    EmpID Supervisor Em Workdate AA_Code Hours ProjectID Reference Text Remarks

    52989 49630 23.9.2013 IM05 9

    52989 49630 24.9.2013 IM05 9

    52989 49630 25.9.2013 IM05 9

    52989 49630 26.9.2013 IM05 9

    52989 49630 27.9.2013 IM05 9

    52989 49630 30.9.2013 IM05 952989 49630 1.10.2013 IM05 9

    52989 49630 3.10.2013 IM05 9

    52989 49630 4.10.2013 IM05 9

    52989 49630 7.10.2013 IM05 9

    52989 49630 8.10.2013 IM05 9

    52989 49630 9.10.2013 IM05 9

    52989 49630 10.10.2013 IM05 9

    52989 49630 11.10.2013 IM05 9

    52989 49630 14.10.2013 IM05 9

    52989 49630 23.10.2013 IM05 9

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    2/24

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    3/24

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    4/24

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    5/24

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    6/24

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    7/24

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    8/24

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    9/24

    Remarks2 Phase Task

    AA_PersonAA_Code Text

    AC01 Rework For Defect Closure

    AC02 Provide Support For UAT

    AC03 Conduct User Training

    AD01 Software InstallationAD02 Vendor Management

    AD03 Maintaining Equipment

    AD04 Maintaining Inventory/Lib

    AD05 Travel Related Activities

    AD06 Backup/Restore

    AD07 Administer Server

    AD08 License Management

    AD09 Delegation Visit Mgmt

    AD10 Service calls

    AD11 Equipment Control

    AD12 Asset Managementl

    AD13 Liaison STPI/Customs

    AD14 Procurement Process

    AD15 Bill/payment Processing

    AD16 Site/Premises Review

    AU01 Internal Appraisal

    AU02 External Audits/Appraisal

    AU03 Internal Audit

    CH01 Problem Reporting

    CH02 Impact Analysis

    CH03 Fix Problem/CodeCH04 Code/other Review

    CH05 Testing

    CH06 Rework for defect closure

    CH07 Design of enhancements

    CH08 Coding of enhancements

    CH09 Tech Discussion

    CH10 Planning and Tracking

    CH11 Testing of enhancements

    CH12 Enhancement Request

    CL01 Query Management

    CL02 Create User Documentation

    CL03 Create/Maintain Templates

    CL05 Final Inspection

    CL06 Set-Up Environment

    CL07 Technical Discussions

    CL08 Technical Support

    CL09 Peer Review Meeting

    CL10 SME Review

    CL11 DBA Activities

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    10/24

    CL12 SME Support

    CL13 Translation

    CL14 Translation Review

    CL15 Creative Problem Solving

    CL16 Create Analysis Tools

    CL17 Walkthroughs

    CL18 Document StudyCM01 Impact Analysis

    CM02 Rework on Change Request

    CM03 Configuration Control

    CM04 Library Management

    CM05 Build code

    CN01 Review Program Code

    CN02 Unit Testing

    CN03 Convert Data

    CN04 Convert Programs

    CN05 Prepare Program Code

    CN06 Rework On Defect Closing

    CN07 Merging/DeMerging of Code

    CT01 Prepare Proposal

    CT02 Present Proposal/Demo

    CT03 Review Proposal/Contract

    EM01 Alert Handling

    EM02 Alert Investigation

    EM03 Alert Procedure Mgmt

    EM04 Creat Alert Handling Proc

    EM05 Review Alert Handling Pro

    FS01 Liason-BankFS02 Payment Processing

    FS03 Liason-External Agencies

    FS06 Bank Reconciliation

    FS07 Liason-Business

    FS08 SAP Books Review

    FS09 Statutory Compliance

    FS10 Manage PF/Superann Trust

    FS11 Employee Expenses

    FS12 Vendor Accounts

    FS13 Rent Processing

    FS18 Review Bank Accounts

    FS19 Forex Management

    FS20 Financing / Credit

    FS21 Financial Statements

    FS22 Intercompany Recon

    FS23 Budgeting

    FS28 Financial Forecasting

    FS29 Support to BUs

    FS30 Monthly Closing

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    11/24

    FS31 Quarterly Closing

    FS32 Year End Closing

    FS33 Branch Region EOU A/c

    FS34 Stock Market Update

    FS35 Peer Data Benchmarking

    FS36 Liason-Investor/Analyst

    FS37 Payroll ProcessingFS38 Full & Final of Employees

    FS39 Employee Taxation

    FS40 SAP Master Data maint.

