Upload
sunit-dhingra
View
608
Download
9
Embed Size (px)
Citation preview
14
9 8 7 6 5 4
15
16
17
18
19
20
21
22
23
G
F
E
D
C
24
27
B
BRACING ELEVATION'N'
BRACING ELEVATION'A'
BRACING ELEVATION'B'
BRACING ELEVATION'C'
BRACING ELEVATION'D'
BRACING ELEVATION'E'
BRACING ELEVATION'F'
BRACING ELEVATION'H'
BRACING ELEVATION'J'
BRACING ELEVATION'G'
BRACING ELEVATION'K'
BRACING ELEVATION'P'
3
400601
60415
170415
160415
150415
130415
100415
90415
80415
70415
30415
40415
110415
120415
140415
20415
10410
20410
30410
40410
50410
20605
20604
10604
200603
10605
200604
170603
100602
180603
190603
140602
150602
170602
180605
10607
20607
PG28
PG24
PG28
PG25
PG25
PG05
PG09
PG09
PG05PG28PG27PG53PG42
5B
5B
5B
PG82
5B
5B
5B 5B
PG82
PG05
5B
PG82PG
04PG05
PG05
PG05
PG82
PG82 PG82
PG109
AC
AC
PG82
PG82
PG82
BE
BE
5B
PG82
PG04 PG04
PG82
PG82
PG05
PG05
5B
PG05
BE
BE
BE
5B
PG10
9
PG04 PG04
PG05
PG05
PG05
PG05
PG82
PG82PG82
5B5B
PG82
5B
PG82
5B
5B
5B
PG24
PG27
PG24
PG27
PG27
PG27
PG24
PG24-C
PG24-C
PG05
PG05
PG05
PG24
PG05PG
05PG05 PG05
PG05 PG
05
PG05
PG05
PG05
PG05 PG
05PG29
SSL +8.425 m
SSL +8.425 m
SSL +8.425 m
VB
VB
VBVB
VB
VB
VB
VB VB
VBVB
VB
VBVB
VB
VBVB
VB
VB
VB
VB
Stair Core
Fire Lift 1
Goods Lift
PG05PG05
PG05
CB
5B5B5B
PG24
AB
BE
EA3A
Corus Comflor®CF51 1.2
EA3A
Corus Comflor®CF51 1.2
TOS +8.275 m
EA3A
TOS +8.275 m
EA3A
TOS +8.425 m
AB
PG39
PG39
PG108
PG39
B2 79
B2 80
B2 81
B2 82
B2 83
B2115
B2116
B2101 B2100 B2 77
B2 76
B2 75
B2114B2112
B2111 B2113
B2 93B2 91
B2106
B2109
B2110
B2104
B2108
B2105
B2 85
B2 86
B2 44
B2 46
B2 48
B2 50
B2 89 B2 92B2 90 B2 94
B2111
B2110
B2 78
B2 79
B2 80
B2 81
B2 82B2 83
B2103B2115
B2116
B2101 B2100 B2 77
B2 99
B2 76
B2 75
B2 98B2114B2112
B2111 B2113 B2 97
B2 74
B2 73
B2 96
B2 93B2 91
B2107 B2109
B2110
B2104
B2108
B2 84
B2 85
B2 86
B2102
B2 44
B2 46
B2 48
B2 50
B2 89 B2 92B2 90 B2 94
B2111
B2110
B2119
Corus Comflor®CF51 1.2
Corus Comflor®CF51 1.2
B2 95
SSL +7.780 m
AB
AB
AB
RHS2
2F
RHS2
2F
RHS2
2F
RHS2
2F
RHS2
2F
RHS2
2F
* *
**
*
*
*
*
*
*
*
*
*
*
**
*
*
**
*
*
* **
*
*
*
*
*
CB
5A5B
149
150
200
150
4865
835
300
1570
150
3630
275
1398
150
585
1135
150
4715
1910181340018772285354170330013591123300476150951300039442001856894300102815023261303
973200285020017771073350465216
150
985
150
150
4400
150
200
1100
950
150
200
1100
1050
150
200
1100
1050
150
150
3300
150
150
1050
1100
200
7529
5075
75 125
1300
1200
1050
2540
2060
1400
2197
16851502238200270020028502001777107320028502751602
150
1050
1700
150
1100
1050
150
150
1050
1100
200
1001827110339845002295209
1400
130
3590
150
3055
67
4715
150
1090
150
150
150
150
150
1517
100 2050 400 2700 200
238
2050
1812 2002001856844200
75
75 375
1023
77
939105
150
1050
2400
150
3765
1035
2550
1073
184
1949
18771173
1517
59933452056
45
150 150
150150 2482
150
1090
45
150 150
150150
3450
2030
1570
150
835
300
3005017634001877
200150 100100 100100 200200
200
2276
2150
2150
75 200 100100 100100 100100 100100 75 75
150150 204
200 200
1875299
1720
SSL +8.425 m
SSL +8.425 m
150mm ThickRC Structural
Slab
2020
3
450
150
150
315
235
270 55
0
820
313
595
1250
Corus Comflor®CF51 1.2
AB
PG01 - Indicates steel beam and beamreference. Top Flange to be -150S.S.L. level, unless noted otherwise onthe Beam.
- Denotes steel shelf angle tosupport metal deck edge and sizereference. See local sections forangle orientation. Level to bearing face.
Beam Legend:
VB - Indicates vertical cross bracing bay.Refer to Bracing Elevation drawing Nos.0550 to 0552
- Indicates 250mm dia. service holethrough beam web. Hole to be atmid depth unless noted otherwise.Typically holes at 500mm centres,unless noted otherwise.
- Indicates rectangular service holethrough beam web. Size 500x250mmDeep. Hole to be at mid depth,unless noted otherwise.
- Indicates rectangular service holethrough beam web. Size 750x250mmDeep. Hole to be at mid depth,unless noted otherwise.
- Indicates rectangular service holethrough beam web. Size 850x250mmDeep. Hole to be at mid depth,unless noted otherwise.
- Indicates rectangular service holethrough beam web. Size 300x250mmDeep. Hole to be at mid depth,unless noted otherwise.
- Denotes steel support plates tometal deck edges and solid rc slabs.See local sections for size and levelsto bearing face.
PG01
EA3ATOS +25.250
RHS89D
FLT350-25TOS +7.735
PG07 - Indicates upstand steel beam and beamreference. Upstand Beam level shown asTOB/TOBF (Top of Bottom Flange) unlessnoted otherwise. Refer to relevant sections.
TOBF=19.950
- Denotes Span Direction, Thickness and Type of New Floor Construction Floors noted as (NWC)/(LWC) to be metal deck concrete slabs.
B2100 - Denotes Column Founding Leveland Individual Reference Number.Refer to Drawing Nos. STR-10614-23-0600 to 0606
- Indicates 1500mm Width Area designed for 7.5 kN/m² 1500mm WIDE
- Denotes Concrete Upstands
- Denotes Steel Column with 50mm min. Concrete Encasement.
- Denoted beams shall be `NOT INTUMESCENT PAINTED` (NIP)
For Fireproofing to these beams refer toArchitects Details.
*
aterman
Scales @ A0
Drawn By
Designed By Checked By
Date
Project No
Drawing Status
Client
Title
Project
Amendments
DescriptionRev Date By
GENERAL NOTES
Works Order No
Pickfords Wharf Clink Street London SE1 9DGUnited Kingdom
t +44 20 7928 7888 f +44 3333 444 [email protected] www.watermangroup.com
This drawing should not be scaled. Dimensions to be verified on site.Any discrepancies should be referred to the Engineer prior to work being put in hand.This drawing is the property of Waterman Structures Limited and the drawing is issued
on the condition that it is not copied, reproduced, retained or disclosed to anyunauthorised person, either wholly or in part without the consent in writing of
Waterman Structures LimitedPickfords Wharf Clink Street London SE1 9DG United Kingdom
t +44 20 7928 7888 f +44 3333 444 501
Publisher Zone Category Number Revision
As indicated
33 KING WILLIAM STREET
Designer Checker
SKD
H.B.REAVIS UK Ltd
CORE LAYOUTLOWER GROUND GA
CONSTRUCTIONSTR10614
Cen
tral:-
\\Nt-l
ncs\
wsl
\Pro
ject
s\ST
R10
614\
CAD
\3D
\WSL
Mod
els\
WSL
-106
14-S
A-33
KWS
- C
entra
l.rvt
0209GA 20 E02STR
FFL =SSL =TOS =
8.5758.4258.275Unless Noted Otherwise
FOR FULL DETAILS SIZES OF PLATE BEAMS,REFER TO DRAWING No. STR-SA-16-0002
Lower Ground - Structural Beam Schedule
Beam Ref Size
5A UB203x133x255B UB203x133x30AB UC152x152x30
AB-C UC203x203x60AC UC152x152x37AE UC152x152x51
AE-C UC203x203x60BE UC203x203x86CB UC254x254x89
PG04 350x300x15/10mm Plate BeamPG04-C 350x300x15/10mm Plate BeamPG05 350x150x10/10mm Plate Beam
PG05-C 350x150x10/10mm Plate BeamPG08-C 450x150x10/10mm Plate BeamPG09 350x300x30/20mm Plate BeamPG10 450x150x10/150x15/10mm Plate BeamPG20 450x200x20/20mm Plate BeamPG24 350x150x15/15mm Plate Beam
PG24-C 350x150x15/15mm Plate BeamPG25 350x150x20/15mm Plate Beam
PG25-C 350x150x20/15mm Plate BeamPG27 350x200x15/15mm Plate Beam
PG27-C 350x200x15/15mm Plate BeamPG28 350x250x30/20mm Plate Beam
PG28-C 350x250x30/20mm Plate BeamPG29 350x350x40/40mm Plate BeamPG30 350x250x20/20mm Plate BeamPG39 925x250x30/30mm Plate BeamPG40 350x200x30/30mm Plate Beam
PG40-C 350x200x30/30mm Plate BeamPG41-C 350x300x40/40mm Plate BeamPG42 450x350x50/40mm Plate BeamPG53 350x300x20/20mm Plate BeamPG61 500x300x40/30mm Plate Beam
PG61-C 500x300x40/30mm Plate BeamPG82 450x150x15/10mm Plate Beam
PG105-C 650x150x15/15mm Plate BeamPG106 350x350x45/45mm Plate BeamPG107 500x500x50/50mm Plate BeamPG108 300x400x40/40mm Plate BeamPG109 655x150x10/10mm Plate BeamPG116 180x350x30mm Plate Beam
E02 STEEL CONSTRUCTION ISSUE UP TO GROUNDFLOOR ONLY16.01.15 SGP
14
9 8 7 6 5 4
15
16
17
18
19
20
21
22
23
G
F
E
D
C
24
27
B
BRACING ELEVATION'N'
BRACING ELEVATION'A'
BRACING ELEVATION'B'
BRACING ELEVATION'C'
BRACING ELEVATION'D'
BRACING ELEVATION'E'
