Production Planning and Execution (PP)

SAP University Alliances

Authors Bret WagnerStefan Weidner

ProductSAP ERP 6.0 EhP7Global Bike Inc.

LevelBeginner

FocusCross-functional integrationgProduction Planning and Execution

Version2.30

© SAP AG

Last UpdateMay 2014

Page 2: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Course Overview

Introduction to SAP

Navigation Navigation

Introduction to GBI

Sales & Distribution

Materials Management

Production Planning

Financial Accounting

Controlling

Human Capital Management

Warehouse Management

Page 6-2

Project System

Page 3: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Functionality

SAP divides production into multiple processes- Production Planning- Manufacturing Execution

• Discrete Manufacturing• Repetitive Manufacturing• KANBAN

- Production – Process Industries• Integrated planning tool for batch-orientated process manufacturing

Design primaril for chemical pharmace tical food and be erage• Design primarily for chemical, pharmaceutical, food and beverage industries along with batch-oriented electronics

Page 6-3

Page 4: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Unit Overview

PP Organizational Structure

PP Master Data PP Master Data

PP Processes- Material Planning- Production Planning- Manufacturing Execution Process

Page 6-4

Page 5: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP PP Organizational Structure

Client- An independent environment in the system

Company Code- Smallest org unit for which you can maintain a legal set of books

Plant- Operating area or branch within a company

• Manufacturing, distribution, purchasing or maintenance facility

Storage Location- An organizational unit allowing differentiation between the various stocks of a- An organizational unit allowing differentiation between the various stocks of a

material in a plant

Work Center Locations (in SAP system master data)- An organizational unit that defines where and when an operation is performed- Has an available capacity- Activities performed are valuated by charge rates, which are determined by

cost centers and activity types. - Can be machines, people, production lines or groups of craftsmen

Page 6-5

, p p , p g p

Page 6: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP GBI Structure for Production Planning

Global Bike Client

Global Bike Inc. Global Bike Germany GmbH CompanyCode

Dallas Heidelberg Plant

StorageLocation

Raw Materials

Semi-fin. Goods

Finished Goods

Raw Materials

Semi-fin. Goods

Finished Goods

Miscellaneous Miscellaneous

Assembly

Packaging

Assembly

Packaging (Work Center Location)

Page 6-6

Inspection Inspection

( )

Page 7: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP GBI Enterprise Structure in SAP ERP (Logistics)

Shipping Point DL00

RM00

MI00 SD00 HD00 HH00

TG00 TG00 TG00 RM00 TG00

TO00

TG00

PE00

Storage Location

RM00

SF00

FG00

MI00

TG00

FG00

MI00

TG00

FG00

MI00

TG00

FG00

MI00

RM00

SF00

FG00

MI00

TG00

FG00

MI00

TG00

FG00

MI00

Central Purchasing Organization (global) GL00Purchasing Org. US00 CA00 PO DE00 AU00

Purchasing Group North AmericaN00

PGr EuropeE00

AsiaA00

CC US00

DallasDL00

MiamiMI00

S. DiegoSD00

CA00

TorontoTO00

AU00

PerthPE00

CC DE00

Heidelb.HD00

HamburgHH00

Plant

Company Code

Page 6-7

Client GBI

Page 8: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP PP Master Data

Material

Bill of Materials (BOM) Bill of Materials (BOM)

Routing

Work Center

Product Group

Page 6-8

Page 9: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Material Master Record

Page 6-9

Page 10: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Bill of Materials (BOM)

List of components that make up a product or assembly

Wheel Assembly- Tire

Tube

Seat Kit

Handle Bar - Tube- Wheel- Hex nut

Lock Washer

Pedal Assembly

Chain- Lock Washer- Socket Head Bolt

Frame

Brake Kit

Warranty Document

Packaging Derailleur Gear Assembly

Packaging

Page 6-10

Page 11: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Bill of Materials (BOM)

