Stark Area Regional Transit Authority Board of Trustees Meeting
October 26, 2016 @ 5:00 PM Mr. DeGraff called the meeting to order at 5:02pm. Attendance Board (Quorum Present) Chuck DeGraff (President), Ron Macala (Vice President), Margaret Egbert, Amanda Fletcher, Ed Grier, James Reinhard, Chet Warren Excused Greg Blasiman, Paul Dykshoorn Ms. Fletcher moved to accept the excused absences. Mr. Grier seconded the motion; vote passed unanimously. Staff Kirt Conrad (Executive Director/CEO), Craig Smith (Director, Information Technology), Nicholas Davidson (Transportation Planning Manager), Kristie Petty Cox (Marketing Manager), Sheila Gines (Transportation Assistant), Latrice Virola (Director, Planning), Carrie Domer (Director, Finance), Kristy Williams (Director, Human Resources), Tammy Marie Brown (Director, Employee Relations & EEO) Other Gust Callas (Black McCuskey)
Approval/Correction of Minutes September 28, 2016 Mr. Grier moved to adopt the meeting minutes. Mr. Warren seconded the motion; vote passed unanimously.
Departmental Reports/Goals Transportation – Nicholas Davidson (As submitted) Ghost riders were in last week from Laketran. All went well and a final report will be given soon. A non CDL operator class started last week.
Maintenance – Mark Finnicum (As submitted)
Finance – Carrie Domer (As submitted) The draft of the operating and capital budget was passed out.
1
Planning – Latrice Virola (As submitted) SARTA’s commercials were played for the Board.
Information Technology – Craig Smith (As submitted) Cornerstone will be installed with WiFi within 2 weeks for our customers. As well large display monitors will be installed. Human Resources – Kristy Williams (As submitted) Interviews are being conducted for a customer service representative and a customer service representative supervisor. Employee Relations & EEO – Tammy Marie Brown (As submitted) SARTA held its annual Community Halloween party. It was well attended with approximately 300 attendees. Clinic reports will be distributed quarterly.
Communications for the Executive Director/CEO OPTA Andy Bowers & Associates will be the new lobbyist for OPTA. Congressman Gibbs Congressman Gibbs visited SARTA and rode the hydrogen bus. Award SARTA was honorably mentioned for the Green Fleets award. Issue 51 The Bowling Event raised about $8,000. Radio ads will be ran starting next week.
Resolutions Resolution #27 For Application FY 2017 Federal Grants “Section 5307 Federal Grant for Internet Program TrAMS” Mr. Macala moved to adopt the resolution. Mr. Warren seconded the motion; vote passed unanimously. Resolution #28 For Application FY 2017 Federal Grants “Section 5339 Bus and Bus Facilities Grant – TrAMS” Ms. Egbert moved to adopt the resolution. Ms. Fletcher seconded the motion; vote passed unanimously. Resolution #29 For Application FY 2017 State Grant “Urban Transit Program Grant (UTP)”
2
Mr. Warren moved to adopt the meeting minutes. Mr. Grier seconded the motion; vote passed unanimously. Resolution #30 A Resolution Authorizing The Executive Director/CEO TO Surplus Obsolete Fixed Asset Inventory Mr. Macala moved to adopt the meeting minutes. Mr. Warren seconded the motion; vote passed unanimously. Adjournment Mr. Warren moved to adopt the meeting at 6:05pm.
3
4
TRANSPORTATION DEPARTMENT REPORT
October 2016
Statistics
• Operated 21 Weekdays and 5 Saturdays compared to 22 Weekdays and 5 Saturdays in 2015.
• Total Weekday Service average rides per day was 8,748.
• Total Saturday Service average rides per day were 5,581.
• Total Ridership was 218,296 compared to 250,898 in 2015.
• Total Vehicle Miles was 322,326 compared to 329,767 in 2015.
• Fixed route service provided 198,610 rides compared to 233,514 in 2015 and 188,154 vehicle miles compared to 195,224 in 2015.
• Special shuttle service provided 3,846 rides compared to 3,687 in 2015 and 937 vehicle miles compared to 1,232 in 2015.
• Proline service provided 15,722 rides compared to 13,559 in 2015 and 119,218 vehicle miles compared to 118,104 in 2015.
• Out Of County Contracted Services provided 118 rides compared to 138 in 2015 and 3,022 vehicle miles compared to 4,492 in 2015.
5
R
ider
ship
CU
RR
EN
T M
O.
PR
IOR
YR
.Y
TD
PR
I OR
YT
D2016
2015
c
han
ge
%
2016
2015
c
han
ge
%
Fixe
d R
oute
198,6
10
233,5
14
-34,9
04
-14.9
5%
1,9
43,5
30
2,0
91,9
67
-148,4
37
-7.1
0%
Par
atra
nsit
15,7
22
13,5
59
2,1
63
15.9
5%
139,9
55
112,4
14
27,5
41
24.5
0%
Oth
er R
even
ue3,8
46
3,6
87
159
4.3
1%
27,9
02
41,6
04
-13,7
02
-32.9
3%
CS
-Out
of c
ount
y118
138
-20
-14.4
9%
1,1
60
1,3
85
-225
-16.2
5%
Tota
l218,2
96
250,8
98
-32,6
02
-12.9
9%
2,1
12,5
47
2,2
47,3
70
-134,8
23
-6.0
0%
Veh
icle
Ope
ratio
nsC
UR
RE
NT
MO
.PR
IOR
YR
.Y
TD
PR
IOR
YT
D M
ileag
e2016
2015
c
han
ge
%
2016
2015
c
han
ge
%
Fixe
d R
oute
188,1
54
195,2
24
-7,0
70
-3.6
2%
1,8
65,9
90
1,8
74,6
52
-8,6
62
-0.4
6%
Par
atra
nsit
119,2
18
118,1
04
1,1
14
0.9
4%
1,1
16,8
40
1,0
60,2
75
56,5
65
5.3
3%
Oth
er R
even
ue937
1,2
32
-295
-23.9
4%
5,5
42
9,1
46
-3,6
04
-39.4
1%
Dea
dhea
d M
iles
10,9
95
10,7
15
280
2.6
1%
105,1
04
102,4
18
2,6
86
2.6
2%
CS
-Out
of c
ount
y3,0
22
4,4
92
-1,4
70
-32.7
2%
38,3
48
48,2
05
-9,8
57
-20.4
5%
Tota
l322,3
26
329,7
67
-7,4
41
-2.2
6%
3,1
31,8
24
3,0
94,6
96
37,1
28
1.2
0%
Hou
rsC
UR
RE
NT
MO
.PR
IOR
YR
.Y
TD
PR
IOR
YT
D2016
2015
c
han
ge
%
2016
2015
c
han
ge
%
Fixe
d R
oute
11,7
40
12,3
93
-653
-5.2
7%
116,5
98
115,5
70
1,0
28
0.8
9%
Par
atra
nsit
6,0
68
6,0
47
21
0.3
5%
57,9
80
57,7
43
237
0.4
1%
Oth
er R
even
ue83
91
-8-8
.79%
1,0
12
1,3
53
-341
-25.2
0%
CS
-Out
of c
ount
y153
217
-64
-29.4
9%
1,7
78
2,2
03
-425
-19.2
9%
Tota
l18,0
44
18,7
48
-704
-3.7
6%
177,3
68
176,8
69
499
0.2
8%
Pas
senge
rs p
er M
ile
C
UR
RE
NT
MO
.
PR
IOR
YR
.
Y
TD
PR
IOR
YT
DF
ixed
Rou
te1.0
6
1.2
0
1.0
4
1.1
2
Par
atra
nsi
t0.1
3
0.1
1
0.1
3
0.1
1
Spec
ial
4.1
0
2.9
9
5.0
3
4.5
5
C
S-O
ut
of c
ounty
0.0
4
0.0
3
0.0
3
0.0
3
Pas
senge
r per
Hou
r
CU
RR
EN
T M
O.
PR
IOR
YR
.
Y
TD
PR
IOR
YT
DF
ixed
Rou
te16.9
2
18.8
4
16.6
7
18.1
0
Par
atra
nsi
t2.5
9
2.2
4
2.4
1
1.9
5
O
ther
Rev
enue
46.3
4
40.5
2
27.5
7
30.7
5
CS-O
ut
of c
ounty
0.7
7
0.6
4
0.6
5
0.6
3
SA
RT
A R
IDE
RSH
IP R
EPO
RT
Oct
ober
2016
2016 O
pera
ting
Day
s 21 W
eekday
s, 5
Sat
urd
ays
2015 O
pera
ting
Day
s 22 W
eekday
s, 5
Sat
urd
ays
6
7
Customer Service & Paratransit Reservations
October 2016
• Mr. Davidson attended an OPTA Paratransit Peers Meeting.
• The Proline Committees met to improve delivery of paratransit services.
• Mr. Davidson held interviews for the CSR position and Customer Service & Paratransit Assistant Supervisor.
• Mr. Davidson adjusted the Trapeze software to increase efficiency of
subscription trips.
• Mr. Davidson along with Ms. Virola and Ms. Petty met with Concerned Veterans for America to review SARTA’s veteran’s programs.
• Mr. Davidson attended several webinar trainings with AVAIL.
8
2016 Proline “Shared Ride” Service Statistics
Month Trips Scheduled
Advance Cancels
Same Day
Cancels
No-Shows
Late Cancels
Cancels at the Door
Total Performed
Trips
Vehicle Miles
Miles per Trip
January 13,273 1,696 1,005 86 59 53 10,374 113,841 10.97
February 13,777 1,718 1,044 86 78 48 10,803 119,767 11.09
March 14,690 1,764 881 73 51 41 11,880 130,525 10.88
April 14,940 2,014 847 90 74 44 11,871 134,818 11.23
May 13,978 1,755 896 114 65 43 11,105 126,763 11.26
June 13,653 1,661 921 81 78 51 10,861 123,485 11.23
July 12,556 1,417 994 73 67 39 9,966 107,281 10.65
August 14,456 1,715 842 90 87 42 11,680 130,860 11.08
September 15,008 1,803 969 97 85 43 12,011 134,798 11.09
October 15,151 1,864 914 96 87 49 12,141 134,257 10.93
November
December
Proline “Shared Ride” Service Statistics For the Month 2015
Month Trips Scheduled
Advance Cancels
Same Day
Cancels
No-Shows
Late Cancels
Cancels at the Door
Total Performed
Trips
Vehicle Miles
Miles per Trip
October 14,740 1,864 884 66 72 26 11,828 132,094 11.08
9
2015 2015 Totals 2016 2016 Totals Percent changed
Jan $96,448.75 Jan $69,475.25 -38.82%
Feb $101,760.50 Feb $82,154.75 -23.86%
Mar $86,928.75 Mar $65,282.25 -33.16%
Apr $65,047.25 Apr $64,435.25 -0.95%
May $70,898.00 May $88,804.00 20.16%
Jun $103,582.00 Jun $67,468.50 -53.53%
Jul $91,424.00 Jul $81,068.25 -12.77%
Aug $88,968.75 Aug $115,003.25 22.64%
Sep $81,728.25 Sep $75,697.00 -7.97%
Oct $81,462.50 Oct $58,354.00 -39.60%
Nov Nov #DIV/0!
Dec Dec #DIV/0!
Year-to-Date $868,248.75 $767,742.50 -13.09%
Pass/Ticket Sales Comparison, 2015-2016
10
Fare
Type
Jan
Feb
Mar
chAp
rilM
ayJu
neJu
lyAu
gSe
ptOc
tNo
vDe
cTo
tal
10-R
ide
Proli
ne$5
,602
.50
$4,3
02.0
0$4
,747
.50
$4,2
97.5
0$1
,912
.50
$2,1
60.0
0$1
,710
.00
$6,6
37.5
0$8
,460
.00
$5,8
50.0
0$0
.00
$0.0
0$4
5,679
.5010
-Ride
Re
duce
d$1
,065
.00
$1,0
80.0
0$1
,560
.00
$1,4
02.5
0$1
,537
.50
$1,1
70.0
0$1
,462
.50
$1,6
12.5
0$1
,365
.00
$1,3
12.5
0$0
.00
$0.0
0$1
3,567
.50
$1,6
65.0
0$3
,420
.00
$1,5
15.0
0$1
,725
.00
$7,9
95.0
0$1
,395
.00
$2,1
00.0
0$2
,010
.00
$7,0
80.0
0$1
,740
.00
$0.0
0$0
.00
$30,6
45.00
$1,9
89.0
0$8
73.0
0$2
90.2
5$8
66.2
5$1
41.7
5$7
69.5
0$1
,293
.75
$2,7
49.5
0$3
8.25
$173
.25
$0.0
0$0
.00
$9,18
4.50
$677
.25
$669
.75
$845
.50
$825
.00
$798
.75
$855
.00
$771
.00
$816
.75
$767
.25
$798
.75
$0.0
0$0
.00
$7,82
5.00
$7,9
41.5
0$5
,451
.00
$6,4
47.0
0$5
,410
.50
$1,5
68.5
0$3
,433
.50
$12,
702.
