7 Customizing Tips to
Make a Good Interactive
Planning Table Great!
by Wolfgang Eddigehausen
December 15, 2004
SAPexperts/SCM
The standard interactive planning
able that ships wi th the Supply
Network Planning (SNP) module in
APO works just fine out of the box,
but there's plenty of room for
mprovement. Fortunately, you cancustomize it in a number of ways that
ot only make it look terrific but also
add value and functionality for
planners.
Key Concept
The interactive planning table in
SNP is the primary interface
planners use to monitor their supply
chain. It displays mission-critical
information such as inventory
levels, manufacturing and
transportation schedules, and much
more.
The task of any planning table is to
provide users with a c lear view of a
product's planning condition while
ighlighting areas that require special
attention. The SNP inactive planning
able provides planners with this typeof insight and can be enhanced to
meet many of your particular
business demands. (For more details
7/17/2019 SAPexperts _ 7 Customizing Tips to Make a Good Interactive Planning Table Great!
http://slidepdf.com/reader/full/sapexperts-7-customizing-tips-to-make-a-good-interactive-planning-table-great 2/17
Figure 1
Customized SNP interactiveplanning table
about SNP and the interactive
planning table, see "Aggregated
Planning Redux: More Relief for
Aggravated Planners." )
By adding new key figures, tweaking
existing names, and making other
modifications like elements that
change to indicate critical conditions,
he interactive planning table in
Figure 1 has been customized in a
way that makes the interface an even
more useful tool. These changes are
ot d ifficult to make.
will show you how to adjust the SNP
nteractive planning table so it is
easier to read as well as more user
riendly. Starting with the standard
elivered planning book (9ASNP94)and the view SNP PLAN, you can
provide users with the enhancements
7/17/2019 SAPexperts _ 7 Customizing Tips to Make a Good Interactive Planning Table Great!
http://slidepdf.com/reader/full/sapexperts-7-customizing-tips-to-make-a-good-interactive-planning-table-great 3/17
and functionality that allow them to
ocus on areas that are unique to
your company.
NoteThe enhancements in this article
should be seen as suggestions thatyou can further modify to suit your individual requirements.
. Create your own planning book. In
most cases, custom planning books
are set up at implementation. If not,
hen you need to do so before youcan customize your own planning
book.
NoteExcept where indicated otherwise,the menu paths described in thisarticle are located in the APO treestructure.
Follow Supply Network Planning>
Environment>Current
Settings>Design Planning Books or
se transaction code
SAPAPO/SDP8B. Create a planning
book (e.g., PBSNP) and data viewe.g., PBSNP(1)) by copying these
with reference to the standard book
9ASNP94) and data view (SNP94(1)).
Specify the newly created planning
book PBSNP and click on Edit. In the
Planning book tab (Figure 2), rename
he planning book in the Planning
book text field. Then repeat the
process for data view 1 on the Data
7/17/2019 SAPexperts _ 7 Customizing Tips to Make a Good Interactive Planning Table Great!
http://slidepdf.com/reader/full/sapexperts-7-customizing-tips-to-make-a-good-interactive-planning-table-great 4/17
Figure 2
Planning book text fieldallows you to rename
customized planning book
Figure 3
Dialog box in Planning
wizard confirming
customization
iew tab. Select the Key figures tab
and click on Yes in the Planning
wizard dialog box that asks Should
planning book and data view be
completed? and save (Figure 3).
n the same transaction, select the
Assign Planning Area option under
Edit. In the next pop-up screen, the
ystem displays the first existing
planning area alphabetically, not the
one currently assigned to the
planning book. Select planning area
9ASNP02 and click on Enter. Then
click on Back and exit the transaction.
7/17/2019 SAPexperts _ 7 Customizing Tips to Make a Good Interactive Planning Table Great!
http://slidepdf.com/reader/full/sapexperts-7-customizing-tips-to-make-a-good-interactive-planning-table-great 5/17
n the final step, follow Supply
Network
Planning>Environment>Current
Settings>Macro Bui lder or use
ransaction code /SAPAPO/ADVM.
Select the planning book view
PBSNP(1) and click on Execute. Next
click on Generate Macros, followed
by Back, and exit the transaction.
