52
SBIIMS, New delhi 1 ssss TENDER DOCUMENT FOR Design, Supply, Installation, Testing & Commissioning of 15 passenger Lift At SBICRM, Campus 2, Plot No 79, Sec 18, Gurugram -122015, Haryana AT CLIENT: Date of issue of Tender: ONLINE On 14/09/2018 SBI INFRA MGMT. SOL. PVT.LTD. 5 TH FLOOR, D- BLOCK, 11, PARLIAMENT STREET, NEW DELHI-110001 SBI INFRA MANAGEMENT SOLUTIONS PVT.LTD. SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM.

SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

1

ssss

TENDER DOCUMENT

FOR

Design, Supply, Installation, Testing & Commissioning of 15 passenger Lift At SBICRM, Campus 2, Plot No 79, Sec

18, Gurugram -122015, Haryana

AT

CLIENT:

Date of issue of Tender: ONLINE On 14/09/2018

SBI INFRA MGMT. SOL. PVT.LTD.

5TH

FLOOR, D- BLOCK,

11, PARLIAMENT STREET,

NEW DELHI-110001

SBI INFRA MANAGEMENT SOLUTIONS PVT.LTD.

SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM.

Page 2: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

2

Notice Inviting Tender

SBI Infra Management Solutions Pvt. Ltd. on behalf of State Bank of India invites online Tenders from the Category ‘A’ Lift manufacturer as per latest CPWD works manual viz. Johnson Lifts, Kone Elevators, OTIS Elevators, Schindler Elevators & Mitsubishi Elevators for the Design, Supply, Installation, testing & Commissioning of 15 passengers Lift At State Bank Institute of Credit and Risk Management(SBICRM), Campus 2, Plot No 79, Sec 18, Gurugram -122015, Haryana

Details of tenders are as under:

TENDER NO. SBIIMS/GUR/BPS/2018-19/ET-001 DATE- 14/09/2018

1. Name of Work : Design, Supply, Installation, Testing & Commissioning of 15 passenger Lift At State Bank Institute of Credit and Risk Management(SBICRM), Campus 2, Plot No 79, Sec 18, Gurugram -122015, Haryana

2. Time allowed for completion : 120 days from date of execution of the

agreement and acceptance of LOA.

3. Earnest Money Deposit (1% of Estimated cost)

: Rs.20,000/-(Rupees TwentyThousand

only) by crossed Bank Draft / Banker’s

Cheque drawn in favour of State Bank of

India, New Delhi (to be enclosed in sealed

envelope as a part of Technical Bid).

4. Initial Security Deposit : 2% of the total value of the contract

including Earnest Money.

5. Cost of Tender Documents : A non-refundable amount of Rs. 2000/-

(Rupees Two Thousand only) in form of

DD/Banker’s Cheque in favour of SBI INFRA

MANAGEMENT SOLUTIONS PVT. LTD.

Payable at Delhi (to be enclosed in sealed

envelope as a part of Technical Bid).

Page 3: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

3

6. Last date and time of receipt of Tenders

: 04/10/2018 upto 3.00 p.m. Tender will be

availabe from 15.09.2018 to 04.10.2018.

7 Date of Pre Bid Meeting : 24.09.2018 at SBIIMS Pvt Ltd, 5th Floor,

D-Block, 11 Parliament Street, N Delhi-

11000 at 11:30AM

8. Address at which the Tenders are to be submitted in physical form duly signed and stamp at each page.

: Technical Bid: In hard copy at SBI

INFRA MANAGEMENT SOLUTIONS PVT.

LTD.

5th Floor, D- Block, 11, Parliament

Street, New Delhi- 110001.

Price Bid: In hard copy in separate

sealed envelope as a part of Price Bid.

9. Online Submission of tender : Vendors is required to upload technical

and price bid separately duly signed and

stamped along with soft copy of

requisite EMD and Tender cost on the

SBI e-tender portal

www.tenderwizard.com/SBIETENDER

9. Date and time of opening of Tenders(Technical & Price Bid)

: 04/10/2018 at 3.30 p.m.

Technical Bid: In hard copy.

Price Bid: Online(only for technically

qualified bidder)at 4:30 p.m on same

day.

10. Place of opening Tenders : SBI INFRA MANAGEMENT SOLUTIONS

PVT. LTD.

5th Floor, D- Block, 11, Parliament

Street, New Delhi- 110001.

11. Defects Liability Period : 12 months from the date of handing over of

the project to the satisfaction of Bank.

12. Validity of Offer

: 90 days from the date of opening the

Tenders.

13. Liquidated Damages : At the rate of 0.5% of the Contract Value per

week which subject to a maximum of 5% of

the accepted Contract Value.

14 Corrigendum(if any) : Will be published on SBI e-tender portal

www.tenderwizard.com/SBIETENDER

15 Availability of Tender Document

: Tender documents to be downloaded from

the SBI e-tender portal

www.tenderwizard.com/SBIETENDER and

www.sbi.co.in under procurement news.

Page 4: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

4

16 For E-Tender related queries : Service provider-M/s Antares System

Limited, Registered Office at: 24, Sudha

Complex, 3rd stage, 4th Block, Banglore-

560079.

Contact Person –Mr.Pushpraj (07503347659)

Mr. Tousik Ghosh (09674758724) &

Mr.Kushal Bose (07686913157)

E-mail:

[email protected]/tousik.g@ant

aressystems.com/kushal.b@antaressystems.

com

17 For Any queries : Contact Person: Bhanu Pratap Singh, Dy

Manager(E.E) Mob:8826613205 at SBICRM

Campus I Plot No 77, Sec 18, Gurugram.

E-mail: [email protected]

Mode of Submission of Tender: The tender shall be submitted in both physical and online in two cover system in accordance with the procedure detailed herein below. Specified documents shall be sealed in envelopes of appropriate size each of which shall be sealed.

1) First Envelope marked Cover 1 shall contain Earnest Money Deposit and Cost of

Tender Document along with Complete Tender document duly signed and stamped at each page.

2) Second Envelope marked Cover 2 shall contain only the duly signed and stamped priced Bill of Quantities.

3) Envelope marked Cover 3 shall be of adequate size and shall contain envelopes marked Covers 1 & 2 and shall be properly sealed. This envelope shall be endorsed on the outside face as under:

“Design, Supply, Installation, testing & Commissioning of 15 passenger Lift At State Bank Institute of Credit and Risk Management(SBICRM), Campus 2, Plot No 79, Sec 18, Gurugram -122015, Haryana”

The envelope marked Cover 3 containing the tender documents as per instructions mentioned above shall be submitted in the office of VICE PRESIDENT (CIVIL), SBI

INFRA MANAGEMENT SOLUTIONS PVT. LTD., 5TH FLOOR, D-BLOCK, 11, SANSAD

MARG, NEW DELHI 110001 ON OR BEFORE 3.00 p.m. on 28/09/2018.

Envelope marked Cover 1 containing Earnest Money Deposit and Cost of Tender Document along with Complete Tender document duly signed and stamped at each page, will be opened first, if the Earnest Money Deposit or Cost of Tender Document is not found as prescribed, the tender shall be rejected.

Page 5: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

5

In case the date of opening of tenders is declared as a holiday, the tenders will be opened on the next working day at the same time.

State Bank of India has the right to accept / reject any or all tenders without assigning any reasons.

SBI Infra Management Solutions Pvt. Ltd. (SBIIMS)

SIGNATURE OF THE TENDERER

Page 6: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

6

SECTION -II

PART – A

GENERAL INSTRUCTIONS TO TENDERERS

• THE SITE OF WORK: State Bank Institute of Credit and Risk Management(SBICRM),

Campus 2, Plot No 79, Sec 18, Gurugram -122015, Haryana.

• Sealed Tender documents duly completed in all respects shall be submitted to VICE

PRESIDENT (CIVIL), SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD., 5TH

FLOOR, D-BLOCK, 11, SANSAD MARG, NEW DELHI 110001 ON OR BEFORE

3.00 p.m. on 04/10/2018. The Bank will not be responsible for any postal

delay/loss/non-receipt thereof. No consideration will be given to a Tenders received

after the time/date specified above and such Tenders are deemed to be rejected. The

Tender Documents are not transferable. Incomplete Tenders and not conforming to

the requirements of the invitation for tenders are liable to be rejected. Tenders

submitted by a firm shall be signed separately by proprietor, each partner thereof

and in the absence of any partner, shall be signed by the Power of Attorney holder.

Tender by a company shall be executed by person(s) duly authorized under the

resolution of the Board of Directors of the Company.

• The offers are to be submitted in two bid system:- The qualification/technical

proposal and the price proposal in two separate sealed covers, distinctly marked

accordingly and both the proposals then put in a third envelope and sealed duly

superscribed as “Tender for design, supply, installation, testing and

commissioning of 15 passengers lift at SBICRM, campus 2, Gurugram”.

Technical bid & price bid, if not enclosed in separate sealed covers, the tender shall

be rejected.

• Qualification proposals will be opened at 3.30 P.M. on 04.10.2018 and Price bid at

4:30 p.m at the office of the VICE PRESIDENT (CIVIL), SBI INFRA

MANAGEMENT SOLUTIONS PVT. LTD., 5TH FLOOR, D-BLOCK, 11, SANSAD

MARG, NEW DELHI 110001, in the presence of bidders or the bidders duly

authorized representatives. Price bid will be opened only for technically qualified

bidders. The authorized representatives should bring necessary authority letters

under an official letterhead of the bidders conferring full and comprehensive

authority to deal with all matters relating to the tenders.

Page 7: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

7

• The tenderer should also submit the following documents along with their offers in

support of:-

a) Drawing/Design of lift to be installed.

b) Drawing/Design/Specification of the Shaft required for installation of lift.

c) Drawing/Details of electrical work to be carried out for installation of lift.

d) Drawing/Details of Civil work to be carried out in the shaft if any.

e) Valid ‘A’ Class Approved Electrical License, Valid registration

certificate/licence with Labour Department under the Contract Labour

(Regulation & Abolition) Act, 1970, if applicable.

•The Contractors should quote in figures as well as in words the rate, and amount Tendered

by them. The amount for each item should be worked out and the requisite totals given.

The rates quoted shall be all inclusive rates for the item of work described, including

materials, labour, tools & plant, carriage & transport, supervision, overheads & profits,

mobilizing, all taxes, and other charges whatsoever including any anticipated or un-

anticipated difficulties etc. complete for proper execution of the work as per drawings and

specifications and no claim whatsoever for any extra payment shall be maintainable.

However, any changes in the taxing structure shall be payable extra.

•Canvassing in connection with Tenders is strictly prohibited and the Tenders submitted by

the Contractors who resort to canvassing will be liable for rejection.