BRACING ELEVATION'F'
BRACING ELEVATION'H'
BRACING ELEVATION'J'
BRACING ELEVATION'G'
BRACING ELEVATION'K'
BRACING ELEVATION'P'
3
400601
60415
170415
160415
150415
130415
100415
90415
80415
70415
30415
40415
110415
120415
140415
20415
10410
20410
30410
40410
50410
20605
20604
10604
200603
10605
200604
170603
100602
180603
190603
140602
150602
170602
180605
10607
20607
PG28
PG24
PG28
PG25
PG25
PG05
PG09
PG09
PG05PG28PG27PG53PG42
5B
5B
5B
PG82
5B
5B
5B 5B
PG82
PG05
5B
PG82PG
04PG05
PG05
PG05
PG82
PG82 PG82
PG109
AC
AC
PG82
PG82
PG82
BE
BE
5B
PG82
PG04 PG04
PG82
PG82
PG05
PG05
5B
PG05
BE
BE
BE
5B
PG10
9
PG04 PG04
PG05
PG05
PG05
PG05
PG82
PG82PG82
5B5B
PG82
5B
PG82
5B
5B
5B
PG24
PG27
PG24
PG27
PG27
PG27
PG24
PG24-C
PG24-C
PG05
PG05
PG05
PG24
PG05PG
05PG05 PG05
PG05 PG
05
PG05
PG05
PG05
PG05 PG
05PG29
SSL +8.425 m
SSL +8.425 m
SSL +8.425 m
VB
VB
VBVB
VB
VB
VB
VB VB
VBVB
VB
VBVB
VB
VBVB
VB
VB
VB
VB
Stair Core
Fire Lift 1
Goods Lift
PG05PG05
PG05
CB
5B5B5B
PG24
AB
BE
EA3A
Corus Comflor®CF51 1.2
EA3A
Corus Comflor®CF51 1.2
TOS +8.275 m
EA3A
TOS +8.275 m
EA3A
TOS +8.425 m
AB
PG39
PG39
PG108
PG39
B2 79
B2 80
B2 81
B2 82
B2 83
B2115
B2116
B2101 B2100 B2 77
B2 76
B2 75
B2114B2112
B2111 B2113
B2 93B2 91
B2106
B2109
B2110
B2104
B2108
B2105
B2 85
B2 86
B2 44
B2 46
B2 48
B2 50
B2 89 B2 92B2 90 B2 94
B2111
B2110
B2 78
B2 79
B2 80
B2 81
B2 82B2 83
B2103B2115
B2116
B2101 B2100 B2 77
B2 99
B2 76
B2 75
B2 98B2114B2112
B2111 B2113 B2 97
B2 74
B2 73
B2 96
B2 93B2 91
B2107 B2109
B2110
B2104
B2108
B2 84
B2 85
B2 86
B2102
B2 44
B2 46
B2 48
B2 50
B2 89 B2 92B2 90 B2 94
B2111
B2110
B2119
Corus Comflor®CF51 1.2
Corus Comflor®CF51 1.2
B2 95
SSL +7.780 m
AB
AB
AB
RHS2
2F
RHS2
2F
RHS2
2F
RHS2
2F
RHS2
2F
RHS2
2F
* *
**
*
*
*
*
*
*
*
*
*
*
**
*
*
**
*
*
* **
*
*
*
*
*
CB
5A5B
149
150
200
150
4865
835
300
1570
150
3630
275
1398
150
585
1135
150
4715
1910181340018772285354170330013591123300476150951300039442001856894300102815023261303
973200285020017771073350465216
150
985
150
150
4400
150
200
1100
950
150
200
1100
1050
150
200
1100
1050
150
150
3300
150
150
1050
1100
200
7529
5075
75 125
1300
1200
1050
2540
2060
1400
2197
16851502238200270020028502001777107320028502751602
150
1050
1700
150
1100
1050
150
150
1050
1100
200
1001827110339845002295209
1400
130
3590
150
3055
67
4715
150
1090
150
150
150
150
150
1517
100 2050 400 2700 200
238
2050
1812 2002001856844200
75
75 375
1023
77
939105
150
1050
2400
150
3765
1035
2550
1073
184
1949
18771173
1517
59933452056
45
150 150
150150 2482
150
1090
45
150 150
150150
3450
2030
1570
150
835
300
3005017634001877
200150 100100 100100 200200
200
2276
2150
2150
75 200 100100 100100 100100 100100 75 75
150150 204
200 200
1875299
1720
SSL +8.425 m
SSL +8.425 m
150mm ThickRC Structural
Slab
2020
3
450
150
150
315
235
270 55
0
820
313
595
1250
Corus Comflor®CF51 1.2
AB
PG01 - Indicates steel beam and beamreference. Top Flange to be -150S.S.L. level, unless noted otherwise onthe Beam.
- Denotes steel shelf angle tosupport metal deck edge and sizereference. See local sections forangle orientation. Level to bearing face.
Beam Legend:
VB - Indicates vertical cross bracing bay.Refer to Bracing Elevation drawing Nos.0550 to 0552
- Indicates 250mm dia. service holethrough beam web. Hole to be atmid depth unless noted otherwise.Typically holes at 500mm centres,unless noted otherwise.
- Indicates rectangular service holethrough beam web. Size 500x250mmDeep. Hole to be at mid depth,unless noted otherwise.
- Indicates rectangular service holethrough beam web. Size 750x250mmDeep. Hole to be at mid depth,unless noted otherwise.
- Indicates rectangular service holethrough beam web. Size 850x250mmDeep. Hole to be at mid depth,unless noted otherwise.
- Indicates rectangular service holethrough beam web. Size 300x250mmDeep. Hole to be at mid depth,unless noted otherwise.
- Denotes steel support plates tometal deck edges and solid rc slabs.See local sections for size and levelsto bearing face.
PG01
EA3ATOS +25.250
RHS89D
FLT350-25TOS +7.735
PG07 - Indicates upstand steel beam and beamreference. Upstand Beam level shown asTOB/TOBF (Top of Bottom Flange) unlessnoted otherwise. Refer to relevant sections.
TOBF=19.950
- Denotes Span Direction, Thickness and Type of New Floor Construction Floors noted as (NWC)/(LWC) to be metal deck concrete slabs.
B2100 - Denotes Column Founding Leveland Individual Reference Number.Refer to Drawing Nos. STR-10614-23-0600 to 0606
- Indicates 1500mm Width Area designed for 7.5 kN/m² 1500mm WIDE
- Denotes Concrete Upstands
- Denotes Steel Column with 50mm min. Concrete Encasement.
- Denoted beams shall be `NOT INTUMESCENT PAINTED` (NIP)
For Fireproofing to these beams refer toArchitects Details.
*
aterman
Scales @ A0
Drawn By
Designed By Checked By
Date
Project No
Drawing Status
Client
Title
Project
Amendments
DescriptionRev Date By
GENERAL NOTES
Works Order No
Pickfords Wharf Clink Street London SE1 9DGUnited Kingdom
t +44 20 7928 7888 f +44 3333 444 [email protected] www.watermangroup.com
This drawing should not be scaled. Dimensions to be verified on site.Any discrepancies should be referred to the Engineer prior to work being put in hand.This drawing is the property of Waterman Structures Limited and the drawing is issued
on the condition that it is not copied, reproduced, retained or disclosed to anyunauthorised person, either wholly or in part without the consent in writing of
Waterman Structures LimitedPickfords Wharf Clink Street London SE1 9DG United Kingdom
t +44 20 7928 7888 f +44 3333 444 501
Publisher Zone Category Number Revision
As indicated
33 KING WILLIAM STREET
Designer Checker
SKD
H.B.REAVIS UK Ltd
CORE LAYOUTLOWER GROUND GA
CONSTRUCTIONSTR10614
Cen
tral:-
\\Nt-l
ncs\
wsl
\Pro
ject
s\ST
R10
614\
CAD
\3D
\WSL
Mod
els\
WSL
-106
14-S
A-33
KWS
- C
entra
l.rvt
0209GA 20 E02STR
FFL =SSL =TOS =
8.5758.4258.275Unless Noted Otherwise
FOR FULL DETAILS SIZES OF PLATE BEAMS,REFER TO DRAWING No. STR-SA-16-0002
Lower Ground - Structural Beam Schedule
Beam Ref Size
5A UB203x133x255B UB203x133x30AB UC152x152x30
AB-C UC203x203x60AC UC152x152x37AE UC152x152x51
AE-C UC203x203x60BE UC203x203x86CB UC254x254x89
PG04 350x300x15/10mm Plate BeamPG04-C 350x300x15/10mm Plate BeamPG05 350x150x10/10mm Plate Beam
PG05-C 350x150x10/10mm Plate BeamPG08-C 450x150x10/10mm Plate BeamPG09 350x300x30/20mm Plate BeamPG10 450x150x10/150x15/10mm Plate BeamPG20 450x200x20/20mm Plate BeamPG24 350x150x15/15mm Plate Beam
PG24-C 350x150x15/15mm Plate BeamPG25 350x150x20/15mm Plate Beam
PG25-C 350x150x20/15mm Plate BeamPG27 350x200x15/15mm Plate Beam
PG27-C 350x200x15/15mm Plate BeamPG28 350x250x30/20mm Plate Beam
PG28-C 350x250x30/20mm Plate BeamPG29 350x350x40/40mm Plate BeamPG30 350x250x20/20mm Plate BeamPG39 925x250x30/30mm Plate BeamPG40 350x200x30/30mm Plate Beam
PG40-C 350x200x30/30mm Plate BeamPG41-C 350x300x40/40mm Plate BeamPG42 450x350x50/40mm Plate BeamPG53 350x300x20/20mm Plate BeamPG61 500x300x40/30mm Plate Beam
PG61-C 500x300x40/30mm Plate BeamPG82 450x150x15/10mm Plate Beam
PG105-C 650x150x15/15mm Plate BeamPG106 350x350x45/45mm Plate BeamPG107 500x500x50/50mm Plate BeamPG108 300x400x40/40mm Plate BeamPG109 655x150x10/10mm Plate BeamPG116 180x350x30mm Plate Beam
E02 STEEL CONSTRUCTION ISSUE UP TO GROUNDFLOOR ONLY16.01.15 SGP
14
13
12
11
9 8 7 6 5 4 2 1
15
16
17
18
19
20
21
22
23
J
H
G
F
E
D
C
24
26
27
A
B
3
20.42
°
5.61°
5.61°
5.61°
5.61°
5.61°
5.61°
5.61°
5.61°
5.61°
7.37°
5664
27.23°
27.23°
32.06°
8370
4675
8.23°
6000
6000
6000
6000
6000
7318
73186000600060006000600060003000
5.61°
5.61°
27.23°
SSL +16.350 m
SSL +16.350 m
SSL +16.350 m
SSL +16.350 mA= ?
A= ?
A= ?
+16.520 m
+16.5
20 m
+16.535 m
+16.535 m
+16.350 m
+16.5
30 m
+16.540 m
A= ?
A= ?