2. Rename key figures to suit your
ystem. There is nothing wrong with
he key figure names that SAP uses,
but they may not be in line with the
ocabulary at your company.
Moreover, it's not always clear what
he corresponding name in R/3 is for
a certain object. While I can't offer
you any hard-and-fast rules, the
ollowing sample scenario should
provide you with some food for
hought when it comes to
establishing a naming scheme that
your users wi ll value.
After a deployment run, orders are
ent to R/3 where they create
purchase requisitions. SNP planningesults, however, are not transferred
o R/3. You can rename the key
gures DistrReceipt (Confirmed) and
DistrDemand (Confirmed) so that it is
easier to understand what they are
called in R/3. Remember, it's often the
mall things that make the biggestmpact.
Use transaction code
7/17/2019 SAPexperts _ 7 Customizing Tips to Make a Good Interactive Planning Table Great!
http://slidepdf.com/reader/full/sapexperts-7-customizing-tips-to-make-a-good-interactive-planning-table-great 6/17
SAPAPO/SDP8B or follow menu path
Supply Network Planning>
Environment>Current
Settings>Design Planning Books.
Specify planning book PBSNP and
click on Edit. Choose key figure
9AFSHIP (DistrReceipt (Conf irmed) )
on the Key Figure Attr ibutes tab and
et the Free Text radio button. Next,
efine the new name DistrReceipt
P/Req).
Now, select the key figure 9ADMDDF
DistrDemand (Conf irmed)), and set
he Free Text radio button. Define the
ew name DistrDemand (P/Req Rel) .
Click on the Save Settings button,
elect the Key figures tab and click
Complete. As described earlier, click
on Yes in the Planning wizard pop- up
box and save.
3. Make sure planning periods meet
your requirements. The response time
of an interactive planning table is
irectly proportional to the number of
periods shown in its grid. The more
tems in the grid, the longer theesponse time. You should closely
crutinize the number of periods
being displayed and create planning
bucket profiles with the optimum
umber of periods.
Follow the menu path Supply Network
Planning>Environment>Current
Settings> Maintain Time Bucket
Profiles for Supply Network Planning
7/17/2019 SAPexperts _ 7 Customizing Tips to Make a Good Interactive Planning Table Great!
http://slidepdf.com/reader/full/sapexperts-7-customizing-tips-to-make-a-good-interactive-planning-table-great 7/17
Figure 4
Define new time bucket
profiles
or use transaction code
SAPAPO/TR30. Enter the name of the
planning buckets profi le in the Time
buckets prfl ID field (PBP) and its
escription in the Short text field (8
eeks in Days) (Figure 4).
Then press Enter on the keyboard.
Type 8 in the first line of the Number
column and W in the Display
Periodicity field. Pressing Enter again
opens the second line of the
isplayed table and populates the
Basic Periodicity field by
automatically matching the settings of
he Display Periodicity field in the firstne. Again, set the Number field to 8
and in the second line enter T in the
Display Periodicity column. Click on
ave.
Now, select Supply Network
Planning>Environment>Current
Settings>Design Planning Books or
access the next screen via
ransaction code /SAPAPO/SDP8B.
7/17/2019 SAPexperts _ 7 Customizing Tips to Make a Good Interactive Planning Table Great!
http://slidepdf.com/reader/full/sapexperts-7-customizing-tips-to-make-a-good-interactive-planning-table-great 8/17
Figure 5
Update the Data view tabwith the new time bucket
profile
Specify planning book PBSNP and
click on the Edit button. On the Data
View tab, set the TB profi le ID (future)
eld to PBP (Figure 5). Select the
Data view PBSNP(2) and repeat this
ast step. Continue to the last tab and
click on the Complete button. Once
again, confirm the save query in the
ialog box by clicking on Yes.
NoteWhen generating a macro, thesystem considers the number of periods defined in the planning bookusing information in the time bucketprofi le. Because it has beenchanged, it is advisable toregenerate the macros using thenew time bucket profile, otherwiseyou may receive incorrect results.