•All rates shall be quoted on the proper form of the Tender alone. Quoted rates and unit

different from prescribed in the Tender schedule will be liable for rejection.

•All corrections such as cuttings, interpolations, omissions and over-writings shall be signed

by the Tenderer.

•GST, works contract tax, or any other tax, any royalties, duties, levies, cess, entry tax,

Octroi, profession tax, turnover tax, or of like on material or finished work in respect of

this Contract shall be payable by the Tenderer and the Employer will not entertain any

claim whatsoever in respect of the same, and nothing extra shall be paid/reimbursed for

the same subsequently. However, any changes in the taxing structure shall be

payable extra.

Page 8: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

8

•The bidder has to sign each and every page of this tender document.

•The L-1 bidder has to sign a formal agreement on stamp paper within seven days of award

of work. The format of the agreement is given in the tender document.

•On acceptance of the Tender, the name of the accredited representative(s) of the

bidder, who would be responsible for taking instructions from the Employer shall be

communicated to the Employer.

•The bidder shall necessarily furnish the com pr ehe ns i ve AMC charges in the price

Bid for 4 years after warranty period and terms of AMC shall be furnished in the bid

clearly indicating the details regarding the scope of AMC, details of spares,

consumables & equipments covered and t ime schedu les f o r r ec t i f i ca t ion o f

major fau l t s . Other than details furnished under exclusions all other related expenditure

towards trouble free maintenance and its normal functioning shall be considered as part of

AMC. Hence, the cost of AMC is also considered for price comparison (to decide

L1) along with the cost of lift.

•The bidders are advised to inspect and examine the site of work, its

surroundings and satisfy themselves before submitting their Tenders as to the

nature of the work and other aspects pertaining to the work, the form and

nature of the site, the means of access to the site and in general shall

themselves obtain all necessary information as to risks, contingencies and other

circumstances which may influence or affect their Tender. The bidder shall be

deemed to have full knowledge of the site whether he inspects it or not and no extra

charges consequent on any misunderstanding or otherwise shall be allowed. The

Tenderer shall be responsible for arranging and maintaining at his own cost all materials,

tools and plants, facilities for workers and all other services required for executing the

work unless otherwise specifically provided for in the Contract documents. Submission of a

Tender by a Tenderer implies that he has read this notice and all other Contract

documents and has made himself aware of the scope and specifications of the work to

be done & local conditions and other factors having a bearing on the execution, of the

work.

Page 9: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

9

•State Bank of India reserves the r ight to accept/reject any/all tender(s)

without ass igning any reason, what so ever.

•The tenderer shall quote the rates in English Language and international numerals. These

rates shall be entered in figures as well as in words. In case of difference in rates between

words and figures THE LESSER OF THE TWO will be treated as valid rate.

•All entries in the tender shall either be typed or be written in ink. Erasure and over writings

are not permitted and may render such tenders liable to summary rejection. All

cancellations and insertions shall be duly attested by the tenderer.

•The bidders must submit their official address and official e-mail ID.

•Submission of documents pertaining to PAN no, GST No, Tin No, ESI regn. No, PF

regn. No, contract labour license and electrical contractor license etc are mandatory,

failing which the tenders are liable for rejection.

•AUTHORISATION AND ATTESTATION: Tenders shall be signed by persons duly

authorized / empowered to do so. Certified copies of such authority and relevant documents

shall be submitted along with the tenders.

•VALIDITY OF OFFER: The offer shall be kept open for acceptance for a period of THREE

MONTHS from the date of opening of tenders. In case State Bank of India calls for

negotiations, such negotiations shall not amount to cancellation or withdrawal of the original

offer which shall be binding on the bidders.

•EXECUTION OF CONTRACT: The successful bidder's responsibility under this Contract

commences from the date of issue of the Letter of Intent/Award by State Bank of India. The

successful bidder shall be required to execute an agreement in the prescribed form, with the

SBI, within the specified time after the acceptance of his tender. The expenses for

completion and making required number of copies and compilation of Contract Documents

duly bound / titled and stamping / registration of the agreement with prescribed authority,

if necessary, shall be borne by the bidder.

•SECURITY DEPOSIT: Upon acceptance of tender, the successful bidder must deposit the

required amount of security deposit within the time specified in the Letter of Intent/Award

for satisfactory completion of work.

Page 10: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

10

Total Security Deposit

Total Security deposit comprise of:-

1. Initial Security deposit

2. Retention Money

Initial Security Deposit (ISD)

The amount of ISD shall be 2% of accepted value of tender including the EMD in the form of

D/D drawn on any scheduled Bank and shall be deposited within 10 days from the date of

acceptance of tender.

Retention Money

Besides the ISD as deposited by the contractor in the above said manner the retention

money shall be deducted from the running account bill at the rate of 10% of the gross value

of work done by the contractor and claimed in each bill provided the total security deposit

i.e. the ISD plus Retention Money shall both together not exceed 5% of the contract value.

The total security deposit shall be refunded to the contractors without interest within fifteen

days after the end of defects liability period of one year provided the contractor has

satisfactorily attended to all defects in accordance with the conditions of contract including

site clearance.

• The Initial Security Deposit shall be deposited within 10 days from the date of issue

of Letter of Intent/Award in the form of demand draft in favour of State Bank India

drawn on a Nationalized/Scheduled Bank payable at New Delhi.

• If the value of the work done at any time exceeds the accepted agreement value, the

Security Deposit shall be correspondingly enhanced and the extra Security Deposit

shall be immediately deposited by the Contractor or recovered from payments due to

him.

• Failure to deposit the Security Deposit within the stipulated time, may lead to

Cancellation of the award of work.

• State Bank of India reserves the right of forfeiture of Security Deposit in addition

to other claims and penalties in the event of the contractor's failure to fulfill any of

the contractual obligations or in the event of termination of contract as per terms

and conditions of contract. SBI reserves the right to set off the Security Deposit,

against any claims of any other contracts with SBI.

Page 11: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

11

• No interest shall be payable by SBI on, Security Deposit or on any moneys due to

the contractor.

• Retention Money will be released against submission of Bank Guarantee of

the same amount.

• EVALUATION AND REJECTION OF TENDER AND OTHER CONDITIONS:

1 The acceptance of Tender will rest with SBI which does not bind itself to accept the lowest

tender or any tender and reserves to itself full rights to reject any or all of the tenders

without assigning any reasons whatsoever.

2 Conditional and un-witnessed tenders, tenders containing absurd or unworkable rates and

amounts, tenders which are incomplete or otherwise considered defective and tenders not in

accordance with the tender conditions, specifications etc., are liable to be rejected.

3 SBI will not be bound by any Power of Attorney granted by the tenderer or by changes in

the composition of the firm made subsequent to the execution of the contract. SBI may,

however, recognise such Power of Attorney and changes after obtaining proper legal advice,

the cost of which will be chargeable to the contractor concerned.

4 If the bidder deliberately gives wrong information in his tender, SBI reserves the right to

reject such tender at any stage or to cancel the contract, if awarded and forfeit the Earnest

Money/ Security Deposit/ any other moneys due.

5 The successful bidder should not sub-contract the part or complete work detailed in the

tender specification without written permission of SBI. The tenderer is solely responsible to

SBI for the work awarded to him.

6 NO DEVIATIONS to the tender conditions/specifications will normally be

accepted. However, if the tenderer insists for certain deviations to the conditions,

financial implication thereof shall be discussed in the pre bid meeting, if deviations

accepted by the Bank, Corrigendum will be released for the same.

7 The bidders must have 24X7 complaint attending service setup. In case of any call, the

same must be attended within two hours.

Page 12: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

12

PART – B

GENERAL TERMS AND CONDITIONS

01. DEFINITION OF TERMS Throughout the Tender Documents including the Inquiry

Letter, the following words shall have the meanings assigned to them herein, unless the

subject matter or the context requires otherwise.

02. The ‘Purchaser’ or SBI’ shall mean State Bank of India (A Govt. of India Undertaking)

incorporated under the Companies Act 1956, with its Registered Office at Corporate Centre,

Madam Cama Road, Nariman Point, Mumbai. which expression shall include its successors

and assigns; acting through its Office, SBICRM Campus 2, Plot No 79, Sec 18, Gurugram,

Haryana -122015 or its authorized officers or its Engineer or other employees authorized to

deal with any matters with which these persons are concerned, on its behalf.

03. The ‘Bidder’ shall mean the Firm/Company/Organization, which quotes against the

Tender Enquiry issued by the Purchaser. It may also be referred as ‘Bidder’.

04. The `Contractor' shall mean the individual, firm or company whose Offer is accepted

by SBI and enters into Contract with SBI and shall include their executors, administrators,

successors and permitted assigns.

05. The `Contract' shall mean and include the agreement, the work order, the accepted

appendices of rates, Schedules of Quantities, if any, General Conditions of Contract, Special

Conditions of Contract, Instructions to the Tenderers, the drawings, the technical

specifications, the special specifications, if any, the tender documents and the Letter of

Intent/ Acceptance letter issued by SBI. Any conditions or terms stipulated by the Tenderer

in the tender documents or subsequent letters shall not form part of the Contract unless

specifically accepted in writing by SBI in the Letter of Intent and incorporated in the

Agreement. It may also be referred as `Contract Document’.

06. The ‘Sub-contractor’ shall mean the person/firm/company/organization to whom any

part of the work has been sub-contracted by the Supplier, with the written of the Purchaser

and shall include his heirs, executors, administrators, representatives and assigns.

07. The ' Engineer', for the purpose of this Contract shall mean an engineer, person or

company duly appointed as such from time to time or such other officials as may be duly

authorized and appointed and notified in writing by purchaser to act as engineer. In cases

Page 13: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

13

where no such Engineer has been so appointed, the word 'Engineer' shall mean the BANK or

his duly authorized representative. It may also be referred to as Engineer –in –Charge.

08. Thè 'Work' shall mean and include supply of all categories of labour, specified

consumables, tools and tackles required for complete and satisfactory installation of lift, site

transportation, handling, stacking, storing, erecting, testing and commissioning of the

equipment; as defined in the Tender Documents, to the satisfaction of SBI. It may also be

referred as `CONTRACT WORK'.

09. The ‘Tender Document’ shall mean and include the instruction to Tenderers, general

conditions, bidding conditions, specific conditions, specifications, schedules, drawings, form

of tender, schedule of prices and quantities, contained in the Tender and any subsequent

modifications thereof.. It may also be referred as ‘Tender Specification’

10. The ‘Offer’ shall mean and include the technical and commercial documents including

specifications, schedule of prices and quantities, drawings etc submitted by the Tenderer in

response to the tender enquiry and any subsequent clarifications thereof. It may also be

referred as ‘Bid’.

11. ‘Acceptance of offer’ shall mean issue of letter of intent/award or memorandum or

detailed Order/Contract communicating the acceptance of offer, to the successful Tenderer.

