Page 1: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

Satellite Navigation ProgramSatellite Navigation Program

Joe FeeJoe FeeInternational Technical Program ManagerInternational Technical Program ManagerFederal Aviation AdministrationFederal Aviation Administration

Page 2: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

2269a_G00AUG09_JF

Basic GPS System

• Space Segment– 24 Satellites– 6 Orbital Planes– 4 Satellites per Plane– Orbit at Approximately 11,000

Nautical Miles Above the Earth– Orbits Every 12 Hours

• Ground Control Segment– Master Control Station, Colorado Springs– 5 Monitor Stations at Worldwide Locations

Page 3: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

3269a_G00AUG09_JF

Satellite Navigation’s MissionWAAS/LAAS Implementation

FAA 460-10

Page 4: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

4269a_G00AUG09_JF

Wide Area AugmentationSystem (WAAS) Architecture

Page 5: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

5269a_G00AUG09_JF

WAAS System Status

Communications• Satellites

– 2 of 2 on Orbit• Terrestrial Communications Links Installation Complete

Hardware• WAAS Reference Stations

– 25 of 25 WRSs Installed/Tested (as of 6/3/98)• WAAS Master Station

– 2 of 2 WMSs Installed/Tested (as of 6/3/98)

Key Issues• Stability• Integrity

Page 6: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

6269a_G00AUG09_JF

WAASKey Issues

• Stability– 21-Day Stability Test Completed - June 30, 2000– Public Announcement of SIS Availability for Non-Safety

Applications - Aug 24, 2000

• Integrity– Meeting FAA Integrity Requirement (Safety) is Now Most

Significant Schedule Driver

– Integrity Requirements (Precision Approach)

• 10-7/Approach

• Time to Alarm: 6.2 Seconds for LNAV/VNAV

• 5.2 Seconds for GLS

Page 7: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

7269a_G00AUG09_JF

FAA Responseto Integrity Issue

• Formed WAAS Integrity Performance Panel(WIPP)– FAA Established Team of Experts in January 2000 To

Work Closely With Raytheon to Identify Most Cost-Effective and Expedient Solution

– Team Includes FAA, MITRE, Stanford University, OhioUniversity, JPL

– WIPP Actions:• Identify a Path to Achieve LNAV/VNAV Integrity• Identify Migration Path to GLS

• Chartered Independent Review Board (IRB)– Reports Directly to FAA Administrator on WIPP Products

and Other Program Activities

Page 8: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

8269a_G00AUG09_JF

WAAS Operational Status

• Initial Operational Capability withLNAV/VNAV in 2002– Vertical Guidance Down to 350 Feet Above

Threshold

• Precision Approach Capability Equivalent toCategory I ILS– Continuing Development

Page 9: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

9269a_G00AUG09_JF

International Status

Canada

• Transitioning to Operational Canadian WAAS (CWAAS)

• Future Agreement Underway to Integrate WAAS and CWAAS

Mexico

• Working Cooperatively With the FAA to Install 3 WAAS TestbedStations (NSTB Single-strand Reference Stations) in Mazatlan, Merida,and Mexico City

• Preparing to Conduct Joint Faa/mexico Tests to Define MexicoOperational WAAS Participation, Expected Benefits and OverallSystem Performance

Page 10: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

10269a_G00AUG09_JF

International Status (Con’t)

South America

• The Caribbean and South American (CAR/SAM) Region Is Committed toa GNSS Solution As a Foundation for a Larger CNS/ATM TransitionWithin Latin America

• The CAR/SAM Test Bed (CSTB) Will Be Based on WAAS TestbedStations (NSTB Single-strand Reference Stations)

– Will Provide Test Capability for All of South America, Central America, andthe Caribbean

• In the Future, LAAS Prototype Equipment Will Be Used to ConductTests for Providing a Precision Approach Capability to the Region

Page 11: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

11269a_G00AUG09_JF

International Status (Con’t)

Japan/Europe

• Interoperability Working Group (IWG) Established to Discuss CriticalInteroperability Issues Important to Satellite Based AugmentationSystems (SBAS) Providers

• IWG/1 Was the First Such Meeting Between All SBAS Providers,Hosted by U.S. - Aug 97

• Seven Additional Meetings Have Been Held in Europe, Canada andMost Recently in Japan (May 2000)

Page 12: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

12269a_G00AUG09_JF

Local Area AugmentationSystem (LAAS) Architecture

LAASReference Station(IntegrityAccuracyAvailability)

Processor

GPS Receiver

VHF Transmitter

Pseudolite

Pseudolite

Pseudolite

L1 DifferentialBroadcast Capability

VHF DataLink

Page 13: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

13269a_G00AUG09_JF

LAAS Background

• Government Industry Partnerships Signed (4/99)– Raytheon and Honeywell Teams

• LAAS Flight Tests in Atlantic City, NJ (8/99)– ATA, FAA, and UPS Participated

• LAAS Flight Trials in Memphis, TN (11/99)– ATA, FAA, and FedEx Participated

Page 14: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

14269a_G00AUG09_JF

LAAS Implementation Plans

• Install 20 CAT I LAAS Beginning in 2002

• Install First CAT III LAAS in 2005

• Plan Calls For a Total of 160 LAAS– 46 CAT I– 114 CAT III

Page 15: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

15269a_G00AUG09_JF

Practical Aspectsof Satellite Navigation

• Routes– Direct– Independent of Ground Infrastructure

• Approaches– Greater Uniformity– More Precise / Easier to Fly– Vertical Guidance Available for Most

Airports

Page 16: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

16269a_G00AUG09_JF

Status of GPS Approach Procedures

• 2,353 GPS Non-precision Procedures Have Been Published

• 1,057 of the GPS NPA’s Provide New Capability to Runwaysthat Previously Did Not Have a Straight-In IFR Approach

• 146 LNAV/VNAV Approaches Have Been Developed

Page 17: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

17269a_G00AUG09_JF

GPS Today and Tomorrow

• 27 Satellites With L1 C/A Signal Today

• WAAS Initial Operational CapabilityLNAV/VNAV in 2002

• LAAS CAT I Commissioning 2002

• LAAS CAT III Commissioning 2005

Page 18: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

18269a_G00AUG09_JF

Back Up Slides

Page 19: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

19269a_G00AUG09_JF

Right Base AreaNavigation to this fix

Left Base AreaNavigation to this fix

Straight-In AreaNavigation to this fix

Basic “T” Approach

IAF IAF

IF(IAF)

FAF

MAP

Basic “T” Standard TAA

Page 20: Satellite Navigation Program - Global Positioning … Navigation Program Joe Fee International Technical Program Manager Federal Aviation Administration

20269a_G00AUG09_JF

WAAS ProceduresDevelopment PLAN

99 00 01 02 03 04 05 06 07 08 Total

WAAS 0 50* 490 490 490 485 485 485 485 150 3610

LNAV/VNAV 0 50* 490 490 490 485 485 485 485 150 3610

LNAV** 490 490 490 490 490 485 485 485 485 0 4340

Helicopter 10 10 10 10 10 15 15 15 15 0 100

* Minimum.

** LNAV (TSO-129) Procedures will be reaccomplished when overlying WAAS and LNAV/VNAV aredeveloped.