understand by the selection of the job for the method study on the basis of money saving potential of the job?

What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the interrelationship of the activities involved?

What do you mean by the verification of object against predetermined standards of quality or quantity or both?

Which method of critical path determination begins with the end event and moves backward to the start event of the project network?

Page 93: SCDL 2009 Assignments - POM

1

1

Reconditioning

Flow process charts do record movements as well as visual pictures.0

0

What is the meaning of " Product features" according to J.M.Juran?Quality of design

Quality assurance

Following are some of the Principles of Management advocated by F W Taylor

How the concept of float is helpful to planners?

Which kind of defect can be called as minor defect?Which does not reduce the usability of the product for its intended use

1

Which element of a network represents a task which has got a definite beginning and definite end?

Activity

Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery.

It would not affect the project completion time if non-critical activities take little loner time than planned.

The ________ is the process of withdrawing the equipment from the production line, dismantling it unitwise, visualising defects, effecting adjustments, replacing worn-out parts and finally building it up to get desired accuracies.

Process Planning is concerned with decisions regarding requirement of machines and manpower for meeting customer demand

Which three of the following options can be used to reduce the duration of activity during project crashing?

Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries.

Which is the next stage to the inspection based quality control in the historical development of quality management.

Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen

To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources

Sampling inspection is best suited when cost of inspection is much higher than the loss arising from the acceptance of a defective part.

Page 94: SCDL 2009 Assignments - POM

Material composition , Dimensions , Any heat treatment if required

1

0

Theoretical capacity equals number of normal working hours of that machine.1

Labour laws , Building codes , Policies regarding issue of licences

Skill of labour force in a product type layout is usually higher than in the process type of layout

0

What is the base for considering activity time as single time estimate or three time estimate?

Level of uncertainty

Product layout is employed for manufacturing following productsrefrigirators

Diversified labour is adequately available in rural area as compared to urban area.0

Which of the following technique makes three time estimates for each activity?Project Evaluation & Review Technique

Suburban location provides the compromise netween rural and urban locations.1

Latest allowable time for each event

1

Kanban system is essentially a computer based system for production scheduling and control

Which features should be covered by the specifications of materials while defining the qualitative requirement?

In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed.

Maintenance function must be decentralised apart from a size of a manufacturing organisation for it's better functioning.

Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view?

Which time is determined by the backward pass computation method of determination of critical path ?

Even in a small set up wherein maintenance of a machine is looked after by a mechanic cum worker, he should report directly to the person responsible for the manufacturing operations.

Page 95: SCDL 2009 Assignments - POM

0

Page 96: SCDL 2009 Assignments - POM

Which of the following are the major steps of making of the X bar-R control chart?

For p-chart, p bar is the ratio of total number of units inspected to the total number of units defectives.

0

Extrernal inspection

Delivery time is less

How dummy activities are shown in the time chart during project scheduling?Vertical lines

1

Which are the advantages of suburban location?

What do you understand by the timeframe for the maintenance needs of the equipment?

Maintenance inspection schedule

Which of the following are assignable cause?Large varaitions in hardness of material , Tool wear , Errors in setting

Which of the following policies is advisable in case of low product variety and large volumes?

Low Skilled Labour & Special Purpose Machines

Critical examination

Gross requirement of finished product is determined on the basis of followingForecasted sales , Pending sales order , Management decision to stock

Main objective of a good plant layout isReduce material handling cost

Collection of data , Claculation of mean,range,grand average and mean range , Set up control chart for average and calculate control limits of range chart

Which kind of preventive inspection detects some maintenance related characteristics by making use of human senses, when equipment is in operation?

Process Engineer does not get sufficient time for designing tooling for most economic production run when

The control chart for number of defectives is more convenient to make than control chart for fraction defectives sincethe fugure of number of defectives units can be directly taken from the inspection report.

Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction

Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods?

Multiple Choice Single Answer

Page 97: SCDL 2009 Assignments - POM

Which of the following are important considerations concerning activity times?

All activities must not be tied up into the network0

Normal cost

In an organization there may not be a formal PPC department if

Which of the following cases can be treated as delay during recording of method study?

0

Cent percent inspection is often more practical and economical than sampling inspection.

0

A load chart specifies the work to be carried out by each person of company during shift hours.

0

Cellular layout is based on the concept of Group Technology1

Expediting function is concerned with following activities

What is represented by an arrow in a network?Activity

Independent float either affects the float of preceding activities or that of succeeding activities.

0

Work Order

Multiple Choice Multiple Answer

Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available.

Multiple Choice Single AnswerWhat do you mean by lowest possible direct cost required to complete an activity within it's normal time?

Multiple Choice Multiple Answer

Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Multiple Choice Multiple Answer

Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn

Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop.