    FS41 SAP Routines/Process Runs

    FS42 Direct Tax Assessment

    FS43 Indirect Tax Assessment

    FS44 Transfer Pricing

    FT01 Future Planned Leave

    FT02 Future Planned Training

    FT03 Future Planned Travel

    GS01 Image Rectification & Reg

    GS02 Data Received and Dwnd

    GS03 Input Data Inventory

    GR01 Visualization

    GR02 S/W and Graphics Research

    GR03 Rework on Graphics

    GR04 Graphics Development

    GR05 Graphics Presentations

    GR06 Develop Prototype (UI)

    GR07 Courseware Development

    GR08 Pre-sales support (UI)GR09 Usability support

    HL01 Define ConversionStrategy

    HL02 Identify Pilot Conversion

    HL03 Prepare Conversion S&G

    HL04 Identify/Create Conv tool

    HL05 Develop Prototype

    HL06 Create Data/Process Model

    HL08 Prepare Object Model

    HL09 Prepare Dynamic Model

    HL10 Prepare Functional Specs

    HL11 Reverse Engg. Func. Spec.

    HL12 Review And Update Models

    HL13 Review Functional Specs

    HL14 Rework On Defect Closing

    HR01 Employee's Query Handling

    HR02 Joinings

    HR03 Transfers

    HR04 Resignations

    HR05 Employee Benefits Admin

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    12/24

    HR06 Resource Mgmt Activities

    HR07 PPDP/HYR Activites

    HR08 Reports & Data Collection

    HR09 Employee Master Reporting

    HR10 Research Activities

    HR11 Identity Card Processing

    HR12 Annual EventsIM01 Investigation of Failure

    IM02 Data Fix/Config. changes

    IM03 Log Investigation

    IM04 On-Call support

    IM05 On-Request support

    IM06 Production Support

    KM01 Knowledge Architecture

    KM02 Create Knowledge objects

    KM03 Maintain Knowledge object

    KM04 Review Knowledge objects

    KT01 Knowledge Transfer

    KT02 Knowledge Mining

    KT03 Learn Plan/Certifications

    LL01 Prepare Func. Test Cases

    LL02 Prepare Integ. Test Cases

    LL03 Prepare Phys Data Model

    LL04 Prepare Program Specs

    LL05 Prepare UT Cases and data

    LL06 Review Models

    LL07 Review Program Specs

    LL08 Review Test Cases/dataLL09 Rework For Defect Closing

    LL10 Convert Data

    LL11 Convert Programs

    LS01 Secretarial compliance

    LS02 Board Meeting Work

    LS03 General Meeting Work

    LS04 Legal Research

    LS05 Stock Exchange Compliance

    LS06 RBI Compliance

    LS07 Annual Report Preparation

    LS08 Dividend related matters

    LS09 Investors Query handling

    LS10 Liasioning with agencies

    LS11 Prep Registers / Records

    LS12 ESOP Management

    LS13 Int. customers resolution

    LS14 Drafting of Documents

    LS15 Vetting of Document

    LS16 Prep of Legal opinions

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    13/24

    ME01 Prepare/Verify Metrics

    ME02 Consolidate Metrics Data

    ME03 Review metrics

    ME04 Metrics analysis

    ME05 Performance baselines

    MI01 PPDP Reviews

    MI02 TravelMI03 Idle Time

    MI04 Sundry

    MI05 Non-Project Meetings

    MI06 Happy Nappy Day

    MI07 Leave - Full-day

    MI08 Leave - half-day

    MI09 Communication-Mail,Tel,..

    MI10 R & D

    MI11 Leave - Paternity

    MI12 Leave - Maternity

    MI13 Leave - Without Pay

    MI14 Leave - LNCL

    MI15 Non-Working Day

    MI16 Event Planning Mgmt Exec

    MI17 Procure Gifts/Giveaways

    OP01 Daily checks

    OP02 Monitoring Site

    OP03 Morning Support

    OP04 Evening Support

    PI01 Basis Administration

    PI03 Custom DevelopmentPI04 Package Testing

    PI05 Rework for defect closure

    PI06 Online Support

    PI07 User Training

    PL Privilege leave

    PM01 Internal Project Meeting

    PM02 Project Feedback

    PM03 Project Sign-Off

    PM04 Project Estimation

    PM05 Project Planning

    PM06 Review Project Plan

    PM07 Proj monitoring/control

    PM08 Sr. Management Review

    PM09 Customer meeting/review

    PM10 Subcontract management

    PM11 Project Wind-up

    PM12 Create Reports

    PM13 Project Start-up

    PM14 Financial Management

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    14/24

    PM15 Create Presentations

    PR01 Task Kick-Off Meeting

    PR02 Forums / Sharing

    PR03 Pilots and Deployment

    PR04 Conduct Causal Analysis

    PR05 Industry seminars & conf.

