    A PROPOSED FIVE STORYCOLLEGE OF BUSINESS &

    ACCOUNTANCY BUILDING

    (Tarlac State University)

    Prepared by:Arch. MARCO F. BILDAN,

    UAP/PIA, FNAMPAP/PSPE, Mpa

    Finished BS Architecture at SLU Baguio City With exposure in Kingdom of Saudi Arabia &

    Thailand for 6 years,

    3rd Term as Dean, College of Architecture & Fine Arts - TARLAC STATE UNIVERSITY,

    Masters in Public Administration 09, Now Taking up Doctor in Public Administration,

    PRC Board of Master Plumbing 2007-2009, UAP District Director 2007-2008,

    UAP Chapter President 2003-2004.

    TSU - Techl Working Group Member Architectural & Plumbing,

    Principal Architect MFB Design Solutions

  • 7/29/2019 Sanitary Design & Lay-outing

    3/29

  • 7/29/2019 Sanitary Design & Lay-outing

    4/29

    I. PROJECT : FIVE STORY COLLEGEOF BUSINESS &ACCOUNTANCY

    LOCATION : Villa Lucinda Campus,

    Tarlac CityPROJECTPROPONENT: TARLAC STATE

    UNIVERSITY

    Romulo Boulevard,Tarlac City

  • 7/29/2019 Sanitary Design & Lay-outing

    5/29

    Project Description:

    The 5 STORY CBA BUILDING PROJECTcomposes of five course Offerings namely:

    Accountacy,

    BA - Financial Management,

    BA - Entrepreneur,

    Hotel & Restaurant Management,BA Economics

    SCOPE & LIMITATION:The topic covers only the Sanitary Design

    & Layouting

  • 7/29/2019 Sanitary Design & Lay-outing

    6/29

    SPACE DESCRIPTIONS:

    1. Ground Floor Lecture Rooms, Male & Female

    Faculty Rooms, Toilet For Male & Female. DeansOffice & Chairmens Office & CR.

    2. Second Floor Lecture Rooms, M & F Toilet.

    3. Third Floor Lecture Rooms, Computer Lab, Male& female Toilet.

    4. Fourth Floor Lecture Rooms, M & F Toilet.

    5. Fifth Floor Lecture Rooms, Audio Visual Rooms,Bar Tending Room, HRM Demo Room, Male &Female Toilet.

  • 7/29/2019 Sanitary Design & Lay-outing

    7/29

    PRELIMINARYDESIGN

    SKETCHES

  • 7/29/2019 Sanitary Design & Lay-outing

    8/29

    PRELIMINARY DESIGN

    ANALYSIS:

    (3 SOIL STACK PIPE)

    ADVANTAGES:

    1.) IDEAL DESIGN

    2.) ONE STACK, ONE BRANCH

    SMALLER DIAMETER OF PIPE

    3.) EFFICIENT DESIGN

    4.) EXCELLENT IN CASE OF

    REPAIR

    DISADVANTAGE:

    1.) NOT ECONOMICAL

    MORE STACK PIPE

    MATERIALS

    TO BE USED

  • 7/29/2019 Sanitary Design & Lay-outing

    9/29

    PRELIMINARY DESIGN ANALYSIS:

    (2 SOIL STACK PIPE)

    ADVANTAGES:

    1.) IDEAL DESIGN

    2 SOIL STACK PIPE BUT SMALLER

    DIAMETER

    (VS FOR MAINTENANCE & REPAIR)

    DISADVANTAGE:

    1.) PRACTICAL BUT NOT

    ECONOMICAL

    1 SOIL STACK FOR MALE

    1 SOIL STOCK FOR FEMALE

    (STACK PIPE CROSS ES TO THE

    CR WINDOWS)

  • 7/29/2019 Sanitary Design & Lay-outing

    10/29

    PRELIMINARY DESIGN

    ANALYSIS:

    ADVANTAGES:

    1.) IDEAL DESIGN

    1 SOIL STACK PIPE

    2.) ECONOMICAL & PRACTICAL

    DISADVANTAGE:

    1.) MIGHT EXCEED THE

    MINIMUM

    FIXTURE UNIT PER BRANCH

    2.) LONGER HORIZONTAL

    DEVELOPMENT LENGTH

    ONE BIGGER DIAMETER SOIL

    STACK PIPE

  • 7/29/2019 Sanitary Design & Lay-outing

    11/29

    SUMMARY:

    DESIGN CONSIDERATIONS:

    ECONOMICAL

    SIMPLE & EASY MAINTENANCE

    INITIAL CONCEPT:

    ONE MAIN SOIL & VENT STACK @ LEFT WING

    AND

    ONE MAIN SOIL & VENT STACK @ RIGHT WING

  • 7/29/2019 Sanitary Design & Lay-outing

    12/29

    Location of Plumbing No. of Name of Equivalent TotalFixtures Fixture Fixtures Fixture UnitSecond Floor 8 Water Closet 6* 48

    To 4th

    Floor 5 Lavatory 1 5Left Wing 5 Floor Drain 2 10

    0 Kitchen Sink 3 0

    2 Slope Sink, (s) 3 6

    4 Urinal 3 12

    2nd to 4th Floor Left wing total 81

    Second Floor 8 Water Closet 6* 48

    To 4th Floor 5 Lavatory 1 5

    Right Wing 5 Floor Drain 2 10

    0 Kitchen Sink 3 0

    2 Slope Sink, (s) 3 64 Urinal 3 12

    2nd to 4th Floor Right wing total 81

    LEFT WING RIGHT

    WING

    TYPICAL

    SECOND

    FLOOR TO4TH FLOOR

  • 7/29/2019 Sanitary Design & Lay-outing

    13/29

    Location of Plumbing No. of Name of Equivalent TotalFixtures Fixture Fixtures Fixture Unit

    fifth Floor 2 Water Closet 6* 12Left Wing 4 Lavatory 1 4

    2 Floor Drain 2 4

    0 Kitchen Sink 3 0

    2 Slope Sink, (s) 3 6

    0 Urinal 3 0

    Fifth Floor Left wing total 26

    Fifth Floor 8 Water Closet 6* 48

    Rigth Wing 5 Lavatory 1 5

    5 Floor Drain 2 10

    0 Kitchen Sink 3 02 Slope Sink, (s) 3 6

    4 Urinal 3 12

    Fifth Floor Right wing total 81

    LEFT WING RIGHT

    WING

  • 7/29/2019 Sanitary Design & Lay-outing

    14/29

  • 7/29/2019 Sanitary Design & Lay-outing

    15/29

    SUMMARY:

    COMPUTATION OF FIXTURE UNIT PER FLOOR / WING:

    LEFT WING RIGHT WING5th FLOOR 26 81

    4TH FLOOR 81 81

    3rd FLOOR 81 81

    2ND FLOOR 81 81GROUND FLR 81 30

    TOTAL = 350 = 354

    LEFT WING TOTAL = 350 F.U.

    RIGHT WING TOTAL = 354 F.U.

  • 7/29/2019 Sanitary Design & Lay-outing

    16/29

    Determine the size of theHORIZONTAL FIXTURE

    BRANCH & STACKGiven: total Fixture unit= 81 F.U. Per Floor Wing

    Refer to SIZE OF HORIZONTALFIXTURE BRANCH AND STACK

    THEREFORE:IT FALLS TO 4 DIA. OR 100mm. DIA.160 MAXIMUM NO. OF

    FIXTURE UNITS THAT MAY CONNECT.ONE HORIZONTAL BRANCH240 MAXIMUM NO. OF

    FIXTURE UNITS THAT MAY CONNECT.NOT OVER 3 BRANCHES90 MAXIMUM NO. OF

    FIXTURE UNITS THAT MAY CONNECT.

    IN ONE BRANCH INTERVAL.500 MAXIMUM NO. OF

    FIXTURE UNITS THAT MAY CONNECT.TOTAL IN STACK WITH 3 OR

    MORE BRANCHES

  • 7/29/2019 Sanitary Design & Lay-outing

    17/29

    COMPUTATION OF FIXTURE UNIT VALUES (RNPC TABLE 7-2)

    Location of Plumbing No. of Name of Equivalent Total

    Fixtures Fixtures Fixture Fixtures Fixture

    Unit

    Ground Floor 8 Water Closet 6* 48

    Left Wing 5 Lavatory 1 5

    5 Floor Drain 2 10

    0 Kitchen Sink 3 0

    2 Slope Sink, 3 6

    4 Urinal 3 12

    Ground Floor Left wing total 81

    Ground Floor 3 Water Closet 4* 12

    Right Wing 3 Lavatory 1 3

    3 Floor Drain 2 6

    3 Kitchen Sink 3 90 Slope Sink 3 0

    0 Urinal 3 0

    Ground Floor Right wing total 30

    RIGHT

    WING

    LEFT

    WING

    Determine the size of the SOIL STACK

  • 7/29/2019 Sanitary Design & Lay-outing

    18/29

    Determine the size of the SOIL STACK Given: total Fixture unit = 350 to 354

    Five story Bldg = 20 meters highRefer to MAXIMUM PERMISSIBLE LENGTH OF VENTS FOR SOIL AND

    WASTE STACKS IN METERS

    THEREFORE: FOR SIZE OF SOIL OR WASTE STACKIT FALLS TO 125 mm DIA. Or 5 inches Dia.UP TO 432 NO. OF FIXTURE UNITSUP TO 28.2 METERS HIGH.

