SAP TRAINING PROGRAM CONTENTS
• Brief up of SAP• Company structure and material codification• Basics• Process mapping• PP and QM important transaction codes• Practice of transactions.
Introduction to SAP R/3
SAP is a by product of a German company SAP AG .SAP SYSTEM, APPLICATION AND PRODUCTS IN DATA PROCESSING.SAP system consist of a complex integration of different modules.SAP runs on fourth generation programming language called ABAP.SAP is an Enterprise Resource planning (E.R.P) software product.SAP process transaction in real time and provide seam less information.Single data entry multiple reports.Transparent system.Information flow with security.
Purpose of R/3
PP ( Production Planning) SD (Sales & Distribution) CO (Controlling) PS (Project System) IS (Industry solutions) PM (Plant Maintenance)
MM( Materials Management) FI (Financial Accounting) AM (Fixed Asset Management) WF (Work Flow) HR (Human Resources) QM (Quality Management)
The sole purpose of a R/3 system is to provide suite of tightly integrated ,large scale business application.
The standard set of applications delivered with each R/3 system are the following :-
The applications are called the functional modules of R/3.
SAP comes prepackaged with the core business application with more than 73000 tables in Standard R/3 product.
R/3 ArchitectureSAP works in 3 Tier Client/server configurations. The architecture can be categorized into following parts
• Presentation server• Application server• Database Server
Presentation LayerSAP GUI, SAP User
Application LayerABAP Programs
Database LayerSAP Data Base, Server
ORGANIZATIONAL STRUCTURE
Our Client is 500
Company code for Bhushan Steel is BSSL
SBPW SBST KPST
RM01
Work Center CRM02
Cost Center SP0103
Cost Center for 6HI HitachiSP0104
Cost Center for CR Slitter Wider
SP0110
Cost Center for CTL Wider SP0111
CRS01 CRS02 CRS04
CTL10
CTL09CTL08
CTL15
CTL14
CRM02
CRS07
CRS08
Cost Center and Work Center Relationship
MATERIAL CODING
Finish material code:
Semi-Finish material code:
Scrap material code:
CR S 0250 OD 12500 ASP
Division Coil / Sheet Thickness Grade Width Process
CRS0250OD12500ASP
CR OD 0250 ASP
Division Grade Thickness Process
CR0D0250ASP
CR SIDE TRIMMING
HOW TO
CHANGE
PASSWORD
nishant
Enter User name
Now enter current password
Now click on New Password tab button
A window will pop-up, where you have to enter new password and enter it again to confirm.
Here you have to enter new password.
Here you enter the password again to confirm and change the password.
Press OK to change the password
SAP Easy Access menu shows with a message in the status bar, Password changed
Menu Bar
Standard Tool Bar
Application Tool Bar
Title Bar
HOW TO
CREATE A
NEW SESSION
This is the icon, used to create a new session.
A new session can also be created by typing ‘/O’ before the T-code.
HOW TO
CREATE A
VARIANT
Press Enter or press this button to go to the transaction’s Selection screen
ZPPWIPGR
crm02
ZP01
Press Save button to make a variant
When the save button is clicked a new screen opens and it is ABAP: save as variant screen.
NISHANTDaily report
Click on save to save variant
Here status bar shows that the variant is saved
Next time when we have to run the same report, we open the transaction and click on GET VARIANT Icon. A window will pop-up which is list of variants and we can select our variant from that list.
This is Get Variant Icon through which variant is
selected.
We select the variant from this list. Now the saved fields would
fill automatically.
The saved fields have been copied automatically.
HOW TO
CREATE A
LAYOUT
These are the three Icons that are used for layout management.
Once the report is open we can change the data that we see on the screen, we can also save these changes that we made, so that next time when we open the report we don’t have to make these changes again and again. And all this is done through the three Icons that were highlighted in the previous slide.
Change layout Icon
When u press this Icon a screen pops-up and u can see two lists. List on the left reads COLUMNS and list on right is COLUMN SET.
COLUMNS: This list is displayed in the report.
COLUMN SET: From this list we select columns to be displayed.
Displayed list
Columns can be selected from this list to display
Once the report is open we can change the data that we see on the screen, we can also save these changes that we made, so that next time when we open the report we don’t have to make these changes again and again. And all this is done through the three Icons that were highlighted in the previous slide.
Change layout Icon
Select layout Icon
When we press this Icon a window pops-up and a list of already saved layouts is displayed. From this list appropriate layout can be selected.
List of layouts
Once the report is open we can change the data that we see on the screen, we can also save these changes that we made, so that next time when we open the report we don’t have to make these changes again and again. And all this is done through the three Icons that were highlighted in the previous slide.
Change layout Icon
Select layout Icon
Save layout Icon
When we press this Icon a window pops-up where we enter layout name and description and then save it.
ORDER TYPE
ZP01
ZP02
ZP03
ZP04
ZP05
ZP06
CR WIDER SEMI – FINISH MATERIAL
CR WIDER FINISH MATERIAL
GP SEMI – FINISH MATERIAL
GP FINISH MATERIAL
CR NARROW SEMI – FINISH MATERIAL
CR NARROW FINISH MATERIAL
BEL GATE PRODUCTION ORDERZP07
ZP08
ZP09
ZP10
POWER PLANT PRODUCTION ORDER
GAS PLANT & UTILITIES PRODUCTION ORDER
BRANCHES PRODUCTION ORDER
SAP Process Flow Chart
Quotation Creation (VA21) (SD)
Technical approval of quotation.
(ZTECHAPPROVE1& 2) (plant)
Commercial approval of quotation.
(ZCOMMAPPROVE) (SD)
Creation of Sales order.(VA01) (SD)
Stock requirement list.(MD04) (PPC)
Creation of semi-finished production order.
(CO01) (PPC)
Material requirement planning is done for finished product.
(MD03) (PPC)
BOM Explosion (CS12) (PPC)
Confirmations at every work center
(CO11N) (PROD)
Goods receipt (ZMB31CG) (PROD)
Creation of production order for finished product(MD04) (PPC)
Goods issue(MB1A) (PPC) Quality check, Batch Creation and
Sticker printing (QE11) (QM)
Planning Sheet/ WIP Report
(ZPPS) / (ZPPWIPGR) (PROD.)
Goods issue (MB1A) (PPC)
Semi-finished stock.(Plan able, Hold)
(ZFGS) (PPC)
Goods Receipt(ZMB31CG) (PROD.)
Confirmation at every work center.
(CO11N) (PROD.)
Quality check, Batch Creation and Sticker printing
(QE11) (QM)
Planning Sheet / WIP Report (ZPPS) / (ZPPWIPGR) (PROD.)
Finished stock.(ZFGS) (PPC)
Loading Slip.(ZS001) (SD)
PDIR.(ZQPDIR) (QM)
TC Making.(ZQTEST) (QM)
Usage Decision.(QA32) (QM)
Delivery Order.(VL01N) (SD)