Multiple Choice Multiple Answer

Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule

Multiple Choice Single Answer

Multiple Choice Single AnswerThe document raised by PPC which authorises different functions to take action as per instruction is called

Page 98: SCDL 2009 Assignments - POM

Proportion of Cubic volume space utilized

Following are some of the factors which influence process planningOrder Quantity , Process capability of machine , Delivery Dates

1

Which of the following are examples of pure materials?Bakeries , Ice factories , Woolen

Which of the following are steps to identify the critical path in a small network?

Which are the three types of float?Total float , Independent float , Free float

Which of the following are major inputs to scheduling?Overlapping of operations , Effective Capacity per work centre , Performance standards

How to calculate activity cost slope?Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash time )

Which of the following are minimum requirement for a good quality of design?Resonable cost , Resonable procurement time , Resonable manufacturing time

0

Production Planning includesPredetermination of manufacturing requirements

How does the control chart of statistical quality control helps the operating personnel?

Identify the presence of an assignable cause before it develops

What can be the worst effect due to excessive vibration?Breakdown

Which of the following activities are used while recording for method study?Delay , Operation , Inspection

Multiple Choice Single AnswerA good layout makes effective use of space. Utilization of space for a department like Stores can be measured by

Multiple Choice Multiple Answer

Availability of training schools, colleges and management institutes reduces the company's internal training needs.

Multiple Choice Multiple Answer

Multiple Choice Multiple Answer

Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path.

Multiple Choice Multiple Answer

Multiple Choice Multiple Answer

Multiple Choice Single Answer

Multiple Choice Multiple Answer

In case of control chart, large smaples such as n=15 or 20 are used if the process standard deviation is small.

Multiple Choice Single Answer

Multiple Choice Single Answer

Multiple Choice Single Answer

Multiple Choice Multiple Answer

Multiple Choice Single Answer

Page 99: SCDL 2009 Assignments - POM

Product cost

Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially influence

Page 100: SCDL 2009 Assignments - POM

1

An ideal OC curve is never possible only with cent percent inspection.0

For p-chart, the central line of fraction defectives is determined by average percentage defectives.

1

What are the benefits of reconditioning?

Transport , Delay , Storage

Which is the zone beyond LTPD in case of Oc curve of a general plan?Zone of rejection

Grouping of machines gives a lot of flexibility in loading and scheduling1

A lot declared rejected in sampling inspection should not be inspected 100% in any case.

0

Which of the following are the basic requirements of quality standard?Deifinite , Undesrstandable , Economically viable

1

Which of the following three methods used to select the qualified supplier?By vendor plant surveys , By reputation , By experience

Operation Layout generally contains following informationPart Sketch , Standard Time , Jigs and fixtures

Where does the SPC exercises the control to prevent the occurances of defectives?

On manufacturing process

Cyclograph

The component produced on completely automatic machines may be subjected to sampling inspection while parts produced on semi-automatic and completely manual operated machines require cent percent inspection.

Multiple Choice Multiple Answer

Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares

Multiple Choice Multiple AnswerWhich of the following processes or activities are denoted by using symbols while recording in method study?

Multiple Choice Single Answer

Multiple Choice Multiple Answer

The plotting of activities - critical, non-critical and dummy activities- is strictly according to their precedence relationship.

Multiple Choice Multiple Answer

Multiple Choice Multiple Answer

Multiple Choice Single Answer

Multiple Choice Single AnswerWhich photographic technique is used to record path of motions of the members of the body during method study?

Page 101: SCDL 2009 Assignments - POM

1

Floor inspection promotes tendency of machines to drift out of limits and produce defectives.

0

Which are the different methods to record details of the existing method during method study?

Charts , Diagrams , Templates or models

Gross requirement of products is determined on the basis ofBoth forecast and pending orders

Crash cost

What do you understand by the extent the products manufactured conforms to the laid down design?

Quality of conformance

Which kind of possible defectives can be reduced due to first off inspection?Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up

Cent percent inspection is required on WIP prior to the key, critical or costly operation.

1

Why stores issue order should not be issued as soon as it is prepared?Material may or may not be available at the time of preparation

Plant layout facilitates processing of products in most effective manner through the following

Shortest possible distance , Shortest processing time , Minimum movement

0

Operational layouts , Move orders , Pre-filled stores issue orders

Specifications is the basic tool of inspection.1

How is the probability of acceptance in case of Acceptable Quality Level (AQL )?Very high

In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either operations or work centres.

Multiple Choice Multiple Answer

Multiple Choice Single Answer

Multiple Choice Single AnswerWhat do you mean by lowest possible direct cost required to complete an activity within it's crashed time?