00$3
4,05
4.50
$5,9
25.5
0$3
,676
.50
$0.0
0$0
.00
$86,6
10.50
$11,
340.
00$1
0,96
2.00
$9,9
54.0
0$1
1,71
8.00
$8,9
01.0
0$9
,090
.00
$8,7
57.0
0$9
,783
.00
$8,0
64.0
0$1
1,02
5.00
$0.0
0$0
.00
$99,5
94.00
$12,
285.
00$1
3,79
2.50
$13,
995.
00$1
4,85
0.00
$12,
960.
00$1
4,18
2.50
$13,
837.
50$1
4,10
7.50
$14,
445.
00$1
2,93
7.50
$0.0
0$0
.00
$137
,392.5
0
$12,
105.
00$3
0,42
0.00
$16,
875.
00$1
4,67
0.00
$37,
980.
00$2
0,90
2.50
$33,
750.
00$3
3,79
5.00
$17,
730.
00$1
2,69
0.00
$0.0
0$0
.00
$230
,917.5
0
$1,7
87.5
0$4
,565
.00
$2,0
90.0
0$3
,547
.50
$3,6
57.5
0$1
,232
.50
$137
.50
$5,8
30.0
0$3
,795
.00
$2,7
50.0
0$0
.00
$0.0
0$2
9,392
.5031
-Day
Co
llege
$6,6
82.5
0$3
,740
.00
$1,6
22.5
0$1
,870
.00
$6,0
50.0
0$2
47.5
0$4
38.0
0$3
02.5
0$3
,052
.50
$1,7
05.0
0$0
.00
$0.0
0$2
5,710
.50$6
,285
.00
$2,7
97.0
0$5
,288
.00
$3,1
88.0
0$4
,674
.00
$3,7
68.0
0$3
,309
.00
$3,1
84.5
0$4
,912
.00
$3,5
83.0
0$0
.00
$0.0
0$4
0,988
.50Su
mmer
Bl
ast
$0.0
0$0
.00
$0.0
0$0
.00
$540
.00
$1,8
60.0
0$7
20.0
0$0
.00
$0.0
0$0
.00
$0.0
0$0
.00
$3,12
0.00
Fixed
Blas
t$0
.00
$0.0
0$0
.00
$0.0
0$0
.00
$6,3
00.0
0$0
.00
$0.0
0$0
.00
$0.0
0$0
.00
$0.0
0$6
,300.0
0Cl
evela
nd$5
0.00
$82.
50$5
2.50
$65.
00$8
7.50
$102
.50
$80.
00$1
20.0
0$6
2.50
$112
.50
$0.0
0$0
.00
$815
.0069
,475
.25
$
82
,154
.75
$
65
,282
.25
$
64,4
35.2
5$
88
,804
.00
$
67,4
68.5
0$
81,0
68.2
5$
115,
003.
25$
75
,697
.00
$
58,3
54.0
0$
-
$
-
$
$7
67,74
2.50
31-D
ay
Redu
ced
31-D
ay
Regu
lar31
-Day
St
uden
t
All D
ay
2016
Tota
l Sale
s by P
ass/
Ticke
t Typ
e
10-R
ide
Regu
lar1-R
ide
Proli
ne1-R
ide
Redu
ced
1-Ride
Re
gular
31-D
ay
Proli
ne
11
Allian
ce201
5All
iance
2016
Mass 2015
Mass 2016
Canto
n 201
5Ca
nton
2016
BV 20
15BV
2016
Fisher
s201
5Fis
hers
2016
Thorn
e's
IGA 20
15Th
orne's
IGA
2016
Stark
State
2015
Stark
State
2016
Kent
State
2015
Kent
State
2016
BMC
2015
BMC
2016
NU
2015
NU
2016
ACH
2015
ACH
2016
Total 2016
Total 2015
Jan$1,
839$1,
477$8,
190$12
,304
$68,51
9$41
,027
$4,983
$6,173
$1,590
$1,731
$60$13
2$9,
763$5,
665$85
3$41
3$60
5$22
0$0
$275
$48$60
$69,47
5$96
,449
Feb$1,
984$1,
936$8,
913$5,
136$80
,615
$57,57
3$4,
873$11
,981
$1,553
$1,842
$285
$126
$2,283
$2,338
$220
$578
$963
$358
$28$24
8$47
$42$82
,155
$101,7
61
Mar
$1,887
$1,976
$9,718
$10,60
2$65
,578
$44,14
9$5,
500$5,
467$1,
506$1,
380$21
0$17
7$1,
815$1,
045$24
8$27
5$46
8$83
$0$11
0$0
$20$65
,282
$86,92
9
Apr
$1,568
$2,331
$11,50
1$12
,317
$42,00
3$40
,130
$5,684
$5,816
$1,304
$1,959
$210
$186
$1,595
$908
$275
$495
$908
$138
$0$13
8$0
$20$64
,435
$65,04
7
May
$1,842
$2,092
$9,952
$10,43
1$46
,047
$62,68
3$4,
689$5,
507$1,
599$1,
914$28
5$16
8$5,
640$5,
693$16
5$13
8$49
0$11
0$16
5$55
$24$14
$88,80
4$70
,898
Jun$1,
831$2,
309$9,
503$10
,903
$83,95
0$45
,798
$4,529
$5,016
$1,482
$2,186
$264
$111
$1,370
$798
$360
$0$27
0$83
$0$24
8$23
$20$67
,469
$103,5
82
Jul$1,
996$1,
787$9,
073$8,
001$72
,602
$64,21
3$5,
674$4,
411$1,
623$1,
929$19
1$25
2$90
$275
$0$28
$133
$28$0
$108
$44$38
$81,06
8$91
,424
Aug
$1,969
$1,886
$10,73
2$12
,833
$67,43
5$91
,416
$6,705
$5,606
$1,763
$2,424
$228
$249
$0$0
$0$41
3$0
$55$13
8$11
0$0
$12$11
5,003
$88,96
9
Sep
$1,864
$1,834
$10,35
5$11
,916
$50,61
9$50
,847
$7,384
$5,764
$1,514
$2,012
$252
$378
$8,388
$2,420
$413
$413
$715
$55$16
5$28
$62$32
$75,69
7$81
,728
Oct
$1,807
$2,081
$7,837
$11,27
7$61
,697
$34,20
3$5,
777$6,
750$1,
860$2,
216$25
8$44
4$1,
265$1,
045$55
$303
$660
$28$19
3$0
$54$9
$58,35
4$81
,463
Nov
$1,595
$0$10
,057
$0$35
,748
$0$4,
557$0
$1,755
$0$16
1$0
$1,018
$0$41
3$0
$220
$0$19
3$0
$110
$0$0
$55,82
4
Dec
$2,235
$0$10
,854
$0$59
,569
$0$5,
432$0
$1,539
$0$16
8$0
$523
$0$30
3$0
$550
$0$11
0$0
$129
$0$0
$81,41
1
Total
$22,41
5$19
,708
$116,6
84$10
5,719
$734,3
81$53
2,038
$65,78
8$62
,489
$19,08
6$19
,592
$2,571
$2,223
$33,74
8$20
,185
$3,303
$3,053
$5,980
$1,155
$990
$1,318
$539
$264
$767,7
43$1,
005,48
3
2015-2
016 Pa
ss/Tic
ket Sa
les by
Locat
ion
12
13
STARK AREA REGIONAL TRANSIT AUTHORITY MAINTENANCE DEPARTMENT
November, 2016 Submitted by: Mark Finnicum
1. There was a total of 124 Preventive Maintenance Inspections • 58 Fixed Route Buses • 60 Paratransit Buses • 06 Support Vehicle
2. There was a total of 109 Wheelchair Inspections
3. There was a total of 51 Heat & Air Conditioning Inspections
4. There was a total of 39 Farebox Inspections
5. There was a total of 23 Front End Alignments
6. There was a total of 45 Bus Exchanges
7. There was a total of 07 CNG Recertification Inspections
8. There was a total of 19 Bi-Monthly Camera Inspections
9. There was a total of 09 Road Calls • 08 Fixed Route Buses – 08 Towed • 00 Non-Revenue Vehicle – 00 Towed • 01 Paratransit Buses – 01 Towed
10. There was a total of 00 Warranty Repair
Building and Grounds Report • Gateway Offices Tasks completed 05 • Gateway Garage Tasks completed 03 • Massillon Tasks completed 01 • Alliance Tasks completed 02 • Cornerstone Tasks completed 05 • Belden Village Tasks completed 05
11. There was 00 job related injuries reported.
14
Preventive Maintenance Inspections2016 Fixed Route Paratransit Support TotalJan 54 52 7 113Feb 60 56 7 123Mar 67 60 5 132Apr 53 58 7 118May 56 55 7 118Jun 61 57 6 124Jul 55 56 4 115Aug 61 55 6 122Sep 60 60 8 128Oct 54 50 5 109Nov 58 60 6 124Dec 0
Road calls2016 Fixed route Paratransit Support TotalJan 6 1 0 7Feb 9 2 0 11Mar 14 2 0 16Apr 5 5 1 11May 6 1 0 7Jun 14 7 1 22Jul 10 4 0 14Aug 10 4 0 14Sep 13 3 0 16Oct 6 2 0 8Nov 8 1 0 9Dec
0
20
40
60
80
100
120
140
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2016 Preventive Maintenance
Fixed Route Paratransit Support Total
0
5
10
15
20
25
Jan
Feb
Mar
Apr
May Jun
Jul
Aug
Sep
Oct
Nov
Dec
2016 Road Calls
Fixed route Paratransit Support Total
15
2016
Prev
enti
ve
Mai
nten
ance
C
osts
Rep
air
Cos
tsT
otal
Die
sel
Gal
lons
U
sed
2015
Die
sel
Gal
lons
U
sed
2016
SAR
TA
C
NG
GG
E
Use
d 20
15
SAR
TA
C
NG
GG
E
Use
d 20
16
CN
G P
ubli
c U
se G
GE
20
15
CN
G P
ubli
c U
se G
GE
20
16
Jan
$16,
169.
94$6
0,69
6.99
$76,
866.
9332
031
2872
916
819.
967
2003
7.53
330
120.
686
1885
8.68
6
Feb
$19,
461.
01$5
9,78
6.06
$79,
247.
0732
037
3205
017
300.
404
1912
8.07
241
710.
803
9603
.141
Mar
$18,
453.
08$6
3,36
7.70
$81,
820.
7836
181
3316
917
029.
787
2077
2.26
319
674.
058
9395
.577
Apr
$19,
102.
79$5
8,17
8.57
$77,
281.
3634
402
3290
619
747.
386
1990
7.28
6525
.334
8929
.724
May
$19,
090.
02$6
7,88
7.82
$86,
977.
8434
013
3244
018
810.
055
1938
3.10
884
83.5
6412
533.
398
Jun
$14,
928.
15$5
9,50
2.15
$74,
430.
3034
295
3461
021
234.
903
2198
2.16
871
45.2
885
31.1
64
Jul
$14,
357.
78$4
5,32
3.74
$59,
681.
5237
355
3438
720
791.
774
2067
8.06
168
99.2
8668
74.9
12
Au
g$1
5,62
4.86
$79,
203.
90$9
4,82
8.76
3630
637
139
2020
6.98
324
194.
476
1228
4.09
1036
4.52
6
Sep
$14,
209.
19$7
8,26
4.37
$92,
473.
5633
389
3252
020
741.
919
2224
6.73
463
78.8
0583
00.7
27
Oct
$15,
900.
70$7
8,29
3.08
$94,
193.
7832
641
3279
220
131.
496
2068
6.00
966
18.0
0565
28.2
25
Nov
$15,
059.
15$7
8,10
8.64
$93,
167.
7930
552
3116
519
574.
828
1960
8.92
6509
.942
5502
.241
Dec
3154
321
568.
969
1737
1.76
3
Tot
al$1
82,3
56.6
7$7
28,6
13.0
2$9
10,9
69.6
940
4745
3619
0723
3958
.471
2286
24.6
2416
9721
.62
1054
22.3
2
Mon
th A
vg.
$16,
577.
88$6
6,23
7.55
$82,
815.
4333
728.
7532
900.
6363
619
496.
5393
2078
4.05
6714
143.
