A PROPOSED FIVE STORYCOLLEGE OF BUSINESS &
ACCOUNTANCY BUILDING
(Tarlac State University)
Prepared by:Arch. MARCO F. BILDAN,
UAP/PIA, FNAMPAP/PSPE, Mpa
Finished BS Architecture at SLU Baguio City With exposure in Kingdom of Saudi Arabia &
Thailand for 6 years,
3rd Term as Dean, College of Architecture & Fine Arts - TARLAC STATE UNIVERSITY,
Masters in Public Administration 09, Now Taking up Doctor in Public Administration,
PRC Board of Master Plumbing 2007-2009, UAP District Director 2007-2008,
UAP Chapter President 2003-2004.
TSU - Techl Working Group Member Architectural & Plumbing,
Principal Architect MFB Design Solutions
7/29/2019 Sanitary Design & Lay-outing
3/29
7/29/2019 Sanitary Design & Lay-outing
4/29
I. PROJECT : FIVE STORY COLLEGEOF BUSINESS &ACCOUNTANCY
LOCATION : Villa Lucinda Campus,
Tarlac CityPROJECTPROPONENT: TARLAC STATE
UNIVERSITY
Romulo Boulevard,Tarlac City
7/29/2019 Sanitary Design & Lay-outing
5/29
Project Description:
The 5 STORY CBA BUILDING PROJECTcomposes of five course Offerings namely:
Accountacy,
BA - Financial Management,
BA - Entrepreneur,
Hotel & Restaurant Management,BA Economics
SCOPE & LIMITATION:The topic covers only the Sanitary Design
& Layouting
7/29/2019 Sanitary Design & Lay-outing
6/29
SPACE DESCRIPTIONS:
1. Ground Floor Lecture Rooms, Male & Female
Faculty Rooms, Toilet For Male & Female. DeansOffice & Chairmens Office & CR.
2. Second Floor Lecture Rooms, M & F Toilet.
3. Third Floor Lecture Rooms, Computer Lab, Male& female Toilet.
4. Fourth Floor Lecture Rooms, M & F Toilet.
5. Fifth Floor Lecture Rooms, Audio Visual Rooms,Bar Tending Room, HRM Demo Room, Male &Female Toilet.
7/29/2019 Sanitary Design & Lay-outing
7/29
PRELIMINARYDESIGN
SKETCHES
7/29/2019 Sanitary Design & Lay-outing
8/29
PRELIMINARY DESIGN
ANALYSIS:
(3 SOIL STACK PIPE)
ADVANTAGES:
1.) IDEAL DESIGN
2.) ONE STACK, ONE BRANCH
SMALLER DIAMETER OF PIPE
3.) EFFICIENT DESIGN
4.) EXCELLENT IN CASE OF
REPAIR
DISADVANTAGE:
1.) NOT ECONOMICAL
MORE STACK PIPE
MATERIALS
TO BE USED
7/29/2019 Sanitary Design & Lay-outing
9/29
PRELIMINARY DESIGN ANALYSIS:
(2 SOIL STACK PIPE)
ADVANTAGES:
1.) IDEAL DESIGN
2 SOIL STACK PIPE BUT SMALLER
DIAMETER
(VS FOR MAINTENANCE & REPAIR)
DISADVANTAGE:
1.) PRACTICAL BUT NOT
ECONOMICAL
1 SOIL STACK FOR MALE
1 SOIL STOCK FOR FEMALE
(STACK PIPE CROSS ES TO THE
CR WINDOWS)
7/29/2019 Sanitary Design & Lay-outing
10/29
PRELIMINARY DESIGN
ANALYSIS:
ADVANTAGES:
1.) IDEAL DESIGN
1 SOIL STACK PIPE
2.) ECONOMICAL & PRACTICAL
DISADVANTAGE:
1.) MIGHT EXCEED THE
MINIMUM
FIXTURE UNIT PER BRANCH
2.) LONGER HORIZONTAL
DEVELOPMENT LENGTH
ONE BIGGER DIAMETER SOIL
STACK PIPE
7/29/2019 Sanitary Design & Lay-outing
11/29
SUMMARY:
DESIGN CONSIDERATIONS:
ECONOMICAL
SIMPLE & EASY MAINTENANCE
INITIAL CONCEPT:
ONE MAIN SOIL & VENT STACK @ LEFT WING
AND
ONE MAIN SOIL & VENT STACK @ RIGHT WING