Multiple Choice Single Answer

Multiple Choice Multiple Answer

Multiple Choice Single Answer

Multiple Choice Multiple Answer

After goods have been manufactured, route sheets and operation layouts should not be collected back.

Multiple Choice Multiple AnswerWhich of the following is a part of preparing manufacturing order set as a primary function of dispatching?

Multiple Choice Single Answer

Page 102: SCDL 2009 Assignments - POM

The dispatching function is of very importance in flow and mass production units.0

Proper care and storage is not an essential part of a well planned lubrication system.

0

Management often fails to realize the importance of efficient layout due to following reason

losses resulting from poor layout are not directly shown in the financial statements

Complexity and difficulty of Planning is influenced by types of layout1

MRP utilises the following informationMaster production schedule , Product structure , Lead time for procurement/manufacturing

Which of the following are types of non-destructive testing?Visual Testing , Eddy current , Magnetic flow detectors

Providing flexibility in plant layout meansLayout can be changed without much cost if required

Which of the following are scheduling techniques?Critical Path Analysis , Index Method , Johnson's two machine algorithm

A network should be progression of activities always moving forward.1

Which is the ideal place to inspect jigs and fixtures in a mass manufacturing unit?Separate inspection room

Which of the following are types of sampling plan?Single sampling plan , Double sampling plan , Multiple sampling plan

Which of the following are ideal situations for the preventive inspection?Weekly off and holidays , Non-production hours , Stand-up equipment

Operation process chart

Multiple gauging

Multiple Choice Single Answer

Multiple Choice Multiple Answer

Multiple Choice Multiple Answer

Multiple Choice Single Answer

Multiple Choice Multiple Answer

Multiple Choice Single Answer

Multiple Choice Multiple Answer

Multiple Choice Multiple Answer

Multiple Choice Single AnswerWhat do you mean by the chart on which the major activities and entry points of materials are recorded to have graphic view of operations and inspections involved in the process?

Multiple Choice Single AnswerWhich kind of gauge consists of electrical contacts operating a series of colloured signal lamps which indicate whether the dimension is correct, oversize or undersize?

Page 103: SCDL 2009 Assignments - POM

Components of Production Management includeCapacity Planning , Job Design , Production Planning

Which of the following is the criteria for the percentage defectives in the zone of the indecision?

Lots having the percentage defective more than AQL but less than LPTD

Which of the following are examples of addition during recording for method study?Brazing , Welding , Riveting

1

The document which incorporates details of process planning for a job is calledRoute Sheet

0

Which of the following cases can be referred as operation in method study recording?

Change in physical characteristic , Consumption of physical effort , Change in chemical characteristic

Site factors for plant location includeSuitability of land

Which of the following defects can be observed during preventive inspection by using human senses?

Deviation from normal sound , Excessive Vibration , Leakage of a gas

Lack of material planning results in the followingOver ordering , under ordering , stockouts

Following is one of the techniques used for Material Planning for high value materialMRP

Quality

Which are the sources of information to update the progress card daily?Detachable ticket , Daily production report , Job Card

Multiple Choice Multiple Answer

Multiple Choice Single Answer

Multiple Choice Multiple Answer

Multiple Choice Multiple AnswerWhich of the following situations demand the economic consideration while selecting a job for method study?

Unorderly movement of men and materials , Excessive process defectives , Too many suggestions received for improvement from a department or section

During set up of X bar-R control chart, control limts should be practically revised from time to time as additional data is accumulated.

Multiple Choice Single Answer

Repetitive movements between work stations which are difficult to be traced on string diagrams can be conveniently shown on flow diagrams.

Multiple Choice Multiple Answer

Multiple Choice Single Answer

Multiple Choice Multiple Answer

Multiple Choice Multiple Answer

Multiple Choice Single Answer

Multiple Choice Single AnswerWhat do you understand by totality of features and characteristics of a product or service that bears on it's ability to satisfy the customer?

Multiple Choice Multiple Answer

Page 104: SCDL 2009 Assignments - POM

Major contributors in the development of Control Charts, Sampling plan areF H Dodge , H G Roming , Walter Schewhart

0

Operation process charts though indicates the sequence of events but do not show movements.

1

0

Random variability

Plant Layout decisions are considered to beStrategic

What are the uses of the instruction manual provided by the manufacturer of a machine?

One of the sophisticated operations research techniques used in material planning is

Dynamic programming

Job life is one of the factors that influence Process Planning1

Material Requirement Planning is very useful in following situationsLong Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle

Both, preventive and breakdown maintenance work must be assigned to the same team.

0

Job Schedule

Which of the following factors decide the choice between the cent percent and sampling inspection?

Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating

Multiple Choice Multiple Answer

Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled.

