23
Scaffolding inside the Pre-heater Cyclones & Calciner

Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

  • Upload
    lytu

  • View
    235

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

Scaffolding inside the Pre-heaterCyclones & Calciner

Page 2: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

Antea Cement has contracted “JU-SM SHPKNJP”.Company, Tetove – FYROM for the scaffolding activities.

JU-SM is founded in 2000, for mounting scaffolds, withstarting five years experience in Germany and now in KosovoAlbania and FYROM.It has qualified ( licensed) and expert personnel.Using exclusively “Layher Allround Scaffolding” (certifiedaccording EN ISO 9001:2008) we have a complete non-boltedsystem in rapid, safe, highly adaptable scaffoldingconstruction.

Safe Erection & Use of ScaffoldingInside the Cyclones/Calciner

Safe Erection & Use of ScaffoldingInside the Cyclones/Calciner

Antea Cement has contracted “JU-SM SHPKNJP”.Company, Tetove – FYROM for the scaffolding activities.

JU-SM is founded in 2000, for mounting scaffolds, withstarting five years experience in Germany and now in KosovoAlbania and FYROM.It has qualified ( licensed) and expert personnel.Using exclusively “Layher Allround Scaffolding” (certifiedaccording EN ISO 9001:2008) we have a complete non-boltedsystem in rapid, safe, highly adaptable scaffoldingconstruction.

Page 3: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

Before entering the cyclone:Before entering the cyclone: Stop the kiln Cool down the kiln Cool down the pre-heater Open pre-heater doors Do all the necessary Tag and Lock Outs of the system Check the pre-heater from top to bottom for remainingmaterials Clean and remove dust and coating if necessary fromthe outside Check temperature and gases (O2, CO, CH4, H2S andLEL) Issue a Confined Space Permit according to the workpermit system

Stop the kiln Cool down the kiln Cool down the pre-heater Open pre-heater doors Do all the necessary Tag and Lock Outs of the system Check the pre-heater from top to bottom for remainingmaterials Clean and remove dust and coating if necessary fromthe outside Check temperature and gases (O2, CO, CH4, H2S andLEL) Issue a Confined Space Permit according to the workpermit system

Page 4: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

Preparation of protective platformagainst falling materials

Preparation of protective platformagainst falling materials

Page 5: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

Preparing the protective platformPreparing the protective platform To protect workers from falling materials, a protectiveplatform must be prepared above the working platform. Placing of metal beams inside the cyclone throughmaintenance holes and fixing them against moving andturning for protective platform support.

Page 6: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

Personal Protective EquipmentPersonal Protective EquipmentPersonal Protective Equipment (PPE) that mustbe worn when inside the cyclones:

Helmet Safety shoes Safety glasses Safety harness Long sleeve clothes Safety gloves Dust mask Full body Uniform

Personal Protective Equipment (PPE) that mustbe worn when inside the cyclones:

Helmet Safety shoes Safety glasses Safety harness Long sleeve clothes Safety gloves Dust mask Full body Uniform

Page 7: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

Preparing the protective platformPreparing the protective platform Before entering inside thecyclone,the Permit to Work is issued andsafety measures are taken suchas24 volt lighting, temperaturecontrol, access, gasses, etc.Decking the platform withwooden planks.

Before entering inside thecyclone,the Permit to Work is issued andsafety measures are taken suchas24 volt lighting, temperaturecontrol, access, gasses, etc.Decking the platform withwooden planks.When preparing the protective platform the work is doneonlyonly by one person and at least two persons stand byoutside the entrance. After decking, all planks are nailed.

