APJ Region Management SystemSAP Daily TASK WELSPUN SOP – INTEGRATED BUILDING MANAGEMENT SYSTEM
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
PreambleStatement of Proprietary Information
The information contained in this document is confidential to HP. The document may not be disclosed, duplicated, or used, for any purpose, in whole or in part, without the prior written consent of HP.
Document Status
Version Number: Version 1.0 D
Date: 15-July-2013
Copy Number: Electronic distribution
Document Author
Title: DL
Name: Suresh Babu T
Document Reviewer
Title: Regional Delivery Lead (RDL)
Name: Bhaskar B V
Document Owner
Title: DL
Name: Suresh Babu T
Document Authorization
Title: Capability Service Manager – SAP
Name: Badre Alam
Signature: Electronic approval received
Date:
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
Distribution
This procedure is available to those HP team members’ involved with ITO India EAO – SAP for WCL functions. Any printed copies of this document are to be considered as information only and not subject to document control. The manual is contained in the ITO EAO SAP for WCL shared directory.
Share Point Portal URL Shared Drive URLhttp://ent141.sharepoint.hp.com/teams/WLSPUN/SitePages/Home.aspx
Glossary
QA Quality Assurance
Referenced DocumentsThe following are key reference documents for the Group. Unless otherwise specified, the latest version should be used as the valid reference point.
Document Title Location
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
CHANGE HISTORYThe following Change History log contains a record of changes made to this document:
Published / Revised
Version #
Author(optional)
Section /Nature of Change
15-JULY-2013
1.0 D Draft release for RDL Review
1.0 D RDL ( B V Bhaskar ) review complete
1.0 D Capability SM ( Badre Alam ) approved
1.0 D 1st Approved version in QMS format
Include links to peer review record(s):
Peer Review Link Comments
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
CONTENTS
1 Daily Check List Sheet Items--------------------------------------------------6
2 Weekly Check List ----------------------------------------------------------------7
3 CHECK THE SYSTEM DUMPS (ST22)-------------------------------------9
4 CHECK THE SAPOSCOL -----------------------------------------------------10
5 CHECK FOR LOCKS (SM12)-------------------------------------------------13
6 CHECK BACKGROUND JOBS HISTORY (SM37)----------------------15
7 SYSTEM MONITORING (SM66 / SM50)-----------------------------------16
8 DAILY DB GROWTH (DB02)---------------------------------------------------20
9 CHECK THE BACKUP STATUS (DB13)------------------------------------21
10 CHECK THE V1, V2 UPDATE (SM13)---------------------------------------23
11 CAPTURE USER’S ANALYTICAL DATA------------------------------------24
12 CAPTURE TRANSACTIONS PROFILE DATA---------------------------- 25
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
1. DAILY CHECK LIST SHEET ITEMS2. Number of Dialog steps performed3. Average Dialog Response Time4. Average DB Response Time5. Average Processing Time6. Number of users logged-in (high, medium & low)7. Scheduled background jobs8. Any locks older than 24 hrs9. Any critical Dumps 10. External mail from ECC / failures11. Backup status (including online + archive)12. Spool status13. Update Status14. DB growth15. Number of transport taken to QAS and PRD16. Number of calls received
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
2. WEEKLY CHECK LIST SHEET1. Check the system maintenance jobs also cross check the BASIS table growth2. Weekly DB growth3. TOP 10 transactions of the week by DB response time4. TOP 10 transactions of the week by processing time
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
TOP 10 transactions of the week by processing time
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
3 CHECK THE SYSTEM DUMPS (ST22)Checking Interval:
every 30 minutes during support hoursObservation/Symptoms:
Any running sessions / processes creating continuous dumps Number of dumps by the same program is more than 20
Action : Kill the process immediately Identify the program / tcode and inform to respective module lead and APPS LEAD If it is Z-program- inform to ABAP LEAD and respective module lead
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
4 CHECK THE SAPOSCOLChecking Interval:
Twice in a day (start of A shift and end of B shift), Check this in all the server
Observation/Symptoms: SAPOSCOL is not running
Action : Start the SAPOSCOL
If SAPOSCOL is not running on the DB node then stop the service using command
In OS level from putty
SAPOSCOL –k
Start the OSCOL with SAPOSCOL –l
Goto ST06
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
Check for update failure (SM13)
Checking Interval: every 30 minutes during support hours
Observation/Symptoms: Any (one or more than one) Update failure reported Check for ‘Update is active’
Action : Take the screen shot and inform to the respective module lead If ‘update is not active’ due to any reason; immediately activate this. Investigate the
reason from the logs.
High Alert: If repeated update failure reported for the same t-code / program for more than 3
days / 3 times in a day, then it is a High alert. Inform to Module lead, APPS LEAD. Also inform to ABAP LEAD (incase of z tcode)
SM13
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
5 CHECK FOR LOCKS (SM12)Checking Interval:
every 30 minutes during support hours
Observation/Symptoms: Checks for number of locks; in an ideal condition this should not be more than 12-15k during peak load After each refresh this locks are getting increased user is occupying more than 1000 locks for more than 15 minutes Locks for more than 24 hrs
Action : Identify the user who is holding the maximum number of locks; also find out the
program / transaction occupying the locks Immediately inform to Mr Sreekumar, APPS Lead. If any Z transaction holding the same
also involve the ABAP Lead. Kill the processes in concurrence with the Basis Teamand APPS Lead. If you observed that any locks are hold for 24 hrs or above, immediately contact the
respective user and based on his confirmation delete the lock.