Single-Level Single-Level

Finished Bike

Wheel Assembly Pedal Assembly

Frame Chain

Derailleur GearAssembly Brake Kit

Handle Bar

Warranty Doc.Seat Kit

Packaging

Page 6-11

Page 12: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Bill of Materials (BOM)

Single-Level vs. Multi-LevelSingle-LevelSingle Level

Finished BikeSingle-Level

Handle Bar ChainDerailleur Doc.Seat BrakePedal Pack.Wheel Frame

Tire

Tube

Wheel

Hex nutHex nut

Lock

Bolt

Page 6-12

Multi-Level

Page 13: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Bill of Materials (BOM)

Variant Bill of Materials (BOM)- Several products with a large proportion of identical parts.

Single-Level

Deluxe Bike (red) Single-Level

Professional Bike (black)Aluminum Wheel

Frame red Chain

Pedal AssemblyProfessional Bike (black)

Carbon Wheel Pedal Assembly

Derailleur GearAssembly

Warranty DocSeat Kit

Brake KitFrame black Chain

Derailleur GearAssembly Brake Kit

Handle Bar

Warranty Doc.Seat Kit

PackagingHandle Bar

sse b y

Warranty Doc.Seat Kit

Packaging

Page 6-13

g g

Page 14: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP BOM – Item Categories

Item Categories- Stock Item- Non-stock Item- Variable Material – Sheet of steel- Intra Item – Phantom material – process industry- Class Item – place holder- Document Item- Text Item

Page 6-14

Page 15: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Routing

Routings enable you to plan the production of materials (products).

Routings are used as a template for production orders and run Routings are used as a template for production orders and run schedules

Routing are also used as a basis for product costing.

Series of sequential steps (operations) that must be carried out to produce a given product

Routings contain: Routings contain: - What, Where, When, How

Page 6-15

Page 16: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Routing

Routing – Operation 20 - Attach seat to frame

Work Center – ASSY1000- Assembly Work Center

Time- 1 minute

Page 6-16

Page 17: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Routing

Routing for Finished Bike

Operation

W k C t

Plant Description Activity Type

Work Center Control Key Time and Unit of Measure

Page 6-17

Page 18: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Work Center

A location within a plant where value-added work (operations or activities) are performed

W k C t t- Work Centers can represent• People or Groups of People• Machines or Groups of Machines• Assembly Linesy

Work center used to define capacities - Labor- MachineMachine- Output- Emissions

Capacities used in Capacities used in- Capacity requirements planning (CRP)- Detailed scheduling- Costing

Page 6-18

Costing

Page 19: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Work Center

Work centers capture and use the following Resource Related data- Basic Data

• Person Responsible, Location of Work Center- Scheduling Information

• Queues and Move Times (interoperation), Formula Keys- Costing Data

• Cost Center, Activity Types- Personnel Data

P l P i i Q lifi i• People, Positions, Qualifications- Capacity Planning

• Available Capacity, Formulas, Operating TimeDefault Data- Default Data

• Control Key, Standard Text Key

Page 6-19

Page 20: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Product Group

Aggregate planning that group together materials or other product groups (Product Families)

Multi- or Single- Level Product Groups- The lowest level must always consist of materials

Page 6-20

Page 21: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Material Planning

SOP provides a method for Sales Planning, Production Planning, Feasibility

Sales, Production, Inventory

3,000,000

3,500,000

4,000,000

ts

1,000,000

1,500,0002,000,000

2,500,000

Uni

t

SalesProductionInventory

0

500,000

Janu

aryFe

bruary

March

April

May

June July

Augu

stSe

ptembe

rOcto

ber

Novem

ber

Decem

ber

Page 6-21

Page 22: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Production Planning & Execution