6000
6000
6000
6000
6000
7318
73186000600060006000600060003000
1191
3729
1004
2002050
4002700
844 3630
2050
1028300
894
400 2950
1050
1123
300
1703 354 4162
1135
973
2150
465
1423
1720 400 2850 200 2850 200 2850 200 2700 200 2163
11001073 17
00 2520
26153450250
2197
1799
3540
835
835
2850200 200
1763
950
8.015° 8.015°
8.015° 8.015°
8.015°
8.015°
8.015° 8.015°
6.66°
8.015°
8.015°
5.70°
6.81°
6.81°
1.1°
5.70°
6 .8 1 °
1.11°
5.70°6.81°
6.81°
6.81°
1.1° 5.70°
6.81°
6.81°
6.81°
1.1°
1.11°
0.52°
1.40°
1.40°
1.18°
1.40°
1.40°
1.1
8°
1.40°
1.40°
1.1
8°
0.23°
1.40°
0.23°
1.40°
0.23°
1.40°
1.40°
1.40°
1.17°
0.23°1.4
0°
1.40°
1.40°1.17°
0.23°1.41°
1.40°1.40°
1.17°0.23° 1.40°
1.40°1.40°
1.17°0.23° 1.40°
1.40°1.40°
1.17°0.23°
1.40°1.40°
1.40°1.17°
0.23°
1.40° 1.40° 1.40° 3.80°1.35°
837
837
837
837
837
837
837
837
837
837
2524.04°
1400
1997
1406
1400
1307
1990
1400
1302
1050
231
1050
2400
1856
1135
654 1153
950
250
794
885
465 1073 1777
1050
1050
1412
1100
585
1359
973
10
4851
4849 31
11
1001
950
478
3511
6000
3128
579
1500
1654
TYPICAL
838
838
838
5.70°
27.23°
32.06°
13.61°
1000
10008 37
836
836
6.81°6.81°
837
837
TYPICAL
TYPICAL
TYPICAL
TYPICAL
TYPICAL
TYPICAL
TYPICAL
TYPICAL
TYPICAL
TYPICAL
TYPICAL
TYPICAL
TYPIC
AL
TYPI
CAL
TYPI
CAL
TYPIC
AL
TYPICAL
1500 7318
4586
231
581
6.81°
1.11°
609
aterman
Scales @ A0
Drawn By
Designed By Checked By
Date
Project No
Drawing Status
Client
Title
Project
Amendments
DescriptionRev Date By
GENERAL NOTES
Works Order No
Pickfords Wharf Clink Street London SE1 9DGUnited Kingdom
t +44 20 7928 7888 f +44 3333 444 [email protected] www.watermangroup.com
This drawing should not be scaled. Dimensions to be verified on site.Any discrepancies should be referred to the Engineer prior to work being put in hand.This drawing is the property of Waterman Structures Limited and the drawing is issued
on the condition that it is not copied, reproduced, retained or disclosed to anyunauthorised person, either wholly or in part without the consent in writing of
Waterman Structures LimitedPickfords Wharf Clink Street London SE1 9DG United Kingdom
t +44 20 7928 7888 f +44 3333 444 501
Publisher Zone Category Number Revision
1 : 100
33 KING WILLIAM STREET
Designer Checker
SKD SEPT 2014
H.B.REAVIS UK Ltd
SLAB EDGESFIRST FLOOR
TENDERSTR10614
Cen
tral:-
\\Nt-l
ncs\
wsl
\Pro
ject
s\ST
R10
614\
CAD
\3D
\WSL
Mod
els\
WSL
-106
14-S
A-33
KWS
- C
entra
l.rvt
0327SA 20 C02STR
C01 ISSUED FOR T1 STEELWORK TENDER10.09.14 MRA
C02 ISSUED FOR T2 STEELWORK TENDER01.12.14 SKD
ABBREVIATIONS
F.F.L. - Denotes Finished Floor Level.S.S.L. - Denotes Structural Slab Level.T.O.S. - Denotes Top Of Steel level.T.O.B.F. - Denotes Top Of Bottom Flange level.T.O.C. - Denotes Top Of Concrete level.B.O.C. - Denotes Bottom Of Concrete level.C.L.O.S. - Denotes Centre Line of Steel level.
LEVELSFORCES
- Indicates moment connection and factored ultimate design moment (kNm).
M=100
- Indicates end vertical reaction. Reaction is factored (kN).
R=125
- Indicates end horizontal reaction. Reaction is factored (kN).
H=125
- Indicates axial reaction. Reaction is factored (kN).
A=200
- Indicates torsional moment connection. Moment is ultimate and factored (kNm).
T=100
- Indicates horizontal moment connection and factored ultimate design moment (kNm).
HM=100
- Indicates amount of pre-camber to be applied to beam.
PC=15
COLUMNS- Denotes Column Carried.
- Denotes Column Capped by beam over.
- Denotes Column Stopped at T.O.S. level.
- Denotes Column Hanging.
CONCRETEN.W.C. - Denotes Normal Weight
Concrete.
L.W.C. - Denotes Light Weight Concrete
CCa
CC
CS
CH
CONNECTIONS OF STEELWORK AROUND LIFT SHAFTS IS NOT TOPROTRUDE INTO THE LIFT SHAFTS BEYOND THE SLAB EDGEWHERE A SLAB EXISTS, OR BEYOND THE STEEL SECTION WIDTH.
- Indicates 30Ø Holes along highlightedbeams placed @ 200mm Centres.Holes to be provided centrally onto thebeam depth
AN ALLOWANCE HAS BEEN MADE FOR A LOADFROM RECEPTION WALLS OF 30kN/m. LENGTHAS SHOWN ON JRA, AS OF 22/10/2014
14
13
12
11
9 8 7 6 5 4 2 1
15
16
17
18
19
20
21
22
23
J
H
G
F
E
D
C
24
26
27
A
A
B
B
E 532830.069 mN 180764.785 m
E 532831.852 mN 180721.596 m
20.42
°
5.61°
5.61°
5.61°
5.61°
5.61°
5.61°
5.61°
5.61°
5.61°
7.37°
E 532827.684 mN 180713.895 m
5664
1500
3010
27.23°
27.23°
32.06°
83702570
49536
61270
10337
12708
1325
4675
8.23°
PG02
PG02
PG70
PG65
PG38PG28PG63
5B
5B
5B
5B 5B
5B 5B
PG08
PG47
PG08
PG08
PG08
PG47BEBE
BE
BE
5B
PG10 PG10
PG08
PG08
5B
PG08
BE
BE
BE
BE
PG08
PG10
PG12
PG08
PG08
PG08
PG08
5B5B
5B
5B
5B
5B
EA3A
EA3A
PG20
PG114 PG114 PG114 PG62
PG20
PG111
PG33
PG33
PG111
PG10
PG10
PG10PG62
PG10
PG47
PG47
PG47
PG08
PG08
BE
PG47
AB
PG68PG68PG68PG68PG69
PG11
0PG
08
PG48
PG48
RHS50D
PG20
PG20
PG20
PG08
PG08
PG117
PG47
PG47
PG47
PG69
PG69
PG69
PG69
PG69
AB
PG56
ABAB
AB
AB
AB
PG08
PG08
PG110
PG110
PG110
PG110
PG15
PG08
PG47
PG47
PG47
AB
ABAB
PG08
PG08
PG11
0PG
08
PG11
0PG
08
PG11
0PG
08
PG11
0PG
08
PG11
0PG
08
PG11
0PG
08
PG11
0PG
08
PG11
0PG
08
PG11
2
PG11
3
AB
5B 5B5B
AB
AB
ABABAB
AB
AB
AB
ABAB
AB
AB AB
AB
AB
AB
AB AB
AB
AB
PG20
AB
6000
6000
6000
6000
6000
7318
73186000600060006000600060003000
5.61°
5.61°
27.23°
3
PG15
PG08
PG20 PG12
PG20PG12
PG12
PG44
PG47
PG47
PG105
PG20
PG25
PG12
PG25
PG20
PG10
PG20
PG12
PG12
PG25
PG25
PG11
PG10
PG47
PG47
PG47
PG105PG12PG12
PG12
PG12
PG12
PG12
PG12
PG12
PG10
PG47
PG10
PG08
PG72PG
08
PG08
PG08
PG11
3
PG11
2
PG12
PG10
PG15
AB
AB
PG117
PG11
7
PG117
PG117
AB
AB
AB
AB
AB
AB
PG117
AB
PG37
-C
PG11
7
AB
PG37-C
PG08
PG08
PG08
PG08
PG08
5B
PG46
PG82
PG82
PG82
PG82
PG82
PG31 PG31
PG82
PG82
PG09
PG09PG
82
PG82 PG82
PG82
PG115
Proposed Piled Raft Foundation
Proposed RC Retaining Wall
PG31
SSL +12.360 m
SSL +12.260 m
SSL +12.260 m
SSL +12.700 m
SSL +12.700 m
SSL +12.700 m
SSL +12.360 m
SSL +12.360 m
SSL +12.360 m
SSL +12.360 m
SSL +12.700 m
SSL +12.700 m
SSL +12.700 m
SSL +12.360 m
SSL +12.700 m
325mm Thick RC Slab
VBVB
VBVB
VB
VB
VB
VB
VB
VBVB
VB
VB VB
VB
VBVB
VB
VB
VB
VB
150mm ThickRC Structural
Slab
150mm Thick RCStructural Slab
150mm ThickRC Structural
Slab
Proposed Precast 300mm Thick TwinWall construction, under Metal Deck Slab.Rebar to be placed into Cavity of PCTwinwall and cast into new Metal DeckSlabs
Ex. Retaining Wall
150mm Thick RCStructural Slab
For Details of Proposed Piled Raft,refer to Drawing No. 10614 SA 10 0067
Tran
sfer B
eam
Transfer Beam
Trans
fer Be
am(C
oncre
te En
case
d)
All CHS's to be concrete filled andArchitecturally finished intumescent paint.
A= 1800kN
A= 18
00kN
A= ?
A= ?
A= ?
A= ?
A= ?
A= ?
A= ?
A= ?
A= ?
A= ?
A= ?
A= ?
A= ?
A= ?
For Additional Details to PublicEntrance Stairs and Lift, refer toDrawings STR SA 24 0550 & 0551
Stair Core
Fire Lift 1
Goods Lift
Concrete Encasementto External Columns
PBG10-C
PG56
PG82
PG82
PG82PG82
PG62
PG117
PG08
PG10-C
AB-C
AB-CAB-C
AB-C
AB
AB
AB
PG117
AB
AB
PG08 PG08
PG15
PG20
PG08
PG08
PG10
PG10
200mm RCUpstand Wall
Proposed Precast300mm Thick Twin Wallconstruction, under.
Proposed Precast300mm Thick Twin Wallconstruction, under.
+12.550 m
+12.210 m
PG60
PG54
PG28
PG54
PG54
+12.6
07 m
PG08
PG47
PG62
EA3A
EA3A
+12.550 m
10420
20420
30420
40420
50420
60420
70420
80420
260420
90420
100420
110420
120420
130420
140420
150420
170420
180420
190420
220420
230420
240420
250420
280420
270420
UA7A+12.550
210420
200420
160420
290420
AB
Piled Raft Extension In Abeyance.
EA3A
310420
5B
150mm ThickRC Structural
Slab
150mm Thick RCStructural Slab
PG12
PG12
320420
AB
AB
325mm ThickRC Slab
FLT225x20TOS +12.550 m
AB
EA3ATOS +12.210 m
New Lift Core
300420
(Concrete Encased)
EA3ATOS +12.010 m
TOS
+12.5
50 m
A= ?
A= ?
A= ?
A= ?
Where assumeUnless Noted Otherwise
A= 1000kNA= ?