12. Thè 'Letter Of Intent/Award' shall mean the intimation by a letter / fax to the

Tenderer that the tender has been accepted in accordance with provisions contained in the

letter. The responsibility of the contractor commences from the date of issue of this letter

and all the terms and conditions of contract are applicable from this date.

13. The ‘Site’ shall mean the site of the proposed work as listed in the tender.

14. Thè 'Completion Time' shall mean the period specified in the Letter of Intent/Award

for completing the work to the satisfaction of the SBI,as per the standards and conforming

to the specifications of the Contract.

15. The `Tests' shall mean and include such test or tests to be carried out by the

Contractor as are prescribed in the Contract or considered necessary by SBI in order to

ascertain the quality, workmanship, performance and efficiency of the contracted work or

part there of.

Page 14: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

14

16. The ‘Commissioning’ shall mean the first operation of the equipment after all initial

adjustments, trials, cleaning and re-assembly required at site, if any, have been completed

and equipment is made ready for commercial use.

17. The Àpproved', `Directed' Or Ìnstructed' shall mean approved, directed or

instructed by SBI.

18. ‘Contract Engineer’ shall mean the official who has signed the Order/Contract on

behalf of the Purchaser.

19. ‘Months’ shall mean calendar months.

20. ‘Days’ shall mean calendar days.

21. ‘Writing’ shall include any manuscript, typewritten or printed statement under or over

signature, seal as the case may be.

22. “Contract Value” shall mean the awarded/ executed value of work calculated on the

basis of the awarded/ executed quantities of work and the approved /accepted rates by SBI.

The words incorporating singular shall include plural and vice-versa, in the words importing

masculine gender shall include feminine and vice-versa and the words importing persons

shall include bodies corporate, limited liability companies, partnership and other legal

entities.

STATE BANK OF INDIA reserves its right to negotiate with the bidder and/ or go

for reverse auction.

23. PRICES AND TERMS OF PAYMENT

23.1 Prices quoted by the bidder shall be fixed and not subject to any escalation whatsoever

during the period of Bid validity and execution of the Contract. A Bid submitted with an

adjustable price will be treated as non -responsive and rejected.

23.2 Prices should be inclusive of all taxes and duties .

23.3 Terms of Payment

a. 30% Advance against submission of ISD and execution of the agreement.

b. 60% upon delivery of material at site

Page 15: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

15

The balance 10% payment shall be released after successful installation and

commissioning of the Lift and after receipt of lift license from the concerned LIFT

INSPECTORATE, however any fee submitted for issuing of lift license will be borne

by the Bank.

23.4 All payments will be released after deduction of taxes as per the rules in force and Tax

Deduction at Source (TDS) certificate will be issued by SBI as applicable.

23.5 AMC charges will be paid quarterly in advance.

24. COMMENCEMENT AND COMPLETION OF WORK

24.1 The contractor shall commence the work within the time indicated in the Letter of

Intent/Award and shall proceed with the same with due expedition without delay. The

responsibility of successful Tenderer under this Contract commences from the date of issue

of the Letter of Intent/Award/Agreement.

24.2 If the successful tenderer fails to commence the work within the stipulated time, SBI,

at its sole discretion, will have the right to cancel the contract. His Earnest Money and/ or

Security Deposit will stand forfeited without any further reference to him without prejudice

to any and all of SBI’s other rights and remedies in this regard.

24.3 All the works shall be carried out under the direction and to the satisfaction of SBI.

24.4 The transported equipment, erected /constructed plant or work performed under the

Contract, as the case may be, shall be taken over by SBI in part or in full when it has been

completed in all respects and/or satisfactorily put into operation at site. However, the work

under the Contract shall be considered as completed only when the full scope of work is

taken over by SBI.

25. MEASUREMENT OF WORK AND MODE OF PAYMENT

25.1 All payments due to the contractor shall be made by Àccount Payee’ Cheques or

through NEFT/RTGS.

25.2 For progress/ running bill payments, the contractor shall present detailed

measurement sheets in triplicate duly indicating all relevant details based on technical

documents and connected drawings for the work done during the month/ period under

different categories in line with terms of payment as per Letter of Intent. The basis of

arriving at the quantities/ weights shall be the relevant documents and drawings released

Page 16: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

16

by SBI. These measurement sheets shall be prepared jointly with Engineer and signed by

both the parties.

26.0 RIGHTS OF SBI: SBI reserves to itself the following rights in respect of this contract

without entitling the contractor to any compensation.

26.1 To get the work done through another agency at the risk and cost of the contractor, in

the event of poor progress or the contractor's inability to progress the work for completion

as stipulated in the contract, poor quality of work, persistent disregard of instructions of

SBI, assignment, transfer, subletting of the contracted work without written permission of

SBI, non-fulfillment of any contractual obligations etc. and to claim / recover compensation

for such losses from the contractor including SBI's supervision charges and overheads from

Security Deposit/ other dues.

26.2 To withdraw any portion of work and / or to restrict / alter quantum of work as

indicated in the contract during the progress of work and get it done through another

agency and/ or by the departmental labour to suit SBI's commitments or in case SBi decides

to advance the completion due to other emergent reasons.

26.3 To terminate the contract after due notice and forfeit the Security Deposit and recover

the loss sustained in getting the balance work done through other agencies in addition to

liquidated damages/ penalty in the event of:

(a) Contractor's continued poor progress.

(b) Withdrawal from or abandonment of the work before completion of the work.

(c) Corrupt act of the contractor.

(d) Insolvency of the contractor.

(e) Persistent disregard of the instructions of SBI.

(f) Assignment, transfer, subletting of the contract work without SBI’s written permission.

(g) Non-fulfillment of any contractual obligations.

26.4 To recover any moneys due from the Contractor from out of any moneys due to the

Contractor under this or any other Contract or from the Security Deposit.

Page 17: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

17

26.5 To claim compensation for losses sustained including SBI's supervision charges and

overheads in case of termination of contract and to levy penalty for delay in completion of

work.

26.6 To determine the Contract or to restrict the quantum of work and pay for the portion of

work done in case SBI's contract with its customer is terminated for any reason.

26.7 To effect recoveries from any amounts due to the contractor under this or any other

contract or in any other form the moneys which SBI is forced to pay to anybody due to

contractor’s failure to fulfill any of his obligations.

26.8 To restrict or increase the quantity and nature of work to suit site requirements, since

the tender specification is based on preliminary documents and quantities furnished therein

are indicative and approximate and the rates quoted shall not be subject to revision.

26.9 To deploy SBI's skilled and semiskilled workmen in case of emergency / poor progress/

deficiency in skill on the part of the employees of the contractor and to recover the

expenditure on account of the same from the moneys, due to the contractor.

26.10 While every endeavor will be made by SBI to this end, SBI cannot guarantee

uninterrupted work due to conditions beyond its control. The Contractor will not be entitled

to any compensation/ extra payment on this account.

26.11 In the event of any dispute of technical nature, the decision of SBI shall be final and

binding on the Contractor.

27. RESPONSIBILITIES OF CONTRACTOR IN RESPECT OF LOCAL LAWS,

EMPLOYMENT OF WORKERS, ETC.

The following are the responsibilities of the Contractor in respect of observance of local

laws, employment of personnel, payment of taxes etc.(If applicable):

27.1 As far as possible, unskilled workers shall be engaged from the local areas in which the

work is being executed.

27.2 The contractor at all times during the continuance of this contract, shall in all his

dealings with the local labour for the time being employed on or in connection with the

work, has due regard to all local festivals, religious and other customs.

Page 18: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

18

27.3 The Contractor shall comply with all State and Central Laws, Statutory Rules,

Regulations, such as The payment of wages Act, The Minimum Wages Act, The workmen's

Compensation Act, The Employer's Liability Act, The industrial Disputes Act, The Employees'

Provident Fund Act, Employees' State Insurance Scheme, the Contract Labour (Regulations

and Abolition Act, 1970) and other Acts, Rules and Regulations for labour as may be

enacted by the Government during the tenure of the Contract and having force or

jurisdiction at site. The contractor shall give to the local Governing Body, Police and other

concerned Authorities all such notice as may be required under law.

27.4 The Contractor, in the event of his engaging 20 or more workmen, will obtain

independent license under the Contract Labour (Regulations and Abolition Act, 1970) from

the concerned authorities based on the certificate (Form-V) issued by the principal

employer.

27.5 The contractor shall pay all taxes, fees, license charges, deposits, duties, tolls, royalty,

commissions or other charges which may be leviable on account of any of his operations

connected with this contract. In case SBI is forced to make any such payment, SBI shall

recover the same from the contractor either from moneys due to him or otherwise as

deemed fit.

27.6 To affect recoveries from any amounts due to the contractor under this or any other

contract or in any other form the moneys which SBI is forced to pay to anybody due to

contractor’s failure to fulfill any of his obligations.

27.7 To restrict or increase the quantity and nature of work to suit site requirements, since

the tender specification is based on preliminary documents and quantities furnished therein

are indicative and approximate and the rates quoted shall not be subject to revision.

27.8 To deploy SBI's skilled and semiskilled workmen in case of emergency / poor progress/

deficiency in skill on the part of the employees of the contractor and to recover the

expenditure on account of the same from the moneys due to the contractor.

27.9 While every endeavor will be made by SBI to this end, SBI cannot guarantee

uninterrupted work due to conditions beyond its control. The Contractor will not be entitled

to any compensation/ extra payment on this account.

27.10 In the event of any dispute of technical nature, the decision of SBI shall be final and

binding on the Contractor.

Page 19: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

19

27.11 While SBI will pay the inspection fees of the government statutory Inspectorate, all

other arrangements for the periodical visits of such Inspectors to site, inspection certificates

etc. will have to be made by the contractor at his cost. The contractor will also meet all

expenses in connection with observed discrepancies by these govt. inspectors and

performing any requisite qualification tests.

27.12 The contractor shall be responsible for the provision of health and sanitary

arrangements more particularly described in the Contract Labour (Regulations and Abolition

Act, 1970) and safety precautions as may be required for safe and satisfactory execution of

the contract.

27.13 The contractor shall be responsible for proper accommodation including adequate

medical facilities for the personnel employed by him.

27.14 The contractor shall be responsible for the proper behavior and observance of all

regulations by the staff employed by him.

27.15 The contractor shall ensure that no damage is caused to any person / property of

other parties working at site. If any such damage is caused, it shall be the responsibility of

the contractor to make good the losses and compensate them.

27.16 All the properties/ equipment/ components of SBI/ its customer loaned with or

without deposit, to the contractor shall remain the properties of SBI/ its customer. The

contractor shall use such properties for the purpose of execution of this contract. All such

properties/ equipment/ components shall be taken to be in good condition unless notified to

the contrary by the contractor within 48 hours. The contractor shall return them in good

condition as and when required by SBI/ its customer. In case of non-return, loss, damage,

repairs etc., the cost thereof, as may be fixed by the Engineer, will be recovered from the

contractor.

