Republic of the Philippines Province of Cebu
Municipality of San Francisco
The 5-Year Municipal Disaster Risk Reduction and Management (MDRRM) Plan is developed by the Municipal Government of San Francisco and its constituents, with technical assistance from Plan Philippines Camotes Program Unit and the United
Nation International Strategy for Disaster Reduction (UNISDR)
San Francisco 5 - Year Municipal Disaster Risk
Reduction and Management (MDRRM)
Plan (2011-2015)
TABLE OF CONTENTS
PAGES LIST OF ANNEXES iii LIST OF TABLES iii LIST OF FIGURES iii ACKNOWLEDGMENT iv LIST OF ACRONYMS v EXECUTIVE SUMMARY vi
CHAPTERS
CONTENTS
PAGES
CHAPTER I INTRODUCTION 1
Rationale Planning Process Scope and Duration
CHAPTER II DISASTERS AND HAZARD PROFILE 4 Description of Municipality of San Francisco Type of hazards that frequently visited Community Risk Assessments results
CHAPTER III THE FIVE- YEAR MUNICIPAL DISASTER RISK REDUCTION AND MANAGEMENT PLAN
4
The Disaster Prevention Program The Disaster Mitigation Program Disaster Preparedness and Response Program
CHAPTER IV GENERAL IMPLEMENTING ARRANGEMENT 4
Organizational Structure Institutional Working Arrangement General Monitoring and Evaluation Framework
CHAPTER V THE LOCAL DISASTER RISK REDUCTION & MANAGEMENT OFFICE REFERENCES
39
ACKNOWLEDGMENT We would like to give you a glimpse behind the scenes to acknowledge the many individuals who played indispensable roles in the successful completion of the Municipal Disaster Risk Reduction and Management Plan of San Francisco:
To Honorable Mayor Aly A. Arquillano for his guidance, logistics and moral support; To the Honorable Sangguniang Bayan Members headed by Honorable Vice Mayor Alfredo A. Arquillano Jr. for their guidance and support in legitimizing this plan; To the Plan Philippines Camotes Program Unit and United Nation International Strategy for Disaster Reduction (UNISDR) for thier invaluable contribution to the San Franciscohanons in providing technical assistance in the formulation of this Plan; To the Municipal and Barangay Officials and to all LGU employees for their cooperation, coordination and unwavering support, who helped us, realize our goals; To the staff Municipal Disaster Risk Reduction and Management Office (MDRRMO) for providing the necessary information and data that helped us realizes the MDRRM Plan; And above all, to the Constituents of the Municipality of San Francisco who are in the frontlines of vulnerabilities when a hazards strikes; to whom this document is dedicated, for sharing to us their lives and shortcomings for the formulation of this Municipal Disaster Risk Reduction and Management Plans.
- Municipal Disaster Risk Reduction and Management Council
LIST OF ACRONYMS
ACDV Accredited Community Disaster Volunteer CP Contingency Plan CPU Camotes Program Unit UNISDR United Nation International Strategy for Disaster Reduction LDRRMF Local Disaster Risk Reduction and Management Fund LDRRMO Local Disaster Risk Reduction and Management Office LDRRMC Local Disaster Risk Reduction and Management Council RA Republic Act BDRRMC Barangay Disaster Risk Reduction and Management Office MDRRMP Municipal Disaster Risk Reduction and Management Plan DP-CRM Disaster Prevention –Coastal Resource Management HFA Hyogo Framework of Action NGO Non-Government Organization PO People’s Organization LGU Local Government Unit MDRRMO Municipal Disaster Risk Reduction and Management Office MDRRMC Municipal Disaster Risk Reduction and Management Council MSWDO Municipal Social Welfare and Development Office RAFI Ramon Aboitiz Foundation Incorporated ECOGOV Philippine Environmental Governance MENRO Municipal Environment and Natural Resources office
EXECUTIVE SUMMARY The municipality of San Francisco, like many islands in the Philippines, is naturally gifted with very rich coastal resources. Its beautiful coral reefs symbolize as one of the earth’s most productive and diverse ecosystems. Its thick, abundant, verdant mangrove forest, a multi-use and multi-user resource, stretches throughout the coastal areas of barangays Southern Poblacion, Unidos, Consuelo and Northern Poblacion. A large area of mangrove swamp lies between the municipalities of Poro and San Francisco, which has provided shelter and habitat to a variety of birds and food organisms; and provided a sustainable supply of building materials, charcoal, fuel wood and other uses of people. The fisherfolk have been enjoying bountiful harvest from their municipal waters even just after three to four hours of fishing. The municipality is also known for their “Soli-Soli Festival”. During the Pasigarbo sa Sugbo festival last August 15, 2009 Soli-soli Festival won the 5th place. Became the 1st EGWEN grand champion of the Province of Cebu. Another land mark of San Francisco is the Lake Danao, known to be the largest lake in the Visayas and Mindanao. The total size of the lake is 680 hectares. This place used to be ful of crocodiles until they were all hunted down ad their hides were sold to Mindanao to produce bags shoes and belts out of crocodile skins. It contains fresh water and still is abundant with fresh water fishes. But these living wonders, rich resources have been under severe stress and the community is always facing the challenges of natural hazards such typhoons and monsoon winds, which frequently affects not only the Municipality of San Francisco but the whole Camotes Islands. The two types of Monsoon winds that regularly hits San Francisco are the North-East Monsoon during the Month of December –February and the South-West Monsoon during the