18
Scanning for Emerging Technology Opportunities ET Summit – Assessments Best Practices Session October 16, 2012 Jennifer Williamson

Scanning for Emerging Technology Opportunities · Grand Coulee Keenleyside Mica Libby Duncan Hungry Horse Kerr Thompson Falls Noxon Rapids Cabinet Gorge Albeni Falls Box Canyon Coeur

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Scanning for Emerging Technology Opportunities · Grand Coulee Keenleyside Mica Libby Duncan Hungry Horse Kerr Thompson Falls Noxon Rapids Cabinet Gorge Albeni Falls Box Canyon Coeur

Scanning for Emerging Technology OpportunitiesET Summit – Assessments Best Practices SessionOctober 16, 2012Jennifer Williamson

Page 2: Scanning for Emerging Technology Opportunities · Grand Coulee Keenleyside Mica Libby Duncan Hungry Horse Kerr Thompson Falls Noxon Rapids Cabinet Gorge Albeni Falls Box Canyon Coeur

2

4,000ft

3,500ft

3,000ft

2,500ft

2,000ft

1,500ft

1,000ft

500ft

Sea Level

100 200 300 400 500 600 700 800 900 1000 1100 1200

Miles from River Mouth

McNary

Wanapum

Wells

Chief Joseph

Grand CouleeKeenleyside

MicaLibby

Duncan

Hungry Horse

Kerr

Thompson Falls

Noxon RapidsCabinet Gorge

Albeni FallsBox

Canyon

Coeur d’Alene Lake

Oxbow

Brownlee

Chelan

Feet

abov

e Sea

Lev

el

OCEAN

Ice HarborRock Island

The Dalles

Rocky Reach

Priest Rapids

John DayBonneville

Treaty ProjectDam in Canada

Base System Federal ProjectBase System Non-Federal ProjectNOTE: FOR ILLUSTRATIVEPURPOSES; NOT ALL PROJECTS

ARE SHOWN

United States – Canada Treaty and Columbia River Base System Projects

Revelstoke

Pacific Northwest Hydro Characteristics

Page 3: Scanning for Emerging Technology Opportunities · Grand Coulee Keenleyside Mica Libby Duncan Hungry Horse Kerr Thompson Falls Noxon Rapids Cabinet Gorge Albeni Falls Box Canyon Coeur

3

• Installed wind capacity is approaching 50 percent of our load

• Not much geographic diversity; most in BPA’s balancing authority

• Nearing limits of hydro system to provide balancing reserves

Page 4: Scanning for Emerging Technology Opportunities · Grand Coulee Keenleyside Mica Libby Duncan Hungry Horse Kerr Thompson Falls Noxon Rapids Cabinet Gorge Albeni Falls Box Canyon Coeur

Agenda

Technology Roadmapping National Summit, Sept 2012Technical Advisory

GroupsOnline library of

technology information

Page 5: Scanning for Emerging Technology Opportunities · Grand Coulee Keenleyside Mica Libby Duncan Hungry Horse Kerr Thompson Falls Noxon Rapids Cabinet Gorge Albeni Falls Box Canyon Coeur

Pipelines and Handoffs

5

TAGs

Stage GateScan Screen Assess New Measure

DocumentationStage Gate

Stage Gate

E3TNWdatabase

R&D Roadmapping

BPA Energy Efficiency Emerging Technologies (E3T)BPA Technology Innovation Programs

Page 6: Scanning for Emerging Technology Opportunities · Grand Coulee Keenleyside Mica Libby Duncan Hungry Horse Kerr Thompson Falls Noxon Rapids Cabinet Gorge Albeni Falls Box Canyon Coeur

BPA Office of Technology Innovation

Annual solicitation for R&D ProjectsStrict management of 50 R&D projects per

yearUse of roadmapping to identify business

needs & technology solutions – 20 year viewHelp create commercially available products

(“Emerging Technologies” for EE Programs)6

Page 7: Scanning for Emerging Technology Opportunities · Grand Coulee Keenleyside Mica Libby Duncan Hungry Horse Kerr Thompson Falls Noxon Rapids Cabinet Gorge Albeni Falls Box Canyon Coeur

Technology Summit

7

Purpose: National research agendaSept 24-27, 2012Portland, OR

Page 8: Scanning for Emerging Technology Opportunities · Grand Coulee Keenleyside Mica Libby Duncan Hungry Horse Kerr Thompson Falls Noxon Rapids Cabinet Gorge Albeni Falls Box Canyon Coeur

Roadmaps

8

Page 9: Scanning for Emerging Technology Opportunities · Grand Coulee Keenleyside Mica Libby Duncan Hungry Horse Kerr Thompson Falls Noxon Rapids Cabinet Gorge Albeni Falls Box Canyon Coeur