    QM01 Process ComplianceQM02 Quality Review

    RA01 User Meeting

    RA02 Study existing system

    RA03 Define user document

    RA04 Prepare architecture/User

    RA05 Prepare Conceptual Model

    RA06 Create / Update SRS

    RA07 Reverse Engineering

    RA08 Rework For Defect Closure

    RA09 Develop Prototype (RA)

    RA10 Use Case Modelling

    RA11 Review Models

    RA12 Review Prototype

    RA13 Review Use Cases/RA Docs

    RL01 Release of enhancements

    RL02 Build Activities

    RM01 Resource Planning

    RM02 Case And Pipeline Mgmt

    RM03 Sourcing And Scheduling

    RM04 Supervise Test/Interviews

    RM05 Conduct InterviewRM06 Generate Offers

    RM07 Monitor Candidate Joining

    RM08 Employee Interactions

    RM09 Work Permit Processing

    RM10 Filing And Record Keeping

    RM12 MIS And Data Management

    RM13 Liason-HR/FSO

    RM14 Liason-Placement Vendor

    SE01 Process Awareness & trg

    SE02 Update/Release processes

    SE03 Process reviews

    SE04 Process facilitation

    SE05 Maintain Process Database

    SE06 Review/Evaluate PIP

    SE07 Pilot and deployment

    SE08 Process Initiatives

    SE09 Maintain Internal Systems

    SL01 Sales Support

    SL02 Client/prospect research

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    15/24

    SL03 Make a sales call

    SL04 Create sales presentation

    SL05 Make sales presentation

    SL06 Make Daily Sales Report

    SL07 Update SalesLogix

    SL08 Marketing Preparation

    SL09 Marketing EventSL10 Sales Incentive Claim

    SL11 Planning Workshop

    SL12 Customer Entertainment

    SL13 Prepare / revise Contract

    SL14 Collect signed Contract

    SL15 Payment Collection

    SL16 Website Maint and Support

    SL17 Website Rev/Res/SEO/SEM

    SL18 Magazine Des/Content/Prod

    SL19 Agency Briefing / Co-ord

    SL20 Collaterals Creation

    SL21 Market Research

    SL22 Inside Sales Research

    SL23 Media Management

    SL24 External Body/Agency Mgmt

    SL25 Analyst Relations

    SL26 Sales Enablement

    SL27 Agency Briefing / Co-ord

    SL28 Analyst Relations

    SL29 GEO Marketing call

    SL30 Business ReviewSL31 Sales Review

    SL32 Marketing Review

    SL33 Finance/Accounts Review

    SR01 Adhoc Requests

    TE01 Working With Development

    TE02 Create Tech Components

    TE03 Create Tech Documents

    TE04 Review Tech Documents

    TE05 Test Tech Components

    TP01 Prepare QA strategy

    TP02 Review QA strategy

    TP03 Prepare Test Plan

    TP04 Review Test Plan

    TP05 Prepare Test Cases

    TP06 Review Test Cases

    TP07 Maint. Regression Bucket

    TP08 Automation-Create Scripts

    TP09 Automation-Update Scripts

    TP10 Automation-Test Execution

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    16/24

    TP11 Create Test Data

    TP12 Review Test Data

    TP13 Functional Testing

    TP14 Integration Testing

    TP15 Non-Functional Testing

    TP16 Regression Testing

    TP17 Unplanned Test CyclesTP18 Review Test Results

    TP19 Rework For Defect Closure

    TP20 Prepare Test Reports

    TP21 Review Test Reports

    TR01 Training/Self Development

    TR02 Conduct Training

    TR03 Coordinate Training

    TR04 Prepare Training Material

    TS01 Functional Testing

    TS02 Integration Testing

    TS03 Rework For Defect Closure

    TS04 Performance Testing

    TS05 Regression Testing

    TS06 Prepare Test Cases/data

    TS07 Review Test Cases/data

    TS08 Test Automation

    TS09 Prepare QA strategy

    TS10 Review QA strategy

    TS11 Compliance testing

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    17/24

    AA_Code AA_Code Text See Comment to create a Personal List

    AC01 Rework For Defect Closure

    AC02 Provide Support For UAT Personal AA AA_Code Text

    AC03 Conduct User Training AU02 External Audits/Appraisal

    AD01 Software Installation CH02 Impact Analysis

    AD02 Vendor Management CH03 Fix Problem/CodeAD03 Maintaining Equipment CH09 Tech Discussion