month of June – September. While the two most significant Typhoons that visited Camotes Island are Typhoon Ruping (Tropical Storm Mike) on November 1990 and Typhoon Bising (Tropical Storm Nelson) on March 1982. These two super typhoons devastated the agriculture and fishery resources of the municipality as well as the houses and other infrastructure and lifeline services of the municipality. Aside from the direct effect of strong winds of the typhoon and big waves of the monsoon winds, it produces also ample amount of rainfalls sea waters that causes floods and landslide to low lying areas of the municipality. The continued occurrences of these natural hazards increases the vulnerabilities of the communities that put them into an endless poverty situation due to damages of properties and devastation to their livelihoods, and sometime leads to loss of life. Taking the opportunity that Disaster Risk Reduction is nowadays a global concerns particularly to the small islands like Camotes, the municipality started the process of conducting barangay based community risk assessment, barangay contingency planning and community drill and series of community awareness seminars on disaster risk reduction and climate change adaptation to generate supports and encouragement among village officials and communities to formulate a 5-Year Comprehensive Municipal Disaster Risk Reduction and Management Plan. The San Francisco Municipal Disaster Risk Reduction and Management Plan will serve as a guide in the implementation a proactive Disaster risk reduction programs that emphasize the five pillars called: 1) Governance by making disaster risk reduction a priority agenda for sustainable development; 2) Risk Assessment by improving risk information and early warning; 3) Knowledge
and Education through building culture of safety and resiliency among vulnerable communities; 4) Vulnerability Reduction by reducing the risks of Key sectors; and 5) Disaster Preparedness and Response for timely and effective response mechanism. These Five Pillars of Disaster Risk Reduction of San Francisco aim to have a “Zero Casualty and No Injury every time hazard occurred. The 5-Year MDRRM Plan entails a total budget of PhP 11.680 Million with total funding requirements of Php 2.457 Million for the year 1; Php 2.395 Million for the year 2 and 3; Php 2.115 Million for Year 4 and Php. 2.115 Million for Year 5. (See Table 1: Total Budgetary Requirements). Table 1: Total Budgetary Requirements
Year 5%LDRRM
Fund Prevention Mitigation Preparedeness
Year Total budget
1 3,336,811.00 1,361,365 631,000 370,000 2,362,365
2 3,336,811.00 463,770 1,565,000 407,000 2,435,770
3 3,336,811.00 463,770 1,565,000 307,000 2,335,770
4 3,336,811.00 463,770 1,470,000 277,000 2,210,770
5 3,336,811.00 363,770 1,470,000 277,000 2,110,770
TOTAL 3,116,445 6,701,000 1,638,000 11,455,445
This amount needed for five years will be sourced out from the 5% Local Disaster Risk Reduction and Management Fund (LDRRMF) of the Municipality. And for the fiscal Year of 2011 the Municipality has total LDRRM Fund amounting Php 3.336 Million pesos.
THE COMPREHENSIVE MUNICIPAL DISASTER RISK REDUCTION AND MANAGEMENT PLAN OF SAN FRANCISCO (CAMOTES ISLAND), CEBU
I. INTRODUCTION:
A. RATIONALE
The municipality of San Francisco has a total land area of 10,596.8753 hectares which occupy 2.08% of Cebu Province’s (508,839 ha) total land area [CLUP Document, 1998]. It is located between geographical coordinates 1240 14’ 04’’ to 124o 30’ 37’’ longitude and 100 26’ 15’’ to 100 32’ 48’’ latitude. It is one of the four municipalities comprising the Camotes Group which is composed of Pilar, Poro, Tudela, and San Francisco. It is presently classified as a fourth class municipality with a total of fifteen barangays, twelve (12) of which are coastal. According to 2007 census, it has a total population of 44,588 people. Last May 27, 2011 Former President Gloria Macapagal Arroyo sign into law the Disaster Risk Reduction and Management Act of 2010 to amend the three decade Presidential Decree 1566 the old disaster management law of the Philippines. The RA 10121 institutionalizes the disaster risk reduction and management system not only in the National Government but also to all local government units in the country. One of the important features of this new law is the comprehensive utilization of 5% calamity fund and now the disaster risk reduction and management fund (DRRMF). It is very clear to us to all government units that 5% calamity fund before can only be used if there is a declaration of one area under the state of calamity. Based on the Section 21 of RA 10121, the 70% of LDRRM Fund can be used for pre disaster activities that can make the LGU’s more proactive in Disaster risk reduction. In order for the LGU to be efficient and effective in the Utilization of the LDRRM Fund the law requires them to formulate a comprehensive DRRM Plan as basis for the disbursement of the fund (Par. 1 of Sec. 21 of RA 10121) It is also important to note that the Municipal Vice Mayor of San Francisco, Honorable Alfredo A. Arquillano Jr. Has been awarded by The UNISDR being the Asia Pacific Regional Champion for Disaster Risk Reduction for 2011, during the Region VII Launching of DRR Campaign last January 13, 2011 at the Social Hall of Cebu Provincial Capitol. Vice Mayor Arquillano is the third person in the Philippines awarded such prestigious awards by UNISDR (Sen. Loren Legarda in 2009 and Gov. Joey Salceda of Albay in 2010) and the only vice Mayor in the international community received such awards.