ForecastingSIS CO/PA

D d

Sales & OperationsPlanning Strategic Planning

DemandManagement

MPSDetailed Planning

MRP

ManufacturingExecution

Order

ProcurementProcess

Page 6-22

OrderSettlement Manufacturing Execution

Page 23: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Production Planning & Execution

Players in the Game- Strategic Planning ForecastingSIS CO/PA

• CEO, COO, CIO, CFO, Controller, Marketing Director

Sales & OperationsPlanning

Strategic Planning

- Detailed Planning• Line Managers,

Production S h d l MRP

DemandManagement

MPSDetailed

PlanningScheduler, MRP Controller, Capacity Planners

MRP

Planning

- Execution• Line Workers,

Shop Floor Supervisors

ManufacturingExecution

Order

ProcurementProcess

Manufacturing

Page 6-23

Supervisors OrderSettlement

Manufacturing Execution

Page 24: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Forecasting

Forecasting is the foundation of a reliable SOP

Accurate forecasts are essential in the manufacturing sector

Overstocked & understocked warehouses result in the same thing: a loss in profitsthing: a loss in profits.

Forecasts are ALWAYS WRONG

Page 6-24

Page 25: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Forecasting

Forecasting Models- Trend- Seasonal- Trend and Seasonal- Constant

Selecting a Model- Automatically- Manually

Page 6-25

Page 26: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Sales and Operations Planning (SOP)

Information Origination- Sales- Marketing- Manufacturing- Accounting- Human Resources- Purchasing

Intra firm Collaboration Intra-firm Collaboration- Institutional Common

Sense

Page 6-26

Page 27: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Sales and Operations Planning (SOP)

Flexible forecasting and planning tool

Usually consists of three steps: Usually consists of three steps:- Sales Plan- Production Plan

Rough Cut Capacity Plan- Rough Cut Capacity Plan

Planned at an aggregate level in time buckets

Page 6-27

Page 28: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Demand Management

Link between Strategic Planning (SOP) & Detailed Planning (MPS/MRP)

The results of Demand Mgmt is called the Demand Program, it is generated from our independent requirements - PIR and CIR

Page 6-28

Page 29: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Demand Management

SalesForecast

PlannedIndependent

Requirements

CustomerIndependent

Requirements

SalesForecast

Requirements Requirements

DemandProgram

MPS / MRP

Page 6-29

Page 30: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Planning Strategies

Planning strategies represent the business procedures for- The planning of production quantities - Dates

Wide range of strategies Wide range of strategies

Multiple types of planning strategies based upon environmentMultiple types of planning strategies based upon environment- Make-To-Stock (MTS)- Make-To-order (MTO)

• Driven by sales ordersy- Configurable materials

• Mass customization of one- Assembly orders

Page 6-30

y

Page 31: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Planning Strategy for Make-to-Stock

Planning takes place using Independent Requirements

Sales are covered by make-to-stock inventory Sales are covered by make-to-stock inventory

Strategies- 10 – Net Requirements Planning- 11 – Gross Requirements Planning- 30 – Production by Lot Size- 40 – Planning with Final Assembly

Page 6-31

Page 32: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Planning Strategy for Make-to-Order

Planning takes place using Customer Orders

Sales are covered by make-to-order production Sales are covered by make-to-order production

Strategies- 20 – Make to Order Production- 50 – Planning without Final Assembly- 60 – Planning with Planning Material

Page 6-32

Page 33: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Master Production Scheduling (MPS)

MPS allows a company to distinguish planning methods between materials that have a strong influence on profit or use critical resources and those that do not

Page 6-33

Page 34: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Material Requirement Planning (MRP)

In MRP, the system calculates the net requirements while considering available warehouse stock and scheduled receipts from purchasing and production

During MRP, all levels of the bill of material are planned

Th t t f MRP i d t il d d ti d/ h i l The output of MRP is a detailed production and/or purchasing plan

Detailed planning level- Primary Functions y- Monitor inventory stocks- Determine material needs

• Quantity• Timing

- Generate purchase or production orders

Page 6-34

Page 35: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Demand-Independent vs. Dependent

Independent Demand – Original source of the demand.