468
9583
.847
36
GG
E -
Gas
olin
e G
allo
n E
quiv
alen
t
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
STA
RK
AR
EA
RE
GIO
NA
L TR
AN
SIT
AU
THO
RIT
YA
ctiv
ity
thro
ugh
Nov
30,
201
6G
RA
NTS
LIS
TIN
G B
Y G
RA
NT
PRO
JEC
T D
ESC
RIP
TIO
N -
CU
RR
EN
T PR
OJE
CTS
PA P
roj N
ame
Gra
nt #
YEA
R O
F A
LLO
CA
TIO
NO
RIG
INA
L
AM
EN
DE
D
GR
AN
T A
MO
UN
TSLI
FE T
O D
ATE
D
RA
WS
FTA
FU
ND
ING
B
ALA
NC
EPO
's s
ubm
itte
d no
t dr
awn
FTA
Fun
ding
B
alan
ce a
fter
O
blig
ated
PO
'sA
CTI
VE
GR
AN
TS:
HYD
RO
BU
S 2
CA
-04-
7004
TOTA
L20
152,
630,
000
2,63
0,00
0(2
,284
,764
)34
5,23
60
345,
236
HYD
RO
BU
S 1
CA
-04-
7009
TOTA
L20
152,
492,
147
2,49
2,14
7(2
,130
,475
)36
1,67
20
361,
672
LoN
oO
H-2
6-00
08TO
TAL
2015
8,87
7,40
58,
877,
405
(7,8
08,9
38)
1,06
8,46
7(5
9,00
2)1,
009,
465
Stat
e of
Goo
d R
epai
rO
H-3
4-00
06TO
TAL
2014
399,
806
399,
806
(366
,208
)36
,798
(8,0
00)
28,7
98
5339
OH
-34-
0017
TOTA
L20
1526
7,13
340
1,24
9(4
01,2
49)
00
0
JAR
CO
H-3
7-60
94TO
TAL
2012
145,
838
145,
838
(101
,339
)44
,499
(4,5
00)
39,9
99
Clo
se N
ov 2
016
5307
OH
-90-
0714
-01
TOTA
L20
105,
830,
610
5,82
8,61
0(5
,828
,610
)0
00
53
07O
H-9
0-X
764
TOTA
L20
123,
833,
589
3,81
2,40
5(3
,720
,333
)10
2,71
8(7
9,02
7)23
,692
5307
OH
-90-
X78
5TO
TAL
2013
1,67
4,53
13,
481,
510
(3,4
50,8
05)
30,7
050
30,7
05
5307
OH
-90-
X79
7TO
TAL
2014
3,59
3,81
93,
593,
819
(3,4
50,6
84)
143,
135
014
3,13
5
5307
OH
-90-
X81
8TO
TAL
2015
3,59
7,71
83,
597,
718
(3,5
66,8
25)
30,6
36(2
5,27
0)5,
366
O
TPPP
OH
-95-
4172
TOTA
L20
141,
126,
800
1,12
6,80
0(5
88,6
20)
538,
180
(94,
549)
443,
631
OTP
PPO
H-9
5-X
200
TOTA
L20
151,
460,
139
1,46
0,13
9(1
,440
,459
)19
,680
019
,680
OTP
PP L
oNo
1 O
H-2
016-
029-
00TO
TAL
2016
1,18
5,73
51,
185,
735
(648
,291
)53
7,44
4(4
54,6
40)
82,8
04
UTP
OH
-201
6-02
3-00
TOTA
L20
1635
1,90
535
1,90
5(3
51,9
05)
00
0
5310
OH
-201
6-05
9-00
TOTA
L20
14 &
15
589,
122
589,
122
(243
,961
)34
5,16
1(1
01,0
68)
244,
093
Aw
arde
d53
10PE
ND
ING
TOTA
L20
1629
1,65
829
1,65
80
291,
658
029
1,65
8
5307
OH
-201
6-03
0-00
TOTA
L20
163,
665,
015
3,66
5,01
5(1
,471
,452
)2,
193,
563
(275
,085
)1,
918,
478
D
ER
GO
H-2
016-
028-
00TO
TAL
2016
1,00
0,00
01,
000,
000
(817
,338
)18
2,66
2(7
4,40
0)10
8,26
2
Aw
arde
dLo
No
2 PE
ND
ING
TOTA
L20
164,
015,
174
4,01
5,17
40
4,01
5,17
40
4,01
5,17
4PE
ND
ING
GR
AN
TS:
PEN
DIN
GLo
No
2 Pr
ojec
tC
MA
QTO
TAL
2017
600,
000
600,
000
600,
000
600,
000
PEN
DIN
G G
RA
NTS
:60
0,00
00
600,
000
060
0,00
044
,423
,908
(34,
257,
017)
10,1
80,4
80(1
,175
,541
)9,
004,
940
50,1
46,0
55(3
8,67
2,25
6)11
,487
,388
(1,1
75,5
41)
10,3
11,8
48FT
A G
RA
ND
TO
TALS
:To
tal I
nclu
ding
Cal
Star
t
39
STA
RK
AR
EA
RE
GIO
NA
L T
RA
NSI
T A
UT
HO
RIT
YG
RA
NT
S LI
STIN
G B
Y G
RA
NT
Act
ivit
y th
roug
h N
ov 3
0, 2
016
PRO
JEC
T D
ESC
RIP
TIO
N -
CU
RR
EN
T P
RO
JEC
TS
PA P
roj N
ame/
PO
Num
ber
Gra
nt #
GR
AN
T
%
YE
AR
O
F A
LLO
CA
TIO
NO
RIG
INA
L
AM
EN
DE
D
GR
AN
T
AM
OU
NT
SLI
FE T
O D
AT
E
DR
AW
SFT
A F
UN
DIN
G
BA
LAN
CE
PO's
su
bmit
ted
not
draw
n
FTA
FU
ND
ING
B
ALA
NC
E a
fter
O
blig
ated
PO
'sA
CT
IVE
GR
AN
TS:
Oh
io A
mer
ican
Fu
el C
ell B
us
2 -
SA
RTA
Mat
ch O
nly
HY
DR
O B
US
2C
A-0
4-70
040%
644,
000
00
00
0O
hio
Am
eric
an F
uel
Cel
l Bu
s 2
- B
AE
Gra
nt
HY
DR
O B
US
2C
A-0
4-70
0410
0%1,
424,
308
1,42
4,30
8(1
,289
,433
)13
4,87
50
134,
875
Oh
io A
mer
ican
Fu
el C
ell B
us
2 -
EN
C G
ran
tH
YD
RO
BU
S 2
CA
-04-
7004
100%
644,
747
644,
747
(529
,137
)11
5,61
00
115,
610
Oh
io A
mer
ican
Fu
el C
ell B
us
2 -
Bal
lard
Gra
nt
HY
DR
O B
US
2C
A-0
4-70
0418%
560,
945
560,
945
(466
,195
)94
,750
94,7
50C
alSt
art
Bus
2C
A-0
4-70
04T
OT
AL
2,63
0,00
02,
630,
000
(2,2
84,7
64)
345,
236
034
5,23
6
Oh
io A
mer
ican
Fu
el C
ell B
us
1 -
SA
RTA
Mat
ch O
nly
HY
DR
O B
US
1C
A-0
4-70
090%
644,
000
00
00
0O
hio
Am
eric
an F
uel
Cel
l Bu
s 1
- B
AE
Gra
nt
HY
DR
O B
US
1C
A-0
4-70
0939
%1,
345,
455
1,34
5,45
5(9
97,1
94)
348,
261
034
8,26
1O
hio
Am
eric
an F
uel
Cel
l Bu
s 1
- E
NC
Gra
nt
HY
DR
O B
US
1C
A-0
4-70
0910
0%64
4,74
764
4,74
7(6
58,0
86)
(13,
339)
0(1
3,33
9)O
hio
Am
eric
an F
uel
Cel
l Bu
s 1
- B
alla
rd G
ran
tH
YD
RO
BU
S 1
CA
-04-
7009
100%
501,
945
501,
945
(475
,195
)26
,750
26,7
50C
alSt
art
Bus
1C
A-0
4-70
09T
OT
AL
3,13
6,14
72,
492,
147
(2,1
30,4
75)
361,
672
036
1,67
2
Cal
Sta
rt D
ata
LoN
o C
al D
ata
OH
-26-
0008
100%
2015
350,
000
350,
000
(123
,400
)22
6,60
022
6,60
0A
ltoo
na
Test
ing
LoN
o A
ltoo
naO
H-2
6-00
0810
0%20
1578
2,86
578
2,86
50
782,
865
782,
865
Spa
res
LoN
o 20
15Sp
ares
LoN
o201
5O
H-2
6-00
0810
0%20
1530
5,50
030
5,50
0(3
05,5
00)
00
Hyd
roge
n S
tati
onH
yd S
tati
onO
H-2
6-00
0810
0%20
1530
0,00
030
0,00
0(2
40,9
98)
59,0
0259
,002
0Pu
rch
ase
(5) H
ydro
gen
Fu
eled
Bu
ses
- Lo
No
40FT
Hyd
ro L
oNo
OH
-26-
0008
100%
2015
7,13
9,04
07,
139,
040
(7,1
39,0
40)
00
0FY
15 5
312
OH
-26-
0008
TO
TA
L8,
877,
405
8,87
7,40
5(7
,808
,938
)1,
068,
467
59,0
021,
009,
465
Bu
ildin
g M
odifi
cati
ons
at G
atew
ayR
EH
AB
GW
201
4O
H-3
4-00
0680
%20
1439
9,80
6
39
9,80
6(3
66,2
08)
36,7
988,
000
28,7
98FY
14 5
339
OH
-34-
0006
TO
TA
L39
9,80
639
9,80
6(3
66,2
08)
36,7
988,
000
28,7
98
SE
C 5
339
- B
us
and
Bu
s Fa
cilit
ies
40 F
T C
NG
Bus
es
OH
-34-
0017
80%
2015
267,
133
401,
249
(401
,249
)0
00
OH
-34-
0017
267,
133
401,
249
(401
,249
)0
00
Tran
sp S
tk C
o B
ack
to W
ork
(Par
atra
nsi
t) -
SA
RTA
Bud
Rev
fST
K B
K W
K O
PER
AO
H-3
7-40
9450
%20
1252
,502
60,5
16(1
6,01
7)44
,499
4,50
039
,999
Tran
spor
tati
on fo
r S
ucc
essf
ul R
e- E
ntr
y -
AB
CD
Bud
Rev
fro
OH
-37-
4094
AB
CD
OH
-37-
4094
50%
2012
32,8
1440
,828
(40,
828)
00
Way
s to
Wor
k Lo
an P
rogr
am -
Tri
lliu
mO
H-3
7-40
94 T
RIL
OH
-37-
4094
50%
2012
45,9
3941
,495
(41,
495)
00
Prog
ram
Adm
in 2
012
Bud
Rev
to S
AR
TA a
nd A
BC
DO
H-3
7-60
94O
H-3
7-60
9410
0%20
1214
,583
2,99
9(2
,999
)0
0FY
12 N
on-V
et J
AR
CO
H-3
7-60
94T
OT
AL
145,
838
145,
838
(101
,339
)44
,499
4,50
039
,999
A
DA
Par
atra
nsi
t S
ervi
ceO
H-9
0-87
1480
%20
1038
1,83
8
38
1,83
8(3
81,8
38)
00
Bel
den
Tra
nsi
t C
ente
r A
rch
itec
tura
l & E
ngi
nee
rin
gO
H-9
0-07
1480
%20
1012
0,00
0
12
0,00
0(1
20,0
00)
00
Bel
den
Tra
nsi
t C
ente
r C
onst
ruct
ion
(Bud
Rev
to C
omm
Sys
)O
H-9
0-07
1480
%20
101,
500,
000
1,
409,
487
(1,4
09,4
87)
00
Be l
den
Tra
nsi
t C
ente
r D
emol
itio
n (B
ud R
ev to
Com
m S
ys)
OH
-90-
0714
80%
2010
157,
360
150,
051
(150
,051
)0
0S
ecu
rity
(pu
rch
ase
and
inst
alla
tion
of c
amer
as a
t B
V s
tati
on)
OH
-90-
0714
80%
2010
38,1
84
38
,184
(38,
184)
00
Tran
sit
En
han
cem
ents
(Lan
dsca
pin
g at
BV
sta
tion
)O
H-9
0-07
1480
%20
105,
928
5,
928
(5,9
28)
00
Tran
sit
En
han
cem
ents
(Sid
ewal
ks, c
urb
s, A
DA
ram
ps, d
irec
tion
al a
rrow
s at
BV
)O
H-9
0-07
1480
%20
1032
,256
32,2
56(3
2,25
6)0
0Pr
ojec
t A
dmin
istr
atio
n C
omm
Sys
tem
(B
ud R
ev -
Proj
Adm
in to
PM
)O
H-9
0-07
1480
%20
1050
,000
18,8
54(1
8,85
4)0
0Pu
rch
ase
Com
mu
nic
atio
n S
yste
m (B
ud R
ev -
BV
fund
s to
CS)
OH
-90-
0714
80%
2010
310,
667
478,
473
(478
,473
)0
0Pu
rch
ase
Mis
c C
omm
un
icat
ion
Equ
ipm
ent
OH
-90-
0714
80%
2010
297,
704
297,
704
(297
,704
)0
0Pu
rch
ase
Rad
ios
OH
-90-
0714
80%
2010
346,
667
346,
667
(346
,667
)0
0C
ompu
ter
Har
dwar
e (p
roje
ctor
s) (B
ud R
ev -