TOBF +12.800 m
10421
39
0421
Proposed RC Retaining Wall
PG37-C
B2 69 B2 70B2 71
B2 72B2 40
B2 44
B2 46
B2 35B2 34
B2 17
B2 01
B2 39
B2 41
B2 61
B2 04
G 162G 163
B2 33B2 27
B2 25
B2 23
B2 05
B2 06
B2 07
B2 01
B2 78
B2 79
B2 80
B2 81
B2 83
B2103 B2115
B2116
B2101
B2100 B2 77
B2 75B2112
B2113 B2 97 B2 74
B2 95B2 91
B2106B2107
B2104
B2105
B2 84
B2 85
B2 86
B2102
B1136
B2 69 B2 70B2 71
B2 72
B2 46
B2 04
B2 08
B2 09
B2 35B2 34B2 33B2 32B2 31B2 30B2 29B2 27
B2 26
B2 25
B2 21
B2 20
B2 19
B2 18
B2 17
G 164
B2 02
B2 36
B2 69 B2 70B2 71
B2 72B2 40
B2 44
B2 46
B2 35B2 34
B2 17
B2 14
B2 01
B2 39
B2 41
B2 60
B2 61
B2 38
B2 04
G 162G 163
B2 33B2 27
B2 25
B2 23
B2 05
B2 06
B2 07
B2 01
B2 15
B2 78
B2 79
B2 80
B2 81
B2 82
B2 83
B2115
B2116
B2101
B2100 B2 77
B2 99
B2 76
B2 75B2 98B2114
B2112
B2111 B2113 B2 97 B2 74
B2 73
B2 96
B2 95B2 93B2 91
B2106B2107 B2109
B2110B2104
B2108
B2105
B2 84
B2 85
B2 86
B2102
B1136
B2 69
B2 88
B2 70B2 71
B2 72
B2 46
B2 48
B2 50
B2 04
B2 08
B2 09
B2 10
B2 35B2 34B2 33B2 32B2 31B2 30B2 29B2 27
B2 26
B2 25
G 165
B2 21
B2 20
B2 19
B2 18
B2 17
B2 16
G 164
B2 57
B2 02
B2 36
25
10
27.23°
13.61°
G 167
1350
1350
G 166
Tran
sfer B
eam
24.04°
32.06°
All Composite Slabs at this level to be 120minute Fire rating. Solid RC Slabs at Grids
12 to 20, A to B, 240 minute fire rating
PG15
PG54
TOS
+12.0
40 m
330420
PG10 A= ?
Transfer Beam
EA3A
EA3ATOS +12.040 m
TOS
+12.1
10 m
TOS
+12.1
10 m
PG08R=40
0R=
400
AB-C
R=27
0R=
270
RHS2
2F
RHS2
2F
RHS2
2F
RHS2
2F
RHS2
2F
RHS2
2F
AB
TOBF+12.375
AB
240421
PG08
PG08
PG08
PG08
***
*
TOS +12.607 m
TOS +
12.60
7 m
TOS +12.607 m
TOS +12.607 m
TOS +12.607 m
TOS +12.607 m
TOS +12.607 m
TOS +12.607
m
TOS +12.607 m
TOS +12.607 m
TOS +12.607 m
TOS +12.607 m
TOS +12.607 m
TOS +12.607 m
TOS +12.550 m
AB
+12.607 m
TOS +12.607 m
TOS +12.607 m
TOS +12.625 m
TOS +12.607 m
TOS +12.607 m
TOS +12.607
m
TOS +1
2.607
m
TOS +
12.60
7 m
TOS
+12.6
07 m
TOS +
12.60
7 m
+12.6
07 m
+12.6
07 m
TOS +
12.60
7 m
cs
cs
(Concrete Encased) Transfer Beam(Concrete Encased)
TOS +12.607 m
A=500
A=500
A=500
A=500
A=500
A=500
A=1800kN
A=500
A=500
A=500
A=1800kN
**
**
**
**
**
#
#
#
#
#
#
#
PG117
R=800 R=800
R=800 R=800
350421
TOBF +12.550 TOBF +12.550
TOBF +12.550
TOBF
+12.5
50
TOBF
+12.2
10TO
S +1
2.550
TOBF
+12.0
40
PG08 PG08 PG08PG08PG08 PG08 PG08 PG08 PG08
5B
PG38-T
AB
AB
AB
PG12
2
2004100200
3500
1150
4850
2500
370421
PG18
200
200
PG11
9
SSL +11.430 m
TOBF
+11.7
60
TOBF
+11.7
60
TOBF +11.760
TOBF +11.760
380421
PG11
9
60620
950
500
750
550 950 950
1025 950 950 950 550 1025950 950 1025 950 950 550
925 1150 925 500 500 500
105
630
415925
925
925
775
925
925
133
500
925
925
500
500
1150
925
500
500
500
500925
925500
925
PG331145
1250500
500500
1250
3000
1490
1510
1510
1490
3000
16.03°
16.03°
15.79°11.74°
0.22°
2.81°
2.81°
9501250
950
500500
500
9501200
925
500500
500500
500
500500
925925
925 500 500 500500 500 500 500 925
925 1150 925
925 925 650
500 500 500 500 500500500500
1000
500
500
500
950
950
950
500
925
925
500
500
1230 950 820
925895925 925 5751025950950 1025
950
950
925
925
500
500
500
500
500
500
925
925
3000 3000 3000 3000 2990 214616001400
500
500
500
1295
1150
925
1300
1150
925
500
500
5091
1017
550
1750
700
600600
600600
2.81°
5.61°
4.02°
2.81°
1073 20771173 1877
925925
500
500950
975
925
925
500
925
925
500
500
500
500
500
500
950
950
500
925
925
500
500
200
4650
200
30421
500
1434
1000
950
950
1100
500
R=800
R=800 R=800
R=800
TOS +12.607 m
TOS +12.210 m
TOS +12.700 m TOS +12.700 m TOS +12.700 mTOS +12.
700 m
TOS +12.550 m
TOS +
12.55
0 m
TOS +12.210 m
TOS +12.550 m
TOS +10.795 m
TOS
+12.2
00 m
TOS
+12.0
40 m
TOS +12.040 m
TOS
+12.0
30 m
TOS
+12.0
30 m
TOS
+12.0
30 m
TOS
+12.0
30 m
TOS
+12.0
30 m
TOS
+12.0
40 m
TOS +12.700 m
TOS +12.550 m
TOS
+12.5
50 m
TOS +12.607 m
TOS +1
2.607
m
TOS +12.607 m
TOS
+10.8
67 m
PG05
20421
CS
CS
CCa
CS
CCa
CS
CS
CS
TOBF
+11.7
60
*
TOS +12.700m
TOS +12.700m
TOS
+12.2
00 m
TOS
+12.2
00 m
TOS
+12.0
20 m
TOS +11.760 m
TOS
+11.7
60 m
TOS
+11.7
60 m
TOS +11.760 m
TOS
+12.2
10 m
CS
AB
PG12
TOS
+12.1
10 m
TOS +12.210 m
TOS +12.210 m
40421
EA2G
EA2G
TOS +12.210 m
TOS +12.210 m
TOS
+12.1
10 m
M=2000kNV=800kN
M=60kNm
M=60kNm
M=60kNm
M=60kNm
M=60kNm
M=90k
Nm
M=90k
Nm
M=90kNm
M=90kNm
M=90kNm
M=90kNm
M=90kNmM=90kNm
M=90kNm
M=90kNm
M=90kNm
M=90kNm
M=90kNm
M=90kNm
M=90kNmM=90kNm
M=90kNmM=90kNm
M=90kNmM=90kNm
M=60kNm
M=60kNm
M=60kNm
M=60
kNm
M=60
kNm
M=60
kNm
M=60
kNm
M=60
kNm
M=60
kNm
M=60
kNm
M=60
kNm
M=60
kNm
M=60
kNm
M=60
kNm
M=60
kNm
M=60
kNm
M=60
kNm
M=60
kNm
M=15
0kNm
M=15
0kNm
M=15
0kNm
M=150kNm
M=150kNm M=150kNm
Concrete slab 300mm thk.
Column unrestrained in theW-E direction between2nd floor & Basement duringconstruction. Steel contractorto make all allowances & provisionsfor temporary case.
End of beam to besupported off existingdiaphragm wall
PG10
-C
A= 250kN
A= 250kN
A= 250kN
A= 250kN
A= 250k
N
A= 250k
N
A= 25
0kN
A= 25
0kN
A= 25
0kN
A= 25
0kN
A= 25
0kN
A= 25
0kN
#
#
#
#
A= 250kN
A= 250kN
A= 250kN
A= 250kNA= 250kN
A= 250kN
A= 250kN
A= 250kN
A= 25
0kN
A= 250kNA= 25
0kN
A= 25
0kN
#
#
#
#
#
#
#
PG08
PG08
PG08
PG08
PG08
TOS +12.325 m
TOS +12.325 m
TOS +12.325 m
TOS +12.550 m
TOS +12.544 m
500
925
925
509
1000
389
500
500
950950253
1488
PG08
PG08
1256 1539
PG01 - Indicates steel beam centre line andbeam reference. Top Flange to be -150S.S.L. level, unless noted otherwise.
- Denotes steel shelf angle to support metaldeck edge and size reference. See localsections for angle orientation.
Beam Legend:
PG01 - Indicates upstand steel beam and beamreference. Upstand Beam level shown asTOB/TOBF (Top of Bottom Flange) unless,noted otherwise. Refer to relevant sections.
- Indicates 250mm dia. service holethrough beam web. Hole to be atmid depth unless noted otherwise.Typically holes at 500mm centres,unless noted otherwise.
- Indicates rectangular service holethrough beam web. Size 500x250mmDeep. Hole to be at mid depth,unless noted otherwise.
- Indicates rectangular service holethrough beam web. Size 750x250mmDeep. Hole to be at mid depth,unless noted otherwise.
- Indicates rectangular service holethrough beam web. Size 850x250mmDeep. Hole to be at mid depth,unless noted otherwise.
- Indicates rectangular service holethrough beam web. Size 300x250mmDeep. Hole to be at mid depth,unless noted otherwise.
- Denotes steel support plates to metaldeck edges and solid rc slabs.See plans and local sections for sizeand levels.
- Denotes Span Direction, Thickness and Type of New Floor Construction Floors noted as (NWC)/(LWC) to be metal deck concrete slabs.
B2100 - Denotes Column Founding Leveland Individual Reference Number.Refer to Drawing Nos. STR-10614-23-0600 to 0606
- Indicates 1500mm Width Area designed for 7.5 kN/m² 1500mm WIDE
- Denotes Concrete Upstands
- Denotes Steel Column with 50mm min. Concrete Encasement.
- Indicates vertical cross bracing bay.Refer to Bracing Elevation drawing Nos.0550 to 0552
VB
50mm Dia. Coupler to be welded onto columnflange, centrally placed to receive H32 Rebar toprovide tie provision. H32 to be fully lapped inthe slab.FW 15mm to be provided all around couplerperimeter.
**
- 30mm Dia. holes along highlightedbeams placed @ 200mm c/c.Hole to be provided centrally ontothe beam depth.
#
- Light weight concrete.
- Normal weight concrete.
aterman
Scales @ A0
Drawn By
Designed By Checked By
Date
Project No
Drawing Status
Client
Title
Project
Amendments
DescriptionRev Date By
GENERAL NOTES
Works Order No
Pickfords Wharf Clink Street London SE1 9DGUnited Kingdom
t +44 20 7928 7888 f +44 3333 444 [email protected] www.watermangroup.com
This drawing should not be scaled. Dimensions to be verified on site.Any discrepancies should be referred to the Engineer prior to work being put in hand.This drawing is the property of Waterman Structures Limited and the drawing is issued
on the condition that it is not copied, reproduced, retained or disclosed to anyunauthorised person, either wholly or in part without the consent in writing of
Waterman Structures LimitedPickfords Wharf Clink Street London SE1 9DG United Kingdom
t +44 20 7928 7888 f +44 3333 444 501
Publisher Zone Category Number Revision
As indicated
33 KING WILLIAM STREET
OR JPT
MRA/SKD JULY 2014
H.B.REAVIS UK Ltd
STEEL GENERALARRANGEMENTGROUND FLOOR
CONSTRUCTIONSTR10614
Cen
tral:-
\\Nt-l
ncs\
wsl
\Pro
ject
s\ST
R10
614\
CAD
\3D
\WSL
Mod
els\
WSL
-106
14-S
A-33
KWS
- C
entra
l.rvt
0110SA 20 E04STR
1 : 100
B01 STAGE D28.07.14 MRA
FFL =SSL =TOS =
+150As Shown-150Unless Noted Otherwise
SURVEYED LINE OF EXISTING DIAPHRAGMWALL AND IMPERFECTIONS OF ITS
INCORPORATION REMAIN WITHSTANDING.