B. PLANNING PROCESS The primary goal of the MDRRM Plan is to improve the existing practices of the LGU on the disaster risk reduction and management through better partnership and working relationship among the departments within the local government unit, civil society organization private sectors and community disaster volunteers (CDV’s). In the formulation of MDRRM plan, there are four specific objectives has been agreed upon by the participants in order to attain a better quality results and guidelines in the formulation of the plan. And these are as follows:
1. To Consolidate the contingency plans of the BLGU as component of Comprehensive Municipal DRRM Plan
2. To conduct Participatory Capacity and Vulnerability Assessment (PCVA) to be more objectives in the budget prioritization for the 70% of Local Disaster Risk Reduction and Management Fund.
3. To consolidate the programs and project of the every department of the LGU related to DRR and allocate funds from LDRRM Fund.
4. To formulate the comprehensive DRRM Plan of the Municipality The 3-day MDRRM Planning and workshop is also a product of various strategies, activities and processes that have been undertaken by the LGU through its Municipal Disaster Risk Reduction and Management Council (MDRRMC). Below are the governance-driven strategies and evolutionary planning processes and activities, to wit: Barangay level: 1. Through the Disaster Prevention – Coastal Resource Management (DP-CRM) Program of Plan
Philippines-Camotes Program Unit (CPU) provided technical assistance to the fifteen Barangays of San Francisco in terms of the formulation of Barangay Contingency Plan and the re-structuring of their Barangay Disaster Risk Reduction and Management Committee (previously known as Barangay Disaster Coordinating Council). As of December 2010, thirteen contingency plan has been formulated and 13 BDRRMC Structure has been reorganize
2. Community Emergency Drill has been regularized in the thirteen communities using the guidelines that have been written in their contingency plan.
Municipal Level: Three-day planning process has been agreed upon by the MDRRMC to draft the municipal disaster risk reduction and management plan. On the first day, discussion on the salient provision of RA 10121 and Basic Concept of DRR has been provided, followed by the presentation of the result of community risk assessments made by the barangays who undergone comntingency planning to Plan Philippines. Consolidation of Municipal wide Risk Assessment and finalization of MDRRMO Structure, review of financial capability of the LGU to fund MDRRM plan and the 5 year MDRRM planning process on the second day. And for the third day, continuation of planning process and final financial projection for five year budgetary requirements has been done to ensure the feasibility and efficiency that the plan is implementable by the LGU. (See Figure 1: MDRRM Planning and Workshop Road Map) Figure 1: MDRRM Planning and Workshop Road Map
INPUT: Salient Provision of RA 10121 and DRRM
Models
Participatory Capacity and Vulnerability Assessment (MDRRMC Perspective)
Presentation of Community Risk Assessment and its Local
Risk Patterns
Review of MDRRMC Structures
Comprehensive DRRM Planning
Legislation
C. SCOPE AND DURATION The 5-year MDRRM Plan (2011 – 2015) focuses on the5 core program namely; 1) Disaster Prevention Program which focuses on the physical and structural component of disaster risk reduction, 2) Disaster Mitigation Program which discuss the knowledge management, social protection, sustainable livelihood, public health, agriculture resiliency, early warning system, barangay digitized hazard mapping, renewable energy, networking and linkaging and the monitoring and evaluation of DRR plan and its implementation. And 3) the Disaster Preparedness and Response Program – the highlights of this program is the organizing and accreditation of community disaster volunteers, relief stockpiling, emergency drills, and purchase of emergency response related equipments.
II. DISASTERS AND HAZARD PROFILE: Table 2: Risk Assessment/Ranking
TYPY OF HAZARDS
LEVEL OF RISKS UNDERLYING FACTORS
LOW MEDIUM HIGH
Typhoon X
Located in Typhoon belt areas
Island Municipality located in an open sea and low land
Insufficient food supplies coming from the mailand during typhoon
Mode of transportation is dependent to small passenger vessels/boat that dependent on fair weather conditions
Most of the houses are made of light materials
All 15 barangays are affected during typhoons
12 Barangays are located t the at the coastal areas that are dependent to fishing activities as major source of livelihood
Strong typhoons as effect of Climate change
El Nino X
Farmers are dependent to rain for their crops
No available irrigation facilities
Lack of water supply
Water source cannot sustain during prolong dry season
No available forest
All 15 barangays are affected during El nino phenomenon
Severe El Nino Phenomenon as effect of Climate change
Monsoon Winds
X
12 Barangays are located t the at the coastal areas that are dependent to fishing activities as major source of livelihood
Residents are dependent on the transportation of prime commodities from the mainland
More than 50% of the populations reside in the coastal areas.