fund
s to
GW
Lot
)O
H-9
0-07
1480
%20
1010
,015
8,27
2(8
,272
)0
0S
oftw
are
(Web
site
)O
H-9
0-07
1480
%20
1073
,600
73,6
00(7
3,60
0)0
0S
upp
ort
Equ
ipm
ent
(Var
iabl
e sp
eed
com
pres
sor)
OH
-90-
0714
80%
2010
17,9
85
17
,985
(17,
985)
00
Prev
enti
ve M
ain
ten
ance
OH
-90-
0714
80%
2010
502,
804
502,
804
(502
,804
)0
0A
DA
Par
atra
nsi
t S
ervi
ceO
H-9
0-07
14-0
180
%20
1136
3,40
5
36
3,40
5(3
63,4
05)
00
Ligh
tin
g &
Pas
sen
ger
Am
enit
ies
at t
ran
sit
stat
ion
sPA
SS AMEN
201
2O
H-9
0-07
14-0
180
%20
1136
,341
36,3
41(3
6,34
1)0
0B
elde
n T
ran
sit
Cen
ter
Arc
hit
ectu
ral &
En
g (B
ud R
ev to
Com
m S
ys)
OH
-90-
0714
-01
80%
2011
87,6
20
17
,636
(17,
636)
00
Sec
uri
ty C
amer
as a
t B
elde
n S
tati
onO
H-9
0-07
14-0
180
%20
1136
,341
36,3
41(3
6,34
1)0
0E
ngi
nee
rin
g &
Des
ign
CN
G E
quip
men
tO
H-9
0-07
14-0
180
%20
1114
0,00
0
14
0,00
0(1
40,0
00)
00
Reh
ab/R
enov
ate
Gat
eway
Par
kin
g Lo
t (B
ud R
ev W
orkf
low
/Pr
GA
TE
WA
Y A
DM
IN 1
2O
H-9
0-07
14-0
180
%20
11-
29,5
57(2
9,55
7)0
0S
oftw
are
- W
orkf
low
& O
utl
ook
(Bud
Rev
- fu
nds
to G
W L
ot)
OH
-90-
0714
-01
80%
2011
60,0
00
32
,186
(32,
186)
00
En
gin
eeri
ng
& D
esig
n M
ahon
ing
Cor
rido
rM
ahon
ing
Rd
E&
DO
H-9
0-07
14-0
180
%20
1133
6,00
0
33
6,00
0(3
36,0
00)
00
Su
ppor
t V
ehic
le &
Sn
ow P
low
OH
-90-
0714
-01
80%
2011
48,0
00
48
,000
(48,
000)
00
Upd
ated
by: Deb
ra Swickard
40
PRO
JEC
T D
ESC
RIP
TIO
N -
CU
RR
EN
T P
RO
JEC
TS
PA P
roj N
ame/
PO
Num
ber
Gra
nt #
GR
AN
T
%
YE
AR
O
F A
LLO
CA
TIO
NO
RIG
INA
L
AM
EN
DE
D
GR
AN
T
AM
OU
NT
SLI
FE T
O D
AT
E
DR
AW
SFT
A F
UN
DIN
G
BA
LAN
CE
PO's
su
bmit
ted
not
draw
n
FTA
FU
ND
ING
B
ALA
NC
E a
fter
O
blig
ated
PO
'sPr
even
tive
Mai
nte
nan
ce (B
ud R
ev -
Proj
Adm
in to
PM
)O
H-9
0-07
14-0
180
%20
1176
2,69
5
79
1,84
1(7
91,8
41)
00
Mob
ility
Man
agem
ent
OH
-90-
0714
-01
80%
2011
115,
200
115,
200
(115
,200
)0
0FY
11 5
307
OH
-90-
0714
-01
TO
TA
L5,
830,
610
5,82
8,61
0(5
,828
,610
)0
00
A
DA
Par
atra
nsi
t S
ervi
ces
AD
A 2
012
OH
-90-
8764
80%
2012
353,
522
353,
522
(353
,522
)0
0Pa
ssen
ger
Am
enit
ies
PASS
AM
EN
201
2O
H-9
0-X
764
80%
2012
36,0
00
36
,000
(36,
000)
00
Pass
enge
r A
men
itie
s -
Mah
onin
g C
orri
dor
PASS
AM
EN
MA
HO
NO
H-9
0-07
6480
%20
1268
,000
68,0
00(6
8,00
0)0
00
Bu
s S
hel
ters
- M
ahon
ing
Cor
rido
r (B
ud R
ev $
128k
to P
lann
inM
AH
ON
ING
SH
ELT
ER
S 12
OH
-90-
0764
80%
2012
204,
000
204,
000
(204
,000
)0
00
Sec
uri
ty A
t G
atew
ay F
acili
tySU
RV
/SE
C G
W 2
012
OH
-90-
X76
480
%20
1266
,400
66,4
00(6
6,40
0)0
0Ph
one
Sys
tem
at
Gat
eway
Fac
ility
(Bud
Rev
bal
to P
M)
PHO
NE
SY
S 20
12O
H-9
0-X
764
80%
2012
128,
000
90,9
49(9
0,94
9)0
0Pu
rch
ase
Com
mu
nic
atio
ns
Sys
tem
(Bud
Rev
tsfr
fro
m T
ow T
rC
OM
M S
YS
2012
OH
-90-
X76
480
%20
1248
0,00
0
68
0,00
0(6
90,6
47)
00
Plan
nin
g fo
r M
ahon
ing
Rd.
(Bud
Rev
$12
8k f
r M
ah R
d Sh
elte
MA
HO
N R
D P
LAN
12
OH
-90-
2764
80%
2012
48,0
00
17
7,64
8(1
77,6
48)
00
0M
isc
Sof
twar
e A
cqu
isit
ion
s (B
ud R
ev $
20k
to H
ardw
are)
SOFT
WA
RE
201
2O
H-9
0-07
6480
%20
1223
2,88
4
17
1,70
0(1
51,8
22)
19,2
2315
,373
3,85
0M
isc
Har
dwar
e A
cqu
isit
ion
(Bud
Rev
$20
k fr
om S
oftw
are)
HA
RD
WA
RE
201
2O
H-9
0-07
6480
%20
1280
,000
120,
000
(120
,655
)(0
)0.
00(0
)E
&D
Mai
nte
nan
ce F
acili
ty P
arki
ng
Lot
GA
TE
WA
Y E
&D
LO
TO
H-9
0-X
764
80%
2012
20,0
00
20
,000
(20,
000)
00
Mai
nte
nan
ce F
acili
ty P
arki
ng
Lot
(Bud
Rev
Add
$16
k an
d $$
GA
TE
WA
Y L
OT
12
OH
-90-
X76
480
%20
1260
,000
95,3
62(9
5,36
2)0
0R
ehab
/Ren
ovat
e G
atew
ay A
dmin
Offi
ce &
Par
kin
g Lo
tG
AT
EW
AY
AD
MIN
12
OH
-90-
X76
480
%20
1216
0,00
0
16
0,00
0(1
60,0
00)
00
Reh
ab/R
enov
ate
Tran
sit
Sta
tion
sR
EH
AB
TC
EN
TE
R12
OH
-90-
0764
80%
2012
48,0
00
48
,000
(25,
146)
22,8
5422
,854
(0)
Dem
ogra
phic
Su
rvey
Ph
s 2
(Bud
Rev
tsfr
$19
,362
Pk
Lot;
$14
DE
OM
OG
SU
RV
201
2O
H-9
0-27
6480
%20
1249
,520
15,7
10(1
5,71
0)0
0M
obili
ty M
anag
emen
tM
OB
IL M
GM
T 1
2O
H-9
0-X
764
80%
2012
50,0
00
50
,000
(50,
000)
00
Acq
uir
e S
upp
ort
Veh
icle
s (4
)SU
PP V
EH
ICLE
S 12
OH
-90-
0764
80%
2012
160,
000
160,
000
(159
,919
)81
081
Acq
uir
e S
upp
ort
Veh
icle
- T
ow T
ruck
(Bud
Rev
Tsf
r to
Com
m
TO
W T
RU
CK
201
2O
H-9
0-X
764
80%
2012
200,
000
00
00
Mis
c S
upp
ort
Equ
ipm
ent
SUPP
EQ
UIP
201
2O
H-9
0-07
6480
%20
1240
,000
40,0
00(2
3,41
2)16
,588
16,8
00(2
12)
Fuel
as
a C
apit
al E
xpen
seFU
EL
2012
OH
-90-
X76
480
%20
1232
1,74
6
32
1,74
6(3
21,7
46)
00
Mah
onin
g R
oad
Bu
s Pu
ll O
ffs (B
ud R
ev ts
fr $
115,
200
to P
lan
MA
H R
D P
ULL
OFF
OH
-90-
0764
80%
2012
400,
000
284,
800
(240
,827
)43
,973
24,0
0019
,973
Alt
ern
ate
Fuel
s S
tudy
(B
ud R
ev ts
fr to
PM
)FU
EL
STU
DY
201
2O
H-9
0-X
764
80%
2012
40,0
00
14
,000
(14,
000)
00
Prev
enti
ve M
ain
ten
ance
(Bud
Rev
fro
m F
uel S
tudy
& P
hone
SPR
EV
MA
INT
201
2O
H-9
0-X
764
80%
2012
587,
517
634,
568
(634
,568
)0
0FY
12 5
307
OH
-90-
X76
4T
OT
AL
3,83
3,58
93,
812,
405
(3,7
20,3
33)
102,
719
79,0
2723
,692
21,1
84
O
pera
tin
g E
xpen
ses
OPE
R E
XP
2013
OH
-90-
4785
50%
2013
1,25
5,89
92,
611,
133
(2,6
11,1
33)
00
AD
A P
arat
ran
sit
Ser
vice
AD
A 2
013
OH
-90-
8785
80%
2013
167,
453
348,
151
(348
,151
)0
0Tr
ansi
t Im
prov
emen
ts -
Mah
onin
g R
d S
hel
ters
MA
HO
N S
HE
LTE
R13
OH
-90-
0785
80%
2013
16,7
4534
,815
(4,1
10)
30,7
0530
,705
Su
rvei
llan
ce &
Sec
uri
ty -
Mah
onin
g R
d Li
ghti
ng
MA
HO
N L
IGH
T S
EC
UR
ITY
13
OH
-90-
0785
80%
2013
16,7
4534
,815
(34,
815)
00
Com
mu
nic
atio
ns
Sys
tem
(Bud
Rev
tsfe
r to
Pre
v M
aint
)C
OM
M S
YS
2013
OH
-90-
X78
5-01
80%
2013
024
,541
(24,
541)
00
Mob
ility
Man
agem
ent
MO
BIL
MG
MT
13
OH
-90-
X78
580
%20
1325
,000
200,
000
(200
,000
)0
0Pr
even
tive
Mai
nte
nan
ce (B
ud R
ev ts
fer
from
Com
m S
ys)
PRE
V M
AIN
T 2
013
OH
-90-
X78
580
%20
1319
2,68
922
8,05
5(2
28,0
55)
00
FY13
530
7O
H-9
0-X
785
TO
TA
L1,
674,
531
3,48
1,51
0(3
,450
,805
)30
,705
030
,705
Ope
rati
ng
Exp
ense
sO
PER
EX
P 20
13O
H-9
0-47
9750
%20
142,
695,
364
2,69
5,36
4(2
,695
,364
)0
0A
DA
Par
atra
nsi
t S
ervi
ceA
DA
201
3O
H-9
0-87
9780
%20
1435
9,38
235
9,38
2(3
59,3
82)
(0)
(0)
Tran
sit
Impr
ovem
ents
- M
ahon
ing
Rd
Sh
elte
rsM
AH
ON
SH
ELT
ER
13O
H-9
0-X
797
80%
2014
35,9
3835
,938
035
,938
35,9
38S
urv
eilla
nce
& S
ecu
rity
- M
ahon
ing
Rd
Ligh
tin
gM
AH
ON
LIG
HT
SE
CU
RIT
Y 1
4O
H-9
0-X
797
80%
2014
35,9
3835
,938
(35,
938)
00
Mah
onin
g R
oad
Bu
s Pu
ll O
ffsM
AH
RD
PU
LL O
FFO
H-9
0-X
797
80%
2014
107,
197
107,
197
010
7,19
710
7,19
7M
obili
ty M
anag
emen
tM
OB
IL M
GM
T 1
3O
H-9
0-X
797
80%
2014
360,
000
360,
000
(360
,000
)0
0FY
14 5
307
OH
-90-
X79
7T
OT
AL
3,59
3,81
93,
593,
819
(3,4
50,6
84)
143,
135
014
3,13
5
Ope
rati
ng
Exp
ense
s20
15 O
P E
XP5
307
OH
-90-
X81
850
%20
1556
5,81
984
8,72
8(8
48,7
28)
00
0<3
0' B
use
s30
FT B
USE
S201
5O
H-9
0-X
818
80%
2015
208,
000
312,
000
(312
,000
)0
00
40' C
NG
Bu
ses
(5)
5 40
FT C
NG
201
5O
H-9
0-X
818
80%
2015
506,
667
1,66
7,19
7(1
,667
,197
)0
00
Gat
eway
Ren
ovat
ion
GT
WY
RN
O 2
015
OH
-90-
X81
880
%20
1526
,667
40,0
00(3
6,44
7)3,
553
3,55
30
AD
A R
eim
burs
emen
tA
DA
RE
IMB
201
5O
H-9
0-X
818
80%
2015
240,
000
360,
000
(360
,000
)0
00
Sec
ur i
ty M
ahon
ing
Rd
MA
H R
D S
EC
201
5O
H-9
0-X
818
80%
2015
24,0
0036
,000
(32,
844)
3,15