    Determine the size of the VENT PIPE REQUIREDGiven: total Fixture unit = 350 - 354 F.U. FOR EACH WING

    5 Story building = 20.00 metersRefer to MAXIMUM PERMISSIBLE LENGTH OF VENTS FOR SOIL

    AND WASTE STACKS IN METERS

    THEREFORE: FOR VENT DIAMETERIT FALLS TO 4 DIA. or 100 mm. Dia.UP TO 432 NO. OF FIXTURE UNITSUP TO 28.2 METERS HIGH.

  • 7/29/2019 Sanitary Design & Lay-outing

    19/29

    BUILDING HEIGHT

    5 STORY OR

    20 25 METERS HT.

    TOTAL FIXTURE UNIT

    = 350 - 354 PER WING

    Determine the size of the HOUSE/SANTARY DRAIN

  • 7/29/2019 Sanitary Design & Lay-outing

    20/29

    Determine the size of the HOUSE/SANTARY DRAIN Given: total Fixture unit = 350 to 354 PER WING

    Five story Bldg = 20 meters highRefer to TABLE 7-1: SIZE OF SANITARY DRAIN

    THEREFORE: FOR SIZE OF SANITARY DRAINIT FALLS TO 200 mm DIA. Or 8 inches Dia.UP TO 990 NO. OF FIXTURE UNITS@ 2% SLOPE

  • 7/29/2019 Sanitary Design & Lay-outing

    21/29

    SUMMARY:

    USE THE FOLLOWING:

    FOR BRANCH PIPE: USE 4 INCH DIA. (100mm)

    FOR SOIL STACK PIPE: USE 5 INCH DIA. (125mm)

    IN CASE NOT COMMERCIALLY AVAILABLE USE 6DIA.

    FOR MAIN VENT: USE 4 INCH DIA. (100mm)

    Use 2 DIA. FOR UNIT VENT, INDIVIDUAL VENTS

    FOR HOUSE DRAIN: USE 8 INCHES DIA. (200mm)

    @ 2 PERCENT SLOPE

  • 7/29/2019 Sanitary Design & Lay-outing

    22/29

    B. Sanitary DrainThe sanitary facilities consist of well

    designed plumbing system and with the useof materials conforming to the specificationprescribe in ASTM.

    a. The design is to install one (1)main stack assembly, soil eachwing.

    b. The design is to install one (1)main stack vent each wing.

  • 7/29/2019 Sanitary Design & Lay-outing

    23/29

    stack and vent stack to insure `atmospheric air circulation in thePlumbing System.

    b. All plumbing fixtures will beprovided with appropriate &applicable installation of ventsystems: unit, relief vent and

    loop vent, wet, individual, etc.c. Horizontal pipe installation is

    to slope but not less than two(2) percent or more than four (4)percent.

    d. All Fixtures are to beprovided with P-trap except

    water closet.

  • 7/29/2019 Sanitary Design & Lay-outing

    24/29

    C. Sewer line

    The collection of wastewater from the buildingwill be through a well designed sewer systemand convey such wastewater into the SepticVault or sewage treatment plant.

    E. VentilationAll interior toilet and bath room without

    external air circulation are to be provided withexhaust fan.

  • 7/29/2019 Sanitary Design & Lay-outing

    25/29

    LEFT WING RIGHT

    WING

  • 7/29/2019 Sanitary Design & Lay-outing

    26/29

    LEFT WING GROUND FLOOR

  • 7/29/2019 Sanitary Design & Lay-outing

    27/29

    RIGHT WING GROUND FLOOR

  • 7/29/2019 Sanitary Design & Lay-outing

    28/29

    REFERENCES: REVISED NATIONAL PLUMBING CODE OF THE

    PHILIPPINES, Series 1999

    PLUMBING DESIGN & ESTIMATE 2nd Edition

    by: Max B. Fajardo Jr.

  • 7/29/2019 Sanitary Design & Lay-outing

    29/29