C01 ISSUED FOR T1 STEELWORK TENDER10.09.14 MRA
STUB BEAMS EXTENT TO THE PERIMETER OFGRID LINES 24 to 27; 8 to 14 & H to GRID 2.
SETTING OUT TO BE ADJUSTED TO SUIT SLABPROFILE FACET, REFER TO STAGE D REPORT
C02 ISSUED FOR T2 STEELWORK TENDER01.12.14 SKD
IN ABEYANCE (PILES,PILECAPS AND BASEPLATESTO BE COORIDINATED WITHTFL BANK STATION WORK).
FOR LOCATION OF SHEAR PLATESREFER TO DRAWINGS STR10614-
SA-23-0609 AND STR10614-SA-23-0620
FOR SHEAR PLATE CONNECTION OFCONCRETE SLAB TO STEEL COLUMN,REFER TO WSL'S DRAWING STR-SA-230609AND STR10614-SA-23-0620.
E01 STEEL CONSTRUCTION ISSUE UP TO GROUNDFLOOR ONLY19.12.14 MRA
E02 STEEL CONSTRUCTION ISSUE UP TO GROUNDFLOOR ONLY16.01.15 MRA
E03 STEEL CONSTRUCTION ISSUE UP TO GROUNDFLOOR ONLY23.01.15 SKD
E04STEEL CONSTRUCTION ISSUE UP TO GROUNDFLOOR ONLY. EXISTING RETAINED STRUCTUREOMITTED FROM PREVIOUS REVISION.
27.01.15 SKD
150mm ThickStructural Slab
SSL +8.425 mLower Ground Floor
PG42
PG28
EA3A
EA3A
50mm Thick StructuralSlab Topping
100x200x10 UnequalAngle to be Cut Down50mm.
15mm Fillet Weld
150mm ThickStructural Slab
Lower Ground Floor
PG05PG05
SSL +8.425 m
AB
150
150mm ThickStructural Slab
SSL +8.425 mLower Ground Floor
PG53
PG05 TOBF +8.275 m
150mm ThickStructural Slab
SSL +8.425 mLower Ground Floor
PG42
5B
EA3A
50mm Thick RCStructural Slab Topping
100x200x10 UnequalAngle to be Cut Down50mm.
15mm Fillet Weld
SSL +8.425 mLower Ground Floor
Loading BayPG39
AETOS +7.380 m
400mm ThickStructural Slab
150mm Thick RCComposite Structural Slab
150mm ThickRC Upstand Wall
400mm ThickRC Structural Slab
2x10mm thick stiffenerplates @ 200 c/c
Studs @ 200 c/c 30Ø Holes placed @200mm Centres thro' BeamWeb to receive Rebar
55
TOS +8.275 m
150mm Thick RCComposite Structural Slab
150mm ThickRC Upstand Wall
PG39
400mm ThickRC Structural Slab
SSL +7.780 mLoading Bay
Lower Ground FloorSSL +8.425 m
2x10mm thickstiffener plates@ 200 c/c
Studs @ 200 c/c
55
30Ø Holes placed @200mm Centres thro' BeamWeb to receive Rebar
400mm ThickRC Structural Slab
150mm ThickRC Slab
SSL +7.780 mLoading Bay
150mm ThickRC Upstand Wall
Lower Ground Floor
PG39
SSL +8.425 m
2x10mm thickstiffener plates@ 200 c/c
Studs @ 200 c/c
TOS +8.275 m
55
30Ø Holes placed @200mm Centres thro' BeamWeb to receive Rebar
400mm ThickRC Structural Slab
150mm ThickRC Slab
SSL +7.780 mLoading Bay
150mm ThickRC Upstand Wall
Lower Ground Floor
PG39
2x10mm thickstiffener plates@ 200 c/c
Studs @ 200 c/c
SSL +8.425 m
TOS +8.275 m
30Ø Holes placed @200mm Centres thro' BeamWeb to receive Rebar
55
400mm ThickRC Structural Slab
SSL +7.780 mLoading Bay Lower Ground Floor
PG108TOS +7.640 m
B
300
140
30040
0
290
SSL +7.780 m
30Ø Holes along highlighted beamsplaced @ 200mm Centres.
150mm ThickStructural Slab
SSL +8.425 mLower Ground Floor
150
150mm ThickStructural Slab
SSL +8.425 mLower Ground Floor
PG24
150150mm ThickStructural Slab
SSL +8.425 mLower Ground Floor
PG27PG28
150mm ThickStructural Slab
SSL +8.425 mLower Ground Floor
PG27 PG27
150mm ThickStructural Slab
Lower Ground Floor
PG25
SSL +8.425 m
TOS +8.275 m
150
150mm ThickStructural Slab
SSL +8.425 mLower Ground Floor
PG25 PG24-C
150mm ThickStructural Slab
SSL +8.425 mLower Ground Floor
PG04PG24-C
150mm ThickStructural Slab
Lower Ground Floor
PG09
SSL +8.425 m
TOS +8.275 m
200
SSL +8.425 m
SSL +7.780 mLoading Bay
Lower Ground Level
150mm ThickStructural Slab
150mm ThickStructural Wall
400mm ThickStructural Slab
Void Former
PG39TOS +8.275 m
Varies
150mm ThickRC Slab
30Ø Holes placed @200mm Centres thro' BeamWeb to receive Rebar
55
150mm ThickStructural SlabLower Ground Floor
PG107
SSL +8.425 m
EA3CEA3C
100x200x10 UnequalAngle to be Cut Down50mm.
15mm Fillet Weld
150mm ThickStructural SlabLower Ground Floor
PG61-CPG105-C PG105-C
EA3AEA3A
SSL +8.425 m
TOS +8.425 m
95
100x200x10 UnequalAngle to be Cut Down50mm.
15mm Fillet Weld
EA2G EA2G
PG42
SSL +8.425 m
150mm ThickStructural Slab
Lower Ground Floor
50mm Thick RCStructural Slab Topping
TOS +8.375 m
100x200x10 UnequalAngle to be Cut Down50mm.
15mm Fillet Weld
aterman
Scales @ A0
Drawn By
Designed By Checked By
Date
Project No
Drawing Status
Client
Title
Project
Amendments
DescriptionRev Date By
GENERAL NOTES
Works Order No
Pickfords Wharf Clink Street London SE1 9DGUnited Kingdom
t +44 20 7928 7888 f +44 3333 444 [email protected] www.watermangroup.com
This drawing should not be scaled. Dimensions to be verified on site.Any discrepancies should be referred to the Engineer prior to work being put in hand.This drawing is the property of Waterman Structures Limited and the drawing is issued
on the condition that it is not copied, reproduced, retained or disclosed to anyunauthorised person, either wholly or in part without the consent in writing of
Waterman Structures LimitedPickfords Wharf Clink Street London SE1 9DG United Kingdom
t +44 20 7928 7888 f +44 3333 444 501
Publisher Zone Category Number Revision
1 : 20
33 KING WILLIAM STREET
Designer Checker
MRA/SKD SEPT '14
H.B.REAVIS UK Ltd
LOWER GROUND FLOORSECTIONSSHEET 1
CONSTRUCTIONSTR10614
Cen
tral:-
\\Nt-l
ncs\
wsl
\Pro
ject
s\ST
R10
614\
CAD
\3D
\WSL
Mod
els\
WSL
-106
14-S
A-33
KWS
- C
entra
l.rvt
0415SA 21 E04STR
C01 ISSUED FOR T1 STEELWORK TENDER10.09.14 MRA
Section 1 Section 2 Section 3 Section 4 Section 5 Section 6
Section 7Section 8
Section 9Section 10 Section 11 Section 12
Section 13 Section 14 Section 15 Section 16 Section 17 Section 18
Section 19
1. For locations of Sections, refer to Drawing STR-SA-20-0109
Section 20
Section 21
INTERFACE BETWEEN SOLID SLAB, ABOVE AND BELOW THELOADING BAY AND THE ADJACENT METAL DECK SLAB/COREAREA YET TO BE DEVELOPED.STEELWORK CONTRACTOR TO ALLOW FOR THE FOLLOWINGTO BE INCLUDED TO STEEL BEAMS ALONG THAT INTERFACE. - 2x50Ø HOLES @ 150mm C/C THROUGH BEAM WEB. - SHELF ANGLES TO BOTH SIDES OF BEAMS, TO BE WELDED CONTINUOUSLY TO WEBS. - PLATE STIFFENERS TO BOTH SIDES OF BEAMS @ 1m. C/C's
C02 ISSUED FOR T2 STEELWORK TENDER01.12.14 SKD
2. FOR BEAM SECTION SIZES, REFER TO DRAWING No. 0002
STEEL TO STEEL CONNECTIONS NOT SHOWN ON THEPRESENT DRAWING. DESIGN AND DETAILING IS TO MAINCONTRACTOR RESPONSIBILITY.
SUBJECT TO ENGINEERS APPROVAL.
E01 STEEL CONSTRUCTION ISSUE UP TO GROUNDFLOOR ONLY19.12.14 MRA
E02 STEEL CONSTRUCTION ISSUE UP TO GROUNDFLOOR ONLY16.01.15 SGP
E03 STEEL CONSTRUCTION ISSUE UP TO GROUNDFLOOR ONLY23.01.15 SKD
E04STEEL CONSTRUCTION ISSUE UP TO GROUNDFLOOR ONLY. EXISTING RETAINED STRUCTUREOMITTED FROM PREVIOUS REVISION.