63,
293
(137
)M
obili
ty M
anag
emen
tM
OB
IL M
GM
T 2
015
OH
-90-
X81
880
%20
1524
0,00
029
7,79
3(2
97,7
93)
00
0Tr
ansi
t E
nh
ance
men
tM
AH
RD
T E
NH
AN
CO
H-9
0-X
818
80%
2015
24,0
0036
,000
(11,
816)
23,9
2718
,424
5,50
3In
clud
es p
art
of L
oNo
proj
ect
fund
ing
FY15
530
7O
H-9
0-X
818
TO
TA
L1,
835,
153
3,59
7,71
8(3
,566
,825
)30
,636
25,2
705,
366
Alt
ern
ate
Fuel
s (B
iodi
esel
))FU
EL
BIO
DIE
SEL
OH
-95-
4172
90%
2014
82,8
0082
,800
(80,
241)
2,55
92,
559
Alt
ern
ate
Fuel
s (C
NG
)FU
EL
CN
G O
TPP
PO
H-9
5-41
7290
%20
1459
4,00
059
4,00
0(5
06,1
35)
87,8
650
87,8
65H
ydro
gen
Fu
elin
g In
fras
tru
ctu
reH
YD
RO
GE
N O
TPP
PO
H-9
5-X
172
90%
2014
450,
000
450,
000
(2,2
44)
447,
756
94,5
4935
3,20
7FY
14 O
TPP
PO
H-9
5-41
72T
OT
AL
1,12
6,80
01,
126,
800
(588
,620
)53
8,18
094
,549
443,
631
Upd
ated
by: Deb
ra Swickard
41
PRO
JEC
T D
ESC
RIP
TIO
N -
CU
RR
EN
T P
RO
JEC
TS
PA P
roj N
ame/
PO
Num
ber
Gra
nt #
GR
AN
T
%
YE
AR
O
F A
LLO
CA
TIO
NO
RIG
INA
L
AM
EN
DE
D
GR
AN
T
AM
OU
NT
SLI
FE T
O D
AT
E
DR
AW
SFT
A F
UN
DIN
G
BA
LAN
CE
PO's
su
bmit
ted
not
draw
n
FTA
FU
ND
ING
B
ALA
NC
E a
fter
O
blig
ated
PO
'sPr
even
tive
Mai
nte
nan
ce (O
TPPP
201
5)PR
EV
MA
INT
201
5O
H-9
5-X
200
80%
2015
1,24
4,13
91,
244,
139
(1,2
24,4
59)
19,6
800
19,6
80Pu
rch
ase
(3) <
30 F
t B
use
s (O
TPPP
201
5)B
US
LTD
UT
Y O
TPP
PO
H-9
5-X
200
80%
2015
216,
000
216,
000
(216
,000
)0
00
FY15
OT
PPP
OH
-95-
X20
0T
OT
AL
1,46
0,13
91,
460,
139
(1,4
40,4
59)
19,6
800
19,6
80
CM
AQ
Hyd
roge
n S
tati
on P
art
of L
oNo
proj
ect
FY15
OT
PPP
Hyd
ro S
tati
onO
H-2
016-
029-
0010
0%20
161,
185,
735
1,18
5,73
5(6
48,2
94)
537,
441
454,
640
82,8
01T
OT
AL
1,18
5,73
51,
185,
735
(648
,294
)53
7,44
145
4,64
082
,801
FY16
UTP
FY 2
016
UT
P PM
OH
-201
6-02
3-00
80%
2016
351,
905
351,
905
(351
,905
)0
0T
OT
AL
351,
905
351,
905
(351
,905
)0
00
FY14
531
0 A
dmin
SA
RTA
FY14
& 1
5 53
10 A
dmin
SA
OH
-201
6-05
9-00
100%
2016
24,9
1224
,912
024
,912
24,9
12FY
14 5
310
Adm
in S
CA
TSFY
14 &
15
5310
Adm
in S
CO
H-2
016-
059-
0010
0%20
1634
,000
34,0
00(1
2,81
1)21
,189
21,1
89FY
14 5
310
<30'
Bu
sFY
14 &
15
5310
<30
' Bus
OH
-201
6-05
9-00
80%
2016
45,3
5245
,352
(14,
896)
30,4
5630
,456
0FY
14 5
310
Man
agem
ent
Mob
ility
FY14
& 1
5 53
10 M
gmnt
Mob
ility
OH
-201
6-05
9-00
80%
2016
105,
617
105,
617
(31,
960)
73,6
5790
272
,755
Su
b-re
cipi
ent
Sec
tion
531
0 -
AB
CD
- C
apit
alFY
14 &
15 5
310
AB
CD
Cap
ital
OH
-201
6-05
9-00
80%
2016
102,
571
102,
571
010
2,57
110
2,57
1S
ub-
reci
pien
t S
ecti
on 5
310
- A
BC
D -
Ope
rati
ng
FY14
& 1
5 53
10 A
BC
D O
pO
H-2
016-
059-
0050
%20
1625
,946
25,9
46(2
4,69
6)1,
250
01,
250
Su
b-re
cipi
ent
Sec
tion
531
0 -
Au
ltm
an H
ospi
tal -
Ope
rati
ng
FY14
& 1
5 53
10 A
ultm
an O
pO
H-2
016-
059-
0050
%20
1671
,126
71,1
260
71,1
2671
,126
Su
b-re
cipi
ent
Sec
tion
531
0 -
Firs
t C
hri
stia
n C
hu
rch
- C
apit
aFY
14 &
15
5310
FC
C C
apO
H-2
016-
059-
0080
%20
1669
,710
69,7
10(6
9,71
0)0
69,7
10(6
9,71
0)S
ub-
reci
pien
t S
ecti
on 5
310
- Fo
un
dati
ons
- O
pera
tin
gFY
14 &
15
5310
Fou
ndat
ions
Op
OH
-201
6-05
9-00
50%
2016
20,0
0020
,000
020
,000
20,0
00S
ub-
reci
pien
t S
ecti
on 5
310
- Th
e W
orks
hop
- C
apit
alFY
14 &
15
5310
The
Wor
ksho
p C
apO
H-2
016-
059-
0080
%20
1689
,888
89,8
88(8
9,88
8)0
0FY
14 &
15
5310
Tot
alT
OT
AL
589,
122
589,
122
(243
,961
)34
5,16
110
1,06
824
4,09
3
FY16
530
7 40
' CN
G B
us
FY16
530
7 40
' CN
G B
usO
H-2
016-
030-
0080
%20
1629
5,00
029
5,00
0(1
2,12
5)28
2,87
512
2,16
116
0,71
4FY
16 5
307
< 30
' Bu
ses
FY16
530
7 <
30' B
uses
OH
-201
6-03
0-00
80%
2016
110,
002
110,
002
(110
,002
)0
0FY
16 5
307
IT S
oftw
are
Su
ppor
tFY
16 5
307
IT S
oftw
are
OH
-201
6-03
0-00
80%
2016
97,6
0097
,600
097
,600
94,0
403,
560
FY16
530
7 IT
Har
dwar
eFY
16 5
307
IT H
ardw
are
OH
-201
6-03
0-00
80%
2016
64,4
0064
,400
(41,
711)
22,6
8921
,840
849
FY16
530
7 S
ecu
rity
FY16
530
7 Se
curi
tyO
H-2
016-
030-
0080
%20
1636
,000
36,0
000
36,0
0037
,044
(1,0
44)
FY16
530
7 Tr
ansi
t E
nh
ance
men
tsFY
16 5
307
T E
nhan
cem
ents
OH
-201
6-03
0-00
80%
2016
36,0
0036
,000
036
,000
36,0
00FY
16 5
307S
tati
on R
ehab
(GW
Mas
s)FY
16 5
307
Reh
ab (G
W M
ass)
OH
-201
6-03
0-00
80%
2016
56,0
0056
,000
056
,000
56,0
00FY
16 5
307
Hyd
roge
n S
tati
onFY
16 5
307
Hyd
roge
n St
atio
nO
H-2
016-
030-
0090
%20
1654
,990
54,9
900
54,9
9054
,990
FY16
530
7 O
pera
tin
g E
xpen
seFY
16 5
307
Ope
rati
ng E
xpen
seO
H-2
016-
030-
0050
%20
1699
5,79
899
5,79
8(9
95,7
98)
00
FY16
530
7 A
DA
Rei
mbu
rsem
ent
FY16
530
7 A
DA
Rei
mb
OH
-201
6-03
0-00
80%
2016
280,
000
280,
000
(280
,000
)0
0FY
16 5
307
Prev
enat
ive
Mai
nte
nan
ceFY
16 5
307
PMO
H-2
016-
030-
0080
%20
161,
479,
225
1,47
9,22
5(1
7,80
4)1,
461,
421
01,
461,
421
FY16
530
7 M
obili
ty M
anag
emen
tFY
16 5
307
Mob
ility
Man
agem
ent
OH
-201
6-03
0-00
80%
2016
160,
000
160,
000
(14,
012)
145,
988
145,
988
TO
TA
L3,
665,
015
3,66
5,01
5(1
,471
,452
)2,
193,
563
275,
085
1,91
8,47
8
FY16
DE
RG
- H
ydro
gen
Bu
sFY
16 D
ER
G H
ydro
gen
Bus
OH
-201
6-02
8-00
80%
2016
1,00
0,00
01,
000,
000
(817
,338
)18
2,66
274
,400
108,
262
1,00
0,00
01,
000,
000
(817
,338
)18
2,66
274
,400
108,
262
FY16
531
0FY
16 5
310
1226
-201
6-8
80%
2016
291,
658
291,
658
029
1,65
829
1,65
829
1,65
829
1,65
80
291,
658
291,
658
FY17
533
9 Lo
No
2 H
ydro
gen
Bu
ses
FY17
533
9 Lo
No
2 -4
0' H
ydro
Bus
es12
26-2
016-
785
%20
163,
415,
174
3,41
5,17
43,
415,
174
3,41
5,17
4E
valu
atio
nFY
17 5
339
LoN
o 2
-Eva
luat
ion
1226
-201
6-7
80%
2016
600,
000
600,
000
600,
000
600,
000
4,01
5,17
44,
015,
174
04,
015,
174
4,01
5,17
4O
H-9
5-01
01 C
lose
d 20
15 R
emov
ed fr
om li
stA
CT
IVE
GR
AN
TS:
43,8
23,9
08(3
4,25
7,02
0)9,
580,
478
1,17
5,54
18,
404,
937
PEN
DIN
G G
RA
NT
S:
CM
AQ
Hyd
roge
n B
use
s P
art
of L
oNo
proj
ect
CM
AQ
Pe
ndi
ng
100%
2018
600,
000
600,
000
600,
000
600,
000
600,
000
600,
000
060
0,00
00
600,
000
43,8
23,9
08(3
4,25
7,02
0)9,
580,
478
1,17
5,54
18,
404,
937
PEN
DIN
G G
RA
NT
S:60
0,00
00
600,
000
060
0,00
0
FTA
GR
AN
D T
OT
ALS
:44
,423
,909
(34,
257,
020)
10,1
80,4
771,
175,
541
9,00
4,93
7
Tota
l Gra
nts
Incl
udin
g C
alSt
art
50,1
46,0
56(3
8,67
2,25
9)11
,487
,385
1,17
5,54
110
,311
,844
Pend
ing
Tot
al
AC
TIV
E G
RA
NT
S:
Upd
ated
by: Deb
ra Swickard
42
43
December 14, 2016
Marketing & Public Outreach
October, November & December
Received a thank you letter from Cody Hoffaker, Phyllis Beyers’ grandson. He expressed his
thanks to SARTA for dedicating the Alliance Transit Center to his grandmother.
Ran Fixed Route Blast Pass special during the week of Thanksgiving. Riders could purchase a
Fixed Route Blast pass for $45 and ride for 45 days. This was limited to 2 per transaction.
o Sold 63 during the week of 11/21-16.
Extended the campaign to sell remaining tickets
o This promotion will continue until the passes are sold out.
Submitted an application to receive an APTA AdWheel Award for the “Where Can SARTA Take
You?” Campaign. The AdWheel Awards recognizes the marketing and communications efforts of
APTA’s members. Additionally, the annual awards competition creates a structure to share best
practices and to raise the awareness of the value of public transportation marketing
professionals within the industry.