27.17 It shall not be obligatory on the part of SBI to supply any tools and tackles or

materials other than those specifically agreed to be given by SBI. However, depending upon

availability / possibility, SBI/ its customer's equipment and other materials may be made

available to the contractor on payment of hire charges as fixed by them, subject to the

conditions laid down by SBI/ its customer from time to time. Unless paid in advance, such

hire and other charges shall be recovered from out of dues to the contractor or security

deposit in one installment.

Page 20: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

20

27.18 The contractor shall fully indemnify and keep indemnified SBI against all claims of

whatever nature arising during the course of execution of this contract.

27.19 In case the contractor is required to undertake any work outside the scope of this

contract, the amount payable shall be as may be mutually agreed upon.

27.20 Any delay in completion of works or non-achievement of periodical targets, due to

reasons attributable to the contractor, will have to be compensated by the contractor either

by increased manpower and resources or by working extra hours or more than one shift at

no extra cost to SBI.

27.21 The contractor shall execute the work under the conditions usual to such plant

construction and in conjunction with numerous other operations at site. The contractor and

his personnel shall cooperate and coordinate with other agencies at project site and proceed

in a manner that shall help in the progress of work at site as a whole.

27.22 The contractor will be directly responsible for payment of wages to his workmen. A

pay-roll sheet giving details of all payments made to the workmen duly signed by the

contractor's representative should be furnished to SBI, if called for.

27.23 In case of any class of work for which there is no specification laid down in the

contract, such work shall be carried out in accordance with the instructions and

requirements of the Engineer.

27.24 No levy, payment or charges made or imposed shall be impeached by reason of any

clerical error or by reason of any mistake in the amount levied, demanded or charged.

27.25 No idle labour charges will be admissible in the event of any stoppage of work

resulting in the contractor's workmen being rendered idle due to any reason at any time.

27.26 The contractor shall take all reasonable care to protect the materials and the work till

such time the plant / equipment has been taken over by SBI.

27.27 Contractor shall not stop work or abandon the site for whatsoever reason or dispute,

excepting for Force Majeure conditions. All problems / disputes shall be separately discussed

and settled without affecting the progress of work. Stoppage or abandonment of work, other

than under force Majeure conditions, shall be treated as breach of Contract and dealt with

accordingly.

Page 21: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

21

27.28 The contractor shall keep the area of work clean and shall remove the debris etc

while executing day-to-day work. Upon completion of work, the contractor shall remove

from the vicinity of work, all scrap, packing materials, rubbish, unused and other materials

and deposit them in places specified by the Engineer. The contractor will also demolish all

the hutments, sheds, offices, etc. constructed and used by him and shall clean the debris.

In the event of his failure to do so, the same will be arranged to be done by the Engineer

and the expenses recovered from the contractor.

27.29 The contractor shall execute the work in the most substantial and workman like

manner in the stipulated time. Accuracy of work and timely execution shall be the essence

of this contract. The contractor shall be responsible to ensure that the quality, assembly and

workmanship conform to the dimensions and clearance given in the drawings and/ or as per

the instructions of the Engineer.

27.30 No land belonging to SBI shall be occupied by the Contractor without the written

permission of SBI.

28. RESPONSIBILITIES OF CONTRACTOR IN RESPECT OF SAFETY OF MEN,

EQUIPMENT, MATERIAL AND ENVIRONMENT.

28.1 All safety rules and codes applied by SBI and its customer at site shall be observed by

the contractor and his workmen without exception. The contractor shall be responsible for

the safety of the equipment / material and work to be performed by him and shall maintain

all lights, fencing guards, signs etc. or other protections necessary for the purpose.

Contractor shall also take such additional precautions as may be indicated from time to time

by the Engineer, with a view to prevent pilferage, accidents, fire hazards etc. Suitable

number of clerical staff, watch and ward, store keepers to take care of equipment,

materials, construction tools and tackles shall be posted at site by the contractor till the

completion of the work under this contract. The contractor shall arrange for such safety

devices as are necessary for this type of work and carry out the requisite site tests of

handling equipment, lifting tools, tackles etc. as per usual standards and practices.

28.2 The contractor shall provide to it's work force and ensure the use of the following

personal protective equipment as found necessary and as directed by the authorized SBI

officials.

(a) Safety Helmets conforming to IS-2925

Page 22: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

22

(b) Safety Belts conforming to IS-3521

(c) Safety shoes conforming to IS-1989

(d) Eye, Ear & Face Protection devices conforming to IS-8520 and IS-8940, IS-5983

(e) Hand & body protection devices conforming to IS-2573, IS-6994, IS-8807 & IS-8519.

(f) Rubber gloves for electrical purposes confirming to IS-4770

(g) Industrial safety gloves (leather & cotton gloves) confirming to IS-6994

(h) Industrial and safety rubber knee boots confirming to IS- 5557

28.3 All tools, tackles, lifting appliances, material handling equipment, scaffolds, cradles,

safety nets, ladders, equipment etc. used by the contractor shall be of safe design and

construction. These shall be tested and certificate of fitness obtained before putting them to

use and from time to time as instructed by authorized SBI official who shall have the right

to ban the use of any item.

28.4 All electrical equipment, connections and wiring for construction power, its distribution

and use shall conform to the requirements of Indian Electricity Act and Rules. Only

electricians licensed by the appropriate statutory authority shall be employed by the

contractor to carry out all types of electrical works. All electrical appliances including

portable electric tools used by contractor shall have safe plugging system to source of

power and be appropriately earthed.

28.5 The contractor shall not use any hand lamp energized by electric power with supply

voltage of more than 24 volts. For work in confined spaces, lighting shall be arranged with

power source of not more than 24 volts.

28.6 Where it becomes necessary to provide and / or store petroleum products, explosives,

chemicals and liquid or gaseous fuel or any other substance that may cause fire or

explosion, the contractor shall be responsible for carrying out such provision and/or storage

in accordance with the rules and regulations laid down in the relevant Government Acts,

such as Petroleum Act, Explosives Act, petroleum and Carbides of Calcium Manual of the

Chief Controller of Explosives, Government of India etc. Prior approval of the SBI official at

the site shall also be taken by the contractor in all such matters.

Page 23: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

23

28.7 The contractor shall arrange at his cost (wherever not specified) appropriate

illumination at all work spots for safe working, when natural daylight may not be adequate

for clear visibility.

28.8 In case of a fatal or disabling injury / accident to any person at construction sites due

to lapses by the contractor, the victim and / or his / her dependents shall be compensated

by the contractor as per statutory requirements. However, if considered necessary, SBI

shall have the right to impose appropriate financial penalty on the contractor and recover

the same from payments due to the contractor for suitably compensating the victim and / or

his / her dependents. Before imposing any such penalty, appropriate enquiry shall be held

by SBI giving opportunity to the contractor to present his case.

28.9 In case of any damage to property due to lapses by the contractor, SBI shall have the

right to recover the cost of such damages from the payments due to the contractor after

holding an appropriate enquiry.

28.10 In case of any delay in the completion of a job due to mishaps attributable to lapses

by the contractor, SBI shall have the right to recover cost of such delay from the payments

due to the contractor, after notifying the contractor suitably and giving him opportunity to

present his case.

28.11 If the contractor fails to improve the standards of safety in its operation to the

satisfaction of SBI after being given reasonable opportunity to do so and / or if the

contractor fails to take appropriate safety precautions or to provide necessary safety devices

and equipment or to carry out instructions regarding safety issued by the authorized SBI

official, SBI shall have the right to take the corrective steps at the risk and cost of the

contractor after giving a notice of not less than seven days indicating the steps that would

be taken by SBI.

28.12 The contractor shall submit report of all accidents, fires, property damage and

dangerous occurrences to the authorized SBI official immediately after such occurrence, but

in any case not later than 12 hours of the occurrence. Such reports shall be furnished in the

manner prescribed by SBI. In addition, periodic reports on safety shall also be submitted by

contractor to the authorised SBI official from time to time as prescribed.

28.13 During the course of construction, alteration or repairs scrap lumbers with protruding

nails, sharp edges etc., and all other debris including combustible scrap shall be kept

cleared from working areas, passageways and stairs in and around site.

Page 24: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

24

28.16 All the contractor's supervisory personnel and sufficient number of workers shall be

trained for fire fighting and shall be assigned specific fire protection duties. Enough number

of such trained personnel must be available during the tenure of the contract.

28.17 Contractor shall provide enough fire protecting equipment of the types and numbers

at his office, stores, erection site, other temporary structures, labour colony area etc.

Access to such fire protection equipment shall be easy and kept open at all times.

Compliance of the above requirement under fire protection shall in no way relieve the

contractor of any of his responsibility and liabilities to fire accident occurring. In the event

fire safety measures are not to SBI’s satisfaction, SBI shall have option to provide the same

and recover the cost plus incidentals from contractor's bills and / or impose penalty as

deemed fit by the Engineer.

28.18 Before commencing the work, the contractor shall appoint / nominate a responsible

officer to supervise implementation of all safety measures and liaison with his counterpart of

SBI.

28.19 If safety record of the contractor in execution of the awarded job is to the satisfaction

of Safety Department of SBI, issue of an appropriate certificate to recognise the safety

performance of the contractor may be considered by SBI after completion of the job.

29.0 CONSEQUENCES OF CANCELLATION

29.1 Whenever SBI exercises its authority to terminate the contract, the work may be got

completed by any other means at the contractor's risk and cost provided that in the event of

the cost of completion (as certified by the Engineer which shall be final and binding on the

contractor) being less than the contract value, the advantage shall accrue to SBI. If the cost

of completion exceeds the moneys due to the contractor under the contract, the contractor

shall either pay the excess amount demanded by SBI or the same shall be recovered from

the contractor. This will be in addition to the forfeiture of Security Deposit and recovery of

liquidated damages as per relevant clauses.

29.2 In case SBI completes the work under the provisions of this clause, the cost of such

completion to be taken into account for determining the excess cost to be charged to the

contractor shall consist of cost of materials purchased and / or labour provided by SBI with

an addition of such percentage to cover supervision and establishment charges as may be

decided by SBI.

Page 25: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

25

30.0 INSURANCE

30.1 The Contractor has to arrange on his own insurance pertaining to their scope of work

for all workers and to arrange for accident risk policy/workmen compensation policy,

materials like Cement, Reinforcement steel, machinery & equipments and other bought out

items and other valuable building materials during it’s transport, storage. Proper insurance

cover against any eventuality such as earthquakes, floods and other calamities has to be

taken by the contractor for constructed and completed structures at site till these are

handed over to SBI.