Page 8: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

Dimensions of entering access,wooden planks and beams

Dimensions of entering access,wooden planks and beams

Dimensions of entering access; 500mm x 600mm Dimensions of wooden planks; 300mm x 50mm x4000mm Dimensions of steel beams; 100mm x100mm x 10mmthickness Steel beam’s length depends on the diameter of thecyclone

Dimensions of entering access; 500mm x 600mm Dimensions of wooden planks; 300mm x 50mm x4000mm Dimensions of steel beams; 100mm x100mm x 10mmthickness Steel beam’s length depends on the diameter of thecyclone

Page 9: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

Preparing the protective platformPreparing the protective platform Before entering, two boards are placed across the beams serving asstanding platform for the first step and the safety harness is attached to a longrope tied to a steady point.When working inside the cyclones at least two persons are always standingby outside the entrance.During preparation of the protective platform, the worker is not protected fromfalling materials, therefore wearing proper PPEs & cleaning from the outside(with a long stick) are his only defense.

Before entering, two boards are placed across the beams serving asstanding platform for the first step and the safety harness is attached to a longrope tied to a steady point.When working inside the cyclones at least two persons are always standingby outside the entrance.During preparation of the protective platform, the worker is not protected fromfalling materials, therefore wearing proper PPEs & cleaning from the outside(with a long stick) are his only defense.

Page 10: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

Preparing the base platform for theerection of the scaffold

Preparing the base platform for theerection of the scaffold

• It is the same procedure as perthe above protective platform.• In this case, the workers areprotected from falling materials.• Safety harness is attached tothe above door.• The walking platform is doubledecked.

• It is the same procedure as perthe above protective platform.• In this case, the workers areprotected from falling materials.• Safety harness is attached tothe above door.• The walking platform is doubledecked.

Page 11: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

Scaffold Erection SupportsScaffold Erection SupportsSupporting base plates are placed on cross double woodenplanks along the beams and the base plates are nailed on theboards.

Page 12: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

Erecting the scaffoldErecting the scaffold Scaffold is equipped with inner vertical safe access (ladder at every level),with diagonal bracings, ledger, transom and platform. At the working platform the minimum width is 600mm, side protection (twoguardrails) one 0,50m above the working platform, and the other at 1,0m.Platforms are placed above the top working level to provide protectionagainst falling materials. The scaffold is secured on the cyclone wall against overturning.

Scaffold is equipped with inner vertical safe access (ladder at every level),with diagonal bracings, ledger, transom and platform. At the working platform the minimum width is 600mm, side protection (twoguardrails) one 0,50m above the working platform, and the other at 1,0m.Platforms are placed above the top working level to provide protectionagainst falling materials. The scaffold is secured on the cyclone wall against overturning.

Page 13: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

Submission of scaffolding to AnteaCement.

Submission of scaffolding to AnteaCement.

After completion of the scaffold as erected by the contractor, the wholeworking zone is inspected by: Health and Safety department Production manager and/or head of kiln Refractory activities Responsible Person (Contractor)

If the scaffold is fulfilling the safety working conditions then a green tag isplaced on it, notifying: “Scaffold is ready for Use”

When a scaffold is not finished, at the entrance a red label notifies:“Scaffold not ready for Use”

After completion of the scaffold as erected by the contractor, the wholeworking zone is inspected by: Health and Safety department Production manager and/or head of kiln Refractory activities Responsible Person (Contractor)

If the scaffold is fulfilling the safety working conditions then a green tag isplaced on it, notifying: “Scaffold is ready for Use”

When a scaffold is not finished, at the entrance a red label notifies:“Scaffold not ready for Use”

Page 14: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

Safe use of the scaffoldingSafe use of the scaffolding

Guardrails

Protection platform

Wooden protectionplatform

Working platform

Access from level tolevel

Securing elementagainst overturning

Page 15: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

Safe use of the scaffoldingSafe use of the scaffolding

Demolishing damaged section Repairing

Page 16: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

DemolishingDemolishingTwo workers aredemolishing from thescaffold, one is inside closeto the access entrance andthe other outside theentrance Demolished materials aretaken out at once with plasticbuckets, so there is no loadleft on the scaffold.

Two workers aredemolishing from thescaffold, one is inside closeto the access entrance andthe other outside theentrance Demolished materials aretaken out at once with plasticbuckets, so there is no loadleft on the scaffold.