27.01.15 SKD
B2 01
UKC2
54x2
54x8
9UK
C254
x254
x89
UKC2
54x2
54x8
9UK
C254
x254
x89
BP4
+3.860 m
350x
25m m
T&B
300x
20W
Plat
e Colu
m n35
0x25
m m T
&B 30
0x20
W P
late C
olum n
Conc
rete
Enca
seme
nt
+19.500 m
+12.360 m
UC25
4x25
4x89
+3.860 m
UC305x305x198
B2 02
BP4
B2 03
UC305x305x198
+3.860 m
BP4
UC305x305x198
B2 04
+3.860 m
UC25
4x25
4x10
7UC
254x
254x
107
UC20
3x20
3x86
UC20
3x20
3x86
BP9
350x
45m m
T&B
260x
45W
Plat
e Colu
m n
350x
45m m
T&B
260x
45W
Plat
e Colu
m n
350x
25m m
T&B
300x
20W
Plat
e Colu
m n
Concrete Encased
Conc
rete
Enca
sed
+19.500 m
+12.360 m
+7.812 m
UC25
4x25
4x10
7
UKC2
54x2
54x1
07UK
C254
x254
x107
UKC2
03x2
03x8
6UK
C203
x203
x86
B2 05
BP13
F-1
+3.860 m
350x
25m m
T&B
300x
20W
Plat
e Colu
m n35
0x25
m m T
&B 30
0x20
W P
late C
olum n
350x
25m m
T&B
300x
20W
Plat
e Colu
m n
Conc
rete
Enca
sed
Conc
rete
Enca
sed
+19.500 m
+12.360 m
+8.275 m
UC25
4x25
4x10
7
B2 06
UKC2
03x2
03x8
6UK
C203
x203
x86
UKC2
54x2
54x1
07UK
C254
x254
x107
BP4
E-1
+3.860 m
350x
25m m
T&B
300x
20W
Plat
e Colu
m n35
0x25
m m T
&B 30
0x20
W P
late C
olum n
350x
25m m
T&B
300x
20W
Plat
e Colu
m n
Conc
rete
Enca
sed
Conc
rete
Enca
sed
+19.500 m
+12.360 m
+8.275 m
UC25
4x25
4x10
7
B2 07
UKC2
03x2
03x8
6UK
C203
x203
x86
UKC2
54x2
54x1
07UK
C254
x254
x107
BP4
D-1
+3.860 m
350x
25m m
T&B
300x
20W
Plat
e Colu
m n35
0x25
m m T
&B 30
0x20
W P
late C
olum n
350x
25m m
T&B
300x
20W
Plat
e Colu
m n
Conc
rete
Enca
sed
+19.500 m
+12.360 m
Conc
rete
Enca
sed
+8.275 m
UC25
4x25
4x10
7
B2 08
UKC2
54x2
54x1
07UK
C254
x254
x107
UKC2
03x2
03x8
6UK
C203
x203
x86
BP4
+3.860 m
350x
25m m
T&B
300x
20W
Plat
e Colu
m n35
0x25
m m T
&B 30
0x20
W P
late C
olum n
350x
25m m
T&B
300x
20W
Plat
e Colu
m n
Conc
rete
Enca
sed
+8.275 m
UC25
4x25
4x10
7
UKC2
54x2
54x8
9UK
C254
x254
x89
UKC2
54x2
54x8
9UK
C254
x254
x107
UKC2
54x2
54x1
32UK
C305
x305
x198
B2 09
BP4
+3.860 m
UKC3
05x3
05x1
98
Conc
rete
Enca
sed
+8.275 m
B2 10
UC30
5x30
5x28
3
+3.860 m
UC305x305x283
UC25
4x25
4x13
2UC
254x
254x
107
UC25
4x25
4x10
7UC
254x
254x
107
UC25
4x25
4x10
7
BP9
Conc
rete
Enca
sed
Concrete Encased
+8.275 m
+12.000 m
B2 11
UC30
5x30
5x19
8
+3.860 m
UC305x305x198
UC25
4x25
4x10
7UC
254x
254x
89UC
254x
254x
89UC
254x
254x
89UC
254x
254x
89
BP9
Conc
rete
Enca
sed
Concrete Encased
+8.275 m
+12.099 m
B2 12
BP1
+3.860 mUC
203x
203x
86UC
203x
203x
86
B2 13
UKC2
03x2
03x6
0
BP1
+2.760 m
UKC2
03x2
03x6
0
Conc
rete
Enca
sed
+8.425 m
B2 14
UKC3
56x4
06x3
40UK
C305
x305
x198
UKC2
54x2
54x1
32UK
C254
x254
x107
UKC2
54x2
54x8
9UK
C203
x203
x86
UC356x406x340
BP9
+2.760 m
UC305x305x198
Conc
rete
Enca
sed
+7.275 m
B2 15
UKC3
05x3
05x1
98UK
C254
x254
x167
UKC2
54x2
54x1
32UK
C254
x254
x107
UKC2
54x2
54x8
9UK
C203
x203
x86
BP3
A-21
+3.860 m
UKC3
05x3
05x1
98
Conc
rete
Enca
sed
+8.275 m
B2 16
UKC2
54x2
54x1
67UK
C254
x254
x132
UKC2
54x2
54x1
07UK
C254
x254
x89
UKC2
03x2
03x8
6
BP9
+3.860 m
UKC3
05x3
05x2
83
UC305x305x283Concrete Encased
+8.100 m
B2 17
UC356x406x287
+3.860 m
UC30
5x30
5x19
8UC
254x
254x
167
UC25
4x25
4x13
2UC
254x
254x
107
UC25
4x25
4x10
7UC
254x
254x
89
BP9
Concrete Encased
+7.810 m
B2 18
UC356x406x287
+3.860 m
UC25
4x25
4x16
7UC
254x
254x
167
UC25
4x25
4x13
2UC
254x
254x
107
UC25
4x25
4x10
7UC
254x
254x
89
BP9
Concrete Encased
+12.375 m
+3.245 m
UC25
4x25
4x13
2UC
254x
254x
132
UC25
4x25
4x13
2UC
254x
254x
167
UC25
4x25
4x16
7UC
254x
254x
167
BP9
Concrete Encased
+12.344 m
B2 19 B2 20
UC356x406x287
+3.245 m
UC25
4x25
4x89
UC25
4x25
4x10
7UC
254x
254x
132
UC25
4x25
4x16
7UC
254x
254x
167
UC30
5x30
5x19
8
BP9
Concrete Encased
Conc
rete
Enca
sed
+12.700 m
4 No. holes for M20 dia. locating bolts /anchors minimum .
Column bolts to be designed for the following:
i) Horizontal shear, the largest of national horizontal load equal to 1%of axial load , or, horizontal component of the lowest storey of bracing.
ii) Tensile forces as noted on the column schedule.
the steelwork contractor must design all column baseplate connectionsby such a time enable bolts and templates to be provided to theconcrete contractor to cast into the raft slab, if required, or locallydisplaced slab reinforcement to avoid post drilled bolt locations.
The Contractor shall allow for any increase in size of baseplates to suitthe bolt design and arrangement. the sizes shown here are theminimum required for bearing only.
9. C3 - Denotes column with C3 exposure point applied.
10. All concrete filled CHS` are to be intumescent painted for 120minuteperiod Basement to Ground, and 90 minutes Ground to Roof level.
Column size varies. Columnsare to be positioned centrallyon the baseplate.
All columns to be centredon baseplates unlesseccentricity shown.
4. All concrete filled hollow sections are to include 20mm Ø vent holeslocated in diametrically opposite pairs in the ceiling void and floor void ofeach level. drain holes are to be provided where division plates arepresent. All holes to be temporarily plugged during concreting.
3. 1x50mm Ø grout hole is to be provided per 0.5m² of basplate, locatedso as to not influence the bolt design. Where multiple grout holes arerequired they are to be placed evenly on the baseplate area.
1. All internal concrete filled CHS columns to be high qualityArchitectural finish intumescent painted with no joints or gaps visiblebenchmark standard is 6 Bevis Marks, London.
2. The steel fabricator shall, based on experience of similar size projects,make due allowance for baseplate sizes for all columns.
X - See table below
Y - S
ee ta
ble be
low
Top of bolt toextend aboveF.F.L. -35mm
25no
mina
l gro
ut
U/SideBaseplate
WELDS TO PLATE GIRDER COLUMN SECTIONSTO BE:-
8mm F.W. - PLATES LESS THAN 40mm THICK10mm F.W. - PLATES 40mm TO 60mm THICK12mm F.W. - PLATES MORE THAN 60mm THICK
D
F
W
B
PG COLUMNS
ALL BASEPLATE DETAILS ARESUBJECT TO APPROVAL BY THE ARCHITECT IN
TERMS OF FLOOR FINISHES AND OTHERARCHITECTURAL CONSTRAINTS
5. Allowances is to be made for shear keys to baseplates to be providedfor all columns with "V=" noted.Refer to Stage D report Clause 1.7 See Detail..A Drg.STR/SA/23/0610
6. Allowances is to be made for uplift baseplate detail noted in Stage Dreport Clause 1.7.All columns with "T=" noted. See Detail..B Drg.STR/SA/23/0610
7. Assume all fabricated columns are welded with 4 No. continuous fillet welds.
8. BASEPLATES:
Baseplate Reference X Y Thickness
BP1 270 270 25
BP3 525 525 70
BP4 425 425 40
BP6 625 625 100
BP7 700 700 100
BP8 675 675 60
BP2 380 380 40
BP6A 575 575 60
BP9 700 700 60
BP10 800 800 100
Baseplate Reference X Y Thickness
BP13 425 395 40
BP14 700 622 50
BP15 700 664 60
BP6B 575 575 70
BP5 525 525 50
Depth
Flang
e Thic
knes
s
Flang
e Thic
knes
s
Flange Width
Web Thickness
Flange Width
50 m
m Co
ncre
te En
case
ment
50 mm Concrete Encasement
WELDS TO PLATE GIRDER COLUMN SECTIONSTO BE:-
8mm F.W. - PLATES LESS THAN 40mm THICK10mm F.W. - PLATES 40mm TO 60mm THICK12mm F.W. - PLATES MORE THAN 60mm THICK
PG-C COLUMNS
For details of the columnbetween the floor level and thesplice above please refer todrawing STR-SA-23-0610 whichshows a divisional plate at floorlevel and the column reducing insize between the divisional plateand the splice to match the sizeof the column above the splice.
aterman
Scales @ A0
Drawn By
Designed By Checked By
Date
Project No
Drawing Status
Client
Title
Project
Amendments
DescriptionRev Date By
GENERAL NOTES
Works Order No
Pickfords Wharf Clink Street London SE1 9DGUnited Kingdom
t +44 20 7928 7888 f +44 3333 444 [email protected] www.watermangroup.com
This drawing should not be scaled. Dimensions to be verified on site.Any discrepancies should be referred to the Engineer prior to work being put in hand.This drawing is the property of Waterman Structures Limited and the drawing is issued
on the condition that it is not copied, reproduced, retained or disclosed to anyunauthorised person, either wholly or in part without the consent in writing of
Waterman Structures LimitedPickfords Wharf Clink Street London SE1 9DG United Kingdom
t +44 20 7928 7888 f +44 3333 444 501
Publisher Zone Category Number Revision
As indicated
33 KING WILLIAM STREET
Designer Checker
SKD
H.B.REAVIS UK Ltd
STANCHION SCHEDULESSHEET 1
CONSTRUCTIONSTR10614
Cen
tral:-
\\Nt-l
ncs\
wsl
\Pro
ject
s\ST
R10
614\
CAD
\3D
\WSL
Mod
els\
WSL
-106
14-S
A-33
KWS
- C
entra
l.rvt
0600SA 23 E03STR
KEY PLAN
1 : 100
WSL COLUMN REFERENCE
COLUMN GRID LOCATION
SEVENTH FLOOR S.S.L.+38.350m
EIGHTH FLOOR S.S.L.+42.000m
NINTH FLOOR S.S.L.
+45.650m
UPPER ROOF LEVEL S.S.L.+51.200m
ROOF LEVEL S.S.L.+49.600m
SIXTH FLOOR S.S.L.+34.700m
COLU
MN T
YPE
COLU
MN T
YPE
FIFTH FLOOR S.S.L.+31.050m
FOURTH FLOOR S.S.L.+27.400m
THIRD FLOOR S.S.L.+23.750m
SECOND FLOOR S.S.L.+20.100m
FIRST FLOOR S.S.L.+16.350m
GROUND FLOOR S.S.L.+12.700m
LOWER GROUND S.S.L.+8.425m
Ex. BASEMENT S.S.L.+3.835m
Ex. BASEMENT S.S.L.+2.785m
SEVENTH FLOOR S.S.L.+38.350m
EIGHTH FLOOR S.S.L.+42.000m
NINTH FLOOR S.S.L.
