Page 1: SARMa – Sustainable Aggregates Resource Management WP5

SARMa – Sustainable Aggregates Resource Management

WP5

Günter Tiess, Montan University of Leoben

15-17 June, Region of Emilia Romagna, Bologna

Page 2: SARMa – Sustainable Aggregates Resource Management WP5

Content of Presentation

• Background/Overview

• Purpose of WP 5

• Important issues of WP5

• Overview of WP 5

• Details of WP 5

Page 3: SARMa – Sustainable Aggregates Resource Management WP5

Background

• Discrepancy in aggregates managament practices and policies among old and new EU member states and canditate countries is large.– Thus, it is very important to create a strategic harmonization of

legislation and policies through SARM and SSM across SEE.

Page 4: SARMa – Sustainable Aggregates Resource Management WP5

Purpose of WP5

• WP addresses transnational aspects and possibilities for harmonizing policies/legislation related to

– 1) SARM– 2) secure supply, – 3) establishment of a Regional Centre for SARM and SSM.

• First 2 activities lead to recommendations for creation of a Aggregate Intelligence System (AIS) for SEE.

– multi-purpose, multi-scale interoperable

• Outputs will be summarized in a manual – incorporating outputs of WP4, – using in dissemination activities (workshops, brochures).

• Workshops on transnational supply: Will emphasize how to ensure SSM,

– considering environmental impacts – considering increased recycling, – enhancing economic development across SEE.

• Regional Centre has potential to become a durable result of the project.

Page 5: SARMa – Sustainable Aggregates Resource Management WP5

Important issues of WP5

1. Creation of a SARMa-method and SSM-Policies

2. Implementation of transnational view of theoretical and practical outputs in SEE.

3. Know-how transfer through AIS integration and Regional Centre establishment of SARM and SSM,

– in order to achieve efficient implementation of SARM harmonized approaches,

• thus increasing sustainable quality of life,

• resource efficiency and long term cooperation in SEE countries.

Page 6: SARMa – Sustainable Aggregates Resource Management WP5

Overview of WP 5

Page 7: SARMa – Sustainable Aggregates Resource Management WP5

WP 5 / Objectives

5.1 Legislation and policies harmonizationCross-border case studies, integrating SARM into land

use planning, AIS-design

5.2 Sustainable supply among SEESynthesis on supply aspects of case studies, land use planning, management, AIS-clarifiaction

SARM and SSM Manual for national and transantional level 5.3SARM and SSM manual, recommend SEE countries to develop their aggregates resource management.

Feasibility study and action plan for Regional Centre on SARM in SEE 5.4Long term implementation of SARMa, i.e.Outputs of WP3,4,5. As well as AIS.

S

A

R

M

Page 8: SARMa – Sustainable Aggregates Resource Management WP5

WP 5 / Methodology

• WP5 will be based on outcomes of W1-W4.

• WP5.1: Harmonization– Case studies in defined areas (AT-SI-HU-HR + GR,

RO + IT)• WP 5.2: Securing supply

– Synthesis of collected information from WP 5.1• WP 5.3: Manual (national/transnational)

– Partners of WP4 and WP 5, providing information• WP 4: Regional centre

– Feasibility study

Page 9: SARMa – Sustainable Aggregates Resource Management WP5

Details of WP 5

Page 10: SARMa – Sustainable Aggregates Resource Management WP5

WP 5.1: Harmonization of legislation and

policies

• Partners will – oversee case studies in their areas, – create reports

• trans-border, cross-country, synthesis

– design of AIS (contribution )– development of recommendation for decision makers

TASK Nr. PARTNERS

(Leader: IGME)

LOCATION Start - End

TASK 1

TASK 2

TASK 3

MUL, MINGORP, GeoZS, MBFH, ER

AT-SI-HU-

HR and GR, RO, IT

August 2010 – October 2011

Page 11: SARMa – Sustainable Aggregates Resource Management WP5

WP 5.1: Harmonization - TASK 1

Responsability Methodology Outputs DeadlineIGME and all partners from WP 5.1

*Case studies in selected countries, i.e. AT-SI-HU-

HR and GR, RO, IT

*defining criteria how to conduct studies i.e. to be able to cover transnational aspects;

*using standardized format to facilitate analysation/synthezation in WP5.2

* depending on country specific issues/SEE: close cooperation with stakeholders of dedicated regions (e.g.: Austria: Chamber of Commerce, land use planning authority in St. Pölten)

Reports

(trans-border, cross-country, synthesis)

Linked to AT-SI-HU-

HR and GR, RO, IT

Pages?: 50-70?

October 2011

Subdeadline:

Cross-border case studies

Page 12: SARMa – Sustainable Aggregates Resource Management WP5

WP 5.1 Harmonization – TASK 2

Responsability Methodology Outputs DeadlineIGME and All Partners from WP 5.1

*using basically information from WP4, i.e. existing legislation, land use planning approaches in SEE, related to AT-SI-HU-HR and GR, RO, IT

*using information from TASK 1/WP5.1

*depending on country specific issues/SEE: close cooperation with stakeholders of dedicated regions (e.g.: Austria: Chamber of Commerce, land use planning authority in St. Pölten)

*recommendations, e.g. related to existing and/or implementing transnational/best practices

Guidelines for integrating SARM (especially: methods) into legislation, land use planning

in AT-SI-HU- HR and GR, RO, IT

including recommendations for stakeholders on harmonization of procedures

Guidelines in small reports?