Prolong Monsoon winds as effect of Climate change
Flooding/ Flash Flood
X
Lack of trees due to illegal cutting
Kaingin system as means of livelihood
Low lying area
Poor drainage
Heavy Rain fall as effect of Climate change
Landslide X
Loss Soil
Steep slope
Denuded forest
Lightning and Tornado
X
Lack of precautionary measures
Fire X
Octopus electrical connection which resulted to over load of electricity
Houses are made of light materials and their places in the 15 barangays that houses are congested
No proper storage of retailed bottled gasoline
Table 3: Vulnerability and Capacity Analysis
HAZARDS ASPECTS VULNERABILITIES CAPACITIES
1. TYPHOON (Bagyo)
Physical/Material (Typhoon, El Nino, Heavy Rain fall, Flooding, Monsoon Winds)
Presence of Illegal Fishing Activities
Destruction of Marine Life and its habitat
Scarcity of catch
Lack of awareness on marine life conservation
Poor/ insufficient coastal law enforcement
Lack of sustainable income among fishers
Presence of dengue
Presence of mosquito breeding areas
Occurrence of diarrhrea
Water source contamination during rainy days and typhoons
Proper nutrition is not a priority among parents
No standby power source to augment during prolong brownouts
Inconsistent availability of communication
Inability to provide updated report during disasters
Isolation of Island to the mainland during occurrence of monsoon winds and typhoons that may cause insufficiency of supplies of food
Devastated farm products during typhoons and el nino
Illegal cutting of trees
Lack of adequate health facilities/personnel
Hospital have no trained staff in major operations
No Consultants available
No clear guidelines for cave tourism
Organized fishermen’s association
Established Marine Sanctuary
Existence of CRM Plan
Systematic IEC Campaign and Monitoring of breeding grounds of dengue carrying mosquito
Existence of chlorination
Regular conduct of PABASA sa Nutrition
Supplemental Feeding
Consumers are good payor of electrical bill
Landline, cell sites and internet connections
Tree planting aas one of priority of the LGU (2 Million tree Project)
Organized chainsaw operator
Availability of district hospital and health centers, general consultations and managements, basic laboratory (CBC, V/A, S/E) and birthing capacity for normal delivery.
Social/ Organizational (Typhoon, El Nino, Heavy Rain fall, Flooding, Monsoon Winds)
Adunay pipila nga Magsalig lang guihapon sa tabang
Fatalistics attitude towards health hazard and other hazards heallth hazard and other hazards
Kakulangan sa pagpangandam sa panahon sa katalagman
Kakulangan sa pagpangandam sa pagresponde sa mga panginahanglan
Disaster as consequene of fate
Neglegence on safety measures
Ang kasagaran maningkamot mobarog sa iyang kaugalingon human sa katalagman.
Mangita ug alternatibong panginabuhian, panahon sa bagyo ug kulyada
Bayanihan system
Magtinabangay panahon sa katalagman
Lig-ong determinasyon pagpahiuli sa guikan sa kadaut
Hugot nga pagtuo sa Dios
Proper Waste Management
Environment to get things done
Motivational/ Attitudinal (Typhoon, El Nino, Heavy Rain fall, Flooding, Monsoon Winds)
Low income (limited due to access to resources)
Big Family Size
Some parents are irresponsible
Failing Healing Belief
Children in conflict with the Law
Possible Social Impact of Tourism
LGU Officials with strong Political Well
Responsive & Supportive Leaders
Organized & Active BDRRMC/MDRRMC
Very Cooperative & Supportive NGO's specially the Plan Philippines, ECOGOV & RAFI
Organized PO's /Council Farmers/BIACAT
III. THE FIVE- YEAR MUNICIPAL DISASTER RISK REDUCTION AND MANAGEMENT PLAN:
Programs Project/Activities Time Frame Expected Output Total Budget Required
Budget Sources
Responsible Department 11 12 13 14 15
DISASTER PREVENTION:
Physical Infrastructure
- Establishment/ Equipping the San
Francisco Operation Center
100,000 200,000 200,000
200,000 200,000 Equipments for LDDRRMO /
Operation Center Purchased
900,000 LDRRM Fund
MDRRMO
- Building Assessment/Implementation of
building Code (schools, business
establishments, houses, hospital buildings)
10,000 10,000 10,000 10,000 10,000 Building Assessment implemented/
safe building structures
50,000 LDRRM Fund
Municipal Engineering
- Formulation of Municipal Drainage
Master Plans/Designs
400,000 Municipal Drainage Master
Plan Formulated
400,000
LDRRM Fund
Municipal Engineering
- Assessments of Roads, Bridges,
Rivers/Creeks
10,000
10,000
10,000
10,000
10,000 Yearly
Assessment
Report on the status of roads, bridges,
rivers/creeks
50,000 LDRRM Fund
Municipal Engineering