30.2 It shall be the sole responsibility of the contractor to insure his workmen against risks

of accidents and injury while at work as required by the relevant Rules and to pay

compensation, if any, to them as per Workmen's Compensation Act. The contractor shall

also insure his staff against accidents. The work will be carried out in a protected area and

all the Rules and Regulations of SBI in the Project Area which are in force from time to time

will be followed by the contractor.

30.3 If due to negligence and/or non-observance of safety and other precautions, any

accident / injury occurs to any other persons/ public, the contractor shall pay necessary

compensation and other expenses, if so decided by the appropriate authority.

30.4 The contractor will take necessary precautions and due care to protect the material,

while in his custody from any damage/ loss till the same is taken over by SBI. For lodging /

processing of insurance claim the contractor will submit necessary documents. SBI will

reserve the right to recover the loss from the contractor, in case the damage / loss is due to

carelessness / negligence on the part of the contractor. In case of any theft of material

under contractor's custody, matter shall be reported to police by the contractor immediately

and copy of FIR and subsequently police investigation report shall be submitted to SBI for

taking up with insurance.

30.5 If due to negligence/ carelessness on the part of the contractor, any material/

equipment owned by SBI is damaged, the contractor shall submit necessary documents for

lodging insurance claims as required by SBI Engineer. SBI shall however reserve the right to

recover deductible franchise and also unsettled portion of insurance claim amount from the

contractor.

30.6 If due to negligence/ carelessness on the part of the contractor, any surrounding

properties also get damaged, the contractor shall submit necessary documents for lodging

Page 26: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

26

insurance claims as required by SBI Engineer. SBI shall however reserves the right to

recover deductible franchise and to unsettled portion of insurance claim amount from the

contractor.

31.0 COMPLETION SCHEDULE AND PENALTY FOR DELAY

31.1 The Contractor shall complete the work as per the time frame given in the Letter of

Intent.

31.2 Failure to complete the work in time as per the time frame specified will make the

Contractor liable to an unconditional penalty as specified in Special Conditions of Contract.

32.0 STRIKES AND LOCKOUTS

32.1 The contractor will be solely responsible for all disputes and other issues connected

with his workmen. In the event of contractor's workmen resorting to strike or the contractor

resorting to lockout and if the strike or lockout so declared is not settled within a period of

one month, SBI shall have the right to get the erection work executed by employing its own

men or through other agencies or both. The cost incurred by SBI in this regard shall be

recovered from the contractor.

32.2 For any purpose whatsoever, the employees of the contractor shall not be deemed to

be in the employment of SBI

33.0 Force Majeure

33.1 Neither contractor nor SBI shall be considered in default in performance of their

obligations if such performance is prevented or delayed by event such as but not to war,

hostilities revolution, riots, civil commotion, strikes, lockout, conflagrations, epidemics,

accidents, fire, storms, floods, droughts, earthquakes or ordinances or any act of god or for

any other cause beyond the reasonable control of the party affected or prevented or

delayed. However a notice is required to be given within 30 days from the happening of the

even with complete details, to the other party to the contract, if it is not possible to serve a

notice, within the shortest possible period without delay.

33.2 As soon as the cause of force majeure has been removed the party whose ability to

perform its obligations has been affected, shall notify the other such cessation and the

Page 27: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

27

actual delay incurred in such affected activity adducing necessary evidence in support

thereof.

33.3 From the date of occurrence of a case of force majeure obligations of the party

affected shall be suspended during the continuance of any inability so caused. With the

cause itself and inability resulting there from having been removed, the agreed time of

completion of the respective obligations under this agreement shall stand extended by a

period equal to the period of delay occasioned by such events.

33.4 Should one or both parties be prevented from fulfilling the contractual obligations by a

state of force majeure lasting to a period of 6 months or more the two parties shall each

other to decide regarding the future execution of this agreement

34.0 Settlement of Disputes and Arbitration

Except where otherwise provided in the contract all questions and disputes relating

to the meaning of the specifications, design, drawings and instructions herein before

mentioned and as to the quality of workmanship or materials used on the work or as

to any other question, claim, right, matter or thing whatsoever in any way arising

out of or relating to the contract, designs, drawings, specifications, estimates,

instructions, orders or those conditions or otherwise concerning the work or the

execution or failure to execute the same whether arising during the progress of the

work or after the cancellation, termination, completion or abandonment thereof shall

be dealt with as mentioned hereinafter.

i) If the contractor considers that he is entitled to any extra payment or compensation

in respect of the works over and above the amounts admitted or in case the

contractor wants to dispute the validity of any deductions or recoveries made or

proposed to be made from the contract or raise any dispute, the contractor shall

forthwith give notice in writing of his claim, or dispute to the Vice President

(Civil), SBI Infra Management Solutions Pvt. Ltd., 5th Floor, D- Block, 11,

Parliament Street, New Delhi- 110001 within 30 days from the date of

disallowance thereof or the date of deduction or recovery. The said notice shall give

full particulars of the claim, grounds on which it is based and detailed calculations of

the amount claimed and the contractor shall not be entitled to raise any claim nor

shall the Bank be in any way liable in respect of any claim by the contractor unless

notice of such claim shall have been given by the contractor to the Vice President

Page 28: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

28

(Civil), SBI Infra Management Solutions Pvt. Ltd., 5th Floor, D- Block, 11,

Parliament Street, New Delhi- 110001 in the manner and within the time as

aforesaid. The contractor shall be deemed to have waived and extinguished all his

rights in respect of any claim not notified to theVice President (Civil), SBI Infra

Management Solutions Pvt. Ltd., 5th Floor, D- Block, 11, Parliament Street,

New Delhi- 110001 in writing in the manner and within the time aforesaid.

ii) Vice President (Civil), SBI Infra Management Solutions Pvt. Ltd., 5th Floor,

D- Block, 11, Parliament Street, New Delhi- 110001shall give his decision in

writing on the claims notified by the contractor. The contractor may within 30 days

of the receipt of the decision of the Vice President (Civil), SBI Infra

Management Solutions Pvt. Ltd., 5th Floor, D- Block, 11, Parliament Street,

New Delhi- 110001 submit his claims to the conciliating authority namely the

Circle Development Officer, SBI, New Delhi for conciliation along with all details

and copies of correspondence exchanged between him and the Regional Manager.

iii) If the conciliation proceedings are terminated without settlement of the disputes,

the contractor shall, within a period of 30 days of termination thereof shall give a

notice to the concerned ChiefGeneral Manager of the Bank for appointment of an

arbitrator to adjudicate the notified claims failing which the claims of the contractor

shall be deemed to have been considered absolutely barred and walved.

iv) Except where the decision has become final, binding and conclusive in terms of the

contract, all disputes or differences arising out of the notified claims of the

differences arising out of the notified claims of the contractor as aforesaid and all

claims of the Bank shall be referred for adjudication through arbitration by the Sole

Arbitrator appointed by the ChiefGeneral Manager of the Bank, It will also be

the objection to any such appointment that the Arbitrator so appointed is a Bank

Officer and that he had to deal with the matters to which the Contract relates in the

course of his duties as Bank Officer. If the arbitrator so appointed is unable or

unwilling to act or resigns his appointment or vacates his office due to any reason

whatsoever another sole arbitrator shall be appointed in the manner aforesaid by

the ChiefGeneral Manager of the Bank, Such person shall be entitled to proceed

with the reference from the stage at which it was left by his predecessor.

It is a term of this contract that the party invoking arbitration shall give a list of

disputes with amounts claimed in respect of each dispute alongwith the notice for

appointment of arbitrator.

Page 29: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

29

It is also a term of this contract that no person other than a person appointed by

ChiefGeneral Manager of the Bank, as aforesaid should act as arbitrator.

The conciliation and arbitration shall be conducted in accordance with the

provisions of the Arbitration & Conciliation Act 1996 or any statutory modification or

re-enactment thereof and the rules made there under.

It is also a term of the contract that if any fees are payable to the arbitrator these

shall be paid equally by both the parties. However, no fees will be payable to the

arbitrator if he is a Bank Officer.

It is also a term of the contract that the arbitrator shall be deemed to have entered

on the reference on the date he issues notice to both the parties calling them to

submit their statement of claims and counter statement of claims. The venue of the

arbitration shall be such place as may be fixed by the arbitrator in his sole

discretion. The fees, if any, of the arbitrator shall, if required to be paid before the

award is made and published, be paid half and half by each of the parties. The cost

of the reference and of the award (including the fees, if any of the arbitrator) shall

be in the discretion of the arbitrator who may direct to any by whom and in what

manner, such costs or any part thereof, shall be paid and fix or settle the amount of

costs to be so paid.

35. INSPECTION AND STAGE APPROVAL OF THE WORK

35.1 The owner or his duly authorised representative shall have at all reasonable times

access to the contractor's premises or works and shall have the power to inspect drawings

or any portion of the work, examine the materials and workmanship and shall have the

authority to reject any work. This would be implemented through joint inspection by the

representative of the owner and SBI and in the form of joint protocols without any extra

claims and loss of time and amount.

35.2 All work embracing more than one process shall be subject to examination and

approval at each stage thereof and the Contractor shall give due notice in writing to the

Engineer when each stage is ready. In default of such notice being received, the Engineer

shall be entitled to approve the quality and extent thereof at any time he may choose and in

the event of any dispute; the decision of the Engineer thereon shall be final and conclusive.

Page 30: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

30

36. DISCREPANCIES AND ADJUSTMENT OF ERRORS

36.1 The several documents forming the Contract are to be taken as mutually explanatory

of one another, detailed drawings being followed in preference to small-scale drawings and

figures dimensions in preference to scale and special conditions in preference to general

conditions.

36.2 In case of discrepancies between schedules of quantities, the specification and / or the

drawings, the following order of preference shall be observed.

(a) Description in schedule of quantities.

(b) Special conditions

(c) Drawings

(d) Technical Specifications

(e) General conditions of contract

If there are varying or conflicting provisions made in any one document forming part of the

contract, the Engineer shall be the deciding authority with regard to the document.

36.3 Any error in description, quantity in schedule of quantities or any omission there from

shall not vitiate the contract or release the contractor from the execution of the whole or

any part of the works comprised therein according to the drawings and specifications or

from any of his obligations under the contract.

36.5 If neither drawing nor specification contain any mention of minor details of

construction which in the opinion of the Engineer whose decision shall be final and

conclusive, are reasonable and obviously and fairly intended for satisfactory completion of

work, such details shall be provided by the contractor without any extra cost, as if they

were specially mentioned and shall be deemed to be included in his scope.

