Ref. No.: Pacdi/MoEF/Forest/A/304/… Date: June 24, 2017 To, The Director- IA Division (Non- Coal Mining), Ministry of Environment, Forest and Climate Change, Govt. of India, Indira Paryavaran Bhavan, Jorbag Road, Aliganj, New Delhi – 110 003 Subject: Proposed Limestone Mine (Area- 18.0388 ha) with Production Capacity 0.35 MTPA near Village: Pachhtardi, Taluka: Bhanvad, District: Devbhumi Dwarka (Erstwhile Jamnagar) (Gujarat) of M/s. Shree Digvijay Cement Company Limited- Issuance of ToR regarding. Ref: 1. Proposal No: IA/GJ/MIN/61098/2016 & MoEFCC File No J-11015/240/2016-IA-II (M) 2. 14 th EAC MoM uploaded on MoEFCC Web Portal (Item No 2.19) 3. MoEFCC Final Notification declaring Eco-Sensitive Zone around Barda Wild Life Sanctuary dated 28 th April, 2017 Sir, In reference to subject cited above; we would like to inform that application for aforesaid mining projects was submitted to MoEFCC, New Delhi on 13.12.2016 & our project was considered in 14 th EAC Meeting at agenda item no 2.19, held on 30.01.2017 for ToR approval. As per 14 th EAC MoM displayed on MoEFCC web portal; our case was rejected as the distance of project site is found about 1 km from Barda Wild Life Sanctuary. Now, Final Notification is published by MoEFCC on dated 28 th April, 2017 declaring Eco-Sensitive Zone around Barda Wild Life Sanctuary & the project site lies outside Eco Sensitive Zone of Barda Wildlife Sanctuary. Map showing, project site vis à vis Eco Sensitive Zone of Barda Wildlife Sanctuary is enclosed herewith as Annexure I. Formal letter of Verification, giving nearest distance of the project site from Barda Wild Life Sanctuary and its recently declared Eco-Sensitive Zone is sought from Forest Department, Porbander. Copy of our application, duly acknowledged at Forest Department, Porbander is being attached as Annexure II. It is expected to get the same shortly and we would be able to produce the same before EAC at the time of presentation of our case for reconsideration of ToR. Therefore, we request that the aforesaid mining project may kindly be considered in next EAC Meeting for grant of Terms of Reference (ToR). Thanking you, Yours faithfully, For SHREE DIGVIJAY CEMENT CO. LTD. (Authorized Signatory) Name: Anil Nigam Designation: General Manager (Mines) Encl. : As above

Sanctuary Sir,environmentclearance.nic.in/writereaddata/Online/... · Sanctuary. Map showing, project site vis à vis Eco Sensitive Zone of Barda Wildlife Sanctuary is enclosed herewith

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Sanctuary Sir,environmentclearance.nic.in/writereaddata/Online/... · Sanctuary. Map showing, project site vis à vis Eco Sensitive Zone of Barda Wildlife Sanctuary is enclosed herewith

Ref. No.: Pacdi/MoEF/Forest/A/304/… Date: June 24, 2017

To,

The Director- IA Division (Non- Coal Mining),

Ministry of Environment, Forest and Climate Change,

Govt. of India, Indira Paryavaran Bhavan,

Jorbag Road, Aliganj, New Delhi – 110 003

Subject: Proposed Limestone Mine (Area- 18.0388 ha) with Production Capacity 0.35 MTPA near Village:

Pachhtardi, Taluka: Bhanvad, District: Devbhumi Dwarka (Erstwhile Jamnagar) (Gujarat) of M/s.

Shree Digvijay Cement Company Limited- Issuance of ToR regarding.

Ref: 1. Proposal No: IA/GJ/MIN/61098/2016 & MoEFCC File No J-11015/240/2016-IA-II (M)

2. 14th

EAC MoM uploaded on MoEFCC Web Portal (Item No 2.19)

3. MoEFCC Final Notification declaring Eco-Sensitive Zone around Barda Wild Life

Sanctuary dated 28th

April, 2017

Sir,

In reference to subject cited above; we would like to inform that application for aforesaid mining

projects was submitted to MoEFCC, New Delhi on 13.12.2016 & our project was considered in 14th

EAC

Meeting at agenda item no 2.19, held on 30.01.2017 for ToR approval.

As per 14th

EAC MoM displayed on MoEFCC web portal; our case was rejected as the distance of

project site is found about 1 km from Barda Wild Life Sanctuary.

Now, Final Notification is published by MoEFCC on dated 28th

April, 2017 declaring Eco-Sensitive Zone

around Barda Wild Life Sanctuary & the project site lies outside Eco Sensitive Zone of Barda Wildlife

Sanctuary. Map showing, project site vis à vis Eco Sensitive Zone of Barda Wildlife Sanctuary is

enclosed herewith as Annexure I.

Formal letter of Verification, giving nearest distance of the project site from Barda Wild Life Sanctuary

and its recently declared Eco-Sensitive Zone is sought from Forest Department, Porbander. Copy of our

application, duly acknowledged at Forest Department, Porbander is being attached as Annexure II.

It is expected to get the same shortly and we would be able to produce the same before EAC at the

time of presentation of our case for reconsideration of ToR.

Therefore, we request that the aforesaid mining project may kindly be considered in next EAC Meeting

for grant of Terms of Reference (ToR).

Thanking you,

Yours faithfully,

For SHREE DIGVIJAY CEMENT CO. LTD.

(Authorized Signatory)

Name: Anil Nigam

Designation: General Manager (Mines)

Encl. : As above

Page 2: Sanctuary Sir,environmentclearance.nic.in/writereaddata/Online/... · Sanctuary. Map showing, project site vis à vis Eco Sensitive Zone of Barda Wildlife Sanctuary is enclosed herewith
Page 3: Sanctuary Sir,environmentclearance.nic.in/writereaddata/Online/... · Sanctuary. Map showing, project site vis à vis Eco Sensitive Zone of Barda Wildlife Sanctuary is enclosed herewith
Page 4: Sanctuary Sir,environmentclearance.nic.in/writereaddata/Online/... · Sanctuary. Map showing, project site vis à vis Eco Sensitive Zone of Barda Wildlife Sanctuary is enclosed herewith