- Conduct Soil Stability Assessment &
Analysis
100,000 Soil Stability Assessment & Analysis
conducted
100,000 LDRRM Fund
Municipal Engineering
- Financial support to the formulation of plan for Water
50,000
Water sources assessed & plans and design for
50,000 LDRRM Fund
MENRO
Programs Project/Activities Time Frame Expected Output Total Budget Required
Budget Sources
Responsible Department 11 12 13 14 15
Sources distribution lines and design
water distribution lines formulated
- Assessment and monitoring of
resorts to the compliance on standard Waste
Water Treatment Facility
5,000 5,000 5,000 5,000 5,000 100% Compliance
ensured
25,000 LDRRM Fund
MENRO
- Establishment/Rainwater Catchment in
all public buildings
100,000
100,000
100,000
100,000 Rainwater
catchment
installed
400,000 LDRRM Fund
Municipal Engineering
CRM
Sustainability
- Support
Maintenance of marker bouys and Annual MPA
Assessment/ Monitoring
10,000 10,000 10,000 10,000 10,000 CRM activities
sustained
50,000
LDRRM
Fund
- Fisherlfok Organizational
Support
10,000 10,000 10,000 10,000 10,000 Fisherfolk Organization
Sustained
50,000 LDRRM Fund
Environmental Protection
- 2 Million Tree project A. Orientation
(i.e., project implementation)
B. Operatonalization (i.e., mapping,
installation of IEC materials, consultancy)
C. Social Marketing
766,365
18,770
18,770
18,770
18,770 2M trees planted, maintained and sustained
841,445
LDRRM Fund
Programs Project/Activities Time Frame Expected Output Total Budget Required
Budget Sources
Responsible Department 11 12 13 14 15
- Purchase of 4 shredder for solid waste management
100,000 100,000 4 shredder purchased for solid waste
management
200.000
Total 1,361,365 463,770 463,770 463,770 363,770 3,116,445 -
Programs Project/ Activities Time Frame Expected Output Total Budget Required
Budget Sources
Responsible Department 11 12 13 14 15
DISASTER MITIGATION PROGRAMS
Knowledge
Management
- Orientation of
Teachers/PTA/ Purok on DRR
15,000 12,000 12,000 12,000 12,000 Oriented & aware
Teachers & Purok Officials
63,000 DRRM
Fund
DepEd &
Purok Coor.
- Integration in the DepEd Lessons
(production of materials)
20,000 30,000 30,000 30,000 30,000 Students awareness
140,000 LDRRM Fund
DepEd
- Conduct DRR Related Contests
(Quiz Bee, Poster Making, Slogan, Jingle, Role Playing
& etc.)
10,000 50,000 50,000 50,000 50,000 Increased awareness on
DRR concepts
210,000 LDRRM Fund
DepEd & LDRRMO
- Integration of DRR Concepts during Celebrations
(DRR/CCA Advocacy thru dances)
15,000 15,000 15,000 15,000 15,000 Increased awareness on DRR concepts
75,000 LDRRM Fund
MDRRMO
- Production and
Post DRR IEC
10,000 10,000
10,000
10,000
10,000 Increased
awareness on
50,000
LDRRM
Fund
MDRRMO
Programs Project/ Activities Time Frame Expected Output Total Budget Required
Budget Sources
Responsible Department 11 12 13 14 15
Materials on strategic places like in the Brgy. Hall,
Church, Purok Center, Schools & Market
DRR concepts
- Orientation on
Personal Safety Lessons in OSY and Puroks.
5,000
5,000
5,000
5,000
5,000
Awareness of the
PSL Concept
25,000
LDRRM
Fund
DSWD
Social
Protection
- 50% Assistance
on Membership on 11k school children red cross
accident insurance
Develop
scheme/ orientation
203,000 203,000 203,000 203,000 Insured school
children and identified 300 indigent parents
812,000 LDRRM
Fund
DSWD,
DepEd
- Philhealth (dili grant)
Membership Assistance (300 indigent)
Develop scheme/
orientation
225,000 225,000 225,000 225,000 900,000 LDRRM Fund
- Strengthening the structure of
MIACAT/BIACAT
5,000 5,000 Strengthened & active
MIACAT/BIACAT
10,000
LDRRM Fund
MSWD
- DRR Orientation on PWD’s Senior Citizen.
5,000
5,000 5,000 5,000 5,000 Strengthened & active Bantay Banay/ Senior
Citizen & Senior Citizen
25,000 LDRRM Fund
MCPC
Sustainable Livelihood
- Provide Trainings of Small & Medium
Scale Entrepreneurship (handicrafts, food
processing, soap
15,000
15,000
15,000
15,000
15,000 Trained skilled entrepreneurs
75,000 LDRRM Fund
DSWD
Programs Project/ Activities Time Frame Expected Output Total Budget Required
Budget Sources
Responsible Department 11 12 13 14 15
making, backyard gardening, livestock raising)
- Provide Loans
Financial Assistance thru micro finance and small scale
green livelihood
Develop
scheme/ orientation
150,000 150,000 150,000 150,000 Increase family
income
600,000 LDRRM
Fund
DSWD
Public Health Project
- 100% Household Sanitary Latrine Program
40,000 45,000 45,000 45,000 45,000 Clean, sanitary & healthy environment
220,000 LDRRM Fund
MHO
- Establish Mobile Clinic with
laboratory & equipment to serve the 15 Brgys.