Page 17: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

RepairingRepairing

It is the same procedure as demolishing:When bricks have to be replaced, or whenconcreting takes place done by a gunite machine, oneworker stays inside and two or more outside theaccess entrance. If the maintenance work inside the cyclones lastsmore than one day then every day before entering, thescaffold & platforms are checked and cleaned up fromany dust or material that might have fallen in.

It is the same procedure as demolishing:When bricks have to be replaced, or whenconcreting takes place done by a gunite machine, oneworker stays inside and two or more outside theaccess entrance. If the maintenance work inside the cyclones lastsmore than one day then every day before entering, thescaffold & platforms are checked and cleaned up fromany dust or material that might have fallen in.

Page 18: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

Dismantling the scaffoldingDismantling the scaffoldingo Starting with the removal of the scaffoldo Following with removal of the base platformo Then the protection platform is taken out ando finally the beams are withdrawn & the holes are closed.

When dismantling the scaffold two workers are inside andtwo outside.

When dismantling the platform one worker is inside andtwo outside. The last two wooden planks are left in for theworker to get out.

During erection, use & dismantling of the scaffold, theworkers have their safety harness put on & attached to anappropriate fixed point.

o Starting with the removal of the scaffoldo Following with removal of the base platformo Then the protection platform is taken out ando finally the beams are withdrawn & the holes are closed.

When dismantling the scaffold two workers are inside andtwo outside.

When dismantling the platform one worker is inside andtwo outside. The last two wooden planks are left in for theworker to get out.

During erection, use & dismantling of the scaffold, theworkers have their safety harness put on & attached to anappropriate fixed point.

Page 19: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

GOOD PRACTICESGOOD PRACTICES

Page 20: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

• USE OF CHECK LISTGOOD PRACTICESGOOD PRACTICES

• WORK INSTRUCTION

Page 21: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

What are those scaffolds ?

Page 22: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

PRE-HEATER

C5-Cyclone• Dimension

- Diameter (cylinder Ф8500 mm and conesmall diameter Ф4700mm)

- High of the cyclone C5 ( cylinder, coneand chute) 19000mm.

• Weight- Metal construction: 60264 kg.- Bricks: 75000kg.- Castable: 53000kg.- Anchors: 1200kg- Insulation: 19000kg.

Total weight: 208.464 kg.

C5-Cyclone Vortex (dip tube)• Dimension and weight

- Diameter: Ф5065 mm.- High: 2410 mm.- Weight: 7617 kg.

PRE-HEATER

C5-Cyclone• Dimension

- Diameter (cylinder Ф8500 mm and conesmall diameter Ф4700mm)

- High of the cyclone C5 ( cylinder, coneand chute) 19000mm.

• Weight- Metal construction: 60264 kg.- Bricks: 75000kg.- Castable: 53000kg.- Anchors: 1200kg- Insulation: 19000kg.

Total weight: 208.464 kg.

C5-Cyclone Vortex (dip tube)• Dimension and weight

- Diameter: Ф5065 mm.- High: 2410 mm.- Weight: 7617 kg.

Page 23: Scaffolding inside the cyclones - Home - Sharrcemsharrcem.com/.../uploads/2014/05/Scaffolding-inside-the-cyclones-.pdf · Company, Tetove – FYROM for the scaffolding activities

PRE-HEATER

Calcainer

• Dimension- Diameter of the calcainer: Ф6000mm.- High of the calcainer: 34000mm.

• Weight- Metal construction: 55680 kg.- Bricks: 111000kg.- Castable: 63000kg.- Anchors: 1300kg- Insulation: 15000kg.

Total: 245980 kg.

PRE-HEATER

Calcainer

• Dimension- Diameter of the calcainer: Ф6000mm.- High of the calcainer: 34000mm.

• Weight- Metal construction: 55680 kg.- Bricks: 111000kg.- Castable: 63000kg.- Anchors: 1300kg- Insulation: 15000kg.

Total: 245980 kg.