Dependent Demand – Source of demand resides at another level Dependent Demand – Source of demand resides at another level.

Page 6-35

Page 36: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Material Requirement Planning (MRP)

MRP is used to ensure the availability of materials based on the need generated by MPS or the Demand Program- 5 Logical Steps

• Net Requirements Calculation• Lot Size Calculation• Procurement Type• Scheduling• BOM Explosion

Page 6-36

Page 37: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Net Requirements

Procurement Proposal Shortage

Firmed Receipts

Firmed Orders

Requirements –Planned Ind. Req.,

ReservationsS l O dor Purchase

Requisitions

Sales Orders, Etc.

StockSafety Stock

Page 6-37

Page 38: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Lot sizing

Static- Based on fixed values in the Material Master

Periodic- Groups net requirements together from multiple periods

Optimum- Calculates the optimum lot size for a several periods of net

requirements

Page 6-38

Page 39: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Procurement Type

External Procurement- Purchase Requisition- Purchase Order- Schedule Line

Internal Procurement Internal Procurement- Planned Order- Production Order

Process Order- Process Order

Page 6-39

Page 40: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Multi-Level Scheduling

RequirementsDatePlanned Order

P h R i iti

Finished Product

Purchase Requisition

Assembly 1Semi-Finished Good

Raw Material

ComponentComponent

Page 6-40

Time

Page 41: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP MRP vs. Consumption-Based

Whether or not a material is planned using MRP or Consumption Based is determined by the MRP Type on the MRP1 screen of the Material Master

MRP

VB Reorder Point

Consumption Based

PD MRP VB – Reorder-Point

VV – Forecast Based

RP R l i h t

PD – MRP

VSD – Seasonal MRPRP – Replenishment

Page 6-41

Page 42: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Consumption-Based

Lot Size

Reorder Point

Replenishment Lead Time

Safety Stock

Page 6-42

Lead Time

Page 43: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Output of MRP

MRP

Planned OrderIn-HouseProduction

ExternalProcurement

Convert to

ProductionOrders

Process

PurchaseRequisitions

Purchase ScheduleProcessOrders

PurchaseOrders

ScheduleLines

Page 6-43

Page 44: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Orders, orders, orders

Planned Order (planning)- A request created in the planning run for a material in the future

(converts to either a production or purchase order)

Production Order (execution)- A request or instruction internally to produce a specific product at aA request or instruction internally to produce a specific product at a

specific time

Purchase Order (execution)A request or instruction to a vendor for a material or service at a- A request or instruction to a vendor for a material or service at a specific time

Page 6-44

Page 45: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Manufacturing Execution Process

ScheduleProductionCapacity Planning Schedule

and ReleaseProductionProposal

(Planning/Other)

g

Shop FloorDocuments

O dOrder Settlement

GoodsIssue

Goods Receipt

Issue

Completion

Page 6-45

Confirmation

Page 46: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Production Order

Production orders are used to control production operations and associated costs- Production Orders define the following

• Material produced• Quantity• Location• Time line• Work involved• Resources usedResources used• How to costs are settled

Page 6-46

Page 47: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Production Order

How

C tWhat

How many

Components

y

Time Line

Page 6-47

Page 48: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Schedule

Calculates the production dates and capacity requirements for all operations within an order- Determines a Routing

• Operation specific time lines• Material Consumption Points

- Material Master• Scheduling Margin Key (Floats)

- Work CenterF l• Formulas

• Standard Inter-operation Times

Page 6-48

Page 49: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Release

Two release processes- Header Level

• Entire order and all operations are released for processing, order is given a REL status

- Operation LevelI di id l ti ithi d l d• Individual operations within an order are released

• Order is given a PREL status• Not until the last operation is released does the order obtains a REL status