One major difference between CPM and PERT is the former's adaptability for the projects where high degree of uncertainty prevails and activity times during performance are expected to vary considerably for certain activities.

Multiple Choice Single AnswerWhat is the reason of fluctuations, if the control chart evaluates that the process is in a state of statistical control?

Multiple Choice Single Answer

Multiple Choice Multiple Answer

It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication

Multiple Choice Single Answer

Multiple Choice Multiple Answer

Multiple Choice Single AnswerWhat is the specific name for the Gantt chart when it shows at a glance the scheduling of various operations involved in a job?

Multiple Choice Multiple Answer

Page 105: SCDL 2009 Assignments - POM

Which of the following are examples of attributes?Cracks , Burrs , Texture

Sales Programme

Which are major benefits of identifying the critical path?

Shape od an OC curve is a function of sample size and the acceptance number.1

Process type layout is suitable whenthere is wide variation in processing time of operations

1

Which of the following activities can become a part of a preventive maintenance system?

Condition monitoring , Planned Lubrication , Preventive inspection

Use of optimum speeds and feeds , Subcontracting , Job splitting

1

How to calculate float?Parallel critical path time minus Non-critical path time

What is the cause of inherent variation or internal variation?Cumulative effect of number of chance causes

Originating process of raw material influence Process Planning1

Planned lubrication is said to be the nervous system of the equipment.1

Which of the following can be termed as operation while recording for method study?

Multiple Choice Multiple Answer

Multiple Choice Single AnswerIn mass/batch production organizations where goods are produced for stocking, Work Order is raised on the basis of

Multiple Choice Multiple Answer

It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception".

Multiple Choice Single Answer

In case of backward pass computation, the latest event time of the burst event equals the smallest of the difference between the latest event time of the head event less duration of the activity converging on the head event.

Multiple Choice Multiple Answer

Multiple Choice Multiple AnswerWhich of the following method can be adopted to overcome the problem of rushing up a job for it's timely completion?

In case of X bar-R charts,it is ensured that the assignable causes are detected before the tolerances are violated, upper and lower statistical limits are worked out and inserted into a chart.

Multiple Choice Single Answer

Multiple Choice Single Answer

Multiple Choice Multiple Answer

Page 106: SCDL 2009 Assignments - POM

Information received , Addition or subtraction , Information given

Page 107: SCDL 2009 Assignments - POM

Nuclear power plant

Which are reason due to which the progress of work is rarely in line with its plan?

Any proposed change must not be intimated to workers in advance.0

Inclusion of certain tolerance on the basic dimensions in the drawing

Where does the central line is located in case of p-chart? at p bar

The product layout has following disadvantage Layout is not flexible

Inspection Order can be a verbal order True

How to claculate the producer risk in the OC Curve? Probability that a good lot will be rejected by the sampling

Fixed cost is lower in case of continuous production than intermittent production. False

True

True

Which of the following is the most popular technique for Project Production? PERT & CPM

Multiple Choice Single AnswerWhich industry out of the following industries require maximum consideration for safety factor while selecting plant location?

Multiple Choice Multiple Answer

Absenteeism , Machine breakdowns , Substandard performance against prefixed production standards

Multiple Choice Single AnswerHow industry has responded to the fact of existence of inherant variability of the manufacturing process?

Multiple Choice Single Answer

Multiple Choice Single Answer

Multiple Choice Single Answer

While making X bar-R-chart, values of X bar and R are recoded samplewise either on the extreme right of the individual measurements on the data sheet or in a separate sheet.

In case of X bar, if the pocess is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed.

Multiple Choice Single Answer

Multiple Choice Multiple AnswerWhich of the following are the most suitable cases where we can use CPA as effective technique of scheduling?

Overhauling of a CNC machine , Purchase and installation of a newly imported special purpose machine , Design, production and testing of prototype of a fighter aircraft.

Page 108: SCDL 2009 Assignments - POM

Sample sizes for the construction of p-chart are typicaly larger that for Xbar-R-charts.

True

What is the location of lower control limit in the X bar-R control chart? 3 standard deviations below central line

What is the basic philosophy of statistical process control? Prevention is better than cure

1

Which are the first three steps of Critical Path Analysis technique?Activity relationships , Activity identification , Network construction

Plant Layout is concerned with optimum arrangement of the followingStorage space , Machines , Material Handling Equipment

Planned lubrication is said to be the nervous system of the equipment.1

Which kind of inspection is followed in case of product layout?Pilot inspection

Multiple Choice Single Answer

Multiple Choice Single Answer

Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date.

Multiple Choice Multiple Answer

Multiple Choice Multiple Answer

Multiple Choice Single Answer