Held Anniversary Celebration for riders on 12/7/16
o Gave riders all day bus passes
o Gave away PinPoint backpacks and other SARTA Marketing material as well as chips and
pretzels
o All Proline riders rode free
Participated in OVI campaign with Drug Free Stark County, Stark County Opiate Task Force and
Stark County Safe Communities.
Partnered with Stark County’s Safe Communities Coalition, the Stark County Sheriff’s Office, the
OVI Task Force and Stark County’s Mental Health and Addition Recovery Agency to promote
having a save New Year’s and the free New Year’s Eve routes. SARTA will be offering free New
Year’s Eve rides and buses will run until 2:00 am. Rides will be free after 6:00 pm.
Placed media buy for the promotion of the NYE free rides.
Transportation Contracts
MedLine has 19 clients that rode during the months of October and November. In October there
were 612 rides taken and 615 rides were taken in November.
SARTA provided 1018 Non-Emergency Transportation rides in October and 943 Non-Emergency
Transportation rides in November for Stark County Job and Family Services for the in and
outside of Stark County. Rides are down for November due to the Thanksgiving holiday and
several days where SARTA did not provide any trips out of Stark County.
SARTA transported 24 clients to SarahCare during the month of October and 17 clients during
the month of November. In October 777 rides were taken and 515 rides where taken in
44
November. When SarahCare closed its Downtown Canton location at the end of October they
did not transfer all of the clients over to the Belden Village location, some clients stopped
attending the SarahCare center while other started riding on SARTA’s Proline service instead of
on the transportation agreement that SarahCare has with SARTA.
SARTA provided 620 trips in the month of October and 585 trips in the month of November on
the transportation agreement that we have with Kent State Stark’s Global Initiatives ESL (English
as a Second Language) Program. Trips were down in November due to the Thanksgiving holiday.
Community Outreach & Training
In the months of October and November, our Outreach Specialists attended many events all over Stark
County Area. In October they attended: the Community Resource/Street Fair at Whipple-Dale
Workshop Center, Vision Fair at Canton Christian Home, Goodwill Industries Job Fair, Trunk-or-treat at
the Massillon Rec Center and the Downtown McKinley Campus as well as Zombie Fest in Alliance. Also
in October the Travel Trainers from Akron Metro came and spent the day with the Outreach Specialists.
The Akron Travel Trainers were able to see first-hand how the specialist perform their travel training
functions and take back things to incorporate in Akron’s program. In the month of November, the
Village of Navarre invited the specialists to participate in the 4th Annual Christmas in the Village Parade.
This is the first time SARTA was invited to this event, there was a great turnout. SARTA also participated
in the 62nd Annual Holiday Parade in Massillon.
Our Outreach Specialists enjoy being out in the Community interacting with people, they are looking
forward to adding new and innovating ways to engage with our riders as well as with the Community as
a whole.
211
197
93
118
99
180
127
84
222
177
107
90
122
117
107
82
106
112
106
101
203
167
63
6
January
February
March
April
May
June
July
August
September
October
November
December
Monthly Travel Training Totals 2015-2016
2016 2015
45
Community Events, 9
Travel Training, 21Presentations, 2
Proline Training, 9
Planning Activities, 3
Community Meetings, 9
One-on-one, 1
Outside Appointments, 2
OCTOBER 2016 OUTREACH STATISTICS
46
Community Events, 5
Travel Training, 25Presentations, 3
Proline Training, 7
Planning Activities, 5
Community Meetings, 3
One-on-one, 4
Outside Appointments, 2
NOVEMBER 2016 OUTREACH STATISTICS
47
48
Project/Task Purpose % EDC Current Task(s) Upcoming Task(s)
Avail system Installation
Installing the new vehicles in the fleet with
the Avail system, including Computer
Aided Dispatch (CAD)/Automatic Vehicle
Locator (AVL), Interactive Voice Response (IVR).
100 NOV 2016
After the arrival of the eight (8) new 8 EH vans, they will
receive the new Avail equipment.
8 new EH buses will be installed with the
new Avail system. Avail installers will be onsite to install during the week of Nov. 7th
Storage Area Network (SAN)
Upgrade
Upgrade and modernize virtualized storage and core network for all of SARTA servers. Move into enterprise level
equipment from entry level.
64 DEC 2016
Current equipment is maxed out on workload causing
delays. Current equipment will be repurposed at DR site
and locally at HQ.
Equipment has been purchased and
received.
Radio Installation
SARTA will be installing new Motorola radios in
eight (8) of the 2016 new paratransit buses.
100 OCT 2016
Staley Technologies will install the latest replacement for XTL 2500 Motorola Radios. (APX
4500)
Receive radios purchased and install.
Upgrade SARTA Security Access
and Badge System
For the last five years SARTA has had 2
security access systems controlling the
headquarters and transit centers. SARTA IT is replacing the older
security systems to have one control all buildings as well as print badges
for employees.
87 DEC 2016
New security system is installed at Cornerstone,
Alliance, Belden and Massillon. Gateway is
currently being worked on.
Finish installation, configure and
support.
Transit Center Public Wi-fi
Install wireless connectivity into the
three transit center that currently do not have
wi-fi.
87 DEC 2016
Massillon and Alliance have been installed since August.
Belden has always had public wifi since it was built.
Cornerstone transit center will use AT&T U-verse for internet.
The wi-fi access points will be installed on
Dec. 12th.
Large Display Monitors
Installation
SARTA will be installing new large monitors at each transit center in order to inform riders and staff of upcoming
events and projects more effectively and
efficiently.
52 JAN 2017
Cornerstone and SARTA Gateway facility has been
completed. Massillon, Alliance, Belden have been
prepped with necessary electrical and network
equipment.
Install large display monitors and
configure.
49
50
Human Resource, Kristy Williams –November 2016
HUMAN RESOURCES BOARD REPORT November 2016
Kristy Williams
New Hires Five new Non – CDL Operators were hired. One new Accounts Payable Administrator was hired. Resignations/Terminations One Non-CDL Operator was terminated. The Accounts Payables Administrator resigned.
Resignation / Retirement
Termination Layoff Released from
probation
September 1 1 N/A 0
Vacancies
Department Position September Transportation Asst. CSR Supervisor September Transportation Bus Operators
Internal Movement John Michaels was promoted from CDL Operator to Assistant Customer Service/Proline Supervisor.
51
Human Resource, Kristy Williams –November 2016
Employee Attrition 2015
Transportation
FT PT
Maintenance
FT PT
Administration
Total # of Employees FT PT
January 128 0 30 0 43 201 0 February 128 0 30 0 43 201 0 March 128 0 29 0 43 200 0 April 134 0 30 0 42 206 0 May 134 0 31 0 43 208 0 June 134 0 31 0 44 209 0 July 132 0 30 0 41 203 0 August 129 0 30 0 41 201 0 September 134 0 33 0 41 208 0 October 134 0 33 0 41 208 0 November 136 0 32 0 41 209 0 December 135 0 32 0 41 208 0
Employee Attrition 2016
Transportation
FT PT
Maintenance
FT PT
Administration
Total # of Employees FT PT
January 134 0 32 0 41 207 0 February 132 0 32 0 41 205 0 March 129 0 31 0 41 201 0 April 129 0 31 0 41 201 0 May 134 0 31 0 41 206 0 June 131 0 30 0 41 202 0 July 135 0 30 0 41 206 0 August 132 0 30 0 41 203 0 September 131 0 30 0 41 202 0 October 131 0 30 0 41 202 0 November 134 0 30 0 41 205 0 December
52
Human Resource, Kristy Williams –November 2016
Employee Relations
• Ms. Pryor attended the Safety Council Luncheon at Myers Lake
ballroom. • Attended the Employer Advisory Council breakfast at Stark
County Community Action. • Interviews are being held for Accounts Payable Administrator. • Conducted hearings for attendance and code of conduct
issues. • Revising and reviewing handbooks. • Interviews were conducted for Non-CDL Operators. • Conducting annual wage comparison for all administrative
employees. • A total of five new Non-CDL Operators have been hired. • Meeting was held with HR Friends (METRO, TARTA, PARTA
and WRTA) to discuss latest trends in Human Resources. • Interviews were conducted for Assistant Customer
Service/Proline Supervisor. • Attended Career Day at Akron St. Vincent St. Mary to exposed
youth to different career opportunities.
53
54
Employee Relations & Equal Employment Opportunity
• Conducted uniform ordering for Coach Operators, CSRs, and Administrative Staff. The style of our uniforms will be new, as the current style has been the same for nearly 10 years.
• An employee electronic message board was placed in the bull pen area. This is used to update employees on current information and is working quite well. There will also be one placed in the Maintenance lounge area.
• Serving on OPTA committee for upcoming OPTA conference next year. • The employee holiday party will be on December 16. Employees will be
given lunch and a gift. • Health Insurance Premiums were reimbursed for those who qualified.
2016 2015 2014
99 93 54 73 72 73 42 45 72
214 210 199
2016 2015 2014 138 136 133 76 74 66
0
20
40
60
80
100
120
2016 2015 2014
Healthcare Reimbursement
Partial Reimbursement Full Reimbursement Did Not Participate
0
20
40
60
80
100
120
140
160
2016 2015 2014
Nicotine-Free Reimbursement
Nicotine-Free Nicotine Users 55
56
57
58
59
60
61
62
STARK AREA REGIONAL TRANSIT AUTHORITY
RESOLUTION # ___________, 2016
A RESOLUTION AUTHORIZING THE EXECUTIVE DIRECTOR/CEO TO ENTER INTO A CONTRACT FOR PURCHASE OF DIESEL FUEL
WHEREAS, the Stark Area Regional Transit Authority (SARTA) will be receiving bids on diesel fuel, as part of the cooperative RFP with Akron Metro and; WHEREAS, the market price is fluctuating constantly, and SARTA must be able to contract consistent with its budget; and WHEREAS, SARTA staff wishes to enter into contract whenever the opportunity presents on a fuel bid that the Executive Director/CEO deems consistent with SARTA’s budgetary requirements; NOW THEREFORE BE IT RESOLVED, that the Executive Director/CEO is authorized to enter into a contract for said fuel, at a contract price staff deems manageable, plus appropriate taxes. ____________________________________ Date of Adoption _____________________________________ Board President _____________________________________ Secretary-Treasurer
63
STARK AREA REGIONAL TRANSIT AUTHORITY
RESOLUTION # __________, 2016
A RESOLUTION AUTHORIZING THE EXECUTIVE DIRECTOR/CEO TO SURPLUS OBSOLETE FIXED ASSET INVENTORY
WHEREAS, in accordance with the FTA “Best Practices in Procurement Manual” and the Ohio Revised Code, this request is made to allow the Executive Director/CEO to surplus obsolete inventory; and WHEREAS, the attached list of fixed assets have exhausted their useful life for which they were purchased; and WHEREAS, that with Board approval the assets will be disposed of in a manner in which staff feels is the best interest of the agency; and WHEREAS, this resolution will assist SARTA in complying with two of the Board approved “Five Bold Steps,” Maximizing Financial Responsibility and Building Public Support through grant initiatives; NOW THEREFORE BE IT RESOLVED, that the Executive Director/CEO is authorized to dispose of obsolete fixed asset inventory per attached. ____________________________________ Date of Adoption _____________________________________ Board President _____________________________________ Secretary-Treasurer
64
Attachment Vehicle # Make/Model Mileage Federal Share of Remaining Life 1004 2010 Goshen 301,389 $0.00 1006 2010 Goshen 325,229 $0.00 1008 2010 Goshen 293,343 $0.00 1023 2010 Goshen 297,750 $0.00
65
STARK AREA REGIONAL TRANSIT AUTHORITY
RESOLUTION # __________, 2016
A RESOLUTION CERTIFYING MEETING DATES AND TIMES FOR CALENDAR YEAR 2017
WHEREAS, the Stark Area Regional Transit Authority (SARTA) Board of Trustees holds regular work sessions on the 2nd Wednesday of every month and meetings on the 4th Wednesday of every month to conduct official business; and WHEREAS, each meeting is to convene at 5:00 pm in the Gateway Board Room; and
WHEREAS, the meeting dates are as follows:
Work Sessions Meetings January 11, 2017 January 25, 2017 February 8, 2017 February 22, 2017 March 8, 2017 March 22, 2017 April 12, 2017 April 26, 2017 May 10, 2017 May 24, 2017 June 14, 2017 June 28, 2017 July 12, 2017 July 26, 2017 August 9, 2017 August 23, 2017 September 13, 2017 September 27, 2017 October 11, 2017 October 25, 2017 November 8, 2017 December 13, 2017
NOW, THEREFORE, after due consideration, be it resolved by the Board of Trustees of the Stark Area Regional Transit Authority, that the Executive Director/CEO is authorized to implement the aforementioned schedule for meeting dates and times. _____________________________________ Date of Adoption _____________________________________ President _____________________________________ Secretary-Treasurer
66
STARK AREA REGIONAL TRANSIT AUTHORITY
RESOLUTION # __________, 2016
A RESOLUTION AUTHORIZING THE EXECUTIVE DIRECTOR/CEO TO ENTER A CONTRACT WITH THE CENTER FOR TRANSPORTATION AND
THE ENVIRONMENT (CTE)
WHEREAS, SARTA has been working to deploy fuel cell buses and establish a center for hydrogen training and education; and
WHEREAS, The Center for Transportation and the Environment
administrates the grant for the Federal Transit Administration under the National Fuel Cell Bus program; and
WHEREAS, The Center for Transportation and the Environment and FTA would like to award a Federal grant of $345,000 to SARTA from the Fuel Cell Bus Demonstration Project; and
WHEREAS, SARTA’s contribution is limited to an in-kind contribution of
operations and no hard local revenue is required; and WHEREAS, this resolution will assist SARTA in complying with two of the
Board’s Five Bold Steps “Maximize Financial Flexibility and Building Public Support Through Grant Initiatives”; NOW THEREFORE BE IT RESOLVED by the Board of the Stark Area Regional Transit Authority that the Executive Director/CEO is authorized to execute a contract with The Center for Transportation and the Environment pending legal review and approval.