    AD04 Maintaining Inventory/Lib CL06 Set-Up Environment

    AD05 Travel Related Activities MI01 PPDP Reviews

    AD06 Backup/Restore MI02 Travel

    AD07 Administer Server MI03 Idle Time

    AD08 License Management MI04 Sundry

    AD09 Delegation Visit Mgmt MI05 Non-Project Meetings

    AD10 Service calls MI06 Happy Nappy Day

    AD11 Equipment Control MI07 Leave - Full-day

    AD12 Asset Managementl MI08 Leave - half-day

    AD13 Liaison STPI/Customs MI09 Communication-Mail,Tel,..

    AD14 Procurement Process MI10 R & D

    AD15 Bill/payment Processing PI01 Basis Administration

    AD16 Site/Premises Review PI02 System Configuration

    AU01 Internal Appraisal PI03 Custom Development

    AU02 External Audits/Appraisal PI04 Package Testing

    AU03 Internal Audit PI05 Rework for defect closure

    CH01 Problem Reporting PI06 Online Support

    CH02 Impact Analysis PI07 User Training

    CH03 Fix Problem/Code PL Privilege leave

    CH04 Code/other Review PM01 Internal Project MeetingCH05 Testing PM02 Project Feedback

    CH06 Rework for defect closure PM03 Project Sign-Off

    CH07 Design of enhancements PM04 Project Estimation

    CH08 Coding of enhancements PM05 Project Planning

    CH09 Tech Discussion PM06 Review Project Plan

    CH10 Planning and Tracking PM07 Proj monitoring/control

    CH11 Testing of enhancements PM08 Sr. Management Review

    CH12 Enhancement Request CL10 SME Review

    CL01 Query Management CL11 DBA Activities

    CL02 Create User Documentation CL12 SME Support

    CL03 Create/Maintain Templates CL13 Translation

    CL05 Final Inspection CH01 Problem Reporting

    CL06 Set-Up Environment CH02 Impact Analysis

    CL07 Technical Discussions CH03 Fix Problem/Code

    CL08 Technical Support CH04 Code/other Review

    CL09 Peer Review Meeting

    CL10 SME Review

    CL11 DBA Activities

    CL12 SME Support

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    18/24

    CL13 Translation

    CL14 Translation Review

    CL15 Creative Problem Solving

    CL16 Create Analysis Tools

    CL17 Walkthroughs

    CL18 Document Study

    CM01 Impact AnalysisCM02 Rework on Change Request

    CM03 Configuration Control

    CM04 Library Management

    CM05 Build code

    CN01 Review Program Code

    CN02 Unit Testing

    CN03 Convert Data

    CN04 Convert Programs

    CN05 Prepare Program Code

    CN06 Rework On Defect Closing

    CN07 Merging/DeMerging of Code

    CT01 Prepare Proposal

    CT02 Present Proposal/Demo

    CT03 Review Proposal/Contract

    EM01 Alert Handling

    EM02 Alert Investigation

    EM03 Alert Procedure Mgmt

    EM04 Creat Alert Handling Proc

    EM05 Review Alert Handling Pro

    FS01 Liason-Bank

    FS02 Payment ProcessingFS03 Liason-External Agencies

    FS06 Bank Reconciliation

    FS07 Liason-Business

    FS08 SAP Books Review

    FS09 Statutory Compliance

    FS10 Manage PF/Superann Trust

    FS11 Employee Expenses

    FS12 Vendor Accounts

    FS13 Rent Processing

    FS18 Review Bank Accounts

    FS19 Forex Management

    FS20 Financing / Credit

    FS21 Financial Statements

    FS22 Intercompany Recon

    FS23 Budgeting

    FS28 Financial Forecasting

    FS29 Support to BUs

    FS30 Monthly Closing

    FS31 Quarterly Closing

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    19/24

    FS32 Year End Closing

    FS33 Branch Region EOU A/c

    FS34 Stock Market Update

    FS35 Peer Data Benchmarking

    FS36 Liason-Investor/Analyst

    FS37 Payroll Processing

    FS38 Full & Final of EmployeesFS39 Employee Taxation

    FS40 SAP Master Data maint.