7/29/2019 Sanitary Design & Lay-outing
12/29
Location of Plumbing No. of Name of Equivalent TotalFixtures Fixture Fixtures Fixture UnitSecond Floor 8 Water Closet 6* 48
To 4th
Floor 5 Lavatory 1 5Left Wing 5 Floor Drain 2 10
0 Kitchen Sink 3 0
2 Slope Sink, (s) 3 6
4 Urinal 3 12
2nd to 4th Floor Left wing total 81
Second Floor 8 Water Closet 6* 48
To 4th Floor 5 Lavatory 1 5
Right Wing 5 Floor Drain 2 10
0 Kitchen Sink 3 0
2 Slope Sink, (s) 3 64 Urinal 3 12
2nd to 4th Floor Right wing total 81
LEFT WING RIGHT
WING
TYPICAL
SECOND
FLOOR TO4TH FLOOR
7/29/2019 Sanitary Design & Lay-outing
13/29
Location of Plumbing No. of Name of Equivalent TotalFixtures Fixture Fixtures Fixture Unit
fifth Floor 2 Water Closet 6* 12Left Wing 4 Lavatory 1 4
2 Floor Drain 2 4
0 Kitchen Sink 3 0
2 Slope Sink, (s) 3 6
0 Urinal 3 0
Fifth Floor Left wing total 26
Fifth Floor 8 Water Closet 6* 48
Rigth Wing 5 Lavatory 1 5
5 Floor Drain 2 10
0 Kitchen Sink 3 02 Slope Sink, (s) 3 6
4 Urinal 3 12
Fifth Floor Right wing total 81
LEFT WING RIGHT
WING
7/29/2019 Sanitary Design & Lay-outing
14/29
7/29/2019 Sanitary Design & Lay-outing
15/29
SUMMARY:
COMPUTATION OF FIXTURE UNIT PER FLOOR / WING:
LEFT WING RIGHT WING5th FLOOR 26 81
4TH FLOOR 81 81
3rd FLOOR 81 81
2ND FLOOR 81 81GROUND FLR 81 30
TOTAL = 350 = 354
LEFT WING TOTAL = 350 F.U.
RIGHT WING TOTAL = 354 F.U.
7/29/2019 Sanitary Design & Lay-outing
16/29
Determine the size of theHORIZONTAL FIXTURE
BRANCH & STACKGiven: total Fixture unit= 81 F.U. Per Floor Wing
Refer to SIZE OF HORIZONTALFIXTURE BRANCH AND STACK
THEREFORE:IT FALLS TO 4 DIA. OR 100mm. DIA.160 MAXIMUM NO. OF
FIXTURE UNITS THAT MAY CONNECT.ONE HORIZONTAL BRANCH240 MAXIMUM NO. OF
FIXTURE UNITS THAT MAY CONNECT.NOT OVER 3 BRANCHES90 MAXIMUM NO. OF
FIXTURE UNITS THAT MAY CONNECT.
IN ONE BRANCH INTERVAL.500 MAXIMUM NO. OF
FIXTURE UNITS THAT MAY CONNECT.TOTAL IN STACK WITH 3 OR
MORE BRANCHES
7/29/2019 Sanitary Design & Lay-outing
17/29
COMPUTATION OF FIXTURE UNIT VALUES (RNPC TABLE 7-2)
Location of Plumbing No. of Name of Equivalent Total
Fixtures Fixtures Fixture Fixtures Fixture
Unit
Ground Floor 8 Water Closet 6* 48
Left Wing 5 Lavatory 1 5
5 Floor Drain 2 10
0 Kitchen Sink 3 0
2 Slope Sink, 3 6
4 Urinal 3 12
Ground Floor Left wing total 81
Ground Floor 3 Water Closet 4* 12
Right Wing 3 Lavatory 1 3
3 Floor Drain 2 6
3 Kitchen Sink 3 90 Slope Sink 3 0
0 Urinal 3 0
Ground Floor Right wing total 30
RIGHT
WING
LEFT
WING
Determine the size of the SOIL STACK
7/29/2019 Sanitary Design & Lay-outing
18/29
Determine the size of the SOIL STACK Given: total Fixture unit = 350 to 354
Five story Bldg = 20 meters highRefer to MAXIMUM PERMISSIBLE LENGTH OF VENTS FOR SOIL AND
WASTE STACKS IN METERS
THEREFORE: FOR SIZE OF SOIL OR WASTE STACKIT FALLS TO 125 mm DIA. Or 5 inches Dia.UP TO 432 NO. OF FIXTURE UNITSUP TO 28.2 METERS HIGH.