________________________________ Date of Adoption ________________________________ Board President ________________________________ Secretary-Treasurer
67
STARK AREA REGIONAL TRANSIT AUTHORITY
RESOLUTION # __________, 2016
A RESOLUTION AUTHORIZING THE EXECUTIVE DIRECTOR/CEO TO ENTER A CONTRACT WITH THE MIDWESTERN HYDROGEN CENTER OF
EXCELLENCE (MHCOE)
WHEREAS, SARTA has been working to establish, support and grow The Midwestern Hydrogen Center of Excellence with Ohio State University Automotive Research (CAR); and
WHEREAS, The Center for Transportation and the Environment
administrates the grant for the Federal Transit Administration under the National Fuel Cell Bus program; and
WHEREAS, The Center for Transportation and the Environment and FTA
would like to award a Federal grant of $345,000 to SARTA from the Fuel Cell Bus Demonstration Project. SARTA’s contribution is limited to an in-kind contribution of operations and no hard local revenue is required; and
WHEREAS, this resolution will assist SARTA in complying with two of the
Board’s Five Bold Steps “Maximize Financial Flexibility and Building Public Support Through Grant Initiatives”; NOW THEREFORE BE IT RESOLVED by the Board of the Stark Area Regional Transit Authority that the Executive Director/CEO is authorized to execute a contract with The Renewable Hydrogen and Fuel Cell Collaborative pending legal review and approval.
________________________________ Date of Adoption ________________________________ Board President ________________________________ Secretary-Treasurer
68
STARK AREA REGIONAL TRANSIT AUTHORITY
RESOLUTION # __________, 2016
A RESOLUTION AUTHORIZING THE EXECUTIVE DIRECTOR/CEO TO ENTER A CONTRACT WITH THE OHIO STATE UNIVERSITY CENTER OF
AUTOMOTIVE RESEARCH (CAR)
WHEREAS, SARTA has been working to establish, support and grow The Renewable Hydrogen and Fuel Cell Collaborative (RHFCC) and Midwestern Hydrogen Center of Excellence (MHCOE) with Ohio State University Automotive Research (CAR) in collaboration with The Center for Transportation and the Environment (CTE); and
WHEREAS, The Center for Transportation and the Environment (CTE)
administrates the grant for the Federal Transit Administration under the National Fuel Cell Bus Program and SARTA administrates the grant for the Federal Transit Administration under the Low or No Emission National Fuel Cell Bus grant award; and
WHEREAS, $200,000 Federal funding from The Center for Transportation and the Environment (CTE) SARTA’s contribution no hard local revenue is required for The Midwestern Hydrogen Center of Excellence (MHCOE); and
WHEREAS, $103,000 Federal funding from awarded Low or No Emission
grant with SARTA’s contribution limited to $20,600 for The Renewable Hydrogen and Fuel Cell Collaborative (RHFCC); and
WHEREAS, this resolution will assist SARTA in complying with two of the
Board’s Five Bold Steps “Maximize Financial Flexibility and Building Public Support Through Grant Initiatives”; NOW THEREFORE BE IT RESOLVED by the Board of the Stark Area Regional Transit Authority that the Executive Director/CEO is authorized to execute a contract with The Ohio State University pending legal review and approval.
________________________________ Date of Adoption ________________________________ Board President ________________________________ Secretary-Treasurer
69
STARK AREA REGIONAL TRANSIT AUTHORITY
RESOLUTION # __________, 2016
A RESOLUTION AUTHORIZING THE EXECUTIVE DIRECTOR/CEO TO ENTER A FIRST AMENDMENT TO THE AGREEMENT FOR SPECIAL
SERVICES WITH THE OHIO STATE UNIVERSITY CENTER OF AUTOMOTIVE RESEARCH (CAR)
WHEREAS, SARTA has been working to establish, support and grow The
Renewable Hydrogen and Fuel Cell Collaborative (RHFCC) and Midwestern Hydrogen Center of Excellence (MHCOE) with The Ohio State University Automotive Research (CAR) under the umbrella of The Center for Transportation and the Environment (CTE); and
WHEREAS, The Center for Transportation and the Environment (CTE)
administrates the grant for the Federal Transit Administration under the National Fuel Cell Bus program and SARTA administrates the grant for the Federal Transit Administration under the Low or No Emission National Fuel Cell Bus grant award; and
WHEREAS, Federal funding from Low or No Emission grant in the amount not to exceed $400,000 for Ohio State University’s portion of The Renewable Hydrogen and Fuel Cell Collaborative (RHFCC) with SARTA’s contribution limited to $80,000; and
WHEREAS, Period of performance ending June 30, 2018; and WHEREAS, this resolution will assist SARTA in complying with two of the Board’s
Five Bold Steps “Maximize Financial Flexibility and Building Public Support Through Grant Initiatives”; NOW THEREFORE BE IT RESOLVED by the Board of the Stark Area Regional Transit Authority that the Executive Director/CEO is authorized to execute a contract with The Ohio State University Automotive Research pending legal review and approval.
_______________________________ Date of Adoption ________________________________ Board President ________________________________ Secretary-Treasurer
70
STARK AREA REGIONAL TRANSIT AUTHORITY
RESOLUTION # __________, 2016
FOR 2017 OPERATING BUDGET APPROVAL
WHEREAS, the Stark Area Regional Transit Authority (SARTA) staff has prepared the 2017 balanced budget of net revenues of $22,340,464 and expenditures of $21,004,464; and with local match funds of $1,305,530 included in the operating budget (see attached pages); and
WHEREAS, in order to operate within budget into 2017, funds must be approved for expenditure and fiscal responsibility mandates operating within projected revenues; in addition, fiscal responsibility and operating within budget are three of the Five Bold Steps; and
WHEREAS, in order to effectively manage said budget, the Executive Director/CEO will require the authority to move funding between line items for effective management of the Agency;
NOW, THEREFORE BE IT RESOLVED, that the 2017 Budget be approved with revenues of $ $22,340,464 and expenditures of $21,004,464; and with local matching funds of $1,305,530 for the capital budget and the Executive Director/CEO shall have the authority to move line item amounts within the established total budget.
______________________________ Date of Adoption
________________________________ Board President
________________________________ Secretary-Treasurer
71
2016
2016
2017
Ececutive
Maine
nance
Expe
nditu
res
YTD
Budget
Chan
geBu
dget
Office
Tran
sportatio
n& Ope
ratio
nsFina
nce
Plan
ning
ITHR
Gen
eral
Wages
6,46
1,475
8,98
7,680
445,06
9
9,43
2,749
212,28
3
6,76
6,291
1,38
2,596
363,19
1
369,93
1
159,047
179,40
9
‐
Health Insurance
1,75
9,440
2,15
6,465
93,535
2,25
0,000
19,737
1,68
7,500
345,39
5
69,079
69,079
19,737
39,474
PERS
and
other Ben
efits
1,96
8,922
2,48
1,303
482,13
2
2,96
3,435
60,863
2,09
9,519
509,64
5
106,24
3
88,618
45,631
52,917
Subtotal W
ages & Ben
efits
10,189
,837
13,625
,448
1,02
0,736
14,646
,184
292,88
3
10,553
,310
2,23
7,636
538,51
3
527,628
224,41
5
271,800
‐
Percen
t of T
otal Bud
get
Professio
nal Services ‐ Legal
133,86
0
160,000
21,200
181,200
180,000
1,20
0
‐
Professio
nal Services ‐ Other
274,87
1
363,26
9
57,731
421,000
80,000
50,000
65,000
150,000
3,50
0
30,500
42,000
Materials
1,17
1,530
1,47
1,600
74,000
1,54
5,600
1,54
5,600
Supp
lies
333,62
7
478,050
57,438
535,48
8
700
32,500
25,100
26,100
102,200
105,200
4,50
0
239,188
Fuel
594,16
8
2,03
7,317
(995
,167
)
1,04
2,150
1,04
2,150
Utilities
362,39
7
717,500
‐
717,500
717,500
Casualty & Liability
514,54
8
858,50
1
(137
,759
)
720,74
2
38,155
627,58
7
Fuel Tax
84,188
130,000
‐
130,000
130,000
Dues
46,858
60,250
500
60,750
1,25
0
8,50
0
1,00
0
4,50
0
500
45,000
Advertising
220,61
9
377,000
2,50
0
379,50
0
5,50
0
374,000
Training
89,661
130,000
7,00
0
137,00
0
17,000
20,000
10,000
23,000
35,000
14,000
18,000
Legal A
ds2,80
5
23,200
(9,500
)
13,700
1,20
0
1,00
0
4,00
0
1,00
0
5,00
0
1,50
0
Expe
ndable Assets
11,508
9,95
0
4,20
0
14,150
1,75
0
2,50
0
3,00
0
1,00
0
3,40
0
1,00
0
500
1,00
0
Tuition
Reimbu
rsem
ent
16,810
25,000
‐
25,000
25,000
Wellness
27,228
30,00 0
‐
30,000
30,000
Security/Safety
136,23
3
202,000
18,500
220,500
220,500
Employee
Relations
11,651
30,000
‐
30,000
‐
‐
30,000
Gen
eral Expen
ses
1,89
7
4,00
0
‐
4,00
0
4,00
0
Subgrantee
Con
tracts
131,510
‐
‐
Clinic & Clinic Sup
pplies
90,730
150,000
‐
150,000
150,000
Sub To
tal O
ther Expen
ses
4,25
6,701
7,25
7,637
(899
,357
)
6,35
8,280
466,150
106,250
2,80
2,505
117,100
673,100
124,700
85,200
1,92
8,275
Total O
peratin
g Expe
nses
14,446
,537
20,883
,085
121,37
9
21,004
,464
759,03
3
10,659
,560
5,04
0,141
655,61
3
1,20
0,728
349,11
5
357,000
1,92
8,275
SART
A RE
VENUES
Revenu
es20
16 YTD
2016
Bud
get
2016
Projected
2017
Bud
get
Fares
1,69
8,008
2,30
9,500
2,26
4,011
2,21
4,700
Program Income
38,044
86,000
50,725
50,000
Interest Income
52,573
30,000
70,098
30,000
Non
transportatio
n Re
venu
e14
1,66
524
0,000
188,887
191,300
Aux Transportatio
n Re
venu
e22
630
030
130
0
Sales T
ax Reven
ues
10,883
,631
14,182
,910
14,511
,508
14,255
,718
STAT
E CA
PITA
L GRA
NTS
00
0‐
FCG ‐ PR
EVEN
TIVE
MAINTENAN
CE23
1,596
2,34
1,524
1,30
8,795
2,91
6,976
FG‐ P
LANNING
167,864
372,96
122
3,818
600,586
SUBR
ANTTEE CONTR
ACTS
024
,964
0‐
FG‐ 5
310 Enhanced
Mob
ility
6,82
80
9,10
4‐
FEDE
RAL CA
PITA
L GRA
NTS*
6,16
5,151
17,527
,427
8,22
0,201
‐
FGG NEW
FRE
EDOM
15,228
546
20,304
‐
FCG ‐ JARC
7,13
590
,966
9,51
334
,292
FEDE
RAL GRA
NTS
1,42
7,596
1,76
5,263
1,90
3,461
2,04
6,591
FEDE