37. SAFETY CODE

37.1 Besides provision with regard to safety under Clause 27, Contractor shall note that

Explosives shall not be used on the work by contractor except with permission in writing of

the Engineer and in manner and to the extent to which he has prescribed. Where explosives

are used, the same shall be stored in a special magazine to be provided by and at the cost

of the contractor who shall be liable for all damages, losses and injury to any person or

Page 31: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

31

property and shall be responsible for complying with all statutory obligations in this respect.

Further, the contractor is required to provide proper Safety Net System wherever the

hazard of fall from height is present as per instructions of SBI Engineer at site. The safety

net shall be duly tested and shall be of ISI mark and the nets shall be located as per site

requirement to arrest or to reduce the consequences of a possible fall of persons working at

different heights.

37.2 The contractor will be responsible for Health, Safety & Environment management at

site for the construction activities to be carried out by them in accordance with

requirements of SBI

37.3 Contractor shall arrange for following provisions of HSE

1. Contractor has to maintain contact with local hospital having scanning & other modern

medical facilities required during emergency.

2. Contractor has to ensure pre employment medical check for all staff & workers.

3. Contractor has to ensure that adequate minimum First Aid facilities at work site.

38.0 FACILITIES TO BE PROVIDED BY CONTRACTOR (If Applicable)

38.1 It is the responsibility of the contractor to develop the space for construction of office

sheds, to provide all utilities like electricity, drinking water etc., as a part of his scope of

work within the accepted rates. Contractor shall be responsible for providing all necessary

facilities like residential accommodation, transport, electricity, water, medical facilities etc.

as required under various labour laws and statutory rules and regulations framed there

under to the personnel employed by him. All wiring must comply with local regulations and

will be subject to Engineer’s inspection and approval before connecting supply.

The Contractor shall not effect any change in the temporary installation unless permission is

obtained from SBI or their authorized representatives. rate or rates on the basis of

prevailing market rates and pay the Contractor accordingly. However, the Engineer, by

notice in writing, will be at liberty to cancel his order to carryout such class of work and

arrange to carry it out in such manner, as he may consider advisable. But under no

circumstance the Contractor shall suspend the work on the plea of non-settlement of rates

falling under the clause or claim any compensation on that account. Elements of profit,

overheads, supervision and establishment charges, depreciation and maintenance will be

taken as 15% over direct cost.

Page 32: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

32

39.0 DRAWINGS AND DOCUMENTS

39.1 The detailed drawings, specifications being sent along with tender available with SBI

engineers will form part of this tender specification. These documents will be made available

to the contractor during execution of work at site. The contractor will also ensure availability

of all drawings / documents at work place.

39.2 Necessary drawings / documents by SBI to carry out the construction work will be

furnished to the contractor by SBI (except those proposed to be prepared by Contractor, as

mentioned in this contract, if any) on loan which shall be returned to SBI Engineer at site

after completion of work. Contractor shall ensure safe storage and quick retrieval of these

documents.

39.3 The contractor shall maintain a record of all drawings and documents available with

him in a register as per format given by SBI Engineer. Contractor shall ensure use of

pertinent drawings / data / documents and removal of obsolete ones from work place and

return to SBI.

39.4 The data furnished in various annexure enclosed with this tender specification are only

approximate and for guidance. However, the change in the design and in the quantity may

occur as is usual in any such large scale of work.

39.5 Should any error or ambiguity be discovered in the specification or information the

contractor shall forthwith bring the same to the notice of SBI before commencement of

work. SBI's interpretation in such cases shall be final and binding on the contractor.

39.6 Deviation from design dimensions should not exceed permissible limit. The contractor

shall not correct or alter any dimension / details, without specific approval of SBI.

40.0 DELAY AND EXTENSION OF TIME

40.1 The Contractor shall not be allowed any time extension of completion except in the

following cases:

(a) Force majeure conditions

(b) Major changes or substantial addition to work ordered by the SBI adversely affecting the

completion time.

Page 33: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

33

(c) Any other circumstance of any kind whatsoever which may occur making the contractor

entitled to an extension of time which, however, shall be in the absolute discretion of SBI.

By reason of any other cause, which in the absolute discretion of the Engineer is beyond the

Contractor's control, then in any such case, the Engineer (or higher authority) may make

fair and reasonable extension in the completion dates of the individual items of work or the

Contract as a whole. Such extension, which will be communicated to the Contractor by

the Engineer in writing, shall be final and binding on the Contractor. No other claim in this

respect for compensation or otherwise howsoever is admissible. Upon the happening of any

such event causing delay, the Contractor shall immediately give notice thereof in writing to

the Engineer but shall nevertheless use constantly his best endeavor to prevent or make

good the delay and shall do all that may reasonably be required to the satisfaction of the

Engineer to proceed with the work. The Contractor, upon happening of any such event shall

immediately present the case. The request for extension of time shall be submitted by the

Contractor in writing and based on the merit the case shall be considered. The contractor

shall not be eligible for any time extension on account of delay in procurement of materials.

SECTION III

SPECIAL CONDITIONS OF CONTRACT

1. INTRODUCTION

1.1. The terms and conditions mentioned in this section are in addition to what are stated in

Section – II (General Conditions of Contract) of the tender document. In case of any

contradiction between the terms and conditions given in Section - II and those specified in

this Section- III, the terms and conditions of this Section–3 shall prevail.

2. SITE LOCATION

2.1. SBICRM, Campus 2, Gurugram.

3. SCOPE OF WORK :

3.1 (a) The scope of work will broadly cover design, supply, erection testing and

commissioning of 15 passenger lift .

Page 34: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

34

3.1 (b) Bidder’s scope shall also be maintenance of passenger lift for 12 months during

guarantee period along with necessary spares, consumables and skilled, unskilled

manpower.

3.2. The bidder’s scope shall broadly include design, supply, installation, testing and

commissioning , maintenance all complete as per BOQ, specifications and drawings.

3.3. In addition to above the bidder’s scope shall also cover engineering and submission of

drawings/designs details/ brochures / technical write ups / manufacturer’s test certificates

and field test results etc, as applicable, along with source of supplies for the bought out

items pertaining to his scope of supplies and execution for the passenger lift.

3.4. It is mandatory for the bidder to produce manufacturer test certificates of materials

incorporated into the lifts.

3.5. The specific technical requirements for work to be executed under this Contract shall be

as per specifications being sent along. The applicability of specifications shall be

limited to the scope of works only as specified in the BOQ.

3.6.The scope of work will also include such other related works although they may not be

specifically mentioned above and all such incidental items not specified but reasonably

implied and necessary for completion of the job as a whole and as desired and as directed

by the engineer. The detail scope of work covered above is not a comprehensive list of

items of work involved. The detail scope of work may vary considerably depending on the

actual construction requirements.

3.7. Unless otherwise specified, the work to be provided by the contractor for the items

mentioned in the “Bill of Quantities” shall include but not be limited to the following.

4. TIME SCHEDULE

4.1. Entire work/ installations as detailed in tender specification shall be completed within

four months from the date of acceptance of LOA/Agreement.

4.2 Contractor has to mobilise adequate resources to meet his commitments to SBI as

indicated from time to time. In case due to reasons not attributable to the contractor,

the work gets delayed and additional manpower / resources have to be mobilized

so as to expedite the work to meet various milestones, same shall be done within

the quoted rates as per Rate Schedule, at no extra cost to SBI. In the event the

Page 35: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

35

contractor fails to respond to these requirements, SBI shall take appropriate actions to meet

it’s commitments in line with the provisions of General Conditions of Contract.

4.3 In case due to reasons not attributable to the contractor, the work gets delayed and

scheduled completion gets extended, time extension will be granted by SBI but in no case

over run compensation will be payable.

4.4 The work under the scope of this contract is deemed to be completed in all respects,

only when all the works are carried out as per satisfaction of SBI. The decision of SBI on

completion date shall be final and binding on the contractor.

5. TAKING OVER OF WORKS BY SBI

5.1 All works/ installations shall be taken over by SBI in part or in full when it has been

completed in all respects and /or can be put to use satisfactorily. The complete work under

the contract shall be taken over only after completion of all punch points, pending work,

rework wherever required, site clearing and reconciliation of materials.

5.2 The guarantee period shall start only after the complete work under the contract has

been taken over by SBI.

6. PRICE

6.1 Price quoted shall be fixed and not subject to any escalation whatsoever during the

period of execution of the Contract including the extended period, if any.

6.2 The quoted price shall include all taxes and duties).

6.3 Price quoted shall be in INR (Indian national Rupee) only.

6.4 No price variation /over run charges on account of any increase whatsoever,

(irrespective of whether escalation is steep/ unanticipated) will be payable during the entire

period of execution of Contract including extended period, if any.

7. TAX DEDUCTED AT SORCE (TDS)

7.1 Deduction of taxes as applicable at source shall be made as per the norms.

Page 36: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

36

8. NEW TAXES/ LEVIES

8.1 In case the Government imposes any new tax/ levy on the output services/ goods /

work after the award of work, the same shall be reimbursed by SBI at actuals. All necessary

documents as required by SBI shall have to be provided by the contractor. However, in the

event of delay in work execution solely attributable to the contractor the new taxes/ levies

imposed during the delay period shall not be reimbursed to the contractor.

8.2 In case any tax/levy/duty etc becomes applicable after the date of bidder's offer, the

bidder/ Contractor must convey it's impact on his price duly substantiated by documentary

evidence in support of the same before opening of the Price Bid. Claim for any such impact

after opening the price bid will not be considered by SBI for reimbursement of tax or

reassessment of offer.

8.3 No reimbursement on account of increase/ decrease in the rate of taxes, levies, duties

etc on input goods/ services/ work shall be made. Bidder has to make his own assessment

of the impact of future variation if any, in rates/ duties/ levies etc in his price bid.

9. MODALITIES OF TAX INCIDENCE ON SBI

9.1 Wherever the relevant tax laws permit more than one option or methodology for

discharging the liability of tax/levy/duty, SBI will have the right to adopt the appropriate

one considering the amount of tax liability on SBI as well as procedural simplicity with

regard to assessment of the liability. The option chosen by SBI shall be binding on the

contractor for discharging the obligation of SBI in respect of the tax liability to the

contractor.

9.2 The contractor shall pay all (save the specific exclusions as enumerated in this contract)

taxes, fees, misc. charges, deposits, duties, tools, royalities, commissions or other charges

which may be levied on the input goods and services delivered in course of his operations in

executing the contract. In case SBI is forced to pay any of such taxes, SBI shall have the

right to recover the same from his bills or otherwise as deemed fit.

10. RATE SCHEDULE CUM BOQ

10.1 Contractor shall fully understand description and scope of work before quoting. The

scope of work and responsibility of the contractor as mentioned under this specification shall

be covered within the quoted / finally accepted rates.

Page 37: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

37

10.2 Quantities mentioned in the rate schedules are approximate only and liable for

variation both on positive and negative sides. The tentative contract value (CV) for entire

scope of work shall be calculated as per finally quoted / accepted item rates & the quantities

indicated in Rate Schedule cum BOQ.