Determine the size of the VENT PIPE REQUIREDGiven: total Fixture unit = 350 - 354 F.U. FOR EACH WING
5 Story building = 20.00 metersRefer to MAXIMUM PERMISSIBLE LENGTH OF VENTS FOR SOIL
AND WASTE STACKS IN METERS
THEREFORE: FOR VENT DIAMETERIT FALLS TO 4 DIA. or 100 mm. Dia.UP TO 432 NO. OF FIXTURE UNITSUP TO 28.2 METERS HIGH.
7/29/2019 Sanitary Design & Lay-outing
19/29
BUILDING HEIGHT
5 STORY OR
20 25 METERS HT.
TOTAL FIXTURE UNIT
= 350 - 354 PER WING
Determine the size of the HOUSE/SANTARY DRAIN
7/29/2019 Sanitary Design & Lay-outing
20/29
Determine the size of the HOUSE/SANTARY DRAIN Given: total Fixture unit = 350 to 354 PER WING
Five story Bldg = 20 meters highRefer to TABLE 7-1: SIZE OF SANITARY DRAIN
THEREFORE: FOR SIZE OF SANITARY DRAINIT FALLS TO 200 mm DIA. Or 8 inches Dia.UP TO 990 NO. OF FIXTURE UNITS@ 2% SLOPE
7/29/2019 Sanitary Design & Lay-outing
21/29
SUMMARY:
USE THE FOLLOWING:
FOR BRANCH PIPE: USE 4 INCH DIA. (100mm)
FOR SOIL STACK PIPE: USE 5 INCH DIA. (125mm)
IN CASE NOT COMMERCIALLY AVAILABLE USE 6DIA.
FOR MAIN VENT: USE 4 INCH DIA. (100mm)
Use 2 DIA. FOR UNIT VENT, INDIVIDUAL VENTS
FOR HOUSE DRAIN: USE 8 INCHES DIA. (200mm)
@ 2 PERCENT SLOPE
7/29/2019 Sanitary Design & Lay-outing
22/29
B. Sanitary DrainThe sanitary facilities consist of well
designed plumbing system and with the useof materials conforming to the specificationprescribe in ASTM.
a. The design is to install one (1)main stack assembly, soil eachwing.
b. The design is to install one (1)main stack vent each wing.
7/29/2019 Sanitary Design & Lay-outing
23/29
stack and vent stack to insure `atmospheric air circulation in thePlumbing System.
b. All plumbing fixtures will beprovided with appropriate &applicable installation of ventsystems: unit, relief vent and
loop vent, wet, individual, etc.c. Horizontal pipe installation is
to slope but not less than two(2) percent or more than four (4)percent.
d. All Fixtures are to beprovided with P-trap except
water closet.
7/29/2019 Sanitary Design & Lay-outing
24/29
C. Sewer line
The collection of wastewater from the buildingwill be through a well designed sewer systemand convey such wastewater into the SepticVault or sewage treatment plant.
E. VentilationAll interior toilet and bath room without
external air circulation are to be provided withexhaust fan.
7/29/2019 Sanitary Design & Lay-outing
25/29
LEFT WING RIGHT
WING
7/29/2019 Sanitary Design & Lay-outing
26/29
LEFT WING GROUND FLOOR
7/29/2019 Sanitary Design & Lay-outing
27/29
RIGHT WING GROUND FLOOR
7/29/2019 Sanitary Design & Lay-outing
28/29
REFERENCES: REVISED NATIONAL PLUMBING CODE OF THE
PHILIPPINES, Series 1999
PLUMBING DESIGN & ESTIMATE 2nd Edition
by: Max B. Fajardo Jr.