(Medical & Dental)
400,000 400,000 300,000 300,000 Indigents availed medical and
dental services for free
1,400,000 LDRRM Fund
MHO
Agriculture Resiliency
- Provide climate resistant crops or seeds
Networking/ inventory of existing
crops and practices
20,000 20,000 20,000 20,000 Increase agricultural production
80,000 LDRRM Fund
MAO
- Support to the establishment of
rain water harvesting system and small water
impounding to farms during drought
25,000 25,000 25,000 25,000 25,000 Increase agricultural
production
125,000 LDRRM Fund
MAO
- Revitalization of
scientific methods of farming (organic farming, vermi
culture, multi
5,000 5,000 5,000 5,000 5,000 Increase
agricultural production
25,000 LDRRM
Fund
MAO
Programs Project/ Activities Time Frame Expected Output Total Budget Required
Budget Sources
Responsible Department 11 12 13 14 15
cropping, etc)
Early Warning
System
- Maintenance of
Rain Gauge
5,000 5,000 5,000 5,000 5,000 Functional rain
gauge
25,000 LDRRM
Fund
LDRRMO
- Establishment and maintenance of two-way Radio
repeater
150,000 20,000 20,000 20,000 20,000 Fast & accurate information dissemination
230,000 LDRRM Fund
LDRRMO
Barangay-based Digitized
Hazard Mapping
- Survey of the Hazard prone areas per brgy
1,000 Identified hazard prone areas
1,000
LDRRM Fund
LDRRMO
- Production of digitized hazard
maps
5,000 Enhance awareness
5,000 LDRRM Fund
LDRRMO
- Tarpaulin printing/posting of the digitized hazard
maps
20,000 Well informed communities
20,000 LDRRM Fund
LDRRMO
Renewable Energy Program
- Establish/repair of power house and other equipment
for solar energy
80,000
20,000
20,000
20,000
20,000 Reduced
dependence on fossil fuel
160,000 LDRRM Fund
Engineering Dept.
- Maintenance and expansion of the renewable energy
program
100,000 100,000 100,000 100,000 Functional supply of energy
400,000 LDRRM Fund
Engineering Dept.
Networking
and Linkaging
- Submit project
proposal to possible Foreign
Donors who are advocates on DRR (proposals like
assistance on the establishment of solar energy)
5,000
5,000 5,000 5,000 5,000 Established
linkages and generate funds
for DRR Projects
25,000 LDRRM
Fund
LDRRMO
Programs Project/ Activities Time Frame Expected Output Total Budget Required
Budget Sources
Responsible Department 11 12 13 14 15
- Resource Mobilization through Climate
Change Mitigation, Renewable Energy and Green
Resources Protection &
Management
100,000 100,000 100,000 100,000 ---------do-----------
400,000 LDRRM Fund
LDRRMO
DRR Planning, Monitoring & Evaluations
Workshops and meetings
200,000 100,000 100,000 100,000 100,000 600,000 LDRRM Fund
LDRRMO
Total Budget 631,000 1,565,000 1,565,000 1,470,000 1,470,000 6,701,000 LDRRMF
Programs Project/Activities Time Frame Expected Output Total Budget Required
Budget Sources
Responsible Department 11 12 13 14 15
DISASTER PREPAREDNESS AND RESPONSE PROGRAM
Organizing of Community
Disaster Volunteers (CDVs)
- Orientation of community disaster
volunteers
50,000 50,000 50,000 50,000 50,000 150 Volunteers oriented and
accredited as disaster volunteers
Quarterly meeting conducted
250,000 LDRRMF
LDRRMO
- Conduct Quarterly meetings with the
ACDV’s
20,000 20,000 20,000 20,000 20,000 100,000 LDRRMF
LDRRMO
Creation of
San Francisco Emergency
Response (SAFER)
- Organize/create
SAFER
10,000 10,000 10,000 10,000 10,000 Local Emergency
Response team organized
50,000 LDRRMF LDRRMC/MO
Programs Project/Activities Time Frame Expected Output Total Budget Required
Budget Sources
Responsible Department 11 12 13 14 15
Capability Building
- Trainings: Rescue group And other
committees
60,000 60,000 30,000 30,000 Training conducted to 50 volunteers every
year
180,000 LDRRMF LDRRMO
- Training on GIS and Application
100,000 100,000 LDRRMF LDRRMO
Relief Stockpiling
Purchase of Evacuation Center
Materials: Banig, habul, foam
Kaldero, stove, plates/spoon & fork
Drinking jar
50,000
2,000
10,000
20,000
10,000
10,000
10,000
Material needed for evacuation
center purchased
90,000
20,000
2,000
LDRRMF LDRRMO
Disaster Emergency
Drills
Conduct of inter barangay disaster
emergency drill contestdrills contest (2 drill/yr)
100,000 100,000 100,000 100,000 Disaster emergency drills
conducted yearly starting year 2
400,000 LDRRMF LDRRMO
Programs Project/Activities Time Frame Expected Output Total Budget Required
Budget Sources
Responsible Department 11 12 13 14 15
Purchase of Disaster Response
Supplies/ Equipments
Emenrgency health kit/ jump kit
Rescue pulley
(moton) Heavy duty bolt
cutter
Hydraulic jack Life buoy/ring
Utility/Static Ropes Rain Coat Boots
Hard hat Tactical gloves Spine backboard