    FS41 SAP Routines/Process Runs

    FS42 Direct Tax Assessment

    FS43 Indirect Tax Assessment

    FS44 Transfer Pricing

    FT01 Future Planned Leave

    FT02 Future Planned Training

    FT03 Future Planned Travel

    GS01 Image Rectification & Reg

    GS02 Data Received and Dwnd

    GS03 Input Data Inventory

    GR01 Visualization

    GR02 S/W and Graphics Research

    GR03 Rework on Graphics

    GR04 Graphics Development

    GR05 Graphics Presentations

    GR06 Develop Prototype (UI)

    GR07 Courseware Development

    GR08 Pre-sales support (UI)

    GR09 Usability supportHL01 Define ConversionStrategy

    HL02 Identify Pilot Conversion

    HL03 Prepare Conversion S&G

    HL04 Identify/Create Conv tool

    HL05 Develop Prototype

    HL06 Create Data/Process Model

    HL08 Prepare Object Model

    HL09 Prepare Dynamic Model

    HL10 Prepare Functional Specs

    HL11 Reverse Engg. Func. Spec.

    HL12 Review And Update Models

    HL13 Review Functional Specs

    HL14 Rework On Defect Closing

    HR01 Employee's Query Handling

    HR02 Joinings

    HR03 Transfers

    HR04 Resignations

    HR05 Employee Benefits Admin

    HR06 Resource Mgmt Activities

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    20/24

    HR07 PPDP/HYR Activites

    HR08 Reports & Data Collection

    HR09 Employee Master Reporting

    HR10 Research Activities

    HR11 Identity Card Processing

    HR12 Annual Events

    IM01 Investigation of FailureIM02 Data Fix/Config. changes

    IM03 Log Investigation

    IM04 On-Call support

    IM05 On-Request support

    IM06 Production Support

    KM01 Knowledge Architecture

    KM02 Create Knowledge objects

    KM03 Maintain Knowledge object

    KM04 Review Knowledge objects

    KT01 Knowledge Transfer

    KT02 Knowledge Mining

    KT03 Learn Plan/Certifications

    LL01 Prepare Func. Test Cases

    LL02 Prepare Integ. Test Cases

    LL03 Prepare Phys Data Model

    LL04 Prepare Program Specs

    LL05 Prepare UT Cases and data

    LL06 Review Models

    LL07 Review Program Specs

    LL08 Review Test Cases/data

    LL09 Rework For Defect ClosingLL10 Convert Data

    LL11 Convert Programs

    LS01 Secretarial compliance

    LS02 Board Meeting Work

    LS03 General Meeting Work

    LS04 Legal Research

    LS05 Stock Exchange Compliance

    LS06 RBI Compliance

    LS07 Annual Report Preparation

    LS08 Dividend related matters

    LS09 Investors Query handling

    LS10 Liasioning with agencies

    LS11 Prep Registers / Records

    LS12 ESOP Management

    LS13 Int. customers resolution

    LS14 Drafting of Documents

    LS15 Vetting of Document

    LS16 Prep of Legal opinions

    ME01 Prepare/Verify Metrics

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    21/24

    ME02 Consolidate Metrics Data

    ME03 Review metrics

    ME04 Metrics analysis

    ME05 Performance baselines

    MI01 PPDP Reviews

    MI02 Travel

    MI03 Idle TimeMI04 Sundry

    MI05 Non-Project Meetings

    MI06 Happy Nappy Day

    MI07 Leave - Full-day

    MI08 Leave - half-day

    MI09 Communication-Mail,Tel,..

    MI10 R & D

    MI11 Leave - Paternity

    MI12 Leave - Maternity

    MI13 Leave - Without Pay

    MI14 Leave - LNCL

    MI15 Non-Working Day

    MI16 Event Planning Mgmt Exec

    MI17 Procure Gifts/Giveaways

    OP01 Daily checks

    OP02 Monitoring Site

    OP03 Morning Support

    OP04 Evening Support

    PI01 Basis Administration

    PI03 Custom Development

    PI04 Package TestingPI05 Rework for defect closure

    PI06 Online Support

    PI07 User Training

    PL Privilege leave

    PM01 Internal Project Meeting

    PM02 Project Feedback

    PM03 Project Sign-Off

    PM04 Project Estimation

    PM05 Project Planning

    PM06 Review Project Plan

    PM07 Proj monitoring/control

    PM08 Sr. Management Review

    PM09 Customer meeting/review

    PM10 Subcontract management

    PM11 Project Wind-up

    PM12 Create Reports

    PM13 Project Start-up

    PM14 Financial Management

    PM15 Create Presentations

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    22/24

    PR01 Task Kick-Off Meeting

    PR02 Forums / Sharing

    PR03 Pilots and Deployment

    PR04 Conduct Causal Analysis

    PR05 Industry seminars & conf.