RAL CA
PITA
L GRA
NTS‐HYD
ROGEN
CALSTAR
T*2,69
5,80
13,59
4,401
‐
Revenu
e Bu
dget
14,670
,395
21,444
,934
20,560
,526
22,340
,464
(30,46
9)
(1) E
xclude
d from
total of reven
ue
1,30
5,530
Net Ope
ratin
g Income (Loss)
*Captia
l Grants e
xlud
ed from
revenu
e total
21,034
,933
Stark Area
Regiona
l Transit Au
thority
2017
Bud
get R
eque
stPe
riod En
ding
Sep
tembe
r 30, 201
6
72
Stark Area
Regiona
l Transit Au
thority
2017
Bud
get R
eque
st
2016
2106
2017
Compa
rison
Compa
rison
Expe
nditu
res
Budget
Projected
Budget
2016
Bud
get to 20
17% Cha
nge
2016
Bud
to 201
7 Project
% Cha
nge
Commen
ts
Wages
8,98
7,68
0
8,14
4,50
1
9,43
2,74
9
445,06
9
4.95
%1,28
8,24
9
15.82%
Additio
nal Employees b
udgeted
Health
Insurance
2,15
6,46
5
2,37
2,91
9
2,25
0,00
0
93,535
4.34
%(122
,919
)
‐5.18%
PERS
and
other Ben
efits
2,48
1,30
3
2,57
4,81
7
2,96
3,43
5
482,13
2
19.43%
388,61
9
15.09%
Additio
nal Employees b
udgeted
Subtotal W
ages & Ben
efits
13,625
,448
13,092
,237
14,646
,184
1,02
0,73
6
7.49
%1,55
3,94
8
11.87%
65%
71%
70%
Profession
al Services ‐ Legal
160,00
0
178,48
0
181,20
0
21,200
13.25%
2,72
0
1.52
%Profession
al Services ‐ O
ther
363,26
9
366,49
5
421,00
0
57,731
15.89%
54,505
14.87%
Materials
1,47
1,60
0
1,51
4,62
9
1,54
5,60
0
74,000
5.03
%30
,971
2.04
%Supp
lies
478,05
0
368,06
6
535,48
8
57,438
12.02%
167,42
2
45.49%
Fuel
2,03
7,31
7
792,22
4
1,04
2,15
0
(995
,167
)
‐48.85
%24
9,92
6
31.55%
Utilities
717,50
0
483,19
6
717,50
0
‐
0.00
%23
4,30
4
48.49%
Casualty & Liability
858,50
1
686,06
4
720,74
2
(137
,759
)
‐16.05
%34
,678
5.05
%Fuel Tax
130,00
0
112,25
0
130,00
0
‐
0.00
%17
,750
15.81%
Due
s60
,250
62,478
60,750
500
0.83
%(1,728
)
‐2.77%
Advertising
377,00
0
294,15
9
379,50
0
2,50
0
0.66
%85
,341
29.01%
Training
130,00
0
119,54
8
137,00
0
7,00
0
5.38
%17
,452
14.60%
Legal A
ds23
,200
3,74
0
13,700
(9,500
)
‐40.95
%9,96
0
266.32
%Expe
ndab
le Assets
9,95
0
15,344
14,150
4,20
0
42.21%
(1,194
)
‐7.78%
Tuition
Reimbu
rsem
ent
25,000
22,413
25,000
‐
0.00
%2,58
7
11.54%
Wellness
30,000
36,304
30,000
‐
0.00
%(6,304
)
‐17.36
%Security/Safety
202,00
0
181,64
4
220,50
0
18,500
9.16
%38
,856
21.39%
Employee
Relations
30,000
15,535
30,000
‐
0.00
%14
,465
93.12%
Gen
eral Expen
ses
4,00
0
2,52
9
4,00
0
‐
0.00
%1,47
1
58.14%
Clinic & Clin
ic Sup
pplies
150,00
0
120,97
4
150,00
0
‐
100.00
%29
,026
100
Sub To
tal O
ther Expen
ses
7,25
7,63
7
5,25
5,09
8
6,35
8,28
0
(899
,357
)
‐12.39
%95
3,18
2
18.14%
Total O
peratin
g Expe
nses
20,883
,086
18,347
,334
21,004
,464
121,37
9
0.58
%2,50
7,13
0
30.01%
35%
29%
30%
SART
A RE
VENUES
Revenu
es20
16 Bud
get
2016
Projected
2017
Bud
get
Fares
2,30
9,50
02,26
4,01
1
2,21
4,70
0
Program Income
86,000
50,725
50,000
Interest Income
30,000
70,098
30,000
Non
transportatio
n Re
venu
e24
0,00
018
8,88
7
191,30
0
Aux Transportatio
n Re
venu
e30
030
1
300
Sales T
ax Reven
ues
14,182
,910
14,511
,508
14,255
,718
STAT
E CA
PITA
L GRA
NTS
0‐
‐
FCG ‐ PR
EVEN
TIVE
MAINTENAN
CE2,34
1,52
41,30
8,79
5
2,91
6,97
6
FG‐ P
LANNING
372,96
122
3,81
8
600,58
6
SUBR
ANTTEE CONTR
ACTS
0‐
‐
FG‐ 5
310 Enhanced
Mob
ility
09,10
4
‐
FEDE
RAL CA
PITA
L GRA
NTS*
17,527
,427
8,22
0,20
1
FGG NEW
FRE
EDOM
546
20,304
‐
FCG ‐ JARC
90,966
9,51
3
34,292
FEDE
RAL GRA
NTS
1,76
5,26
31,90
3,46
1
2,04
6,59
1
FEDE
RAL CA
PITA
L GRA
NTS‐HYD
ROGEN
CALSTAR
T*0
3,59
4,40
1
21,444
,934
20,560
,526
22,340
,464
(1) E
xclude
d from
total of reven
ue
1,30
5,53
0 21
,034
,933
*Captia
l Grants e
xlud
ed from
revenu
e total
Perio
d En
ding
Sep
tembe
r 30, 201
6
73
BUDG
ETED
PROJECT
EDBU
DGETED
20
1620
1620
17Fares
$2,309
,500
$2,264
,011
$2,214
,700
Program In
come
$86,00
0$5
0,72
5$5
0,00
0Interest In
come
$30,00
0$7
0,09
8$3
0,00
0Au
x Tran
sportatio
n$3
00$3
01$3
00Non
‐Transpo
rtation Income
$240
,000
$188
,887
$191
,300
Sales T
ax Reven
ues
$14,18
2,91
0$1
4,51
1,50
8$1
4,25
5,71
8Re
venu
e Projections
$16,84
8,71
0$1
7,08
5,53
1$1
6,74
2,01
8FCG ‐ PR
EVEN
TIVE
MAINTENAN
CE$2
,341
,524
$1,308
,795
$2,916
,976
FG ‐ PLAN
NING
$372
,961
$223
,818
$600
,586
SUBG
RANTEE CO
NTR
ACTS (5
310P
rgm M
gt)
$9,104
FEDER
AL CAP
ITAL
GRA
NTS*
$17,52
7,42
7$8
,220
,201
$10,48
6,16
2FG
‐ NEW
FRE
EDOM
$546
$20,30
4$0
FG ‐ JARC
$90,96
6$9
,513
$34,29
2FEDER
AL GRA
NTS
$1,790
,227
$1,903
,461
$2,046
,591
FEDER
AL CAP
ITAL
‐CAL
STAR
T GRA
NT*
$0$3
,594
,401
$0TO
TAL GRA
NTS
$4,596
,224
$3,474
,995
$5,598
,445
Total R
even
ue$2
1,44
4,93
4$2
0,56
0,52
6$2
2,34
0,46
422
,340
,464
$
Local M
atch excluded from
total of revenue
1,30
5,53
0$ 21,034
,933
$
*Cap
tial G
rants E
xcluded from
Total Revenue
Stark Area
Regiona
l Transit Au
thority
2017
Bud
get R
eque
stRe
venu
e Projections
74
STARK AREA REGIONAL TRANSIT AUTHORITY
RESOLUTION # ___________, 2016
FOR 2017 CAPITAL BUDGET APPROVAL
WHEREAS, the Stark Area Regional Transit Authority (SARTA) staff has prepared the 2017 Capital Budget (see attached sheet), in the amount of $20,393,914 Project Costs, consisting of: Federal, State and Local grant matches of $16,839,245, SARTA staff Wages/Operating Expenses of $2,302,381, and local cash requirement of $1,305,530, and said funds are available in current and past revenues; and
WHEREAS, SARTA staff recommends said budget amendment be passed for 2017, in order that all projects can continue their progress, and
WHEREAS, the above measures allow SARTA to Operate Within Budget, Build Public Support and Maximize Financial Flexibility, three of the Five Bold Steps;
NOW, THEREFORE BE IT RESOLVED, that the 2017 Capital Budget be approved (see attached sheet), in the amount of $20,393,914 Project Costs, consisting of: Federal, State and Local grant matches of $16,839,245, SARTA staff Wages/Operating Expenses of $2,302,381, and local cash requirement of $1,305,530 and the executive director has the authority to move funds within line-items within the proposed budget.
_____________________________ Date of Adoption _____________________________ President _____________________________ Attest: Secretary-Treasurer
75
Project
Total Bud
geted Co
st
Fed
eral Sha
re
Wages/Expen
ses
Local Sha
re
Ope
ratin
g Expe
nse
$2,419
,837
$1,236
,540
$1,236
,540
Alternate Fuels ‐ CNG & Biodiesel
$588
,946
$530
,051
$58,89
5AD
A Ope
ratin
g Expe
nses
$350
,000
$280
,000
$70,00
0Mob
ility M
anagem
ent
$395
,650
$316
,520
$79,13
0Preven
tive Mainten
ance
$3,646
,220
$2,916
,976
$729
,244
JARC
$42,86
534
,292
8,57
3
Captial Projects
Total Bud
geted Co
st
Fed
eral Sha
re
Wages/Expen
ses
Local Sha
re
Bus C
ompo
nents
$32,46
8$2
5,97
4$6
,494
2017
(8) <
30' Buses
$1,381
,565
$1,105
,252
$276
,313
Hydrogen
Buses
$9,055
,815
$8,203
,137
$852
,678
IT Projects
$67,86
3$5
4,29
0‐
$13,57
3Gatew
ay Building Re
novatio
ns
$83,05
0$6
6,44
0$1
6,61
0Transit Enh
ancemen
ts
$63,52
7$5
0,82
2$1
2,70
5Safety/Security
$5
,240
$4,192
$1,048
Radio Project
$600
,000
$480
,000
$120
,000
Hydrogen
Fue
ling Infrastructure
$304
,241
$298
,131
$6,110
Other Local Projects
Total Bud
geted Co
st
Fed
eral Sha
re
Wages/Expen
ses
Local Sha
re
Mahon
ing Co
rridor *
$756
,627
$756
,627
FY16
531
2 LoNO Evaluation
$600
,000
$480
,000
$120
,000
Total Bud
geted Co
st
Fed
eral Sha
re
Wages/Expen
ses
Local Sha
re
Project T
otals
$20,39
3,91
4$1
6,83
9,24
5$2
,302
,381
$1,305
,530
* No local m
atch re
quire
d from
SAR
TA
Stark Area
Regiona
l Transit Au
thority
20
17 Bud
get R
eque
stProjects
76
STARK AREA REGIONAL TRANSIT AUTHORITY
RESOLUTION # __________, 2016
A RESOLUTION AUTHORIZING THE EXECUTIVE DIRECTOR/CEO TO CONTINUE THE ASSOCIATION WITH AND LIABILITY AND PROPERTY
INSURANCE WITH OHIO TRANSIT RISK POOL FOR 2017
WHEREAS, SARTA has been a member of the Ohio Transit Risk Pool (OTRP) since November 25, 1994; and
WHEREAS, OTRP has secured and provided coverage for SARTA’s assets and
employees for Liability and Property claims; and WHEREAS, OTRP will continue to provide coverage for SARTA within acceptable
costs for SARTA’s 2017 budget - $627,587; and WHEREAS, this action is consistent with two of the Five Bold Steps, that of
“Building High Quality Staff/Board” by providing superior coverage and that of “Operating Within Budget” by contracting within budgetary constraints;
NOW, THEREFORE, BE IT RESOLVED, that the Executive Director/CEO be
authorized to extend the OTRP Insurance Coverage contract through 2017, and sign any documents in accordance thereof.
_____________________________ Date of Adoption _____________________________ President _____________________________ Attest Secretary-Treasurer
77
STARK AREA REGIONAL TRANSIT AUTHORITY
RESOLUTION # __________, 2016
A RESOLUTION AUTHORIZING THE EXECUTIVE DIRECTOR/CEO TO CONTINUE THE ASSOCIATION WITH AND HEALTH INSURANCE COVERAGE
WITH THE HEALTH TRANSIT POOL OF OHIO FOR 2017
WHEREAS, the Stark Area Regional Transit Authority (SARTA) has been a member of the Health Transit Pool of Ohio since October 23, 2013; and
WHEREAS, HTPO has secured and provided health insurance coverage for SARTA’s employees; and
WHEREAS, HTPO will continue to provide coverage for SARTA within acceptable costs for SARTA’s 2017 budget - $2,250,000; and
WHEREAS, this action is consistent with two of the Five Bold Steps, that of “Building High Quality Staff/Board” by providing superior coverage and that of “Operating Within Budget” by contracting within budgetary constraints;
NOW, THEREFORE, BE IT RESOLVED, that the Executive Director/CEO be authorized to extend the HTPO health coverage contract through 2017, and sign any documents in accordance thereof, and pay any claims costs arising from the plan attributable to SARTA employees.