4. Hide non-essential key f igures. In
most cases, not all of the key figures
available are necessary. Key figures
or joint production, for example, or
7/17/2019 SAPexperts _ 7 Customizing Tips to Make a Good Interactive Planning Table Great!
http://slidepdf.com/reader/full/sapexperts-7-customizing-tips-to-make-a-good-interactive-planning-table-great 9/17
hose related to target stock levels
are somewhat extraneous because
only a handful of companies use
hem. Others, such as the ATD
eceipts and ATD issues key figures,
on't need to be moni tored because
or the most part they only support
background planning jobs. The two
key figures that I just noted are only
sed in a deployment planning run
and do not require a place in your
SNP interactive planning table.
You can suppress the display of
nwanted key figures rather than
eleting them to avoid future
problems if you decide to display
hem later. Here's how to hide key
gures related to stock levels.
Follow the path Supply NetworkPlanning>Environment>Current
Settings>Design Planning Books or
se transaction code
SAPAPO/SDP8B. Specify planning
book PBSNP and data v iew PBSNP(1)
and Edit. Next, click on the Target
Stock Level row, and right-click onhe same row to activate the context-
ensitive menu (Figure 6). Chose
Selected rows in the menu and then
Hide.
7/17/2019 SAPexperts _ 7 Customizing Tips to Make a Good Interactive Planning Table Great!
http://slidepdf.com/reader/full/sapexperts-7-customizing-tips-to-make-a-good-interactive-planning-table-great 10/17
Figure 6
Right-click on a row to
activate the context -sensitive
menu to access settings
To make a row vis ible again, click on
he name SNP PLAN located on the
op left of the screen. Right-click on
he cell to activate the context-
ensitive menu, and select Manage
Hidden Rows. In the upcoming
creen, drag the rows you want to
isplay from the Hidden Rows folder
o the Shown Rows folder (Figure 7).
7/17/2019 SAPexperts _ 7 Customizing Tips to Make a Good Interactive Planning Table Great!
http://slidepdf.com/reader/full/sapexperts-7-customizing-tips-to-make-a-good-interactive-planning-table-great 11/17
Figure 7
The Manage Hidden Rows
screen allows you to display
rows after they have been
hidden
5. Refine the Days' supply key figure.The Days' supply key figure displays
he number of days that the current
ay's stock will last after all known
uture requirements and demands
ave been factored in, such as
orecast or actual sales. This key
gure's shortcoming is that it roundso the next full day, and some
ndustries require more precise
orecasting. You can create a new
nit of measure that adds one
ecimal to the Days' supply value and
se that instead of the SAP supplied
UoM.
n the mySAP SCM tree structure,
elect Tools>Customizing>IMG>Edit
7/17/2019 SAPexperts _ 7 Customizing Tips to Make a Good Interactive Planning Table Great!
http://slidepdf.com/reader/full/sapexperts-7-customizing-tips-to-make-a-good-interactive-planning-table-great 12/17
Project or use transaction code
SPRO. Click on the SAP Reference
MG button and select General
Settings>Check Units of
Measurement. Select the Time
imension and click on the Units of
Measurement button. Press funct ion
key F7 (Create) and define the
ollowing in the next screen:
Internal Unit of Measurement DS
Commercial Format DS
Technical Format DS
Decimal Places 1
Numerator 86,400 Denominator 1
Measurement Text (Line 1) Days
Measurement Text (Line 2) Days
ISO Code Day
Commercial Measurement Unit "On"
On the keyboard, press Enter and
confirm the onscreen warning
message (ISO code DAY is already
sed for measurement uni t D) bypressing Enter again. Click on the
ave icon and the warning message
will appear again. You must conf irm it
again by pressing the Enter key. Exit
he customizing transaction and
eturn to the APO tree structure.
NoteBecause this definition is acustomizing task, it may require arequest number if your systemrequires change requests.
Select Supply Network
Planning>Environment>CurrentSettings>Design Planning Books or
se transaction code
7/17/2019 SAPexperts _ 7 Customizing Tips to Make a Good Interactive Planning Table Great!
http://slidepdf.com/reader/full/sapexperts-7-customizing-tips-to-make-a-good-interactive-planning-table-great 13/17
SAPAPO/SDP8B and specify
planning book PBSNP. Click on Edit ,
elect the Key Figure Attributes tab,
and choose the key figure Cover to
maintain the Days' supply value.