    QM01 Process Compliance

    QM02 Quality ReviewRA01 User Meeting

    RA02 Study existing system

    RA03 Define user document

    RA04 Prepare architecture/User

    RA05 Prepare Conceptual Model

    RA06 Create / Update SRS

    RA07 Reverse Engineering

    RA08 Rework For Defect Closure

    RA09 Develop Prototype (RA)

    RA10 Use Case Modelling

    RA11 Review Models

    RA12 Review Prototype

    RA13 Review Use Cases/RA Docs

    RL01 Release of enhancements

    RL02 Build Activities

    RM01 Resource Planning

    RM02 Case And Pipeline Mgmt

    RM03 Sourcing And Scheduling

    RM04 Supervise Test/Interviews

    RM05 Conduct Interview

    RM06 Generate OffersRM07 Monitor Candidate Joining

    RM08 Employee Interactions

    RM09 Work Permit Processing

    RM10 Filing And Record Keeping

    RM12 MIS And Data Management

    RM13 Liason-HR/FSO

    RM14 Liason-Placement Vendor

    SE01 Process Awareness & trg

    SE02 Update/Release processes

    SE03 Process reviews

    SE04 Process facilitation

    SE05 Maintain Process Database

    SE06 Review/Evaluate PIP

    SE07 Pilot and deployment

    SE08 Process Initiatives

    SE09 Maintain Internal Systems

    SL01 Sales Support

    SL02 Client/prospect research

    SL03 Make a sales call

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    23/24

    SL04 Create sales presentation

    SL05 Make sales presentation

    SL06 Make Daily Sales Report

    SL07 Update SalesLogix

    SL08 Marketing Preparation

    SL09 Marketing Event

    SL10 Sales Incentive ClaimSL11 Planning Workshop

    SL12 Customer Entertainment

    SL13 Prepare / revise Contract

    SL14 Collect signed Contract

    SL15 Payment Collection

    SL16 Website Maint and Support

    SL17 Website Rev/Res/SEO/SEM

    SL18 Magazine Des/Content/Prod

    SL19 Agency Briefing / Co-ord

    SL20 Collaterals Creation

    SL21 Market Research

    SL22 Inside Sales Research

    SL23 Media Management

    SL24 External Body/Agency Mgmt

    SL25 Analyst Relations

    SL26 Sales Enablement

    SL27 Agency Briefing / Co-ord

    SL28 Analyst Relations

    SL29 GEO Marketing call

    SL30 Business Review

    SL31 Sales ReviewSL32 Marketing Review

    SL33 Finance/Accounts Review

    SR01 Adhoc Requests

    TE01 Working With Development

    TE02 Create Tech Components

    TE03 Create Tech Documents

    TE04 Review Tech Documents

    TE05 Test Tech Components

    TP01 Prepare QA strategy

    TP02 Review QA strategy

    TP03 Prepare Test Plan

    TP04 Review Test Plan

    TP05 Prepare Test Cases

    TP06 Review Test Cases

    TP07 Maint. Regression Bucket

    TP08 Automation-Create Scripts

    TP09 Automation-Update Scripts

    TP10 Automation-Test Execution

    TP11 Create Test Data

  • 7/27/2019 SampleTimesheet_v1.5N.xls

    24/24

    TP12 Review Test Data

    TP13 Functional Testing

    TP14 Integration Testing

    TP15 Non-Functional Testing

    TP16 Regression Testing

    TP17 Unplanned Test Cycles

    TP18 Review Test ResultsTP19 Rework For Defect Closure

    TP20 Prepare Test Reports

    TP21 Review Test Reports

    TR01 Training/Self Development

    TR02 Conduct Training

    TR03 Coordinate Training

    TR04 Prepare Training Material

    TS01 Functional Testing

    TS02 Integration Testing

    TS03 Rework For Defect Closure

    TS04 Performance Testing

    TS05 Regression Testing

    TS06 Prepare Test Cases/data

    TS07 Review Test Cases/data

    TS08 Test Automation

    TS09 Prepare QA strategy

    TS10 Review QA strategy

    TS11 Compliance testing