Discussion: which form of guidelines? Must be very practically, to be applied.

October 2011

Subdeadline:

Proposals on harmonization of legislation and policies and methods for incorporating SARM into land use planning and management

Page 13: SARMa – Sustainable Aggregates Resource Management WP5

WP 5.1 – Harmonization – TASK 3

Responsability Methodology Outputs DeadlineAll partners from WP 5.1

*Defining AIS, related to SARMa:AIS=System, comprising data, information, maps, legislation, practices, protocols, procedures,

How shall it work?

QUESTION:AIS-at which WP will this issue basically defined/discussed?

*collecting information from WP 5.1 task 1, 2 (including WP4)

*analysing, synthesizing

*recommendations

Structure and protocol for multi-scale interoperable Aggregate Intelligence System

How do we handle it?

Regarding transnational aspects: „AIS – issue“ is very important: I need more information: we have to discuss it.

October 2011:Subdeadline:

Design of structure and protocols for Aggregate Intelligence System

Page 14: SARMa – Sustainable Aggregates Resource Management WP5

WP 5.2

PARTNERS

(leader: MUL)

LOCATION Start - End

TASK 1

TASK 2

TASK 3

METE

PELLA

MINGORP

MBFH

GeoZS

FGG MGK10

Same Location as Action 5.1 plus AL and BA will also look at their trans-border aggregate supply issues

August 2010 – October 2011

Securing Sustainable Supply Across SEE

Role of partners:•review case studies•synthesizing, preparation of proposals on harmonisation/addressing SSM in land use planning •analysing of AIS issues.

Page 15: SARMa – Sustainable Aggregates Resource Management WP5

WP 5.2: Securing supply in SEE – TASK 1

Responsability Methodology Outputs Deadline

MUL and all partners of WP 5.2

*review and synthesis on supply aspects of case studies (5.1) plus BA and AL

*indication of „pro and contra issues“ in dedicated areas

*Indication of best practices

*recommendations

Recommendations on securing SSM in SEE, i.e. AT-SI-HU-HR and GR, RO, IT

Recommendations in small reports?

October 2011:Subdeadline:

Review and synthesis on supply aspects of case studies (5.1)

Page 16: SARMa – Sustainable Aggregates Resource Management WP5

Action 5.2: Securing supply in

SEE – TASK 2

Responsability Methodology Outputs Deadline

MUL and all partners of WP 5.2

*strong reliance on 5.2/ TASK 1 outputs

* close cooperation with stakeholders of dedicated regions in SEE (i.e.conducted case studies related to AT-SI-HU-HR and GR, RO, IT)

*Proposals have to be refeered to „AIS-discussion“

*Recommendations on securing SSM in land use planning and management in SEE-regions, i.e. AT-SI-HU-HR and GR, RO, IT

Recommendations in small reports?

October 2011:

Subdeadline:

proposals on harmonization of supply policies / legislation and methods for addressing SSM in land use planning and management,

Page 17: SARMa – Sustainable Aggregates Resource Management WP5

WP 5.2: Securing supply in SEE – TASK 3

Clarifying contributions of AIS to SSM planning

Responsability Methodology Outputs Deadline

MUL and all partners of WP 5.2

*strong reliance on WP4 and 5.2/ TASK 2

*Analysing, finding out the „gaps“- with regard to SSM

planning in SEE

Is there a possibility to find/define a criteria how to manage the issue „clarify “.

How to messure?

* close cooperation with stakeholders of dedicated

regions in SEE

*Recommendation:

Which design/structure of AIS will be needed (or would be the

best one) to feed in existing SSM planning, i.e. to

„contribute, harmonize and improve secure supplying“ in

SEE

I believe: much discussion is needed to checkt this issue

October 2011:

Subdeadline:

Page 18: SARMa – Sustainable Aggregates Resource Management WP5

WP 5.3

TASK Nr. PARTNERS LOCATION Start - End

TASK 1 All Partners from WP4 and

WP5

N/A December 2010 – October 2011

Preparation of manual for national and transnational level

Page 19: SARMa – Sustainable Aggregates Resource Management WP5

WP 5.3

Responsability Methodology Outputs Deadline

All partners from WP4 and

WP5

*arranging collected

information on SARM and SSM

700 copies in english and 1500 in local languages

October 2011:

Subdeadline:

Manual on SARM and SSM

Page 20: SARMa – Sustainable Aggregates Resource Management WP5

WP 5.4

TASK Nr. PARTNERS

(leader: GeoZS)

LOCATION Start - End

TASK 1 MUL

IGME

TUC MBFH

IGR

FGG

N/A February 2010 – October 2011

Follow-up activities: SARM regional centre

Page 21: SARMa – Sustainable Aggregates Resource Management WP5

WP 5.4

Responsability Methodology Outputs Deadline

GeoZS and partners from ACTION 5.4

*conduct feasibility study and develop

action plan for Regional Centre on SARM in SEE

*based also on outputs of WP3,

WP4 and WP5 as well as AIS.

Regional Centre to carry forward the

work and conclusions of

SARMa.

Joint Action plan for Regional

Centre on SARM.

October 2011

Follow-up activities: SARM regional centre