STANDARD OPERATING PROCEDURES
Department: Finished goods stores
Stage: Receiving & storage of finished goods
PURPOSE : This SOP outlines the procedure for the proper receiving and storage of materials.
RESPONSIBILITY : H.O.D / Receiving person.
REFERENCE : Quality manual
PROCEDURE :
1. Production department shall keep proper records of finished products passed to FG
stores
2. Finished goods shall be received in FG stores in properly packed & labelled cartons.
3. Single pallet shall contain cartons of single type of product & similar type packing only.
4. Pallets shall be kept in such a way that, the labels on cartons shall be easily visible
from walkway.
5. Maintain adequate space between the rows of stored products for cleaning,
monitoring, and inspection.
6. Periodically check finished goods stores area for leakages.
7. Undertake proper rotation of finished products on First In, First Out basis.
8. Periodically check for pest activity in store area.
9. At the time of dispatch verify the weight of box against standard weight chart.
OBJECTIVE : Proper storage of material.
Document No. Revision No. Revision Date Page No.
comp/SOP/FG/001 00 24/01/15 0 of 0
STANDARD OPERATING PROCEDURES
Department:
DOCUMENT TITLE:
ISSUED TO:
PREPARED BY REVIEWED BY APPROVED BY
REVISION AND ISSUE HISTORY:
Issue No. 0 of SOP/Dept/000 Revision no.00 Dated. 00/00/00 issued for perusal & implementation.
Document No. Revision No. Revision Date Page No.
comp/SOP/Dept/000 00 00/00/00 0 of 0