Change the Unit of Measure from D to
DS. Click Save Settings and continue
o the Key Figures tab. Click on the
Complete button and click on Yes in
he dialog box to save.
6. Add an Available Stock key figure.
The main goal of every planner is to
ensure that enough stock is available
at any time on any day. "Available
tock" is defined as the projected
physical stock minus the safety stock
equirements.
Unfortunately, no key figure exists for
available stock. You can create oneand make it so i ts field color changes
o reflect stock levels when displayed
n the planning table. If, for example,
he projected physical stock level
alls to zero or below, the color
changes to red. Yellow indicates
ome projected physical stockemains, but it is below the safety
tock requirement. If you do not like
isplaying colors, you can still use
he macro to calculate the available
tock. It can also be used to add a
warning icon to the backlog key
gure whenever a backlog exists.
Via transaction code /SAPAPO/SDP8B
or following Supply Network
7/17/2019 SAPexperts _ 7 Customizing Tips to Make a Good Interactive Planning Table Great!
http://slidepdf.com/reader/full/sapexperts-7-customizing-tips-to-make-a-good-interactive-planning-table-great 14/17
Figure 8
Planning> Environment>Current
Settings>Design Planning Books,
pecify planning book PBSNP and
click on Edit. Select the Key figure
attributes tab and type in the name of
he new key figure Available. Set the
Free Text radio button and define the
ew name Available Stock.
Then press the Enter key on your
keyboard, set the UoM from product
master flag and click on the Save
ettings button. On the Key figures
ab, drag the newly created key figure
AVAILABLE from the Planning book
st on the right to the Data view list
on the left in the Assign key figures to
ata view area (Figure 8). Determine
ts appropriate location wi thin the list
and place the new key figure in the
esired position. Click on the
Complete button and confirm the
ettings by clicking on Yes in the
ialog box noted earlier.
7/17/2019 SAPexperts _ 7 Customizing Tips to Make a Good Interactive Planning Table Great!
http://slidepdf.com/reader/full/sapexperts-7-customizing-tips-to-make-a-good-interactive-planning-table-great 15/17
Move the new key figure to
the desired position of the
Data view list
Figure 9
Modify the Days’ supply
macro by adding the
Available Stock step
You have created the new key f igure
o display the available stock. Now
et's define the algorithm to calculate
he available stock, and also the
conditions under which the colors are
et.
Use transaction code /SAPAPO/ADVM
or follow Supply Network
Planning>Environment> Current
Settings>Macro Builder. Select the
planning book view PBSNP(1) and
click on Execute. Modify the existing
macro Days' supply. Add the new
tep Available Stock (Figure 9), then
add Highlight Available Stock (Figure
0) and cl ick on Generate Macros toenerate them. Click on the Back
button to exit the transaction.
7/17/2019 SAPexperts _ 7 Customizing Tips to Make a Good Interactive Planning Table Great!
http://slidepdf.com/reader/full/sapexperts-7-customizing-tips-to-make-a-good-interactive-planning-table-great 16/17
Figure 10
The second step added to
the Days’ supply macro is
Highlight Available Stock
7. Highlight non-working days.
Monitoring multiple sites across an
nternational supply network requiresaccommodating workdays, holidays,
on-workdays, etc. that are not
consistent in all locations. You can
ndicate non-workdays by displaying
he key figure Total Demand with a
reen background via a macro that
ses is the shipping calendar definedn the Location Master Calendar tab.
Use the transaction code
7/17/2019 SAPexperts _ 7 Customizing Tips to Make a Good Interactive Planning Table Great!
http://slidepdf.com/reader/full/sapexperts-7-customizing-tips-to-make-a-good-interactive-planning-table-great 17/17
Figure 11
Modify the Determine
Workdays macro by adding
the Highl ight Non-Workdays
step
SAPAPO/ADVM or follow Supply
Network Planning> Environment>
Current Settings>Macro Builder and
elect the planning book view
PBSNP(1) and cl ick on the Execute
button. Modify the existing Determine
Workdays macro by adding the new
tep Highlight Non-Workdays in the
ame way you modified Available
Stock (Figure 11). Click on the
Generate Macros button to generate
he macros. Then cl ick on the Back
button and exit the transaction.