8/13/2019 SAP MRP What is SAP MRP - Material Requirement Planning
1/2
SAP MRPWhat is SAP MRP - Material Requirement
PlanningOverview
Material Requirement Planning (SAP MRP) is a tool which helps
in planning the requirement quantities and schedules of a given
material. It not onlyensures availability of the material for whichMRP is carried out, but also ensures availability of the
components (of all the BOM levels) below in the BOMstructure.Apart from assuring material availability, MRP also carries out
scheduling of the procurement proposals using the lead times forthe materials/components. Whenthe material is an internallymanufactured material, it will use the lead times or operation lead
times from the routings/recipes and when the material is an
externalprocured material, it will fetch the lead times or deliverytimes for the material defined at an appropriate place in the
tool/system. Scheduling of the procurementproposals not onlyderives the capacity loading of the orders on the workcenter but it
also calculates the delivery dates of the components that would
be requriedfor manufacturing (delivery date = start date ofprocessing). The output of MRP proposes procurement proposals
(planned order or purchase requests) so as to gaurantee material
availability and at the same time schedulethe procurementproposals using delivery lead times for the materials/components.
Material requirement Planning can be run for purchased materials
or finishedsaleable materials or subassemblies (semi-finished)used in production. While the Material Requirement Planning in
SAP ECC (SAP MRP), derives a plan for the materials and helps
the planners and supervisors to purchase, produceor sell. Itoffers all the possible planning methods available in the market
8/13/2019 SAP MRP What is SAP MRP - Material Requirement Planning
2/2
like the reorder point planning for the consumption based planned
materials, lot for lotMRP planning for the demand based planningmaterials, forecast based planning methods which uses the past
historical figures to extrapolate the futurerequirements (again aconsumption based planning material). SAP material requirement
planning or SAP MRP, uses the following factors in its planing
run: a) planning strategies - made to order or made to stock or its
variations b) planning types - type of the MRP run, i.e.,
consumption based planning methods or demand based planning
methods and net requirement planing or grossrequirementplanning c) lot sizing procedures set for the material d) master
data such as BOM or Routings/Recipes, quota arrangements,
souce list, vendors, purchase info records. customer masters etc,
and transaction datasuch as sales orders, forecast, plannedindependent demands (forecasted demand)