+45.650m
UPPER ROOF LEVEL S.S.L.+51.200m
ROOF LEVEL S.S.L.+49.600m
SIXTH FLOOR S.S.L.+34.700m
FIFTH FLOOR S.S.L.+31.050m
FOURTH FLOOR S.S.L.+27.400m
THIRD FLOOR S.S.L.+23.750m
SECOND FLOOR S.S.L.+20.100m
FIRST FLOOR S.S.L.+16.350m
GROUND FLOOR S.S.L.+12.700m
LOWER GROUND S.S.L.+8.425m
Ex. BASEMENT S.S.L.+3.835m
Ex. BASEMENT S.S.L.+2.785m
WSL COLUMN REFERENCE
COLUMN GRID LOCATION
UNDERSIDE OFBASEPLATE LEVEL.
BASEPLATE TYPE
UNDERSIDE OFBASEPLATE LEVEL.
BASEPLATE TYPE
C01 ISSUED FOR T1 STEELWORK TENDER10.09.14 SKD
A=27
50 kN
A=29
00kN
A=40
50kN
A=48
50 kN
A=40
00 kN
A=32
00 kN
A=27
00 kN
A=20
50 kN
A=12
50 kN
A=39
00 kN
A=32
50 kN
A=26
50 kN
A=20
00 kN
A=12
00 kN
SPLICE
SPLICE
SPLICE
SPLICE
SPLICE
A=23
50 kN
A=20
50 kN
A=16
00 kN
A=12
00 kN
A=75
0 kN
A=30
00 kN
A=28
50 kN
A=22
00 kN
A=17
50 kN
A=11
00 kN
V=80
0kN
A=29
00kN
V=80
0kN
A=48
00kN
V=60
0kN
A=39
00kN
A=30
00 kN
A=27
00 kN
A=22
00 kN
A=17
50 kN
A=11
00 kN
A=40
00kN
A=30
00 kN
A=27
00 kN
A=22
00 kN
A=17
50 kN
A=11
00 kN
A=42
00kN
A=30
00 kN
A=27
00 kN
A=22
00 kN
A=17
50 kN
A=11
00 kN
A=39
00kN
A=30
50 kN
A=24
50 kN
A=19
50 kN
A=15
00 kN
A=95
0 kN
A=35
00kN
V=10
00kN
A=35
00kN
V=30
0kN
A=13
00 kN
A=90
0 kN
A=58
00 kN
A=50
00kN
V=12
00kN
A=60
00kN
V=12
00kN
A=60
00kN
V=10
0kN
A=50
00kN
V=11
00kN
A=50
00 kN
V=15
00kN
A=39
00 kN
A=32
00 kN
A=26
00 kN
A=19
50 kN
A=12
00 kN
V= SHEAR LOADA= AXIAL LOAD (COMPRESSION) AT SPLICE LOCATIONT= AXIAL LOAD (TENSION) ON CONNECTION
#= REFER TO TYPICAL DETAIL FOR SPLICE DETAILBETWEEN CHS CHANGE IN SERIAL SIZE ON DRG. STR-SA-23-0610
1/J 1/H-J 1/H-G 1/G 1/C 1/27 1/2-26 1/2-25 1/2-24 1/2-23 A/22 A/20 A/19 A/18 A/17 A/16
V=15
00kN
A=46
00kN
A=42
50kN
A=36
00kN
A=30
00kN
A=24
00kN
A=16
50kN
A=45
50kN
A=39
00kN
A=33
00kN
A=26
50kN
A=18
50kN
A=46
00kN
A=33
00kN
A=27
00kN
A=20
50kN
A=12
50kN
A=46
00kN
A=40
00kN
A=33
50kN
A=27
50kN
A=21
50kN
A=13
00kN
A=41
00kN
A=30
00kN
A=27
00kN
A=22
50kN
A=17
50kN
A=11
50kN
A=26
50kN
A=22
00kN
A=18
00kN
A=14
00kN
A=90
0kN
A=21
50kN
A=18
00kN
A=15
50kN
A=10
50kN
A=75
0kN
C02 ISSUED FOR T2 STEELWORK TENDER01.12.14 SKD
*= REFER TO SPLICE DETAIL WHERE PLATE GIRDER/UC ISLOCATED ABOVE CONCRETE FILLED CHS ON DWG;STR_SA_23_0610.
**= REFER TO SPLICE DETAIL WHERE CONCRETE FILLED CHS ISLOCATED ABOVE PLATE GIRDER/UC ON DRAWING;STR_SA_23_0610.
A=45
00 kN
A=28
00kN
A=31
00kN
FOR DETAILS OF CONCRETE ENCASED COLUMNS,REFER TO STR-SA-16-002 & STR-SA-21-0400
E01 STEEL CONSTRUCTION ISSUE UP TO GROUNDFLOOR ONLY19.12.14 SKD
E02 STEEL CONSTRUCTION ISSUE UP TO GROUNDFLOOR ONLY16.01.15 SKD
= REFER TO TYPICAL SPLICE DETAIL AT CHANGE IN H SECTIONCOLUMN WITHIN FLOOR DEPTH IE NOT AT SPLINE, ON DRAWINGSTR-SA-23-0610
+
E03 STEEL CONSTRUCTION ISSUE UP TO GROUNDFLOOR ONLY24.01.15 SKD
C
F
47B
Ex Basement SSL3.835 m
Lwr Ground SSL8.425 m
Ground SSL12.700 m
First SSL16.350 m
Second SSL20.100 m
Third SSL23.750 m
Fourth SSL27.400 m
Fifth SSL31.050 m
Sixth SSL34.700 m
Seventh SSL38.350 m
Eighth SSL42.000 m
Ninth SSL45.650 m
Roof SSL49.600 m
Upper Roof51.200 m
E
RHS13G
RHS13G
RHS22F
RHS22F
RHS22F
RHS22F
RHS22F
RHS22F
RHS28D
RHS28D
RHS28DRH
S28D
A= ±
1600
A= ± 1400
A= ± 1000
A= ± 900
A= ± 800
A= ± 700
A= ± 550
A= ± 550
A= ± 450
A= ± 450
A= ± 300
A= ± 300
A=± 850
A=± 800
A=± 725
A=± 650
A=± 500
A=± 500
A=± 400
A=± 400
A=± 300
A=± 300
A=± 225
A=± 150
A=± 100
A= ± 100
M=150 M=150
M=20
M=20
M=150 M=150
M=20
M=20
M=75 M=75
M=20
M=20
M=75 M=75
M=20
M=20
M=50 M=50
M=20
M=20
M=50 M=50
M=20
M=20
M=50 M=50
M=20
M=20
M=50 M=50
M=20
M=20
M=50 M=50
M=20
M=20
M=50 M=50
M=20
M=20
M=50 M=50
M=20
M=20
M=50 M=50
M=20
M=20
USBPL +2.145 m
RHS13H
Ex Basement SSL3.835 m
Lwr Ground SSL8.425 m
Ground SSL12.700 m
First SSL16.350 m
Second SSL20.100 m
Third SSL23.750 m
Fourth SSL27.400 m
Fifth SSL31.050 m
Sixth SSL34.700 m
Seventh SSL38.350 m
Eighth SSL42.000 m
Ninth SSL45.650 m
Roof SSL49.600 m
7
Upper Basement6.125 m
RHS13GRHS13G
RHS13G
RHS13GRHS22F
RHS22FRHS22F
RHS22FRHS28D
RHS28D
RHS28DRHS28D
A= ±1400
A= ±1000
A= ± 750
A= ± 750
A= ± 700
A= ± 700
A= ± 650
A= ± 650A= ± 600
A= ± 600
A= ± 450A= ± 450
A=± 600
A=± 550
A=± 500
A=± 500
A=± 450
A=± 450
A=± 400
A=± 400
A=± 300
A=± 350
A=± 350
A=± 200
M=100 M=100
M=50
M=50
M=100 M=100
M=100 M=100
M=100 M=100
M=75 M=75
M=75 M=75
M=75 M=75
M=75 M=75
M=75 M=75
M=50 M=50
M=50M=50
M=75 M=75
M=50M=50
M=50M=20
M=20M=20
M=20M=20
M=20M=20
M=20
M=50M=50
M=50M=20
M=20M=20
M=20M=20
M=20M=20
M=20
5A
5A
5A
5A
5A
5A
5A
5A
5A
5A
5A
5A
USBPL +2.145 m
5A
5A
Ex Basement SSL3.835 m
Lwr Ground SSL8.425 m
Ground SSL12.700 m
First SSL16.350 m
Second SSL20.100 m
Third SSL23.750 m
Fourth SSL27.400 m
Fifth SSL31.050 m
Sixth SSL34.700 m
Seventh SSL38.350 m
Eighth SSL42.000 m
Ninth SSL45.650 m
Roof SSL49.600 m
Upper Roof51.200 m
F E
Upper Basement6.125 m
LV Switch Room7.335 m
RHS28G
RHS28G
RHS28G
RHS28G RHS28GRHS28G
RHS28G RHS28GRHS28G
RHS28E
RHS28ERHS28E
RHS28E
RHS28ERHS28E
RHS28E
RHS28ERHS28E
RHS28E
RHS28ERHS28E
RHS22F RHS22FRHS22F
RHS22F RHS22FRHS22F
RHS22F RHS22FRHS22F
RHS22F RHS22FRHS22F
RHS13H
A=± 2
500 A=± 3900
A=± 2500
A=± 2500 A=± 2500
A=± 1000A=± 1000 A=± 1000
A=± 1000A=± 1000 A=± 1000
A=± 900 A=± 900 A=± 900
A=± 850A=± 850 A=± 850
A=± 750 A=± 750 A=± 750
A=± 700 A=± 700 A=± 700
A=± 600 A=± 600 A=± 600
A=± 500A=± 500
A=± 500
A=± 450A=± 450 A=± 450
A=± 350 A=± 450 A=± 350
A=± 350 A=± 350 A=± 350
A=± 50
A=± 3200
A=± 2000
A=± 1650
A=± 1500
A=± 1450
A=± 1350
A=± 1300
A=± 950
A=± 800
A=± 650
A=± 650
A=± 1300
A=± 1300
A=± 1200
A=± 1050
A=± 1000
A=± 800
A=± 700
A=± 550
A=± 450
A=± 400
A=± 100
M=150 M=250 M=250 M=200
M=150
M=150
M=150
M=150
M=150
M=150
M=150
M=150
M=150
M=150
M=150
M=100
M=100
M=50
M=50
M=50
M=50
M=50
M=50
M=20
M=20
M=20
M=20
M=100
M=100
M=100
M=100
M=50
M=50
M=50
M=50
M=50
M=20
M=20
M=20
M=20
M=50
M=50
M=50M=50
M=50M=50
M=50M=20
M=20M=20
M=20
M=50M=50
M=50M=50
M=50M=20
M=20M=20
M=20
M=20
M=20
M=200
M=200
M=200
M=200
M=200
M=200
M=175
M=175
M=150
M=150
M=150
M=50
USBPL +2.145 m
M=250 M=250
M=200 M=200
M=200 M=200
M=200 M=200
M=200 M=200
M=200 M=200
M=150 M=150
M=150 M=150
M=150 M=150
M=200 M=200
M=25 M=25
M=200 M=200
Ex Basement SSL3.835 m
Lwr Ground SSL8.425 m
Ground SSL12.700 m
First SSL16.350 m
Second SSL20.100 m
Third SSL23.750 m
Fourth SSL27.400 m
Fifth SSL31.050 m
Sixth SSL34.700 m
Seventh SSL38.350 m
Eighth SSL42.000 m
Ninth SSL45.650 m
Roof SSL49.600 m
Upper Roof51.200 m
6
Ex. SSL +3.385 m
Upper Basement6.125 m
RHS13G
RHS13G
RHS13GRHS22F
RHS22FRHS22F
RHS22F
RHS28DRHS28D
RHS28D
RHS28D
RHS13H
A=± 1800A=± 800
A=± 750A=± 750
A=± 700
A=± 700
A=± 600
A=± 600
A=± 500
A=± 500
A=± 500
A=± 50
A=± 150
A=± 350
A=± 350
A=± 350
A=± 400
A=± 400
A=± 450
A=± 450
A=± 500
A=± 500
A=± 525
A=± 600
M=100 M=100
M=100 M=100
M=75 M=75
M=75 M=75
M=75 M=75
M=75 M=75
M=50 M=50
M=50 M=50
M=50 M=50
M=50 M=50
M=50 M=50
M=50 M=50
M=25 M=25
M=50
M=50
M=50M=50
M=50
M=20
M=20
M=20
M=20
M=20
M=20
M=20
M=20M=20
M=50M=50
M=50
M=20M=20
M=20M=20
M=20M=20
M=20
USBPL +3.385 m
USBPL +2.145 m
A=± 50
Ex Basement SSL3.835 m
Lwr Ground SSL8.425 m
Ground SSL12.700 m
First SSL16.350 m
Second SSL20.100 m
Third SSL23.750 m
Fourth SSL27.400 m
Fifth SSL31.050 m
Sixth SSL34.700 m
Seventh SSL38.350 m
Eighth SSL42.000 m
Ninth SSL45.650 m
Roof SSL49.600 m
Upper Roof51.200 m
E
Upper Basement6.125 m
LV Switch Room7.335 m
RHS13H
RHS13GRHS13G
RHS13G
RHS13GRHS22F
RHS22F
RHS22F
RHS28DRHS28D
RHS28D
RHS28DRHS22F
A=± 1
000
A=± 7
50
A=± 600
A=± 575
A=± 500
A=± 475
A=± 425
A=± 375
A=± 300
A=± 300
A=± 250
A=± 225
A=± 100
A=± 400
A=± 400
A=± 350
A=± 350
A=± 325
A=± 325
A=± 250
A=± 250
A=± 200
A=± 200
A=± 175
A=± 150
A=± 50
M=150 M=150
M=150 M=150
M=100 M=100
M=100 M=100
M=75 M=75
M=75 M=75
M=75 M=75
M=50 M=50
M=50 M=50
M=50 M=50
M=50 M=50
M=50 M=50
M=25 M=25
M=50
M=50M=50
M=50M=50
M=50M=50
M=50M=20
M=20
M=20M=20
M=20M=20
M=20M=20
M=20
M=20M=20
M=20M=20
M=20M=20
M=20
M=20
M=20
USBPL +3.385 m
REFER TO WSL ENABLING WORKSDRG. STR-SA-83-0801FOR DETAILS OF RC SLAB IN THIS AREA.