A t ti l Automatic vs. manual

Page 6-49

Page 50: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Availability Check

Automatic check to determine whether the component, production resource tools, or capacities in an order are available- Can be automatic or manually executed- Determines availability on the required date

Generates an availability logGenerates an availability log- Displays results of the check- Missing parts list- Reservations that could not be verified- Reservations that could not be verified

Page 6-50

Page 51: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Schedule & Release

The time between scheduling and releasing an order is used for company checks and any preparation needed for the processing of the order

Once an order has been released it is ready for execution, we can at this time- Print shop floor documents- Execute goods movements- Accept confirmations against the orderAccept confirmations against the order

Page 6-51

Page 52: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Shop Floor Documents

Shop Floor Documents are printed upon release of the Production Order, examples would be:- Operation-based Lists

• Time Tickets, Confirmation Slips- Component-based Lists

• Material Withdrawal Slips, Pull List (consumption list)- PRT Lists

• Overview of PRT’s used and in which operations M lti P Li t- Multi-Purpose Lists

• Operation Control Ticket, Object Overview

Page 6-52

Page 53: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Material Withdrawal

When a production order is created it references a BOM to determine the necessary components to produce the material.

It then places a reservation on each of the components.

Upon release of the order (or operation) you can withdraw the d t i l f i treserved materials from inventory

- Reservation is updated- Inventory is updated

C i d h d l- Costs are assigned to the order as actual costs

Page 6-53

Page 54: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Confirmations

Confirmations are used to monitor and track the progression of an order through its production cycle

C fi ti b d t th ti d l l- Confirmation can be done at the operation or order level

Exact confirmation shortly after completion of an operation is essential for realistic production planning and control

Data that needs confirmation include- Quantities – yield, scrap, rework- Activity data – setup time, machine time- Dates – setup, processing, teardown started or finished- Personnel data – employee who carried out the operation, number of

employee involved in the operationWork center- Work center

- Goods movements – planned and unplanned- Variance reasons- PRT usage

Page 6-54

PRT usage

Page 55: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Goods Receipt

Acceptance of the confirmed quantity of output from the production order into stock- Effects of the Goods Receipt

• Updates stock quantity• Updates stock value

f f• Price stored for future valuation changes• Production order is updated

- Three documents are created• Material document• Material document• Accounting document• Controlling document

Page 6-55

Page 56: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Order Settlement

Consists of settling the actual costs incurred in the order to one or more receiver cost objects

R i ld i l d t i l t t i t l d- Receivers could include: a material, a cost center, an internal order, a sales order, a project, a network, a fixed asset

Parameters for Order SettlementS ttl t P fil- Settlement Profile

• Specifics the receivers, distributions rules and method- Settlement Structure

• Determines how the debit cost elements are assigned to the settlementDetermines how the debit cost elements are assigned to the settlement cost elements

Settlement Rule- Automatically assigned on creation of order, the parameters are used y g , p

to define this rule• Has one or more distribution rules assigned to it• Distribution rules defines: cost receiver, settlement share, settlement type

Page 6-56

Page 57: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Order Settlement

Settling a Production Order to Stock- Debt posting is made to the Production Order with the value of the

material- Difference between the debt posting and credit posting is posted to a

price difference account

Material Prod. Order Price Diff.

100 2080

* Material Price is determined by the quantity produced

Page 6-57

Material Price is determined by the quantity produced times the Standard Price in the Material Master.

Page 58: SAP University Alliances Authors Bret Wagner … homework and exercis… · Production Planning and Execution (PP) SAP University Alliances Authors Bret Wagner Stefan Weidner Product

SAP ERP Order Settlement

Costs analyzed- Primary

• Materials• External Processing

- Secondary• Production, Material, and Administrative Overhead• Labor

Cost Analysis Reporting- Calculate and analyze planned costs, target costs, and actual costs of

the production order.- Calculate and analyze variances

Page 6-58