High Alert: If repeated locks reported for the same t-code / program for more than 3 days / 3 times
in a day, then it is a High alert. Inform to Module lead, APPS LEAD. Also inform to ABAP LEAD (incase of z tcode) to
investigate the reason. Correct the program (if it is Z tode) Raise the very high message with OSS incase of SAP standard transactions
SM12
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
6 CHECK BACKGROUND JOBS HISTORY (SM37)Checking Interval:
Twice in a day (start of A shift and end of B shift); Capture the failed jobs in the daily report. List down all the batch jobs module-wise, running frequency and its owners
Observation/Symptoms: Scheduled business jobs failed
Action : Inform to the job owner, respective module lead and if it is Ztcode /z-program job;
inform to respective module and ABAP Lead.
T code SM37
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
7 SYSTEM MONITORING (SM66 / SM50)Checking Interval:
every 30 minutes during support hours
Observation/Symptoms: 1. One user running single background job for more than 6 hrs2. One user running multiple background jobs (> 4) for more than 4 hrs3. Multiple DIALOG processes occupied by one user for more than 30 minutes4. DIALOG processes are almost occupied (i.e. only 3 / 4 DIA processes are free)5. Processes are in ‘PRIV’ mode6. Multiple time restart of processes
T Code SM66
T Code SM50
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
Action : 1. For point 1 –
o Inform to respective user that you are running transaction for these many hours; based on his confirmation take appropriate action.
o OR Send mail to the end-user who is running the jobs; if the users confirm then kill it.
o For any long running background jobs i.e. more than 24 hrs – immediately call the user / send mail / popup message thru SAP.
o If user not reverted within 30 minutes; kill the processeso BACKGROUND JOBS for more than 24 hrs allowed only in exceptional cases but
user has to inform to BASIS team in advance.2. For point 2 –
o Send mail to the end-user who is running the jobs;o If user not reverted within 30 minutes; send the 2nd remindero If the users confirm then kill it otherwise wait for additional 1 hr.o If no response received from the end user and jobs reached to 6 hrs+ then
inform toBASIS team take appropriate actions after business confirmation.
3. For point 3 –
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
o Inform to respective user that you are running transactions in dialog mode for more than 30 minutes; based on his confirmation take appropriate action.
o OR Send mail to the end-user who is running the transactiono If user not reverted within 15 minutes; kill the dialog processes
4. For point 4 – (High Alert)o Inform to Basis Teamand APPS LEAD immediately.o Based on approval, kill few of the long running dialog processeso Keep monitoring the system very carefullyo Investigate the reason from the logs what transactions / user lead to this
situation
5. For point 5 & 6 – Analyze it, how many users are getting into ‘PRIV” mode and what is the reason.Also check – if there is any multiple restart of processes reported.
Check the System Logs (SM21)Checking Interval:
every 30 minutes during support hours
Observation/Symptoms: Correlate the messages with the current system status; if any errors reported; investigate this.
Action: Proactive evaluation of the warning / error
T Code SM21
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
8 DAILY DB GROWTH (DB02) Checking Interval:
Once in a day (start of A shift)
Observation/Symptoms: Record the database delta growth day-wise in the daily monitoring sheet
Action : Reporting purpose If high volume of data growth (i.e. > 5 gb) reported on any day; immediately speak to APPS Lead /
Basis Teamto find out the additional activities performed that led to the sudden growth. Also investigate the table growth (i.e. which table grown more during the day) Record this in the daily monitoring sheet with remarks about the observation.
TCode DB02
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
9 CHECK THE BACKUP STATUS (DB13)Checking Interval:
Once in a day (start of A shift)
Observation/Symptoms: Record the backup status (completed / failed) in the daily monitoring sheet
Action : Reporting purpose Also note down the last log number that was taken during the backup.
T Code DB13
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
T Code DB12
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
10 CHECK THE V1, V2 UPDATE (SM13)Checking Interval:
every 30 minutes during support hours
Observation/Symptoms: Correlate the messages with the current system status; if any errors reported; investigate this.
High Alert
If you observe that V1/V2 update (Sm13) processes are pilling-up for more than 15 minutes inform to APPS LEAD, Basis Team immediately.
Take the screen shot and inform to respective module lead Check the number of locks occupied
Action:
Identify the user who is holding the maximum number of V1/V2 updates under ‘Initial’ state.
After confirmation from APPS LEAD, Basis Team; kill the specific user processes that holding the update in queue.
Immediately contact the respective lead and investigate the reason what led to pilling of V1/V2 update
Lock the user after confirmation from Basis Team. In case of Z-transactions, inform to ABAP lead. For any other SAP standard transactions – raise the very high message with OSS
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
11 CAPTURE USER’S ANALYTICAL DATAChecking Interval:
Once in a day (start of A shift)
Observation/Symptoms: Top 5 users based on number of DIALOG steps executed Top 5 users based on DB response times
Action : Analysis The same report shall be used for weekly review meeting to analyze the users behavior
in terms of executing the transactions and response time.
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013
12 CAPTURE TRANSACTIONS PROFILE DATAChecking Interval:
Once in a day (start of A shift)
Observation/Symptoms: TOP 10 transactions based on number of DIALOG steps TOP 10 transactions based on number of DB response time
Action : Analysis The same report shall be used for weekly review meeting to analyze the users behavior
in terms of executing the transactions and response time.
ST03n
1.
Document Version: 1.0
Project Document Id: NA
© Copyright 2023 Hewlett-Packard Development Company, L.P.
Valid agreement required.
document.docLast changed: 7/15/2013