10.3 In addition to the above, the Contractor shall also submit the rates as asked for in the

11. EXTRA WORK

11.1 The Contractor shall, when requested by SBI, perform extra work at mutually agreed rates.

12. TERMS OF PAYMENT

12.1 The terms of payment have been mentioned in the General Conditions of Contract.

13. PENALTY FOR DELAY

13.1 If the Work is not completed within the specified period and any extension thereof, the

Contractor shall be liable to pay penalty for delay in completion of work @ 0.5% of the

contract value per week of delay subject to a maximum of 5% of the accepted contract

value.

14. COMPLETION CERTIFICATES/ NOC FROM LOCAL STATUTORY BODIES

14.1 Contractor has to arrange at his own cost to obtain completion

certificates/operation certificates /Lift licenses from the local statutory bodies of

central and state govt. such as lift safety deptt., electrical safety, Fire authority,

Lift Inspectorates etc. The lift licenses shall be handed over to the BANK in

originals at the time of handing over. However, any fees required for obtaining

such NOCs shall be paid by SBI on production of relevant depository challans /

receipts from such Govt. authorities.

15. DRAWINGS AND SPECIFICATIONS

The specifications and drawings of the lift should be provided in two sets.

16. SETTLEMENT OF DISPUTES AND ARBITRATION:

16.1 All questions relating to the performance of the obligations under this agreement and

to the quality of materials used in respect of the work contract as mentioned above and all

the disputes and differences which shall arise either during or after the agreement period or

Page 38: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

38

other matters arising out of or relating to this agreement or payment to be made in

pursuance thereof, shall be referred as per the clause mentioned above.

17. SPECIAL CONDITIONS TO THE TENDERER: •This specification shall be read in conjunction with General conditions of contract as

applicable and the participating firms have to quote for all four consecutive years (after

defects liability period of one year) for AMC charges.

• The Tenderer shall design the equipment considering the site conditions.

• The tenderer shall arrange for all scaffolding, if required for SITC of the Lift.

•All minor Civil alteration works inside the lift pit, lift shaft and lift machine room

shall be the responsibility of the Contractor. Hence, the bidders are advised to

visit all the sites and make themselves fully aware of the civil works required for

successful installation, commissioning of the lifts. The successful Tenderer shall

furnish all the necessary load data/ information, insert details etc. The connections

between elevator frame and the respective building / columns shall be provided by the

Contractor. The equipment shall be designed keeping in view the provisions of the

statutory regulations and safety codes in force in the locality of installation. All such

minor civil works like chipping, grouting, drilling, etc for fixing guide rails and other

accessories and finishing the chased portions are to be executed by the Contractor.

Chasing/cutting the RCC slab projection inside the lift shaft by cutting and bending the

reinforcement provided for mounting the old landing doors and making the surface good

one is in the scope of Supplier.

•Within two weeks of placement of order, the Contractor shall furnish the load data, insert

details and other such details/ information as are necessary to carry out the alterations of

foundation by the Contractor for the information of the Purchaser/ his Consultant.

•The following drawing/ documents shall be submitted for approval before commencement

of manufacturing.

1. A general arrangement drawing indicating various dimensions, parameters,

illumination and ventilation requirement, power requirement and characteristic of

the elevator to be installed including load diagram and loadings to be taken into

consideration in the machine room, elevator shaft and the elevator pit shall be

submitted for approval of the purchaser within 2 weeks of placement of order.

2. The electrical scheme drawings, single line control circuit diagram, technical

plan diagram, cable schedule, bill of materials etc., for approval.

Page 39: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

39

• The following drawings/ documents shall be submitted for records before handing

over the elevator.

i. One copy of reproducible (polyster film) along with prints of approved drawings.

ii. The copies of all operating manuals, maintenance schedules, lubrication charts,

electrical power/ control circuit diagram, specification of the equipment, oils,

lubricants and other consumables.Regarding number of copies etc., refer to relevant

articles.

iii. The copies of erection schedule and manuals, assembly erection sequence,

special precautions to be followed (3months prior to delivery).

•The supplier shall submit test Certificates for all electrical equipment, cables, and all

parts used in handling loads, wire ropes, pulleys etc.

•The supplier shall submit relevant material test Certificates for structural steel and

mechanical components such as gear boxes, couplings, pulleys, shafts, gears etc.

•List of preferred make of electrical and mechanical components as per list furnished in

this specification shall be adhered to for bought out items.

•The Tenderer shall satisfy the purchaser/ his Consultant that he possesses necessary

technical know how and facilities to execute the order. Necessary \ particulars to

establish the same shall be furnished along with the Tender.

•A write –up on testing facilities available in the works of Tenderer shall be furnished.

•Contractor shall ensure that minimum amount of assembly is necessary at site. Site

assembly shall be avoided as far as possible.

•Rates shall also be given in the Tender for comprehensive maintenance Contract with full

responsibility of carryout out repair with supply of required original spare parts to keep

the elevator in fully operational condition for minimum period of 4 years after expiry of one

year of free servicing and guarantee/warranty period.

•The Tender shall indicate price for design, supply, Installation, testing and commissioning

of the elevator. The quoted price shall include charges on account of taxes, duties,

packing, forwarding, transport, insurance etc. The quoted price shall remain firm and

binding and shall not be subjected to any escalation whatsoever on any account during

entire period of design, supply, installation, testing & commissioning.

•Elevator shall be guaranteed for a minimum period of one year of trouble free

operation after commencement of regular operation and shall include free servicing,

repair and replacement of parts by the Contractor.

Page 40: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

40

18. INSPECTION & TESTING

•GENERAL: The bidder based on the broad outline inspection procedure indicated in this

Section shall finalize with owner/ his consultant prior to the award of contract, the

detailed procedure for inspection, testing (at factory/ site) along with the schedule of time

and period of individual activities.

•The Contractor shall submit relevant test Certificates for all electrical equipment, cables.

Following are the guidelines for shop testing.

a) All motors to be routine tested as per IS 325-1978.

b) All control panels/ MCCS shall be routine tested as per IS:8623 Part I & II-

1980.

c) Thyristor/ Rectifier panels as per IEC 146.

•Similar test Certificates shall be submitted in respect of items like wire ropes, chains,

couplings, gears, gear boxes, rope drums, pulleys, shafts etc.

•Contractor shall give adequate notice to the owner in regard to shop testing of major

items like motors, etc. in order to enable the owner/ his consultant to witness the tests if

required by the owner.,

•Work shall be carried out in accordance with prevalent/ relevant standards like Indian

Electricity Act, IEE rules, Lift Act, etc. It will be the responsibility of the firm to

arrange for inspection by the statutory authorities at the appropriate time,

obtain necessary Certificates/Lift Licenses and handover the same to the Bank

for record. The statutory fees (if any) will be borne by the Bank or will be

reimbursed against production of receipt.

19 INSPECTION AT SITE:

19.1 These tests after erection of the elevator in plant shall comprise of the following:

a) The supplier’s tests.

b) Acceptance tests/ performance guarantee tests.

19.2 After the elevators are erected all equipment and machinery shall be tested as

required by the owner/ inspector in line with IS 4666. The elevator shall be run

without load and the adjustments shall then be completed.

19.3 All tests shall be carried out in the presence of the owner/ Inspector and any

corrections found necessary shall be approved by the owner/ inspector and shall be

carried out with minimum of delay The supplier shall be responsible for producing

all necessary working sketches and drawings to the approval of the owner/ inspector

19.4 The elevators after erection shall be tested as follows:

Page 41: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

41

i) Performance guarantee test:

The elevators after completion of erection shall be performance tested to meet

the following acceptable limits of design parameters.

SPEED: 1.0m/s with LANDING ACCURACY within + or - 5mm

In case of unit capacities and design parameters guaranteed by the Contractor are not

established during the performance guarantee testing, the owner at his discretion may

reject or accept the elevator after assessing its technical suitability. The Contractor shall

be given 2 months time after commissioning for rectification to achieve the necessary

design parameters, beyond which the purchaser may reject.

20. ELECTRICAL TESTS:

a) Visual check for adequacy & completeness of scope of

supply.

b) Insulation test on electrical equipment wiring.

c ) Satisfactory operation of controllers, limit switches, safety devices

etc.

d) Correctness of all circuits and interlocks.

e) Satisfactory operation of electric lift for all motions/ stops.

It is the responsibility of the tenderer to arrange for inspection by the statutory

authorities like CEIG/CEA/City Corporation etc and to obtain approval certificate

before putting the lift into service. Time of completion will be treated completed

only after obtaining approval certificate from the appropriate statutory authority.

6.6. The Lift shall be under the warranty of a minimum of 12 months from the date of

handing over during which all the regular servicing /breakdowns are to be done with free of

cost. Bank will not make any extra Payment.

21. ACCEPTANCE TESTS:

After supplier’s tests are completed, an acceptance test shall be carried out by the

Owner’s operator, and if accepted, the elevator shall be handed over to the owner.

Operation & capacity tests will be conducted as specified in IS 4666 and as specified

above. Insulation and other tests applicable to the electric lift shall be done as per

relevant IS. The date(s) for operation and capacity tests shall be set by the owner/

Page 42: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

42

inspector and the supplier shall be informed of the date (s) in advance. The supplier shall

be represented at the tests by a qualified engineer or erection superintendent familiar

with erection and commissioning of the elevator.

22. TECHNICAL SPECIFICATION OF ELEVATOR

S.No Description Specification

1 Designation of lift Passenger Lift, Gearless without Machine Room

2 No of Elevators 1

3 Type and Capacity 15 Passenger (1020KG)

4 Make Kone/OTIS/Schindler/Mitsubishi/Johnson

5 Speed 1.0 m/sec

6 Location of M/c room On top within shaft

7 Travel 8000 mm

8 Serving 0,1,2

9 No of Stops 03

10 Car Ceiling SS Hairline :- LED Lights with Axial fan

11 Car panel SS Hairline Finish

12 Car flooring Granite Flooring

13 Car Illumination LED Lights

14 No of Entrance Single Entrance

15 Car Entrance Automatic Centre Opening Power Doors with Half

Glass –SS Hairline Finish

16 Door safety Infrared Curtain covering full height of door

17 Laqnding Entrance Automatic Centre Opening Power Doors with Half

Glass –SS Hairline Finish

18 Clear Opening 900mm(W) * 2000mm(H)

Page 43: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

43

19 Control Simplex

20 Indicator LCI(landing Call Indicators)

21 Power Supply 415V, 3 Phase, 50Hz

22 Auxiliary 220V, Single Phase, 50hz

23 Brail Buttons Brail Buttons/features inside the car for Visually

impaired peoples

24 Intercomm Provision of Intercomm facility inside the car

25 Alarm Alarm features in case of emergency

26 Drive VVVF

27 Rescue Device Equipped with Automatic Rescue Device in case of

power failure.