Search light Locking carabineer Ascender (Left)
50,000
20,000
15,000 2,500 4,500
3,000 2,000 4,000
2,000 6,000 4,000
10,000
50,000
20,000
2,000
2,000
2,000
2,000
Supplies and equipments purchased/acquir
ed
50,000
10,000
50,000
20,000 20,000
15,000 10,500 4,500
3,000 2,000 4,000
2,000 6,000 4,000
LDRRMF
LDRRMO
Maintenance
of Emergency Transportation Facilities
Purchase of fuel
and lubricants
25,000 25,000 25,000 25,000 25,000 Rescue vehicle
maintained
125,000 LDRRMF
LDRRMO
Maintenance of
disaster response equipments
30,000 30,000 30,000 30,000 Rescue
equipments maintained
120,000 LDRRMF LDRRMO
TOTAL 370,000 407,000 307,000 277,000 277,000 1,638,000 LDRRMF
OVER-ALL SUMMARY OF BUDGET
PROGRAMS BUDGETARY REQUIREMENTS/SOURCES TOTAL BUDGET REQUIRED INTERNAL EXTERNAL
1. Disaster Prevention Program
Physical Infrastructure Project 1,975,000.00 - Php 1,975,000.00
CRM Sustainability Project 100,000.00 - Php 100,000.00
Environmental Protection Project 1,041,445.00 - Php 1,041,445.00
SUB-TOTAL Php 3,116,445.00
2. Disaster Mitigation Program
Knowledge Management Project 563,000.00 - Php 563,000.00
Social Protection Project 1,747,000.00 - Php 1,747,000.00
Sustainable Livelihood 675,000.00 - Php 675,000.00
Public Health Project 1,620,000.00 - Php 1,620,000.00
Agriculture Resiliency project 230,000.00 - Php 230,000.00
Early Warning System Project 255,000.00 - Php 255,000.00
Barangay-based Digitized Hazard Mapping Project 26,000.00 - Php 26,000.00
Renewable Energy Program 560,000.00 - Php 560,000.00
Networking and Linkaging Project 425,000.00 - Php 425,000.00
DRR Planning, Monitoring & Evaluations 600,000.00 - Php 600,000.00
SUB-TOTAL Php 6,701,000.00
3. Disaster Preparedness and Response Program
Organizing of Community Disaster Volunteers (CDVs) 350,000.00 - Php 350,000.00
Creation of San Francisco Emergency Response (SAFER) 50,000.00 - Php 50,000.00
Capability Building 280,000.00 - Php 280,000.00
Relief Stockpiling 112,000.00 - Php 112,000.00
Disaster Emergency Drills 400,000.00 - Php 400,000.00
Purchase of Disaster Response Equipments 201,000.00 - Php 201,000.00
Maintenance of Emergency Transportation Facilities 245,000.00 - Php 245,000.00
SUB-TOTAL Php 1,638,000.00
SUMMARY of BUDGET Php 11,455,445.00 Php 11,455,445.00
IV. GENERAL IMPLEMENTING ARRANGEMENT:
A. ORGANIZATIONAL STRUCTURE:
MDRRMC (Chairperson Municipal
Mayor)
MDRRM Officer
Administrative and Training
Research and Planning
Operation and Warning
Early Warning Service
Damage Assessment and Needs
Analysis
Rescue and Evacuation
Service
Relief and Rehabilitation
Service
Medical and Health
Service
Security and Police
Service
Camp Management
Service
B. INSTITUTIONAL WORKING ARRANGEMENT
- There shall be mutual cooperation among and between LDRRMO, other municipal department such MSWDO, MAO, Municipal Engineering Office, Municipal Health Office (MHO) MPDC, MENRO and among others, DepED, BDRRMC and Accredited Community Disaster Volunteers in the implementation of MDRRM Plan
- Quarterly Plans and monthly progress of MDRRM activities shall likewise be reported to the Municipal Council and other funding partners for information, technical and management guidance
- The MDRRMC shall actively participate in/support local policy proposals including discussions and decisions relative to formulation, amendment and/or modifications of local policies pertinent to local disaster risk reduction especially in three core programs namely; disaster prevention, mitigation and preparedness
Accountability for the regular reporting systems to the public and concerned officials belongs to the MDRRMO
C. GENERAL MONITORING AND EVALUATION FRAMEWORK
Monitoring and evaluation is the process of gathering, filing, accessing and analyzing information that will enable the Municipal Mayor as Disaster Risk Reduction and Management Council Head to determine the progress of the implementation of the MDRRM Plan, and make timely decisions to ensure that progress is maintained according to schedules and targets. The public dissemination of the outputs of monitoring and evaluation activities enhances transparency in management. The MDRRMO shall be primarily responsible in carrying out monitoring and evaluation activities but whose work shall be reviewed by the Municipal Disaster Risk reduction and Management as the overseeing body of the municipality for disaster risk reduction and management
The MDRRMO shall submit a monthly, quarterly and an annual report to the MDRRMC and to the Municipal Mayor informing them of the state of the implementation of the approved MDRRM program/projects for the period.