Roadmap Portfolio

9

http://www.bpa.gov/energy/n/emerging_technology/

Page 10: Scanning for Emerging Technology Opportunities · Grand Coulee Keenleyside Mica Libby Duncan Hungry Horse Kerr Thompson Falls Noxon Rapids Cabinet Gorge Albeni Falls Box Canyon Coeur

E3Tnw.org Database - Browse

10

Page 11: Scanning for Emerging Technology Opportunities · Grand Coulee Keenleyside Mica Libby Duncan Hungry Horse Kerr Thompson Falls Noxon Rapids Cabinet Gorge Albeni Falls Box Canyon Coeur

E3Tnw.org Database - Details of ET

11

Page 12: Scanning for Emerging Technology Opportunities · Grand Coulee Keenleyside Mica Libby Duncan Hungry Horse Kerr Thompson Falls Noxon Rapids Cabinet Gorge Albeni Falls Box Canyon Coeur

E3T Showcase Webinars

12http://e3tnw.org/Portals/0/E3TFiles/LED%20Parking%20and%20Area%20Lighting.pdf

Page 13: Scanning for Emerging Technology Opportunities · Grand Coulee Keenleyside Mica Libby Duncan Hungry Horse Kerr Thompson Falls Noxon Rapids Cabinet Gorge Albeni Falls Box Canyon Coeur

Technical Advisory Groups

13

Page 14: Scanning for Emerging Technology Opportunities · Grand Coulee Keenleyside Mica Libby Duncan Hungry Horse Kerr Thompson Falls Noxon Rapids Cabinet Gorge Albeni Falls Box Canyon Coeur

TAG -- Process

1. Recruit2. Brainstorm3. Rank (top 5 out of 80 or so ideas)4. Discuss top 5 in subgroups5. Score based on criteria6. Recommend research to get into

programs14

Page 15: Scanning for Emerging Technology Opportunities · Grand Coulee Keenleyside Mica Libby Duncan Hungry Horse Kerr Thompson Falls Noxon Rapids Cabinet Gorge Albeni Falls Box Canyon Coeur

HVAC2009 DCV Commercial Kitchens DCV VRF Indirect-direct evaporative cooling2010 Variable Capacity Compressors in packaged

rooftop units Air side economizers for data centers Web-based small commercial thermostat Advanced design rooftop HVAC unit

Past TAGsLighting 2009• Wireless Lighting Controls• Integrated Classroom Lighting System• Bi-Level Parking Lighting with Occupancy

Sensors• Bi-Level Stairwell Lighting with Occupancy

Sensors• Bi-Level Office Lighting with Occupancy

Sensors

Energy Management 2011 Packaged RTU Controls EMS for small commercial Information collection, analysis and control Behavior (using information effectively for

change) Non-intrusive load monitoring

Lighting – LED 2012• LED Outdoor Wall-mounted luminaires• LED Streetlighting• LED Area and parking lot lighting• LED Linear Commercial Office lighting

All reports, webinars, workgroup presentations, etc

are on e3tnw.org

Page 16: Scanning for Emerging Technology Opportunities · Grand Coulee Keenleyside Mica Libby Duncan Hungry Horse Kerr Thompson Falls Noxon Rapids Cabinet Gorge Albeni Falls Box Canyon Coeur

TAG Scoring

16

LED

Page 17: Scanning for Emerging Technology Opportunities · Grand Coulee Keenleyside Mica Libby Duncan Hungry Horse Kerr Thompson Falls Noxon Rapids Cabinet Gorge Albeni Falls Box Canyon Coeur

Resources

17

BPA Database of ETs www.e3tnw.org Conduit www.conduitnw.org BPA Research Reports http://www.bpa.gov/energy/n/emerging_technology/index.cfm E3T Showcase webinars -- http://e3tnw.org/Webinars.aspx FEMP http://www1.eere.energy.gov/femp/technologies/new_technologies.html EPRI http://portfolio.epri.com/Research.aspx?sId=PDU&rId=203 E Source http://www.esource.com/ NW National lab http://www.pnnl.gov/ Center for Built Environment http://cbe.berkeley.edu/index.htm American Council http://www.aceee.org/topics/emerging-technologies-and-practices European council http://www.eceee.org/ California Emerging Technologies coordinating council http://www.etcc-ca.com/

Page 18: Scanning for Emerging Technology Opportunities · Grand Coulee Keenleyside Mica Libby Duncan Hungry Horse Kerr Thompson Falls Noxon Rapids Cabinet Gorge Albeni Falls Box Canyon Coeur

Contacts

For more information, contact:Name: Ryan FedieTitle: EE Engineering Services ManagerE-mail: [email protected] number 503-230-4433

Name: Jack CallahanTitle: Emerging Technologies Program ManagerE-mail: [email protected] number 503-230-4496

Name: Jennifer WilliamsonTitle: Emerging Technologies Technology Transfer Manager (contract worker)E-mail: [email protected] number 503-230-4536

18