23. Shaft of the lift will be constructed only after award of work to the successful

bidder, as per the drawing/dimension furnished by the successful bidder in

consultation/supervision of the successful bidder.

Note: Slight changes in the dimension mentioned in the specification is allowed as

dimension may varies for different manufacturer.

Page 44: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

44

ANNEXURE - I

(On non-judicial stamp paper of Rs. 100/-) BANK GUARANTEE IN LIEU OF SECURITY DEPOSIT

B.G. No. ______________ Value Rs. ____________ State Bank of India (Address) Sub.: Bank Guarantee of Rs. …………………….towards Security Deposit for the work

of for State Bank of India.

(Name of Branch / Office)

WHEREAS (Name and address of contractor /vendor) (hereinafter called the Contractor)

have entered in to contract for ( Name of work )with state bank of India (S B I ) as

mentioned in the letter of SBI’s Consultants ( Name and address of consultants) vide their

letter No……… dated…………… and the correspondence and tender relating there to which is

herein after referred to as “ the said contract “ and that the Contractor has agreed to

produce a Bank guarantee amounting to 2 % of the contract value less earnest money

deposit of Rs…………… (Rupees only), to State Bank of India for performing their part of the

contract obligation their liability ceases.

AND WHEREAS in terms of the said Contract is required to furnish to State Bank of India a

Guarantee of a Scheduled Bank for a value of Rs…………… to be valid up to (date)

AND WHEREAS (Name of Bank and its branch) having their office at (address) the

guarantor, at the request of the Contractor hereby furnishes a guarantee in favour of State

Bank of India and Guarantee in the manner hereafter appearing.

In consideration of the premises, We (name of bank and its branch ) having our office at (

address ) hereafter called the “ Guarantor” ( Which expression shall include successors and

assigns ) hereby expressly, irrevocably and unreservedly undertake and guarantee that if

the Contractor fails to execute the work according to his obligations under the said contract

, then not with standing any dispute between State Bank of India and the contractor the

guarantor shall, without demur and without reference to the contractor pay to State Bank of

India immediately any sum claimed by State Bank of India under the said contract up to a

maximum amount of Rs……… (Rupees only)

Page 45: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

45

In case the amount demanded by State Bank of India is not paid with in 48 hours of receipt

of demand , the Guarantor agrees to pay the aforesaid amount of Rs ___________ (Rupees

____________________________________________only )

1 Such payment shall be not withstanding any right the contractor may have directly

against State Bank of India of any disputes raised by the Contractor with State Bank

of India or any suits of preceding pending in any competent court or before any

arbitrator. State Bank of India’s written demand shall be conclusive evidence to the

guarantor that such payment is payable under the terms of the Contract and shall be

binding in all respect on the guarantor.

2. The Guarantor shall not be discharged or released from this undertaking and

Guarantee, by any arrangement, variations made between SBI and the Contractor

and or indulgence shown to the contractor by SBI, with or without the consent and

knowledge of the guarantor or by alteration in the obligations of the contractor by

any forbearance, whether as to payment, time performance or otherwise.

3. This guarantee shall remain valid until _________or as may be caused to be

extended by the contractor or until discharged by SBI in writing whichever is earlier.

4a. This guarantee shall be continuing and shall not be revocable during its currency

except with the previous written consent of SBI.

4b. This guarantee shall not be affected by any change in the constitution of the

contractor, by absorption with any other body or corporation or dissolution n or

otherwise and this guarantee will be available to or enforceable against such body or

corporation.

5. In order to give effect to this guarantee SBI will be entitled to act as if the Guarantor

were the Principal debtor and the Guarantor hereby waives all and any of its rights or

suretyship.

6. This guarantee shall continue to be in force notwithstanding the discharge of the

contractor by operation of law and shall cease only on payment of the full amount by

the Guarantor to SBI of the amount hereby secured.

7. This guarantee shall be in addition to and not in substitution for any other guarantee

or security for the contractor given or to be given to SBI in respect of the said

contract.

Page 46: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

46

8. Any notice by way of request and demand or otherwise here under may be sent by

post or any other mode or communication to the guarantor addressed as aforesaid

and if sent by post it shall be deemed to have been given at the time when it would

be delivered in due course of post and in providing such notice when given by post in

shall be sufficient to prove that the envelope containing the notice was posted and a

certificate signed by an officer of SBI that the envelope was so posted shall be

conclusive.

9. These presents shall be governed by and constructed in accordance with Indian

Law.

Notwithstanding anything contained herein-before the liability of the guarantor

under this guarantee is restricted to a sum of Rs. ……………………………..

This guarantee will remain valid upto…………………………… Unless a demand or claim

under this guarantee is made in writing on or before ……………….. the guarantor

shall be discharged from all liability under the guarantee thereafter.

Dated the ……………………

For (Name of Bank)

(Signature/s with designation/s of signatory/les)

(Name and Stamp of Bank)

ANNEXURE - II

PROFORMA OF APPLICATION FOR REGISTRATION OF ESTABLISHMENT

EMPLOYING CONTRACT LABOUR

•Name and location of the Establishment.

•Postal address of the establishment.

•Full name and address of the principal employer.

(furnish father name in the case of individuals)

•Full name and address of the manager or the person responsible for the supervision and

control of the establishment.

Page 47: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

47

•Nature of work carried on in the establishment.

•Particulars of contractors and contract labour.

•Name and address of the contractors

•Nature of work in which contract labour is employed or is to be employed

•Maximum number of contract labour to be employed on any day through each contractor.

•Estimated date of commencement of each contract work under each contract.

•Estimated date of termination of employment of contract labour under each contractor.

•Particulars of Treasury Receipt enclosed.

(Name of the Treasury, amount and date.)

I hereby declare that the particulars given above are true to the best of my knowledge

and belief.

Principal Employer

Seal and Stam

ANNEXURE -III

INSTRUCTIONS TO BE DISPLAYED IN HINDI/ENGLISH INSIDE THE LIFT CAR AND

AT LIFT LANDINGS.

INSIDE THE CAR

1 Capacity …….Kg. ……. Person

2 No Smoking

3 Do not lean against lift door.

4 Watch before stepping door.

5 Do not panic in the event of break down. Press alarm button/ use In terms available in the Lift and follow instruction of authorised staff.

Page 48: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

48

AT LIFT LANDINGS

1 Capacity ……. Kg. ….. Person

2 Please stand in ‘Q’.

3 Smoking not permitted inside the Car.

4 Please keep the lift neat and clean

5 Do not force open the landing doors

6 Watch before you step into and out of the lift car.

7 Avoid use of lift during fire.

Note:- This is only a Draft. Successful Tenderer shall submit the appropriate

Instructions and obtain approval of the BANK.

Page 49: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

49

Design, Supply, Installation, Testing & Commissioning of 15 passengers Lift At SBICRM, Campus 2, Plot No 79, Sec 18, Gurugram -122015, Haryana

PRICE BID

S.NO. DESCRIPTION UNIT QTY RATE(Rs.) AMOUNT(Rs.)

1 Design, Supply, Installation, Testing & Commissioning of gearless15 passenger lift of make Schindler/ Kone / OTIS / Misubishi / Johnson suitable for 1020.0 KGs of load with speed of 1.0 mtr/sec, suitable for 2 floor operation (G+ 2 Floors) and as per the technical specifications mentioned in the tender document at SBICRM, Campus 2, Plot No 79, Sec 18, Gurugram -122015, Haryana. (Rate should be inclusive of all )

No 01

2 Comprehensive AMC charges for the above mentioned lift for 4 years.(AMC will be started after completion of 1 year of warranty period) (Rate should be inclusive of all)

No 01

TOTAL(In Fig.)

TOTAL(in Words)

Page 50: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

50

BREAKUP OF AMC CHARGES

Sr No Description Amount(Rs.)

01 AMC Charges for Ist Year

02 AMC Charges for IInd Year

03 AMC Charges for IIIrd Year

04 AMC Charges for IVth Year

TOTAL

Page 51: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

51

Format for submission of Tender

To VICE PRESIDENT (CIVIL),

SBI INFRA MANAGEMENT SOLUTIONS PVT LTD,

5TH FLOOR, D-BLOCK,

11, PARLIAMENT STREET,

NEW DELHI 110001.

Dear Sir, Reg.: Design, Supply, Installation, Testing & Commissioning of 15 passengers Lift At State Bank Institute of Credit and Risk Management(SBICRM), Campus 2, Plot No 79, Sec 18, Gurugram -122015, Haryana

1. I / We refer to the tender notice issued by you for Design, Supply, Installation, testing & Commissioning of 15 passengers Lift At State Bank Institute of Credit and Risk Management(SBICRM), Campus 2, Plot No 79, Sec 18, Gurugram -122015, Haryana

2. I / We hereby offer to perform, provide, execute, complete and maintain the works in conformity with the complete tender document, drawings, designs, conditions of contracts, specifications, schedule of quantities relating to the works for the sum of Rs……………………………………. at the respective rates quoted in the schedule of quantities.

3. I / We have satisfied myself / ourselves as to the site conditions, examined the drawings and all aspects of the tender conditions, subject to above, I / We do hereby agree, should this tender be accepted in whole or in part, to:

a. Abide by and fullfill all the terms and provisions of the said conditions annexed here to,

b. Complete the works within 120 days as per the completion period enclosed with the tender in two or three shifts if considered necessary by the Employer at no extra cost to the Employer.

4. I / We have deposited a non-refundable amount of Rs. 2,000/- (Rupees Two Thousand only) towards cost of Tender and an earnest money ofRs. 20,000/-(Rupees Twenty Two Thousand only) in the form of Demand Draft / Banker’s Cheque drawn in favour of SBIIMS payable at New Delhi and State Bank of India payable at New Delhi, respectively which, I / We note, will not bear any interest and is liable for forfeiture as per the clauses mentioned in the tender document..

5. I / We understand that you are not bound to accept the lowest/conditional or any tender you receive.

Page 52: SBICRM CAMPUS II, PLOT NO 79 SEC 18, GURUGRAM

SBIIMS, New delhi

52

The names of DIRECTORS of our Firm are:

1. ________________________________

2. ________________________________

3. ________________________________

4. ________________________________

Yours faithfully,

Signature ……………………………..

Designation ………………………….. Name of Partner / Director of the Firm, authorized to sign or name of person having power of attorney to sign the contract. (Certified true copy of power of attorney should be attached) Signature and address of witnesses: a. Signature ……………………………………

Name ………………………………………………..

Address ……………………………………………..

b. Signature………………………………………

Name ……………………………………………….

Address …………………………………………….