CHAPTER V THE LOCAL DISASTER RISK REDUCTION & MANAGEMENT OFFICE
Municipality of San Francisco Local Disaster Risk Reduction Management Office
San Francisco, Cebu, Philippines
Vision:
Resilient municipality founded on political, economic and empowered community of marginalized rural sectors that have a responsive local government that can manage own resources towards sustainable development and a well prepare family in response to
emergency.
Missions:
1. Zero casualty and no injury in times of disaster.
2. To strengthen different stakeholders of San Francisco to become knowledgeable to all forms of hazards in the municipality
3. Vigorously work towards the safety of families located in the various organization to make disaster risk management become priority in their barangay
4. To empower barangay officials and leaders in the various organization to make
disaster risk management become priority in their barangay 5. To train per purok member households on the environmental protection and
sustainability of resources.
Goals :
1. Develop a strong economy for every vulnerable sectors in the society 2. Achieve food security by promoting sustainable farming & fishing 3. Establish and equip and full of supply Camotes Operation Center
4. Train knowledgeable families in response to disaster management 5. A well manage and protected San Francisco environment
Functions and Responsibilities of the Local Disaster Risk Reduction and Management Officer and Staff
Local Disaster Risk Reduction & Management Officer
Set the direction, development, implementation and coordination of
disaster risk management programs within their territorial jurisdiction.
Design, program, and coordinate disaster risk reduction and
management activities consistent with the National Council’s Standards
and guidelines.
Formulate and implement a compressive and integrated LDRRMP in
accordance in accordance with the National, Regional and provincial
framework, and policies on disaster risk reduction in close coordination
with the Local Development Councils (LDC’s).
Prepare and submit to the local sanggunian through the LDRRMP and
the LDC the annual LDRRMO Plan and budget, the proposed
programming of the LDRRMF, other dedicated disaster risk reduction
and management resources, and other regular funding sources and
budgeting support of the LDRRMO/BDRRMC.
Recommend through the LDRRMC the enactment of local ordinances
consistent with the requirement of the Act.
Implement policies, approved plans and programs of the LDRRMC
consistent with the policies and guidelines laid down in the Act.
Establish a Municipal Disaster Risk Reduction and Management
Operation Center.
Act on other matters that may be authorized by the LDRRMC.
Prepare and submit, through the LDRRMC and the LDC, the report on
the utilization of the LDRRMF and other dedicated disaster risk reduction
and management resources for internal audit, copy furnished the
regional director of the OCD and the Local Government Operation
Officer of the DILG.
RESEARCH AND PLANNING FUNCTION OFFICER
Consolidate local disaster risk information which includes natural
hazards, vulnerabilities, and climate change risks, and maintain a local
risk map.
Identify access and manage the hazards vulnerabilities and risks that
may occur in their locality.
Identify and implement cost-effective risk reduction
measures/strategies.
Develop, strengthen and operationalize mechanisms for partnership or
net working with private sector, CSOs, International NGO and volunteers
group.
Facilitate and Support Risk Assessment and Contingency Planning
Activities at the Local Level
ADMINISTRATION AND TRAINING FUNCTIONS OFFICER
Organize and conduct training, orientation and knowledge management
activities on disaster risk reduction and management at the local level.
Disseminate information and raise public awareness about those
hazards; vulnerabilities and risks, their nature, effects, early warning
signs and counter-measures.
Maintain a database of human resources, equipment, directories, and
location of critical infrastructures and their capacities such as hospitals
and evacuation centers.
Take all necessary steps on a continuing basis to maintain, provide, or
arrange the provision of or to otherwise make available, suitably-trained
and competent personnel for effective civil defense disaster risk
reduction and management in its area.
Organize, train equip and supervise the local emergency response
teams and the ACDVs, ensuring that humanitarian aid workers are
equipped with basic skills to assist mothers to be breastfeed.
Within its area, promote and raise public awareness of a compliance
with the Act legislative provisions relevant to the purpose of the Act.
Establish linkage/network with other LGU’s for Disaster risk reduction
emergency response purposes.
Served as the secretariat and executive arm of the LDRRMC.
OPERATION AND WARNING FUNCTIONS
Operation a multi-hazard early warning system, linked to disaster risk
reduction to provide accurate and timely advice to national or local
emergency response organizations and to the general public, through
diverse mass media, particularly radio, landline communications, and
technologies for communication within rural communities.
Conduct continuous disaster monitoring and mobilize instrumentalities
and entities of the LGU’s, CSOs, private groups and organized volunteers,
to utilize their facilities and resources for the protection and
preservation of life and properties during emergencies in accordance
with existing policies and procedures.
Respond to and manage the adverse effects of emergencies and carry
out recovery activities in the affected area, ensuring that there is an
efficient mechanism for immediate delivery of food. Shelter and medical
supplies for women and children, endeavor to create a special place
where internally-displaced mothers and children can find help with
breastfeeding, feed and care their babies and give support to each
other.
Coordinate other disaster risk reduction and management activities.
Local Disaster Risk Reduction & Management Office
Local Disaster Risk Reduction Management Officer
Administration & Training
Research & Planning
Operations & Warning