Ex Basement SSL3.835 m
Lwr Ground SSL8.425 m
Ground SSL12.700 m
First SSL16.350 m
Second SSL20.100 m
Third SSL23.750 m
Fourth SSL27.400 m
Fifth SSL31.050 m
Sixth SSL34.700 m
Seventh SSL38.350 m
Eighth SSL42.000 m
Ninth SSL45.650 m
Roof SSL49.600 m
Upper Roof51.200 m
D
Upper Basement6.125 m
RHS13GRHS13G
RHS13GRHS13G
RHS22FRHS22F
RHS22FRHS22F
RHS28DRHS28D
RHS28DRHS28D
RHS13H
A=± 1600
A=± 1400A=± 1050
A=± 950A=± 800
A=± 800A=± 650
A=± 650A=± 475
A=± 475A=± 425
A=± 275
A=± 75
A=± 50
A=± 150
A=± 225
A=± 250
A=± 250
A=± 350
A=± 350
A=± 425
A=± 425
A=± 500
A=± 550
A=± 675
A=± 775M=150 M=150
M=150 M=150
M=150 M=150
M=100 M=100
M=100 M=100
M=75 M=75
M=75 M=75
M=75 M=75
M=50 M=50
M=50 M=50
M=50 M=50
M=50 M=50
M=25 M=25
M=50
M=50
M=50M=50
M=50M=20
M=20M=20
M=20M=20
M=20M=20
M=20
M=20M=20
M=50M=50
M=50M=20
M=20M=20
M=20M=20
M=20M=20
M=20
Ex Basement SSL3.835 m
Lwr Ground SSL8.425 m
Ground SSL12.700 m
First SSL16.350 m
Second SSL20.100 m
Third SSL23.750 m
Fourth SSL27.400 m
Fifth SSL31.050 m
Sixth SSL34.700 m
Seventh SSL38.350 m
Eighth SSL42.000 m
Ninth SSL45.650 m
Roof SSL49.600 m
Upper Roof51.200 m
E
Upper Basement6.125 m
LV Switch Room7.335 m
2335
1035
RHS13GRHS13G
RHS13GRHS13G
RHS22FRHS22F
RHS22FRHS22F
RHS28DRHS28D
RHS28DRHS28D
RHS13H
A=± 1400A=± 1700
A=± 1050A=± 950
A=± 800A=± 800
A=± 625A=± 625
A=± 425A=± 425
A=± 275A=± 275
A=± 100
A=± 50
M=150 M=150
M=150 M=150
M=150 M=150
M=150 M=150
M=150 M=150
M=150 M=150
M=100 M=100
M=100 M=100
M=75 M=75
M=75 M=75
M=50 M=50
M=50 M=50
M=25 M=25
M=50
M=50
M=50M=50
M=50M=50
M=50M=20
M=20M=20
M=20M=20
M=20
M=20
M=20
M=20M=20
M=20M=20
M=20M=20
M=50M=50
M=50M=50
M=50
USBPL +3.385 m
A=± 750
A=± 675
A=± 550
A=± 500
A=± 425
A=± 425
A=± 325
A=± 325
A=± 225
A=± 225
A=± 150
A=± 150
Ex Basement SSL3.835 m
Lwr Ground SSL8.425 m
Ground SSL12.700 m
First SSL16.350 m
Second SSL20.100 m
Third SSL23.750 m
Fourth SSL27.400 m
Fifth SSL31.050 m
Sixth SSL34.700 m
Seventh SSL38.350 m
Eighth SSL42.000 m
Ninth SSL45.650 m
Roof SSL49.600 m
5 4
RHS22F
RHS22F
RHS22F
RHS22F
RHS28E
RHS28E
RHS28E
RHS28E
RHS28G
RHS28G
RHS28G
RHS28G
RHS22FRHS22F
RHS22FRHS22F
RHS28ERHS28E
RHS28ERHS28E
RHS28GRHS28G
RHS28GRHS28G
A=± 1600
A=± 1400
A=± 800 A=± 600
A=± 700 A=± 500
A=± 1400
A=± 1100
A=± 600 A=± 425
A=± 1000 A=± 850
A=± 600 A=± 425
A=± 800
A=± 725
A=± 500 A=± 350
A=± 800
A=± 725
A=± 500 A=± 350
A=± 700
A=± 500
A=± 425 A=± 325
A=± 700
A=± 550
A=± 425 A=± 325
A=± 575
A=± 375A=± 300 A=± 250
A=± 575
A=± 375
A=± 300 A=± 250
A=± 450
A=± 250
A=± 250 A=± 225
A=± 450
A=± 250
A=± 150 A=± 150
A=± 400
A=± 225
M=50 M=100 M=100 M=50
M=50 M=100 M=100 M=50
M=50 M=100 M=100 M=50
M=50 M=100 M=100 M=50
M=50 M=100 M=100 M=50
M=50 M=100 M=100 M=50
M=50 M=100 M=100 M=50
M=50 M=75 M=75 M=50
M=50 M=75 M=75 M=50
M=50 M=75 M=75 M=50
M=50 M=75 M=75 M=50
M=20 M=50 M=50 M=20
M=50
M=50
M=50
M=50
M=50
M=50
M=50
M=50
M=50M=50
M=50
M=50
M=20
M=20
M=20
M=20
M=20
M=20
M=20
M=20
M=20
M=20
M=20
M=20
M=20
M=20
M=20
M=20
M=20
M=20
M=20
M=20M=20
M=20M=20
M=20M=20
M=20M=20
M=20
M=20M=20
M=20M=20
M=20M=20
M=20M=20
USBPL SSL +3.860 m
N
H
J
K
P
B
A
C
E G
F
L M
Daterman
Scales @ A0
Drawn By
Designed By Checked By
Date
Project No
Drawing Status
Client
Title
Project
Amendments
DescriptionRev Date By
GENERAL NOTES
Works Order No
Pickfords Wharf Clink Street London SE1 9DGUnited Kingdom
t +44 20 7928 7888 f +44 3333 444 [email protected] www.watermangroup.com
This drawing should not be scaled. Dimensions to be verified on site.Any discrepancies should be referred to the Engineer prior to work being put in hand.This drawing is the property of Waterman Structures Limited and the drawing is issued
on the condition that it is not copied, reproduced, retained or disclosed to anyunauthorised person, either wholly or in part without the consent in writing of
Waterman Structures LimitedPickfords Wharf Clink Street London SE1 9DG United Kingdom
t +44 20 7928 7888 f +44 3333 444 501
Publisher Zone Category Number Revision
As indicated
33 KING WILLIAM STREET
OR JPT
MRA/SKD JULY 2014
H.B.REAVIS UK Ltd
BRACING ELEVATIONSSHEET 1 of 3
CONSTRUCTIONSTR10614
Cen
tral:-
\\Nt-l
ncs\
wsl
\Pro
ject
s\ST
R10
614\
CAD
\3D
\WSL
Mod
els\
WSL
-106
14-S
A-33
KWS
- C
entra
l.rvt
0500SA 22 E03STR
BRACING ELEVATION 'A' BRACING ELEVATION 'B' BRACING ELEVATION 'C' BRACING ELEVATION 'D' BRACING ELEVATION 'E' BRACING ELEVATION 'F' BRACING ELEVATION 'G' BRACING ELEVATION 'H'
KEY PLAN
1 : 100
B01 STAGE D28.07.14 MRA
C01 ISSUED FOR T1 STEELWORK TENDER10.09.14 SKD
RHS Beam Schedule
Beam Ref Description Shear (kN)
RHS13G 200x150x10 RHS 200RHS13H 200x100x12.5 RHS 200RHS22F 300x200x10 RHS 200RHS28D 400x200x10 RHS 200RHS28E 400x200x12.5 RHS 200RHS28G 400x200x16 RHS 200
C02 ISSUED FOR T2 STEELWORK TENDER01.12.14 SKD
E01 STEEL CONSTRUCTION ISSUE UP TO GROUNDFLOOR ONLY19.12.14 MRA
E02 STEEL CONSTRUCTION ISSUE UP TO GROUNDFLOOR ONLY16.01.15 MRA
E03 STEEL CONSTRUCTION ISSUE UP TO GROUNDFLOOR ONLY23.01.15 SKD